    PART G: BIODIESEL PLANT PROJECT

    1. Project Cost

    The estimated total investment of RM45,000,000-00, of which RM30,000,000.00 is required for the

    purchase of machinery and equipment and RM15,000,000.00 for projected cash flow as follow:

    Capital Required (RM`0000)

    No. Content Quantity UnitAmount

    (RM)Remarks

    A Land

    1Acquisition

    cost/premium10 Acres

    2 Filling/Leveling 10 Acres

    B Building Construction 2355

    1 Factory Plant 3500 Sq/m 875 RM250/sq/m2 Integrated Office 1000 Sq/m 400 RM400/sq/m

    3 R&D Center 800 Sq/m 480 RM600/sq/m

    4 Road & greening 8000 Sq/m 600 RM75/sq/m

    CMachinery &

    Equipment30,000

    1 Main Machine 3 set 26,200Shanghai / Wuxi /

    Hubei

    2 Auxiliary Equipment 3 set 1,750 China

    3Environmental

    protection equipment1 set 450 China

    4 Installation materials 400Pipes, valves,

    fittings

    5Water, electricity,

    steam equipment750

    Electricity, wiring,

    electrical

    appliances, boilers

    6 Installation costs 450Labor costs,

    machinery costs

    D Instrumentation 1,000

    1 Instrument equipment 450Shanghai, Wuxi,

    Shandong2 Detection equipment 250 Shanghai

    3 R & D 300 Germany

    E Support Facilities 320

    1Raw material storage

    tank2000 ton 700 Carbon steel

    2 Product Storage tank 1500 ton 750 Stainless steel

    3 Material Storage tank 500 ton 250 Carbon steel

    F Start-up costs 115Conference fees,travel expenses,

    business

  • 8/12/2019 Biofuel Plant Cost Analysis

    2/5

    G Licensing 200

    EIA, planning, fire

    safety, quality

    supervision

    H Cash flow 10,000

    The purchase of

    raw materials,

    materials, fuel, etc.

    Total 43,990

    BIODIESEL MACHINERY/EQUIPMENT LIST

    No. Name SpecificationQuanti

    ty

    Power/K

    WRemarks

    1 Washing pot 1900*3500 5 5.5

    2 Air Balance tank 600*1500 4 5.5

    3 Heater 15M2 8

    4 Rotameter BL-45-2000L 25

    Vacuum

    dehydrator6502500 2

    6 Water jet pump PLB180 2

    7 Concrete pond 200040000 3

    8Dehydrated oil

    storage tank19003500 1

    9Oil-water

    separator tank12001500 1 Stainless steel

    10 Enamel Reactor 6300L 12 7.5

    11 Methanoltank(High)

    1.21.21.2 3

    12 Oil tank (High) 1.21.21.2 1

    13 Sulfur tank (high) 12001200 2 L316

    14 Condenser 20M2 10 Stainless steel

    15 Condenser (last) 10 M2 2

    16Oil & Water

    Separator tank7

    17Spiral plate

    heater15 M

    2 1

    18 MethanolDistillation tower

    2 Stainless steel

    19 Condenser 30M2 10 Stainless steel

    20

    Methanol

    Intermediate

    storage tank

    30 5 18004000

    21

    Methyl

    temporary

    storage tank

    50 2 18004000

    22 Injection pump QPLB180 2

    23 Water circulationpump

    8 11

    24Other motor

    pump56 3 Explosion proof

  • 8/12/2019 Biofuel Plant Cost Analysis

    3/5

    2. Project Economic Analysis

    i) Estimated Cost Analysis

    No Item UnitUnit

    Price%

    Annual

    Quantity

    RM

    (`0000)Tax

    A Raw Material 64,4931 Waste Oil tons 1500 34500 51,075

    2 Methanol tons 1100 16% 5520 6,072

    3 Sulfuric Acid tons 300 3% 1035 311

    4 Alkali tons 1150 1% 345 397

    5 Catalyst tons 2000 0.2% 69 138

    6Hydrogen

    Peroxidetons 650 30% 10,000 6,500

    B Power & Fuel 2621 Electricity Ton/M 230 1140 262

    2 Water Ton/M

    3 Coal Ton/M

    C EmployeeWage

    900/

    mth324 30 persons

    D Finance costs -

    E AdminExpenses

    3,306

    1

    Depreciation

    &amortization

    3,000

    Depreciation

    10 yrs. (10%p.a.)

    2Employee

    (EPF)324*15% 49 15%

    3 Unions funds 324*2% 7 2%

    4Pension

    Insurance-

    5Others

    Expenses250

    F Cost of Sales 9901%on Sales

    Revenue

    G Total Cost 69,375

    HSales

    Revenue99,000

    1 Biodiesel ton 3,300 85% 30,000 99,000

    ii) Profit & Loss Analysis

    Item RM(`0000) Remarks

    A) Sales Revenues 99,000 Exclude Sales TaxLessProduction Cost 64,493

    Value added Tax -

    B) Sales Profits 34,507Less

  • 8/12/2019 Biofuel Plant Cost Analysis

    4/5

    Selling expenses 1,576

    Management fees & others 3,306

    Finance cost -

    C) Total Profit 29,625LessIncome Tax 7,406 25%

    D)Net Profits 22,218

    The above estimates based on the Current Market Price.

    ***************************************************************************

    Profit and Loss & Cash Flow Projection (Trading)

    i) Projected Profit & Loss (240 tons/day)

    Item (RM`000) RemarksA) Sales Revenues 792

    LessProduction Cost 621.05

    B) Sales Profits 171

    LessSelling expenses 8

    Management fees & others 3.44

    Finance cost -

    C) Total Profit 160

    LessIncome Tax 40 25%

    D) Net Profits 120ii) Projected Cost Analysis (200 tons/Day)

    No Item UnitUnit

    Price% Quantity RM (`000) Tax

    A Raw Material 620 -1 Biodiesel tons 2400 31200 480

    2 Methanol tons 1100 - - - -

    3 Sulfuric Acid tons 300 3% - - -

    4 Alkali tons 1200 1% - - -

    5 Catalyst tons 3500 20% 40 140 -

    6Hydrogen

    Peroxidetons 750 30% - -

    B Power & Fuel 0.7 -1 Electricity Ton/M 230 3 0.7 -

    2 Water Ton/M 0.30 - - -

    3 Coal Ton/M - - - -

    C Employee

    Wage

    900/

    month

    0.35 10 person

    D Finance costs -

    E AdminExpenses

    3.44

  • 8/12/2019 Biofuel Plant Cost Analysis

    5/5

    1

    Depreciation

    &

    amortization

    9,000 2.90Depreciation

    10 yrs. (10%)

    2Employee

    welfare0.35*10% 0.04 15%

    3 Unions funds 0.35*1% 0.0004 1%

    4Pension

    Insurance-

    5Others

    Expenses0.50

    F Cost of Sales 81%on Sales

    Revenue

    G Total 632.5

    HSales

    Revenue792

    1 Biodiesel ton 3,300 240 792

    Remarks:

    The Net Profit of RM120,000-00 per day (RM3.12 million per month) is relatively high and good

    investment project which has edged over most of the industry. The Returned on Investment shall be short

    and is expected in 3 months period.

    PART H: SWOT ANALYSIS

    -----------. .. ..