biofuel plant cost analysis
TRANSCRIPT
-
8/12/2019 Biofuel Plant Cost Analysis
1/5
PART G: BIODIESEL PLANT PROJECT
1. Project Cost
The estimated total investment of RM45,000,000-00, of which RM30,000,000.00 is required for the
purchase of machinery and equipment and RM15,000,000.00 for projected cash flow as follow:
Capital Required (RM`0000)
No. Content Quantity UnitAmount
(RM)Remarks
A Land
1Acquisition
cost/premium10 Acres
2 Filling/Leveling 10 Acres
B Building Construction 2355
1 Factory Plant 3500 Sq/m 875 RM250/sq/m2 Integrated Office 1000 Sq/m 400 RM400/sq/m
3 R&D Center 800 Sq/m 480 RM600/sq/m
4 Road & greening 8000 Sq/m 600 RM75/sq/m
CMachinery &
Equipment30,000
1 Main Machine 3 set 26,200Shanghai / Wuxi /
Hubei
2 Auxiliary Equipment 3 set 1,750 China
3Environmental
protection equipment1 set 450 China
4 Installation materials 400Pipes, valves,
fittings
5Water, electricity,
steam equipment750
Electricity, wiring,
electrical
appliances, boilers
6 Installation costs 450Labor costs,
machinery costs
D Instrumentation 1,000
1 Instrument equipment 450Shanghai, Wuxi,
Shandong2 Detection equipment 250 Shanghai
3 R & D 300 Germany
E Support Facilities 320
1Raw material storage
tank2000 ton 700 Carbon steel
2 Product Storage tank 1500 ton 750 Stainless steel
3 Material Storage tank 500 ton 250 Carbon steel
F Start-up costs 115Conference fees,travel expenses,
business
-
8/12/2019 Biofuel Plant Cost Analysis
2/5
G Licensing 200
EIA, planning, fire
safety, quality
supervision
H Cash flow 10,000
The purchase of
raw materials,
materials, fuel, etc.
Total 43,990
BIODIESEL MACHINERY/EQUIPMENT LIST
No. Name SpecificationQuanti
ty
Power/K
WRemarks
1 Washing pot 1900*3500 5 5.5
2 Air Balance tank 600*1500 4 5.5
3 Heater 15M2 8
4 Rotameter BL-45-2000L 25
Vacuum
dehydrator6502500 2
6 Water jet pump PLB180 2
7 Concrete pond 200040000 3
8Dehydrated oil
storage tank19003500 1
9Oil-water
separator tank12001500 1 Stainless steel
10 Enamel Reactor 6300L 12 7.5
11 Methanoltank(High)
1.21.21.2 3
12 Oil tank (High) 1.21.21.2 1
13 Sulfur tank (high) 12001200 2 L316
14 Condenser 20M2 10 Stainless steel
15 Condenser (last) 10 M2 2
16Oil & Water
Separator tank7
17Spiral plate
heater15 M
2 1
18 MethanolDistillation tower
2 Stainless steel
19 Condenser 30M2 10 Stainless steel
20
Methanol
Intermediate
storage tank
30 5 18004000
21
Methyl
temporary
storage tank
50 2 18004000
22 Injection pump QPLB180 2
23 Water circulationpump
8 11
24Other motor
pump56 3 Explosion proof
-
8/12/2019 Biofuel Plant Cost Analysis
3/5
2. Project Economic Analysis
i) Estimated Cost Analysis
No Item UnitUnit
Price%
Annual
Quantity
RM
(`0000)Tax
A Raw Material 64,4931 Waste Oil tons 1500 34500 51,075
2 Methanol tons 1100 16% 5520 6,072
3 Sulfuric Acid tons 300 3% 1035 311
4 Alkali tons 1150 1% 345 397
5 Catalyst tons 2000 0.2% 69 138
6Hydrogen
Peroxidetons 650 30% 10,000 6,500
B Power & Fuel 2621 Electricity Ton/M 230 1140 262
2 Water Ton/M
3 Coal Ton/M
C EmployeeWage
900/
mth324 30 persons
D Finance costs -
E AdminExpenses
3,306
1
Depreciation
&amortization
3,000
Depreciation
10 yrs. (10%p.a.)
2Employee
(EPF)324*15% 49 15%
3 Unions funds 324*2% 7 2%
4Pension
Insurance-
5Others
Expenses250
F Cost of Sales 9901%on Sales
Revenue
G Total Cost 69,375
HSales
Revenue99,000
1 Biodiesel ton 3,300 85% 30,000 99,000
ii) Profit & Loss Analysis
Item RM(`0000) Remarks
A) Sales Revenues 99,000 Exclude Sales TaxLessProduction Cost 64,493
Value added Tax -
B) Sales Profits 34,507Less
-
8/12/2019 Biofuel Plant Cost Analysis
4/5
Selling expenses 1,576
Management fees & others 3,306
Finance cost -
C) Total Profit 29,625LessIncome Tax 7,406 25%
D)Net Profits 22,218
The above estimates based on the Current Market Price.
***************************************************************************
Profit and Loss & Cash Flow Projection (Trading)
i) Projected Profit & Loss (240 tons/day)
Item (RM`000) RemarksA) Sales Revenues 792
LessProduction Cost 621.05
B) Sales Profits 171
LessSelling expenses 8
Management fees & others 3.44
Finance cost -
C) Total Profit 160
LessIncome Tax 40 25%
D) Net Profits 120ii) Projected Cost Analysis (200 tons/Day)
No Item UnitUnit
Price% Quantity RM (`000) Tax
A Raw Material 620 -1 Biodiesel tons 2400 31200 480
2 Methanol tons 1100 - - - -
3 Sulfuric Acid tons 300 3% - - -
4 Alkali tons 1200 1% - - -
5 Catalyst tons 3500 20% 40 140 -
6Hydrogen
Peroxidetons 750 30% - -
B Power & Fuel 0.7 -1 Electricity Ton/M 230 3 0.7 -
2 Water Ton/M 0.30 - - -
3 Coal Ton/M - - - -
C Employee
Wage
900/
month
0.35 10 person
D Finance costs -
E AdminExpenses
3.44
-
8/12/2019 Biofuel Plant Cost Analysis
5/5
1
Depreciation
&
amortization
9,000 2.90Depreciation
10 yrs. (10%)
2Employee
welfare0.35*10% 0.04 15%
3 Unions funds 0.35*1% 0.0004 1%
4Pension
Insurance-
5Others
Expenses0.50
F Cost of Sales 81%on Sales
Revenue
G Total 632.5
HSales
Revenue792
1 Biodiesel ton 3,300 240 792
Remarks:
The Net Profit of RM120,000-00 per day (RM3.12 million per month) is relatively high and good
investment project which has edged over most of the industry. The Returned on Investment shall be short
and is expected in 3 months period.
PART H: SWOT ANALYSIS
-----------. .. ..