Biomass plant

2024CRICKPRIMARY SCHOOL SITE PLAN1:1250JAN 12AD D0185AProperty Asset Management

ECMT-W4

CRICK PRIMARY SCHOOLBIOMASS BOILER

LOCATION1:1250

JUL 14

RB

D0185A-Z3

Property Asset Management

Page 2: Biomass plant - Northamptonshire County Council elections · Poujoulat UK Ltd Unit 1 Quadrum Park, Old Portsmouth Road, Guildford, Surrey, GU3 1LU Tel: 01483 461 700 Fax: 01483 533

Biomass plant

2024CRICKPRIMARY SCHOOL SITE PLAN1:1250JAN 12AD D0185AProperty Asset Management

ECMT-W4

CRICK PRIMARY SCHOOLBIOMASS BOILER

SITE PLAN1:100

MAY 14

RB

D0185A-Z1

Property Asset Management

Page 3: Biomass plant - Northamptonshire County Council elections · Poujoulat UK Ltd Unit 1 Quadrum Park, Old Portsmouth Road, Guildford, Surrey, GU3 1LU Tel: 01483 461 700 Fax: 01483 533

2024CRICKPRIMARY SCHOOL SITE PLAN1:1250JAN 12AD D0185AProperty Asset Management

ECMT-W4

CRICK PRIMARY SCHOOLEXISTING PLAN

SITE PLAN1:100

JUL 14

RB

D0185A-Z2

Property Asset Management

Page 4: Biomass plant - Northamptonshire County Council elections · Poujoulat UK Ltd Unit 1 Quadrum Park, Old Portsmouth Road, Guildford, Surrey, GU3 1LU Tel: 01483 461 700 Fax: 01483 533

DRAWN BY

DATE

DRAWING No.

ashwellbiomass solutions

A3

PROJECT

TITLE

SCALE

DIMENSION UNITS

Unit 12, 35 Pinfold Road,Thurmaston, Leicester,LE4 8ATT: 0116 260 4050W: www.ashwellbiomass.com

REVISION

PROPOSED BIOMASS LAYOUT

CRICK PRIMARY SCHOOL

N.T.S. A.S. with RB image inclusion

mm 04/08/2014

TENDER CRICK L1 2

PLAN

SIDE ELEVATION

PELLET FILL PIPE

CLAD TO REDWOOD/CEDARPELLET STORE

800L EXPANSION VESSEL

8800

2890

6000

1200900

1200

END ELEVATION ( ' A ' )

1250

CL 100mm

IMPACT MAT (1500 WIDEx 1250 HIGH)

GUY WIRES

KWB USV D 80 BOILERPRESSURISATION UNIT2000L BUFFER TANK

ø200 FLUE

SERVICESENTRYPOINT

DIST'NBOARD

1500

800

2580

VENT/FILTER

INTERNAL ACCESSDOOR

2890

2890

2580

6000

Page 5: Biomass plant - Northamptonshire County Council elections · Poujoulat UK Ltd Unit 1 Quadrum Park, Old Portsmouth Road, Guildford, Surrey, GU3 1LU Tel: 01483 461 700 Fax: 01483 533

Legend

Project ZECOS

Status PLANNING

Title

CRICK PRIMARYSCHOOL BIOMASS BOILER PHOTOMONTAGE

Scale Not to scale

Prepared by RB

Checked by JS

Date 04/08/2014

Fig no. W-Z-CR5

Job no. J30

Revision 0

Page 6: Biomass plant - Northamptonshire County Council elections · Poujoulat UK Ltd Unit 1 Quadrum Park, Old Portsmouth Road, Guildford, Surrey, GU3 1LU Tel: 01483 461 700 Fax: 01483 533

CHIMNEY HEIGHT CALCULATION

According to the 3rd Edition (1981) of the 1956 Clean Air Act Memorandum

PROJECT NUMBER

PROJECT REFERENCE

boiler Note: input data in grey cells

BIOMASS

95

94%

17

0.07%

21.4

0.9

4.4

B

1

Building 1 Height (m) 3 Width (m) 15

CALCULATED FINAL CHIMNEY HEIGHT ABOVE GROUND LEVEL (m) 3.5

DISTRICT REFERENCE

APPLIANCE TYPE

UNCORRECTED HEIGHT (m)

NUMBER OF BUILDING(S)

RADIUS OF CONSIDERATION (m)

MAX RATE OF COMB (kg/h)(m3/h)

CALORIFIC VALUE (MJ/kg)(MJ/m3)

APPLIANCE OUTPUT (kW)

Poujoulat UK Ltd

Unit 1 Quadrum Park, Old Portsmouth Road, Guildford, Surrey, GU3 1LU

Tel: 01483 461 700 Fax: 01483 533 435

SCOPE OF THIS SPREADSHEET:

• Takes account of plant burning fuel with gross heat input between 150kW and 150MW

• Takes account of adjacent / neighbouring buildings (max 8 including attached building)

• Calculations for fuels with very low sulphur (VLS) content (i.e. less than 0.04%) and other fuels (i.e. above 0.2%)

Where more than one fuel may be used, calculations should be carried out for each and the greatest resulting height adopted.

In any cases where fuel is in the range 0.04% - 0.2% of S. a similar procedure of performing both calculations should be followed.

The final chimney height must meet the following requirements and should otherwise be increased appropriately:

• It will terminate at least 3m above any area to which there is general access (e.g. roof areas, opening windows or ground level)

• It must be approved by the local Environmental Authorities.

TARGET EFFLUX VELOCITY:

Boilers up to 2.2 MW: 6m/s at full load

Boilers up to 9 MW with induced draught fans: 7.5m/s at full load

Boilers up to 135 MW: 15m/s

9 MW < OUTPUT < 135 MW: pro rata

680

Crick

Partially developed area with scattered houses

FUEL TYPE

APPLIANCE EFFICIENCY (%)

SULPHUR CONTENT (% of Mass)