PUTZMEISTER BOOM PUMPS WORKING ATBANGALORE METRO PROJECT, BANGALORE
JOB SITE REPORT
About BMRCL :Bangalore Metro Rail Corporation Ltd (BMRCL) is a jointventure between Govt. of India and Govt. of Karnataka
sharing the responsibility of implementation of BangaloreMetro Rail Project. It is named as Namma Metro.
Phase I metro project started(Civil work) in June2007 .Theestimated cost of project is Rs 11609 Cr.
Namma Metro phase-I network consist of two corridors :East-West and North South.
Project highlights: Project Routes -East-West Corridor (Purple Line): Baippanahalli station to
Mysore road Terminal - 18.10 KmsNorth-South Corridor (Green Line): Nagasandra station to
Puttenahalli - 24.20 KMS
Total KMS in Phase I: 42.30 KMSElevated section - 33.48 KMSUnder Ground Section - 8.82 KMS
No. of Station - 40 ( 33 Elevated and 7 under ground)
PCM JSR1029 12.09.2012/Bangalore Metro/Page 1
-
7/29/2019 Bengaluru Metro Project
2/7
Section Line Route
Reach-1 East Line Cricket stadium to Baiappanahalli -6.7 kms
Reach-2 West Line Leprocy hospital to Mysore Road-6.4 kms
Reach-3 North Line Sampige Road to yeshwantpur -5.1 kms
Reach -3A First North ext. Line Yeshwantpur to Peenya ind -4.8kms
Reach -3B Second North ext. Line Peenya Ind to Nagasandra-2.5 kms
Reach-4 South Line National college to R V Road-4.1 kms
Reach-4A South Ext. Line R V road to Puttenahalli -3.9 kms
UG-1 N-S Underground Line Sampige and National College-4 kms
- - -
Reach and Routes:
For the implementation and execution of the project, four elevated stretches are called Reaches
& are identified so for convenience purpose. Also there are two underground sections are
connecting Reach -1 and Reach-2 in East-West Corridor and Reach-3 & Reach-4 in North-South
Corridor respectively. Each Reach has been given to a contractor for execution of the project.
The details of Reaches are as under.
JOB SITE REPORT
.
PCM JSR1029 12.09.2012/Bangalore Metro/Page2
-
7/29/2019 Bengaluru Metro Project
3/7
BMRCL has distributed the works to select best contractors based on their expertise in execution ofproject -
1) Building of Elevated structure.2) Building railway station.
3) Rail tracking construction4) Underground Tunnel construction.
Methods used for concreting:
1)Viaduct (Elevated structure): Basically using precast structure for segment, girders, pier cap etc. Eachsegment requires 20 cu.m. concrete and I- girder is required 17 cum.
2)Station building : Using precast and slab by concreting.3)Under ground tunnel: Using precast for tunnel rings. Tunnel concreting by shotcrete.
4)Track laying : Concrete is required to make plinth construction and track bed construction insidetunnel.All the above application require high grade concrete: M40,M50,M60
JOB SITE REPORT
PCM JSR1029 12.09.2012/Bangalore Metro/Page3
Market share of Putzmeister Boom
Pumps is around 70-80 % in this project.
BMRCL project of R-3A for Elevatedstructure for 5.1 KMS. Putzmeister Boompump model BSF 36.09 is being used for pre-
casting and concreting piers & piers caps.
Boom Pump details :Pump commissioned on :19/08/2010
Pumping hrs : 1092 hrsConcrete done : 45,000 Cu.m.Concrete grade used : M40, M50
Almost done 1100 segments and 1000 nos.I-Girders by using this machine.
Each segment will have 20 cum concrete and
each I-Girder will have 17 cum concrete.
P&M - Incharge is extremely satisfied withthe performance of the machine and
completing his project as per stipulatedtimeline.
-
7/29/2019 Bengaluru Metro Project
4/7
BMRCL project of 3 nos. station in R-3, 3 nos
station in R-3A, 3 nos. Stations in R-4. PutzmeisterBoom Pump being used basically for building
Station and for placing concrete at 3 level and fordifferent structure. All station locations are highlycongested due to traffic & placing concrete is a big
challenge.
Machine working at Yeshwantpur Station
JOB SITE REPORT
Boom pump working for placing concrete at Peenya station.
Pump commissioned : 2006
Shifted to this site : March 2009Pumping hrs : 1800 hrs
Concrete done : 52,000 Cum
Cumulative (since from purchase) concrete done :above 1,00,000 CUMConcrete Grade used in this project : M40,M50Mostly this machine is being used for placing the
concrete for station construction.P&M - Head is satisfied with the performance of
the machine & is confident of completing theproject as per schedule. Also, he has appreciated
the service support extended during concretingeven at night.
PCM JSR1029 12.09.2012/Bangalore Metro/Page4
Putzmeister Boom Pumps working in different phases of Bangalore Metro Project
-
7/29/2019 Bengaluru Metro Project
5/7
BMRCL project of R- 4A in which 4 km elevated structure and 3 nos. stations and R-3B in which 3.8 kmselevated structure and 3 nos. stations. The machine is used for precast application and placing concrete atelevated structures wherever required and to build a station.
Boom Pump details :
Pump commissioned on : 5/12/2010Pumping hrs : 1200 hrs
Concrete done : 45,000 CumConcrete Grade used in this project : M40,M50,M60Casting concrete Grade : M50
P&M- Head has mentioned that PM machine performance is up to his satisfaction.
JOB SITE REPORT
Casting yard done by Putzmeister Boom Pumps
Machine working for Precast at site
PCM JSR1029 12.09.2012/Bangalore Metro/Page5
-
7/29/2019 Bengaluru Metro Project
6/7
Underground Tunnel project of total
length 4.9 KMS. Constructing 4nosunderground stations in East-West
line. Project has started and almost3KM tunnel has been completed.Brief project details are as under:
Tunnel length: 4.9 KMS and Tunneldiameter is 5.9 meter.
Underground depth: 35 meter
No. of under ground stations: 4 nos.Tunnel Rings : Rings are pre-castedin different segment.
They are using our boom pump forplacing concrete at tunnel opening,pathways, sidewall construction etc.
JOB SITE REPORT
Machine details :1)Model : BSF 32.09
This machine was shifted from other project.Commissioned on :18.06.2008Concrete done so far :63000 CUM
Concrete done for this project : 15,000 CUMPumping Hours : 1392 Hrs.
2) Model :BSF 36.09
Machine shifted from other project.Machine Commissioned on:12.04.2009Concrete done so far: 40,000 CUM
Concrete done for this Project: 15000 CUMTotal Pumping Hours done: 1068 hrs.
Concrete Grade Pumped: M25.M35
Tunnel insde view.Tunnel near Chinnaswamy stadium station.Boom pump placing concrete
ac ne wor ng or p ac ng concre ng or unne ng
PCM JSR1029 12.09.2012/Bangalore Metro/Page6
-
7/29/2019 Bengaluru Metro Project
7/7
Underground Tunnel project of total length4kms Constructing 3 nos. underground
stations in North-South line. Project hasstarted and Tunnel work not yet started.
Brief project details are as under.Tunnel length :4.0 KMS & Tunnel diameter
is 5.9 meter.Underground depth: 35 meter
No of under ground stations: 3 nos.Tunnel Rings : Rings are pre-casted in
different segments.They are using Putzmeister boom pump forconcrete placing in tunnel opening,
pathways, sidewall construction etc.
JOB SITE REPORT
Tunneling Site
Machine details:
Model :BSF 36.09Machine commissioned on: June 2012
Concrete done : 500 CUMPumping hrs :12 hrs .
This pump started using fromSeptember 2012 onwards only
Full view of Boom Pump.
PCM JSR1029 12.09.2012/Bangalore Metro/Page7