beta leed-cs 2.0 certification submittal template mr

7
LEED-CS 2.0 Certification Submittal Template MR Credit 4.1/4.2: Recycled Content: 10%/20% (post-consumer + 1/2 pre-consumer) BETA I, , from verify that the information provided below is accurate, to the best of my knowledge. (Company Name) (Responsible Individual) SELECT OPTION Please select the appropriate option to determine the Total Materials Cost Option 1: Default Materials Value: Based on the total construction costs (hard costs for CSI Master Format 1995 Divisions 2-10 only) Option 2: Actual Materials Value: Based on actual materials cost (hard costs for CSI Master Format 1995 Divisions 2-10 only) Option 3: Tenant Lease / Sales Agreement: A sufficient amount of tenant scope for this LEED-CS project is obligated, as described below, to comply with the specific requirements of this credit by a binding lease/sales agreement. DEFAULT MATERIALS VALUE Enter the total construction costs (hard costs for CSI Master Format 1995 Divisions 2-10 only )* Default materials cost (total construction cost * 0.45) ACTUAL MATERIALS VALUE Enter the actual materials cost (excluding labor and equipment) (hard costs for CSI Master Format 1995 Divisions 2-10 only)*

Upload: others

Post on 16-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

I, , from

verify that the information provided below is accurate, to the best of my knowledge.

(Company Name)(Responsible Individual)

SELECT OPTION

Please select the appropriate option to determine the Total Materials Cost

Option 1: Default Materials Value: Based on the total construction costs(hard costs for CSI Master Format 1995 Divisions 2-10 only)

Option 2: Actual Materials Value: Based on actual materials cost(hard costs for CSI Master Format 1995 Divisions 2-10 only)

Option 3: Tenant Lease / Sales Agreement: A sufficient amount of tenant scope for this LEED-CS project is obligated,as described below, to comply with the specific requirements of this credit by a binding lease/sales agreement.

DEFAULT MATERIALS VALUE

Enter the total construction costs(hard costs for CSI Master Format 1995 Divisions 2-10 only )*

Default materials cost (total construction cost * 0.45)

ACTUAL MATERIALS VALUE

Enter the actual materials cost (excluding labor and equipment)(hard costs for CSI Master Format 1995 Divisions 2-10 only)*

Page 2: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

CREDIT COMPLIANCE

Enter the material descriptions and their corresponding recycled content information in the table below.The combined post-consumer and pre-consumer recycled percentage should not be greater than 100%.

*For cost values do not use commas and enter numbers only i.e. enter 100000 for $100,000

MaterialCost*

($)ManufacturerMaterial Name

Post-ConsumerRecycled

Content (%)

Pre-ConsumerRecycled

Content (%)

Recycled ContentInformation

Source

Core and ShellScope OR

Tenant Scope

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

Page 3: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

MaterialCost*

($)ManufacturerMaterial Name

Post-ConsumerRecycled

Content (%)

Pre-ConsumerRecycled

Content (%)

Recycled ContentInformation

Source

Core and ShellScope OR

Tenant Scope

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

Page 4: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

MaterialCost*

($)ManufacturerMaterial Name

Post-ConsumerRecycled

Content (%)

Pre-ConsumerRecycled

Content (%)

Recycled ContentInformation

Source

Core and ShellScope OR

Tenant Scope

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

CS Tenant

Page 5: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

Recycled Content Calculations

Total value ($) of post-consumer content

Total combined recycled content value ($): post-consumer + 1/2 pre-consumer

Total value ($) of pre-consumer content

Combined Recycled Content Value as a percentage of Total Materials Cost** %

**To qualify for the credit the percentage of recycled content (post-consumer +1/2 pre-consumer must be at least 10% of the total materials cost

Please check whether using Default Materials or Actual Materials

TENANT LEASE / SALES AGREEMENT

100% of the leased or sold square footage complies with the credit requirements.

100% of the unleased or unsold square footage shall comply with the credit requirements.

I have provided the appropriate supporting documents in the document upload section of LEED Online.Please refer to the above sheets.

A copy of the tenant sales/lease agreement(s) have been uploaded. A statement from the developer/owner that all leasesand/or sales agreements will comply has also been provided.

SUPPORTING DOCUMENTATION

Sheet Description LogPlease include the file name and file description for each uploaded document.

Page 6: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

DEFAULT MATERIALS VALUE

Enter the total core and shell construction costs(hard costs for CSI Master Format 1995 Divisions 2-10 only )*

Default materials cost ((total core andshell costs + estimated tenant total costs) * 0.45)

Enter the estimated tenant total construction costs.

Total tenant construction square footage:

Cost per square foot (for tenant construction scope):

ACTUAL MATERIALS VALUE

Enter the actual core and shell materials cost (excluding labor and equipment)(hard costs for CSI Master Format 1995 Divisions 2-10 only)*

Enter the estimated tenant total construction costs.

Total tenant construction square footage:

Cost per square foot (for tenant construction scope):

Page 7: BETA LEED-CS 2.0 Certification Submittal Template MR

LEED-CS 2.0 Certification Submittal TemplateMR Credit 4.1/4.2: Recycled Content:

10%/20% (post-consumer + 1/2 pre-consumer)BETA

NARRATIVE (Optional)

Please provide any additional comments or notes regarding special circumstances or considerations regarding theproject's credit approach.

The project is seeking point(s) for this credit using an alternate compliance approach. The compliance approach,including references to any applicable Credit Interpretation Rulings is fully documented in the narrative above. (Indicatethe number of points documented in the field below).

Alternative Compliance Points Documented

Credit: Points Documented:

Project Name:

First Name Last Name

READY TO SAVE THIS TEMPLATE TO LEED-ONLINE? Please enter your first name, last name and today's date below, followed by yourLEED-Online Username and Password associated with the Project listed above to confirm submission of this template.

Date Username (Email Address) Password

Letter Template Version