Page 1: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

QuickTime™ and a decompressor

are needed to see this picture.

BIORETENTION IN RIVERWOODS

An RPC Project Proposal

November 16, 2010

Page 2: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

2QuickTime™ and a decompressor

are needed to see this picture.

BIORETENTIONBIOSWALESRAIN GARDENS ETC…….

Page 3: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

3QuickTime™ and a decompressor

are needed to see this picture.

Bioretention

• Treatment of stormwater – Ground depression– Conditioned soil bed– Plant Materials

• Objectives– Stormwater runoff management– Hydrology restoration– Pollutant reduction– Aesthetic variation and native plant restoration

Page 4: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

4QuickTime™ and a decompressor

are needed to see this picture.

Design Considerations

• Drawdown within 24-48 hours• 1-3 ft above Groundwater• Underlying Infiltration Rates• Soil Augmentation• Underdrain• Pollutant Hotspots

(Source: Baxter Woodman)

Page 5: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

5QuickTime™ and a decompressor

are needed to see this picture.

RPC Role

• Act as a focal point and champion bioretention within the Village

• Build upon the Village’s initial rain garden efforts

• If proven appropriate, help define and support…– a Village policy and support program– property owner education

Page 6: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

6QuickTime™ and a decompressor

are needed to see this picture.

Bioretention Project - Phase 1

• Demonstration cells (4)• Permissions and cooperation• Requirements and costs• Measurements• Grant availability, corporate support?• Implementation plan

Page 7: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

7QuickTime™ and a decompressor

are needed to see this picture.

Bioretention Project - Phase 2

• Obtain volunteer and financial assistance• Develop the four sites• Conduct the evaluation• Propose policies and programs

Page 8: BIORETENTION IN RIVERWOODS An RPC Project Proposal November 16, 2010

8QuickTime™ and a decompressor

are needed to see this picture.

Current Requests

• Continue to endorse bioretention• Confirm the RPC role• Acknowledge the project plan• Cooperation:

– Easements– Resident communication– Etc.