bim coordination portofoliooo

23
BIM COORDINATION PORTOFOLIO Architect BIM Coordinator : Mohab Magdy Mohamed M:0097430327104 Email: [email protected]

Upload: mohab-magdypmp

Post on 14-Apr-2017

312 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: BIM COORDINATION PORTOFOLIOOO

BIM COORDINATION PORTOFOLIOArchitect BIM Coordinator : Mohab Magdy Mohamed M:0097430327104 Email: [email protected]

Page 2: BIM COORDINATION PORTOFOLIOOO

1-Sample for Coordination Process :

Page 3: BIM COORDINATION PORTOFOLIOOO

2-Sample for Central Files Hirecahy :

Page 4: BIM COORDINATION PORTOFOLIOOO

SOME SAMPLE FOR PERVIOUS MODELS.

Page 5: BIM COORDINATION PORTOFOLIOOO

Sample For Discrepancy Flag Inside The model To Detect the Clash Easily Through The Filters.

Page 6: BIM COORDINATION PORTOFOLIOOO

1-Sample For Discrepancy Status Inside The Schedule With Discrepancy ID to Detect and Modify The Clashes Easily Through Discrepancy Flag.

Page 7: BIM COORDINATION PORTOFOLIOOO

2-Documentation For The Clashes Inside Excel sheet.

Page 8: BIM COORDINATION PORTOFOLIOOO

SAMPLE FOR INTERFERNCE CHECK REPORT

BY REVIT & NAVISWORKS

Page 9: BIM COORDINATION PORTOFOLIOOO

INTERFERENCE REPORT BY REVIT:

Page 10: BIM COORDINATION PORTOFOLIOOO

Interference Report By Navisworks:

Page 11: BIM COORDINATION PORTOFOLIOOO
Page 12: BIM COORDINATION PORTOFOLIOOO

SAMPLES FOR BIM COORDINATED 2D&3D CLASHES & DISCREPENCIES And COORDINATION MEETINGS

ASUMPTIONS WITH STAKEHOLDERS.

Page 13: BIM COORDINATION PORTOFOLIOOO

BIM Discrepancy Description: References: StatusThere is a conflict in the location of (BWO) at the structure drawings (SM.103A.18) and the arch. Ceiling (CLG-02) at the Arch. drawings (AM1.413.18) in (MC.18.03.B21).

SM.103A.18AM1.413.18Revit Model

New �

ID: AR-FF-347 Page 1/1 Active-BOJV ��

Active-BIM �

Zone: MU_L3Active-PMC �

Resolved �

Stage Description By Date

BIM Team Assumption: Postponed Michael 16-Jul-2013

Coordination Meeting Action 1: Refer to dwg no. 280136 Silvia (TO) - Enji 25-Feb-2014

Coordination Meeting Action 2:Coordination Meeting Action 3: .

Page 14: BIM COORDINATION PORTOFOLIOOO

Stage Description By Date

BIM Team Assumption: Follow arch drawing and reduce the height of the structural beam. MOHAB MAGDY 20-Nov-2013

Coordination Meeting Action 1: Follow RFI no. (405076-1750) Ashraf Mounir -

Enji15-Jan-2014

Coordination Meeting Action 2: Refer to RFI – 405076-1750 rev A Abram Mohsen 17-Sep-2014

Page 15: BIM COORDINATION PORTOFOLIOOO

BIM Discrepancy Description: References: StatusConflict Between Arch DWG AM1.103.13 And Structural DWG SM1.103.13 in (MS.13.03.001)

AM1.103.13SM1.103.13

New �

ID: C0-CD- Page1 Active-BOJV �

Active-BIM ��

Zon MU-L3 Active-PMC �

Resolved �

Stage Description By DateBIM Team Assumption: mohab 05-Dec-2014

Coordination Meeting Action 1:

Issue to be solved between HVAC & Structure as discussed with Francois and Juan.

surnda-TO 26-Nov-2014

Coordination Meeting Action 2:

Check the openings with MEP since we will maintain only the ones needed (and in reasonable locations).

Ahmed amin .

Page 16: BIM COORDINATION PORTOFOLIOOO

BIM DiscrepancyDescription: References: Statusconflict between the structure drawings (SM2.322.03) and the roller shutter detail (AM6.955) at MP.12.03.002 , MP.13.03.003 , MP.13.03.001

SM2.322.03SM2.324.03AM6.955AM6.954

New �

ID: C0-CD-310 Page1 Active-BOJV TO �

Active-BIM Team �

Zon MU-L3 Active-PMC �

Resolved �

Stage Description By DateBIM Team Assumption: Postponed mohab 24-Feb-2013

Coordination Meeting Action 1: - -

The actual

concrete beam

Page 17: BIM COORDINATION PORTOFOLIOOO

BIM DiscrepancyDescription: References: StatusConflict in concrete level between structural plan DWG ( SM1.103)(+47.4) with the arch section (AM2.344)(+49.4)At the gridline ( S23)( fall arrest missing in design )

AM1.103SM1.103AM2.344

New �

ID: C0-CD-308 Page2/2 Active-BOJV TO �

Active-BIM Team �

Zone MU-L3 Active-PMC ��

Resolved �

Stage Description By Date

BIM Team Assumption: Follow structural Level and if follow arch DWG we must put handrail in N elev. because different level 1.50m M.Magdy 29-Nov-2013

Coordination Meeting Action 1: RFI-285062-1926 Dina – Salam– Mary (TO) 07-Jan-2015

Coordination Meeting Action 2: .

Page 18: BIM COORDINATION PORTOFOLIOOO

SAMPLES FOR CODING CLASHES

Page 19: BIM COORDINATION PORTOFOLIOOO

Coding DiscrepancyDescription: References: StatusMissing item in BOQNo foundation with 700mm thickness

in the BOQ

Book 2A – Bill 2 Part 1 - 2/1/2SM1.10G.19

Element ID: 4045565 NewID: 001 Pag

eActive-BOJV Active-BIM

Zone: BOQ Active-PMC

Resolved

Stage Description By Date

BIM Team Assumption: Assumed to be classified as ‘pad foundation’ (2/1/2/M) mohab 30-Apr-2013

Coordination Meeting Action 1: Confirmed samer 13-Jun-2014

Coordination Meeting Action 2: -

Coordination Meeting Action 3: -

Page 20: BIM COORDINATION PORTOFOLIOOO

Coding DiscrepancyDescription: References: StatusMissing item in BOQNo foundation with 2000mm

thickness in BOQ

Book 2A – Bill 2 Part 1 - 2/1/2SM5.451

Revit Element ID: 3632958 NewID: 002 Pag

eActive-BOJV Active-BIM

Zone: BOQ Active-PMC

Resolved

Stage Description By Date

BIM Team Assumption: Assumed to be ‘mat foundationof 1900mm’ (2/1/2/L) Mariam 30-Apr-2012

Coordination Meeting Action 1: Confirmed MOHAB 13-Jun-2014

Coordination Meeting Action 2: -

Coordination Meeting Action 3: -

Page 21: BIM COORDINATION PORTOFOLIOOO

SAMPLES FOR MANUAL COORDINATION USING 2D COORDINATION TECHINQUE USING XREF FILES IN

AUTOCAD AND LINKED TO REVIT.

Page 22: BIM COORDINATION PORTOFOLIOOO
Page 23: BIM COORDINATION PORTOFOLIOOO

The Progress Modeling & Coordination Status: