Chapter 10: Biomass
Handling System
Mech 4840 Jake Young
Steam Plant B00451186
Engineering October 2, 2009
![Page 2: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/2.jpg)
Why is the Handling System so
important?
• Metering the fuel feed system is an important aspect of the biomass gasification plant because it is used to control the entire process.
• The handling system controls the flow rate of fuel into the gasifier. If the flow is variable then the gasifier will not maintain the desired temperatures and will not be as efficient.
![Page 3: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/3.jpg)
The problem
• Unlike liquids, the biomass solids do not deform under shear stresses (causes jamming) and this is why the storage and handling of biomass is so important.
• Reasons for many shutdown incidents of biomass gasifier plants can be traced to the failure of the biomass handling system.
• Some biomass contains rocks and other debris when it arrives at the plant.
![Page 4: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/4.jpg)
Biomass Handling System
• The Biomass Handling System can be
broken down into 5 stages:
– Biomass receiving
– First Stage Screening (Optional)
– Storage
– Feed preparation
– Conveying
– Feeding
![Page 5: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/5.jpg)
Biomass Receiving
• The Biomass is first transported via truck
or rail-car and unloaded at the receiving
station.
![Page 6: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/6.jpg)
First Stage Screening (optional)
• Sometimes depending on the type of
biomass there is a first stage screening to
remove foreign materials.
![Page 7: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/7.jpg)
Storage
• Once received (or screened) the biomass
is transported by conveyor belt to one of
the 2 types of storage types:
– Above ground storage for large biomass
– Silo or bunker for enclosed storage of smaller
biomass.
![Page 8: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/8.jpg)
Above Ground Storage
![Page 9: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/9.jpg)
Silo or Bunker Storage
![Page 10: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/10.jpg)
Retrieval from Storage
• The following are some methods of biomass
retrieval from storage
– Simple gravity feed or chute
– Screw type auger feed
– Conveyor belt
– Pneumatic blower
– Pumped flow
– Bucket conveyor
– Front loader
– Bucket grab
![Page 11: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/11.jpg)
Feed Peparation
• Once retrieved the biomass is transported to the Feed Preparation System because biomass can not be fed directly into the gasifier for the following reasons– Presence of foreign materials like rocks and metals
– Unacceptable level of moisture in biomass
– Too large (or uneven) in size
• The feed preparation process consists of– Screening
– Drying
– Sizing
![Page 12: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/12.jpg)
Screening
• The most common foreign materials that must
be removed are:
– Stones
– Ferrous metals like iron
– Non-ferrous metals like aluminum
• This is why there is a screening (possibly
second) process that consists of
– De-stoner
– Non-ferrous metal separators
– Magnetic metal separation
![Page 13: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/13.jpg)
De-stoner
• The purpose of a de-stoner is to separate
heavier-than-biomass materials like glass,
stones and metals.
• Typically use vibratory actions in series
with airflow to separate materials
according to specific gravity.
![Page 14: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/14.jpg)
Non-Ferrous Metal Separators
• Uses an eddy current to separate
according to specific mass and resistivity
![Page 15: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/15.jpg)
Magnetic Metal Separation
• Use powerful magnets for separation of
iron and other magnetic materials.
![Page 16: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/16.jpg)
Drying
• Freshly cut biomass can contain up to 40-60%
surface moisture and a gasification process
typically requires moisture to be less than 10-
15%.
• Use heat in the flue gas or external sources of
heat to reduce moisture levels.
• If moisture is not removed then the gasifier can
not reach high enough temperatures and the
efficiency of the plant is decreased.
![Page 17: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/17.jpg)
Sizing
• Typical equipment that are used for cutting
biomass into different sizes.
– Chunker: 250 to 50 mm
– Chipper: 50 to 5 mm
– Grinder: <80 mm
– Pulverizer: dust <100 micrometers
![Page 18: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/18.jpg)
Conveying
• Once the biomass prepared, it is then
transported to the hopper which gravity
feeds the feeder.
![Page 19: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/19.jpg)
Hopper
![Page 20: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/20.jpg)
6 Main Types of Feeders
• Gravity Chute
• Screw Conveyor
• Pneumatic Injection
• Rotary Spreader
• Moving Hole Feeder
• Belt Feeder
![Page 21: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/21.jpg)
Gravity Chute
![Page 22: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/22.jpg)
Screw Conveyor
![Page 23: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/23.jpg)
Pneumatic Injection
![Page 24: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/24.jpg)
Rotary Spreader
![Page 25: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/25.jpg)
Moving Hole Feeder
![Page 26: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/26.jpg)
Belt Feeder
![Page 27: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/27.jpg)
Mode of Fuel Injection in Fluidized Beds
• Over-Bed System – handles coarser particles
• Under-Bed System – handles fine particles
![Page 28: Biomass handling system](https://reader033.vdocument.in/reader033/viewer/2022051514/54bd268f4a79592b308b4595/html5/thumbnails/28.jpg)
References
• Google Images
• Chapter 10: Biomass Handling System by
Dr. Basu