bifrost cable system - keppel corporation

1
North Pacific Ocean INDONESIA JAPAN HONG KONG CHINA Tuas SINGAPORE GUAM Largest high-speed capacity data cable system across the Pacific Ocean from Singapore Length: > 15,000 km Completion: 2024 Keppel’s share of the total project cost is approximately US$350 million Celebes Sea NORTH AMERICA Java Sea AUSTRALIA BIFROST CABLE SYSTEM World’s first subsea fibre cable system directly connecting Singapore to the west coast of North America via Indonesia through the Java Sea and Celebes Sea South China Sea SOUTH KOREA To Japan To Australia Strategic landing in Guam for cross-connectivity with other cable systems to Japan and Australia BIFROST CABLE SYSTEM & ROUTE TRADITIONAL TRANS-PACIFIC ROUTE PHILIPPINES

Upload: others

Post on 15-Mar-2022

12 views

Category:

Documents


0 download

TRANSCRIPT

North Pacific Ocean

INDONESIA

JAPAN

HONG KONG

CHINA

Tuas SINGAPORE

GUAM

Largest high-speed capacity data cable system

across the Pacific Ocean from Singapore

Length: > 15,000 km

Completion: 2024

Keppel’s share of the total project cost

is approximately US$350 million

Celebes Sea

NORTH AMERICA

Java Sea

AUSTRALIA

BIFROST CABLE SYSTEMWorld’s first subsea fibre cable system directly connecting

Singapore to the west coast of North America via Indonesia through the Java Sea and Celebes Sea

South China Sea

SOUTH KOREA

To Japan

To Australia

Strategic landing in Guam for cross-connectivity with other cable systems to Japan and Australia

BIFROST CABLE SYSTEM & ROUTE

TRADITIONAL TRANS-PACIFIC ROUTE

PHILIPPINES