bim: bim uses bim uses extracting values from your model

25
9/10 + 10/10 - 2018 BIMINFRA - BIM USES 1 BIM: BIM uses BIM Uses – extracting values from your model - How to Achieve goals by applying BIM uses Magnus Jacob Christensen, BIM strategist COWI, [email protected]

Upload: others

Post on 04-Dec-2021

25 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES1

BIM: BIM uses

BIM Uses – extracting values from your model- How to Achieve goals by applying BIM uses

Magnus Jacob Christensen, BIM strategist COWI, [email protected]

Page 2: BIM: BIM uses BIM Uses extracting values from your model

Agenda

2

10 min -

9/10 + 10/10 - 2018

BIMINFRA - BIM USES

BIM uses: Explained

8 min - BIM uses: Examples

2 min What is next? BIM requirements -

Page 3: BIM: BIM uses BIM Uses extracting values from your model

39/10 + 10/10 - 2018

BIMINFRA - BIM USES

BIM uses - explained 10 min

Page 4: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES4

A BIM use is defined as a method of applying

building information modelling during an asset’s

lifecycle to achieve one or more specific

objectives. The BIM manual provides a structured

method for planning the implementation of BIM on

a project. The procedure includes the following

three steps:

1. Identify high-value BIM uses during the

project planning, design, construction and

operational phases.

2. Design the BIM execution process by creating

process maps (already as defaults in BIM

wheel tab).

3. Define the BIM deliverables in the form of

information exchanges.

BIM USES

Page 5: BIM: BIM uses BIM Uses extracting values from your model

BIM uses in COWI

9/10 + 10/10 - 2018

BIMINFRA - BIM USES5

Page 6: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES6

BIM USES – Standardized processes

Phase 1

Identify high-value BIM uses

during the project planning,

design, construction and

operational phases.

Phase 2

Design the BIM execution

process by creating process

maps (already as defaults in

BIM wheel tab).

Phase 3

Define the BIM deliverables in

the form of information

exchanges.

Page 7: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES7

BIM USES – Phase 1

Phase 1

Identify high-value BIM uses

during the project planning,

design, construction and

operational phases.

Page 8: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES8

BIM USES – Phase 2

Phase 2

Design the BIM execution

process by creating process

maps (already as defaults in BIM

wheel tab).

Page 9: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES9

BIM USES – Phase 3

Phase 3

Define the BIM deliverables in

the form of information

exchanges.

Page 10: BIM: BIM uses BIM Uses extracting values from your model

10

BIM USES

9/10 + 10/10 - 2018

BIMINFRA - BIM USES

Cost Estimation (5D)

Scheduling (4D)

Site Utilization Planning (4D)

Design Authoring

Design Reviews

Drawing Generation

Lighting Analysis

Site Analysis

Energy Analysis

Engineering AnalysisSustainability (6D)

Code Validation

Space Management/Tracking

Disaster Planning

Building System Analysis

Construction System Design

3D Coordination

Record Model

Maintenance Scheduling (7D)

Asset Management

Existing Conditions Modelling

Programming

Digital Fabrication

3D Control and Planning

24

12 uses in COWIInvention of the

BIM wheel!

……but what happens from 5 to 6?

Page 11: BIM: BIM uses BIM Uses extracting values from your model

What is a level of development (LOD)?

9/10 + 10/10 - 2018

BIMINFRA - BIM USES11

› LOI + LOG

› LOD is a measure of how seriously you take the information represented by a BIM element. It is not necessarily a measure of the amount of information, although obviously there must be enough information to satisfy the specified LOD level. The appearance of a BIM element is only one piece of information about that object, and usually the least important. A contractor does not need to know, e.g., what a sign looks like to order it, nor to place it along the road. But he does need to know the x, y, z coordinates and model number. He also needs to know its dimensions to coordinate with things around it, but not necessarily exactly what it looks like.

Page 12: BIM: BIM uses BIM Uses extracting values from your model

What is the information and detail level needed?

9/10 + 10/10 - 2018

BIMINFRA - BIM USES12

› Before setting the level of development ask your self: What is the purpose of the model?

Page 13: BIM: BIM uses BIM Uses extracting values from your model

What is a BIM maturity level?

9/10 + 10/10 - 2018

BIMINFRA - BIM USES13

Page 14: BIM: BIM uses BIM Uses extracting values from your model

How does the (3D) models evolve through phases?

9/10 + 10/10 - 2018

BIMINFRA - BIM USES14

Page 15: BIM: BIM uses BIM Uses extracting values from your model

15

BIM uses: Examples

9/10 + 10/10 - 2018

BIMINFRA - BIM USES

8 min

Page 16: BIM: BIM uses BIM Uses extracting values from your model

BIM use: Design review

9/10 + 10/10 - 2018

BIMINFRA - BIM USES16

E18, Rugtvedt - Dørdal Client: Hæhre entreprenør

› Communication through models

› Direct feedback and communication in models

› live editing and live update when review is done (Instant update, always dynamic)

› Software

› Novapoint 20.xx DCM

› Trimble easy access

Page 17: BIM: BIM uses BIM Uses extracting values from your model

BIM use: Design review

9/10 + 10/10 - 2018

BIMINFRA - BIM USES17

E18, Rugtvedt - Dørdal Client: Hæhre entreprenør

Page 18: BIM: BIM uses BIM Uses extracting values from your model

BIM use: 3D Coordination

9/10 + 10/10 - 2018

BIMINFRA - BIM USES18

Clash detection

› Multidisciplinary model

› Basis models

› Discipline models

› As built models

› Software

› Autodesk Navisworks Manage

› Conflict matrix (app)

› Bentley Navigator

Page 19: BIM: BIM uses BIM Uses extracting values from your model

BIM use: 3D Coordination

9/10 + 10/10 - 2018

BIMINFRA - BIM USES19

Clash detection

Page 20: BIM: BIM uses BIM Uses extracting values from your model

BIM use: Visualisation AR + VR

9/10 + 10/10 - 2018

BIMINFRA - BIM USES20

› Communication

› Client

› Project team

› Stakeholders

› Software

› Autodesk InfraWorks

› Autodesk Manage

› Bentley Navigator

Page 21: BIM: BIM uses BIM Uses extracting values from your model

BIM use: Visualisation AR + VR

9/10 + 10/10 - 2018

BIMINFRA - BIM USES21

Page 22: BIM: BIM uses BIM Uses extracting values from your model

22

Next step?

9/10 + 10/10 - 2018

BIMINFRA - BIM USES

5 min

Page 23: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES23

Development needed for Future BIM execution

Describe the output/delivery in

ICT

Standardize the workflows for All

BIM uses

Define the LODneeded for specific

BIM uses

Define object-classifications and metadata needed for

specific BIM uses

Next step

Page 24: BIM: BIM uses BIM Uses extracting values from your model

9/10 + 10/10 - 2018

BIMINFRA - BIM USES24

E-mail me: [email protected]

Page 25: BIM: BIM uses BIM Uses extracting values from your model

Thank you!

9/10 + 10/10 - 2018

BIMINFRA - BIM USES25