Barton Malow Company
LIVONIA PUBLIC SCHOOLS
Livonia, Michigan
Frost and Cooper Renovations
BID PACKAGE No. 1
ADDENDUM # 2
February 14, 2014
Barton Malow Company Frost and Cooper Renovations
Page 1 of 4 Addendum #2: February 14, 2014
MEMORANDUM ADDENDUM NO. 2 Client: Livonia Public Schools Project Name: Frost and Cooper Renovations Bid Package No.: 1 Issue Date: February 14, 2014 Bid Due Date: February 20, 2014 @ 12:00 p.m. (Official school clock) All requirements contained in the Contract Documents shall apply to this addendum no. 2 and the general character of the work called for in this addendum shall be the same as originally set forth in the applicable portions of the contract. This addendum no. 2 is hereby made a part of the contract documents and shall assume its position of relevance in the contract documents. TABLE OF CONTENTS
1) Barton Malow Issued Documents
Pre-Bid Meeting Minutes and Sign In Sheet (8 Pages) Frost and Cooper Abatement Plans (2 Pages) Approved Substitution Request for Section 081416 Flush Wood Doors – Oshkosh Door
Company (2 Pages) Pre-Bid RFI Log (14 Pages) Pre-purchase Quotes from Metro, National Time and Bolhouse (9 Pages) Planholders List (5 Pages)
2) Barton Malow Clarifications:
Unless otherwise noted in a specific work scope, dumpsters will be provided by the
owner/Barton Malow.
ALL fire rating of rated walls must be complete by 8/22/14. Any fire rating not completed at that time will be completed by Barton Malow and the appropriate contractor will be backcharged.
All punch list items completed after school is back in session must be completed on
second shift and during times as not to interrupt the district’s operations.
The district’s commissioning agent is Sellinger Associates. Contractors shall coordinate with the commissioning agent as required. See specification section 019100 Commissioning (located at the end of the Barton Malow project manual) for more information.
Work Scope 042000 – Masonry (Not Re-Issued)
o Add work scope Item #29: Masonry contractor to include a $10,000 allowance for "miscellaneous patching" as directed by the construction manager. Note: The
Barton Malow Company Frost and Cooper Renovations
Page 2 of 4 Addendum #2: February 14, 2014
masonry contractor is responsible for all mechanical and electrical patching as identified on the any / all drawings.
Work Scope 061000 General Trades/Carpentry (Not Re-Issued)
o Revise work scope item #5 to include demolition key note #9 at Cooper.
Work Scope 084000 Aluminum Entrances and Windows (Not Re-Issued) o Add work scope Item #15: As new windows are put in place, the Aluminum
Entrances contractor will remove temporary partitions and neatly stockpile them on site. In the event of inclement weather the Aluminum Entrances contractor must reinstall the temporary protection as needed.
o Clarification: Provide and install any wood backing/nailers and caulking for FRP Panel System. See Pre-Bid RFI BP 1 PB 023 Question 3 for more information.
Work scope 099000 Painting (Not Re-Issued)
o Add work scope item #21: Assume in your base bid that all painting will occur around all new and finish material. You are required to protect all materials that you are working around in your base bid be it new or existing. All doors are to be assumed to be hung fully assembled and you are required to paint in and around the hardware, glass, handles, closures, etc.
Work scope 200593 Testing Adjusting and Balancing (Not Re-Issued) o Add work scope item #10: The Testing and Balancing Contractor is responsible
to perform 1 initial testing and balancing of the project. Then allow time for the mechanical contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list. Then the testing and balancing contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete. Note: this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations. All work is to be performed in conjunction with the commissioning agent as required. The Testing and Balancing Contractor is responsible to perform 1 initial testing and balancing of the project. Then allow time for the Mechanical Contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list. Then the Testing and Balancing Contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete. Note: this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations. All work is to be performed in conjunction with the commissioning agent as required.
Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems. The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning. If after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE
Barton Malow Company Frost and Cooper Renovations
Page 3 of 4 Addendum #2: February 14, 2014
REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor
Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems. The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning. IF after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor.
Work scope 230000 Mechanical (Not Re-Issued) o Add work scope Item #35: For plumbing demolition key note 16 and plumbing
key note 12 at Frost and plumbing demolition key note 14 and plumbing key note 10 at Cooper, include the complete removal/replacement of 10 cleanouts/floor drains at each school in your base bid. On the bid proposal form, please provide a unit price for a 3” cleanout as well as a 4” cleanout.
o Add work scope Item #36: Mechanical contractor required to make all repairs and adjustment to all items found to not meet the specified GPM's, CFM's, etc or found to be missing as found by the Testing and Balancing contractor. Provide all required information, submittals, manufacturer's operational information to the Testing and Balancing contractor as required for them to evaluate the system. Mechanical contractors are required to provide the necessary onsite factory authorized service representatives for the systems as required to make the systems meet the required testing and balancing requirements.
o Add work scope item #37: The Testing and Balancing Contractor is responsible
to perform 1 initial testing and balancing of the project. Then allow time for the mechanical contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list. Then the testing and balancing contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete. Note: this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations. All work is to be performed in conjunction with the commissioning agent as required. The Testing and Balancing Contractor is responsible to perform 1 initial testing and balancing of the project. Then allow time for the Mechanical Contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list. Then the Testing and Balancing Contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete. Note: this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations. All work is to be performed in conjunction with the commissioning agent as required.
Barton Malow Company Frost and Cooper Renovations
Page 4 of 4 Addendum #2: February 14, 2014
Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems. The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning. If after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor
Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems. The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning. IF after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor
o Clarification: ALL roofing work required for this project is the responsibility of the mechanical contractor. This includes any electrical roof penetrations required. Per the owner, the existing roof at both building is Thermal plastic, reinforced Single Ply. Cooper received a new roof 8/15/2001. Frost received a new roof 8/15/2003. Contractor is to assume all roofs have existing warranties still in place and must maintain those warranties.
o Clarification: All masonry patching for mechanical work will be done by the
042000 Masonry contractor through an allowance.
3) SHW Group Clarification Items and Sketches
Frost Narrative (8 pages) Cooper Narrative (6 pages) Specification Section 06 40 23 Interior Architectural Woodwork (12 Pages) Specification Section 22 34 00 Fuel Fired Domestic Water Heaters (6 Pages) Cooper Re-Issued Full Size Drawings: G001, S131, AD111A, P501, ED121, E111A,
E111B, E111C, E111D, E111E, E211A, E211B, E211D, E231, E401, E411, E502, E601 Frost Re-Issued Full Size Drawings:, G001, S131, AD111E, AD111F, AD111G, A6111B,
A611E, A611F, A611G, ED111A, E111A, E111B, E111C, E111D, E111E, E111F, E111G, E121, E211A, E411, E502, E601
(End of Addendum No. 2 - Memorandum)
Barton Malow Company 2013 Bond Program
Pre-Bid Meeting Minutes Page 1 of 5
February 11, 2014 2:00 p.m. Livonia Public Schools Frost and Cooper Renovations Pre-Bid Meeting Minutes I. INTRODUCTION
Barton Malow Company – Construction Manager
Stephanie Hachey – Project Manger Scott Lone – Project Superintendent Steve Rewers – Project Director
SHW Group – Architects John Waldrop - Project Architect
Livonia Public Schools – Owner Attendees – See attached Sign-in Sheet.
II. PROJECT OVERVIEW
A. Specific Bid Package Bid Category Scopes included with this project. (Section 00220)
Bid Categories
042000 Masonry 051000 Steel 061000 General Trades/Carpentry 084000 Aluminum Entrances and Windows 093000 Hard Tile 095000 Metal Studs, Gypsum and Ceilings 096000 Carpet and Resilient Flooring 099000 Painting 101000 Visual Display Boards 105000 Lockers 123000 Casework 200593 Testing, Adjusting and Balancing 230000 Mechanical 260000 Electrical
B. Project Description - (Sections 00100, 00210, 00220) This project generally consists of renovations to Frost Middle School and Cooper Upper
Elementary School. The Bidders are encouraged to visit the school for comparison. Barton Malow Company shall serve as the Construction Manager for Livonia Public Schools. Each bidder shall be required to enter into a contract with Livonia Public Schools. Each bidder shall be responsible for the work described in their Bid Category work descriptions and as shown and described within the contract documents. Bidders are encouraged to review their Bid Category work description for assignments of the work, Section 00220 Work Scopes. Also, pay particular attention to Section 00210 Description of the Work/ Special Provisions/ Requirements, as each Bid Category shall be responsible for each of the items noted.
C. Bid Documents
Barton Malow Company 2013 Bond Program
Pre-Bid Meeting Minutes Page 2 of 5
Bid documents and an updated planholders list may be obtained electronically through ARC
PlanWell using the following link:
https://order.e-arc.com/arcEOC/x_project.asp?de=6856028E-D507-4EC8-815E-F9FB45278B82
D. Construction Schedule – (Section 00230) The bids are due at the Administration Building located at 15125 Farmington Road, Livonia, MI
48154 on February 20, 2014 at 12:00 p.m. (local time) on the official School Clock located in the Administration building.
Please review Section 00230 Schedule and Phasing of the Project Manual which includes a schedule for both buildings as well as abatement phasing plans. Also, please review the work scopes for schedule related notes. Several trades will be required to work second shift as noted in the work scopes. There is a significant amount of pull ahead work outlined in the work scopes that scheduled for second shift from April through June. Contractors are encouraged to review the scope and do as much pull ahead work as possible. ALL cleaning and reinstallation during the second shift work must be provided in your bid to be performed ON THE DAY you perform that work.
Summer construction hours (starting June 16th) include a 6 day work week as required to meet
the construction schedule. Include all costs for second shift and/or Saturday work in your bid. E. Site Location and Facilities – (Sections 00050, 01520)
Frost Middle School is located at 14041 Stark Rd., Livonia, MI 48154. Cooper Upper Elementary is located at 28550 Ann Arbor Trail, Westland, MI 48185. Contractors are encouraged to visit the site, but must do so after regular schools hours. Please contact Scott Lone at [email protected] if you would like to visit the sites.
III. BIDDER REQUIREMENTS A. Bonding, Insurance and Tax Requirements – (Sections 00610, 00620, 00400)
All bidders shall be required to provide proper performance, labor and payment bonds to the Barton Malow Company as specified in section 00610 Bonds, the General Conditions and Supplemental General Conditions. The bonding company must be based in the United States of America and licensed to do business in the State of Michigan and must have an A.M Best rating of A or better. Contractors must include all applicable sales tax in their bid. This project is not Tax Exempt! Refer to the Project Manual. The general requirements portion of the project manual is located online at livoniapublicschools.org in the Purchasing Department section and is titled “Project Manual”. The general requirements are part of the bid documents and must be reviewed prior to submitting a bid.
B. Alternates, Voluntary Alternates, Unit Prices and Allowances (Sections 00200, 00220) Alternates/ Unit Prices - Each Bidder is required to provide pricing for all the alternates and unit prices as described in their work category descriptions, and as contained in the addendums.
Voluntary Alternates may be considered if sufficient detail is provided with the offer. Please note the base bid shall include the specified manufacturer(s) identified on the drawings and in the Project Manual Book.
Barton Malow Company 2013 Bond Program
Pre-Bid Meeting Minutes Page 3 of 5
Allowances – Please review the work scopes in the project manual and include any applicable allowances in your bid. Labor rates will be required to be provided on the bid proposal form for each trade category and foreman and journeyman status.
C. Prevailing Wages
This is a prevailing wage project. Please review the prevailing wage rates that are included in Section 00870 in the project manual and include all associated costs in your bid.
D. Bid Due Date and Bid Proposal Form Requirements – (Sections 00100, 00400, 00401)
1. Bid Due Date: February 20, 2014 at 12:00 p.m.
2. A bid security of five (5) percent in the form of a Bid Bond or Certified Check is required with all proposals submitted.
3. OSHA Form 300 and current EMR rate shall be provided with the bid proposal. 4. Special attention must be given to the Familial Disclosure Form, Section 00410
of the Project Manual. This form is required to be submitted along with the Bid Proposal Form, Section 00400 of the Project Manual. Bids shall not be accepted without these items identified above.
5. All bids must be accompanied by a sworn and notarized statement certifying that the Contractor is not an Iran Linked Business within the meaning of the Iran Economic Sanctions Act of 2012. No bid shall be accepted that does not include this sworn and notarized disclosure statement.
E. Addendum Status Each bidder is responsible to secure all addendums and incorporate them into their bid. Addendum shall be distributed to all known plan holders and will be posted on PlanWell through ARC. Addendum #1 was issued on February 7, 2014. Addendum # 2 will be issued this Friday February 14, 2014. It will include the pre‐bid meeting minutes and sign in sheet. A plan holders link is available on the Planwell site from ARC. Contractors shall give special attention to all clarifications issued along with the requests for information. Contractors requiring clarifications shall need to document their questions in writing and submit a Request for Information to Barton Malow Company. All Request for Information must be submitted by Thursday February 13, 2014 at 12:00 p.m. If you don’t receive a response or have a question after the cut-off date for RFIs, please quantify and qualify your bid.
F. Bidding Strategy Each bidder must bid an entire work scope category and not individual specification
sections. Bidders may bid on one or both schools. Bidders may submit a combination bid (combining schools and/or combining work scope categories). The lowest qualified bid for each bid category or combination and alternate pricing may be the basis of contract award. If you do bid a combination bid, please make sure you fill out the accounting breakdown as noted on the bid proposal form.
IV. ADMINISTRATIVE REQUIREMENTS
Barton Malow Company 2013 Bond Program
Pre-Bid Meeting Minutes Page 4 of 5
A. Agreement Form, General /Supplemental Conditions –(Sections 00500, 00700, 00800)
Please note the Agreement Form (Contract) is not bound into the Project Manual. The Agreement Form is available to be viewed at the Barton Malow Company office at 26500 American Dr. Southfield, MI 48034. Also note the General Conditions of the Contract are bound into the Project Manual. All bidders are responsible for and encouraged to read information contained in each Project Manual and the drawings. Pay special attention to the provisions of the contract as contained in the Project Manual. Note: All contractors shall have the required bonds and insurance, safety information in place prior to mobilization to the project site. No payment applications shall be processed until this information is received and approved!
B. Safety Requirements
Please review the Barton Malow Safety Manual which is included in the online portion of the project manual. Each contractor will be required to submit a site specific safety plan, contractor safety certificate, daily pre-task plans, weekly tool box talks, and a monthly work hours report. Contractors are also required to wear hard hats, safety glass and high visibility clothing while working on site and work gloves when needed. Pay special attention to the confined space at Frost for the new mechanical unit installation and include all required safety measures in your bid. The mechanical contractor is responsible for all roofing work on the projects and will be required to provide and maintain a warning line system 15’ back from the edge of the roof. Any contractor working outside the warning line system must be tied off. There is a significant amount of asbestos abatement at both schools that will be handled directly by the district. Contractors will be required to work around the abatement contractor. While the best possible phasing plan has been made, all contractors are required for multiple remobilizations and relocations to work around the abatement work.
V. Questions/Clarifications The following items were clarified at the meeting:
1) All on‐site storage and security will be the responsibility of the contractors. 2) There are 3 pre‐purchase agreements for this project: unit ventilators through
Bolhouse, controls through Metro Controls and fire alarm through National Time and Signal. The mechanical and electrical contractors are required to contact those suppliers for pricing. The pre‐purchase suppliers WILL become sub‐contractors to the Mechanical and Electrical contractors who will be required to provide all necessary supervision of these sub‐contractors.
3) The flooring is being abated. The abatement contractor will most likely use a solvent. A full skim coat of the abated floors is included in the 096000 Flooring contractor’s scope of work.
4) The doors are expected to be delivered to the site preassembled as stated in the work scope. General Trades contractor 061000 must include cost for preassembled doors in their bid. Contractor may submit a voluntary alternate to deliver doors not pre‐assembled.
5) At Frost, the mechanical drawings show tying in sanitary lines to existing acid waste piping. That is correct. There will not be any chemicals utilized in these areas in the future.
Barton Malow Company 2013 Bond Program
Pre-Bid Meeting Minutes Page 5 of 5
6) New control valves are required at both new and existing unit heaters. 7) Demolition is included in each individual work scope. There will not be a separate
demolition contractor on‐site. Please review the work scopes for demolition requirements and include all costs for this work in your bid.
8) The toilet partitions are included in the 230000 Mechanical contractor’s scope of work.
(End of Pre-Bid Meeting Minutes) These meeting minutes constitute our understanding of the proceedings of this meeting. Unless notification to the contrary is made, in writing, within ten (10) days of receipt, these meeting minutes shall be deemed correct. If you have any additional questions or comments regarding this project, please contact me at [email protected]. Sincerely, BARTON MALOW COMPANY Stephanie Hachey Project Manager Attachments – Attendees List
X
JPW
2-13-14
Request for Information
Summary Log, Open RFIs with Q/A
130736 - Livonia Public Schools
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
BP 1 PB - 001
Frost and Cooper - Hardware Specification
2/6/14 82/13/14 1BMC Prolog TeamSHW Group
[2/6/2014 BMC Prolog Team - Stephanie Hachey]On both schools the hardware set in spec 087100 only includes set up to #38. On the door schedule many doors have sets listed with higher numbers. Please advise.
Stephanie HacheyJohn Waldrop
Yes
[2/10/2014 BMC Prolog Team - Stephanie Hachey]See Addendum 1.
BP 1 PB - 002
Frost and Cooper - Electrical Clarifications
2/7/14 32/14/14 02/10/14Barton Malow CompanySHW Group
[2/7/2014 BMC Prolog Team - Stephanie Hachey]1. E601 (Frost) Light Fixture schedule is incomplete, please clarify.2. E111A, E111B (Frost) Many light fixtures shown with a ? , please clarify.3. E501 (Frost) lighting control system manufacturers do not match that in specification 260923, also 260923 does not include the light control panels or other parts of the system, please clarify.4. E401 Shows 4.8KV medium volt transformer, please provide a specification.
Stephanie HacheyJohn Waldrop
Yes
[2/10/2014 BMC Prolog Team - Stephanie Hachey]Item No. 1: E601 Response: Refer to Addendum 1.Item No. 2: E111A Response: Refer to Addendum 1.Item No. 3: E501 Response: Deleted. Refer to Addendum 1. Item No. 4: E401 Response: Secondary service. Transformer provided by Utility Co. Underground
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
conduit by Electrical contractor. Primary Conductors by Utility Co. Secondary conductors by Electrical Contractor.
BP 1 PB - 003
Frost and Cooper - Aluminum Framing
2/10/14 12/13/14 02/11/14BMC Prolog TeamSHW Group
[2/10/2014 BMC Prolog Team - Stephanie Hachey]1.) Specs 084113 and 081600 both spec 2" x 6" framing but on the drawings 2" x 4 1/2" framing is shown. Please advise which is correct.
Stephanie HacheyJohn Waldrop
Yes
[2/11/2014 BMC Prolog Team - Stephanie Hachey]4 1/2" storefront framing is correct.
BP 1 PB - 004
Frost - Prebid Electrical - E111A adn ED111A
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. E111A, ED111A - Office 116, 117, 115, 113, 118, Storage 119, Conference 120, main office 121 on ED111A show no fixtures being demo'd. However E111A Show new fixutres, were fixtures previously demo'd?2. ED111A, ED111A - Office 113, 115, 118 storage 119show no switches to be demo'd. THese rooms show new switches, is this correct?3. ED111A - Corridor H001B shows key switches being demo'd with no new shown on E111A, are we to blank these off? Waht will control the Corridor lighting?
Scott LoneJohn Waldrop
Yes
See Addendum 2 for all.
BP 1 PB - 005
Prebid Electrical RFI - E111B & E111B
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. E111B, ED111B - Storage TC-1 shows an exterior light fixture being demo'd with no new showon on E111B, are we to blank this up?2. E111B, ED111B - Boys toilet 130, Girls toilet 131 show switches being demo'd with no new switches, are we to blnk these up?
Scott LoneJohn Waldrop
Yes
See Addendum 2 for all.
BP 1 PB - 006
Prebid Electrical - ED111C, E111C
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. Corridor H002B - no fixtures are shown on ED111C being Demo'd, E111C shows new, is this correct?2. Storage 5 & 6 show light swithc being demo'd with no new SW shown on E111C, is this correct?3. Storage 9 and Team 10 show all lights being demo'd with no new lights shown on E111C, is this correct?4. Boys locker room 11 & Girls locker room show exit
Scott LoneJohn Waldrop
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
lights as being demo'd, on E111C is shows these in light lines as exist., please clarify. Also lighting shown in these rooms show all fixtures being demo'd with only a few unidentified fixtures going back in, please clarify? There are also other storage rooms, etc with new fixtures that are unidentified.5. Aux Gym 055 / corridor H002B show exit lights being demo'd with no new fixtures going in, is this correct?6. Office 15 shows light switch as demo, however on E111C shows no new switching, is this correct?7. Gymnasium 055W upper right hand exit doors on ED111C shows an exit light being demo'd, E111C shows no new, is this correct?
See Addendum 2 for all.
BP 1 PB - 007
Prebid Electrical - ED111D, ED111D
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. LMC059 - ED111D shows exit lights being demo'd, E111D shows no new exit lights, also LMC059 to corridor H006 & corridor H006 show eixt lights being demo'd with no new exits shown, is this correct?
Scott LoneJohn Waldrop
Yes
See Addendum 2 for all.
BP 1 PB - 008
Prebid Electrical RFI - ED111E & E111E
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. Storage 32, 34, JC38, schoolstore 39, storage 41, all show lighting & switching being demo'd, E111E shows no new work, is this correct?2. Science Labs 009, 010, 11, 017 show exit lights at exterior doors being demo'd, E111E show no new exit lights, is this correct?3. Storage 31, Science lab 011, 017, 016, 018, 019 classroom 013, girls toilet 46, Computer Lab 014, all show light switches being demo'd, E111E shows no new switches, are we to blank these off?4. Science Labs 010, 011, 016, 017, 018, 019, classrooms 013, computer labs 014, 015, show no occupancy sensors, is this correct?5. Classroom 008 no fixture ID, plesae clarify.6. All corridors show exit lights being demo'd, E111E shows new? with no fixture ID, please clarify.
Scott LoneJohn Waldrop
Yes
See Addendum 2 for all.
BP 1 PB - 009
Electrical RFI - ED111F & E111F
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. Classroom 024, 027 no fixture ID, please clarify.2.Conference rooms 54,67, 72 show all lighting &
Scott LoneJohn Waldrop
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
switching as being demo'd with E111F showing no new work, is this correct?3. Toilet Rooms 51, 52, 64, 65, 70 all show light fixtures being demo'd, E111F show no new switches, are we to blank these off?4. All corridors show exit lights being demo'd, E111F show new exit lights with no ID, are these indeed new?
See Addendum 2 for all.
BP 1 PB - 010
Pre Bid - Electrical RFI ED111G & E111G
2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group
[2/11/2014 Barton Malow Company - Scott Lone]1. Classrooms 041,042, storage 97, 110, 148, 150, toilet 109, office 96 show all lighting and switching as being demo'd, E111G shows no new work, please clarify.2. Rooms 039, 049, 048, 106, 105, 107, 108, 112, 94, 92, 91, 100, 045, 043, 88 all show light switches being demo'd, E111G shows no new switching, are we to blank these off?3. Toilet rooms 94, 99 E111G shows new light fixtures, ED111G does not show any lighting to be removed, please clarify.4. All corridors show key switching to be demo'd, E111G show no new switches, are we to blank these off?5. Corridors show several (E111G) new exit lights with no ID Tags, are these indeed new?
Scott LoneJohn Waldrop
Yes
See Addendum 2 for all.
BP 1 PB - 011
Frost - E111A Light Fixtures 2/11/14 22/13/14 02/13/14BMC Prolog TeamSHW Group
[2/11/2014 BMC Prolog Team - Stephanie Hachey]E111A was not revised in addendum #1 and still shows many light fixtures with a question mark. Please clarify.
Stephanie HacheyJohn Waldrop
Yes
See Addendum 2 for all.
BP 1 PB - 012
Frost - E601 Occupancy Sensor Schedule
2/11/14 22/13/14 02/13/14BMC Prolog TeamSHW Group
[2/11/2014 BMC Prolog Team - Stephanie Hachey]E601 revised the occupancy sensor schedule to clarify the individual sensors OCA, OCB, etc., however, the drawings have not been revised to reflect this change. Please clarify.
Stephanie HacheyJohn Waldrop
Yes
See addendum 2 for all.
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
BP 1 PB - 013
Prebid - Frost - Windows 2/12/14 02/13/14 02/12/14Barton Malow CompanyBarton Malow Company
[2/12/2014 Barton Malow Company - Scott Lone]A201-A204 Exterior Elevations show Sliding windows in various locations. The details for these windows state “Aluminum Framed Storefronts” also there is no window specification. Are these windows to be storefront or sliding windows? If windows, please provide a specification and details accordingly. Thanks
Scott LoneScott Lone
Yes
[2/12/2014 Barton Malow Company - Scott Lone]Per your RFI question below, please refer to specification section 084113 Aluminum-Framed Entrances and Storefronts - 2.4 Venting Aluminum Window Units in the bidding documents. I copied a small section of this for your reference:
2.4 VENTING ALUMINUM WINDOW UNITS A. Exterior Venting Aluminum Window Units: Storefront manufacturer's standard units, complying with AAMA/WDMA/CSA 101/I.S.2/A440, with self-flashing mounting fins, and as follows: 1. Basis-of-Design Product: Subject to compliance with requirements, provide Kawneer North America ‘8470TL Isolock Thermal Horizontal Slider Window, Heavy Commercial Grade HS-HC70, 4-Inch Frame Depth, and 1-Inch IGU Infill’; or approved comparable product by one of the storefront manufacturers listed in Article 2.2 of this Section.
BP 1 PB - 014
Prebid - Frost - Windows 2/12/14 02/13/14 02/12/14Barton Malow CompanyBarton Malow Company
[2/12/2014 Barton Malow Company - Scott Lone]On page A201 Exterior Elevations Detail D7 – It shows an elevation of three pairs of doors with sidelites and transoms. From what I am seeing all that they want replaced is the storefront frame. Is that correct? If yes, what hardware is on these doors?
Scott LoneScott Lone
Yes
[2/12/2014 Barton Malow Company - Scott Lone]Please reference drawings AD111B and A111B. Per AD111B, the existing doors and door frames to remain. Per Key note 1 on A111B, Provide new glass and aluminum storefront system at existing window locations.
BP 1 PB - 015
Frost - Electrical clarifications 2/12/14 22/13/14 12/14/14BMC Prolog TeamSHW Group
[2/12/2014 BMC Prolog Team - Stephanie Hachey]1. E211A: Rooms 113, 118, and 126 all show an EF-X. Are these new? If so, where are they circuited to?
Stephanie HacheyJohn Waldrop
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
2. E211A: Detail F4 AHU-4 to LP-B where is this panel located? Where is tunnel location? No reference.
3. E211B: Room 054A (same as above)
4. E211C Room 11 shows a new recpt., where is this circuited to?
5. E211C Corridor south of classroom 056 shows new water cooler recpt. Where is the circuited to?
6. E211D Classroom 057/058 shows 2 new recpt. Where are these circuited to?
7. E211 D Storage 60 shows a teacher station and overhead projector. Is this correct?
8. E211E Power note #2 - need for info on panels.
9. E211E Girls Toilet 36 shows EF will no circuit #, please clarify.
10. E401 One line shows panel "RP-EGX". Is there a panel schedule for this?
11. E221 Detail E5 reference to power note #1. No devices shown. Are we to include?
12. E211G Boiler room shows relocated pump. Please provide original pump location, size of pump motor. Is the original fed from underground or overhead?
13. E211G Boiler room shows panel PP-1 with new bussing, breakers, cover. Please provide more info.
14. E211G Classroom 042 shows a new receptable between Storage 100 and Office 91. Please identify circuit.
15. E211G Wood shop 46 shows an EF. Please size and circuit.
16. E401 Feed to PP-1 shows a 60A/3P breaker to a
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
15KV transformer. Per the sizing chart this should be a 30A. Please clarify.
17. E401 Feed to RP-EG (112.5 KVA XFMR) shows a 350A/3P breaker. Per the sizing chart this should be a 175A. Please clarify.
18. New panel RP-EGX - panel schedule? Need more info.
19. E501 Clock system detail calls for power relay panel in mechanical room and says to refer to drawing E2B1. This drawing doesn't exist. Please identify location of mechanical room and location of panel.
20. E501 Clock detail shows conduit and wire to each clock. Is this covered under the $5000 allowance as noted on E211A Power note #4.
Response to items 1 thru 15: Refer to Add#2.Item No. 16 response: 15 KVA transformer is not incorrect. Transformer is 30KVA. Change 60A-3P breaker to 45A-3P.Item No. 17 response: Change transformer to 45KVA. Change breaker in MDP to 70A-3P and fused disconnect to 200A-3P with175Amp fuses.Item No. 18response: Refer to Addendum #2.Item No. 19 response: Revise to read as follows: in Main Office 121. Refer to E211A.Item No. 20 response: Revise note as follows: Existing wiring to remain. Refer to key note #4.
BP 1 PB - 016
Prebid - RFI Cooper and Frost - Lockers
2/12/14 02/13/14 02/12/14Barton Malow CompanySHW Group
[2/12/2014 Barton Malow Company - Scott Lone]Cooper Elementary:
1. Specifications call for 18" deep lockers, Existing lockers are 15"deep with a 16" deep Wing Wall. Please advise if we are to provide 18" or 15" to match existing condition.
2. Are these lockers to receive Built in Combination Locks
Frost Middle School:
Scott LoneJohn Waldrop
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
1. Currently lockers are approx. 1 1/2" off wall. Current sloped tops leave gap behind top of lockers. Are special depth slope tops required to close the gap between the lockers and back wall.
2. If furring is required, is this by the Locker installer or carpentry.
3. Are the Corridor lockers to receive Built in Combination locks
4. Are the Athletic Lockers to receive any locks.
Cooper1. Match existing depth2. See plans and keynote 15Frost1. Slope tops to extend to wall2. If furring is required, it is the responsibility of the 105000 Locker Contractor. 3. See plans and keynote 154. See plans and keynote 15
BP 1 PB - 017
Frost and Cooper - Mechanical Clarifications
2/13/14 12/13/14 12/14/14BMC Prolog TeamSHW Group
[2/13/2014 BMC Prolog Team - Stephanie Hachey]1. Drawing detail “Vertical Unit Ventilator Section” indicate VUV drains thru exterior wall to outside. What is contractor to figure for the VUVs that do not back an exterior wall?2. Contractor to include entirely new piping assembly per “Typical Cabinet Unit Heater Piping Diagram With Two-Way Control Valve” or reuse existing for each of the replaced unit heaters?3. Demo note #14 and installation note #10regarding floor cleanout and drain remove and replace IF NESSECARY. What quantity is contractor to include for? What size are the existing? Are existing UG SAN drawings available for reference of both schools?4. Frost - M211E - no indication of HHWR/S piping to VUV-4 & VUV-5. Contractor to assume piping to be existing or new?5. Frost - M211F - no indication of HHWR/S piping to VUV-31, VUV-32 & VUV-33. Contractor to assume piping to be existing or new?6. Frost - M211G - Center Program 039 & Technology 047 indicate (x3) sets of 1” HHWS/R piping but do not indicate what type of equipment they
Stephanie HacheyJohn Waldrop
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
connect to?7. Frost – P501 – Existing expansion tank was not noticed during site walk? Contractor to include for an existing tank or new? If new please provide spec.8. Frost – P501 – Existing housekeeping pads to be reused for setting of new DWHs or contractor to include for remove and replace with new? If new what size and thickness?9. Frost – P111E – Contractor to include for verification of entire acid waste system to be in working order or just at tie in points and downstream to outside of building?10. Mechanical contractor to include for masonry patch work at replaced drinking fountains, urinals, heaters etc. or by Masonry contractor?
1. Condensate pumps will be provided with the VUV for interior rooms with cooling. Condensate drains will be routed to nearest janitors closet. Both items are identified in Addendum #2.2. All components indicated on the detail are to be provided as new by the mechanical contractor. 3. Heating hot water piping will be new and identified in Addendum #24. Heating hot water piping will be new and identified in Addendum #25. Heating hot water piping will be new and identified in Addendum #26. Heating how water piping in Technology 047 has been revised as part of Addendum #2. New 1" heating hot water piping in Center Program 039 can be removed back to new tap to existing 1-1/2" piping in Orchestra and Vocal Classroom 041. This new piping is not required. 7. Expansion tank will be new and identified in Addendum #2.8. Existing concrete housekeeping pad will be expanded to accomodate new hot water heaters and identified in Addendum #2. 9. Verify entire acid waste system. 10. See Addendum 2.
BP 1 PB - 018
Frost and Cooper - Mechanical Clarifications
2/13/14 12/13/14 1BMC Prolog TeamSHW Group
[2/13/2014 BMC Prolog Team - Stephanie Hachey]1. Does the current roof on the schools have a warranty on it? Who is the roofing contractor that maintains that warranty? We would want to utilize them on this job.
Stephanie HacheyJohn Waldrop
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
2. Note 16 on the plumbing drawings that states verify floor cleanouts and/or floor drains are located in space. Is there a count of how many cleanouts or floor drains are in the areas where the floor is to be removed?3. Are there any liquidated damages on this job?4. Who is responsible for wall patching? Architectural Trades?5. Is the equipment to be removed to be turned over to the owner or is it the contractor’s responsibility to remove and dispose of it?6. If crane is to be used for equipment removal/installation, can the crane be utilized anytime during the day as long as it is coordinated?7. Is each trade responsible for ceiling tile removal and reinstallation and replace if damaged?
[2/13/2014 BMC Prolog Team - Stephanie Hachey]1. See clarification in Addendum #2.
2. See Addendum #2.
3. No liquidated damages.
4. See Addendum #2.
5. It is the contractor's responsibility to remove and dispose of the equipment unless otherwise noted.
6. All crane use must be coordinated with Barton Malow.
7. In areas, where new ceilngs are not being installed, each trade is responsible to remove/reinstall/replace ceiling tile as needed to complete their work. For above ceiling work that occurs before school gets out (even in areas that will receive a new ceiling), each trade is responsible to remove/reinstall/replace ceiling tile as needed to complete their work. See Mechanical Work Scope Item #8.
BP 1 PB - 019
Frost and Cooper - Time Out Room
2/13/14 02/13/14 02/13/14BMC Prolog TeamSHW Group
[2/13/2014 BMC Prolog Team - Stephanie Hachey]Sec. 11 66 23 mentions that padding is required in a “time-out room”. Can you help me in locating where that room is?
Stephanie HacheyJohn Waldrop
Yes
The Time Out Room is room 72A. It is located between classrooms 037 and 038,
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
BP 1 PB - 020
PreBid - Cooper & Frost - Balancing
2/13/14 02/13/14 02/13/14Barton Malow CompanyBarton Malow Company
[2/13/2014 Barton Malow Company - Scott Lone]How are the balancing companies to figure what the schedule is, when the schedule is not showing any time allotted for balancing. HVAC Balancing should begin after HVAC is installed and under control.
Scott LoneScott Lone
Yes
[2/13/2014 Barton Malow Company - Scott Lone]Plan on starting air-balancing work the last two weeks (starting on Approximately 8/11/14) prior to mechanical inspections to get outside air requirements/exchanges for all mechanical systems to meet requirements for occupancy prior to start of school. All other balancing work as scoped to be completed on 2nd shift starting in September and completing by Oct. 15th.
BP 1 PB - 021
Cooper and Frost - Casework Spec
2/13/14 12/13/14 12/14/14Barton Malow CompanySHW Group
We are questioning the specifications for the casework Div 12. The specs call out all veneer core plywood which would add a tremendous cost to the job. The listed approved manufacturers do not fabricate educational casework using veneer core plywood. In addition all the doors will warp. AWI premium specifications call our industrial grade particle board as the substrate of choice.
Scott LoneJohn Waldrop
Yes
Bid per the contract documents.
BP 1 PB - 022
Cooper and Frost - Gym Elevations
2/13/14 02/13/14 02/13/14Barton Malow CompanySHW Group
We are interested in submitting a proposal for the gym equipment at Cooper Upper Elementary and Frost Middle School. In looking through the drawings I was unable to find the interior elevations for both the gymnasium at Cooper Upper Elementary and the time out room at Frost Middle School. I believe those are the only two areas that have gym equipment as I was unable to find any others. If I have missed anything, please let me know.
If you could provide the interior elevations for both of these locations I would appreciate it, especially the gymnasium as we would need to know the height from finished floor to bottom of beam for the divider curtain.
Scott LoneJohn Waldrop
Yes
1. Both rooms will have standard height wall pads per the spec2. Bottom of beam height at Cooper gymnasium is 21'-1"
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
BP 1 PB - 023
Cooper and Frost - FRP Panels
2/13/14 12/13/14 12/14/14Barton Malow CompanySHW Group
1. I have some questions regarding the FRP panels. It looks like they are the Special Lite SL-37. The drawings call for a ¾" thick panel per detail 5/A321.
Spec section 081743 - 2.2 B 1 calls out a 1 ¾" thick panel.
Special Lite website states that the only sizes available are ¼", 1" and 1 ¾" thick.
What is going to be the thickness of the panel??
2. Also detail 5/A321 states that an exposed fastener is to be used at the top and bottom of the panel to fasten it to the substrate.
What is the spacing of the fasteners?
3. Also what is to be done at the vertical joints of the panels?
4. Lastly G7/A201 states tooth in the existing grill opening with masonry prior to FRP panel installation.
How are we responsible for the "tooth in" of the grill? Do we have to cut a hole into the panel or is this something Special Lite does at the factory?
Scott LoneJohn Waldrop
Yes
1. Panel Thickness for FRP at windows shall be 1" Thick.2. Provide fasteners 16" O.C. maximum, fastenerpattern to be symmetrical for each panel.3. Vertical joints at Cooper should have a P.T. wood nailer behind the FPR joint.Provide fasteners at vertical joint and sealant between panels. Contractor to fieldverify panel lengths so that vertical joints align with window framing system mullions.4. The existing grille openings should be toothed in prior to FRP installation. Thework scope for the masonry work shall be determined by the CM. There shouldnot be any openings or holes in the FRP panel system.
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
BP 1 PB - 024
Cooper and Frost - Door H018B
2/14/14 02/14/14 02/14/14Barton Malow CompanyBarton Malow Company
At Frost, Door H018B, the door schedule on page A501 calls out a HM door and frame. The floor plan, A111C, has it noted (key note 3) as "New FRP Doors and Aluminum Frame". Please clarify.
Scott LoneScott Lone
Yes
Door H018B is a HM door and frame per the door schedule.
BP 1 PB - 025
Cooper and Frost - FRP Doors
2/14/14 02/14/14 02/14/14Barton Malow CompanyBarton Malow Company
Frost:
1. Elevation D3/A201 shows (2) pair and (2) single doors without door #'s on floor plan. Are these doors existing to remain?2. Elevation D7/A201 shows (3) pair of doors in new storefront framing. These doors do not have door #'s on floor plan. Are these new doors?3. Elevation D7/A204 shows (1) pair of doors in new storefront framing. These doors do not have door #'s on floor plan. Are these new doors?
Cooper:
1. Elevation A7/A201 shows (1) pair of doors in new storefront framing. These doors do not have door #'s on floor plan. Are these new doors?
Scott LoneScott Lone
Yes
Frost1. Yes, existing doors and frames to remain.
2. No, existing doors and frames to remain.
3. No, existing doors and frames to remain.
Cooper1. No, existing doors and frames to remain.
BP 1 PB - 026
Cooper and Frost - General Trades Clarifications
2/14/14 02/14/14 02/14/14Barton Malow CompanyBarton Malow Company
1. Temp wall infill is not called for at exterior door frame removal areas, are we to provide it? 2. Have the plaster ceilings to be demolished been tested? (ACM) 3. Have the glue pods behind marker boards been tested? 4. The last sentence of General Trades scope #13states "Removal and repair of all rust forming on HM frames before final painting is the responsibility of this contractor." Does this apply to all existing frames or the new ones being provided. The rest of the note
Scott LoneScott Lone
Yes
Request for InformationSummary Log, Open RFIs with Q/A
RFI # SubjectDate
CreatedIn
ReviewDate Req'd
Days Late
Date Answered
Author CompanyAnswer Company
QuestionAnswer
Authored ByClosedAnswered By
pertains to new frames. 5. Frost MS there are several rooms that have marker boards drawn but not labeled they are rooms, 014,015, 019, 032, 022. Do they need to have them and what type. In addition, there are no tack boards called out there either. Are they needed?
1. No.2. Yes3. Yes4. New frames only.5. No
Overall Averages: 2 126Quantity of open RFIs:
Quantity of Late RFIs: 6
Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501
Project Name: Cooper Elementary Renovation Trade Specification: 230900 Direct Digital Control for HVAC Date: February 7, 2014
Metro Controls, Inc. is pleased to submit the following scope of work and quotation for the Cooper Elementary Renovation project. Our scope and pricing is based upon the design intent of the SHW drawings and specifications dated 1.31.14 through addendum #2 dated 2.13.14. We propose to provide the building automation system as listed below:
Building Automation System • Provide an extension of the specified Automated Logic WebCTRL BMS front-end.
Hot Water Boiler System • Provide DDC package at the Heating Hot Water System. Package to include:
o (3) Pump start/stop/status controls, (4) well temperature sensors, and (2) boiler enable, reset, and alarm points.
o Retrofit the existing 4” 3-way pneumatic actuator with a new DDC electronic actuator at the Heating hot Water System.
o Provide (4) Lighting zone controls. Includes (1) photo-cell and (3) low voltage override switches.
(3) CV Roof Top Unit with (5) VAV terminal Units • Provide BACnet integration at (3) RTU. • Provide (5) Gravity Relief Hood dampers and actuators. • Provide DDC packages at (5) VAV terminal units.
(2) Existing Roof Top Units • Provide DDC package at (2) existing RTU. Package to include:
o Mixing damper actuators, supply fan start/stop/status, hot water coil valve, mixed air averaging sensor, discharge air sensor, space temperature sensor and freeze stat.
(1) Ductless Mini-splits A/C Units • Provide low voltage thermostat and condenser interlock wiring • Provide DDC space temperature monitoring.
(21) Exhaust Fan Controls • Provide DDC package at (21) exhaust fans. Controls to include controller and CTCR relay
and motorized dampers.
Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501
(41) Unit Ventilators
• (31) new heating units (3) new cooling units o Provide DDC package to the Unit Ventilator manufacture for factory mounting
and wiring. Package to include: DDC controller, (2) start/stop/status relay, DAT sensor, Mixed air
temperature sensor, freeze stat, 3-way control valve, damper actuator and combination spacer temperature/CO2 sensor.
• (7) Existing Unit Ventilator o Retrofit (7) existing unit ventilators. Control package to include new valve and
damper actuators, DDC control module, space temperature/CO2 sensor, discharge air temperature sensor, start/stop/status relay.
(10) Fan Coil Units o Retrofit (10) Fan Coil Units. Control package to include new valve and damper
actuators, DDC control module, space temperature sensor, discharge air temperature sensor, and start/stop/status relay.
(33) Fin Tube Radiation/Convector Control • Provide temperature control package at (33) FTR.
(23) Cabinet Unit Heaters/Unit Heaters • Provide temperature control package at (23) CUH.
(2) Kitchen Make-up Air Unit • Provide temperature control package at (2) Make-up Air Units.
Building Automation Training and Warranty • Provide specified owner training and product and labor warranty.
Control Pricing: 203,500 Two Hundred Three Thousand Five Hundred Dollars
Notes: 1. Exclude and work associated with Smoke/Fire Dampers or Fire Alarm System 2. Price includes a (2) year warranty on all parts and labor Metro Controls provides.
Trent Bomer Sales Engineer / LEED®AP Michael P Mares CEM® / LEED®AP Metro Controls, Inc.
Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501
Project Name: Frost Elementary Renovation Trade Specification: 230900 Direct Digital Control for HVAC Date: February 13, 2014
Metro Controls, Inc. is pleased to submit the following scope of work and quotation for the Cooper Elementary Renovation project. Our scope and pricing is based upon the design intent of the SHW drawings and specifications dated 1.31.14 through addendum #2 dated 2.13.14. We propose provide the building automation system as listed below:
Building Automation System • Provide an extension of the specified Automated Logic WebCTRL BMS front-end.
Hot Water Boiler System • Provide DDC package at the Heating Hot Water System. Package to include:
o (3) Pump start/stop/status controls, (4) well temperature sensors, and (8) boiler enable, reset, and alarm points.
o Retro-fit the existing differential pressure relief valve o Provide (6) Lighting zone controls. Includes (1) photo-cell and (4) low
voltage override switches.
(2) New CV Roof Top Unit with remote hot water coils (Technology and Shop) • Provide BACnet integration at (32) RTU. • Provide DDC packages at (2) hot water coils.
(3) Existing Roof Top Units (Media Center & RTU 1B) • Provide DDC package at (2) existing RTU. Package to include:
o Mixing damper actuators, supply fan start/stop/status, hot water coil valve, DX cooling control, mixed air averaging sensor, discharge air sensor, combination space temperature/CO2 sensor and freeze stat.
• Provide DDC packages at (7) electric re-heat zones. Includes Control module, and space temperature sensor.
(6) Air Handling Units (Gym, Aux Gym, Cafeteria, New Office & West Gym) • Provide DDC package at (6) existing Air Handling Units. Package to include:
o Mixing damper actuators, supply fan start/stop/status, hot water coil valve, DX cooling control, mixed air averaging sensor, discharge air sensor, combination space temperature/CO2 sensor and freeze stat.
Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501
• Provide DDC packages at (4) hot water re-heat zones. Includes Control module, new valve and space temperature sensor.
• Provide (7) Gravity Relief and Intake dampers and actuators for RTU/AHU controls
(1) Ductless Mini-splits A/C Units • Provide low voltage thermostat and condenser interlock wiring • Provide DDC space temperature monitoring.
(42) Exhaust Fan Controls • Provide DDC package at (42) exhaust fans. Controls to include controller and
CTCR relay and motorized dampers.
(44) Unit Ventilators • (32) new heating units (10) new cooling units
o Provide DDC package to the Unit Ventilator manufacture for factory mounting and wiring. Package to include: DDC controller, (2) start/stop/status relay, DAT sensor, Mixed air
temperature sensor, freeze stat, 3-way control valve, damper actuator and combination spacer temperature/CO2 sensor.
Provide and Control (22) Gravity Relief/Intake Hoods • (2) Existing Unit Ventilator
o Retrofit (2) existing unit ventilators. Control package to include new valve and damper actuators, DDC control module, space temperature/CO2 sensor, discharge air temperature sensor, start/stop/status relay.
(6) Fan Coil Units o Retrofit (6) Fan Coil Units. Control package to include new valve and
damper actuators, DDC control module, space temperature sensor, discharge air temperature sensor, and start/stop/status relay.
(21) Fin Tube Radiation/Convector Control • Provide temperature control package at (21) FTR.
(35) Cabinet Unit Heaters/Unit Heaters • Provide temperature control package at (35) CUH.
Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501
(1) Kitchen Make-up Air Unit • Provide temperature control package at (1) Make-up Air Unit.
Building Automation Training and Warranty • Provide specified owner training and product and labor warranty.
Base Bid Control Pricing: $282,650 Two hundred eighty two thousand six hundred and fifty dollars
Alternate Bid M-1. Replace (2) existing RTU with (1) new RTU. Alt M-1 Pricing: Deduct ($4,250)
Notes: 1. Exclude and work associated with Smoke/Fire Dampers or Fire Alarm System 2. Price includes a (2) year warranty on all parts and labor Metro Controls provides.
Trent Bomer Sales Engineer / LEED®AP Michael P Mares CEM® / LEED®AP Metro Controls, Inc.
Today’s Date: February 14, 2014 Page 1 of 1
Project Due: February 20, 2014
Project Name: Cooper Upper Elementary - Livonia Public Schools
All quotes are Full Freight allowed unless noted otherwise. Terms are Net 30 days. No taxes of any kind are included in the price above unless noted otherwise. All taxes are the responsibility of the purchaser. The price shown on this quote is based on our supplier’s current prices. If our supplier’s prices change prior to shipment of the material covered, we reserve the right to adjust our price to you accordingly.
AIREDALE
(34) Vertical Unit Ventilators (VUV‐1 thru VUV‐35)
2‐way piping package (control valve, strainer, drain, circuit setter, PT ports and shut offs)
6" raised base
8" deep rear extension (21 units)
Louver
Wall sleeve
Duct flange
Duct shroud
Remote ACCU
Condensate Pump (2 units)
Side trims
Spare filters
Factory start up Note: Remote ACCU refrigeration line sets and mounting base/rails are by others. Net Price.........$ 206,595.00 (sales tax included in price) Scott Bolhouse
Today’s Date: February 14, 2014 Page 1 of 1
Project Due: February 20, 2014
Project Name: Frost Middle School - Livonia Public Schools
All quotes are Full Freight allowed unless noted otherwise. Terms are Net 30 days. No taxes of any kind are included in the price above unless noted otherwise. All taxes are the responsibility of the purchaser. The price shown on this quote is based on our supplier’s current prices. If our supplier’s prices change prior to shipment of the material covered, we reserve the right to adjust our price to you accordingly.
AIREDALE
(42) Vertical Unit Ventilators (VUV‐1 thru VUV‐42)
3‐way piping package (control valve, strainer, drain, balancing valve, circuit setter, PT ports and shut offs)
6" raised base
8" deep rear extension (9 units)
Louver
Wall sleeve
Duct flange
Duct shroud
Remote ACCU
Condensate Pump (7 units)
Side trims
Spare filters
Factory start up Note: Remote ACCU refrigeration line sets and mounting base/rails are by others. Net Price.........$ 269,591.00 (sales tax included in price) Scott Bolhouse
Thursday, February 13, 2014 4:18:02PM ( Eastern Time )
Livonia Public Schools Planholders List
Project Information
Project Name : Livonia Public Schools
Project Hosted By :
Barton Malow
ARCMI_05_6247 : Project 21100 Fern
Project Type : Public Oak Park Michigan USA 48237
248-584-6300
EmailFaxPhone (W)AddressRecipient
Allen Electric SupplyCompany Name
Paul Mazza 31750 Plymouth Rd [email protected]
AmeriNetCompany Name
Bill Barnier 1241 South Maple [email protected] Arbor
Artisan TileCompany Name
Jen. Morton 9864 E Grand River Ave jenm@artisantileinc.com810-220-3762810-220-237048116MichiganBrighton
ASG, LLCCompany Name
Lavonne Fritz 92 Veterans Dr [email protected]
A-Turf, IncCompany Name
Kristopher Schmitt PO Box 157 [email protected] YorkWilliamsville
B & A Steel Co., IncCompany Name
Christie Goralski 50775 Richard W Blvd [email protected]
B&A Structural Steel LLCCompany Name
Christie Bayly 50775 Richard Dr [email protected]
Bolhouse LLCCompany Name
Scott Bolhouse 2704 Edward Street [email protected]
Builders Exchange of Grand RapidsCompany Name
general order 4461 Cascade Rd SE [email protected] Rapids
Builders Exchange of LansingCompany Name
Leslie. Vargas 1240 E Saginaw St [email protected]
Calvin & Company IncCompany Name
Tony Dunsmore 5076 Pilgrim Rd [email protected]
CDC NewsCompany Name
Erlinda Gutierrez 4201 West Parmer LaneSuite
A200
Cig Jan ProductsCompany Name
Tom Schiller 39 Twin Oaks Drive tomschiller@cigjanproducts.
com
810-667-7266810-667-659448446MichiganLapeer
Commercial Contracting CorpCompany Name
PlanWell Enterprise Page 1 of 5
Thursday, February 13, 2014 4:18:02PM ( Eastern Time )
Livonia Public Schools Planholders List
EmailFaxPhone (W)AddressRecipient
Commercial Contracting CorpCompany Name
Laura Ottman 4260 N Atlantic Blvd [email protected]
om
248-209-0502248-209-049148326MichiganAuburn Hills
Construction Association of MichiganCompany Name
Stacie Gold 4363 Woodward Ave gold@cam-online.com248-972-1136248-972-100048302MichiganBloomfield Hills
Construction SolutionsCompany Name
Ruth Webb 529 Carberry Hill Drive [email protected]
om
734-741-0602734-741-050048116MichiganBrighton
Contrast MechanicalCompany Name
Paul Boweis - 24833627452483362320-Michigan-
DA Home Improvements, IncCompany Name
Cindy Tiefry 1128 Eureka Rd cindy.dahome@gmail.com734-285-3371734-285-335048192MichiganWyandotte
Davis Iron WorksCompany Name
Ed Kietur 1166 Benstein Rd [email protected]
m
-248-624-596048390MichiganWalled Lake
Davis Iron Works IncCompany Name
Ed Keitur 1166 Benstein Road edkietur@davisironworksinc
.com
248-624-596048390MichiganWalled Lake
DC Byers CompanyCompany Name
Jon Mackie 5715 Rivard St jon.a.mackie@sbcglobal.net313-875-6579313-875-054548211MichiganDetroit
Dee CramerCompany Name
Daniel Hatchew 4221 Baldwin Rd [email protected]
Detroit Piping Group Mechanical Contractors, IncCompany Name
Pete Garcia 422 W Congress St pgarcia@dpgcompanies.com313-963-9642313-963-964148226MichiganDetroit
DRV ContractorsCompany Name
Joe Zitterman 51667 Oro Drive [email protected]
om
586-248-6499734-578-139648315MichiganShelby Township
E & L Construction GroupCompany Name
Sue Leedle 2830 Lippincott Blvd -810.744.1735810-744-430048507MichiganFlint
Ecker MechanicalCompany Name
Regina Schacher 3149 E Maple Ave [email protected]
m
-810-742-865248519MichiganBurton
Edgar Boettcher MasonryCompany Name
Sam Kasley 3803 N. Euclid sjkasley@boettchermasonry
.com
989-684-4824989-684-480748706MichiganBay City
Trade(s) : Unit Masonry04200
Efficient DesignCompany Name
PlanWell Enterprise Page 2 of 5
Thursday, February 13, 2014 4:18:02PM ( Eastern Time )
Livonia Public Schools Planholders List
EmailFaxPhone (W)AddressRecipient
Efficient DesignCompany Name
Kim - 51935 Gratiot efdes@sbcglobal.net586-598-8199586-598-005548051MichiganChesterfield
Elkhorn ConstructionCompany Name
Gerry - 6072 N Birch Hill elkhornco@comcast.net000-000-0000810-367-746048074MichiganKimball
Trade(s) : Gypsum Wallboard09250
Partitions10600
FutureNet Group IncCompany Name
Nirav. Patel 12801 Auburn St niravp@futurenetgroup.com313-544-7111313-544-711748223MichiganDetroit
Gillis Electric, IncCompany Name
Jim Mckechnie 34133 Schoolcraft [email protected]
m
-734-425-101148150MichiganLivonia
Great Lakes MechanicalCompany Name
Jackie Pancoast 3800 Maple [email protected]
Green Line ElectricCompany Name
Greg Abb PO Box 703390 abb.greenline@msn.com734-667-5284248-231-571648170MichiganPlymouth
Heritage ContracringCompany Name
Dan Thomas 3821 Camden Place [email protected]
Hicks ConstructionCompany Name
Deanna Degrande 1431 Industrial Drive ddegrande@hicksconstructio
nco.com
586-566-2660586-566-606048315MichiganShelby Twp
iSqFt Plan roomCompany Name
steve castellini 4500 Lake Forest Dr [email protected]
JD Candler RoofingCompany Name
William Makie 31111 Industrial Rd [email protected]
JM & Sons PlumbingCompany Name
Chad Ellis 8080 Boardwalk sales@jmsonsplumbing.com248-491-0093248-667-314048116MichiganBrighton
Macomb Mechanical, IncCompany Name
Anne Maltese 6250 19 Mile Rd amaltese@macombmechani
cal.com
586-737-9903586-737-992548314MichiganSterling Heights
Master Craft CarpetCompany Name
Jim Judd 12870 Inkster Rd jim.judd@mastercraftcarpet
s.com
313-387-0266313-387-700048239MichiganRedford
McGraw-Hill FinancialCompany Name
Darnel Foster 4300 Beltway Pl STE 180 darnel.foster@mhfi.com800-768-5594513-763-361076018MichiganArlington
Metro ElectricCompany Name
Kristina - 110 E. Pond Drive kristinametro@sbcglobal.net586-752-2862586-752-262248065MichiganRomeo
PlanWell Enterprise Page 3 of 5
Thursday, February 13, 2014 4:18:02PM ( Eastern Time )
Livonia Public Schools Planholders List
EmailFaxPhone (W)AddressRecipient
NACECompany Name
Dan Edick 27085 Gratiot Ave.Suite 106 dedick@nace-intl.com586-498-9004586-498-900348066MichiganRoseville
National Time & Signal CorporationCompany Name
Walter Crosby 28045 Oakland Oaks Ct [email protected]
Omega Electric IncCompany Name
Al Giroux 24784 Hathaway St [email protected] Hills
Omega Electric, Inc.Company Name
- - 24784 Hathaway St. omegaelecinc@aol.com248-471-2929248-471-435848335MichiganFarmington Hills
Precision Contracting GroupCompany Name
Scott Richardson 28 West AdamsSuite 330 [email protected]
m
248-521-673648226MichiganDetroit
Professional Movers.comCompany Name
Kristopher Bergstrom 1270 N. Pontiac Trail kris@professionmovers.com248-926-9921248-926-999948390MichiganWalled Lake
R C Nowak CompanyCompany Name
- - 5848 Hubbard [email protected]
om
734-425-4289734-425-077048135MichiganGarden City
Reed Construction DataCompany Name
Kristin Whiston 30 Technology Pkwy SSuite
100
Kristin.Whiston@reedbusine
ss.com
630-288-790730092GeorgiaNorcross
RW MeadCompany Name
Robin Zampich 333795 Riviera [email protected]
Schiffer Mason ContractorsCompany Name
Steve Meyer 2190 Delphine NEBox 250 stevemeyer@schiffermason
ry.com
517-694-4662517-694-256648842MichiganHolt
Shock BrothersCompany Name
Ron Adams 20320 Cornillie Drive [email protected]
Shores Tile CoCompany Name
Mike Maiuri 29975 Little Mack Ave m_maiuri@shorestile.com586-293-3810586-293-554048066MichiganRoseville
Shoreview ElectricCompany Name
Grace Pilarowski 37830 Groesbeck Highway gpilarowski@shoreviewelecti
c.net
586-463-4383586-463-890048036MichiganClinton Twp
The Bouma CorporationCompany Name
Pete Hill 4101 Roger B. Chaffee [email protected]
m
538-0143538-360049548MichiganGrand Rapids
Thermal NeticsCompany Name
Melissa Kalish 3955 Pinnacle Court [email protected]
m
248-276-3301248-276-333748326MichiganAuburn Hills
PlanWell Enterprise Page 4 of 5
Thursday, February 13, 2014 4:18:02PM ( Eastern Time )
Livonia Public Schools Planholders List
EmailFaxPhone (W)AddressRecipient
Tollis DevelopmentCompany Name
Mike Tollis 76302 Burman Rd [email protected]
m
928-569-5306586-784-834648062MichiganRichmond
Unified Business Technologies, IncCompany Name
David Jaworski 353 Indusco CourtSuite C david.jaworski@butus.com248-588-1834248-588-178148083MichiganTroy
VentconCompany Name
Michael Wagner 500 Enterprise Dr [email protected] Park
Villanova ConstructionCompany Name
Larry Bukowski 20765 Parker Street villanova_larry@yahoo.com248-476-5011248-476-512248336MichiganFarmington Hills
WJ O'Neal CompanyCompany Name
Drake Bacha 35457 Industrial [email protected]
End of Report
PlanWell Enterprise Page 5 of 5
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 1 of 8
ADDENDUM
Pre-Bid Addendum No. 02
TO PLANS AND SPECIFICATIONS FOR
Livonia Public Schools – BID Frost MS Renovation
SHW Project No. 7113.058.00
February 13, 2014
NOTE: If you have questions about this project, please contact: John Waldrop, SHW-
Construction Administrator.
This Addendum is generally separated into sections for convenience; however, all contractors,
subcontractors, material suppliers and other involved parties shall be responsible for reading the
entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not
relieve any party affected from performing per instructions, provided the information is set forth
one time anywhere in the Addendum.
This document shall become attached to and part of the Construction Documents for the
aforementioned project.
SPECIFICATIONS
1. Section 06 40 23 Interior Architectural Woodwork (re-issued)
a. Revised section to include solid surface countertops and backsplashes
2. Section 10 51 13 Metal Lockers (not re-issued)
a. Revise Locker type L1 from 15 x 18 x 60 to 15 x 15 x 60
3. Section 22 34 00 – Fuel-Fired, Domestic Water Heaters (re-issued):
a. Add Domestic Water Expansion Tanks to section 2.2 Domestic Water Heater
Accessories.
4. Section 23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units (not re-
issued)
a. Add the following to the list of acceptable manufacturers:
AAON model RN-B
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 2 of 8
DRAWINGS – GENERAL
1. Sheet G001 (re-issued):
a. Add re-issued addendum sheets.
DRAWINGS – STRUCUTRAL
1. Sheet S131 (re-issued):
a. Revise Partial Roof Framing Plan – Area D as indicated.
b. Revise Partial Roof Framing Plan – Area G as indicated.
c. Revise detail G1 as indicated.
DRAWINGS – ARCHITECTURAL
1. Sheet AD111E (re-issued):
a. Add demolition keynote 20 to rooms 020 and 021.
2. Sheet AD111F (re-issued):
a. Add demolition keynote 20 to rooms 022, 023, 024, 027, 031, 032, 033, 034,
035, 036, 037, and 038.
3. Sheet AD111G (re-issued):
a. Add demolition keynote 20 to rooms 043, 044, and 045.
b. Revise demolition keynote in Classroom 044 to 5A, as indicated.
4. Sheet A111A through A111G (not re-issued):
a. Revise keynote 1 to read as follows, “NEW GLASS AND ALUMINUM
STOREFRONT SYSTEM”.
5. Sheet A201 (not re-issued):
a. Revise A7 to read as follows, “AREA G – EAST ELEVATION”
b. Revise D7 to read as follows, “AREA B – EAST ELEVATION”
c. Revise D3 to read as follows, “AREA A – EAST ELEVATION”
6. Sheet A202 (not re-issued):
a. Revise F7 to read as follows, “AREA E – WEST ELEVATION”
7. Sheet A203 (not re-issued):
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 3 of 8
a. Revise C7 to read as follows, “AREA C – WEST ELEVATION”
8. Sheet A611B (re-issued):
a. Revise light location in Platform 051A.
9. Sheet A611E (re-issued):
a. Add lights to room 025, 026, and 49.
b. Revise lights in room 008, 009, and 010.
10. Sheet A611F (re-issued):
a. Add lights to rooms 024, 027, 031, 032, 037, 038, 54, 67, and 72.
11. Sheet A611G (re-issued):
a. Add lights to rooms 039, 041, 042, 87, 88 and 100.
DRAWINGS – MECHANICAL
1. Sheet MD111E (not-re-issued):
a. Revise Mechanical Demolition Key Note 2 to read as follows: “REMOVE
EXISTING HORIZONTAL UNIT VENTILATOR INCLUDING CONTROLS, PIPING
AND ALL ASSOCIATED ACCESSORIES. REMOVE EXTERIOR OUTSIDE AIR
LOUVER AND COORDINATE EXTERIOR WALL PATCHING/REPAIR WITH
ARCHITECTURAL TRADES. REMOVE EXISTING HHW PIPING COMPLETE
BACK TO MAIN IN EITHER TUNNEL OR CEILING PLENUM AND CAP AT
MAIN.”
2. Sheet M111D (not re-issued):
a. Revise return duct size up to RTU-1 to 68”x44” and return branches north and
south to be 44”x18”.
b. Revise supply duct size up to RTU-1 to 60”x28” and supply duct branch east to
be 60”x24”
3. Sheet M111E (not re-issued):
a. Provide 8” rear extension for VUV-2 and VUV-3.
b. VUV-2, VUV-3, VUV-6, VUV-8, VUV-9, VUV-14 and VUV-15 will serve
Classrooms.
c. Provide condensate pump for VUV-7, VUV-9, VUV-10, VUV-11, VUV-12 and
VUV-13. Route 1” condensate drain from VUV-7 and VUV-9 to sink in JC 38.
Route 1” condensate drain from VUV-10, VUV-11, VUV-12 and VUV-13 to sink
in JC 47.
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 4 of 8
4. Sheet M111F (not re-issued):
a. Provide condensate pump for VUV-24 and route 1” condensate drain to sink in
JC 47.
5. Sheet M211C (not re-issued):
a. Revise HHWS & HHWR piping in Locker Room 11E to show pipes going up and
add note to read “1 1/2” HHWS & HHWR UP TO AHU-2 IN MEZZANINE”.
6. Sheet M211E (not re-issued):
a. Remove existing plumbing line shown at JC 47 and Girls 46.
b. At JC 47 (E)(E) 2 1/2" HHWR DN should read (E) 2 1/2" HHWS DN, (E) 2 1/2"
HHWR DN.
c. At JC 47 route new 1 1/4" HHWS & R piping from existing 2 1/2” HHWS & R
risers and route into ceiling space of Computer Lab 007, route 1” HHWS & R
piping and connect to VUV-4 and VUV-5.
7. Sheet M211F (not re-issued):
a. At JC 69 route new 1 1/2" HHWS & R piping from existing 2 1/2" HHWS & R
risers and route into ceiling space of Classroom 002, route 1” HHWS & R and
connect to VUV-31, VUV-32 and VUV-33.
8. Sheet M211G (not re-issued):
a. In Technology 047 remove the 1” branch piping, temperature sensor and co2
sensor at column B and column C.
9. Sheet M601 (not re-issued):
a. Revise PUMP SCHEDULE as follows – P-1, HP to .33 and Model Number to
SERIES 60 1 1/4 x 5 1/4. P-4, Overload GPM to .31, HP to .08, RPM to 2650
and Model Number to PL-30.
10. Sheet M602 (not re-issued):
a. Add note as follows to VERTICAL UNIT VENTILATOR APPLICATION
SCHEDULE – “PROVIDE CONDENSATE PUMP FOR VUV-7, VUV-9, VUV-10,
VUV-11, VUV-12, VUV-13 and VUV-24.
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 5 of 8
11. Sheet M701 (not re-issued)
a. Add the following:
Interior and Exterior Lighting Control
Refer to electrical drawings for location and quantities of contactors and remote
pushbuttons for the DDC interlock to the lighting system.
DRAWINGS – ELECTRICAL
1. Sheet ED111A (re-issued)
a. Add Key Note #6:’REMOVE EXISTING LIGHTING AND SWITCHES IN THIS
ROOM. RETAIN CIRCUIT FOR RECONNECTION TO NEW LIGHTS AND
SWITCHES’.
b. Add Key Note 6 designation to rooms 113, 115, 116, 117, 118, 119, 120, and
121.
c. Add CUH identification to cuh in H001, H002 and H001B.
d. Relocate CUH in H001B and H001.
e. Add two CUH to be removed in H001B
f. Add switches to be removed to rooms 113, 115, 118, 119, 120.
g. Revise Tunnel plan to reflect proper location.
h. Add note in Vestibule H001 about removal and installation of light.
2. Sheet ED111B (not re-issued)
a. Add Key Note #6. Refer to ED111A above.
b. Add CUH identifications I H002 and H004.
c. Revise CUH in 054a from Cuh to be removed to FTR to remain.
d. Remove item from penthouse showing on first floor.
3. Sheet ED111C (not re-issued)
a. Add Key Note #5. Refer to Addendum #1.
b. Add Key Note #6. Refer to ED111A above.
c. Add Key Note 6 designation to Corridor H002B.
d. Add CUH to be removed in corridor H002.
e. Remove item from penthouse showing on first floor.
4. Sheet ED111D (not re-issued)
a. Add Key Note #5. Refer to Addendum #1.
b. Add Key Note #6. Refer to ED111A above.
c. Add Light switches to be removed in rooms 057 and 058.
d. Add hatching to down light in room 059 previously shown demolished.
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 6 of 8
5. Sheet ED111E (not re-issued)
a. Add Key Note #5. Refer to Addendum #1.
b. Add Key Note #6. Refer to ED111A above.
c. Add lighting switches to rooms 36 and 37 and demolish.
d. Add Key Note 6 designation to room 49.
e. Add CUH in Corridor H009 and demolish.
6. Sheet ED111F (not re-issued)
a. Add Key Note #5. Refer to Addendum #1.
b. Add Key Note #6. Refer to ED111A above.
c. Add location, identification and hatching to (3) CUH and demolish in Corridor
H009.
d. Add identification and hatching to CUH in Corridor H007 previously shown
demolished.
7. Sheet ED111G (not re-issued)
a. Add Key Note #6. Refer to ED111A above.
b. Revise CUH in Corridor H009 from demolish to existing to remain.
c. Add U.V. in room 044 and demolish.
d. Add Key Note 6 designation to room 94.
e. Add removal of Temperature Control Air compressor to Boiler room.
8. Sheet ED121 (not re-issued)
a. Change EF in Penthouse B to existing to remain.
9. Sheet E111A (re-issued)
a. Add Key Note #6:DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND
CONNECT TO PANEL LP-EM AS INDICATED’.
b. Revise Tunnel plan to reflect correct background.
c. Add emergency circuit to tunnel plan.
d. Add Occupancy Sensor designations to tunnel plan.
e. Add emergency circuit and controls to lights as indicated.
f. Add Key Note 6 designation as indicated.
10. Sheet E111B (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add emergency circuit and controls to lights as indicated.
c. x
11. Sheet E111C (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add Key Notes # 3 thru #5. Refer to Addendum #1.
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 7 of 8
c. Add emergency circuit and controls to lights as indicated.
d. Add light fixture and light fixture designations as indicated.
e. Add Key Notes as indicated.
f. Remove text note in GYM 055W.
12. Sheet E111D (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add emergency circuit and controls to lights as indicated.
c. Add Key Note designations as indicated.
d. Add light fixture and light fixture designations as indicated.
13. Sheet E111E (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add Key Notes # 3 thru #5. Refer to Addendum #1.
c. Add emergency circuit and controls to lights as indicated.
d. Add Key Note designations as indicated.
e. Add light fixture and light fixture designations as indicated.
14. Sheet E111F (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add emergency circuit and controls to lights as indicated.
c. Add Key Note designations as indicated.
d. Add light fixture and light fixture designations as indicated.
15. Sheet E111G (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add emergency circuit and controls to lights as indicated.
c. Add Key Note designations as indicated.
d. Add light fixture and light fixture designations as indicated.
16. Sheet E121 (re-issued)
a. Add Key Note #6. Refer to E111A above.
b. Add emergency circuit to Mezzanines A, B, and C.
c. Add Occupancy Sensor designations to Mezzanines A, B, and C.
17. Sheet E211A (re-issued)
a. Revise Tunnel plan to reflect correct background.
b. Remove EF-X from rooms 113, 118 and 126.
18. Sheet E211C (not re-issued)
a. Add circuit EG-48 for EWC in corridor H002.
b. Change receptacle shown as new to existing in room 11.
Project Name: BID Frost MS Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 8 of 8
19. Sheet E211D (not re-issued)
a. Rename Storage Room 60 to Classroom 60.
b. Add two receptacles ot classrooms 57 and 58 along new wall. Circuit all (4)
receptacles to EG-47.
20. Sheet E211E (not re-issued)
a. Remove EF-X from room 036.
21. Sheet E211G (not re-issued)
a. Add existing CUH in Corridor H009.
b. Add circuit EG-49 to EWC, GFCI receptacle in room 042.
c. Remove EF-X from room 046.
22. Sheet E221 (not re-issued)
a. Change EF in Penthouse B to existing to remain.
b. Add EF designations to match Mechanical in Penthouse A.
c. Add two smoke damper smoke detectors to Penthouse A.
23. Sheet E411 (re-issued)
a. Revise panel schedule loads as indicated.
b. Add panel schedule RP-EGX.
24. Sheet E502 (re-issued)
a. Revise corridor and exterior lighting control detail as indicated.
25. Sheet E601 (re-issued)
a. Revise light fixture schedule as indicated.
END OF PRE-BID ADDENDUM No. 02
Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 1 of 6
ADDENDUM
Pre-Bid Addendum No. 02
TO PLANS AND SPECIFICATIONS FOR
Livonia Public Schools – BID Cooper Upper ES Renovation
SHW Project No. 7113.057.00
February 13, 2014
NOTE: If you have questions about this project, please contact: John Waldrop, SHW-
Construction Administrator.
This Addendum is generally separated into sections for convenience; however, all contractors,
subcontractors, material suppliers and other involved parties shall be responsible for reading the
entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not
relieve any party affected from performing per instructions, provided the information is set forth
one time anywhere in the Addendum.
This document shall become attached to and part of the Construction Documents for the
aforementioned project.
SPECIFICATIONS
1. Section 06 40 23 Interior Architectural Woodwork (re-issued)
a. Revised section to include solid surface countertops and backsplashes
2. Section 10 51 13 Metal Lockers (not re-issued)
a. Revise Locker type L1 from 15 x 18 x 60 to 15 x 15 x 60
3. Section 22 34 00 – Fuel-Fired, Domestic Water Heaters (re-issued):
a. Add Domestic Water Expansion Tanks to section 2.2 Domestic Water Heater
Accessories.
4. Section 23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units (not re-
issued)
a. Add the following to the list of acceptable manufacturers:
AAON model RN-B
Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 2 of 6
DRAWINGS – GENERAL
1. Sheet G001 (re-issued):
a. Add re-issued addendum sheets.
DRAWINGS – STRUCUTRAL
1. Sheet S131 (re-issued):
a. Revise Roof Framing Plan – Area A as indicated.
b. Revise detail G1 as indicated.
DRAWINGS – ARCHITECTURAL
1. Sheets AD111A through AD111E
a. Revise demolition keynote 9 to read as follows, “REMOVE FOLDING TABLE
AND FRAME”
2. Sheet AD111A (re-issued):
a. Add demolition keynote 9 to Cafeteria 410.
3. Sheet AD111E (not re-issued):
a. Remove demolition keynote 18 at south exterior wall.
4. Sheets A111A through A111E
a. Revise keynote 20 to read as follows, “INFILL TABLE OPENINGS WITH CMU
FLUSH WITH PLASTER ABOVE (TYPICAL FOR 10)”
5. Sheet A111A (not re-issued):
a. Revise wall types in Cafeteria 410 to M4 at table opening infills.
6. Sheet A111E (not re-issued):
a. Remove keynote 18 near door H006B.
Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 3 of 6
DRAWINGS – PLUMBING
1. Sheet P111G (not re-issued):
a. Revise Plumbing key Note #9 to read as: “PROVIDE NEW GAS FIRED
STORAGE WATER HEATERS. ROUTE NEW CW, HW, AND NG PIPING FROM
EXISTING SERVICES LOCATED WITHIN ROOM AND CONNECT TO NEW
WATER HEATERS. EXTEND CONCRETE HOUSKEEPING PAD TO
ACCOMMODATE NEW DOMESTIC WATER HEATERS”.
2. Sheet P501 (re-issued):
a. Revise Gas Fired Domestic Water Heater Piping Diagram to show expansion
tank as new expansion tank ET-1 and remove new connection.
b. Add Plumbing Expansion Tank Schedule.
DRAWINGS – MECHANICAL
1. Sheet M111D (not re-issued):
a. Provide condensate pump for VUV-20, VUV-21 and VUV-22. Route 1”
condensate drain for VUV-20 and VUV-21 to sink in JC 11. Route 1” condensate
drain for VUV-22 to sink in MAINT. 43.
2. Sheet M601 (not re-issued):
a. Revise PACKAGED ROOF TOP UNIT SCHEDULE AS FOLLOWS: Dimensions –
Height 56”, Width 97”, Length 91”, Heating Section – EAT 60, LAT 88.4, INPUT
MBH 200, OUTPUT MBH 160, Stages Modulating 10:1 turndown, Cooling Coil
(DX) – EDB 79.8, LDB 57.7, LWB 57.6, Total MBH 155.416, Sensible MBH
125.66, Fans ESP 2.9, HP 8.4, RPM 1514, EER 11.9, Manufacturer McQuay,
Model Number DPS012A.
3. Sheet M602 (not re-issued):
a. Add note to VERTICAL UNIT VENTILATOR APPLICATION SCHEDULE as
follows: PROVIDE CONDENSATE PUMP FOR VUV-20, 21 AND 22 AS
MANUFACTURED BY VUV MANUFACTURER.
b. Revise rear extension requirement on VERTICAL UNIT VENTILATOR
APPLICATION SCHEDULE for VUV-6, 18, 19, 24, 25, 28 and 29 from “YES” to
“NO.”
4. Sheet M701 (not re-issued)
a. Add the following:
Interior and Exterior Lighting Control
Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 4 of 6
Refer to electrical drawings for location and quantities of contactors and remote
pushbuttons for the DDC interlock to the lighting system.
DRAWINGS – ELECTRICAL
1. Sheet ED111A (not-reissued):
a. Demo two AHU’s in GYM 412.
b. Demo AHU in Store RM. 410A.
c. Add not to remove and reinstall existing fixtures in Corridor H003Cto allow
installation of new mechanical ductwork. Clean and re-lamp fixtures.
2. Sheet ED111B (not-reissued):
a. Demo two AHU’s in GYM 412 and Boiler 311.
b. Demo smoke detector in Store Rm. 32, Elec 311A, and Maint. 310A.
c. Demo fire alarm horn strobe in Boiler Rm 311 and Maint. 310A.
d. Demo Kiln disconnect switch in Art 309.
3. Sheet ED111C (not-reissued):
a. Demo fire alarm horn strobe in Classrooms 204, 205, 206, 207, 208, 209, 210
and 211.
b. Demo U.V.’s in classrooms 206, 207,and 208.
c. Demo light switches in toilet rooms 8 and 9.
d. Demo smoke detector in Store Rm. 212.
4. Sheet ED111D (not-reissued):
a. Demo fire alarm horn strobe in Classrooms Team RM 25.
b. Demo Kiln disconnect switch in Art 309.
5. Sheet ED111E (not-reissued):
a. Demo fire alarm horn strobe in Rooms 107,104, 103, 102, 101, 124, 112, 115,
117, 1136, 118 and 119.
b. Demo U.V.’s in classrooms 118 and 119.
c. Demo smoke detectors in rooms 72, 73, 105 and 106.
6. Sheet ED121E (reissued):
a. Add demolition key notes #8 and #9.
b. Revise Demolition roof plan as indicated.
c. Add demolition of existing RTU duct detectors.
7. Sheet E111A (reissued):
a. Add circuiting to emergency light fixtures as indicated.
Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 5 of 6
b. Revise occupancy sensor types as indicated.
c. Delete photos cells as indicated.
d. Add light switches as indicated.
e. Add contactors C3 as indicated.
f. Add override switch SL3 as indicated.
8. Sheet E111B (reissued):
a. Add LC fixtures in the North Courtyard as indicated.
b. Add circuiting to emergency light fixtures as indicated.
c. Revise occupancy sensor types as indicated.
d. Delete photos cells as indicated.
e. Add light switches as indicated.
9. Sheet E111C (reissued):
a. Add LC fixtures in the West Courtyard outside each door as indicated.
b. Add circuiting to emergency light fixtures as indicated.
c. Revise occupancy sensor types as indicated.
d. Delete photos cells as indicated.
e. Add light switches as indicated.
f. Add contactor C1 and C4 as indicated.
g. Add override switch SL4 as indicated.
10. Sheet E111D (reissued):
a. Add circuiting to emergency light fixtures as indicated.
b. Revise occupancy sensor types as indicated.
c. Delete photos cells as indicated.
d. Add light switches as indicated.
11. Sheet E111E (reissued):
a. Add type LC fixture in the Courtyard outside north door as indicated.
b. Add circuiting to emergency light fixtures as indicated.
c. Revise occupancy sensor types as indicated.
d. Delete photos cells as indicated.
e. Add light switches as indicated.
f. Add light fixtures as indicated.
g. Add contactor C2 as indicated.
h. Add override switch SL2 as indicated.
12. Sheet E211A (reissued):
a. Add key Note #7as indicated.
b. Add general note #9 as indicated.
c. Add smoke damper smoke detectors as indicated.
d. Add junction box and circuiting for card readers as indicated.
Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014
Pre-Bid Addendum No. 02 Page 6 of 6
e. Add EWC as indicated.
f. Add Key note #3 to sleeves as indicated.
13. Sheet E211B (reissued):
a. Add circuits for generator as indicated.
b. Add card reader as indicated.
c. Delete VUV-5 in Art Room as indicated.
d. Delete duct smoke detector from VUV-6 as indicated. Revise size of MDP as
indicated.
e. Add UH-1 in Elec. 311A as indicated.
14. Sheet E211C (not reissued):
a. Add card reader to south door of corridor H002 circuited to EG-36.
15. Sheet E211D (reissued):
a. Add circuit for EWC as indicated.
b. Add circuit to FACP as indicated.
c. Add receptacles in Classrooms 120, 203 and 202 as indicated.
16. Sheet E211E (not reissued):
a. Add circuits EGX-5, 7, and 9 to MDF.
b. Add circuit for A/C-1 in Tech 73. Circuit to VUV-9 and provide 30A-2P fused
disc. Switch.
c. Add Key note #3 to conduits into Tech 73.
17. Sheet E231 (reissued):
a. Add key notes #7 and #8 as indicated.
b. Revise roof power plan as indicated.
18. Sheet E401 (reissued):
a. Add RTU’s to MDP as indicated.
19. Sheet E411 (reissued):
a. Revise panel schedules as indicated.
20. Sheet E502 (reissued):
a. Revise Corridor and exterior lighting contactors as indicated.
21. Sheet E601 (reissued):
a. Revise fixture schedule as indicated.
END OF PRE-BID ADDENDUM No. 02
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 1
SECTION 06 40 23 - INTERIOR ARCHITECTURAL WOODWORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions andDivision 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section Includes:
1. Interior solid hardwood lumber trim (SHLT), including standing and running trim, edging, and cutmoldings for transparent finish.
2. Interior veneer-core plywood (VCPV) custom architectural millwork cabinetry with doors, and customflush wall paneling; plastic-laminate-clad, and for transparent finish.
3. Solid-surface-material countertops and backsplashes.
B. Related Sections:
1. Section 06 10 00 "Rough Carpentry" for plywood substrate panels, wood lumber blocking, and othercarpentry work not exposed to view and supporting interior architectural woodwork.
2. Section 12 32 16 “Manufactured Plastic-Laminate-Faced Casework” for manufactured plastic-laminate-faced casework units of stock design, and for solid surfacing material (SSM) -facedcountertop assemblies with SSM back- and side-splashes and countertop edge aprons.
3. Section 09 65 13 “Resilient Base and Accessories” for resilient wall base applied to customarchitectural millwork cabinetry.
4. Division 22 Plumbing Sections, for provision of built-in sinks, lavatories, and plumbing fittings.5. Division 26 Electrical Sections, for provision of built-in electrical outlets and wiring.
1.3 DEFINITIONS
A. Interior architectural woodwork includes wood furring, blocking, shims, grounds, and hanging strips forinstalling custom architectural millwork and cabinetry items, unless concealed within supporting constructionbefore millwork and cabinetry installation.
B. AWI-QSI: American Woodwork Institute - Quality Standards Illustrated.
C. AWI-AWS: American Woodwork Institute - Architectural Woodwork Standards.
D. Balanced Construction: To achieve balanced construction, wall and shelving panels must be symmetricalfrom plywood core centerline, i.e., use materials on either side of panel that contract and expand, and aremoisture permeable, at the same rate.
E. SHLT: Solid hardwood lumber trim.
F. VCPV: Veneer-core plywood with wood veneer applied to one face.
G. T&G: Tongue-and-groove.
H. The following definitions apply to custom architectural millwork cabinetry units:
1. Exposed portions of cabinetry units (Finish Surfaces) include surfaces visible when doors anddrawers are closed. Bottoms of cases more than 4' 0" above floor shall be considered as exposed.Visible members in open cases also shall be considered as exposed portions.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 2
2. Semi-exposed portions of cabinetry units includes those members behind opaque doors, such asshelves, divisions, interior faces of ends, case back, drawer sides, backs and bottoms, and back faceof doors. Tops of cases 6'- 6" or more above floor shall be considered to be semi-exposed.
3. Concealed portions of casework include sleepers, web frames, dust panels, and other surfaces notusually visible after installation.
I. For the purposes of this Specification Section and Project:
1. High-Pressure Decorative Laminate (HPDL): Plastic Laminate other than Melamine.
2. CLS: Thin Plastic Laminate used exclusively for cabinet liner or other “hidden from view”applications, unless otherwise indicated.
1.4 SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product indicated. Include componentmaterials, dimensions, profiles, textures, and colors; and include construction and application details, andfinishing materials and processes.
1. Include data for wood-preservative treatment from chemical-treatment manufacturer and certificationby treating plant that treated materials comply with requirements. Indicate type of preservative usedand net amount of preservative retained. Include chemical-treatment manufacturer's printedinstructions for finishing treated material.
2. Include data for fire-retardant treatment from chemical-treatment manufacturer and certification bytreating plant that treated materials comply with requirements.
3. For products receiving a waterborne treatment, include statement that moisture content of treatedmaterials was reduced before shipment to Project site to levels specified.
4. Include copies of warranties from chemical-treatment manufacturers for each type of treatment.
5. Shop Drawings: For countertops. Show materials, finishes, edge and backsplash profiles, methodsof joining, and cutouts for plumbing fixtures.
6. Samples for Verification: Countertop material, 6 inches square.
B. Sustainability Submittals:
1. Product Data for VOCs Content: For adhesives and glues used at Project site, documentationincluding printed statement of VOCs content.
2. Product Data for Urea Formaldehyde Content: For composite wood products, documentationindicating that products contain no urea formaldehyde.
C. Shop Drawings: Comply with AWS Section 1 - Submittals, and, in addition, the following:
1. Submit one copy of Shop Drawings to AWI Quality Certification Program for review.2. Shop Drawings to display AWS certified compliance label on first page.3. Show shelf to cabinet joint details of bottom, intermediate, and top fixed shelves.
D. Samples for Verification: Comply with AWS Section 1 - Submittals, and, in addition, the following:
1. Solid Hardwood Lumber Trim (SHLT) with Transparent Finish: Three (3) individual lumber samples;each 8 inches wide by 24 inches long by minimum 5/8-inch thick; of specified species, cut, and AWIGrade; finished on one side and on one edge; and showing producer’s full range of wood grain, color,and finish variations to be expected in the completed Work.
2. Veneer-Core Plywood with Wood Veneer Applied to One Face (VCPV) with Transparent Finish:Three (3) individual plywood samples; each 12 inches wide by 24 inches long by minimum 7/16-inchthick; of specified veneer species, cut, and AWI Grade; finished on veneered side; and showingproducer’s full range of wood grain, color, and finish variations to be expected in the completed Work.Include at least one face veneer seam and finish as specified.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 3
3. Corner Pieces as Follows:
a. Cabinet front frame joints between stiles and rail, as well as exposed end pieces, 18 incheshigh by 18 inches wide by 6 inches deep.
b. Miter joints for standing trim.
E. Product Certificates: Signed by manufacturers of woodwork certifying that products furnished comply withrequirements.
F. Evaluation Reports: For fire-retardant-treated wood, from ICC-ES.
G. Qualification Data: For architectural woodwork fabricator.
H. Sample Warranty: For manufacturer's warranty.
1.5 QUALITY ASSURANCE
A. Source Limitations: Engage one (1) qualified woodworking firm to assume undivided responsibility forfabrication and installation of interior architectural woodwork.
B. Fabricator Qualifications: A woodworking firm with minimum of ten (10) years’ experience in producinginterior architectural woodwork similar in materials, design, and extent to that indicated for this Project andwhose work has resulted in construction with an established record of successful in-service performance,as well as sufficient production capacity to produce required units of work.
C. Quality Standard: Comply with Architectural Woodwork Institute’s’ “Architectural Woodwork QualityStandards (AWS), Current Edition,” for grades of interior architectural woodwork, construction, finishes, andother requirements.
1. Provide AWS Quality Certification Program certificates indicating that interior architectural woodwork,including installation, complies with requirements of AWI grades specified.
2. Contractor, upon award of the Work, shall register interior architectural woodwork specified in thisSection with the AWI Quality Certification Program 800-449-8811 www.awiqcp.org
D. Chemical Content: All interior architectural woodwork materials used shall be relatively non-toxic whenexposed to heat or flame.
E. Fire-Test-Response Characteristics: Where fire-retardant materials or products are indicated, providematerials and products with specified fire-test-response characteristics as determined by testing identicalproducts per test method indicated by UL, ITS, or another testing and inspecting agency acceptable toauthorities having jurisdiction. Identify with appropriate markings of applicable testing and inspecting agencyin the form of separable paper label or, where required by authorities having jurisdiction, imprint on surfacesof materials that will be concealed from view after installation.
F. Preinstallation Conference: Conduct conference at Project site to comply with the requirements specified inSection 01 31 00 “Project Management and Coordination.”
1.6 DELIVERY, STORAGE, AND HANDLING
A. Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air circulation.Protect materials from weather by covering with waterproof sheeting, securely anchored. Provide for aircirculation around stacks and under coverings.
B. Deliver interior architectural woodwork materials only when environmental conditions meet requirementsspecified for installation areas. If interior architectural woodwork materials must be stored in other thaninstallation areas, store only where environmental conditions meet requirements specified for installationareas.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 4
1.7 PROJECT CONDITIONS
A. Environmental Limitations: Do not deliver or install interior architectural woodwork materials until building isenclosed and weatherproof, wet work in space is completed and nominally dry, and permanent HVACsystem is operating and maintaining temperature and relative humidity at occupancy levels during theremainder of the construction period.
B. Field Measurements: Where interior architectural woodwork is indicated to fit to other construction, verifydimensions of other construction by field measurements before fabrication and indicate measurements onShop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
1. Locate concealed framing, blocking, and reinforcements that support woodwork by fieldmeasurements before being enclosed and indicate measurements on Shop Drawings.
2. Established Dimensions: Where field measurements cannot be made without delaying the Work,establish dimensions and proceed with fabricating woodwork without field measurements. Provideallowance for trimming at site, and coordinate construction to ensure that actual dimensionscorrespond to established dimensions.
C. Do not install interior architectural woodwork materials that are wet, moisture damaged, or mold damaged.
1. Indications that wood materials are wet or moisture damaged include, but are not limited to,discoloration, sagging, or irregular shape.
D. Indications that wood materials are mold damaged include, but are not limited to, fuzzy or splotchy surfacecontamination and discoloration.
1.8 COORDINATION
A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units of Workspecified in other Sections to ensure that interior architectural woodwork can be supported and installed asindicated.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Provide materials that comply with requirements of the AWS quality standard for each type ofwoodwork and quality grade specified, unless otherwise indicated.
B. Low-Emitting Materials: Composite wood products shall comply with the testing and product requirementsof the California Department of Health Services' "Standard Practice for the Testing of Volatile OrganicEmissions from Various Sources Using Small-Scale Environmental Chambers."
C. Formaldehyde Emission Levels: Comply with formaldehyde emission requirements of voluntary standardreferenced below:
1. Hardwood Plywood: HPMA FE.
D. Lumber: DOC PS 20 and the following grading rules:
1. NeLMA: Northeastern Lumber Manufacturers' Association, "Standard Grading Rules forNortheastern Lumber."
2. NHLA: National Hardwood Lumber Association, "Rules for the Measurement and Inspection ofHardwood & Cypress."
3. WCLIB: West Coast Lumber Inspection Bureau, Standard No. 17, "Grading Rules for West CoastLumber."
4. WWPA: Western Wood Products Association, "Western Lumber Grading Rules."
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 5
E. Factory mark each piece of lumber with grade stamp of inspection agency indicating grade, species,moisture content at time of surfacing, and mill.
1. For exposed lumber, mark grade stamp on end or back of each piece, or omit grade stamp andprovide certificates of grade compliance issued by inspection agency.
F. Veneer Core Hardwood Plywood: HPVA HP-1, Veneer core (three or more layers of cross-bandedhardwood veneers glued together) for plastic-laminate-faced casework shall be either 7-ply (3/4”) or 9-ply(1”) thickness, industrial (cabinet) grade, and made without urea formaldehyde.
G. Hardboard: AHA A135.4.
H. General Cabinet Construction Requirements:
1. Cabinet bases shall be of dimensional lumber.2. Frames, side panels, and structural parts of the cabinets shall be of plywood and/or dimension
lumber.3. Doors and shelves may have their substrate of any wood material except particleboard and except
medium density and heavy density fiberboards. All fixed shelves shall be full shelf thickness “stopdado” joined to their supports. The full depth of the stop dado joint shall begin no more than 1-1/2inch from the face of the shelf and end at the back of the shelf. The joint shall be continuous.
2.2 FIRE-RETARDANT-TREATED MATERIALS
A. General: For applications indicated, use materials complying with requirements in this article that areacceptable to authorities having jurisdiction, and comply with testing requirements; testing by a qualifiedtesting agency.
B. Fire-Retardant-Treated Lumber and Plywood by Pressure Process: Products with a flame-spread index of25 or less when tested according to ASTM E 84, with no evidence of significant progressive combustionwhen the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5feet beyond the centerline of the burners at any time during the test.
1. Kiln dry lumber and plywood after treatment to a maximum moisture content of 19 and 15 percentrespectively.
C. For exposed items indicated to receive a stained or natural finish, use organic resin chemical formulationsthat do not contain salt and colorants, and provide materials that do not have marks from spacer sticks onexposed face.
D. Do not use material that does not comply with requirements for untreated material or is warped or discolored.
E. Identify fire-retardant-treated wood with appropriate classification marking of testing and inspecting agencyacceptable to authorities having jurisdiction.
1. For exposed lumber indicated to receive a stained or natural finish, mark end or back of each pieceor omit marking and provide certificates of treatment compliance issued by inspection agency.
2. For exposed veneer-core plywood with wood veneer applied on one face and indicated to receive astained or natural finish, mark back of each piece.
F. Application: All interior lumber and plywood.
2.3 INTERIOR SOLID HARDWOOD LUMBER TRIM (SHLT)
A. Hardwood Lumber Trim for Transparent Finish (Stain or Clear Finish):
1. Species and Cut: Red Oak, Quarter sawn.2. AWI Lumber Grade: Grade I for Hardwoods.3. Maximum Moisture Content: 10 percent.4. Finger Jointing: Not allowed.5. Gluing for Width: Not allowed.6. Veneered Material: Not allowed.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 6
7. Face Surface: Surfaced (smooth).8. Matching: Selected for grain and color compatible with
VCPV panels specified in Article 2.4 below.9. Factory Finishing: As specified in Article 2.11 of this Section.
2.4 IINTERIOR VENEER-CORE PLYWOOD (VCPV) PANELS
A. Hardwood Veneer Plywood Paneling: Manufacturer's hardwood plywood panels complying with HPVA HP-1, made without urea-formaldehyde adhesive.
1. Face Veneer Species and Cut: Red Oak, Quarter sliced.2. AWI Veneer Face Grade: Grade AA.3. Matching between Adjacent Veneer Leaves: Slip matching.4. Backing Veneer Species: Any hardwood compatible with face species.5. Paneling Construction: Veneer core plywood of balanced construction, with applied hardwood
veneer on one face.6. Thicknesses: 5/16-inch and 1/2-inch.7. Panel Size: 48 by 96 inches.8. Glue Bond: Type II (interior).9. Face Pattern: No pattern, flush panel.10. Matching: Selected for grain and color compatible with flush
wood door face veneers specified in Section 08 14 16.11. Factory Finishing: As specified in Article 2.11 of this Section.
2.5 SOLID-SURFACE-MATERIAL COUNTERTOPS
A. Configuration: Provide countertops with the following front and backsplash style:
1. Front: As indicated.2. Backsplash: As indicated.3. Endsplash: As indicated.
B. Adhesives: Adhesives shall not contain urea formaldehyde.
C. Solid Surface Material: Homogeneous solid sheets of filled plastic resin complying with ANSI SS1.
1. Manufacturers: Subject to compliance with requirements, provide products as indicated.2. Colors and Patterns: As indicated on the Drawings.
D. Countertops: 1/2-inch- thick, solid surface material with front edge built up with same material.
E. Backsplashes: 1/2-inch-thick, solid surface material
F. Fabrication: Fabricate tops in one piece with shop-applied edges unless otherwise indicated. Comply withsolid-surface-material manufacturer's written instructions for adhesives, sealers, fabrication, and finishing.
1. Fabricate with loose backsplashes for field assembly.
2.6 INSTALLATION MATERIALS
A. Furring, Blocking, Shims, and Hanging Strips: Fire-retardant-treated softwood lumber, kiln dried to less than15 percent moisture content.
B. Fasteners for Interior Architectural Woodwork: Nails, screws, and other anchoring devices of type, size,material, and finish required for application indicated to provide secure attachment, concealed wherepossible.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 7
C. Wall Panel Hanger ‘Z’ Clips: Extruded aluminum ‘Z’ clip two-piece interlocking assembly, designed forremovable installation of flush wall panels on back-up wall surfaces. Provide units matching Monarch MetalFabrications ‘Model MF-375' with the following characteristics:
1. Length: 2 inches with two holes per clip for individual units supporting wall panels less than 6 incheswide.
2. Length: 72 inches with holes at 8" o/c continuous clip sections supporting wall panels more than 6inches wide. Field cut to length sized 2 to 4 inches smaller than the panel width.
3. Lift Off Clearance: 3/8-inch.4. Projection: 1/4-inch (face of back-up wall to back of wall panel).5. Total Height: 2-3/8 inches (two clip sections fully engaged).
D. Adhesives and Sealants: Glues shall be water-resistant, with gluing done in presses, clamps, and jigs.Adhesives and sealants used inside the weatherproofing system of the building must comply with the
testing and product requirements of the California Department of Health Services Standard Practice for theTesting of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers,including Addenda.
E. Glue: Aliphatic-resin, polyurethane, or resorcinol wood glue recommended by manufacturer for generalcarpentry use.
1. Wood glue shall have a VOC content of 30 g/L or less when calculated according to 40 CFR 59,Subpart D (EPA Method 24).
F. Paneling Adhesive: Comply with paneling manufacturer's printed recommendations for adhesives.
1. Adhesive shall have a VOC content of 50 g/L or less when calculated according to 40 CFR 59,Subpart D (EPA Method 24).
G. Multipurpose Construction Adhesive: Formulation complying with ASTM D 3498 that is recommended forindicated use by adhesive manufacturer.
1. Adhesive shall have a VOC content of 70 g/L or less when calculated according to 40 CFR 59,Subpart D (EPA Method 24).
2.7 CABINET HARDWARE AND ACCESSORIES
A. General: Provide cabinet hardware and accessory materials associated with architectural cabinet doors anddrawers.
B. Hardware Standard: Comply with BHMA A156.9 for items indicated by referencing BHMA numbers or itemsreferenced to this standard.
C. Cabinet Hardware:
1. Door Hinges: Five knuckle, steel, institutional grade, 2-3/4 inch overlay type with hospital tip. 0.095inch thick. ANSI-BHMA standard A156.9, Grade 1. Exposed finish to match door and drawer pulls.
a. Doors 48 inches and over in height to have three (3) hinges per door.
2. Door Pulls: Solid wire-type satin stainless steel, 5 inches long and complying with regulatoryrequirements. Secure each pull in place by (2) No. 10 flat head machine screws (washer head andpan head screws are not acceptable). Screw heads are countersunk. Pulls are provided on allhinged base cabinet doors and drawers, hanging wall cabinets, and counter-mounted cabinetsrequiring same for proper function. Provide two (2) horizontal pulls for drawers more than 24 incheswide. For sliding doors, provide recessed flush pulls. ALL WIRE PULLS ON WOOD PANELCABINET DOORS SHALL BE ORIENTED VERTICALLY - NO EXCEPTIONS.
3. Door Locks: Surface mounting, cylinder length as required for application intended, supply withstandard accessories, and two keys.
a. #6810 Million Lock, Sugatsune America, Inc. 800-562-5267 www.sugatsune.com
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 8
b. C8178, pin tumbler, CompX National, Division of CompX Security Products 864-297-6655www.compxnet.com
D. For concealed hardware, provide manufacturer's standard finish that complies with product classrequirements in BHMA A156.9.
2.8 FABRICATION, GENERAL
A. Grade of Interior Architectural Woodwork: AWS ‘Premium Grade’, unless otherwise indicated.
B. Wood Moisture Content: Comply with requirements of referenced quality standard for wood moisturecontent in relation to ambient relative humidity during fabrication and in installation areas.
C. Sand fire-retardant-treated wood lightly to remove raised grain on exposed surfaces before fabrication.
D. Fabricate interior architectural woodwork to dimensions, profiles, and details indicated. Ease edges to radiusindicated for the following:
1. Exposed Corners of Cabinets and Edges of Solid-Wood (Lumber) Members 3/4-Inch Thick or Less:1/16-inch.
2. Edges of Rails and Similar Members More Than 3/4-Inch Thick: 1/8-inch.
3. Semi-Exposed Corners of Door and Drawer Openings in Cabinet Fronts: Edge easing not required.
E. Fixed Shelves: Fixed wood shelves shall be fastened to cabinet bodies with full-shelf thickness “Stop Dado”joints. The dado shall stop no farther than 1-1/2 inch from the edge of the vertical support. The dado shallnot begin closer than 1-inch from the edge of the vertical support. The depth which the dado cut shall extendinto the vertical shelf support shall be no more than half of the thickness of the vertical support. The jointshall be glued for its’ entire length and all the surfaces of the joint shall be fully glued with no fraction of thejoint’s ‘shelf to support’ surfaces void of glue.
F. Supported Wood Shelves Up To 36-Inch-Span: Adjustable and fixed shelves with end supports only, andend-to-end spans shorter than or equal to 36 inches in length, shall be 3/4-inch minimum thickness. Fixedshelves of end-to-end lengths shorter than or equal to 36 inches, with support along at least one of their longedges, shall also be 3/4-inch minimum thickness.
G. Multiple Holes Adjustable Peg Supports: Adjustable wood shelves shall be supported by the ‘Multiple Holes’method with two (2) columns of predrilled holes aligned at 2” inch o.c. intervals to accommodate two pegsupports at each end of one shelf. The front and back shelf supports shall be basis-of-design product asspecified below. Other AWS accepted methods of adjustable wood shelf support will not be allowed,including the “surface mounted standards” method and the “recessed standards” method.
1. Basis-of-Design Shelf Support: “Ex-Cellent H”, Item #282.23.725, 5mm / nickel plated zinc, asmanufactured by HAFELE America Co. 800-423-3531 www.hafele.com/us/.
H. Complete fabrication, including assembly, finishing, and hardware application, to maximum extent possible,before shipment to Project site. Disassemble components only as necessary for shipment and installation.Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting.
I. Shop cut openings, to maximum extent possible, to receive hardware, appliances, plumbing fixtures,electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagramsto produce accurately sized and shaped openings. Sand edges of cutouts to remove splinters and burrs.
J. Furnish and install glass lite panels to comply with applicable requirements in Division 8 Section "Glazing"and in GANA's ‘Glazing Manual’. For glass lite panels set in wood frames, secure glass using removablehardwood stops.
2.9 INTERIOR STANDING AND RUNNING TRIM FOR TRANSPARENT FINISH
A. Quality Standard: Comply with AWS Standing & Running Trim Section 300.
B. For trim items wider or thicker than available lumber, use veneered construction. Do not glue for width or
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 9
thickness.
C. Back out or groove backs of flat trim members, and kerf backs of other wide, flat members, except formembers with ends exposed in finished work:
D. Ease edges of lumber less than 1-inch in nominal thickness to 1/16-inch radius and edges of lumber 1-inchor more in nominal thickness to 1/8-inch radius.
2.10 PLASTIC-LAMINATE-FACED CUSTOM MILLWORK CABINETRY AND FLUSH WALL PANELING
A. Quality Standard: Comply with AWS Architectural Cabinets Section 400.
B. AWS Type of Cabinet Construction: Flush overlay.
C. High-Pressure Decorative Plastic Laminate: NEMA LD 3, grades as indicated.
1. Plastic Laminate Facing Sheet: Vertical General Purpose Grade (VGS), 0.030-inch nominalthickness; for exterior cabinet surfaces, interiors of open cabinets, underside of wall cabinets, andflush wall panel surfaces.
2. Plastic Laminate Balancing Sheet: Cabinet Liner Grade (CLS), 0.020-inch nominal thickness, whitehigh-pressure cabinet liner, for balancing exterior laminate surfaces.
D. Plastic-Laminate Materials: Subject to compliance with requirements, provide plastic laminate products byone or more of the following manufacturers:
1. Formica Corporation 800-367-6422 www.formica.com2. Lamin-Art, Inc. 800-323-7624 www.laminart.com3. Panolam Industries; Nevamar 800-638-4380 www.nevamar.com4. Pionite Decorative Surfaces 800-746-6483 www.pionite.com5. Wilsonart International, LLC 800-433-3222 www.wilsonart.com
E. Colors, Patterns, and Textures: As indicated in the Materials Legend on the Drawings or, if not indicated,as selected by Architect from manufacturer’s full range consisting of both solid colors and patterns.
1. Allow for a maximum total of eight (8) different plastic laminate and countertop colors and/orpatterns to be selected for this Project. All exposed-to-view exterior surfaces including edgings,door and cabinet sides, and exposed backs shall be available in colors to match selectedcolors/patterns.
2. End Panels: Exposed-to-view cabinet end panels shall match exterior cabinet faces.
F. Edgebanding for Plastic Laminate: Comply with the following:
1. Exposed Edges Open Shelving: Banded with plastic laminate facing sheet matching color / patternfor cabinet unit; applied with waterproof hot-melt adhesive.
2. Door and Semi-Exposed Shelf Edges: Banded with matching color extruded PVC edging, through-color with satin finish, 3 mm thick; resistant to chipping, cracking, and high impact; applied withwaterproof hot-melt adhesive; and shaped to provide radiused edges and corners.
3. Color selections for PVC edging will be made by Architect from full line of edging color selectionsoffered by casework manufacturer.
2.11 FACTORY FINISHING
A. Quality Standard: Comply with AWS Factory Finishing Section 1500.
B. Grade of Factory Finishing: AWS ‘Premium Grade’, unless otherwise indicated.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 10
C. Preparations for Factory Finishing: Comply with referenced AWS Quality Standard for sanding, fillingcountersunk fasteners, sealing concealed surfaces, and similar preparations for finishing interiorarchitectural woodwork, as applicable to each unit of work.
1. Backpriming: Apply one coat of sealer or primer, compatible with finish coats, to concealed surfacesof woodwork. Apply two coats to back of paneling and to end-grain surfaces.
D. Transparent Finish: Comply with requirements indicated below for grade, finish system, staining, and sheen,with sheen measured on 60-degree gloss meter per ASTM D 523:
1. Factory Finishing System: AWS ‘Transparent Finish System TR-6 Catalyzed Polyurethane’.2. Staining: Match approved verification samples for color.3. Open Finish for Open-Grain Woods: Do not apply filler to open-grain woods.4. Sheen: Satin, 30-50 gloss units.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances andother conditions affecting performance.
B. Examine interior architectural woodwork materials before installation. Reject materials that are wet, moisturedamaged, and mold damaged.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean supporting substrates of projections and substances detrimental to installation of interior architecturalwoodwork.
B. Before installing interior architectural woodwork, examine shop-fabricated items for completion andcomplete work as required, including removal of packaging.
C. Before installing architectural woodwork, condition materials to average prevailing humidity in installationareas for a minimum of 24 hours unless longer conditioning is recommended by manufacturer.
3.3 INSTALLATION, GENERAL
A. Quality Standard: Install woodwork to comply with AWS for the items specified in Part 2 of this Section fortype of interior architectural woodwork involved.
B. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, toosmall to fabricate with proper jointing arrangements, or with defective surfaces, sizes, or patterns.
C. Install interior architectural woodwork level, plumb, true, straight, and aligned with adjacent materials. Useconcealed shims where necessary for alignment.
1. Scribe and cut interior architectural woodwork to fit adjoining work. Refinish and seal cuts asrecommended by manufacturer.
2. Anchor woodwork to anchors or blocking built in or directly attached to substrates. Secure withcountersunk, concealed fasteners and blind nailing as necessary for complete installation. Whereface fastening is unavoidable, use fine finishing nails or finishing screws countersunk and filled flushwith woodwork surfaces, sanded and matching final finish if transparent finish is indicated.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 11
3. Install to tolerance of 1/8-inch in 96 inches for level and plumb. Install adjoining interior architecturalwoodwork with 1/32-inch maximum offset for flush installation and 1/16-inch maximum offset forreveal installation.
4. Coordinate interior architectural woodwork with materials and systems in or adjacent to it. Providecutouts for mechanical and electrical items that penetrate interior architectural woodwork.
3.4 STANDING AND RUNNING TRIM INSTALLATION
A. Standing and Running Wood Trim: Install with minimum number of joints possible, using full-length piecesfrom maximum lengths of lumber available to greatest extent possible. Do not use pieces less than 30inches long, except where shorter single-length pieces are necessary. Scarf running joints and stagger inadjacent and related running trim. Cope joints at returns and miter at outside and inside corners to producetight-fitting joints with full-surface contact throughout length of each joint. Plane backs of trim casings toprovide uniform thickness across joints where necessary for proper alignment.
1. Match color and grain pattern of trim for transparent finish (stain or clear finish) across joints.
2. Install standing and running trim after gypsum-board joint finishing operations are completed.
3. Install standing and running trim with no more variation from a straight line than 1/8-inch in 96 inches.
4. Install trim without splitting; drill pilot holes before fastening where necessary to prevent splitting ofwood. Fasten trim to prevent movement or warping. Use fine finishing nails or finishing screwscountersunk and filled flush with trim surfaces, sanded and matching transparent finish.
3.5 PANELING INSTALLATION
A. Veneered Plywood Paneling (VCPV): Select and arrange panels on each wall to minimize noticeablevariations in veneer grain character and color between adjacent panels. Leave 1/4-inch gap to be coveredwith trim at top, bottom, and openings. Install with uniform tight joints between panels.
1. Attach veneered plywood panels to supporting plywood substrates with manufacturer'srecommended panel adhesive and fasteners. Space fasteners and adhesive as recommended bypanel manufacturer.
2. Conceal fasteners to greatest practical extent.
3.6 CUSTOM MILLWORK CABINETRY AND FLUSH WALL PANELING INSTALLATION
A. Plastic-Laminate-Faced Custom Millwork Cabinetry with Doors: Install without distortion so doors fitopenings properly and are accurately aligned. Adjust hardware to center doors in openings and to provideunencumbered operation. Complete installation of hardware and accessory items as indicated.
1. Install wood cabinetry with no more than 1/8-inch in 96 inches for sag, bow, or other variation fromstraight lines.
2. Key wood cabinetry door locks alike within each room and differently from room to room. Providethree (3) master keys that can operate all cabinetry locks throughout areas receiving new cabinetry.
B. Plastic-Laminate-Faced Flush Wall Paneling: Anchor paneling to supporting wall construction withconcealed panel hanger ‘Z’ clips. Do not face nail or screw wall panels unless otherwise indicated.
1. Install flush wall paneling with no more than 1/16-inch in 96 inches vertical cup or bow and 1/8-inchin 96 inches horizontal variation from a true plane. Provide ‘Z’ clip shims as necessary.
2. Install wall panels with spacing as indicated on Drawings to maintain no more than 1/16-inch variationfrom the design widths of wall reveals.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 12
3.7 COUNTERTOPS
A. Install countertops level to a tolerance of 1/8 inch in 8 feet.
B. Fasten countertops by screwing through corner blocks of base units into underside of countertop. Pre-drillholes for screws as recommended by manufacturer. Align adjacent surfaces and, using adhesive in colorto match countertop, form seams to comply with manufacturer's written instructions. Carefully dress jointssmooth, remove surface scratches, and clean entire surface.1. Install backsplashes and endsplashes to comply with manufacturer's written instructions for
adhesives, sealers, fabrication, and finishing.2. Seal edges of cutouts in particleboard subtops by saturating with varnish.
3.8 FINISHING, ADJUSTING, AND CLEANING
A. Complete the finishing work specified in this Section to the extent not completed at shop or beforeinstallation of woodwork. Fill nail holes with matching filler where exposed. Apply specified finish coats,including stains and paste fillers if any, to exposed surfaces where only sealer/prime coats were applied inthe shop.
B. Adjust interior architectural woodwork joinery for uniform appearance.
C. Damaged and defective woodwork may be repaired or refinished if work complies with requirements andshows no evidence of repair or refinishing. Where not possible to repair or refinish, replace woodwork.
D. Replace interior architectural woodwork that does not comply with requirements.
E. Clean woodwork on exposed and semi-exposed surfaces. Restore soiled areas and touch up factory-applied finishes, if any.
3.9 PROTECTION
A. Protect installed interior architectural woodwork from damage due to moisture and other causes duringremainder of Project construction period.
B. Remove and replace woodwork materials that become wet, moisture damaged, and mold damaged.
1. Indications that woodwork materials are wet or moisture damaged include, but are not limited to,discoloration, sagging, or irregular shape.
2. Indications that woodwork materials are mold damaged include, but are not limited to, fuzzy orsplotchy surface contamination and discoloration.
END OF SECTION 06 20 23
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014
FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 1
SECTION 22 34 00 - FUEL-FIRED, DOMESTIC-WATER HEATERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions andDivision 01 Specification Sections, apply to this Section.
B. Division 20, Common Work Results for Mechanical, requirements apply to this section.
C. Division 01, Project Management and Coordination, apply to this section and will require the contractors’participation in the Above Ceiling Coordination Program.
D. Division 01, General Commissioning Requirements, apply to this section and will require the contractors’participation in the commissioning process.
1.2 SUMMARY
A. Section Includes:
1. Commercial, gas-fired, high-efficiency, storage, domestic-water heaters.2. Domestic-water heater accessories.
1.3 SUBMITTALS
A. Product Data: For each type and size of domestic-water heater indicated. Include rated capacities,operating characteristics, electrical characteristics, and furnished specialties and accessories.
B. Shop Drawings:
1. Wiring Diagrams: For power, signal, and control wiring.
C. Product Certificates: For each type of commercial, gas-fired, domestic-water heater, from manufacturer.
D. Domestic-Water Heater Labeling: Certified and labeled by testing agency acceptable to authorities havingjurisdiction.
E. Source quality-control reports.
F. Field quality-control reports.
G. Warranty: Sample of special warranty.
H. Operation and Maintenance Data: For fuel-fired, domestic-water heaters to include in emergency,operation, and maintenance manuals.
1.4 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by aqualified testing agency, and marked for intended location and application.
B. ASHRAE/IESNA Compliance: Fabricate and label fuel-fired, domestic-water heaters to comply withASHRAE/IESNA 90.1.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014
FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 2
C. ASME Compliance:
1. Where ASME-code construction is indicated, fabricate and label commercial, domestic-waterheater storage tanks to comply with ASME Boiler and Pressure Vessel Code: Section VIII,Division 1.
2. Where ASME-code construction is indicated, fabricate and label commercial, finned-tube,domestic-water heaters to comply with ASME Boiler and Pressure Vessel Code: Section IV.
D. NSF Compliance: Fabricate and label equipment components that will be in contact with potable water tocomply with NSF 61, "Drinking Water System Components - Health Effects."
1.5 COORDINATION
A. Coordinate sizes and locations of concrete bases with actual equipment provided.
1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replacecomponents of fuel-fired, domestic-water heaters that fail in materials or workmanship within specifiedwarranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including storage tank and supports.b. Faulty operation of controls.c. Deterioration of metals, metal finishes, and other materials beyond normal use.
2. Warranty Periods: From date of Substantial Completion.
a. Commercial, Gas-Fired, Storage, Domestic-Water Heaters:
1) Storage Tank: Three years.2) Controls and Other Components: One year(s).
b. Expansion Tanks: One years.
PART 2 - PRODUCTS
2.1 COMMERCIAL, GAS-Fired, STORAGE, domestic-WATER HEATERS
A. Commercial, Gas-Fired, High-Efficiency, Storage, Domestic-Water Heaters:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Bradford White Corporation; EF Series.b. Heat Transfer Products, Inc. Phoenix Series.c. Laars Heating Systems; a subsidiary of Bradford White Corporation, U.H.E Series.d. Lochinvar Corporation, Shield Series.e. Smith, A. O. Water Products Co.; a division of A. O. Smith Corporation, Cyclone Xi Series.
2. Standard: ANSI Z21.10.3/CSA 4.3.3. Description: Manufacturer's proprietary design to provide at least 95 percent combustion efficiency
at optimum operating conditions.4. Storage-Tank Construction: ASME-code steel with 150-psig minimum working-pressure rating.
a. Tappings: Factory fabricated of materials compatible with tank. Attach tappings to tankbefore testing.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014
FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 3
1) NPS 2 and Smaller: Threaded ends according to ASME B1.20.1.2) NPS 2-1/2 and Larger: Flanged ends according to ASME B16.5 for steel and
stainless-steel flanges and according to ASME B16.24 for copper and copper-alloyflanges.
b. Lining: Glass complying with NSF 61 barrier materials for potable-water tank linings,including extending lining into and through tank fittings and outlets.
5. Factory-Installed Storage-Tank Appurtenances:
a. Anode Rod: Replaceable magnesium.b. Dip Tube: Required unless cold-water inlet is near bottom of tank.c. Drain Valve: Corrosion-resistant metal complying with ASSE 1005.d. Insulation: Comply with ASHRAE/IESNA 90.1. Surround entire storage tank except
connections and controls.e. Jacket: Steel with enameled finish.f. Burner or Heat Exchanger: Comply with UL 795 or approved testing agency requirements
for gas-fired, high-efficiency, domestic-water heaters and natural-gas fuel.g. Temperature Control: Adjustable thermostat.h. Safety Controls: Automatic, high-temperature-limit and low-water cutoff devices or systems.i. Combination Temperature-and-Pressure Relief Valves: ANSI Z21.22/CSA 4.4-M. Include
one or more relief valves with total relieving capacity at least as great as heat input, andinclude pressure setting less than domestic-water heater working-pressure rating. Selectone relief valve with sensing element that extends into storage tank.
B. Capacity and Characteristics: Refer to schedule on drawings.
2.2 domestic-WATER HEATER ACCESSORIES
A. Domestic-Water Expansion Tanks:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. AMTROL Inc.b. ITT Industries; Bell & Gossett.c. Pentair Pump Group (The); Myers.d. Smith, A. O. Water Products Co.; a division of A. O. Smith Corporation.e. State Industries.f. Taco, Inc.g. Wessels Co.
2. Joints and factory-installed butyl-rubber diaphragm. Include air precharge to minimum system-operating pressure at tank.
3. Construction:
a. Tappings: Factory-fabricated steel, welded to tank before testing and labeling. IncludeASME B1.20.1 pipe thread.
b. Interior Finish: Comply with NSF 61 barrier materials for potable-water tank linings,including extending finish into and through tank fittings and outlets.
c. Air-Charging Valve: Factory installed.
4. Capacity and Characteristics: Refer to schedule on drawings.
B. Drain Pans: Corrosion-resistant metal with raised edge. Comply with ANSI/CSA LC 3. Includedimensions not less than base of domestic-water heater, and include drain outlet not less than NPS 3/4with ASME B1.20.1 pipe threads or with ASME B1.20.7 garden-hose threads.
C. Piping-Type Heat Traps: Field-fabricated piping arrangement according to ASHRAE/IESNA 90.1.
D. Heat-Trap Fittings: ASHRAE 90.2.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014
FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 4
E. Manifold Kits: Domestic-water heater manufacturer's factory-fabricated inlet and outlet piping for fieldinstallation, for multiple domestic-water heater installation. Include ball-, butterfly-, or gate-type shutoffvalves to isolate each domestic-water heater and calibrated balancing valves to provide balanced flowthrough each domestic-water heater.
1. Comply with requirements for ball-, butterfly-, or gate-type shutoff valves specified inSection 220523 "General-Duty Valves for Plumbing Piping."
2. Comply with requirements for balancing valves specified in Section 221119 "Domestic Water PipingSpecialties."
F. Gas Shutoff Valves: ANSI Z21.15/CSA 9.1-M, manually operated. Furnish for installation in piping.
G. Gas Pressure Regulators: ANSI Z21.18/CSA 6.3, appliance type. Include 1/2-psig pressure rating asrequired to match gas supply.
H. Automatic Gas Valves: ANSI Z21.21/CSA 6.5, appliance, electrically operated, on-off automatic valve.
I. Combination Temperature-and-Pressure Relief Valves: Include relieving capacity at least as great as heatinput, and include pressure setting less than domestic-water heater working-pressure rating. Select reliefvalves with sensing element that extends into storage tank.
1. Gas-Fired, Domestic-Water Heaters: ANSI Z21.22/CSA 4.4-M.
J. Pressure Relief Valves: Include pressure setting less than domestic-water heater working-pressure rating.
1. Gas-Fired, Domestic-Water Heaters: ANSI Z21.22/CSA 4.4-M.
K. Vacuum Relief Valves: ANSI Z21.22/CSA 4.4-M.
2.3 SOURCE QUALITY CONTROL
A. Factory Tests: Test and inspect assembled domestic-water heaters specified to be ASME-codeconstruction, according to ASME Boiler and Pressure Vessel Code.
B. Hydrostatically test commercial domestic-water heaters to minimum of one and one-half times pressurerating before shipment.
C. Domestic-water heaters will be considered defective if they do not pass tests and inspections. Complywith requirements in Section 01 "Quality Requirements" for retesting and reinspecting requirements andSection 01 "Execution" for requirements for correcting the Work.
D. Prepare test and inspection reports.
PART 3 - EXECUTION
3.1 domestic-WATER HEATER INSTALLATION
A. Commercial, Domestic-Water Heater Mounting: Install commercial domestic-water heaters on concretebase. Comply with requirements for concrete base specified in Section 03 "Miscellaneous Cast-in-PlaceConcrete."
1. Exception: Omit concrete bases for commercial domestic-water heaters if installation on stand,bracket, suspended platform, or directly on floor is indicated.
2. Maintain manufacturer's recommended clearances.3. Arrange units so controls and devices that require servicing are accessible.4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install
dowel rods on 18-inch centers around the full perimeter of concrete base.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014
FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 5
5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base andanchor into structural concrete floor.
6. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, anddirections furnished with items to be embedded.
7. Install anchor bolts to elevations required for proper attachment to supported equipment.8. Anchor domestic-water heaters to substrate.
B. Install domestic-water heaters level and plumb, according to layout drawings, original design, andreferenced standards. Maintain manufacturer's recommended clearances. Arrange units so controls anddevices needing service are accessible.
1. Install shutoff valves on domestic-water-supply piping to domestic-water heaters and on domestic-hot-water outlet piping. Comply with requirements for shutoff valves specified in Section 22"General-Duty Valves for Piping."
C. Install gas-fired, domestic-water heaters according to NFPA 54.
1. Install gas shutoff valves on gas supply piping to gas-fired, domestic-water heaters without shutoffvalves.
2. Install gas pressure regulators on gas supplies to gas-fired, domestic-water heaters without gaspressure regulators if gas pressure regulators are required to reduce gas pressure at burner.
3. Install automatic gas valves on gas supplies to gas-fired, domestic-water heaters if required foroperation of safety control.
4. Comply with requirements for gas shutoff valves, gas pressure regulators, and automatic gasvalves specified in Section 23 "Facility Natural-Gas Piping.
D. Install combination temperature-and-pressure relief valves in top portion of storage tanks. Use reliefvalves with sensing elements that extend into tanks. Extend commercial-water-heater relief-valve outlet,with drain piping same as domestic-water piping in continuous downward pitch, and discharge by positiveair gap onto closest floor drain.
E. Install water-heater drain piping as indirect waste to spill by positive air gap into open drains or over floordrains. Install hose-end drain valves at low points in water piping for domestic-water heaters that do nothave tank drains. Comply with requirements for hose-end drain valves specified in Section 22 "DomesticWater Piping Specialties."
F. Install thermometer on outlet piping of domestic-water heaters. Comply with requirements forthermometers specified in Section 20 "Meters and Gages for Piping."
G. Assemble and install inlet and outlet piping manifold kits for multiple domestic-water heaters. Fabricate,modify, or arrange manifolds for balanced water flow through each domestic-water heater. Include shutoffvalve and thermometer in each domestic-water heater inlet and outlet, and throttling valve in eachdomestic-water heater outlet. Comply with requirements for valves specified in Section 20 "General-DutyValves for Piping," and comply with requirements for thermometers specified in Section 20 "Meters andGages."
H. Install piping-type heat traps on inlet and outlet piping of domestic-water heater storage tanks withoutintegral or fitting-type heat traps.
I. Fill domestic-water heaters with water.
J. Charge domestic-water compression tanks with air.
3.2 CONNECTIONS
A. Comply with requirements for domestic-water piping specified in Section 22 "Domestic Water Piping."
B. Comply with requirements for gas piping specified in Section 23 "Facility Natural-Gas Piping."
C. Drawings indicate general arrangement of piping, fittings, and specialties.
Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014
FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 6
D. Where installing piping adjacent to fuel-fired, domestic-water heaters, allow space for service andmaintenance of water heaters. Arrange piping for easy removal of domestic-water heaters.
3.3 IDENTIFICATION
A. Identify system components. Comply with requirements for identification specified in Section 22"Identification for Piping and Equipment."
3.4 FIELD QUALITY CONTROL
A. Perform tests and inspections.
1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspectcomponents, assemblies, and equipment installations, including connections, and to assist intesting.
2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until noleaks exist.
3. Operational Test: After electrical circuitry has been energized, start units to confirm properoperation.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls andequipment.
B. Domestic-water heaters will be considered defective if they do not pass tests and inspections. Complywith requirements in Section 01 "Quality Requirements" for retesting and reinspecting requirements andSection 01 "Execution" for requirements for correcting the Work.
C. Prepare test and inspection reports.
3.5 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust,operate, and maintain commercial, gas-fired, storage, domestic-water heaters.
END OF SECTION 22 34 00
DRAWING INDEX
LIVONIA, MICHIGANPROJECT NO. 7113.057.00
JANUARY 31, 2014
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:1
8:2
2P
M
2/13/2014 6:18:22 PM
Checker
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
PROJECT COVER SHEET
G0017113.057.00
Author
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
2014.0
1.3
1B
IDS
2014.0
2.0
7A
DD
EN
DU
M1
2014.0
2.1
3A
DD
EN
DU
M2
MECHANICALM001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS OMD111A FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA A OMD111B FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA B OMD111C FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA C OMD111D FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA D OMD111E FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA E OMD121 ROOF LEVEL MECHANICAL DEMOLITION PLAN O OM111A FIRST LEVEL SHEET METAL PLAN - AREA A OM111B FIRST LEVEL SHEET METAL PLAN - AREA B OM111C FIRST LEVEL SHEET METAL PLAN - AREA C OM111D FIRST LEVEL SHEET METAL PLAN - AREA D OM111E FIRST LEVEL SHEET METAL PLAN - AREA E OM121 ROOF LEVEL MECHANICAL PLAN O OM211A FIRST LEVEL HVAC PIPING PLAN - AREA A OM211B FIRST LEVEL HVAC PIPING PLAN - AREA B OM211C FIRST LEVEL HVAC PIPING PLAN - AREA C OM211D FIRST LEVEL HVAC PIPING PLAN - AREA D OM211E FIRST LEVEL HVAC PIPING PLAN - AREA E OM501 MECHANICAL DETAILS OM502 MECHANICAL DETAILS OM503 MECHANICAL DETAILS OM601 MECHANICAL SCHEDULES OM602 MECHANICAL SCHEDULES O OM700 TEMPERATURE CONTROLS LEGEND OM701 CONTROLS DIAGRAM O OM702 CONTROLS DIAGRAM OM703 CONTROLS DIAGRAM OM704 CONTROLS DIAGRAM OM705 CONTROLS DIAGRAM OM706 CONTROLS DIAGRAM OM707 CONTROLS DIAGRAM OM708 CONTROLS DIAGRAM O OM709 CONTROLS DIAGRAM O
ELECTRICALE001 ELECTRICAL LEGENDS, ABBREVIATIONS AND SYMBOLS OE011 ELECTRICAL COMPOSITE PLAN OED111A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA A OED111B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA B OED111C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA C OED111D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA D OED111E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA E OED121 COMPOSITE ROOF ELECTRICAL DEMOLITION PLAN O OED401 ELECTRICAL ONE LINE DEMOLITION DIAGRAM OE111A FIRST LEVEL LIGHTING PLAN - AREA A O O OE111B FIRST LEVEL LIGHTING PLAN - AREA B O O OE111C FIRST LEVEL LIGHTING PLAN - AREA C O O OE111D FIRST LEVEL LIGHTING PLAN - AREA D O O OE111E FIRST LEVEL LIGHTING PLAN - AREA E O O OE211A FIRST LEVEL POWER & AUXILIARY PLAN - AREA A O OE211B FIRST LEVEL POWER & AUXILIARY PLAN - AREA B O OE211C FIRST LEVEL POWER & AUXILIARY PLAN - AREA C OE211D FIRST LEVEL POWER & AUXILIARY PLAN - AREA D O OE211E FIRST LEVEL POWER & AUXILIARY PLAN - AREA E OE231 COMPOSITE ROOF POWER AND AUXILIARY PLAN O OE401 ELECTRICAL ONE LINE DIAGRAM O OE411 ELECTRICAL PANEL SCHEDULES O OE501 ELECTRICAL DETAILS OE502 ELECTRICAL DETAILS O OE601 LIGHTING FIXTURE SCHEDULE O O O
2014.0
1.3
1B
IDS
2014.0
2.0
7A
DD
EN
DU
M1
2014.0
2.1
3A
DD
EN
DU
M2
GENERALG001 PROJECT COVER SHEET O O O
STRUCTURALS131 ROOF FRAMING PLAN - AREA A O O
ARCHITECTURALA001 ABBV. CONVENTIONS, TYPICAL MTG HTS, WALL ASSEMBLY INFO OA002 TYPICAL MOUNTING HEIGHTS OA003 INTERIOR PARTITION TYPES OA011 COMPOSITE NEW WORK FLOOR PLAN AND CODE INFORMATION OAD111A FIRST LEVEL DEMOLITION PLAN - AREA A O OAD111B FIRST LEVEL DEMOLITION PLAN - AREA B OAD111C FIRST LEVEL DEMOLITION PLAN - AREA C OAD111D FIRST LEVEL DEMOLITION PLAN - AREA D OAD111E FIRST LEVEL DEMOLITION PLAN - AREA E OAD401 ENLARGED TOILET ROOM - DEMOLITION OA111A FIRST LEVEL FLR PLAN - AREA A OA111B FIRST LEVEL FLR PLAN - AREA B OA111C FIRST LEVEL FLR PLAN - AREA C OA111D FIRST LEVEL FLR PLAN - AREA D OA111E FIRST LEVEL FLR PLAN - AREA E O OA131 ROOF PLAN OA201 EXTERIOR ELEVATIONS OA202 EXTERIOR ELEVATIONS O OA203 EXTERIOR ELEVATIONS O OA301 EXTERIOR WALL SECTIONS OA321 EXTERIOR SECTION DETAILS OA401 ENLARGED PLANS OA431 MISC INTERIOR DETAILS OA501 DOOR SCHEDULE, INFO, AND FRAME TYPES OA611A FIRST LEVEL CEILING PLAN - AREA A O OA611B FIRST LEVEL CEILING PLAN - AREA B O OA611C FIRST LEVEL CEILING PLAN - AREA C O OA611D FIRST LEVEL CEILING PLAN - AREA D OA611E FIRST LEVEL CEILING PLAN - AREA E OA700 FIRST LEVEL COMPOSITE FINISH PLAN OA711A FIRST LEVEL FLOOR PATTERN PLAN OA711B FIRST LEVEL FLOOR PATTERN PLAN OA711C FIRST LEVEL FLOOR PATTERN PLAN OA711D FIRST LEVEL FLOOR PATTERN PLAN OA711E FIRST LEVEL FLOOR PATTERN PLAN OA801 MATERIAL LEGEND AND ROOM FINISH SCHEDULE OA821 INTERIOR ELEVATIONS AND DETAILS O O
PLUMBINGP001 PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS OPD111A FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA A OPD111B FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA B OPD111C FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA C OPD111D FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA D OPD111E FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA E OPD301 ENLARGED TOILET ROOM PLUMBING DEMOLITION PLANS OP111A FIRST LEVEL PLUMBING PLAN - AREA A OP111B FIRST LEVEL PLUMBING PLAN - AREA B OP111C FIRST LEVEL PLUMBING PLAN - AREA C OP111D FIRST LEVEL PLUMBING PLAN - AREA D OP111E FIRST LEVEL PLUMBING PLAN - AREA E OP121 ROOF LEVEL PLUMBING PLAN OP301 ENLARGED TOILET ROOM PLUMBING PLANS OP401 PLUMBING DIAGRAMS OP501 PLUMBING DETAILS AND SCHEDULES O O
G1S131
(E) 32L14
(E) 32L14
(E) 32L14
(E) 32L14
(E) 32L14
(E) 32L14
(E) 32L14
(E) 32L14
(E) 18L02
(E) 28L11
(E) 28L11
(E) 28L06
(E) 8W
F31
(E) 8W
F31
(E) 8W
F31
(E) 8W
F31
(E) 8W
F31
(E) 8W
F31
(E) 8B10
(E) 8B10
(E) 8B10
(E)1
6WF3
6(E
)16W
F36
(E)1
6WF3
6(E
)16W
F36
(E)8
C11
.5
(E)8
C11
.5
(E)8
B10
(E)8
B10
(E) 8B10
(E) 8B10
(E) 8B10
(E)6W
F15.5
(E)6W
F15.5
(E)8
C11
.5
(E)8
C11
.5(E
)6W
F15.5
(E)6W
F15.5
RTU-19,710#
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L08
(E)2
0L04
(E) 14WF30 (E) 14WF30 (E) 14WF30(E
)6W
F15.5
(E)6W
F15.5
(E)6W
F15.5
RTU-25,713#
(E)6W
F15.5
(E)6W
F15.5
(E) 8W
F24
(E) 8W
F24
(E) 40L16
(E) 40L16
(E) 8W
F24
(E) 8W
F24
(E) 40L16
(E) 40L16
(E) 40L16
(E) 40L16
(E) 40L16
(E) 40L16
(E) 40L16
(E) 40L16
(E) 8WF24 (E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E)8
C11
.5
(E)8
C11
.5
(E)8
C11
.5
(E)8
C11
.5
(E)6W
F15.5
(E)6W
F15.5
22'-0" 23'-0" 22'-0"
8'-0
"8'
-0"
8'-0
"8'
-0"
8'-1
"
10"
8'-1
"8'
-0"
8'-0
"8'
-0"
8'-0
"
20'-0" 20'-0" 20'-0"
5'-6
7/16
"6'
-0"
3@
6'-7
5/8
=19
'-10
7/8"
3@
6'-7
5/8
=19
'-10
7/8"
7'-0
"7'
-0"
7'-0
"3
13/1
6"
6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9"
RTU-310,335#
TYP
G1S131
SIM
+/- 11'-6" VIF
G1S131
SIM
MEC
H'L
CO
OR
D
5'-4
"V
IF+/
-2'
-10"
W/ MECH'LCOORD
(E) TOS113'-3 7/8" VIF
(E) TOS124'-10 1/2" VIF
(E) TOS124'-10 1/2" VIF
(E) BULB TEELOCATION VIF
COORD W/ MECH'L (E) BULB TEELOCATION VIF
MITER (4)CORNERS
5'-4"VIF
+/- 11'-6"
MITER (4)CORNERS
CONT L TYP(ON HSS3X3)
HSS3X3X1/4@ +/- 4'-6" OC(ON WT6)
WT6 TYP(ON BULB TEE)
CO
OR
DW
/ME
CH
'L
MECH'LCOORD
(E) BULB TEELOCATION VIF
MITER (4)CORNERS
CONT L TYP(ON HSS3X3)
HSS3X3X1/4@ +/- 5'-0" OC(ON WT6)
WT6 TYP(ON BULB TEE)
MEC
H'L
CO
OR
D
5'-4" 5'-4" 5'-4"
EXIST STEEL JOIST VIFREINF PER DTL G3 IFBULB TEES ARE > 6"FROM TOP CHORDPANEL POINT
EXIST STEELBULB TEE @32" OC VIF
WT6X13 @ 64" OCWELDED TO EVERYOTHER (E) BULB TEE
RTU CURBSEE MECH'L
ROOF TOP UNITSEE MECH'L
CONT L4X4X3/8AROUND UNITPERIMETER
1/8" 2-12TYP
SEE ARCH'L FORFLASHING, TAPEREDINSULATION & ROOFING
GYM DIVIDER CURTAIN& STEEL CONN TO (E)JST BOT CHORD, BYCURTAIN SUPPLIER
REMOVE (E)POURED GYPDECK AS REQ'DFOR WT INSTALL
L4X4X3/8
WT6X13
(E) BULBTEE VIF
1/8" 2"TYP
(E) POUREDGYP DECK VIF
PROVIDE STEELFRAME PER DTL G5FOR S&R OPN'G
MAX OPNG REMARKS
4'-0" L3-1/2x3-1/2x5/16
MASONRY LOOSE LINTEL SCHEDULE
MEMBER
7'-0" L5x3-1/2x3/8
NOTE:
1. ALL LOOSE LINTELS LOCATED IN EXTERIOR WALLSARE TO BE HOT DIPPED GALVANIZED PER SPECS TYP.2. ALL LOOSE LINTELS TO HAVE 8" BEARING LENGTH(MIN) FOR FULL WIDTH OF MEMBER TYP.3. PROVIDE (1) ANGLE PER 4" (NOMINAL) OF MASONRYWALL THICKNESS (T) TYP.4. PROVIDE CONT GALVANIZED BOTTOM PL 3/8X(T-1")STITCH WELDED TO BOTTOM FLANGE OF BEAM TYP.5. SEE ARCH'L FOR ALL NEW MASONRY OPENINGSIZES AND LOCATIONS TYP.6. SEE DEMO PLANS FOR EXISTING MASONRYOPENING SIZES AND LOCATIONS WHERE EXISTINGLINTEL REPLACEMENT IS REQUIRED TYP.
10'-0" W8X18 + PL
NOTE 3, LLV
NOTE 4
NOTE 3
17'-0" W8X28 + PL NOTE 4
NOTE:THIS DETAIL IS APPLICABLE TO ALL POINT LOADS ON JSTS,WHETHER INDICATED ON STRCT'L DWGS OR NOT.EXAMPLES:HANGING PARTITION LOAD > 150 POUNDS.HANGING PLUMBING, MECH STL PIPE W/ DIA > THAN 5".HANGING BASKETBALL GOALS.
POINT LOADON BOTTOMCHORD
2-L2x2x3/16 (1 -EACH SIDE) BY G.C.
JOIST PANEL POINT
EXIST JST SEEPLAN FOR SIZE
JOIST PANEL POINTPOINT LOADON TOPCHORD
3/16TYP
1.2.3.
NOTE: 1. NO ANGLE FRAMING FOR OPENINGS LESS THAN 12" ANDWEIGHT LESS THAN 50 POUNDS.
2. FOR OPENINGS BETWEEN 12" AND 18" AND WEIGHT LESSTHAN 150 POUNDS, USE L2x2x3/16.
3. FOR OPENINGS BETWEEN 19" AND 36" AND WEIGHT LESSTHAN 300 POUNDS, USE L3x3x1/4.
4. FOR LARGER OPENINGS AND HEAVIER WEIGHTS, SEEOTHER DETAILS.
PLAN ELEVATION
SEE PLAN,MECH, ORARCH'L FOROPENINGSIZE ANDLOCATION
.
4"
.
ARCH'L OR MEP ROOFPENETRATION
STL JST ORBM SEE PLAN
L5X5X6/16 TYP
CO
OR
DW
/MEC
HC
OO
RD
W/M
ECH
1'-7
97/12
8"1'
-939
/128"
EQ
UAL
UO
NE
QU
ALU
ON
3/16TYP
3/16TYP
ANGLE PER NOTE
X
BEAM + PL LINTEL
ANGLES LINTEL
EXIST MASONRYWALL VIF
EXIST MASONRYWALL VIF
GALV STEEL LINTELSEE SCHEDULE
GALV STEEL LINTELSEE SCHEDULE
PROVIDE SHORINGAS REQ'D FOR NEWLINTEL INSTALLATION
PROVIDE SHORING ASREQ'D FOR EXISTLINTEL REPLACEMENT(NOTE 1)
NOTE:
1. PROVIDE OWNER CREDIT IF EXIST STEEL BEAM CAN BE SALVAGEDAND ONLY THE EXIST STEEL BOTTOM PLATE NEEDS REPLACEMENT(VIF) IN LIEU OF ENTIRE EXIST BEAM + PL LINTEL REPLACEMENT.
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
9:2
6P
M
As indicated
Checker
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
ROOF FRAMING PLAN -AREA A
S1317113.057.00
Author
1 2014.01.31 BIDS
2 2014.02.13 ADDENDUM 2
1/8" = 1'-0"
ROOF FRAMING PLAN - AREA AA4
1/2" = 1'-0"
SECTIONG13/4" = 1'-0"
MASONRY LINTEL SCHEDULEG73/4" = 1'-0"
TYP JOIST REINFORCING DETAILG33/4" = 1'-0"
TYP ROOF OPENING DETAILG53/4" = 1'-0"
TYP MASONRY LINTEL DETAILSG9
DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY
ABATEMENT CONTRACTOR2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN
4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR
5 REMOVE 1X1 ACOUSTICAL CONCEALED SPLINEDCEILING SYSTEM BY ABATEMENT CONTRACTOR
6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM
7 REMOVE CABINET UNIT HEATER
8 REMOVE CARPET AND VAT TYPICALLY BELOW CARPETBY ABATEMENT CONTRACTOR
9 REMOVE FOLDING TABLE AND FRAME
10
REMOVE GREENHOUSE IN ITS ENTIRETY. REFER TO TOMECH AND ELEC FOR ADDITIONAL SCOPE OF WORK.GLASS AND WINDOW FRAMING BY ABATEMENTCONTRACTOR
11 REMOVE SINK AND PIPING AS REQUIRED.RE: MECHANICAL
13 REMOVE STRUCTURAL GLAZED TILE
14 REMOVE MASONRY WALL
15 REMOVE LOCKERS (EXISTING STRUCTURAL GLAZEDTILE BASE TO REMAIN)
16 REMOVE LOCKERS WITH METAL BASE
17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS
18
REMOVE STRUCTURAL STEEL LINTEL. REMOVE ANYADJACENT MASONRY OR EXTERIOR PLASTER SOFFITAS REQUIRED FOR REMOVAL OF LINTEL - PROVIDETEMPORARY SHORING AS REQUIRED
19 REMOVE GLASS AND HOLLOW METAL WINDOWFRAMING BY ABATEMENT CONTRACTOR
20 REMOVE IN-WALL TABLES IN CAFETERIA
21 REMOVE WOOD WALL PANELING AT OFFICES ALONGCORRIDOR
22 REMOVE VERTICAL SUPPORT FOR VOLLEYBALL NETCOMPLETE
23 REMOVE WOOD FLOOR IN-FILL AT TIERED AREA OFMUSIC ROOM BY ABATEMENT CONTRACTOR
24 REMOVE MOTORIZED GYM PARTITION AND TRACKASSEMBLY IN ITS ENTIRETY - ALTERNATE A-3
25 REMOVE HORIZONTAL UNIT VENTILATOR (HUV) ANDASSOCIATED PIPING AND COVERS
26 REMOVE EXISTING CHALKBOARDS AND TACKBOARDS
27 REMOVE SINKS, COUNTERS AND CASEWORK, RE:MECH
3 REMOVE HOLLOW METAL DOOR AND FRAME
28 REMOVE CHIN UP BARS AND SUPPORTS, RELOCATEAS INDICATED ON NEW WORK PLAN.
29 REMOVE MOVABLE WALL AND TRACK ASSEMBLY ATCLASSROOM
30REMOVE DEMONSTRATION TABLE BY ABATEMENTCONTRACTOR - CUT AND CAP PLUMBING ANDELECTRICAL AT FLOOR
31 REMOVE DISPLAY CASE WINDOW SYSTEM
32REMOVE CMU WALL FROM FLOOR TO UNDERSIDE OFDISPAY CASE - PROVIDE MASONRY OPENING FOR NEWDOOR AND FRAME
33 REMOVE COAT RACK
34 REMOVE CABINETS/SHELVES
35 REMOVE PROJECTOR SCREEN BY OWNER
36 REMOVE WALL MOUNTED FAN
37 REMOVE AND REPLACE WALL MTD DRINKINGFOUNTAIN, RE: MECH
38 REMOVE AND REPLACE MIS-MATCH VCT FLOORING
39 REMOVE GYP BD SOFFIT
40 REMOVE WOOD CONSTRUCTION PIPE CHASE, RE:MECHANICAL
41 REMOVE WALL MOUNTED TRASH RECEPTACLE -PATCH WALLS AT FASTENER LOCATIONS
42 REMOVE WALL MOUNTED A/C UNIT, RE: MECH
12
CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.
43 REMOVE WALL MOUNTED SAFETY PADS
44REMOVE MASONRY WALL FOR INSTALLATION OF NEWALUM STOREFRONT SYSTEM, RE: F6/A301 FOR SIZE OFSTORFRONT SYSTEM
45 NOT USED
46 REMOVE AND REPLACE CEILING GRID AS REQUIREDFOR WINDOW REPLACEMENT
2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN
27A REMOVE SINKS, COUNTERS AND CASEWORK BYABATEMENT CONTRACTOR, RE: MECH
CB4 = 4' CHALKBOARD TB2 = 2' TACKBOARDCB8 = 8' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB16 = 16' CHALKBOARD TB8 = 8' TACKBOARDCB20 = 20' CHALKBOARD TB16 = 16' TACKBOARDCB24 = 24' CHALKBOARD TB24 = 24' TACKBOARDMB6 = 6' MARKERBOARD MB7 = 7' MARKERBOARDMB12 = 12' MARKERBOARD
26A REMOVE CHALKBAORD AND TACKBOARD, RE:ALTERNATE A-1
3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR
5A REMOVE 1X1 ACOUSTICAL CONCEALED SPLINEDCEILING SYSTEM
33A REMOVE COAT RACK, RE: ALTERNATE A-4
GYMNASIUM412
TOILET92
WORK ROOM401
OFFICE401B
PRINCIPAL402
PRINCIPAL403
CONFERENCE404
JC405
STORAGE406C
RESOURCE ROOM406
TOILET406B
TOILET406A
SPEECH407
TOILET RM104
TOILET RM105
CORRIDORH012
CORRIDORH005CAFETERIA
410
STORAGE410A
MUSIC CLASSROOM408
PRACTICE ROOM408A
PRACTICE ROOM408B
PRACTICE ROOM408C
STORAGE409A
OFFICE409B
STORAGE409C
MUSIC CLASSROOM409
STORAGE417
TOILET411C
STORAGE411B
OFFICE411A
KITCHEN411
STORAGE411E
PLATFORMA106
MAIN OFFICE400
TOILET403B
CORRIDORH003C
CORRIDORH010
CORRIDORA107
OFFICE418
3
3 3
3
3
1
1
1
1
1919
18
23
24
/REFER TO
A5 AD111B
/REFER TO
A5 AD111D
/REFER TO
A5 AD111D
/REFER TO
A6 AD111E
66
6
6
6
4
6
6
4
44
8
4
4
6
6
31
2A
25
17
25 17
25
17
25
17
16
16
A4AD401
C7AD401
C4AD401
A7AD401
A9AD401
2222A2A
22
2A2A2
2
2 2
25
25
25
2
2
2
5A
8
8
8
8
8 8 8
4
8
6
4A
4
6
6
6
6
7
7
CPT
VAT
32
77
8
8
8
8 88
8
7
41
37
26
37
EXISTING SERVICESINK TO REMAIN
37EXISTING COUNTER,CABINET AND SINKTO REMAIN
EXISTING COUNTER, CABINETS,AND SINK TO REMAIN
EXISTING MILLWORKTO REMAIN
7
28
22
22
22
22
26
26
43
6COORDINATE WITHNEW DUCTWORK
5A
(TB4)
37
37
37
37
9
9
9
9 9
9
9
9
9
9
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
A13_S
Gro
ss.r
vt
2/1
3/2
014
5:5
0:0
7P
M
As indicated
Checker
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL DEMOLITIONPLAN - AREA A
AD111A7113.057.00
Author
1/8" = 1'-0"
FIRST LEVEL DEMOLITION PLAN - AREA AA4
1 2014.01.31 BIDS
2 2014.02.13 ADDENDUM 2
SEAL OPENING AROUNDSLEEVE AND CONCRETEWALL WITH NON-SHRINKGROUT
360° SPLIT SHEET METALSHIELD WHERE INSULATEDPIPE PENETRATES WALL
FIRE STOPPING SYSTEM
IN EXPOSED AREAS ONLY: PROVIDEFINISHED ESCUTCHEON PLATE FLUSHAGAINST WALL (SIZE TO COMPLETELYCOVER OPENING)
CALCIUM SILICATE INSULATIONINSERT WHERE INSULATEDPIPE PENETRATES WALL
PIPE
PIPE INSULATION
SCHEDULE 40 BLACKSTEEL PIPE SLEEVE.TERMINATE SLEEVEFLUSH WITH FINISHEDWALL SURFACE
NOTES:
1. DETAIL INDICATES THE INSULATION REQUIREMENTS FOR A FIRE RATED ASSEMBLY.FOR A NON-FIRE RATED ASSEMBLY PACK SLEEVED OPENING WITH INSULATIONMATERIAL AND CAULK WITH NON-HARDENING SEALANT.
2. PIPE PENETRATION DETAIL SIMILAR FOR UNINSULATED PIPING.
FIRE RATED AND NON-FIRE RATED POUREDCONCRETE OR BLOCK WALL PIPE
PENETRATION DETAILScale : None
METAL STUD ANDDRYWALLPARTITION WALL
NOTES:
1. PIPE PENETRATION DETAIL SIMILAR FOR UNINSULATED PIPING.
PIPE INSULATION
360º SPLIT SHEETMETAL SHIELD WHEREINSULATED PIPESPENETRATES WALL
PIPE
IN EXPOSED AREAS ONLY:PROVIDE FINISHEDESCUTCHEON PLATE FLUSHAGAINST WALL (SIZE TOCOMPLETELY COVEROPENING.)
NON-FIRE RATED STUD AND DRYWALL PARTITIONWALL PIPE PENETRATION DETAIL
Scale : None
NEW PIPE
GALVANIZEDSCHEDULE40 PIPE SLEEVE
2" .
SEAL OPENINGAROUND PIPE WITHFIRE RATED CAULK SEALANT
¼" PL. COLLARWELDED TO SLEEVECAULK SEALANT
EXPANSION BOLT TOFLOOR SET IN MASTIC
CALCIUM SILICATEINSULATION INSERT WHEREINSULATED PIPEPENETRATES FLOOR
PIPE PENETRATION THROUGH FLOOR DETAILScale : None
EXPANSIONTANKET-1
GAS FIREDWATERHEATERDWH-2
MASTER MIXING VALVEMMX-1. SET TO
MAINTAIN 130 DEG F(PIPE PER
MANUFACTURERRECOMMENDATIONS)
1" HWR
2 1/2" HW
2 1/2" CW
SPILL TO NEARESTFLOOR DRAIN (TYP)
(E)RELOCATEDCIRC PUMP
FLOOR
GAS FIRED DOMESTIC WATERHEATER PIPING DIAGRAM
SCALE: NONE
THERMOMETER (TYP)
NOTES:1. ALL WATER PIPING AND ASSOCIATED VALVES MUST COMPLY WITH ALL APPLICABLE CODES.2. MASTER MIXING VALVE PIPING ARRANGEMENT SHALL BE COORDINATED AND INSTALLED PER MANUFACTURERRECOMMENDATIONS. PROVIDE ANY VALVING/PIPING PER THEIR SPECIFIC REQUIREMENTS.
SHUT OFF VALVE (TYP)CHECK VALVE (TYP)
GAS FIREDWATERHEATERDWH-1
2"N
G
MINIMUM 6" LONGDIRT LEG FULLSIZE WITH ENDCAP (TYP)
GAS ISOLATIONVALVE (TYP)
(E)FD
(E)1" HWR
(E)2 1/2" HW
(E)2 1/2" CW
(E)3" NG
GAS FIREDWATERHEATERDWH-3
ROUTE FLUE TO ROOF AND TERMINATE PERMANUFACTURER RECOMMENDATION (TYP)
DRAIN VALVE WITHHOSE ENDCONNECTION (TYP)
(E)FD
2"N
G
2"N
G
GRADE
NATURAL GAS RISER DIAGRAMSCALE: NONE
ROOF
FIRST FLOOR
150 KWEMERGENCYGENERATOR(2061 CFH)
STORAGE108
(E) NG METER(5000 CFH)
(E) PRESSUREREGULATORREDUCED TO7" W.C.
(E) 1 1/2" NGINCOMING NGFROM SITE(20-50 PSIG)
1 1/2" NG
PRESSURE REGULATORREDUCE TO 11" W.C.
3/4" GV TO TERMINATETO ATMOSPHERE
NATURAL GAS METERPROVIDED BY CONSUMERS POWER
(E) 1 1/2" NG
NATURAL GAS LOAD SCHEDULE(NEW METER)
EQUIPMENT PRESSURE (IN W.C.) LOAD (CFH)
EMERGENCY GENERATOR 11 2061TOTAL 2061
(E) 4" NG TOBUILDING NG
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
M13_sm
cin
tosh
.rvt
2/1
3/2
014
10:2
5:4
1A
M
As indicated
ML
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
PLUMBING DETAILS,DIAGRAMS & SCHEDULES
P5017113.058.00
SM
4 2014.01.31 BIDS
6 2014.02.14 ADDENDUM 2
PLUMBING FIXTURE SCHEDULEMARK FIXTURE WASTE VENT TRAP CW HW COMMENTS
FV-1 FLUSH VALVE (URINAL) - - - 1 1/2" - URINAL FLUSH VALVE; TOP SPUD, SLOAN MODEL ROYAL OPTIMA SMOOTH 186, 1.0 GPF SENSOR.FV-2 FLUSH VALVE (WATER CLOSET) - - 1 1/2" - WATER CLOSET FLUSH VALVE; SLOAN MODEL ROYAL OPTIMA SMOOTH 111, 1.6 GPF SENSOR, BATTERY OPERATED FLUSH VALVE,
OLSONITE MODEL10SSC/10SSCT ELONGATED TOILET SEAT.L-1 LAVATORY 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" WALL HUNG VITREOUS CHINA LAVATORY; AMERICAN STANDARD "LUCERNE" MODEL 0355.012. PROVIDE AMERICAN STANDARD MODEL
5400.142H MANUAL LAVATORY FAUCET.PROVIDE DRAIN, CONICAL STRAINER, TAILPIECE, P-TRAP WITH CLEAN OUT PLUG,QUARTER-TURN ANGLE STOPS AND SUPPLIES. INSULATE EXPOSED WASTE AND WATER PIPING. PROVIDE MIXING VALVE MX-1 BELOWLAV.
LF-1 FAUCET (LAVATORY) - - - 1/2" 1/2" LAVATORY FAUCET; AMERICAN STANDARD MODEL 5400.142H MANUAL LAVATORY FAUCET.SH-1 SHOWER VALVE - - - 3/4" 3/4" POWERS HYDROGUARD MODEL E420 TEMPERATURE AND PRESSURE COMPENSATING, ASSE 1016 LISTED MIXING VALVE WITH
CHROME PLATED FINISH AND ADA LEVER HANDLE.UR-1 URINAL 3" 1 1/2" INTEGRAL 1" - WALL HUNG VITREOUS CHINA URINAL; AMERICAN STANDARD "WASHBROOK" 1.0 GPF URINAL WITH TOP SPUD AND SLOAN MODEL
ROYAL OPTIMA SMOOTH 186, 1.0 GPF SENSOR, BATTERY OPERATED, URINAL FLUSH VALVE.WC-1 WATER CLOSET 4" 2" INTEGRAL 1 1/2" - FLOOR MOUNTED TYPE, VITREOUS CHINA WATER CLOSET, AMERICAN STANDARD, MODEL "MADERA" 16 1/2" ELONGATED. PROVIDE
WITH SLOAN MODEL ROYAL OPTIMA SMOOTH 111, 1.6 GPF SENSOR, BATTERY OPERATED FLUSH VALVE, OLSONITE MODEL10SSC/10SSCT ELONGATED TOILET SEAT.
WC-2 WATER CLOSET 3" 2" INTEGRAL 1 1/2" - FLOOR MOUNTED TYPE, VITREOUS CHINA WATER CLOSET, AMERICAN STANDARD, MODEL "MADERA" 16 1/2" ELONGATED. PROVIDEWITH SLOAN MODEL ROYAL OPTIMA SMOOTH 111, 1.6 GPF SENSOR, BATTERY OPERATED FLUSH VALVE, OLSONITE MODEL10SSC/10SSCT ELONGATED TOILET SEAT.
PLUMBING EQUIPMENT SCHEDULEMARK TYPE SAN VENT TRAP CW HW DETAILS
DF-1 DRINKING FOUNTAIN 1 1/4" 1 1/4" 1 1/4" 1/2" - ELKAY MODEL EDFP214RC SOFT SIDES, SOLID SURFACE DRINKING FOUNTAIN WITH VANDALRESISTANT BUBBLER.
EWC-1 ELECTRIC WATER COOLER 1 1/4" 1 1/4" 1 1/4" 1/2" - ELKAY MODEL VRCGRN8, HIGH EFFICIENCY, WALL MOUNTED, VANDAL RESISTANT, STAINLESSSTEEL DRINKING FOUNTAIN. ELECTRICAL: 115 VOLTS, 2.8 AMPS.
MX-1 POINT-OF-USE MIXING VALVE - - - - - POWERS MODEL - E480-00, ASSE 1070 UNDER THE COUNTER TYPE THERMOSTATIC MIXING VALVE.
FUEL FIRED WATER HEATER SCHEDULE
TAG MANUFACTURERMODEL
NUMBERAREA
SERVEDFUELTYPE
ASMERATED
FIRINGRATE MbH
STORAGEGALLONS
RECOVERYRATE GPM EWT (F) LWT (F) VOLTS PHASE HERTZ NOTES
DWH-1 AO SMITH BTH 500A BUILDING NATURAL GAS YES 500 130 485 40 140 120 1 60DWH-2 AO SMITH BTH 500A BUILDING NATURAL GAS YES 500 130 485 40 140 120 1 60DWH-3 AO SMITH BTH 500A BUILDING NATURAL GAS YES 500 130 485 40 140 120 1 60
THERMOSTATIC MIXING VALVE
MARK MFR MODEL SYSTEM SERVEDMIN FLOW
(GPM)MAX FLOW
(GPM)HW INLETTEMP (°F)
HWOUTLET
TEMP (°F)
PRESSUREDROP AT MAXFLOW (PSIG) NOTES
MMX-1 SYMMONS 7-770 BLDG DOMESTIC HOT WATER 0.5 62 140 130 25 INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS B SERIES
PLUMBING EXPANSION TANK SCHEDULE
MARKSYSTEMSERVED MANUFACTURE MODEL TYPE
ENTERINGWATERTEMP
ASMECONSTRUCTION
PRESSURERATING (PSI)
TANKVOLUME
(GALLONS)
ACCEPTANCEVOLUME
(GALLONS)WEIGHT
(LBS) NOTES/ACCESSORIESET-1 DOMESTIC HOT
WATERAMTROL ST-85-CL FIXED BLADDER 40 YES 150 22 11 88
SD
SD
SD
SD
9
9
9
9
8
8
8
8
9
99
9
9 8
9
8
89
9
9
98
8
8
8
8
9
9
9
8
8
9
9
8
9
8
8
9
9
8
8
8
COURTYARD
COURTYARD
COURTYARD
HIGH ROOF CAFETERIA ROOF
(E) RTU
(E) RTU
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:3
7P
M
1/16" = 1'-0"
2/13/2014 6:41:37 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
COMPOSITE ROOFELECTRICAL DEMOLITIONPLAN
ED1217113.057.00
NF
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
GENERAL ELECTRICAL DEMOLITION NOTES
1. REFER TO DRAWING E001 FOR LEGEND, ABBREVIATIONS AND GENERALNOTES.
2. ALL LIGHTS AND LIGHTING DEVICES SHOWN CROSS HATCHED SHALLBE REMOVED. REMOVE ALL ASSOCIATED WIRING, SWITCHES ANDCONTROLS BACK TO SOURCE.
3. ALL ELECTRICAL ITEMS BEING REMOVED SHALL BE LEGALLY DISPOSEDOF OFF-SITE UNLESS DIRECTED OTHERWISE BY OWNER.
4. ALL ELECTRICAL OUTLETS, DEVICES, CONDUIT AND WIRING, ETC.,SHOWN CROSS HATCHED SHALL BE REMOVED BACK TO SOURCE ORUPSTREAM JUNCTION BOX.
5. CONTRACTOR SHALL NOT ABANDON EXISTING WIRING WITHINEXISTING WALLS OR CEILINGS TO REMAIN. ALL SUCH ELECTRICALITEMS SHALL BE REMOVED.
6 MAINTAI N OPERATION OF ALL EXISTING SYSTEMS DURINGCONSTRUCTION. ANY REQUIRED SHUTDOWNS SHALL BECOORDINATED WITH THE OWNER.
7 'R' INDICATES EXISTING EQUIPMENT TO BE RELOCATED. CAREFULLYDISCONNECT AND STORE IN A SAFE PLACE UNTIL RE-INSTALLATION.
ELECTRICAL DEMOLITION KEY NOTES
1 REMOVE A/C CONDENSER ON ROOF AND CASSETTE UNIT IN CEILINGCOMPLETE. REMOVE BRANCH CIRCUITS BACK TO PANEL.
2 REMOVE SURFACE V500 RACEWAY AND SURFACE BOXES. RETAINCIRCUITING TO BE RE-USED.
3 REPLACE PANEL INTERIOR AND BREAKERS. REFER TO ONE LINEDIAGRAM.
4 REMOVE PANEL. RETAIN FEEDERS FOR RECONNECTION TO NEW PANELMDP-2.
5 COORDINATE WITH DTE TO REMOVE DTE OWNED TRANSFORMERS INVAULT. REMOVE ALL BUSSING, ETC. TO PROVIDE AN EMPTY VAULT.
6 REMOVE SPEAKERS AND WIRING COMPLETELY. NEW SPEAKERSINSTALLED BY OTHERS.
7 DISCONNECT EXISTING CIRCUIT TO CUH. RETAIN CIRCUIT FORRECONNECTION TO NEW UNIT.
8 DISCONNECT EXISTING CIRCUIT. RETAIN CIRCUIT FO RECONNECTION TONEW FAN..
9 REMOVE CIRCUIT TO EXHAUST FAN BACK TO NEAREST DEVICE TOREMAIN.
X
1/16" = 1'-0"A4COMPOSITE ROOF ELECTRICAL DEMOLITION PLAN
OCC
OCC
OCC
OCC
OCC
OCB OCB OCB
OCC
OCB
OCB
OCB
OCB
OCC
OCDOCD
OCC
OCB
OCCOCC
OCX
OCCOCCOCC
OCCOCC
OCC OCC
3
3
33
3 3
333 3OCE
OCC
OCE
33
3 3 33
44
OCB
3
3
4
4
33
4
4
3
3
4 4
OCE
OCM OCEOCB
OCE
OCC
33
3a 3b 3c
3a 3b 3c
4a4a
4c
3 3
OCE
OCC OCC
OCC OCC
OCC OCC
OCC OCC
3
OCB
3
OCC
GYM412
STORE RM417
CORR.A107
STORE RM411E
TLT411C
STORE RM411B
OFFICE411A
PRAC RM408B
PRAC RM408A
PRAC RM408C
MUSIC409
STORE RM409A
OFFICE409B
STORE RM409C
TLT105
TLT104
STORE RM410A
MUSIC408
KITCHEN411
TLT406B
TLT406A
STOR RM406C
MAINT405
TLT92
WORK RM401
COORIDORH005
RESOURCE RM406
OFFICE418
PRINCIPAL403
PRINCIPAL402
OFFICE401B
MAIN OFFICE400
CONFERENCE404
TLT403B
COORIDORH010
STAGEA106
SPEECH407
COORIDORH012
COORIDORH003C
CAFETERIA410
/A4 E111B
/A4 E111D
/A4 E111D
/A4 E111E
FB FB
FB
FBE
FB FB FB FB
FBFBEFBFBE
FB FB FB FB
FBFBFBFB
FBE FB FBE FB
FBFBFBFB
FA
FAE
FA
FAE
FAE
FB FBE FB FBE
FBFBFBFB
FB FB FB FB
FBFBEFBFBE
FAEFAE FAE FAE
FDE
FD
LCELCE
LBE
LCE
FBFBFBFB
FB FB FB FB
FGE
FGE
FA
FAFB
FBFB
FBFBFB
FBFB
FB
FDEFCEFGE
FAE
FA
FAFA
FBE
FBFBFB
FBEFB FB FB
LBE LBE LBE
FB FB FB FB FB FB FB
FBFBEFBFBFBFBEFB
FB FB FB FB FB FB FB
FBFBFBFBFBFBFB
FB FBE FB FB FBFBE
FB
FBFBFBFBFBFBFB
LC
XAXA
FF
FGE
FGE
LCE
FA
FAE
FD FD
FD FD
FD FD
FD
FDE
FDE
XA
LCE
FGE
FG
FGE
FGE
FG
FG
FG
FGE
FG
FG
FG
FG
FG
FG
FG
FGE
FG
FG
FG
FG
FGE
FGFG
FG
FG
FG
FGE
FG
FG
FG
FGE
FG
FG
(E) (E) (E)
(E) (E) (E)
a
a
a
a
a
a
a
a b
b
b
b
b
b
b
c
c
c
c
c
c
c
c
c
c
c
LCELCE
FG FGEFGE
FG
FG
FG FG
(E) (E) (E) (E)(E) (E)
(E) (E)
1 1
1 1
FG
VESTIBULE001
5
XA
111
(E)
XA
XA
3
3
3
3
3
LC
1
1 1
FDE
3
EM-1EM-1
EM-1
EM-1
EM-1 EM-1
EM-1
EM-1
EM-1EM-1
EM-1EM-1
EM-1
EM-1EM-1 EM-1
EM-1
EM-1
EM-1
EM-1
EM-1
EM-1
EM-1
EM-2 EM-2EM-2
EM-2
EM-2
EM-2
EM-2
EM-2
EM-2 EM-2
EM-2
EM-2
EM-2
EM-2
EM-2EM-2
EM-2
EM-2EM-2
EM-2
EM-2 EM-2EM-2
EM-2EM-2
EM-7EM-7
EM-7
EM-7EM-7EM-7EM-7
EM-2
EM-3
EM-6 EM-6 EM-6
EM-6
EM-6
EM-6 EM-6
EM-6
EM-6 EM-6 EM-6
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:3
9:5
2P
M
1/8" = 1'-0"
2/13/2014 6:39:52 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA A
E111A7113.057.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.
3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.
6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA A
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
OCC
OCC
3
33
OCB
OC
B
OC
B
OCBOCBOCB
OCB
OC
B
OC
B
OC
B
OC
B
OC
B
OC
B
OC
B
ATS
ATS
T
OCC
OCC
3
4 4
OCC
OCC OCC
OCE
OCH
3
3
3
3
OCH
OCE
OCM
OCH OCC
3 3
OCH
KK
MAINT.310A
STORE RM32
ART STORAGE308B
BOILER RM311
ELEC311A
CLASSROOM301
CLASSROOM302
RECEIVING310
BOY'S TLT RM26 GIRL'S TLT RM
27
COORIDORH009
CLASSROOM305
CLASSROOM308
CLASSROOM307
CLASSROOM304
CLASSROOM306
COORIDORH004
COORIDORH013
ART309
NORTHCOURTYARD
CYN
/A4 E111D /A4 E111A/A4 E111D
LBE
LCE
MDP-1
FDE
FD
FG FG
FGFGE
FG FG
FBFBE
FB
FB FB FB
FB FB FB FB FB FB
FBFBEFBFBFBEFB
FB FB
FB FB FB
FBFBFB
FB FB FB
FBFBFB
FB FBFB
LBE
LCE
FB FB FB
FBFBFB
FB FB FB
FB FB FB
XA
XAXA
LCELCELCE 2
RESOURCE RM303B
CLASSROOM303
FG
FG
FG
FG
FGE
FG
5
5
5
5151
5
5
5
1
1
1
1
1
1
FD
FDE
FD
FG
FG FGE FG
3 3 3 3 3
3
3
XA
FD
3
COORIDORH008
3
3
3
EM-7 EM-7 EM-7 EM-7
EM-7
EM-7
EM-7EM-7
EM-7
EM-7
EM-3
EM-3
EM-3
EM-3 EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
(TYPICAL)
LC
EM-6
EM-6
EM-6EM-6EM-6
EM-6
EM-6
C1
SL4
C4
LCLC
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
0:0
3P
M
1/8" = 1'-0"
2/13/2014 6:40:03 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA B
E111B7113.057.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.
3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.
6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA B
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
3
3
OCE
3
3
OCE
3 3
OCE
OCE
OCC
OCC
OCE
OCE
OCE
3 3
KK
STORE RM204B
WESTCOURTYARD
CYW
STORE RM212
STORE RM210B
STORE RM211B
STORE RM208B
STORE RM206B
CLASSROOM211
CLASSROOM210
BOY'S TLT RM9
GIRL'S TLT RM8
JC11
CLASSROOM204
CLASSROOM205
CLASSROOM206
CLASSROOM207
CLASSROOM208
CLASSROOM209
CORRIDORH002
CORRIDORH007
COORIDORH003
/A4 E111B
/A4 E111D
/A4 E111D
/A4 E111E
FG FGE FG
FGFGEFG
FB FB FB
FBFBFB
FB FB FB
FB FB
FB FB
FB FB FB
FB FB FB FB
FBFBFBFB
FB FB FB
FB FB FB
FBFBFB
FB FB FB
FBFBFB
FB FB FB
FBFB
FB FB
FB FB FB
FBFBFB
FB FB FB
LC
LC
LBE
LBE
FB FB FB
FB
FB
FB
FB
FB
FB
FB
FB
FB FB FB
FBFBFB
FB
FB
FB FB FB
FB
FB
FB
FB
FB
FB FB FBFB
FB FB FB
FB FB
FAE
FAE
FAE
FDE
XA
FG FG FG
FG FGFG
FDE FDE
XA
XA
XA
FAE
11
5
5
5 1 5
5
XA
LC
CORRIDORH007
3
3
3
EM-7EM-9EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-5
EM-5
EM-5EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
EM-6
EM-6
C3
SL3
LC
LC
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
0:1
1P
M
1/8" = 1'-0"
2/13/2014 6:40:11 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA C
E111C7113.057.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.
3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.
6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA C
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
OCC OCC
OCC
OCC
OCC OCC
OCC
3
3 3
OCC OCC
OCC
OCB
3
3
3 333
33
OCC OCC
OCBOCB OCG
OCC
OCC
OCC
OCC
OCC
OCM
OCH
OCK
OCHOCE
OCH
OCH
OCM
OCH
OCH
OCH
OCEOCH
OCK
OCB
OCB
OCC
3 3
K K
STOR415A
STOR414A
OFFICE413
TLT413A
OFFICE416
CLASSROOM313
TLT44
MAINT43
TLT42
GIRL'S TLT RM45
BOY'S TLT RM46
CLASSROOM122
CLASSROOM121
CLASSROOM312
CLASSROOM301
TLT202B
TEAM RM15
COORIDORH009
CORR.318
PSYCH315
ESL317
S.W.316
ESAP319
LOUNGE314
LOCKER RM415
LOCKER RM414
CORRIDORH007
COORIDORH003
COORIDORH004B
COORIDORH003B
COORIDORH007B
COORIDORH008
CLASSROOM120
CLASSROOM202
CLASSROOM203
/A4 E111B
/A4 E111E
/A4 E111A
/A4 E111B
/A4 E111E
/A4 E111C
/A4 E111C
/A4 E111A
FB
FB
FB
LC
FB FB FB
FB
FBFB
FBFB
FB
FB FB FB
FB
FB
FB FBFB
FB
FBFB FB
FBFBFB
FBFB FB
FBFBFB
FB FB FB
FBFBEFB
FBFBE FB
FBFBFB
FBE
FB
FB
FGE
FG
FGE
FGFG
FGE
FG
FGE
FC FC
FDE
FGEFG
FG
FGE
FGE
FG
FGE FGFG
FG
FGE
FG
FG
FGE
FG
FG
FG FGEFG FG
FGFGE
FG FG
FGEFG
FG FG
FG
FB FB FB
FB
FB
CORRIDORH009B
1
5
1
FA
FA
FAE
11
1 1
1
1
5
1
55
1
FC
XA
FBE
FB
FBE
FB
FBFB
FB
FBE
FB
FG FG
FG FG
FG FG
XA
FG
FG
FG
FGE
FG FGE FG
3
3
XA
1
3
XA
3
3
3 3
33
3
33
3
1
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FB FB FB
FBFBFB
FB FB FB
FB FB FB
EM-7
EM-7
EM-9EM-9EM-9EM-9
EM-7
EM-7
EM-7 EM-7
EM-7
EM-7EM-7EM-7
EM-9EM-9
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
EM-4
EM-4 EM-4
EM-4
EM-4
EM-4
EM-4
EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
LC
LC
6
6
6
6
6
EM-3EM-3
EM-3
EM-3
EM-3
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
0:2
2P
M
1/8" = 1'-0"
2/13/2014 6:40:22 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA D
E111D7113.057.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.
3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.
6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA D
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
OCC
OCC OCC
OCX OCC
OCC
33
3
OCC
OCC
OCXOCXOCX
PC
3
3
33
33
3
OCE
OCCOCC
OCE
OCM
OCE
OCE
33
33
KK
OCCOCC
33
33
3
3
3
3
3c3b
3a
3c3b3a
OCC OCC
OCC
CONF102B
COURT YARDGH
STORE RM62
CLASSROOM115
COMPUTER LAB117
STORE RM104
CORR.211C
BOY'S TLT RM68GIRL'S TLT RM
67
OFFICE112
WORK RM111
COORIDORH004C
TLT66MAINT.
65
TLT64
COMPUTER LAB113
OFFICE108
OFFICE109
CONFERENCE118B
TLT119B
SACC101
CONF101B
CLASSROOMRM103
STORE RM105
STORE RM106
CLASSROOM107
RESOURCE RM102
COMPUTER LAB118
TLT119C
LMC114
MEDIA124
WORK RM72
TECH CLOSET73
COORIDORH001
COORIDORH006
RESOURCE RM119
/A4 E111D /A4 E111A/A4 E111D
LC
FBE
FB
FBEFB
FB
FBE
FBE
FB
FAE
FA
FA
FA
LBE
FB FB FB FB
FBFB
FB FB
FB
FB
FB
FB
FB FB FB
FBFBFB
FB FB FB FB FB
FB FB
FB
FBFB
FB
FB
FB
FB
FB FB FB
FBFBFB
FB FB FB
FBFB
FB FB FB
FBFBFB
FB FB FB
FB FB FB
FBFBFB
FB FB FB
FBE FB FB FBE
FBFBFBFB
FB FB FB FB
FBEFBFBFBE
FA
FA
FA
FA
FA
FB FB FB FB
FBFBFBFB
FB FB FB FB
FBFBFBFB
FA FA
FAFAE
FA FA
FA FAE
FAEFA
LCE
LBE
LC
LC
LBE
FB FB FB
FB
FB
FB FBFB
FB
FAE FAE
LC
FGE FGE FA FAE
5
5
3
3
1
5
5 53
XA
1
XA
XA
5
COORIDORH004B
5
3
5
XA
XA
COORIDORH008
5
3
XA
FDE
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9 EM-9 EM-9
EM-4 EM-4
EM-4EM-4
EM-4 EM-4
EM-4
EM-4
EM-4EM-4
EM-4
EM-4
EM-4 EM-4
EM-4
EM-4
FCEFCEEM-4EM-4
a
b
c
a
b
c
a
b
c
a
b
c
XA
XA
XA
FA
FA
FA
FAE FAE
FA FA
FA FA
FAE
FA
FAE
FA
EM-4 EM-4
EM-4
EM-4
FA
FAE
FA
EM-4
FCEFCFCFCFC FCE FC FC FCE FC FC FC FC FCE FC FC FCE FC
FCFCFCFC
FC FC
FCFC
FC FCE
FCFC
FC FC
FC FC
FC FCE FC FC FCE FC FC FC FC FCE FC FC FCE FC FC FC FCE FC
FC FC
FC FC
FC FC
FCE FC
FC FC
FC FC FC FCE FC FC
FC FC FC FC
FCFCFCFC
FC FC FCE FC
FCFCFCFC
FCE FC FC FC
XA XA
XA
FC FC
FC FCE FC FC FCE FC
FCFCFCFC FC
FCE
FC FC FC FCE FC
FCFCFCFCEFC FC FC FC
FCFCEFC
EM-6EM-6
EM-6
EM-6
C2
SL2
LC
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
0:3
3P
M
1/8" = 1'-0"
2/13/2014 6:40:33 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA E
E111E7113.057.00
NF
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA E
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.
3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.
6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
X
F
F
F F F
F
F
F
F
F
FF
60
F
60
F
60
F
F
F
F
F F
F
F
F
F
F F F
F
FAAP
F
F
F30
F
F 60
75
F
75
F
75
F
75
F
60
F
F30
F30 60
F
30
F
F
F60
F
S
SD
SD
P
B
B
BB
B
B
J
J
GYM412
STORE RM417
CORR.A107
STORE RM411E
TLT411C
STORE RM411B
OFFICE411A
PRAC RM408B
PRAC RM408A PRAC RM
408C
MUSIC409
STORE RM409A
OFFICE409B
STORE RM409C
TLT105
TLT104
STORE RM410A
MUSIC408
KITCHEN411
TLT406B
TLT406A
STOR RM406C
MAINT405
TLT92
WORK RM401
COORIDORH005
OFFICE413
OFFICE416
RESOURCE RM406
OFFICE418
PRINCIPAL403
PRINCIPAL402
OFFICE401B
MAIN OFFICE400 CONFERENCE
404
TLT403B
COORIDORH010
STAGEA106
SPEECH407COORIDOR
H012
COORIDORH003C
CAFETERIA410
/A4 E211D
/A4 E211D
/A4 E211E
/A4 E211B
VUV-4
VUV-3
VUV-1
VUV-2
CUH-1 CUH-2
CUH-3
CUH-4
CUH
T
2
RP-G2
WG WG
WG WG
VESTIBULE001
4 4
(E) FCU
VUV-34
1
VUV-8,10
4
VUV-12,14
VUV-13,15
VUV-16,18
4
VUV-17,19
CUH-5
4
IDF-1EGX -1
EG -1
EG -1T
(E) SECURITY PANEL
PANEL E
PANEL A
PANEL DP
PANEL-K
RP-G1
(E)
(E)
(E)
(E)
(E)
6
(E) (E)
(E)
6
6
6
(E)
(E)
6
(E)
6
(E)
(E)
(E)(E)
(E)
(E)
(E) U.H.
(E)
(E) U.H.
(E)
(E)
3
3
3
CARDREADEREG -36
EG -36
CARDREADER
EWCCIRCUIT T0SPARE CIRCUITIN EXISTINGPANEL-A
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
0:4
3P
M
1/8" = 1'-0"
2/13/2014 6:40:43 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL POWER &AUXILIARY PLAN - AREA A
E211A7113.057.00
NF
GENERAL POWER NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.
3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.
4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.
5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.
6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.
7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.
X
1/8" = 1'-0"B4FIRST LEVEL POWER AND AUXILIARY PLAN AREA A
POWER AND AUXILIARY KEY NOTES
1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.
2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.
3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.
4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.
5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.
ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.
6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.
7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.
8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
F F F F F
F
F
F
F
F
F
F
FF
F
F60
60
F
60
FF60
60
F F60 60
F
60
F
30
F
F 30 F30
F 110 F110
F
110
F
FF
F
60
F 60
F60
F
F
F
ATS
ATS
T
B
P
PPPP
P
P
P
P
P
60
F
B
B
F
H
J
J
MAINT.310A
STORE RM32
ART STORAGE308B
BOILER RM311
ELEC311A
OFFICE416
CLASSROOM301
CLASSROOM302
RECEIVING310
CLASSROOM303
BOY'S TLT RM26 GIRL'S TLT RM
27
COORIDORH009
CLASSROOM305
CLASSROOM308
CLASSROOM307
CLASSROOM304
CLASSROOM306
COORIDORH004
COORIDORH013
ART309
NORTHCOURTYARD
CYN
NEW NATURAL GASGENERATOR
NEW UTILITYTRANSFORMER
MDP-1A(SPLICE BOX)
MDP-1B(SPLICE BOX)
(E) PP-KRENAMEDTO DP-X
75 KVA
/A4 E211D/A4 E211D /B4 E211A
VUV-6
(E) VUV (E) VUV (E) VUV (E) VUV(E) VUV
VUV-8
VUV-17
(E) CUH
CUH-6CUH-7
CONCRETE PAD ANDGROUND MAT
CONCRETEBOLLARDS(TYP OF 5)
CONCRETEBOLLARDS(TYP OF 4)
T T T T T
T
T
T
T
2
(TYPICAL)
LP-1A
MDP-2
(E) DP-REC-B
PANEL N-2
PANEL N-1
MDP-1
ATS-2
ATS-1
LP-EM
RP-EGX
4 4
NEW RECEPTACLESEXTEND FROMEXISTING CIRCUIT
5
(TYPICAL)
EG -3
EG -3
EG -7
EG -7
EG -5
EG -5
EG -11
EG -11
EG -9
EG -9
RESOURCE RM303B
VUV-7
T
VUV-35
T
WP WP
WP
EG -15EG -15
EG -13EG -13
EG -19
EG -19
EG -17EG -17
VUV-20,22
VUV-21,23
VUV-25,27
VUV-24,26
(2) 4" PVC CONDUITS 42" BELOWGRADE. REFER TO E011 FOR ROUTING.
4" CONCRETE HOUSEKEEPING PAD
CONCRETE PAD ANDGROUNDING
.
.
UNDERGROUNDTO ATS-1
UNDERGROUNDTO ATS-2
TO DP-X-8FOR BATTERYCHARGER
TO DP-X-7FOR BLOCKHEATER
EG -2 EG -2T
(E) CUH
OUTDOOR STORAGE
PANEL H
(N) PP-B
(E) B-1
(E) B-2
(E) HWP
(E) HWP
(E) HWP
(E)
(E)
(E)(E)
(E)
(E)(E)
(E)(E)
(E)(E)
(E)
(E)
(E)
(E)(E)
(E)
(E)(E)
(E)
(E)
(E)(E)
(E)
(E)
6
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
6
6
(E) WH-2(E) WH-1
(E) CUH
(E)
E EG -36
CARDREADER
CARDREADEREG -36
FORTEMEPERATURECONTROLS
EGX -11
UH-1CIRCUIT TOSPARE 20A-1PBREAKER INPANEL DP-X
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
0:5
2P
M
1/8" = 1'-0"
2/13/2014 6:40:52 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL POWER &AUXILIARY PLAN - AREA B
E211B7113.057.00
NF
GENERAL POWER NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.
3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.
4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.
5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.
6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.
7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.
X
1/8" = 1'-0"A4FIRST LEVEL POWER AND AUXILIARY PLAN - AREA B
POWER AND AUXILIARY KEY NOTES
1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.
2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.
3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.
4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.
5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.
ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.
6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.
7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.
8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
F
F60 60
F
60
F
F
FF
F
F
60
F
F60
60
F
F60 60
F
60
F
F 60 F60
F F
F
110
FF
FF
F
F60
F
F
F
F
F
F
F
F
F30
F30
F
F
F
F
F
F30
FAC
P
S
P
P
P P
PP
P
P
P
P
P
BB
B
B
B
B
B
B
B
STORE RM32
STOR415A
STOR414A
OFFICE413
TLT413A
OFFICE416
CLASSROOM313
TLT44
MAINT43
TLT42
GIRL'S TLT RM45
BOY'S TLT RM46
CLASSROOM122
CLASSROOM121
CLASSROOM312
CLASSROOM301
TLT202B
STORE RM211B
TEAM RM15
COORIDORH009
CORR.318
PSYCH315
ESL317
S.W.316
ESAP319
LOUNGE314
LOCKER RM415
LOCKER RM414
CORRIDORH007
COORIDORH003
COORIDORH004B
COORIDORH003B
COORIDORH007B
COORIDORH008
CLASSROOM120
CLASSROOM202
CLASSROOM203
PANEL C
/A4 E211B
/A4 E211E
/A4 E211B
/B4 E211A
/A4 E211E
/A4 E211C
/A4 E211C
VUV-17
VUV-18 VUV-19
VUV-20VUV-21
VUV-22
VUV-25VUV-24
VUV-23
VUV-26
(E)
(E) CUH(E) CUH
T
T
TT
TT
TT
TT
2
(TYPICAL)
RP-G2
CORRIDORH009B
DP-VUV
RP-EG
WP
EG -17EG -17
5
(TYPICAL)
EG -6
EG -6
EG -4
EG -4EG -2 EG -2T
VUV-29,31VUV-32,34
VUV-33,35EG -8
EG -21
EG -21
(E) CUH
EG -22 EG -23
EG -23EG -22
VUV-53,55,57VUV-52,54 VUV-56,58,60
(E) CUH
(2) DEDICATEDPHONE LINES
IDF-2EGX -3
VUV-59,61
EG -24
EG -24
EG -25
EG -25
EG -26
EG -26
VUV-62,64VUV-63,65
EG -27EG -35
RP-G1
(E)-SOUNDCAB.
(E)-T.C. CAB.
(E)
6
(E)
6
(E)
(E)
(E)
(E)
(E)
(E) U.H.
(E)
(E)
(E)(E)
(E)(E)
(E)
(E)
(E)
(E) PANEL W-1
(E) PANEL W-2
(E) (E)
(E)
(E) (E)
(E)
(E)
(E)6
(E)
(E) (E)
(E)
(E) U.H.
(E)
(E)
(E)
(E)
(E)(E)(E)(E)
T
(E)
(E)(E)
(E)
E
EWCGFCI
EG -37
EG-38
EG -39 EG -39
EG -39EG -39
EG -40
EG -40 EG -40
EG -40
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:1
1P
M
1/8" = 1'-0"
2/13/2014 6:41:11 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
FIRST LEVEL POWER &AUXILIARY PLAN - AREA D
E211D7113.057.00
NF
GENERAL POWER NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.
3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.
4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.
5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.
6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.
7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.
X
1/8" = 1'-0"A4FIRST LEVEL POWER AND AUXILIARY PLAN - AREA D
POWER AND AUXILIARY KEY NOTES
1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.
2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.
3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.
4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.
5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.
ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.
6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.
7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.
8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
11
GFCIWP
11
1
GFCIWP
GFCIWP
EF-21
EF-17
EF-18
EF-22
EF-20
EF-19
ACCU-2(VUV-22)
EF-13
EF-15
EF-16
RTU-3
EF-12
COURTYARD
EF-14
ACCU-1(VUV-21)
EF-9
COURTYARD
EF-11
EF-10
EF-7
EF-8
COURTYARD
EF-3EF-4
EF-5
EF-6
CAFETERIA HIGH ROOF
RTU-1
TO MDP-1
TO MDP-1
EF-1
RTU-2
EF-2
TO MDP-1
GYM ROOF
8
WP
41
WP
4
4
4
4
WP
4
4
4
4
4
4
44
4
4
WPWP
8
4
4
4
4
4
WP
ACCU-3(VUV-28)
WPAC-1
(E) RTU
(E) RTU1 1
1 1
VUV -1,3VUV -2,4
VUV -5,7
VUV -9,11
CONNECT TO 120VCIRCUIT MADEAVAILABLE FROMDEMOLITION OFEXHAUST FANS
CONNECT TO 120VCIRCUIT MADEAVAILABLE FROMDEMOLITION OFEXHAUST FANS
N
A
B
C D
E
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:1
5P
M
1/16" = 1'-0"
2/13/2014 6:41:15 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
COMPOSITE ROOF POWERAND AUXILIARY PLAN
E2317113.057.00
NF
GENERAL POWER NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.
3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.
4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.
5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.
6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.
7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.
POWER AND AUXILIARY KEY NOTES
1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.
2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.
3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.
4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.
5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.
ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.
6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.
7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.
8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.
X
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
1/16" = 1'-0"A3COMPOSITE ROOF POWER AND AUXILIARY PLAN
.5
208V, 3 PHASESIZE(HP) OVERCURRENT
SWITCH/FUSE(AMPS)
.75
1
1.5
2
3
5
7.5
10
15
STARTERSIZE
DISC.SWITCH(AMPS)
20
25
30
40
50
60
75
100
125
150
200
OVERCURRENTCB
(AMPS)
NOTES:
1. BASED ON MOTOR FULL LOAD AMPS AS LISTED IN THE N.E.C.
2. BASED ON MOTOR RUNNING OVERLOAD PROTECTION PROVIDED BYTHERMAL OVERLOAD RELAYS.
3. WHERE THE STARTER IS LOCATED REMOTE FROM THE MOTOR,PROVIDE DISCONNECT LOCATED AT THE MOTOR, SIZE AS INDICATED.
3 PHASE MOTOR CIRCUIT SIZINGSCHEDULE
30A/6A 15 1
30A/6A
30/10
30/10
30/10
30/20
30/25
60/40
60/50
15 1
15 1
15 1
15 1
20 1
35 1
50 1
60 2
90 3
30
30
30
30
30
30
60
60
60
100
100/90 100 3
100/100
200/125
200/175
200/200
400/300
400/400
800/500
600/600
110 3
125 4
175 4
200 4
250 5
300 5
400 6
600 6
600 6
100
100
200
200
400
400
400
800
800
N/A N/A N/A N/A
200
60/60
400/250
FEEDER AND BRANCH CIRCUIT SIZING SCHEDULE
15-20 #12
COPPER (CU)
FUSE/CB(AMPS)
CONDUIT
CONDUCTORSIZE
2 WIRE+G 3 WIRE+G 3 WIRE+G 4 WIRE+G
GROUNDSIZE
1 PHASE 3 PHASE
#12 3/4" 3/4" 3/4" 3/4"
25-30
35-40
45-50
60
70
80
90-100
110
125
150
175
200
225
250
300
350
400
450
500
600
700
800
1000
1200
1600
2000
#10 #10 3/4" 3/4" 3/4" 3/4"
#8 #10 3/4" 3/4" 3/4" 3/4"
#8 (#6) #10 3/4" 3/4" 3/4" 3/4"
#6 (#4) #10 3/4" (1) 3/4" (1) 3/4" (1) 3/4" (1)
#4 #8 1" 1 1/4" 1 1/4" 1 1/4"
#4 (#3) #8 1" 1 1/4" 1 1/4" 1 1/4"
#3 (#2) #8 1 1/4" 1 1/4" 1 1/4" 1 1/4"
#2 (#1) #6 N/A 1 1/4" 1 1/4" 1 1/4" (1 1/2")
#1 (#1/0) #6 N/A (1 1/2")1 1/4" (1 1/2")
#1/0 #6 N/A 1 1/2" 2"1 1/2"
1 1/4" (1 1/2")
#2/0 #6 N/A 2" 2"2"
#3/0 #6 N/A 2" 2 1/2"2"
#4/0 #4 N/A 2" 2 1/2"2"
#250 #4 N/A 2 1/2" 2 1/2"2 1/2"
#350 #4 N/A 2 1/2" 3"2 1/2"
#500 #3 N/A 3" 3"3"
#600 #3 N/A 3" 3 1/2"3"
2 SETS #4/0 2 SETS #2 N/A 2 - 2" 2 - 2 1/2"2 - 2"
2 SETS #250 2 SETS #2 N/A 2 - 2 1/2" 2 - 2 1/2"2 - 2 1/2"
2 SETS #350 2 SETS #1 N/A 2 - 2 1/2" 2 - 3"2 - 2 1/2"
2 SETS #500 2 SETS #1/0 N/A 2 - 3" 2 - 3"2 - 3"
2 SETS #600 2 SETS #1/0 N/A 2 - 3" 2 - 3 1/2"2 - 3"
3 SETS #400 3 SETS #2/0 N/A 3 - 3" 3 - 3"3 - 3"
3 SETS #600 3 SETS #3/0 N/A 3 - 3 1/2" 3 - 3 1/2"3 - 3 1/2"
4 SETS #600 4 SETS #4/0 N/A 4 - 3 1/2" 4 - 3 1/2"4 - 3 1/2"
5 SETS #600 5 SETS #250 N/A 5 - 3 1/2" 5 - 3 1/2"5 - 3 1/2"
* REFER TO NOTE 2.
**
***
NOTES:
1. ELECTRICAL CONTRACTOR TO SIZE FEEDERS AND BRANCH CIRCUITS BASED ON THISSCHEDULE AND OVERCURRENT DEVICES AS INDICATED ON ONE-LINE DIAGRAM, UNLESS NOTEDOTHERWISE.
2. CONDUCTORS ARE BASED ON 90°C, 600V, INSULATED COPPER WIRE APPLIED AT 75° FORTERMINATIONS RATED 60°/75° OR 75°C. FOR TERMINATIONS RATED AT 60°C, USE CONDUCTORSAND CONDUIT SIZED INDICATED IN PARENTHESIS.
3. CONDUCTORS ARE BASED ON THHN/THWN UP TO AND INCLUDING #4/0. CONDUCTORS #250KCMIL AND LARGER ARE BASED ON XHHW.
4. CONDUIT SIZES ARE BASED ON EMT AND RGS. ELECTRICAL CONTRACTOR SHALL REVISESSIZES FOR THERE CONDUIT TYPES.
5. DISCONNECT SWITCHES DOWN STREAM OF OVERCURRENT PROTECTION SHALL BE SIZEDACCORDINGLY BASED ON OVERCURRENT DEVICES AS INDICATED.
6. ELECTRICAL CONTRACTOR SHALL SUBMIT FOR APPROVAL CONDUCTOR AND CONDUIT SIZESTHAT ARE NOT INCLUDED IN THIS SCHEDULE.
7. FEEDERS OR BRANCH CIRCUITS TERMINATING IN MECHANICAL EQUIPMENT SHALL BE COPPER.
NEW ELECTRICAL ONE LINE DIAGRAMSCALE: NONE
NEW UTILITYPAD MOUNTTRANSFORMER4.8KV - 208Y/120V,3 PH - 4W
NEW 15KV PRIMARY CABLESUNDERGROUNDIN 4" PVC CONDUIT 42" BELOW GRADETO EXISTING UTLILTY POLE
(NEW) MDP-12400A, 208Y/120V, 3PH, 4W
2400A3PMCB
M
15A3P
TVSS
NEWCOMPUTER
RECEPTACLES
(N) MDP-2600A, 208Y/120V, 3PH, 4W
200A3P
CORRIDORH003
200A3P
H004
200A3PSPARE
200A3P
H008
30A3P
KILN308B
100A3P
H008
30A3P
NOLABEL
100A3P
KILN ROOM308B
20A3P
20A3P
CORRIDORH003
AUDITORIUMH010
DIMMERRACK
CORRIDORH005
SOUTH WINGH106
BOYS GYM
GIRLS LOCKER412
ADMINISTRATIONH003C
NEWVUV'S
G
100A/3P
NEW100A/3PATS-1
BOILERSAND
PUMPS
NEW70KW NATURAL GAS GENERATOR480Y/277V, 3PH, 4W
EMERGENCYLIGHTING
200A/3P
NEW200A/3PATS-2
NEWRP-EG
(E)DP-
REC-B
200A3P
600A3P
600A3P
400A3P
6
T
(E)PANELPP-B
(E)75KVA
6 6 6 6
PANELK
PANELC
7
PANELDP
7
200A3P
200A3P
200A3P
200A3P
100A3PSPARE
800A3P
100A3P
200A3P
6
PANELG1
6
PANELY
7 7
PANELS
7
PANELG2
7
H003EKITCHEN417 STOR.
PANELE
7
6
PANELA
7
NEWDP-VUV
FEEDTHROUGH
PANELW-1
7
PANELW-2
7
PANELH
7
PANELN-1
7
PANELN-2
7
(E)LP-1AT/C
PC
EXTERIORLIGHTING
(E)
(E)
NEWLP-EM
(E)PP-K
RENAMEDP-X
NEWPP-B
NEWRP-EGX5
4
8
3
80A3P
100A3P
60A3P
NEMA 3R
RTU-1
NEMA 3R
RTU-2
125A3P
NEMA 3R
RTU-3CKT#2
NEMA 3R
RTU-3CKT#1
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:1
9P
M
12" = 1'-0"
2/13/2014 6:41:19 PM
BC
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
ELECTRICAL ONE LINEDIAGRAM
E4017113.057.00
NF
ONE LINE DIAGRAM GENERAL NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
ONE LINE DIAGRAM KEY NOTES
1 TIE EXISTING METERING INTO BUILDING MANAGEMENT SYSTEM.
2 ELECTRICAL CONTRACTOR SHALL PROVIDE CT'S FOR METERING THELIGHTING PANELS. CT'S SHALL BE TIED INTO THE BUILDING MANAGEMENTSYSTEM.
3 DISCONNECT (13) 20A-1P BRANCH CIRCUITS FOR EXIT LIGHTS ANDAUDITORIUM EMERGENCY LIGHTS FROM EXISTING PANEL PP-B ANDEXTEND TO NEW PANEL LP-EM, CIRCUITS 1 THRU 13.
4 RECONNECT REMAINING BRANCH CIRCUITS TO NEW PANEL PP-B.
5 FEED NEW PANEL PP-B FROM SPARE 60A-3P SWITCH IN EXISTING PANELPP-K. INSTALL 60A FUSES.
6 EXTEND EXISTING FEEDERS TO NEW MDP. UTILIZE EXISTING PANELS ASSPLICE BOXES.
7 REMOVE AND REPLACE BUSS BARS, BREAKERS AND DOORS. FIELDVERIFY BUSS AND BREAKERS PRIOR TO ORDERING. NOTIFY ENGINEER OFANY DISCREPENCIES. RECONNECT EXISTING FEEDERS AND CIRCUITS,EXTEND AS REQUIRED. EXISTING PANEL TUB AND COVER TO REMAIN.ELECTRICAL CONTRACTOR SHALL MEASURE EXISTING PANELENCLOSURES TO DETERMINE APPROPRIATE INTERIOR RETROFIT KITS.EATON RETROFIT INTERIOR KITS BR OR CR OR EQUAL BY OTHERS.PROVIDE FEED THRU OR DOUBLE LUGS AS REQUIRED. MATCH AICRAITINGS.
8 INSTALL NEW 60A-3P FUSIBLE SWITCH WITH 60AF TO FEED NEW PANELRP-EGX.
X
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:2
2P
M
2/13/2014 6:41:22 PM
BC
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
ELECTRICAL PANELSCHEDULES
E4117113.057.00
NF
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
Notes:
Total Est. Demand Current: 1097 ATotal Conn. Current: 947 A
Total Est. Demand: 395386 VAPOWER 0 VA 0.00% 0 VA Total Conn. Load: 341186 VAMotor 341186 VA 115.89% 395386 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 1400 A 349 A 1365 ATotal Load: 151777 VA 41838 VA 147571 VA
83 1084... 0 VA 1 20 A SPARE 8481
VUV-33, SACC 101 15 A 21084... 1084... 82
79 1084... 1084...2 15 A VUV-32, RESOURCE RM 102
8077
VUV-31, CLASSROOM RM103 15 A 21084... 1084... 78
75 1084... 1084...2 15 A VUV-30, CLASSROOM 107
7673
VUV-29, CLASSROOM 115 15 A 21084... 3516... 74
71 3516... 3516... 7269 3516... 3516...
3 45 A VUV-28, COMPUTER LAB 11770
67VUV-27, COMPUTER LAB 118 45 A 3
3516... 1084... 6865 1084... 1084...
2 15 A VUV-26, RESOURCE RM 11966
63VUV-25, CLASSROOM 122 15 A 2
1084... 1084... 6461 1084... 1084...
2 15 A VUV-24, CLASSROOM 12162
59VUV-23, CLASSROOM 120 15 A 2
1084... 3516... 6057 3516... 3516... 5855 3516... 3516...
3 45 A VUV-22, LOUNGE 31456
53VUV-21, CLASSROOM 202 45 A 3
3516... 1084... 5451 1084... 1084...
2 15 A VUV-20, CLASSROOM 20352
49VUV-15, CLASSROOM 204 15 A 2
1084... 1084... 5047 1084... 1084...
2 15 A VUV-16, CLASSROOM 20548
45VUV-14, CLASSROOM 206 15 A 2
1084... 1084... 4643 1084... 1084...
2 15 A VUV-13, CLASSROOM 20744
41VUV-12, CLASSROOM 208 15 A 2
1084... 1084... 4239 1084... 1084...
2 15 A VUV-11, CLASSROOM 20940
37VUV-10, CLASSROOM 210 15 A 2
1084... 1084... 3835 1084... 1084...
2 15 A VUV-9, CLASSROOM 21136
33VUV-17, CLASSROOM 301 15 A 2
1084... 1084... 3431 1084... 1084...
2 15 A VUV-18, CLASSROOM 31332
29VUV-19, CLASSROOM 312 15 A 2
1084... 3027 1084... 2825
VUV-6, ART 309 15 A 21084... 1084... 26
23 1084... 1084...2 15 A VUV-8, CLASSROOM 302
2421
VUV-7, CLASSROOM 303 15 A 21084... 1084... 22
19 1084... 1084...2 15 A VUV-35, RM 303B
2017
VUV-34, RM 408 15 A 21084... 1084... 18
15 1084... 1084...2 15 A VUV-4, RM 409
1613
VUV-3, RM 409 15 A 21084... 1084... 14
11 2028... 1084...2 15 A VUV-2, RM 407
129
AC-1 20 A 22028... 1084... 10
7 3567... 1084...2 15 A VUV-1, RM 406
85
ACCU-3 (VUV-28) 45 A 23567... 0 VA 1 20 A SPARE 6
3 2205... 1862... 41
ACCU-2 (VUV22) 30 A 22205... 1862...
2 30 A ACCU-1 (VUV-21)2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating:
Mounting: Surface Wires: 4 Bus Rating: 400 ASupply From: MDP-1 Phases: 3 Mains Type:
Location: LOCKER RM 414 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: DP-VUV
Notes:
Total Est. Demand Current: 37 ATotal Conn. Current: 37 A
Total Est. Demand: 13369 VALighting Emergency 1105 VA 100.00% 1105 VA Total Conn. Load: 13369 VALIGHTING - EMERGENCY 12264 VA 100.00% 12264 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 49 A 51 A 19 ATotal Load: 5422 VA 5582 VA 2308 VA
41 4239 4037 3835 3633 3431 3229 3027 2825 2623 2421 2219 2017 1815 1613 1411 129 LIGHTING COORIDORS AREA C AND E 20 A 1 2208 107 LTG - EM - CORRIDORS AREA B AND D 20 A 1 2304 85 LIGHTING - EMERGENCY AREAS C AND D 20 A 1 1066 1242 1 20 A LIGHTING - EMERGENCY - EXTERIOR... 63 LIGHTING - EMERGENCY - AREA B 20 A 1 1531 1843 1 20 A LIGHTING - EMERGENCY AREA E 41 LIGHTING - EMERGENCY - AREA A (EAST) 20 A 1 1396 1722 1 20 A LIGHTING - EMERGENCY AREA A (WEST) 2
CKT Circuit Description Trip Poles Aø Bø Cø Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A
Supply From: MDP-1 Phases: 3 Mains Type:
Location: STORE RM 32 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: LP-EM
Notes:
Total Est. Demand Current: 61 ATotal Conn. Current: 91 A
RECEPTACLE 31700 VA 65.77% 20850 VA Total Est. Demand: 22050 VAPOWER 1200 VA 100.00% 1200 VA Total Conn. Load: 32900 VAOther 0 VA 0.00% 0 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 84 A 107 A 83 ATotal Load: 10100 VA 12800 VA 10000 VA
83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 5249 5047 4845 4643 4441 4239 RECEPTACLE CLASSROOM 120 20 A 1 1600... 1600... 1 20 A RECEPTACLE CLASSROOM 203 4037 RECEPTACLE COORIDOR H003C 20 A 1 400 VA 0 VA 1 20 A OTHER SPACE 216 3835 RECEPTACLE SACC 101 20 A 1 800 VA 1200... 1 20 A POWER COORIDOR H010 3633 RECEPTACLE CLASSROOM RM103 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE RESOURCE RM 102 3431 RECEPTACLE COMPUTER LAB 117 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE CLASSROOM 115 3229 RECEPTACLE COMPUTER LAB 113 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE CLASSROOM 107 3027 RECEPTACLE RESOURCE RM 119 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE COMPUTER LAB 118 2825 COMPT. REC. CLASS RM 121 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 122 2623 COMPT. REC. CLASS RM 202 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM120 2421 COMPT. REC. CLASS RM 204 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 203 2219 COMPT. REC. ART 309 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 205 2017 COMPT. REC. CLASS RM 302 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 206 1815 COMPT. REC. RESOURCE RM 303B 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 207 1613 COMPT. REC. CLASS RM 303 20 A 1 800 VA 900 VA 1 20 A COMPT. REC. CLASS RM 208 1411 COMPT. REC. CLASS RM 305 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 209 129 COMPT. REC. CLASS RM 304 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 210 107 COMPT. REC. CLASS RM 307 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 211 85 COMPT. REC. CLASS RM 306 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 312 63 COMPT. REC. CLASS RM 308 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 313 41 COMPT. REC. MUSIC 409 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 301 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating:
Mounting: Surface Wires: 4 Bus Rating: 400 ASupply From: MDP-1 Phases: 3 Mains Type:
Location: Space 216 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: RP-EG
Notes:
Total Est. Demand Current: 21 ATotal Conn. Current: 21 A
Total Est. Demand: 7680 VARECEPTACLE 1680 VA 100.00% 1680 VA Total Conn. Load: 7680 VAPOWER 6000 VA 100.00% 6000 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 27 A 27 A 14 ATotal Load: 3000 VA 3000 VA 1680 VA
23 2421 2219 2017 1815 1613 1411 RECEPTACLE BOILER RM 311 20 A 1 180 VA 129 MDF-2 TECH CLOSET 73 20 A 1 1500... 0 VA 1 20 A SPARE 107 MDF-2 TECH CLOSET 73 20 A 1 1500... 0 VA 1 20 A SPARE 85 MDF-2 TECH CLOSET 73 20 A 1 1500... 0 VA 1 20 A SPARE 63 IDF-2, LOUNGE 314 20 A 1 1500... 0 VA 1 20 A SPARE 41 IDF-1, RM 417 20 A 1 1500... 0 VA 1 20 A SPARE 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating:
Mounting: Surface Wires: 4 Bus Rating: 100 ASupply From: DP-X Phases: 3 Mains Type: MLO
Location: ELEC 311A Volts: 208Y/120V A.I.C. Rating:
Branch Panel: RP-EGX
Notes:
Total Est. Demand Current: 24 ATotal Conn. Current: 24 A
Total Est. Demand: 8680 VARECEPTACLE 1680 VA 100.00% 1680 VA Total Conn. Load: 8680 VAPOWER 7000 VA 100.00% 7000 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 35 A 27 A 14 ATotal Load: 4000 VA 3000 VA 1680 VA
23 2421 2219 2017 1815 1613 1411 129 107 GENERATOR BLOCK HEATER 20 A 1 500 VA 500 VA 1 20 A GENERATOR BATTERY CHARGER 85 1680... 63 3000... 41
PANEL RP-EGX 60 A 33000... 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A
Supply From: MDP-1 Phases: 3 Mains Type:
Location: BOILER RM 311 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: DP-X
Notes:
Total Est. Demand Current: 0 ATotal Conn. Current: 0 A
Total Est. Demand: 0 VATotal Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A 0 A 0 ATotal Load: 0 VA 0 VA 0 VA
23 2421 2219 2017 1815 1613 1411 129 107 85 63 41 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes: EXISTING LOADS TO BE RE-CONNECTED
Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A
Supply From: Phases: 3 Mains Type:
Location: BOILER RM 311 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: (E) PP-B
NOTE #1
3/4" x 10' COPPER GROUND ROD W/CADWELD CONNECTIONS (TYP.)
CAST IN PLACECONCRETE PAD
CADWELDCONNECTOR (TYP.)
4" TYP.
CONDUIT ACCESS AREA
NOTE:CONNECT TO GROUNDING OF ADJACENT TRANSFORMER, SWITCHGEAR AND BUILDING(WHERE APPLICABLE)
1.
SCALE: NONE
TRANSFORMER AND GENERATORGROUNDING PLAN (TYP.)
#4/0 BARE COPPER,@ 24" DEPTH
#4/0 BARE COPPERUP TO EQUIPMENTGROUND LUGS/BUS(TYP.)
#4 @ 11"(TOP & BOTTOM)
#4 @ 10"(TOP & BOTTOM)
12" GRAVEL BALLAST
6" 10"
5"
10"
18"
2"5"
48"
72"
2"
8"
CABLE OPENING(NOTE 2)
6'-2" (750 KVA) XFMR4'-1" (250 KVA) XFMR
NOTES:
SCALE: NONE
EXTEND PAD 4" BEYOND ENCLOSURE AND COOLING FIN OF TRANSFORMER.
VERIFY ACTUAL DIMENSIONS OF TRANSFORMERS AND GENERATOR CABLE OPENINGS.
1.
2.
PLAN VIEW
ELEVATION
TRANSFORMERS PAD DETAIL (TYP.)
SOIL
FINISH GRADE
1" CHAMFER
48"
8" DIAMETER PIER48" DEEP(4) TYPICAL
SCALE: NONE
NOTE:CONNECTION SHALL BE FIRMLY BONDED TO NEUTRAL BUS MEDIUM VOLTAGESWITCHGEAR, BUILDING FOUNDATION STEEL, GROUNDING ROD, AND WATER PIPE.
1.
GROUNDING SYSTEM DETAIL
IDF ROOM 026GROUND BUS
#4/0 COPPERGROUND
#4/0 COPPER
#500kcmil COPPERGROUND
#2/0 COPPER
MDF ROOMGROUND BUS
WATER METER ORDIELECTRIC FLANGE
METAL WATER PIPE WITHIN 5 FT.OF WATER SERVICE ENTRANCE TOBUILDING. PROVIDE BONDINGJUMPER ACROSS WATER METER ANDDIELECTRIC FLANGES.
GROUND BUS480V UNITSUBSTATION
NEUTRAL BUS480V UNITSUBSTATION
SUPPLY SIDE
AREAWAYCONCRETEFLOOR
3/4" X 10'-0" LONGGROUND ROD(TYPICAL)
1'-0" MINIMUMBELOW SLAB
GENERATORGROUND MATREFER TODRAWING E401
#4/0 COPPER
FLOORSLAB
MAIN BUILDING GROUND BUSWITHIN ELECTRICAL ROOM -PROVIDE 1" STANDOFF. REFER TODETAIL THIS DRAWING
BUILDING STEEL
GROUND MATUNDER FLOORSLAB, REFER TODRAWING E4013/4" X 10'-0" LONGGROUND ROD(TYPICAL)
1'-0
"MIN
IMU
MBE
LOW
GR
ADE
#4/0 COPPER TO LIGHTNINGPROTECTION SYSTEM.CONNECT TO BUILDINGCOLUMN F-1. REFER TODRAWING E201.
#4/0 COPPER
#4/0 COPPER TO BUILDINGFOUNDATION STEEL(CONCRETE ENCASEDELECTRODES)
#4/0 COPPER TOMEDIUMVOLTAGESWITCHGEAR
#250kcmil TOGENERATOR NEUTRAL
5KV PRIMARY SYSTEMDUCTBANK DETAIL
SCALE: NONE
30" (MIN.) 19"
7 1/2"12"
11 1/2"
19"
7 1/2"
19"7 1/2"
(4) 4" ENCASEMENTTYPE DB PVCCONDUITS
WARNING MARKER
NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 2)
(2) 4" ENCASEMENTTYPE DB PVCCONDUITS
NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 4)
EXISTING GRADE
CONDUIT PENETRATION ANDROOF FLASHING DETAIL
SCALE: NONE
STAINLESS STEELADJUSTABLE DRAWBAND
LAP SPLICESEALANT
CONDUIT (VERIFYSIZE AND LOCATION)
SEALANT
PREMOLDED PIPE SEAL
EPDM ROOF MEMBRANE
RIGID INSULATION
METAL DECK
C1
ELECTRICALLYHELD
(E) 120VCKT
EXTERIOR BUILDING LIGHTINGCONTACTOR
LOW VOLTAGE TO BAS
LOW VOLTAGE TO BAS
(E) EXTERIORBUILDING LIGHTS
C2
ELECTRICALLYHELD
(E) CORRIDOR LIGHTS
COORIDOR LIGHTINGCONTACTOR "C2"
30ACONTACTOR(TYPICAL)
SK
(E) 120VCKT
SK
SK
SK
(E) CORRIDOR LIGHTS
(E) CORRIDOR LIGHTS
(E) CORRIDOR LIGHTS
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
BUILDING AUTOMATIONSYSTEM(B.A.S.)
COORDINATE EXACTLOCATION WITH
TEMPERATURE CONTROLSCONTRACTOR
PHOTOCELLLOCATED ON ROOFFACING NORTH,INSTALLED BY TCCONTRACTOR
PC
24V POWER SUPPLY
TO B.A.S. (CIRCUITING BYTEMPERATURE CONTROLS
CONTRACTOR)TO B.A.S. WITH LOW
VOLTAGE WIRING BYTEMPERATURE CONTROLS
CONTRACTORHOMERUN TO EACH 24VCOIL CONTACTOR (TYP)
SL2
CORRIDOR LOW VOLTAGEMOMENTARY OVERRIDE PUSHBUTTONS (TYP)
C3
ELECTRICALLYHELD
SPARE
(E) CORRIDOR LIGHTS(E) 120VCKT
30ACONTACTOR(TYPICAL)
SK
C4
ELECTRICALLYHELD
SPARE
(E) CORRIDOR LIGHTS
LOW VOLTAGE TO BAS
LOW VOLTAGE TO BAS
30ACONTACTOR(TYPICAL)
SK
SK
SK
SK
(E) CORRIDOR LIGHTS
(E) CORRIDOR LIGHTS
(E) CORRIDOR LIGHTS
(E) 120VCKT
COORIDOR LIGHTINGCONTACTOR "C3"
COORIDOR LIGHTINGCONTACTOR "C4"
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
SK(E) CORRIDOR LIGHTS
SK(E) CORRIDOR LIGHTS
SK(E) CORRIDOR LIGHTS
SK(E) CORRIDOR LIGHTS
(E) 120VCKT
SPARE
SPARE
SK(E) CORRIDOR LIGHTS
SK(E) CORRIDOR LIGHTS
(E) 120VCKT
SPARE
SPARE
SK(E) CORRIDOR LIGHTS
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
(E) 120VCKT
(E) EXTERIORBUILDING LIGHTS
TO C1
TO C2,C3,C4,C5
SPARE
SPARESL3
SL4
WIREMOLD V4000.MOUNT 5" ABOVECOUNTER TOP
ACCESSIBLE CEILING
FINISHED FLOOR
WIREMOLD V4050
BLANK INSERT FORINSTALLATION OFFUTURE DATA DEVICES
DECORA STYLEDUPLEX RECEPTACLE
120V CIRCUIT ASINDICATED ON PLANS
SCALE: NONE
SURFACE MOUNTED POWER/DATARACEWAY DETAIL
T
DIVIDER
6'-0" (TYP.)
5'-0
"(T
YP)
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:2
8P
M
1/2" = 1'-0"
2/13/2014 6:41:28 PM
BC
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
ELECTRICAL DETAILS
E5027113.057.00
NF
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
OCCUPANCY SENSOR LEGEND
TYPE DESCRIPTION
OCA
OCB 90° CORNER CEILING/WALL MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR
OCD
360° CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR
OCE 360° CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR
OCF
OCG
(ALL SENSORS MAY NOT BE USED ON THIS PROJECT)
OCH 360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR
OCK
OCM ULTRASONIC CORRIDOR CONFIGURATION CEILING MOUNTED OCCUPANCY SENSOR
360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR
180° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR
90° CORNER CEILING/WALL MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR
WALL SWITCH PASSIVE INFRARED OCCUPANCY SENSOR
REFER TO SPECIFICATIONS FOR COVERAGE AREA
90° CORNER CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR
OCC
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
57.0
0L
PS
CO
OP
ER
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
6:4
1:3
3P
M
1/4" = 1'-0"
2/13/2014 6:41:33 PM
BC
LIVONIA PUBLICSCHOOLS
COOPER UPPER ES -RENOVATIONLIVONIA, MI
LIGHTING FIXTURESCHEDULE
E6017113.057.00
NF
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
LIGHTING FIXTURE SCHEDULE
TYPE DESCRIPTION VOLTAGE LAMP LENSREFLECTOR/
DISTRIBUTION
Manufacturer and Model (Multiple Options)
MODEL (4) MFR (4) COMMENTSMFR (1) MODEL (1) MFR (2) MODEL (2) MFR (3) MODEL (3)
(E)(E) NLFA 2'X4'' RECESSED LAY-IN TROFFER 120 V (2) 25W T8 A12 .125 ACRYLIC
PRISMATICLITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPS
DAYBRITETG8 SERIES LSI G SERIES WHITE DOOR FRAME, FUSED, PROGRAM RAPID START BALLAST
FAE SAME AS TYPE "FA" EXCEPT WITH EMERGENCYTRANSFER DEVICE
120 V
FB 2'X4'' RECESSED LAY-IN TROFFER 120 V (3) 25W T8 A12 .125 ACRYLICPRISMATIC
LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSDAYBRITE
TG8 SERIES LSI G SERIES WHITE DOOR FRAME, FUSED, PROGRAM RAPID START BALLAST, PROVIDE (2) BALLASTS FOR DUAL LEVELSWITCHING OF INNER/OUTER LAMPS
FBE SAME AS TYPE "FB" EXCEPT WITH EMERGENCYTRANSFER DEVICE
120 V
FC 1'X4'' RECESED TROFFER 120 V (2) 25W T8 A12 .125 ACRYLICPRISMATIC
LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSDAYBRITE
TG8 SERIES LSI T SERIES WHITE DOOR FRAME, FUSED, PROGRAM RAPID START BALLAST
FCE SAME AS TYPE "FC" EXCEPT WITH EMERGENCYTRANSFER DEVICE
120 V
FD 4' INDUSTRIAL FLUORESCENT CHAIN HUNG 120 V (2) 25W T8 NO LENS WITHWIREGUARD
LITHONIA Z SERIES METALUX SNF SERIES PHILIPSDAYBRITE
1107-S HDS LSI F20 SERIES FUSED, PROGRAM RAPID START BALLAST, WIREGUARD, CHAIN HUNG KIT
FDE SAME AS TYPE "FD" EXCEPT WITH EMERGENCYTRANSFER DEVICE
120 V
FF 6" RECESSED DOWNLIGHT 120 V LED, 1300 LUMENS OPEN SEMI-SPECULAR/MEDIUM BEAM
GOTHAM ECSR SERIES PORTFOLIO LD6 SERIES CALCULITE C6L SERIES PATHWAY 6VLED
FG 1'X4' SURFACE MOUNTED TROFFER 120 V (2) 25W T8 HIGH IMPACT ACRYLICDIFFUSER
LITHONIA ST8 SERIES FAIL-SAFE HVL12 SERIES PHILIPSLIGHTOLIER
EYE-QL LSI DW SERIES WHITE HOUSING, FUSED, PROGRAM RAPID START BALLAST
FGE SAME AS TYPE "FG" EXCEPT WITH EMERGENCYTRANSFER DEVICE
120 V
FH NOT USED 120 VFHE NOT USED 120 VFJ 4'-0" STRIP LIGHT 120 V (1) 25W T8 N/A LITHONIA Z SERIES METALUX SNF SERIES PHILIPS
LIGHTOLIERSN SERIES LSI S ESRIES
LBE 6" EXTERIOR LED ROUND DOWNLIGHT WITHEMERGENCY TRANSFER DEVICE
120 V LED, 1300 LUMENS, 4000K PRISMATIC TEMPEREDSPREAD LENS
MEDIUM BEAM KIRLIN GRR SERIES ENGINEER APPROVEDEQUAL
ENGINEERAPPROVEDEQUAL
ENGINEERAPPROVEDEQUAL
UL. RATED FOR WET LOCATION, IC RATED.
LC EXTERIOR LED WALL SCONCE 120 V LED, 3800 LUMENS, 4000K ACRYLIC LENS LITHONIA WSR SERIES MCGRAW-EDISON ISC SERIES WIDELITE ASW SERIES ECLIPSE TURIN SERIES CUSTOM COLOR AS SELECTED BY ARCHITECT, UL RATED FOR WET LOCATIONSLCE SAME AS TYPE "LC" EXCEPT WITH EMERGENCY
TRANSFER DEVICE120 V
XA UNIVERSAL MOUNT EXIT SIGN LED RED LETTERING LITHONIA LE SERIES SURE-LITE TPX SERIES LIGHTOLIER LDS SERIES EXITRONICS 400 SERIES WHITE DIE CAST ALUMINUM HOUSING, HIGH OUTPUT LED DIFFUSE LIGHT PANEL, WHITE STENCIL FACE. PROVIDESINGLE OR DUAL FACE WITH ARROWS AS INDICATED ON PLAN.
DRAWING INDEX
LIVONIA, MICHIGANPROJECT NO. 7113.058.00
JANUARY 31, 2014
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
7:2
3:0
9P
M
2/13/2014 7:23:09 PM
Checker
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
PROJECT COVER SHEET
G0017113.058.00
Author
2014.0
1.3
1B
IDS
2014.0
2.0
7A
DD
EN
DU
M1
2014.0
2.1
3A
DD
EN
DU
M2
MECHANICALM001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS OMD111A FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA A O OMD111B FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA B OMD111C FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA C OMD111D FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA D OMD111E FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA E OMD111F FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA F OMD111G FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA G OMD121 ROOF LEVEL MECHANICAL DEMOLITION PLAN O OM111A FIRST LEVEL SHEET METAL PLAN - AREA A O OM111B FIRST LEVEL SHEET METAL PLAN - AREA B O OM111C FIRST LEVEL SHEET METAL PLAN - AREA C OM111D FIRST LEVEL SHEET METAL PLAN - AREA D OM111E FIRST LEVEL SHEET METAL PLAN - AREA E OM111F FIRST LEVEL SHEET METAL PLAN - AREA F OM111G FIRST LEVEL SHEET METAL PLAN - AREA G O OM121 ROOF LEVEL MECHANICAL PLAN O OM211A FIRST LEVEL HVAC PIPING PLAN - AREA A OM211B FIRST LEVEL HVAC PIPING PLAN - AREA B OM211C FIRST LEVEL HVAC PIPING PLAN - AREA C OM211D FIRST LEVEL HVAC PIPING PLAN - AREA D OM211E FIRST LEVEL HVAC PIPING PLAN - AREA E OM211F FIRST LEVEL HVAC PIPING PLAN - AREA F O OM211G FIRST LEVEL HVAC PIPING PLAN - AREA G O OM301 ENLARGED MECHANICAL PLANS O OM302 ENLARGED MECHANICAL PLANS AND SECTIONS OM501 MECHANICAL DETAILS OM502 MECHANICAL DETAILS OM503 MECHANICAL DETAILS O OM504 MECHANICAL DETAILS OM601 MECHANICAL SCHEDULES O OM602 MECHANICAL SCHEDULES O OM700 TEMPERATURE CONTROLS LEGEND OM701 CONTROLS DIAGRAM O OM702 CONTROLS DIAGRAM O OM703 CONTROLS DIAGRAM O OM704 CONTROLS DIAGRAM O OM705 CONTROLS DIAGRAM O OM706 CONTROLS DIAGRAM O OM707 CONTROLS DIAGRAM O OM708 CONTROLS DIAGRAM O OM709 CONTROLS DIAGRAM O OM710 CONTROLS DIAGRAM O OM711 CONTROLS DIAGRAM O O
ELECTRICALE001 ELECTRICAL LEGENDS, ABBREVIATIONS AND SYMBOLS OE011 ELECTRICAL COMPOSITE PLAN OED111A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA A O OED111B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA B OED111C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA C OED111D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA D OED111E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA E OED111F FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA F OED111G FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA G O OED121 PENTHOUSE ELECTRICAL DEMOLITION PLANS O OED231 COMPOSITE ROOF ELECTRICAL DEMOLITION PLAN O OED401 ELECTRICAL ONE LINE DEMOLITION DIAGRAM OE111A FIRST LEVEL LIGHTING PLAN - AREA A O OE111B FIRST LEVEL LIGHTING PLAN - AREA B O O OE111C FIRST LEVEL LIGHTING PLAN - AREA C O OE111D FIRST LEVEL LIGHTING PLAN - AREA D O O OE111E FIRST LEVEL LIGHTING PLAN - AREA E O OE111F FIRST LEVEL LIGHTING PLAN - AREA F O O OE111G FIRST LEVEL LIGHTING PLAN - AREA G O O OE121 PENTHOUSE LIGHTING PLANS O OE211A FIRST LEVEL POWER & AUXILIARY PLAN - AREA A O OE211B FIRST LEVEL POWER & AUXILIARY PLAN - AREA B OE211C FIRST LEVEL POWER & AUXILIARY PLAN - AREA C OE211D FIRST LEVEL POWER & AUXILIARY PLAN - AREA D OE211E FIRST LEVEL POWER & AUXILIARY PLAN - AREA E O OE211F FIRST LEVEL POWER & AUXILIARY PLAN - AREA F O OE211G FIRST LEVEL POWER & AUXILIARY PLAN - AREA G O OE221 PENTHOUSE POWER AND AUXILIARY PLANS O OE231 COMPOSITE ROOF POWER AND AUXILIARY PLAN O OE401 ELECTRICAL ONE-LINE DIAGRAM O OE411 ELECTRICAL PANEL SCHEDULES O O OE501 ELECTRICAL DETAILS OE502 ELECTRICAL DETAILS O OE601 LIGHTING FIXTURE SCHEDULE O O O
2014.0
1.3
1B
IDS
2014.0
2.0
7A
DD
EN
DU
M1
2014.0
2.1
3A
DD
EN
DU
M2
GENERALG001 PROJECT COVER SHEET O O O
STRUCTURALS131 ROOF FRAMING PLAN - AREAS D & G O O
ARCHITECTURALA001 ABBV. CONVENTIONS, TYPICAL MTG HTS, WALL ASSEMBLY INFO OA002 TYPICAL MOUNTING HEIGHTS OA003 INTERIOR PARTITION TYPES OA011 COMPOSITE NEW WORK FLOOR PLAN AND CODE INFORMATION OAD111A FIRST LEVEL FLR DEMOLITION PLAN - AREA A OAD111B FIRST LEVEL FLR DEMOLITION PLAN - AREA B OAD111C FIRST LEVEL FLR DEMOLITION PLAN - AREA C OAD111D FIRST LEVEL FLR DEMOLITION PLAN - AREA D OAD111E FIRST LEVEL FLR DEMOLITION PLAN - AREA E O OAD111F FIRST LEVEL FLR DEMOLITION PLAN - AREA F O OAD111G FIRST LEVEL FLR DEMOLITION PLAN - AREA G O OAD401 ENLARGED TOILET ROOMS - DEMOLITION OAD402 ENLARGED TOILET ROOMS - DEMOLITION OA111A FIRST LEVEL FLR PLAN - AREA A OA111B FIRST LEVEL FLR PLAN - AREA B OA111C FIRST LEVEL FLR PLAN - AREA C OA111D FIRST LEVEL FLR PLAN - AREA D OA111E FIRST LEVEL FLR PLAN - AREA E OA111F FIRST LEVEL FLR PLAN - AREA F O OA111G FIRST LEVEL FLR PLAN - AREA G OA131 ROOF PLAN OA201 EXTERIOR ELEVATIONS O OA202 EXTERIOR ELEVATIONS O OA203 EXTERIOR ELEVATIONS O OA204 EXTERIOR ELEVATIONS OA301 EXTERIOR WALL SECTIONS OA321 EXTERIOR SECTION DETAILS OA401 ENLARGED PLANS OA402 ENLARGED PLANS OA431 MISC INTERIOR DETAILS OA501 DOOR SCHEDULE, INFO, AND FRAME TYPES O OA611A FIRST LEVEL CEILING PLAN - AREA A OA611B FIRST LEVEL CEILING PLAN - AREA B O O OA611C FIRST LEVEL FLOOR PLAN - AREA C OA611D FIRST LEVEL CEILING PLAN - AREA D O OA611E FIRST FLOOR CEILING PLAN - AREA E O O OA611F FIRST LEVEL CEILING PLAN - AREA F O O OA611G FIRST LEVEL CEILING PLAN - AREA G O O OA711A FIRST LEVEL - FLOOR PATTERN PLAN OA711B FIRST LEVEL - FLOOR PATTERN PLAN OA711C FIRST LEVEL - FLOOR PATTERN PLAN OA711D FIRST LEVEL - FLOOR PATTERN PLAN OA711E FIRST LEVEL - FLOOR PATTERN PLAN OA711F FIRST LEVEL - FLOOR PATTERN PLAN OA711G FIRST LEVEL - FLOOR PATTERN PLAN OA801 MATERIAL LEGEND AND ROOM FINISH SCHEDULE OA821 INTERIOR ELEVATIONS O
PLUMBINGP001 PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS OPD111A FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA A OPD111B FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA B OPD111C FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA C OPD111D FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA D OPD111E FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA E OPD111F FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA F OPD111G FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA G OPD301 ENLARGED DEMOLITION PLUMBING PLANS OP111A FIRST LEVEL PLUMBING PLAN - AREA A OP111B FIRST LEVEL PLUMBING PLAN - AREA B OP111C FIRST LEVEL PLUMBING PLAN - AREA C OP111D FIRST LEVEL PLUMBING PLAN - AREA D OP111E FIRST LEVEL PLUMBING PLAN - AREA E O OP111F FIRST LEVEL PLUMBING PLAN - AREA F OP111G FIRST LEVEL PLUMBING PLAN - AREA G OP301 ENLARGED PLUMBING PLAN OP501 PLUMBING DETAILS, DIAGRAMS & SCHEDULES O
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
O
O
NOTE:THIS DETAIL IS APPLICABLE TO ALL POINT LOADS ON JSTS,WHETHER INDICATED ON STRCT'L DWGS OR NOT.EXAMPLES:HANGING PARTITION LOAD > 150 POUNDS.HANGING PLUMBING, MECH STL PIPE W/ DIA > THAN 5".HANGING BASKETBALL GOALS.
POINT LOADON BOTTOMCHORD
2-L2x2x3/16 (1 -EACH SIDE) BY G.C.
JOIST PANEL POINT
EXIST JST SEEPLAN FOR SIZE
JOIST PANEL POINTPOINT LOADON TOPCHORD
1.2.3.
3/16TYP
RTU-115,760#
7 6 5
N
L
J
H
28'-
0"34
'-0"
30'-
4"
50' - 8" 38' - 0"
(E)TS3-1
/2X3-1
/2X5/1
6
(E)TS3-1
/2X3-1
/2X5/1
6
(E)TS3-1
/2X3-1
/2X5/1
6
(E)TS3-1
/2X3-1
/2X5/1
6
(E) 8W
F24
(E) 8W
F31
(E) 8W
F24
(E) 8W
F31
(E)TS3-1
/2X3-1
/2X1/4
(E) 8W
F31
(E) 8W
F31
(E) 8W
F24
(E) 8W
F24
(E) 8W
F31
(E) 8W
F31
(E) 8W
F24
14'-
1"13
'-11
"17
'-0"
17'-
0"15
'-3"
15'-
1"
18' - 8" 19' - 4"
(E)1
0WF2
1(E
)10W
F25
(E)1
0WF2
1
(E)2
4WF6
8(E
)27W
F84
(E)2
4WF6
1
(E)2
4WF6
1(E
)24W
F76
(E)2
4WF5
5
(E) 10WF21
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH07
(E) 32LH07
(E) 32LH07
(E) 32LH07
(E) 32LH07
(E) 32LH07
(E) 32LH07
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH06
(E) 32LH06
4'-1
1"4'
-7"
4'-7
"4'
-7"
4'-8
"4'
-8"
5'-8
"5'
-8"
5'-8
"5'
-8"
5'-8
"5'
-8"
5'-1
"5'
-1"
5'-1
"5'
-1"
5'-1
"4'
-11"
(E) 24LH04
(E) 24LH04
(E) 24LH04
(E) 24LH04
(E) 24LH04
(E) 24LH04
(E) 24LH05
(E) 24LH05
(E) 24LH05
(E) 24LH05
(E) 24LH05
(E) 24LH05
(E) 24LH05
(E) 24LH04
(E) 24LH04
(E) 24LH04
(E) 24LH04
(E) 24LH04
COORD W/ MECH'L
+/- EQUAL +/- EQUAL
G1S131
MEC
H'L
CO
OR
DW
/
RE: ALTERNATE M-1IN SPECS
(E) TOS117'-0" VIF
TYP
RTU - 24,175#
1
A
B
2344.23' - 0" 19' - 0" 23' - 6" 15' - 10"
37'-
4"
(E)TS8X
4X1/4
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E)TS8X
4X1/4
(E)18WF50 (E)18WF50 (E)18WF50
(E)14WF43 (E)14WF43 (E)14WF43
(E)2
0J8
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
0J8
15 @ 4' - 0" = 60' - 0" 3' - 4"
G1S131
MECH'LCOORD W/
C
RTU - 34,670#
G1S131
MEC
H'L
CO
OR
DW
/
+/-1
0'-0
"
(E)14WF43 (E)14WF43 (E)14WF43
(E)2
0J8
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
4J7
(E)2
0J8
37'-
4"
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
(E) 8W
F24
MECH'LCOORD W/
TYP
+/-1
0'-0
"M
ECH
'LC
OO
RDTYP
RTU CURBSEE MECH'L
ROOF TOP UNITSEE MECH'L
CONT L4X4X3/8AROUND UNITPERIMETER
SEE ARCH'L FORROOFING AND FLASHING
TAPERED RIGIDINSULATION INFILL
EXIST 1 1/2"X22GA NARROW RIBROOF DECK (VIF)
EXIST STEELJOIST (VIF)
1/8" 2"TYP
CUT OUT (1) 6" RIBAS REQ'D FORBEAM INSTALL
W6X15 @5'-0 OC MAX
PROVIDE FRAMEFOR OPENINGSPER TYP DTL
NOTE: 1. NO ANGLE FRAMING FOR OPENINGS LESS THAN 12" ANDWEIGHT LESS THAN 50 POUNDS.
2. FOR OPENINGS BETWEEN 12" AND 18" AND WEIGHT LESSTHAN 150 POUNDS, USE L2x2x3/16.
3. FOR OPENINGS BETWEEN 19" AND 36" AND WEIGHT LESSTHAN 300 POUNDS, USE L3x3x1/4.
4. FOR LARGER OPENINGS AND HEAVIER WEIGHTS, SEEOTHER DETAILS.
PLAN ELEVATION
SEE PLAN,MECH, ORARCH'L FOROPENINGSIZE ANDLOCATION
.
.
ARCH'L OR MEP ROOFPENETRATION
STL JST ORBM SEE PLAN
L5X5X5/16 TYP
CO
OR
DW
/MEC
HC
OO
RD
W/M
ECH
EQ
UAL
UO
NE
QU
ALU
ON
ANGLE PER NOTE
3/16TYP
3/16TYP
4"
1'-7
97/12
8"1'
-939
/128"
X
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Users
\rlo
ng
\Do
cu
men
ts\7
113.0
58.0
0L
PS
Fro
st
A13_rl
on
g.r
vt
2/1
0/2
014
10:5
4:3
0A
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
ROOF FRAMING PLAN -AREAS D & G
S1317113.058.00
Author
1/8" = 1'-0"
PARTIAL ROOF FRAMING PLAN - AREA DA11/8" = 1'-0"
PARTIAL ROOF FRAMING PLAN - AREA GA5
1 2014.01.31 BIDS2 2014.02.12 ADDENDUM 2
1/2" = 1'-0"
TYP ROOFTOP CURB SUPPORTG13/4" = 1'-0"
TYP ROOF JOIST REINF DETAILG33/4" = 1'-0"
TYP ROOF OPENING DETAILG5
DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY
ABATEMENT CONTRACTOR
2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN
3 REMOVE HOLLOW METAL DOOR AND FRAME
4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR
5 REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM
6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM
7 REMOVE CABINET UNIT HEATER
8 REMOVE CARPET BY ABATEMENT CONTRACTOR
9 REMOVE CONCRETE SLAB
10 REMOVE PROJECTOR SCREEN, BY OWNER
11
CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.
12 REMOVE PLASTER CEILING
13 REMOVE EYEWASH STATION
14 REMOVE MASONRY WALL
15 REMOVE LOCKERS (EXISTING STRUCTURAL FACEDTILE BASE TO REMAIN)
16 REMOVE LOCKERS AND METAL BASE
17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS
18 REMOVE CHALKBOARDS AND TACKBOARDS
19 REMOVE HORIZONTAL VENTILATOR UNIT (HUV), RE:MECH
4A REMOVE VCT FLOORING
20 REMOVE COUNTER TOP AND BASE CABINETS
21 REMOVE WALL MOUNTED OR FLOOR MOUNTEDSHOWCASE
22 REMOVE MOVEABLE WALL AND TRACK ASSEMBLY ATCLASSROOM
23REMOVE DEMONSTRATION TABLE CASEWORK - CUTAND CAP PLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.
24REMOVE LAB TABLE CASEWORK - CUT AND CAPPLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.
25 REMOVE FUME HOOD, RE: MECHANICAL
26 REMOVE WALL MOUNTED TRASH RECEPTACLE
27 REMOVE DRINKING FOUNTAIN OR ELECTRIC WATERCOOLER, RE: MECHANICAL
28 REMOVE SINK, COUNTER AND CASEWORK, RE:MECHANICAL
6A REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM BYABATEMENT CONTRACTOR
5A REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM BYABATEMENT CONTRACTOR
29
REMOVE SECTION OF MASONRY WALL AS REQUIREDFOR NEW WINDOW OPENING, TOOTH IN BRICK/CMU ATJAMBS TO MATCH EXISTING. REFER TO ENLARGEDELEVATION DETAIL FOR CONTRAINTS.
30 REMOVE LADDER FOR MECHANICAL UNITINSTALLATION, RE-INSTALL UNIT
2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN
18A REMOVE CHALKBOARDS AND TACKBOARDS, RE:ALTERNATE A-1
CB6 = 6' CHALKBOARD TB1 = 1' TACKBOARDCB8 = 8' CHALKBOARD TB3 = 3' TACKBOARDCB9 = 9' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB14 = 14' CHALKBOARD TB10 = 10' TACKBOARDCB16 = 16' CHALKBOARDCB20 = 20' CHALKBOARDCB22 = 22' CHALKBOARDCB23 = 23' CHALKBOARD
3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR
31 REMOVE WALL PADS
1A REMOVE GLASS AND ALUMINUM WINDOW SYSTEM
32SAW CUT REMOVE EXISTING CONCRETE FLOOR FORNEW SANITARY LINES. REF: PLUMBING, PATCHCONCRETE SLAB ON GRADE TO MATCH EXISTING
CLASSROOM008
COMPUTER LAB007
CLASSROOM010
STORAGE31
STORAGE32
CLASSROOM009
STORAGE34
CLASSROOM011
GIRL'S TOLIET36
BOY'S TOLIET37
JC38
SCHOOL STORE39
STORAGE013
STORAGE41
CLASSROOM017
CLASSROOM016
CLASSROOM018
CLASSROOM019
GIRL'S TOILET46
JC47
CLASSROOM026
CONFERENCE49
CLASSROOM025
CLASSROOM020
CLASSROOM021
COMPUTER LAB014
COMPUTER LAB015
CORRIDORH010
CORRIDORH008
CORRIDORH007B
CORRIDORH008B
11111
1
1 1 1
11 1
3
3
3
3
3
3
3 3 3
15
15
1
4
6A
4
6
4
6
4
6
4
4 4
4 4 4
5A
4
5A
15 15 15
15
15
15
15
15
15
15
4
5A
4
5A
4
/REFER TO
A5 AD111F
/REFER TO
A5 AD111F
/REFER TO
A5 AD111D
/REFER TO
A5 AD111D
2 2222A22 2A
2
2
2A
2
2
2A 22
2
2A
18
1818
18
18
18
18 18
18
18
18
191919
19
19
19
19 19
19
19
19
19
19 19
19
171717
17
17
17
1
17
1
17
17 17
E1AD401
G1AD401
21 21
21 TYP FOR 5
22
23
7
7
7
7
24TYP FOR 4
7
5A
7
H
23
10
10
23
10 10
23 23
10
2323
10
10
10 2310
13
25
25
10
18
27
10
10
27
18A
26
18
10
1018A
10
24 TYP FOR 4
TYP FOR 524
EWC
6A
6
6 6
6 6
6A
6A
12
(CB12)
(TB4)
(TB4)
(CB9)
(TB10)
(CB9)
(CB22)
(TB4)
(TB4)
(CB20)(TB1)
(CB8)(TB6) (TB6)
(CB8)
(TB6) (TB6)
(CB16)
(TB6)
(CB16)
(TB6)
(CB16)
(TB6)
(TB4)
(CB22)
(TB4)
(TB4)
(CB20)
(TB4)
(TB4)(CB8)
(CB23) (TB4)(TB4)
(CB23) (TB4)(TB4)
(CB6)
32
32
32
20 202020
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
6:0
5P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL FLRDEMOLITION PLAN - AREAE
AD111E7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL DEMOLITION PLAN - AREA EA5
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY
ABATEMENT CONTRACTOR
2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN
3 REMOVE HOLLOW METAL DOOR AND FRAME
4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR
5 REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM
6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM
7 REMOVE CABINET UNIT HEATER
8 REMOVE CARPET BY ABATEMENT CONTRACTOR
9 REMOVE CONCRETE SLAB
10 REMOVE PROJECTOR SCREEN, BY OWNER
11
CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.
12 REMOVE PLASTER CEILING
13 REMOVE EYEWASH STATION
14 REMOVE MASONRY WALL
15 REMOVE LOCKERS (EXISTING STRUCTURAL FACEDTILE BASE TO REMAIN)
16 REMOVE LOCKERS AND METAL BASE
17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS
18 REMOVE CHALKBOARDS AND TACKBOARDS
19 REMOVE HORIZONTAL VENTILATOR UNIT (HUV), RE:MECH
4A REMOVE VCT FLOORING
20 REMOVE COUNTER TOP AND BASE CABINETS
21 REMOVE WALL MOUNTED OR FLOOR MOUNTEDSHOWCASE
22 REMOVE MOVEABLE WALL AND TRACK ASSEMBLY ATCLASSROOM
23REMOVE DEMONSTRATION TABLE CASEWORK - CUTAND CAP PLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.
24REMOVE LAB TABLE CASEWORK - CUT AND CAPPLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.
25 REMOVE FUME HOOD, RE: MECHANICAL
26 REMOVE WALL MOUNTED TRASH RECEPTACLE
27 REMOVE DRINKING FOUNTAIN OR ELECTRIC WATERCOOLER, RE: MECHANICAL
28 REMOVE SINK, COUNTER AND CASEWORK, RE:MECHANICAL
6A REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM BYABATEMENT CONTRACTOR
5A REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM BYABATEMENT CONTRACTOR
29
REMOVE SECTION OF MASONRY WALL AS REQUIREDFOR NEW WINDOW OPENING, TOOTH IN BRICK/CMU ATJAMBS TO MATCH EXISTING. REFER TO ENLARGEDELEVATION DETAIL FOR CONTRAINTS.
30 REMOVE LADDER FOR MECHANICAL UNITINSTALLATION, RE-INSTALL UNIT
2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN
18A REMOVE CHALKBOARDS AND TACKBOARDS, RE:ALTERNATE A-1
CB6 = 6' CHALKBOARD TB1 = 1' TACKBOARDCB8 = 8' CHALKBOARD TB3 = 3' TACKBOARDCB9 = 9' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB14 = 14' CHALKBOARD TB10 = 10' TACKBOARDCB16 = 16' CHALKBOARDCB20 = 20' CHALKBOARDCB22 = 22' CHALKBOARDCB23 = 23' CHALKBOARD
3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR
31 REMOVE WALL PADS
1A REMOVE GLASS AND ALUMINUM WINDOW SYSTEM
32SAW CUT REMOVE EXISTING CONCRETE FLOOR FORNEW SANITARY LINES. REF: PLUMBING, PATCHCONCRETE SLAB ON GRADE TO MATCH EXISTING
BOY'S TOILET51
M STAFF TOILET52
CLASSROOM027
CONFERENCE54
CLASSROOM024
TEACHER LOUNGE028
CONFERANCE029
OFFICE030B
COUNSELING OFFICE030A
STORAGE60
OFFICE61A
OFFICE62
W. STAFF TOILET64
BOY'S TOILET65
CLASSROOM031
CONFERENCE67
CLASSROOM032
JC69
GIRL'S TOILET70
CLASSROOM038
CONFERENCE72
CLASSROOM037
CLASSROOM022
CLASSROOM023
CLASSROOM033
CLASSROOM034
CLASSROOM035
CLASSROOM036
CLASSROOM001
CLASSROOM003
CLASSROOM002
WEST COURTYARDCTY-3
EAST COURTYARDCTY-1
CORRIDORH007
CORRIDORH009
CORRIDORH011
CORRIDORH007C
111
1 1 1
1 11 11 11 11
1 1 1
1111
1
1
1
15
15
4A
5A
4A
5A
4A
5A
15
5A5A
5A
5A
5A
5A5A
1
1
1
4A
5A
4A
5A
4
5A
4
5A
4
5A
4
5A
4
5A
4
5A
4
5A
4
5A
4
5A
4A 44
15
15
15
15 15
1515
15
15
/REFER TO
A5 AD111D
/REFER TO
A5 AD111G
/REFER TO
A5 AD111D
1515
/REFER TO
A6 AD111A /REFER TO
A6 AD111A
/REFER TO
A5 AD111G/REFER TO
A5 AD111E
/REFER TO
A5 AD111E
1
1
1
1
1
222222
2 2
2 2
222
18
10
10
10
10
18
18 18
10
18
10
18 18
191919191919
19
1919
19
19 19 19
19
19
171717171717
17
17
17 17 17
17
1717
3
D5AD401
G5AD401
E5AD401
2
2
2
2
22
23
5A
8
5A
TIME OUT ROOM72A
5A
5A
6 5
H
10 2310
27
10 10
18
10
72627
18
18
7
18
7 7
18
18
18A
23
1010
1010
27
8
(CB20)
(TB4)
(TB4)
(CB22)
(TB4)
(TB4)
(CB22)
(TB4)
(TB4)
(CB20)
(TB4)
(TB4)
(CB20)
(TB4)
(TB4)
(CB22)
(TB4)
(TB4)
(CB23)
(TB3) (TB3)
(CB23)
(TB3) (TB3)
(CB23)
(TB3) (TB3)
(CB23)
(TB3) (TB3)
(CB23)
(TB3) (TB3)
(CB20)
(TB4)
(TB4)
(CB20)
(TB4)
(TB4)
(CB20)
(TB4)
(TB4)
31
REMOVE AND RE-INSTALLCEILING GRID AND TILE FOR NEWWINDOWS
20 20 20 20 20 20 20 20 20 20 20 20
20
20
20
20
20
20
20
20
20
20
20
20
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
6:1
1P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL FLRDEMOLITION PLAN - AREAF
AD111F7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL DEMOLITION PLAN - AREA FA5
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
T
T
T
T
T
UPUP
DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY
ABATEMENT CONTRACTOR
2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN
3 REMOVE HOLLOW METAL DOOR AND FRAME
4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR
5 REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM
6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM
7 REMOVE CABINET UNIT HEATER
8 REMOVE CARPET BY ABATEMENT CONTRACTOR
9 REMOVE CONCRETE SLAB
10 REMOVE PROJECTOR SCREEN, BY OWNER
11
CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.
12 REMOVE PLASTER CEILING
13 REMOVE EYEWASH STATION
14 REMOVE MASONRY WALL
15 REMOVE LOCKERS (EXISTING STRUCTURAL FACEDTILE BASE TO REMAIN)
16 REMOVE LOCKERS AND METAL BASE
17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS
18 REMOVE CHALKBOARDS AND TACKBOARDS
19 REMOVE HORIZONTAL VENTILATOR UNIT (HUV), RE:MECH
4A REMOVE VCT FLOORING
20 REMOVE COUNTER TOP AND BASE CABINETS
21 REMOVE WALL MOUNTED OR FLOOR MOUNTEDSHOWCASE
22 REMOVE MOVEABLE WALL AND TRACK ASSEMBLY ATCLASSROOM
23REMOVE DEMONSTRATION TABLE CASEWORK - CUTAND CAP PLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.
24REMOVE LAB TABLE CASEWORK - CUT AND CAPPLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.
25 REMOVE FUME HOOD, RE: MECHANICAL
26 REMOVE WALL MOUNTED TRASH RECEPTACLE
27 REMOVE DRINKING FOUNTAIN OR ELECTRIC WATERCOOLER, RE: MECHANICAL
28 REMOVE SINK, COUNTER AND CASEWORK, RE:MECHANICAL
6A REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM BYABATEMENT CONTRACTOR
5A REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM BYABATEMENT CONTRACTOR
29
REMOVE SECTION OF MASONRY WALL AS REQUIREDFOR NEW WINDOW OPENING, TOOTH IN BRICK/CMU ATJAMBS TO MATCH EXISTING. REFER TO ENLARGEDELEVATION DETAIL FOR CONTRAINTS.
30 REMOVE LADDER FOR MECHANICAL UNITINSTALLATION, RE-INSTALL UNIT
2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN
18A REMOVE CHALKBOARDS AND TACKBOARDS, RE:ALTERNATE A-1
CB6 = 6' CHALKBOARD TB1 = 1' TACKBOARDCB8 = 8' CHALKBOARD TB3 = 3' TACKBOARDCB9 = 9' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB14 = 14' CHALKBOARD TB10 = 10' TACKBOARDCB16 = 16' CHALKBOARDCB20 = 20' CHALKBOARDCB22 = 22' CHALKBOARDCB23 = 23' CHALKBOARD
3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR
31 REMOVE WALL PADS
1A REMOVE GLASS AND ALUMINUM WINDOW SYSTEM
32SAW CUT REMOVE EXISTING CONCRETE FLOOR FORNEW SANITARY LINES. REF: PLUMBING, PATCHCONCRETE SLAB ON GRADE TO MATCH EXISTING
MUSIC CLASSROOM040
STORAGE83
STORAGE84
STORAGE85
IDF CLOSET86
STORAGE87
OFFICE88
INSTR. STORAGE040A
ORCHESTRA &VOCAL CLASSROOM
041
OFFICE91
STORAGE92
CLASSROOM042
GIRL'S TOILET94
TECHNOLOGY047
OFFICE96
STORAGE97
WOOD SHOP046
BOY'S TOILET99
STORAGE100
CENTER PROGRAM039
SEWING049
COOKING ROOM048
STORAGE105
ELECTRICAL106
STORAGE107
STORAGE108
TOILET109
STORAGE110
RECEIVING111
GAS METER ROOM112
RESOURCE ROOM043
CLASSROOM044
STORAGE148
CLASSROOM045
STORAGE150
BOILER ROOMBRM
CORRIDORH001C
CORRIDORH007D
CORRIDORH012
STORAGE041B
1
1
1
1
1111111
1111
3 3
33
5A
4
4
6A
6A
5
8
6
5
5 5 5
4
4
5
5
4 5
5
4
6
5A
4
/REFER TO
A5 AD111F
/REFER TO
A6 AD111A /REFER TO
A6 AD111A
/REFER TO
A5 AD111F
1111
11
1
1
1
1
222
2222
2
2A
18 18
18
18 18
18
191919
19
19
1919
19 19
171717
17 17
17
17
1717
3A 3A
B7AD401
A7AD401
21 21
21
21 TYP FOR 4 21
21
2
2
2
2A
2 2
21
1719
1719
7
7
4
5
6
8
1
A
B
2344.2
18
10
1810
26 27
26 27 2627
C
3'-4
"M
.O.
3'-4
"
11
28
6A
4 5
4 5
6A
4 8
4 8 4 8 4 8
(CB12)
18A
(CB6)
18
27
27
27
REMOVE AND RE-INSTALL CEILING GRIDAND TILES FOR NEWWINDOWS
REMOVE AND RE-INSTALL CEILING GRIDAND TILE AS REQUIREDFOR NEW WINDOWS
202020202020
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
6:1
7P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL FLRDEMOLITION PLAN - AREAG
AD111G7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL DEMOLITION PLAN - AREA GA5
EXISTINGAREAWAY
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
GYMNASIUM129
COOLER137
STORAGE134
DRY STORAGE135
KITCHEN136
STORAGE054A
STORAGETC_1
BOY'S TOILET130
GIRL'S TOILET131
STORAGE132
JC133
OFFICE138
CORRIDOR139
PLANNING052
SERVER ROOM141
CAFETERIA051
PLATFORM051A
CORRIDORH004
CORRIDORH002
CORRIDORH003
CORRIDORH003B
TOILET138A
/REFER TO
A5 A611C
/REFER TO
A5 A611D /REFER TO
A5 A611A
/REFER TO
A5 A611C
/REFER TO
A5 A611A
14'-
0"14
'-0"
EQEQ
EQ
CONTINUOUS PRE-FINISHED METALEDGE PROFILEAROUND FLOATINGCEILING, TYPICAL
14'-
0"14
'-0"
109' - 0"
114' - 0"
114' - 0"
114' - 0"
114' - 0"
109' - 0"
2A611B
1'-9
"
113' - 11"
114' - 0"114' - 0"
108' - 11"
113' - 11" 113' - 11"
3A611B
3A611B
108' - 11" 108' - 11"
PRIME AND PAINTEXPOSEDSTRUCTURE, RE:ROOM FINISHSCHEDULE
1A611B
4A611B4
A611B
2'-0
"
1'-8
"
2' - 0"38' - 2"
12'-
0"
109' - 0"
1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.
2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.
3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.
4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED
5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.
GENERAL CEILING NOTES
2 x 2 LAY-IN
GYPSUM BD
ROLLER SHADE
LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS
RETURN GRILLERE: MECHANICAL DOCUMENTS
EXHAUST GRILLRE: MECHANICAL DOCUMENTS
SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS
INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
EXIT SIGNRE: ELECTRICAL DOCUMENTS
4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS
FINISH CEILINGRE: REF. CEILING PLAN
LAY-IN CEILING SYSTEM
CONTINUOUS PRE-FINISHEDMETAL EDGE PROFILE, SIMILAROR EQUAL TO "AXIOM TRIM BYARMSTRONG CEILINGS)
6".
BULKHEAD13'-11" AFF
5/8" GYPSYM BOARD
3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED
P.LAMINATE SIDEWALL PANEL,BEYOND
SEALANT AND BACKER ROD,BOTH SIDES
3'-0
"
BOTTOM OFSTRUCTURAL DECK
1' - 9"ALIGN GYP.BD. WITH EDGEOF SIDEWALL PANEL
BOT. OF BULKHEADRE: CEILING PLAN
5/8" GYPSYM BOARD
3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED
SEALANT AND BACKER ROD,BOTH SIDES
BOTTOM OFSTRUCTURAL DECK
1"4"
LAY-IN CEILING SYSTEM
BOT. OF WALL8'-11 1/4" AFF
5/8" GYPSYM BOARD
3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED
EXISTING CMU WALL CONSTRUCTION
SEALANT AND BACKER ROD,BOTH SIDES
BOTTOM OFSTRUCTURAL DECK
EXISTING STRUCTURAL FRAMING
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
5:4
3P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL CEILINGPLAN - AREA B
A611B7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL CEILING PLAN - AREA BA4
CEILING LEGEND
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
1 1/2" = 1'-0"A611AEDGE PROFILE AT FLOATING CEILING1
1 1/2" = 1'-0"A431BULKHEAD AT PLATFORM2
1 1/2" = 1'-0"A611ACEILING TRANSITION3
1 1/2" = 1'-0"A611ACAFETERIA SIDEWALL4
CORRIDORH010
CLASSROOM008
COMPUTER LAB007
CLASSROOM010
STORAGE31
STORAGE32
CLASSROOM009
STORAGE34
CLASSROOM011
GIRL'S TOLIET36
BOY'S TOLIET37
JC38
SCHOOL STORE39
STORAGE013
STORAGE41
CLASSROOM017
CLASSROOM016
CLASSROOM018
CLASSROOM019
GIRL'S TOILET46 JC
47
CLASSROOM026
CONFERENCE49
CLASSROOM025
CLASSROOM020
CLASSROOM021
COMPUTER LAB014
COMPUTER LAB015
CORRIDORH008
CORRIDORH007B
CORRIDORH008B
/REFER TO
A5 A611D
/REFER TO
A4 A611F
/REFER TO
A4 A611F
/REFER TO
A5 A611D
7
H
WS-
1
WS-
1
WS-
1TY
P
WS-
1TY
P
WS-1
WS-1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.
2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.
3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.
4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED
5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.
GENERAL CEILING NOTES
2 x 2 LAY-IN
GYPSUM BD
ROLLER SHADE
LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS
RETURN GRILLERE: MECHANICAL DOCUMENTS
EXHAUST GRILLRE: MECHANICAL DOCUMENTS
SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS
INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
EXIT SIGNRE: ELECTRICAL DOCUMENTS
4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
5:4
9P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST FLOOR CEILINGPLAN - AREA E
A611E7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL CEILING PLAN - AREA EA5
CEILING LEGEND
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
BOY'S TOILET51
M STAFF TOILET52
CLASSROOM027
CONFERENCE54
CLASSROOM024
TEACHER LOUNGE028
CONFERANCE029
OFFICE030B
COUNSELING OFFICE030A
STORAGE60
OFFICE61A
OFFICE62
W. STAFF TOILET64
BOY'S TOILET65
CLASSROOM031
CONFERENCE67
CLASSROOM032
JC69
GIRL'S TOILET70
CLASSROOM038
CONFERENCE72
CLASSROOM037
CLASSROOM022
CLASSROOM023
CLASSROOM033
CLASSROOM034
CLASSROOM035
CLASSROOM036
CLASSROOM001
CLASSROOM003
CLASSROOM002
WEST COURTYARDCTY-3
EAST COURTYARDCTY-1
CORRIDORH007
CORRIDORH009
CORRIDORH011
CORRIDORH007C
/REFER TO
A5 A611G
/REFER TO
A5 A611D
/REFER TO
A5 A611D
/REFER TO
A5 A611E
/REFER TO
A5 A611A
/REFER TO
A5 A611E
/REFER TO
A5 A611A
6 5
H
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-1
WS-1
WS-1
WS-
1
WS-
1
WS-
1
WS-
1
WS-1
WS-1
WS-1 WS-1
WS-1
WS-1
WS-1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
TIME OUT ROOM72A
1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.
2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.
3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.
4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED
5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.
GENERAL CEILING NOTES
2 x 2 LAY-IN
GYPSUM BD
ROLLER SHADE
LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS
RETURN GRILLERE: MECHANICAL DOCUMENTS
EXHAUST GRILLRE: MECHANICAL DOCUMENTS
SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS
INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
EXIT SIGNRE: ELECTRICAL DOCUMENTS
4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
5:5
5P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL CEILINGPLAN - AREA F
A611F7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL CEILING PLAN - AREA FA4
CEILING LEGEND
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
MUSIC CLASSROOM040
STORAGE83
STORAGE84
STORAGE85
IDF CLOSET86
STORAGE87
OFFICE88 INSTR. STORAGE
040A
ORCHESTRA &VOCAL CLASSROOM
041
OFFICE91
STORAGE92
CLASSROOM042
GIRL'S TOILET94
TECHNOLOGY047
OFFICE96
STORAGE97
WOOD SHOP046
BOY'S TOILET99
STORAGE100
CENTER PROGRAM039
SEWING049
COOKING ROOM048
STORAGE105
ELECTRICAL106
STORAGE107
STORAGE108
TOILET109
STORAGE110
RECEIVING111
GA
SM
ET
ER
RO
OM
112
RESOURCE ROOM043
CLASSROOM044
STORAGE148
CLASSROOM045
STORAGE150
BOILER ROOMBRM
CORRIDORH001C
CORRIDORH007D
CORRIDORH012
ST
OR
AG
E04
1B
/REFER TO
A4 A611F
/REFER TO
A5 A611A /REFER TO
A5 A611A
/REFER TO
A4 A611F
1' - 6"1' - 6"
1A611G
1A611G
1
A
B
2344.2
ALIGN SOFFITWITH VUV
ALIGN SOFFITWITH VUV
C
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-1
WS-1
WS-1
WS-1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
WS-
1
CORRIDORH009
111' - 7"
111' - 7"111' - 7" 111' - 7"
109' - 6"
109' - 0"
109' - 0"
109' - 6"
1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.
2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.
3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.
4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED
5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.
GENERAL CEILING NOTES
2 x 2 LAY-IN
GYPSUM BD
ROLLER SHADE
LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS
RETURN GRILLERE: MECHANICAL DOCUMENTS
EXHAUST GRILLRE: MECHANICAL DOCUMENTS
SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS
INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS
EXIT SIGNRE: ELECTRICAL DOCUMENTS
4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS
1"
4"
1' - 6"
FINISH CEILINGRE: REF. CEILING PLAN
LAY-IN CEILING SYSTEM
5/8" GYPSYM BOARD,PAINTED PT-1
3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED
ALIGN BOT. OF GYP. BOARD WITH TOPOF EXISTING HOLLOW METAL FRAME
SEALANT AND BACKERROD
10"
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
A13_S
Gro
ss.r
vt
2/1
3/2
014
6:4
5:5
9P
M
As indicated
Checker
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL CEILINGPLAN - AREA G
A611G7113.058.00
Author
1/8" = 1'-0"
FIRST LEVEL CEILING PLAN - AREA GA5
CEILING LEGEND
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
1 1/2" = 1'-0"A611ACEILING DETAIL AT MUSIC ROOM1
K
K
K
F
F
F
F F
FF
F
B
3
S
3
TT
F
S
FF S
SS
S
F
F
BF
B
S
F FACPS
F
S
B
BFF K 3 K K
F
S
S
/A4 ED111B
/A4 ED111B
/A4 ED111G/A4 ED111G
/A4 ED111D
/A4 ED111F
/A4 ED111C
/A4 ED111D
/A4 ED111FA/C ONROOF
IC
CUH
(E) RP-6(E) RP-B
PA RACK
MASTERCLOCK
D
IC
PULL BOX
(E) DP-A (E) DP-1B
TVSS
(E)IDF-2
TOILET123A
2
3
(TYPICAL)
(TYPICAL)
CUH
U.V.U.V.
CUH
CUH
CUH
CUH
CUH
6
66
6
6
6
6
6MAIN OFFICE
121
VESTIBULEH001
CORRIDORH001B
CORRIDORH002
OFFICE113
OFFICE115
OFFICE116
OFFICE117
STORAGE119
OFFICE118
CONFERANCE120
CONFERANCE125
CLINIC123
ADMIN. OFFICE124
ADMIN OFFICE122
ELECTRICAL126
CORRIDORH002
SERVER ROOM141
COURTYARDNCY
CORRIDORH001C
CORRIDORH001B
CUHCUH
CUH
SEWING049
REMOVE AND REINSTALL EXISTINGFIXTURES FOR INSTALLATION OFMECHANICAL DUCTWORK. CLEAN ANDRELAMP FIXTURES BEFORE RE-INSTALLATION.
REMOVE EXISTINGELECTRICAL BOX TOALLOW REMOVAL OFAHU. REINSTALLAFTER INSTALLATIONOF NEW AHU.
INCANDESCENT LIGHTFIXTURES TO BEREMOVED
CPEXISTINGAHU
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
5:2
0:3
3P
M
1/8" = 1'-0"
2/13/2014 5:20:33 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL ELECTRICALDEMOLITION PLAN - AREAA
ED111A7113.058.00
NF
X ELECTRICAL DEMOLITION KEY NOTES
1 REPLACE PANEL INTERIOR AND BREAKERS. REFER TO ONE LINE DIAGRAM,DRAWING E401.
2 REMOVE SPEAKERS AND WIRING COMPLETELY. NEW SPEAKERS INSTALLEDBY OTHERS.
3 DISCONNECT EXISTING CIRCUIT TO CUH. RETAIN CIRCUIT FORRECONNECTION TO NEW UNIT.
4 DISCONECT EXISTING CUIRCUIT. RETAIN CIRCUIT FOR RECONNECTION TONEW FAN.
5 REMOVE CIRCUIT TO EXHAUST FAN BACK TO NEAREST DEVICE TO REMAIN.
6 REMOVE EXISTING LIGHTING AND LIGHT SWITCHES IN THIS ROOM. RETAINCIRCUIT FOR RECONNECTION TO NEW LIGHTS AND SWITCHES.
GENERAL ELECTRICAL DEMOLITION NOTES
1. REFER TO DRAWING E001 FOR LEGEND, ABBREVIATIONS AND GENERALNOTES.
2. ALL LIGHTS AND LIGHTING DEVICES SHOWN CROSS HATCHED SHALLBE REMOVED. REMOVE ALL ASSOCIATED WIRING, SWITCHES ANDCONTROLS BACK TO SOURCE.
3. ALL ELECTRICAL ITEMS BEING REMOVED SHALL BE LEGALLY DISPOSEDOF OFF-SITE UNLESS DIRECTED OTHERWISE BY OWNER.
4. ALL ELECTRICAL OUTLETS, DEVICES, CONDUIT AND WIRING, ETC.,SHOWN CROSS HATCHED SHALL BE REMOVED BACK TO SOURCE ORUPSTREAM JUNCTION BOX.
5. CONTRACTOR SHALL NOT ABANDON EXISTING WIRING WITHINEXISTING WALLS OR CEILINGS TO REMAIN. ALL SUCH ELECTRICALITEMS SHALL BE REMOVED.
6 MAINTAI N OPERATION OF ALL EXISTING SYSTEMS DURINGCONSTRUCTION. ANY REQUIRED SHUTDOWNS SHALL BECOORDINATED WITH THE OWNER.
7 'R' INDICATES EXISTING EQUIPMENT TO BE RELOCATED. CAREFULLYDISCONNECT AND STORE IN A SAFE PLACE UNTIL RE-INSTALLATION.
1/8" = 1'-0"A4FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA A
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
1/8" = 1'-0"C8PARTIAL TUNNEL ELECTRICAL DEMOLITION PLAN
OCC
OCC
OCC
OCC
OCC OCC
OCC
OCC
OCC
TT
OCC
3
3
OCC
OCC
OCC
3
3 33
3
3
4
3
3
3
3
3
3
OCA
3
3
3
3
3
OCK
OCK
OCK
OCK
/A4 E111B/A4 E111C
/A4 E111B
/A4 E111G/A4 E111G
/A4 E111D
/A4 E111F
/A4 E111D
/A4 E111F
OFFICE113
STORAGE119
ELECTRICAL126
ADMIN. OFFICE124
TOILET123A
MAIN OFFICE121
CONFERANCE120
OFFICE118
OFFICE115
OFFICE117
OFFICE116
CONFERANCE125
CLINIC123
ADMIN OFFICE122
COURTYARDNCY
CORRIDORH001B
CORRIDORH002
VESTIBULEH001
FAE
FAFA
FA
FAE FA
FAFA
FA FAEFAFAE
FA
FAFAE
FA
FAE
FA FA
FA
FA
FAFAE
FA
FAE
FA
FAE
FAEFA
FA
FAE
FA
FAE
FA
FAE
FA
FA
FA
FA
FAE
XA
XA
XA
XA
LDE
LDELD
LD
OUTDOOR FIXTURESCONTROLLED VIAOUTDOOR CONTACTOR(TYP)
FCFBFBFB
FAE FA FA
(E) (E) (E)
(E)NL
(E) (E)
(E)
(E)
(E)
(E)(E)(E)
(E)NL
XA
XA
(E) (E) (E) (E) (E)
(E)NL (E)
NL
(E)
(E)
(E)
(E)
(E)
(E)
(E)NL
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E) (E)
(E)
(E) (E)
(E)(E)NL
(E)NL
XA
1
1
1
6
1
6
6FD
FDE
FGE
XA XA
6 11
EM-6
XA
EM-3
EM-3
EM-6
EM-6
EM-6
EM-6EM-6
EM-6
EM-6
EM-6EM-6
EM-5EM-5
EM-5 EM-5 EM-5
EM-5
EM-5 EM-5
EM-5
EM-5EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
EM-2
AHU-4
FDE FD
FDE
FD
FDE
3EM-5
EM-5EM-5
SWITCH LOCATEDAT TOP OF STAIR
4
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
4:0
2P
M
1/8" = 1'-0"
2/13/2014 4:34:02 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA A
E111A7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA A
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
1/8" = 1'-0"F4PARTIAL TUNNEL LIGHTING PLAN
OCC
OCC
OCC
OCM
OCC
OCC
OCH
OCHOCX OCX
OCXOCX
OCX OCX
OCXOCX
OCC
OCC
OCC
OCE
OCE
OCE
OCC
OCE
OCX
3
33
4
4
3
3
3
OCC
3
3
OCE
3
3
OCE
OCA
3K
4
OCK
3
33
3K3K
3K3K
4K
OCC
/A4 E111D
/A4 E111A
/A4 E111C
/A4 E111A
GYMNASIUM129
OFFICE15
STORAGE054A
STORAGETC_1
STORAGE132
CORRIDORH004
COOLER137
JC133
STORAGE134
PLANNING052
DRY STORAGE135
OFFICE138
TOILET138A
SERVER ROOM141
BOY'S TOILET130
GIRL'S TOILET131
CORRIDOR139
KITCHEN136
CAFETERIA051
CORRIDORH002
CORRIDORH003
CORRIDORH003B
(E) (E) (E) (E) (E) (E) (E) (E) (E) (E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E) (E) (E) (E) (E) (E) (E) (E) (E)
(E) (E) (E)
(E)
(E)(E)(E)(E)(E)(E)(E)
LBE LBE
LCE
XAXA
FCE
FCE
FCE
FC
FBFBFB
FB FBE FB
FBFBFB
FAE FA FA FA FAE
FC
FCE
(E)NL (E) (E) (E) (E) (E) (E)
NL
(E) (E) (E)
(E)(E)(E)(E)
(E) (E) (E)
(E)NL
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)
(E)NL
XA
FA FAE FA FAE FA
FA FA FA FA FA
FA FA FA FA FA
FA FAE FA FAE FA
FA FA FA FA FA
FA FA FA FA FA
FA FAE FA FAE FA
FA FA FA FA FA
XA
1
LC
LCE
XA
LCE
XA
FG FG FG FG
FG FGFGE FGE
LC
1
1 1
1 1
1 1
XA
XA XA
1
61
1XA
1
1
6
FA
FA FA
FA
FDE
FG
FGE
FDE FD
FD
FG
FGE
FG FG FG
FG FGE FG
FG FG FG
FGE FG FG
FGE
FGE
11
LF
FG
FGE
FGE
6
FDFDEFDFDFDEFD
5
5
OFFICE12
FGE
FG
FGE
EM-6
(E) (E)
EM-3
EM-1
EM-1EM-1
EM-1 EM-1
EM-1 EM-1
EM-2
EM-1
EM-2
EM-2 EM-2
EM-2EM-2
XA
EM-3
EM-3
EM-3EM-3
LC
FDE
EM-6
EM-6
EM-6
EM-6
EM-6
EM-6
EM-6EM-6
EM-6
EM-2EM-2
PLATFORM051A
EM-2 EM-2
EM-2
EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
EM-5
EM-5EM-5
EM-5EM-5
EM-5EM-5
EM-5
EM-5
EM-5EM-5
FDE
FD
EM-5
EM-7
EM-7
EM-7
(E)
(E) (E)
(E)
(E)(E)
(E)(E)
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
4:1
2P
M
1/8" = 1'-0"
2/13/2014 4:34:12 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA B
E111B7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA B
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
OCX
OCEOCK
OCK
OCK
OCK
OCK
OCK
OCK
OCK
OCC
OCX OCX
OCX OCX
OCX OCX
OCX OCX
OCX
KK
K
K
K
KK
T
OCX
OCX OCX
OCX
OCK
OCE
3K
OCK OCK
OCK OCK
OCKOCA
3K
3
3
4
OCK
OCK
OCK
OCK
OCK
OCK
OCAOCK
OCK
3
3
3K
3K
3
33
3
3
OCC OCCOCE
OCE
OCE
33
OCC
OCE
OCE
33
4K
OCM
7 6 5
N
/A4 E111B
/A4 E111D/A4 E111A
/A4 E111B
/A4 E111D
WESTGYMNASIUM
055W
STORAGE5
VESTIBULEH005
TEAM ROOM10
STORAGE9
TOILET12A
TOILET15A
STORAGE14
OFFICE15
STORAGE13
STORAGE7
STORAGE6
CLASSROOM056
BOY'S LOCKERROOM
11
STORAGE3
CORRIDORH002B
CORRIDORH018B
AUX. GYMNASIUM055
STORAGE2
(E) (E) (E) (E)
(E)
(E)(E)
(E)
(E) (E) (E) (E)
(E)(E)(E)(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E) (E) (E)
(E)(E)
(E)
(E)
XA
XALCE
LBELBE
FA
FAE
FA
LCE
LCE
LCE
LCE
LCE
LCE
(E)(E)(E)(E)(E)NL
(E)(E)(E)
(E)
1 1
11
16
1XA
XA
FB
FG
FGE
FGEFG
FGFGE
FG FG FG FGE
FG
FGE
FGE
FG
FGE FG
FGFGE
FG
FGE
FG FGE
FGE
OFFICE12
FA FAE
FGE
FG FG FG FG FG FG
FGE
FG
FGE
FG
FGE
FG FGE
FGE
FGE FGFG
FGE
FG
FG
FGE
FG
FG
FG
FG
FG
FG
FG
FG
FG
FGE
FA FAE
FGFGE
FG
FG
FGE
FG
FGEFB FB FB
FB FBE FB FB
FB FB FBE FB
LCE
XA
1
XA
FDE FD
FD FDE
FDE FD
FD FDE
FDEFDFDFDE
FDFDE
FDE
FD
1 1
XA11
1 1
1 1
1 1
LCE
LCE
FDE
FD
FDE
XA
XA
EM-3
EM-3(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
EM-3
EM-3
EM-3
FDE
FD
FDE
EM-3
EM-3
EM-3
EM-3
EM-3
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E) (E)
(E) (E)
(E)(E)
(E) (E)
(E)
EM-3
EM-3
XA
EM-6
EM-6
EM-6
EM-6 EM-6
EM-6
EM-6
XA
XA
XA
XA
LFLF
LFLF LF LF LF
LF
EM-7 EM-7
EM-7EM-7
EM-7
EM-7 EM-7EM-7
EM-7
EM-7 EM-7
EM-7
EM-7EM-7
EM-7
EM-7
EM-7
EM-7
EM-7
EM-7
EM-7
EM-7
EM-7
EM-7EM-7
EM-7
EM-7 EM-7
EM-7
EM-7
EM-7
EM-7
(E) (E)
(E)
(E)
(E)
EM-7
EM-7
EM-7
EM-7 EM-7
EM-7EM-7
EM-7
EM-7 EM-7
EM-7
EM-7
EM-7
EM-7
EM-7EM-7
EM-7EM-7
EM-7
EM-7
(E) (E)
(E) (E)
(E) (E)
(E) (E)
(E) (E)
(E) (E)
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
4:2
3P
M
1/8" = 1'-0"
2/13/2014 4:34:23 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA C
E111C7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA C
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
OCC
OCC
3
OCC OCC
OCCOCC
OCCOCC
OCC
OCC
OCC
OCCOCC
OCCOCC
OCC OCC
OCCOCC
OCC OCC
OCC OCC
3
33
4 4
OCC
3
3
OCC
OCC
OCH
OCC
3
3
OCH
3
3
3
3
4
OCH
3K
33
33
33
33
3
3
3
3
4
4
3
3
3
3
7 6 5
N
L
J
H
/A4 E111B/A4 E111C
/A4 E111F
/A4 E111A
/A4 E111E
/A4 E111F
/A4 E111A
CLASSROOM057
CLASSROOM058
CLASSROOM60
A/V ROOM004
COMPUTER LAB007
PSYCHOLOGIST25
ESL OFFICE24
OFFICE26
OFFICE28
IT ROOM29
OFFICE27
WORK ROOM19
OFFICE18
COURTYARDNCY
CORRIDORH007
CORRIDORH006
TEACHERWORKROOM
059B
LMC059
CLASSROOM002CLASSROOM
003
FAE FA FA
FAFAFA
FA FA FAE
FB FB FBE FB FB
FB
FBEFB
FBFB
FB
FB
FB
FB
FBE
FAE FAE
FB FB FBE
FBFBE
FB
FB FB FB
FB FB FB
FB
FB
FB
FBFBE
FB
FB FB
FBE
FB FB FB
FB
FBFB FB
FBFBE
FB FB
LA LA LA LA LA LA LA
LALAE
LA LA LALAE
LA
LALALALALALALA
LALAE
LA LA LA LALAE
LA
LA
LA
LA
LA
LA
LALAE
LA
LA LA
LA
LA LA
LA
LA LA
LA
LA LA
LA
LA LA
LA
LAE
LAE
LA
LA
LA
LA
LALAE
LA
LA LA
LALAE
LALAE
LALA
LA LA LA LA LA LA LA
LALAE
LALALALAE
LA
LA LA LA LA LA LA LA
LALALALALALALA
LA LA LA LA LA LA LA
LALAE
LALALALAE
LA
LA LA LA LA LA LA LA
LALALALALALALA
LALAE
LA LA LALAE
LA
LALALALALALALA
LCE
FB FBE FB
FBFBFB
FB FB FB
FBFBEFBFB
FB
FB
FBFB
FBFBFBFBE
(E)(E)(E)(E)(E)NL
(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)NL
16
1XA
XA
V.I.61
FAE
FAFA
FAE FAE
FAE
FA
FA FAE
FA
FAFAE
FA
FGE FG FG FG FG FGE
1
1
EM-3
XA
EM-6
EM-6EM-6
EM-6
EM-6
XA
XA
XA
XA
XA
LFLF
LFLF LF LF LF
LF
LF
LF
LF
LF LF LF LF LF LF LF
LF
LF
LFLFLFLFLFLFLFLF
LF
LF
LF
LFLFLFLF
LFLF
LF
LF
LF
LF
LF
LF
LF
LF
LF
EM-7 EM-7
EM-8
EM-8FBE
EM-8
EM-8
EM-8EM-8
EM-8 EM-8
EM-8 EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-8EM-8EM-8
EM-8 EM-8
EM-8EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-9
EM-9EM-9
EM-10
EM-10
EM-10
EM-8
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
4:3
4P
M
1/8" = 1'-0"
2/13/2014 4:34:34 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA D
E111D7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
X
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA D
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
OCC
OCC
OCC
OCC
OCCOCC
3 3
33
3
OCCOCC
OCC
3
33
4 4
3
3OCC
K
4
3
3
3
3
3
3
OCE
OCE
OCE
KK
33
3 3 3 3
33
33
3 333
33 3 3
3 3
OCC
OCC OCC
OCC
OCX
4 4
33 3
3
44
OCX
OCX
4 4
OCC
OCC
44
OCC
4
33
OCC
OCC
33 3 3
OCC
K
OCC
OCC
OCC
4
3 3
7
H
/A4 E111F
/A4 E111F
/A4 E111D
/A4 E111D
CLASSROOM021
CLASSROOM022
CLASSROOM020
CONFERENCE54CONFERENCE
49
CLASSROOM027
JC47
GIRL'S TOILET46
CLASSROOM008
COMPUTER LAB007
ESL OFFICE24
OFFICE26
STORAGE31
STORAGE34
STORAGE32
SCIENCE LAB009
CLASSROOM026
CLASSROOM025
SCIENCE LAB019SCIENCE LAB
018
SCIENCE LAB017
SCIENCE LAB016
STORAGE41
STORAGE013
SCHOOL STORE39
JC38
BOY'S TOLIET37
GIRL'S TOLIET36
SCIENCE LAB011
SCIENCE LAB010
CORRIDORH008B
CORRIDORH010
CORRIDORH008
CORRIDORH007B
COMPUTER LAB014
COMPUTER LAB015
FB FB FBE FB FB
FB
FBEFB
FBFB
FB
FB
FB
FB
FBE
LALALAE
LA
LA LA LA LA
LCE
LCE
LCE
FB
FB
FBFB
FB FB FBE FB
FBFBFBFBE
FB FB FBE FB
FBFBFBFB
FA
FAFAEFA
FA FA
FB
FB
FB FB
FBFBFBEFB
FB FB FBFBE
FBFBFBEFB
FB FB FB FB
FGEFGFGEFGEFGFGE
FA
FA
FAE
FA
FAFAE
FA
FAFAE
FA
FAFA
FA
FA
FB FB FB
FBFBEFB
FB FB FB
FBFBEFB
FB FB FB
FB FB FB FB
FBEFBFBFBE
FB FB FB FB
FB FB FB FB
FBEFBFBFBE
FB FB FB FB
FB FB FB FB FB
FBEFBFBFBFBE
FB FB FB FB FB
FB FB FB FB FB
FBEFB
FBFBFB
FBFB
FBFB
FBE
LCE
LCE LCE
FB FB FB
FBE
FBFBFB
FB
FB FBE FB FB
FBE
FB
FB FB
FB
FB FB
FB
FBE
FB
FB
FB
FB FBE FB
FBFBFB
FB FB FB
FBFBEFB
FB FBE FB
FBFB FB
FBFBFB
FB FBE FB
FB FB FB
FBEFBFB
FBE FB FB
FBFB
FB FB
FBE FB FB
FBEFBFB
FB FB FB
FG
FGEFG FGE
FB
FBE
FBFB
FB
FB
FG
(E)NL
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)NL
(E)(E)
(E)NL
(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)
(E)
(E)
(E)NL(E)(E)(E)(E)(E)(E)
(E)
(E)
XA
XA
FB FB FB
FBFBFB
FB FB
FBE
XA
XA
XA
XA
XA
XA
EM-3
EM-3
EM-3
EM-3
EM-3
EM-3
FA FAE
FA FA
FD FDE
FD FD
EM-4EM-4EM-4EM-4
EM-4
EM-4
EM-4
EM-4
EM-4XA
EM-4
LC
XA
EM-4
EM-4
6
6
EM-4
XA
1
11
1
11
1
1
111
1
FDE
FDE
FD
XA
EM-4
XA
LFLF
LFLF
LF
FDE
FBE
EM-8
EM-9
EM-9EM-9EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9
EM-9EM-9EM-9EM-9
EM-9
EM-9
FAE
EM-9 EM-9
EM-9
EM-9
EM-9EM-9 EM-9 EM-9
EM-9
EM-9
EM-9
EM-9 EM-9EM-9
EM-9
FBEEM-9
EM-9
EM-9
EM-9
EM-9
EM-9 EM-9 EM-9 EM-9
EM-9
EM-9
EM-9
EM-9
EM-10
EM-10
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
4:4
8P
M
1/8" = 1'-0"
2/13/2014 4:34:48 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA E
E111E7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA E
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
X
OCC
OCC
OCC
OCC OCC
OCC
OCC
OCC OCC
OCCOCCOCCOCCOCCOCC
OCCOCC
OCCOCC
OCC
OCCOCC
OCC
OCC
33
4 4
OCC
3
3
OCC
OCC
OCH
OCC
3
3
OCH
3
3
3
3
4
OCH
OCC
OCC
OCC OCC
OCC
OCC OCC
OCC
K K
OCCOCC
K K K
4
3
3
3
4
3
3
3
OCC
3
3
4
3 3
33
44
OCC OCC
3
OCC
6 5
H /A4 E111G
/A4 E111D
/A4 E111E
/A4 E111D
/A4 E111A /A4 E111A
/A4 E111G
/A4 E111E
STORAGE83
CLASSROOM036
CLASSROOM033
EAST COURTYARDCTY-1
GIRL'S TOILET70
JC69
W. STAFF TOILET64
CONFERENCE67
CLASSROOM031
CLASSROOM032
CONF72
CLASSROOM038
CLASSROOM037
CLASSROOM023
CLASSROOM022
CONFERANCE029
OFFICE030B
COUNSELINGOFFICE
030A
STORAGE-160-1
OFFICE62
V.I.-161-1
TEACHERLOUNGE
028
M STAFF TOILET52BOY'S TOILET
51
CONFERENCE54
WESTCOURTYARD
CTY-3
CLASSROOM027
CLASSROOM024
A/V ROOM004
COMPUTER LAB007
PSYCHOLOGIST25
ESL OFFICE24
OFFICE26
OFFICE28
IT ROOM29
OFFICE27
WORK ROOM19
CLASSROOM001
BOY'S TOILET65
CLASSROOM034
CLASSROOM035
CORRIDORH009
CORRIDORH011
CORRIDORH007C
CORRIDORH010
CORRIDORH007
TEACHERWORKROOM
059B
CLASSROOM002CLASSROOM
003
FAE FA FA
FAFAFA
FA FA FAE
FB FB
FB
FBEFB
FB
FAE FAE
FB FB FB
LALAE
LALAE
LALA
LA LA LA LA LA LA
FB
FB
FBFBE FB FB
FB
FB
FBE
FBFB
FB
FB
FB
FB
FBE
FB
FB
FB
FB
FBFB
FBE
FBFB
FB
FB
FB FB FBFBE
FB
FBFB
FBFBFB
FB
FBE
LCE
FBEFB FB FB
FB
FBFBE
FBFB
FBFB
FB
FB FB FBFBE
FBFBFBFB
FB
FBE
FB FB
FBE
FB
FB FB
FB
FB FB
FB
FBE
FB
FB
FB
FB FB FB
FBEFBFB
FB FB
FBFB
FB FB FBE
FBFBFB
FB FB FB
FGEFG FG FGE
FGFGE FG FGE FGFG
FGE FG FGE
FG
FB FB FB FB FB FB
FBFBFB
FBE FB FB
FBFB
FB FB
FBFBFBE
FB FB FB
FBFBFB
FB FBE FBFB
FBFBFBFB
FB FB FBFBE
FB
FB
FBE FB
FB
FB FBE
FB
FBFB
FB
FBFBFBEFBFB
FB
FB
FBFB
FBFBFBFBE
FA
FB
FB
FB
FB
(E)NL
(E)
(E)
(E)NL(E)(E)(E)(E)
(E)NL(E)(E)(E)(E)(E)
(E)NL(E)(E)(E)(E)
(E)NL
(E)(E)
(E)(E)(E)(E)
(E)NL
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)
(E)
(E)
(E)
(E)NL
(E)(E)(E)(E)(E)
(E)NL
(E)
(E)
(E)
(E)
6
V.I.61
FAE
FAFA
FAE FAE
FAE
FA
FA FAE
FA
FAFAE
FA
FAE FA
FA FA FAE
FA FA
FAE FA
FAE
FA
FAE
FA
FAE
FA
FA
FAE
FA
FAEFA
FAFAE
FB FB FB
FBEFBFB
FBE FB FB
FBFB
FB FB
FBFBFBE
FB FB FBE
FBFBFB
LCE
XA
EM-3
XA
XA
1
1
LCEEM-3EM-3
XA
EM-4EM-4EM-4EM-4EM-4
EM-4
EM-4
EM-4
EM-4
6
EM-4 EM-4XA
EM-4EM-4 EM-4
EM-6
EM-6
1
1
1 1
1
1 1
6111
1
LFLFLFLF
LFLF
(E)
FBE
FBE
EM-8
EM-8
EM-8 EM-8
FAE
EM-8EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-8
EM-9
EM-9
EM-10 EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10 EM-10
EM-10
EM-10
EM-10EM-10
EM-10EM-10
EM-10
EM-10 EM-10
EM-10 EM-10
EM-10EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10
EM-10EM-10
FDEEM-10
EM-10EM-10
EM-10
EM-10
EM-10
EM-10EM-10
EM-10
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
5:0
5P
M
1/8" = 1'-0"
2/13/2014 4:35:05 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA F
E111F7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA F
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
X
OCCOCC
OCC
3
ATS
ATS
T
T
OCX
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCCOCC
OCC
OCCOCC
OCC
3
3
T
T
T
T
T
3
3 3
OCC OCC
OCCOCC
OCCOCC
3 3
4 4
3
3
3
3
3
3
33
33
KK
3
3
3
3
3
3
33
OCE
3
3
3 33
33
3
3
3
3 33 3
3 3
444
3 3
3
OCC OCCOCC
OCE
OCC
OCC
OCC
3
33
3
4 4
33
33
OCC
OCCOCC
OCE
OCC
OCH
OCE
OCG
OCG
OCE
1
A
B
2344.2
C
/A4 E111A
/A4 E111F
/A4 E111F
/A4 E111AELECTRICAL
126CONFERANCE125
COOKING ROOM048
GAS METERROOM
112
STORAGE105
ELECTRICAL106
STORAGE107
STORAGE108
RECEIVING111
TOILET109
STORAGE110
GIRL'S TOILET94
OFFICE96
STORAGE97
BOY'S TOILET99
WOOD SHOP046
TECHNOLOGY047
RESOURCE ROOM043
STORAGE148
STORAGE150
CLASSROOM044
BOILER ROOMBRM
CLASSROOM045
INSTR. STORAGE040A
CENTERPROGRAM
039
IDF CLOSET86
OFFICE88
STORAGE87
STORAGE85STORAGE
84STORAGE
83
MUSICCLASSROOM
040
EAST COURTYARDCTY-1
STORAGE100
CLASSROOM042
OFFICE91
STORAGE92
ORCHESTRA &VOCAL
CLASSROOM041
SEWING049
CORRIDORH012
CORRIDORH007D
CORRIDORH001C
FA
FA
FA
FAE
XA
FB
FB
FB
FA
FAE
FA
FAE
FAE FA
FG FGE FG
FBE FB FB FB FBE
FB
FBFB
FBFBFBFB
FB FB FB
FBE FB FB FB
FBE
FBFBFBFBFB
FB FB FB FB FB
FBE FB FB FBE
FBFBFBFB
FB FB FB FB
FGEFGE FGEFGFGEFB FBE FB FB FBE
FB
FB
FB
FB
FB
FB
FBE
FB
FB
FB
FB
FB
FBFBE
FB
FBFB
FB
FBE
FB
FB
FB
LCE
LCE
LCE
FD
FDE
FDFDE
FD
FDE
FDE
FDEFD
FAFAE
FB FB FB FB
FBEFBFBFBE
FB FB FB FB
FB FB FB FB FB
FB
FBFB
FBEFBFBEFB
FB FB FB FB
FBE
FB
FDE FD FD FDE
FDFDFDFD
FDE FD FD FDE
FDEFDFDFDEFD
FD FD FD FD FD
FDFD
FDEFDFD
FDFD
FDE
FD
FD
FDE
FD
FD
FD
FA FAE FA FAE FA FAE FA
FB FBE FB FB FBE FB
FB
FB
FBFBE
FB
FBFB
FB
FB
FB
FB
FB
FB
FB
FBE
FB
FB
FB
FA FAE FA
FAFAFA
FAE FAE
FAFA
FDE
FA
FAE
FAFAE
(E)NL
(E) (E)(E)NL
(E)NL
(E) (E)
(E)(E) (E) (E)
(E) (E) (E)
(E) (E) (E) (E) (E) (E) (E)
(E)NL
(E) (E) (E) (E) (E)(E)
(E)NL
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)NL(E)(E)(E)(E)(E)(E)
NL(E)(E)(E)(E)NL
(E)NL
(E)
6
6FD
FDE
XA
XAXA
XA
XA XA
FB
LCEEM-3
LCEEM-3
LCEEM-3
XA
LCE
XA
XA
XA
XA
XA
XA
XA
EM-3
EM-3
EM-3
EM-3
EM-4EM-4EM-4EM-4EM-4
EM-4
EM-4
6
EM-4 EM-4EM-46 EM-4EM-4
EM-6EM-6
EM-6 EM-6
1 1
1 1 1
1
1
1116
FAE
FAE
FAE
EM-
FGE
FGE
EM-5EM-5
FDE
FDFDE
FD
FDE
FB FBE FB
FB
FB
FB FB FB
FB FBE FB FB FB
FBE FB FB FB
FB FB FB FB
FB FB FB FBE
(E)
(E) (E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
1 1
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_L
San
ders
.rvt
2/1
3/2
014
4:3
5:2
0P
M
1/8" = 1'-0"
2/13/2014 4:35:20 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL LIGHTINGPLAN - AREA G
E111G7113.058.00
NF
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA G
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
X
OCK
OCK
T
OCK
OCK
T
OCK
OCK
FDE FD
FDEFD
FD FD
FDEFD
3
AHU-1
EM-11
EM-11
EM-11
FD
FDE
FDE
FD
FD
3
EM-11
EM-11
FD
FDE
FD
FD
FDE
FD3
EM-11
EM-11
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
5:2
5:1
9P
M
1/8" = 1'-0"
2/13/2014 5:25:19 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
PENTHOUSE LIGHTINGPLANS
E1217113.058.00
NF
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
GENERAL LIGHTING NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.
2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.
3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.
4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.
5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.
6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.
8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
LIGHTING KEY NOTES
1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.
2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.
3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.
4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.
5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.
6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.
X
1/8" = 1'-0"E5PENTHOUSE A LIGHTING PLAN
1/8" = 1'-0"E7PENTHOUSE B LIGHTING PLAN
1/8" = 1'-0"E3PENTHOUSE C LIGHTING PLAN
F
F
F
FF
F
F
F
F95
F
FF
F F F
F
60
F
F
30
F F
F30
F
F
F
F
F110
F110
FAC
P
TT
B
B
B
BF
SD
SD
F F
/A4 E211B/A4 E211C
/A4 E211D/A4 E211B
/A4 E211G/A4 E211G
/A4 E211D
/A4 E211F /A4 E211F
OFFICE113
STORAGE119
ELECTRICAL126
ADMIN. OFFICE124
TOILET123A
MAIN OFFICE121
CONFERANCE120
OFFICE118
OFFICE115
OFFICE117
OFFICE116
CONFERANCE125
CLINIC123
ADMIN OFFICE122
PLANNING052
SERVER ROOM141
COURTYARDNCY
CORRIDORH001B
CORRIDORH002
VESTIBULEH001
VUV-32 VUV-33
CUH-3
CUH-1
CUH-2
CUH-8
CUH-7
VUV-34
NEW FACP
T T
T
(E) DP-A(E) DP-1B
TVSS
PULL BOX(E)75KVA
(E)150KVA
(E)
(E)
(E)
(E)(E) (E)
(E) RP-B (E) RP-6
(E)
(E)
(E) (E) (E)
(E)
(E)
(E)(E)
(E) (E)
(E)
(E)
(E) (E)
(E)(E)(E)
(E)
(E)(E)
(E) (E)
(E)
MASTERCLOCK
PA RACK
3
CUH-4
3
CUH-5
3
CUH-6
3
3
3
4
(TYPICAL)
(E) IDF-2RE-CIRCUIT TO NEWPANEL RP-EGX
(E)
(E)3
3
(E)200A3P
(E)200A3P
EG -20 EG -18
VUV-62,64
VUV-66,68VUV-65,67 (E) CUH
EXISTINGELECTRICAL BOXREINSTALL AFTERINSTALLATION OFNEW AHU-4
REMOVE 20A-3P BREAKERIN EXISTING PANEL RP-B(ROOM 113) AND INSTALLNEW 25A-3P BREAKERAND FEEDER TO FEEDNEW AHU-4
1
1
3 CP-4
LADDER TO ABOVE
AHU-4
A
BC
D
E F G
N
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
KEY PLAN (NTS)
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
5:2
5:3
6P
M
1/8" = 1'-0"
2/13/2014 5:25:36 PM
BC
ARCHITECT NAMEREGISTRATION #
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
FIRST LEVEL POWER &AUXILIARY PLAN - AREA A
E211A7113.058.00
NF
GENERAL POWER NOTES
1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.
3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.
4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.
5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.
6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.
7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.
8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.
X
1/8" = 1'-0"A4FIRST LEVEL POWER AND AUXILIARY PLAN - AREA A
POWER AND AUXILIARY KEY NOTES
1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.
2 INSTALL NEW BUSSING, BREAKERS AND PANEL COVER TO MATCH EXISTING.EXISTING PANEL TUB TO REMAIN.
3 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.
4 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE $5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.
5 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
1/8" = 1'-0"F4TUNNEL POWER AND AUXILIARY PLAN
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
FOR REVIEWNOT FOR
REGULATORYAPPROVAL,
PERMITTING, ORCONSTRUCTION
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_p
rob
ert
so
n.r
vt
2/1
3/2
014
5:2
5:5
7P
M
2/13/2014 5:25:57 PM
BC
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
ELECTRICAL PANELSCHEDULES
E4117113.058.00
NF
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
Notes:
Total Est. Demand Current: 27 ATotal Conn. Current: 27 A
Lighting Emergency 1634 VA 100.00% 1634 VA Total Est. Demand: 22258 VALIGHTING - EMERGENCY 20549 VA 100.00% 20549 VA Total Conn. Load: 22258 VALIGHTING 75 VA 100.00% 75 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 22 A 40 A 19 ATotal Load: 5959 VA 10992 VA 5244 VA
41 4239 4037 3835 3633 3431 3229 3027 2825 2623 2421 2219 2017 1815 1613 1411 LIGHTING - EMERGENCY - MEZZ. A, B, & C 20 A 1 525 129 LIGHTING - EMERGENCY - AREA E 20 A 1 3361 2868 1 20 A LIGHTING - EMERGENCY - AREA F 107 LIGHTING - EMERGENCY - AREA C 20 A 1 2505 2310 1 20 A LIGHTING - EMERGENCY - AREA D 85 LIGHTING - EMERGENCY - AREAS A , B,... 20 A 1 2077 2642 1 20 A LIGHTING - EMERGENCY - NORTH... 63 LIGHTING - EMERGENCY - EXTERIOR 20 A 1 1691 3072 1 20 A LIGHTING - EMERGENCY - SOUTH... 41 LTG - EM - GYMNASIUM 129 20 A 1 672 472 1 20 A LTG - EMERG. CAF. 051, PLATFORM 051A 2
CKT Circuit Description Trip Poles Aø (VA) Bø (VA) Cø (VA) Poles Trip Circuit Description CKT
Notes: UTILIZING ATS-1 TO GENERATOR
Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A
Supply From: MDP-1 Phases: 3 Mains Type:
Location: STORAGE 108 Volts: 480Y/277 Wye A.I.C. Rating:
Branch Panel: LP-EM
DP-XLP-EMRP-VUVRP-EG
Notes:
Total Est. Demand Current: 203 ATotal Conn. Current: 201 A
Total Est. Demand: 73030 VATotal Conn. Load: 72488 VA
Motor 72488 VA 100.75% 73030 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 196 A 199 A 211 ATotal Load: 23464 VA 23776 VA 25248 VA
83 1084... 1084... 8481
VUV-41, CLASSROOM 044 15 A 21084... 1084...
2 15 A VUV-42, CLASSROOM 04582
79 1084... 8077 1084...
2 15 A VUV-40, RESOURCE ROOM 04378
75 1084... 7673
VUV-37, MUSIC CLASSROOM 040 15 A 21084... 74
71 1084... 1084... 7269
VUV-35, COOKING ROOM 048 15 A 21084... 1084...
2 15 A VUV-36, MUSIC CLASSROOM 04070
67 1084... 1084... 6865
VUV-33, CLASSROOM 001 15 A 21084... 1084...
2 15 A VUV-34, SEWING 04966
63 1084... 1084... 6461
VUV-31, CLASSROOM 003 15 A 21084... 1084...
2 15 A VUV-32, CLASSROOM 00262
59 1084... 1084... 6057
VUV-29, CLASSROOM 038 15 A 21084... 1084...
2 15 A VUV-30, CLASSROOM 03758
55 1084... 1084... 5653
VUV-27, CLASSROOM 031 15 A 21084... 1084...
2 15 A VUV-28, CLASSROOM 03254
51 1084... 5249
VUV-25, CLASSROOM 55 15 A 21084... 50
47 1084... 1084... 4845
VUV-23, CLASSROOM 036 15 A 21084... 1084...
2 15 A VUV-24, CLASSROOM 02746
43 1084... 1084... 4441
VUV-21 CLASSROOM 034 15 A 21084... 1084...
2 15 A VUV-22, CLASSROOM 03542
39 1084... 1084... 4037
VUV-19, CLASSROOM 023 15 A 21084... 1084...
2 15 A VUV-20, CLASSROOM 03338
35 1084... 1084... 3633
VUV-17, CLASSROOM 021 15 A 21084... 1084...
2 15 A VUV-18, CLASSROOM 02234
31 1084... 1084... 3229
VUV-15, SCIENCE LAB 019 15 A 21084... 1084...
2 15 A VUV-16, CLASSROOM 02030
27 1084... 2825 1084...
2 15 A VUV-14, SCIENCE LAB 01826
23 2421 2219 2017 1815 1084... 1613 MOTOR 20 A 1 700 VA 1084...
2 15 A VYV-8, SCIENCE LAB 01714
11 MOTOR 20 A 1 1400... 1084... 129 MOTOR 20 A 1 1012... 1084...
2 15 A VUV-6, SCIENCE LAB 01110
7 1084... 1084... 85
VUV-3, SCIENCE LAB 009 15 A 21084... 1084...
2 15 A VUV-4, CLASSROOM 0086
3 1084... 1084... 41
VUV-1, CLASSROOM 056 15 A 21084... 1084...
2 15 A VUV-2, SCIENCE LAB 0102
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating:
Mounting: Surface Wires: 4 Bus Rating: 600 ASupply From: MDP-1 Phases: 3 Mains Type: MLO
Location: CONFERANCE 029 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: DP-VUV
Notes:
Total Est. Demand Current: 68 ATotal Conn. Current: 108 A
Total Est. Demand: 24570 VARECEPTACLE 38740 VA 62.91% 24370 VA Total Conn. Load: 38940 VAPOWER 200 VA 100.00% 200 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 117 A 99 A 112 ATotal Load: 13820 VA 11900 VA 13220 VA
83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 5249 RECEPTACLE CLASSROOM 042 20 A 1 500 VA 5047 RECEPTACLE - CLASSROOMS 058, 057 20 A 1 720 VA 500 VA 1 20 A EWC CORRIDOR H002 4845 POWER CORRIDOR H007 20 A 1 200 VA 500 VA 1 20 A RECEPTACLE CORRIDOR H007 4643 RECEPTACLE CLASSROOM 042 20 A 1 1400... 720 VA 1 20 A RECEPTACLE COMPUTER LAB 014 4441 COMPT. RECEPT. - MUSIC CLASSROOM 040 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CENTER PROGRAM 039 4239 COMPT. RECEPT. - CLASSROOM 023 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - SEWING 049 4037 COMPT. RECEPT. - CLASSROOM 022 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 057 3835 COMPT. RECEPT. - STORAGE 60 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE TECHNOLOGY 047 3633 COMPT. RECEPT. - COOKING ROOM 048 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE METAL SHOP 046 3431 COMPT. RECEPT. - CLASSROOM 026 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 045 3229 COMPT. RECEPT. - CLASSROOM 025 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 044 3027 COMPT. RECEPT. - CLASSROOM 021 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - RESOURCE ROOM 043 2825 COMPT. RECEPT. - CLASSROOM 020 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 027 2623 COMPT. RECEPT. - SCIENCE LAB 019 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 55 2421 COMPT. RECEPT. - SCIENCE LAB 018 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 003 2219 COMPT. RECEPT. - SCIENCE LAB 016 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 002 2017 COMPT. RECEPT. - SCIENCE LAB 017 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 001 1815 COMPT. RECEPT. - SCIENCE LAB 011 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 031 1613 COMPT. RECEPT. - SCIENCE LAB 010 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 032 1411 COMPT. RECEPT. - SCIENCE LAB 009 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 038 129 COMPT. RECEPT. - CLASSROOM 008 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 037 107 COMPT. RECEPT. - COMPUTER LAB 007 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 036 85 COMPT. RECEPT. - COMPUTER LAB 014 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 035 63 COMPT. RECEPT. - CLASSROOM 058 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 034 41 COMPT. RECEPT. - CLASSROOM 056 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 033 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 400 AMounting: SURFACE Wires: 4 Bus Rating: 400 A
Supply From: MDP-1 Phases: 3 Mains Type:
Location: CONFERANCE 029 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: RP-EG
Notes:
Total Est. Demand Current: 202 ATotal Conn. Current: 195 A
Total Est. Demand: 72911 VATotal Conn. Load: 70274 VA
Motor 70274 VA 103.75% 72911 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 199 A 201 A 189 ATotal Load: 23679 VA 23924 VA 22671 VA
83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 2028... 5451
AC-1 30 A 22028... 1081... 52
49 1784... 1081... 5047
ACCU-3 (VUV-39) 60 A 21784... 1081...
3 40 A ACCU-4 (AHU-4)48
45 792 VA 1784... 4643 792 VA 1784...
2 60 A ACCU-3 (VUV-38)44
41VUV-39, CLASSROOM 042 20 A 3
792 VA 792 VA 4239 1862... 792 VA 4037
ACCU-1 (VUV-26) 30 A 21862... 792 VA
3 20 A VUV-38, CLASSROOM 04138
35 792 VA 792 VA 3633 792 VA 792 VA 3431
MOTOR CLASSROOM 025 20 A 3792 VA 792 VA
3 20 A VUV-26, TEACHER LOUNGE 02832
29 792 VA 792 VA 3027 792 VA 792 VA 2825
VUV-12, COMPUTER LAB 015 20 A 3792 VA 792 VA
3 20 A VUV-13, CLASSROOM 02626
23 792 VA 792 VA 2421 792 VA 792 VA 2219
VUV-9, SCIENCE LAB 016 20 A 3792 VA 792 VA
3 20 A VUV-10, COMPUTER LAB 01420
17 1784... 1784... 1815
ACCU-3 (VUV-11) 60 A 21784... 1784...
2 60 A ACCU-3 (VUV-13)16
13 1784... 1784... 1411
ACCU-3 (VUV-10) 60 A 21784... 1784...
2 60 A ACCU-3 (VUV-12)12
9 1862... 1097... 107
ACCU-1 (VUV-7) 30 A 21862... 1097...
2 35 A ACCU-2 (VUV-9)8
5 3516... 792 VA 63 3516... 792 VA 41
VUV-5, COMPUTER LAB 007 45 A 33516... 792 VA
3 20 A VUV-7, STORAGE 0132
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating:
Mounting: Surface Wires: 4 Bus Rating: 600 ASupply From: Phases: 3 Mains Type: MLO
Location: CONFERANCE 029 Volts: 208Y/120V A.I.C. Rating:
Branch Panel: DP-VUV2
Notes:
Total Est. Demand Current: 4 ATotal Conn. Current: 4 A
Total Est. Demand: 1560 VATotal Conn. Load: 1560 VA
RECEPTACLE 1560 VA 100.00% 1560 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 7 A 5 A 2 ATotal Load: 800 VA 580 VA 180 VA
23 2421 2219 2017 1815 1613 1411 129 107 85 RECEPTACLE IDF CLOSET 86 20 A 1 180 VA 63 RECEPTACLE 20 A 1 400 VA 180 VA 1 20 A RECEPTACLE STORAGE 7 41 RECEPTACLE 20 A 1 400 VA 400 VA 1 20 A RECEPTACLE 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A
Supply From: Phases: 3 Mains Type:
Location: BOILER ROOM BRM Volts: 208Y/120V A.I.C. Rating:
Branch Panel: RP-EGX
NOTE #1
3/4" x 10' COPPER GROUND ROD W/CADWELD CONNECTIONS (TYP.)
CAST IN PLACECONCRETE PAD
CADWELDCONNECTOR (TYP.)
4" TYP.
CONDUIT ACCESS AREA
NOTE:CONNECT TO GROUNDING OF ADJACENT TRANSFORMER, SWITCHGEAR AND BUILDING(WHERE APPLICABLE)
1.
SCALE: NONE
TRANSFORMER AND GENERATORGROUNDING PLAN (TYP.)
#4/0 BARE COPPER,@ 24" DEPTH
#4/0 BARE COPPERUP TO EQUIPMENTGROUND LUGS/BUS(TYP.)
#4 @ 11"(TOP & BOTTOM)
#4 @ 10"(TOP & BOTTOM)
12" GRAVEL BALLAST
6" 10"
5"
10"
18"
2"5"
48"
72"
2"
8"
CABLE OPENING(NOTE 2)
6'-2" (750 KVA) XFMR4'-1" (250 KVA) XFMR
NOTES:
SCALE: NONE
EXTEND PAD 4" BEYOND ENCLOSURE AND COOLING FIN OF TRANSFORMER.
VERIFY ACTUAL DIMENSIONS OF TRANSFORMERS AND GENERATOR CABLE OPENINGS.
1.
2.
PLAN VIEW
ELEVATION
TRANSFORMERS PAD DETAIL (TYP.)
SOIL
FINISH GRADE
1" CHAMFER
48"
8" DIAMETER PIER48" DEEP(4) TYPICAL
SCALE: NONE
NOTE:CONNECTION SHALL BE FIRMLY BONDED TO NEUTRAL BUS MEDIUM VOLTAGESWITCHGEAR, BUILDING FOUNDATION STEEL, GROUNDING ROD, AND WATER PIPE.
1.
GROUNDING SYSTEM DETAIL
IDF ROOM 026GROUND BUS
#4/0 COPPERGROUND
#4/0 COPPER
#500kcmil COPPERGROUND
#2/0 COPPER
MDF ROOMGROUND BUS
WATER METER ORDIELECTRIC FLANGE
METAL WATER PIPE WITHIN 5 FT.OF WATER SERVICE ENTRANCE TOBUILDING. PROVIDE BONDINGJUMPER ACROSS WATER METER ANDDIELECTRIC FLANGES.
GROUND BUS480V UNITSUBSTATION
NEUTRAL BUS480V UNITSUBSTATION
SUPPLY SIDE
AREAWAYCONCRETEFLOOR
3/4" X 10'-0" LONGGROUND ROD(TYPICAL)
1'-0" MINIMUMBELOW SLAB
GENERATORGROUND MATREFER TODRAWING E401
#4/0 COPPER
FLOORSLAB
MAIN BUILDING GROUND BUSWITHIN ELECTRICAL ROOM -PROVIDE 1" STANDOFF. REFER TODETAIL THIS DRAWING
BUILDING STEEL
GROUND MATUNDER FLOORSLAB, REFER TODRAWING E4013/4" X 10'-0" LONGGROUND ROD(TYPICAL)
1'-0
"MIN
IMU
MBE
LOW
GR
ADE
#4/0 COPPER TO LIGHTNINGPROTECTION SYSTEM.CONNECT TO BUILDINGCOLUMN F-1. REFER TODRAWING E201.
#4/0 COPPER
#4/0 COPPER TO BUILDINGFOUNDATION STEEL(CONCRETE ENCASEDELECTRODES)
#4/0 COPPER TOMEDIUMVOLTAGESWITCHGEAR
#250kcmil TOGENERATOR NEUTRAL
5KV PRIMARY SYSTEMDUCTBANK DETAIL
SCALE: NONE
30" (MIN.) 19"
7 1/2"12"
11 1/2"
19"
7 1/2"
19"7 1/2"
(4) 4" ENCASEMENTTYPE DB PVCCONDUITS
WARNING MARKER
NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 2)
(2) 4" ENCASEMENTTYPE DB PVCCONDUITS
NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 4)
EXISTING GRADE
CONDUIT PENETRATION ANDROOF FLASHING DETAIL
SCALE: NONE
STAINLESS STEELADJUSTABLE DRAWBAND
LAP SPLICESEALANT
CONDUIT (VERIFYSIZE AND LOCATION)
SEALANT
PREMOLDED PIPE SEAL
EPDM ROOF MEMBRANE
RIGID INSULATION
METAL DECK
LOW VOLTAGE TO BAS
COORIDOR LIGHTINGCONTACTOR "C4"
LOW VOLTAGE TO BAS
BUILDING AUTOMATIONSYSTEM(B.A.S.)
COORDINATE EXACTLOCATION WITH
TEMPERATURE CONTROLSCONTRACTOR
PHOTOCELLLOCATED ON ROOFFACING NORTH,INSTALLED BY TCCONTRACTOR
PC
24V POWER SUPPLY
TO B.A.S. (CIRCUITING BYTEMPERATURE CONTROLS
CONTRACTOR)
TO B.A.S. WITH LOWVOLTAGE WIRING BY
TEMPERATURE CONTROLSCONTRACTOR
HOMERUN TO EACH 24VCOIL CONTACTOR (TYP)
SL1 (LOCATE OUTSIDE OF OFFICE 113)
CORRIDOR LOW VOLTAGEMOMENTARY OVERRIDEPUSH BUTTIONS (TYP)
SL2 (LOCATE OUTSIDE OF JC 69)
SL3 (LOCATE OUTSIDE OF JC 38)
SL4 (LOCATE OUTSIDE OF ELEC. 107)
TO C1, C2, C3, C4
TO C5, C6, C7
C7
ELECTRICALLYHELD
(E) 277VCKT
EXTERIOR BUILDING LIGHTINGCONTACTOR "C7"
EXTERIOR BUILDING LIGHTS
COORIDOR LIGHTINGCONTACTOR "C3"
C6
ELECTRICALLYHELD
(E) 277VCKT
EXTERIOR BUILDING LIGHTINGCONTACTOR "C6"
EXTERIOR BUILDING LIGHTS
COORIDOR LIGHTINGCONTACTOR "C2"
C5
ELECTRICALLYHELD
(E) 277VCKT
EXTERIOR BUILDING LIGHTINGCONTACTOR "C5"
EXTERIOR BUILDING LIGHTS
C1
ELECTRICALLYHELD
(E) CORRIDOR LIGHTS
COORIDOR LIGHTINGCONTACTOR "C1"
30A CONTACTOR (TYPICAL)LOCATE IN OFFICE 113
SK
SK
SK
(E) CORRIDOR LIGHTS
(E) CORRIDOR LIGHTS
(E) 277VCKT
(E) 277VCKT
(E) 277VCKT
SPARE
SPARE
C2
ELECTRICALLYHELD
(E) CORRIDOR LIGHTS
SK
SK
(E) CORRIDOR LIGHTS
(E) 277VCKT
(E) 277VCKT
SPARE
C3
ELECTRICALLYHELD
(E) CORRIDOR LIGHTSSK
(E) 277VCKT
SPARE
SPARE SPARE
SPARE
C3
ELECTRICALLYHELD
(E) CORRIDOR LIGHTSSK
(E) 277VCKT
SPARE
SPARE
SPARE
LOW VOLTAGE TO BAS
30A CONTACTOR (TYPICAL)LOCATE IN JC 69
30A CONTACTOR (TYPICAL)LOCATE IN JC 38
30A CONTACTOR (TYPICAL)LOCATE IN ELEC 107
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
LOW VOLTAGE TO BAS
SPARE
SPARE
SPARE
30A CONTACTOR (TYPICAL)LOCATE IN JC 69
30A CONTACTOR (TYPICAL)LOCATE IN ELEC 107 30A CONTACTOR (TYPICAL)
LOCATE IN STORAGE 7
WIREMOLD V4000.MOUNT 5" ABOVECOUNTER TOP
ACCESSIBLE CEILING
FINISHED FLOOR
WIREMOLD V4050
BLANK INSERT FORINSTALLATION OFFUTURE DATA DEVICES
DECORA STYLEDUPLEX RECEPTACLE
120V CIRCUIT ASINDICATED ON PLANS
SCALE: NONE
SURFACE MOUNTED POWER/DATARACEWAY DETAIL
T
DIVIDER
6'-0" (TYP.)
5'-0
"(TY
P)
CONDUIT, JUNCTIONBOXES, DUPLEXRECEPTACLES,BUSHINGS ANDCOVERPLATES BYELECTRICALCONTRACTOR
SCALE: NONE
TECHNOLOGY WORKSTATIONDETAIL
1 1/4"C TOELECTRICALPANEL
(1)1-1/4"C EMPTY WITHPULL STRING FORTELECOMMUNICATIONWIRING.
1 1/4"C WITH BUSHINGSTO ABOVE ACCESSIBLECEILING
2 GANGDATA
2 GANG120V1'-8"
2
FLOOR
FINISHED CEILING(WHERE APPLICABLE)
DECK
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_p
rob
ert
so
n.r
vt
2/1
4/2
014
9:0
3:1
8A
M
1/2" = 1'-0"
BC
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
ELECTRICAL DETAILS
E5027113.058.00
NF
1 2014.01.31 BIDS
3 2014.02.13 ADDENDUM 2
OCCUPANCY SENSOR LEGEND
TYPE DESCRIPTION
OCA
OCB 90° CORNER CEILING/WALL MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR
OCD
360° CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR
OCE 360° CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR
OCF
OCG
(ALL SENSORS MAY NOT BE USED ON THIS PROJECT)
OCH 360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR
OCK
OCM ULTRASONIC CORRIDOR CONFIGURATION CEILING MOUNTED OCCUPANCY SENSOR
360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR
180° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR
90° CORNER CEILING/WALL MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR
WALL SWITCH PASSIVE INFRARED OCCUPANCY SENSOR
REFER TO SPECIFICATIONS FOR COVERAGE AREA
90° CORNER CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR
OCC
1
ISSUE:
CHECKED:
SCALE:
© 2012 SHW Group
SHW Project:
SHEET TITLE:
Final Plans for Bidding and Construction
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
DRAWN:
2338 COOLIDGESUITE 100
BERKLEY, MICHIGAN 48072
P 248.336.4700F 248.336.4701
C:\
Revit
Lo
calF
iles\7
113.0
58.0
0L
PS
Fro
st
E13_p
rob
ert
so
n.r
vt
2/1
4/2
014
9:0
3:2
4A
M
1/4" = 1'-0"
BC
LIVONIA PUBLICSCHOOLS
FROST MS - RENOVATIONLIVONIA, MI
LIGHTING FIXTURESCHEDULE
E6017113.058.00
NF
1 2014.01.31 BIDS
2 2014.02.07 ADDENDUM 1
3 2014.02.13 ADDENDUM 2
LIGHTING FIXTURE SCHEDULE
TYPE DESCRIPTION VOLTAGE LAMP LENSREFLECTOR/
DISTRIBUTION
Manufacturer and Model (Multiple Options)
MFR (4) MODEL (4) COMMENTSMFR (1) MODEL (1) MFR (2) MODEL (2) MFR (3) MODEL (3)
(E) EXISTING TO REMAIN(E) NL EXISTING FIXTURE WITH NIGHT LIGHTING TO REMAINFA 2'X4'' RECESSED LAY-IN TROFFER 277 V (2) 25W T8 A12.125 ACRYLIC
PRISMATICLITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPS
DAYBRITETG8 SERIES LSI G SERIES WHITE DOOR FRAME. FUSED, PROGRAM RAPID START BALLAST.
FAE SAME AS TYPE "FA" EXCEPT WITH EMERGENCYTRANSFER DEVICE
277 V
FB 2'X4'' LAY-IN TROFFER 277 V 25W T8 3-LAMP A12.125 ACRYLICPRISMATIC
LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSLIGHTOLIER
TG8 SERIES LSI G SERIES 2 BALLASTS FOR DUAL LEVEL SWITHCHING OF INNER/OUTER LAMPS
FBE SAME AS TYPE "FB" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE
277 V
FC 1'X4' RECESSED TROFFER 277 V (2) 25W T-8 A12.125 ACRYLICPRISMATIC
LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSLIGHTOLIER
TG8 SERIES LSI T SERIES WHITE DOOR FRAME. FUSED, PROGRAM RAPID START BALLAST.
FCE SAME AS TYPE "FC" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE
277 V
FD 4' INDUSTRIAL FLUORESCENT CHAIN HUNG 277 V (2) 25W T8 NO LENS WITHWIREGUARD
LITHONIA Z SEIRES METALUX SNF SERIES PHILIPSLIGHTOLIER
1107-S HDS LSI F20 SERIES FUSED PROGRAM RAPID START BALLAST. WIREGUARD, CHAIN HUNG KIT
FDE SAME AS TYPE "FD" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE
277 V
FG 1'X4' SURFACE MOUNTED TROFFER 277 V (2) 25W T8 HIGH IMPACT ACRYLICDIFFUSER
LITHONIA ST8 SERIES FAIL-SAFE HVL12 PHILIPSLIGHTOLIER
EYE-QL LSI DW SERIES WHITE HOUSING, FUSED, PROGRAM RAPID START BALLAST
FGE SAME AS TYPE "FG" EXCEPT WITH EMERGENCYTRANSFER DEVICE
277 V
FJ 4' STRIP LIGHT 277 V (1) 25W T8 N/A LITHONIA Z SERIES METALUX SNF PHILIPSLIGHTOLIER
1107-S-HDS LSI F20 SERIES FUSED, PROGRAM RAPID START, WIRE GUARD, CHAIN HUNG KIT.
FJE NOT USEDLA 2'X2' LED LAY-IN TROFFER 277 V LED, 3300 LUMENS, 4000K 2 PIECE VOLUMETRIC
REFLECTORSLITHONIA 2RTLED METALUX 2AC SERIES PHILIPS
LIGHTOLIEROPALESCENT TWIN SERIES LSI TLED-C-P
SERIESCUSTOM COLOR AS SELECTED BY ARCHITECT, UL RATED FOR WET LOCATIONS.
LAE SAME AS TYPE "LA" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE
277 V
LBE 6" EXTERIOR LED ROUND DOWNLIGHT WITHEMERGENCY LOAD TRANSFER DEVICE
277 V LED, 1300 LUMENS, 4000K PRISMATIC TEMPEREDSPREAD LENS
MEDIUM BEAM KRILIN GRR SERIES ENGINEER APPROVEDEQUAL
ENGINEERAPPROVEDEQUAL
ENGINEERAPPROVEDEQUAL
GASKETING, UL RATED FOR WET LOCATIONS.IC RATED.
LC EXTERIOR LED WALL SCONCE 277 V LED, 3800 LUMENS, 4000K ACRLYLIC LENS TYPE IV DISTRIBUTION LITHONIA WSR SERIES MCGRAW-EDISON ISC SERIES WIDELITE ASW SERIES ECLIPSE TURIN SERIES CUSTOM COLOR AS SELECTED BY ARCHITECT, UL RATED FOR WET LOCATIONS.LCE SAME AS TYPE "IC" EXCEPT WITH LOAD TRANSFER
DEVICE.277 V
LD 6" INTERIOR DOWNLIGHT 277 V LED, 1500 LUMENS, 4000K SEMI-SPECULAR/MEDIUMBEAM
GOTHAM ECSR SERIES PORTFOLIO LD6 SERIES CALCULITE C6L SERIES PATHWAY 6VLED SELF-FLANGED, SEMI SPECULAR FINISH, CLEAR TRIM FINISH.
LDE SAME AS TYPE "LD" EXCEPT WITH LOAD TRANSFERDEVICE
277 V
LF EXTERIOR SURFACE MOUNT UNDER CANOPY FIXTURE 277 V LED,4793 LUMENS,4000K REFRACTIVE ACRYLICLENS
LITHONIA KACM LED LSI XPG3 SERIES PHILIPSGARDCO
SLENDERFORM SERIES TRACELITE TLED-C-P CUSTOM COLOR SELECTED BY ARCHITECT
XA UNIVERSAL MOUNT EXIT SIGN 277 V LED RED LETTERING LITHONIA LE SERIES SURE-LITE TPX SERIES LIGHTOLIER LDS SERIES EXTRONICS 400 SERIES WHITE DIE CAST ALAUMINUM HOUSING, HIGH OUTPUT LEDDIFFUSE LIGHT PANEL. WHITE STENCIL FACE.PROVIDE SINGLE OR DUAL FACE WITH ARROWS AS INDICATED ON PLAN.