01

Adoption of technology in construction has been slow but the industry is becoming increasingly aware of BIM’s potential

Page 3: Bim challenges and potential

02

Are you Awareof BIM

Page 4: Bim challenges and potential

Building Information Modelling (BIM)

A process involving the structured sharing and coordination of digital information about a building thoughout the lifecycle (Eastman, 2011)

Eliminates most of the communication-related delivery challenges of the industry

The single well-coordinated process that could catalyze the improvement of the construction industry

03

BIM: A Recap

Page 5: Bim challenges and potential

04

BIM Projections

Up to 20% cost

reduction

Improved carbon performance

Efficient delivery

Page 6: Bim challenges and potential

05

BIM Benefits

Faster and more effective processes

Better design

Better customer service

Controlled whole-life costs and environmental data

Lifecycle data

Automated assembly

Better production quality

Hi, can we make the data in plain slides into something awesome as this: http://cdn.lineshapespace.com/2013/04/Building-Information-Modeling-Infographic-LineShapeSpace.jpeg? There are no appealing images/infographics regarding BIM benefits and potential other than the Autodesk one. Thanks!-Donna Longstocking
Page 7: Bim challenges and potential

Up to 40% elimination of unbudgeted change

Cost estimation accuracy within 3% as compared to traditional estimates

Up to 80% reduction in time taken to generate a cost estimate

A savings of up to 10% of the contract value through clash detections

Up to 7% reduction in project time

06

BIM Case Studies Data

Page 8: Bim challenges and potential

07Specific Benefits to BIM

ParticipantsClients:

Better requirement due to enhanced communication with design team

Contractors: Increased clarity in design intent, easy testing of design options, and easy distribution of

design documentation across the teams

Designers: Access to better quality information for estimation and bidding, early involvement to

contribute to constructability and effective scheduling, and clash-free construction due to ability to simulate before actual construction

Facilities Management: enhanced quality of as-built and handing-over information, and easier integration into

computer-aided facilities management systems for maintenance and post occupancy assessments

Page 9: Bim challenges and potential

08

Page 10: Bim challenges and potential

75% of contractors globally reported a positive ROI

09

BIM ROI Study

Page 11: Bim challenges and potential

BIM ROI for 10 projects varied from 140% to 39,900% with a calculated average of 1,633% for all projects and 634% for projects without a planning or value analysis phase

10

BIM ROI

Page 12: Bim challenges and potential

11

BIM Challenges

Page 13: Bim challenges and potential

12

Page 14: Bim challenges and potential

13Success for BIM Relies

on

Page 15: Bim challenges and potential

THANK YOU

Thomas Goubau CEO

www.aproplan.com www.facebook.com/AproPLAN

www.twitter.com/AproPLAN

www.linkedin.com/in/thomasgoubau/