bid form - dot.state.tx.us by: state: zip code: fax: txdot csj no. 17hgrckpt bid form email address:...

23
Bid by: State: Zip Code: Fax: TxDOT CSJ No. 17HGRCKPT Bid Form Email Address: Telephone: City: Address: Name of Bidder: Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar. Schedule 1B Alternate Bid No. 1: Construct P-401 asphalt pavement section in lieu of P-501 concrete pavement section. Schedule 2 Alternate Bid No. 3: Provide and install all plumbing fixtures and accessories for shop area. (100% Local Funded) Schedule 2 Alternate Bid No. 6: Finish concrete foundation floor with polished concrete finish. (100% Local Funded) Schedule 2 Alternate Bid No. 7: Additional paint coating on bottom hangar panels. (100% Local Funded) Project: Aransas County Airport - 2017 Hangar Project Schedule 2 Alternate Bid No. 2: Provide and install HVAC system for shop area. (100% Local Funded) Schedule 1A Alternate Bid No. 1: Construct TxDOT 340 asphalt pavement section in lieu of TxDOT 360 concrete pavement section. Pursuant to the foregoing Instruction to Bidders, the undersigned bidder having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all the conditions surrounding the construction of the project hereby proposes to furnish all necessary superintendence, labor, machinery, equipment, tools materials and supplies to complete all the work upon which is bid in accordance with the contract documents, within the time set forth and at the prices stated below. Project Description: To the Texas Department of Transportation hereinafter called the Agent. Schedule 2 Base Bid: Construct box hangar. Schedule 2 Alternate Bid No. 1: Construct shop shell for office/storage/restroom areas including doors, windows, lighting and electrical components with wiring. (100% Local Funded) Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded) Schedule 2 Alternate Bid No. 5: Galvanize all hangar structural steel. (100% Local Funded) Schedule 1B Base Bid: Construct P-501 concrete apron pavement for box hangar. P-1

Upload: lamquynh

Post on 24-Mar-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Bid by:

State: Zip Code:

Fax:

TxDOT CSJ No. 17HGRCKPT

Bid Form

Email Address:

Telephone:

City:

Address:

Name of Bidder:

Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar.

Schedule 1B Alternate Bid No. 1: Construct P-401 asphalt pavement section in lieu of P-501

concrete pavement section.

Schedule 2 Alternate Bid No. 3: Provide and install all plumbing fixtures and accessories for shop

area. (100% Local Funded)

Schedule 2 Alternate Bid No. 6: Finish concrete foundation floor with polished concrete finish.

(100% Local Funded)

Schedule 2 Alternate Bid No. 7: Additional paint coating on bottom hangar panels. (100% Local

Funded)

Project: Aransas County Airport - 2017 Hangar Project

Schedule 2 Alternate Bid No. 2: Provide and install HVAC system for shop area. (100% Local

Funded)

Schedule 1A Alternate Bid No. 1: Construct TxDOT 340 asphalt pavement section in lieu of

TxDOT 360 concrete pavement section.

Pursuant to the foregoing Instruction to Bidders, the undersigned bidder having examined the plans and

specifications with related documents and the site of the proposed work, and being familiar with all the

conditions surrounding the construction of the project hereby proposes to furnish all necessary

superintendence, labor, machinery, equipment, tools materials and supplies to complete all the work upon

which is bid in accordance with the contract documents, within the time set forth and at the prices stated

below.

Project Description:

To the Texas Department of Transportation hereinafter called the Agent.

Schedule 2 Base Bid: Construct box hangar.

Schedule 2 Alternate Bid No. 1: Construct shop shell for office/storage/restroom areas including

doors, windows, lighting and electrical components with wiring. (100% Local Funded)

Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

Schedule 2 Alternate Bid No. 5: Galvanize all hangar structural steel. (100% Local Funded)

Schedule 1B Base Bid: Construct P-501 concrete apron pavement for box hangar.

P-1

dollars and

cents.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

linear foot.

dollars and

cents per

linear foot.

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

1A.3 160

Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar.

$ $

$ $

TxDOT 506. Construction exit

(install), complete in place for the

unit price of

1A.1 1 LS Section 105. Mobilization, complete

in place for the lump sum amount of

$

1A.2 160 SY

SY TxDOT 506. Construction exit

(remove), complete in place for the

unit price of

$

1A.5 1,015 LF TxDOT 506. Temporary sediment

control fence (remove), complete in

place for the unit price of

$ $

1A.4 1,015 LF TxDOT 506. Temporary sediment

control fence (install), complete in

place for the unit price of

$ $

P-2

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

linear foot.

dollars and

cents per

linear foot.

dollars and

cents per

linear foot.

dollars and

cents.

dollars and

cents per

square yard.

1A.10 2,515 SY

1A.7 255 LF SS-G-700. Remove and dispose of

existing barbed wire fencing,

complete in place for the unit price of

$ $

1A.6 140 LF SS-G-700. Remove and dispose of

existing chain-link fencing, complete

in place for the unit price of

$ $

1A.9 1 LS SS-G-700. Remove and salvage

existing fire hydrant, complete in

place for the lump sum amount of

$ $

1A.8 270 LF SS-G-700. Remove and dispose of

existing water line, complete in place

for the unit price of

$ $

$ $

P-101. Remove and dispose of

existing asphalt pavement, complete

in place for the unit price of

P-3

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

cubic yard.

dollars and

cents per

cubic yard.

dollars and

cents per

cubic yard.

dollars and

cents per

square yard.

dollars and

cents per

ton.

20 TON TxDOT 275. Cement (10% by

weight), complete in place for the unit

price of

$ $

$ $

1A.15

1A.14 670 SY TxDOT 275. Cement treatment

(existing material)(6-inch thick),

complete in place for the unit price of

$

1A.11 100 CY P-152. Unclassified excavation,

complete in place for the unit price of

$

$

1A.13 200 CY P-152. Stockpiled material, complete

in place for the unit price of

$ $

1A.12 140 CY P-152. Drainage excavation, complete

in place for the unit price of

$

P-4

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

$ $

1A.19 27 SY P-610. Concrete hangar header (3-

foot wide), complete in place for the

unit price of

$ $

1A.18 36 SY TxDOT 360. Reinforced concrete

flume (6-inch thick), complete in

place for the unit price of

$ $

1A.17 514 SY TxDOT 360. Reinforced concrete

pavement (joint reinforced)(6-inch

thick), complete in place for the unit

price of

1A.16 150 SY Special. Recycled asphalt driveway (6-

inch thick), complete in place for the

unit price of

$ $

$ $

1A.20 25 SY P-610. Concrete sidewalk (5-foot

wide)(5-inch thick), complete in place

for the unit price of

P-5

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

square foot.

dollars and

cents per

square foot.

dollars and

cents per

linear foot.

dollars and

cents per

each.

dollars and

cents.

1A.25 1 LS 33 11 13. Install salvaged fire hydrant

and install new fire hydrant lead,

complete in place for the lump sum

amount of

$ $

1A.24 2 EA D-752. 4:1 safety end treatment (18-

inch RCP), complete in place for the

unit price of

$ $

1A.23 30 LF D-701. 18-inch reinforced concrete

pipe (Class III), complete in place for

the unit price of

$ $

1A.22 98 SF P-620. Permanent taxiway painting

(black), complete in place for the unit

price of

$ $

1A.21 95 SF P-620. Permanent taxiway painting

(yellow), complete in place for the

unit price of

$ $

P-6

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

linear foot.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

mega gallon.

1A.29 6,120 SY TxDOT 164. Cellulose fiber mulch

seeding (perm)(rural)(sand), complete

in place for the unit price of

$

1A.30 280 MG TxDOT 168. Vegetative watering,

complete in place for the unit price of

$ $

$

1A.27 6,120 SY TxDOT 164. Broadcast seeding

(temp)(warm), complete in place for

the unit price of

$ $

1A.28 6,120 SY TxDOT 164. Broadcast seeding

(temp)(cool), complete in place for

the unit price of

$ $

1A.26 515 LF 33 11 13. Install new water service

line (including meters), complete in

place for the unit price of

$ $

P-7

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

square yard.

dollars and

cents per

cubic yard.

dollars and

cents per

square yard.

dollars and

cents per

ton.

Total Schedule 1A Base Bid $

1A.31 1,860 SY TxDOT 169. Soil retention blankets

(Class 2)(Ty F), complete in place for

the unit price of

$ $

SY TxDOT 247. Flexible base

(compacted in place)(7-inch thick)(Ty

A, Gr 1-2), complete in place for the

unit price of

$ $

Schedule 1A Alternate Bid No. 1: Construct TxDOT 340 asphalt pavement section in lieu of TxDOT 360

concrete pavement section.

DeductionDeduct the total price of Schedule 1A Base Bid Items 1A.17 and

1A.22. $

S1A-A1.1 120 CY P-152. Unclassified excavation,

complete in place for the unit price of

$ $

S1A-A1.2 625

S1A-A1.3 130 TON TxDOT 340. Dense-graded HMA

(SQ)(TY D)(SAC B)(PG70-22)(4.5-

inch thick), complete in place for the

unit price of

$ $

P-8

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

gallon.

dollars and

cents per

pound.

dollars and

cents.

dollars and

cents per

square yard.

Schedule 1B Base Bid: Construct P-501 concrete apron pavement for box hangar.

1B.1 1 LS Section 105. Mobilization, complete

in place for the lump sum amount of

$ $

1B.2 160 SY TxDOT 506. Construction exit

(install), complete in place for the

unit price of

$ $

S1A-A1.4 125 GAL P-602. Prime coat (MC-30 @ 0.20

gal/sy), complete in place for the unit

price of

$ $

Total Schedule 1A Alternate Bid No. 1 $

S1A-A1.5 2 LB P-602. Sterilant (soil sterilant @ 15

lbs/acre), complete in place for the

unit price of

$ $

P-9

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

square yard.

dollars and

cents per

linear foot.

dollars and

cents per

linear foot.

dollars and

cents per

linear foot.

dollars and

cents per

linear foot.

1B.3 160 SY TxDOT 506. Construction exit

(remove), complete in place for the

unit price of

$ $

1B.5 1,015 LF TxDOT 506. Temporary sediment

control fence (remove), complete in

place for the unit price of

$ $

1B.4 1,015 LF TxDOT 506. Temporary sediment

control fence (install), complete in

place for the unit price of

$ $

1B.7 255 LF SS-G-700. Remove and dispose of

existing barbed wire fencing,

complete in place for the unit price of

$ $

1B.6 140 LF SS-G-700. Remove and dispose of

existing chain-link fencing, complete

in place for the unit price of

$ $

P-10

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

linear foot.

dollars and

cents.

dollars and

cents per

square yard.

dollars and

cents per

cubic yard.

dollars and

cents per

cubic yard.

1B.9 1 LS SS-G-700. Remove and salvage

existing fire hydrant, complete in

place for the lump sum amount of

$ $

1B.8 270 LF SS-G-700. Remove and dispose of

existing water line, complete in place

for the unit price of

$ $

1B.11 100 CY P-152. Unclassified excavation,

complete in place for the unit price of

$ $

1B.10 2,515 SY P-101. Remove and dispose of

existing asphalt pavement, complete

in place for the unit price of

$ $

1B.12 140 CY P-152. Drainage excavation, complete

in place for the unit price of

$ $

P-11

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

cubic yard.

dollars and

cents per

square yard.

dollars and

cents per

ton.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

1B.13 200 CY P-152. Stockpiled material, complete

in place for the unit price of

$ $

1B.15 20 TON P-301. Cement (10% by weight),

complete in place for the unit price of

$ $

1B.14 670 SY P-301. Cement treatment (existing

material)(6-inch thick), complete in

place for the unit price of

$ $

1B.17 514 SY P-501. Reinforced concrete pavement

(joint reinforced)(6-inch thick),

complete in place for the unit price of

$ $

1B.16 150 SY Special. Recycled asphalt driveway (6-

inch thick), complete in place for the

unit price of

$ $

P-12

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

square foot.

dollars and

cents per

square foot.

1B.19 27 SY P-610. Concrete hangar header (3-

foot wide), complete in place for the

unit price of

$ $

1B.18 36 SY P-501. Reinforced concrete flume (6-

inch thick), complete in place for the

unit price of

$ $

1B.21 95 SF P-620. Permanent taxiway painting

(yellow), complete in place for the

unit price of

$ $

1B.20 25 SY P-610. Concrete sidewalk (5-foot

wide)(5-inch thick), complete in place

for the unit price of

$ $

1B.22 98 SF P-620. Permanent taxiway painting

(black), complete in place for the unit

price of

$ $

P-13

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

linear foot.

dollars and

cents per

each.

dollars and

cents.

dollars and

cents per

linear foot.

dollars and

cents per

square yard.

1B.23 30 LF D-701. 18-inch reinforced concrete

pipe (Class III), complete in place for

the unit price of

$ $

1B.25 1 LS 33 11 13. Install salvaged fire hydrant

and install new fire hydrant lead,

complete in place for the lump sum

amount of

$ $

1B.24 2 EA D-752. 4:1 safety end treatment (18-

inch RCP), complete in place for the

unit price of

$ $

1B.27 6,120 SY TxDOT 164. Broadcast seeding

(temp)(warm), complete in place for

the unit price of

$ $

1B.26 515 LF 33 11 13. Install new water service

line (including meters), complete in

place for the unit price of

$ $

P-14

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

square yard.

dollars and

cents per

square yard.

dollars and

cents per

mega gallon.

dollars and

cents per

square yard.

Schedule 1B Alternate Bid No. 1: Construct P-401 asphalt pavement section in lieu of P-501 concrete pavement

section.

DeductionDeduct the total price of Schedule 1B Base Bid Items 1B.17 and

1B.22. $

$

1B.31 1,860 SY TxDOT 169. Soil retention blankets

(Class 2)(Ty F), complete in place for

the unit price of

$ $

1B.30 280 MG TxDOT 168. Vegetative watering,

complete in place for the unit price of

$ $

1B.29 6,120 SY

Total Schedule 1B Base Bid $

TxDOT 164. Cellulose fiber mulch

seeding (perm)(rural)(sand), complete

in place for the unit price of

$ $

1B.28 6,120 SY TxDOT 164. Broadcast seeding

(temp)(cool), complete in place for

the unit price of

$

P-15

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents per

cubic yard.

dollars and

cents per

square yard.

dollars and

cents per

ton.

dollars and

cents per

gallon.

dollars and

cents per

pound.

Total Schedule 1B Alternate Bid No. 1 $

P-209. Flexible base (compacted in

place)(7-inch thick)(Ty A, Gr 1-2),

complete in place for the unit price of

$ $

S1B-A1.5 2 LB

$ $

P-602. Sterilant (soil sterilant @ 15

lbs/acre), complete in place for the

unit price of

S1B-A1.4 125 GAL

$ $

P-602. Prime coat (MC-30 @ 0.20

gal/sy), complete in place for the unit

price of

S1B-A1.1 120 CY P-152. Unclassified excavation,

complete in place for the unit price of

$ $

S1B-A1.3 130 TON

$ $

P-401. Dense-graded HMA (PG70-

22)(4.5-inch thick), complete in place

for the unit price of

S1B-A1.2 625 SY

P-16

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents.

dollars and

cents per

linear foot.

dollars and

cents.

dollars and

cents.

LF D-701. 8-inch Sch. 40 PVC pipe,

complete in place for the unit price of

34 1 LS SS-H-700. Plumbing stub-outs for

shop area (water & sewer), complete

in place for the lump sum amount of

$

LS SS-H-700. Furnish and install all

electrical wiring, conduit, lighting,

and appurtenances necessary to

complete working system, complete

in place for the lump sum amount of

$ $

Schedule 2 Base Bid: Construct box hangar.

$ $

32 1 LS SS-H-700. Reinforced concrete

foundation for box hangar, complete

in place for the lump sum amount of

$ $

33 100

$

35 1

P-17

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents.

dollars and

cents.

dollars and

cents.

Total Schedule 2 Alternate Bid No. 1 $

$ $

37 1 LS

$

SS-H-700. Provide and erect box

hangar, complete in place for the

lump sum amount of

SS-H-700. Furnish and install electric

mechanically operated bottom rolling

doors (80' x 24' clear opening),

complete in place for the lump sum

amount of

36 1 LS

$

Total Schedule 2 Base Bid $

Schedule 2 Alternate Bid No. 1: Construct shop shell for office/storage/restroom areas including doors,

windows, lighting and electrical components with wiring. (100% Local Funded)

S2A1.1 1 LS Special. Construct shop shell for

office/storage/restroom areas

including doors, windows, lighting,

and electrical components with

wiring, complete in place for the lump

sum amount of

$ $

P-18

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents.

dollars and

cents.

dollars and

cents.

Total Schedule 2 Alternate Bid No. 3 $

S2A3.1 1 LS Special. Provide and install all

plumbing fixtures and accessories to

provide functioning shop bathroom

and shower facilities, complete in

place for the lump sum amount of

$ $

Schedule 2 Alternate Bid No. 3: Provide and install all plumbing fixtures and accessories for shop area. (100%

Local Funded)

Schedule 2 Alternate Bid No. 2: Provide and install HVAC system for shop area. (100% Local Funded)

S2A2.1 1 LS Special. Provide and install HVAC

system and all incidentals to provide

functioning system, complete in place

for the lump sum amount of

$

Total Schedule 2 Alternate Bid No. 4 $

Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

S2A4.1 1 LS SS-H-700. Gutters and downspouts

along northwest and southeast hangar

walls, complete in place for the lump

sum amount of

$ $

$

Total Schedule 2 Alternate Bid No. 2 $

P-19

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents.

dollars and

cents.

S2A5.1 1 LS SS-H-700. Galvanize all hangar

structural steel, complete in place for

the lump sum amount of

$ $

Total Schedule 2 Alternate Bid No. 6 $

Total Schedule 2 Alternate Bid No. 5 $

Schedule 2 Alternate Bid No. 6: Finish concrete foundation floor with polished concrete finish. (100% Local

Funded)S2A6.1 1 LS 03 35 43. Finish concrete foundation

with polished concrete finish,

complete in place for the lump sum

amount of

$ $

Schedule 2 Alternate Bid No. 5: Galvanize all hangar structural steel. (100% Local Funded)

P-20

Pay ItemEstimated

QuantityDescription and Unit Price in Words Unit Price Total Price

dollars and

cents.

$

$

$

$

$

$

$

$

$

$

$

$

Total Schedule 2 Alternate Bid No.

5Total Schedule 2 Alternate Bid No.

6Total Schedule 2 Alternate Bid No.

7

Total Schedule 2 Base Bid

Total Schedule 2 Alternate Bid No.

1Total Schedule 2 Alternate Bid No.

2Total Schedule 2 Alternate Bid No.

3Total Schedule 2 Alternate Bid No.

4

Total Schedule 1A Alternate Bid

No. 1Total Schedule 1B Base Bid

Total Schedule 2 Alternate Bid No. 7 $

Schedule 2 Alternate Bid No. 7: Additional paint coating on bottom hangar panels. (100% Local Funded)

S2A7.1 1 LS SS-H-700. Provide additional paint

coating for bottom hangar panels,

complete in place for the lump sum

amount of

$ $

Total Schedule 1A Base Bid

Summary of Bids:

Total Schedule 1B Alternate Bid

No. 1

P-21

Title

Printed Phone

It is understood the quantities of work to be done at unit prices are approximate and are intended for bidding

purposes only. Amounts are to be shown in both words and figures. In case of discrepancy the amount shown in

words shall govern.

Bidders must bid on all Base Bids plus all Alternates.

Bidders understand the Agent reserves the right to reject any irregular bid form and the right to waive

technicalities if such waiver is in the best interest of the Owner or Agent and conforms to State and local laws

and ordinances pertaining to the letting of construction contracts. Funding availability will be considered in

selecting the bid award. The bidder agrees this bid shall be honored and may not be withdrawn for a period of

60 calendar days after the scheduled closing time for receiving bids.

Upon receipt of the written "Notice of Award", the bidder will execute the formal contract agreement within 14

days and deliver a surety bond or bonds as required under the contract documents. The bid security attached, two

percent (2%) of the total bid price stated in the bid form, in the sum of

$_____________________________________________________________________ is to become the property

of the Agent in the event the contract is not executed as set forth in the contract documents as liquidated

damages for the delay and additional expense caused thereby. Bidder hereby agrees to commence work under

this contract on or before a date to be specified in a written “Notice to Proceed” and to fully complete the project

within 120 calendar days for any combination of Base and Alternate Bid improvements. Bidder further agrees to

pay as liquidated damages the sum of $750.00 for each calendar day to complete the work beyond the allotted

time or as extended by an approved Change Order or Supplemental Agreement.

Signature

Mailing Address City, State, Zip Code

The contract award will be based on the lowest qualified bid for either Schedule 1A Base Bid or Schedule 1B

Base Bid plus Schedule 2 Base Bid or the lowest qualified bid for the Base Bids plus any combination of

Alternate Bids that the Agent/Owner chooses, depending on the availability of funds.

P-22

Dated:

Dated:

Dated:

Title

Note: The bidder may also submit an electronically completed bid form. The bid form must have pay items in

the same order and with the exact information as on this bid form. If submitting an electronically completed bid

form, please print it out and submit the qualification/signature page with it. The bidder is responsible for

incorrect information and will be considered non-responsive if pay items are incorrect.

Qualification Acknowledgment:

Addendum No:

The undersigned Bidder certifies they are a prequalified bidder with the Texas Department of Transportation

OR

The undersigned Bidder is not a pre-qualified TxDOT bidder and has enclosed the bidder’s qualifications per

General Provision 20-02, Prequalification of Bidders.

Qualification Acknowledgment Signature:

I have enclosed qualification statements.

Mailing Address City, State, Zip Code

Addendum No:

Bidder’s Questionnaire

Full Prequalification

Addendum No:

Signature

Addendum:

The undersigned Bidder certifies that he has acknowledged the addendum(s) to the contract as indicated below.

P-23