    QUALITY CONTROL CHECKLISTS

    FOR

    CONSTRUCTIONWORK

    PREPARED BY: BIRLA AIRCON INFRASTRUCTURE PRIVATE

    LIMITED

    SHRIRAM SIGNIAA PROJECT

  • 8/12/2019 Birla Check

    2/31

    TABLE OF CONTENTS

    CHECKLIST FOR SURVEYING................................................................................................................1

    CHECKLIST FOR EARTHWORKS - EXCAVATION............................................................................2

    CHECKLIST FOR EARTHWORKS - BACKFILLING...........................................................................3

    CHECKLIST FOR ANTI-TERMITE TREATMENT ..............................................................................4

    CHECKLIST FOR PLAIN CEMENT CONCRETE.................................................................................5

    CHECKLIST PRIOR TO CONCRETING.................................................................................................

    .........................................................................................................................................................................

    CHECKLIST AFTER CONCRETING.......................................................................................................!

    CHECKLIST FOR CONCRETE BLOCK MASONRY............................................................................"

    CHECKLIST FOR CUTTING# BEN$ING % FIXING OF HYS$ REINFORCEMENT.....................&

    CHECKLIST FOR FORMWORK 'SHUTTERING( $ESIGN .............................................................1)

    CHECKLIST FOR SHUTTERING ASSEMBLY....................................................................................11

    CHECKLIST FOR SHUTTERING AFTER REMOVAL OF SHUTTERS..........................................12

    CHECKLIST FOR PLASTERING............................................................................................................13

    CHECKLIST AFTER PLASTERING.......................................................................................................14

    CHECKLIST FOR TILING........................................................................................................................15

    CHECKLIST FOR TILING $A$O % SKIRTING..................................................................................1

    CHECKLIST FOR PLASTIC EMULSION PAINT.................................................................................1!

    CHECKLIST FOR WATERPROOF CEMENT PAINT.........................................................................1"

    CHECKLIST FOR FIXING ALUMINIUM $OORS...............................................................................1&

    CHECKLIST FOR WATER PROOFING ...............................................................................................2)

    INCOMING MATERIAL INSPECTION REPORT FOR CEMENT....................................................21

    INCOMING MATERIAL INSPECTION REPORT FOR CERAMIC*MOSAIC TILES....................22

    INCOMING MATERIAL INSPECTION REPORT FOR COARSE AGGREGATES........................23

    INCOMING MATERIAL INSPECTION REPORT FOR FINE AGGREGATES...............................24

    INCOMING MATERIAL INSPECTION REPORT FOR $OORS % WIN$OWS.............................25

  • 8/12/2019 Birla Check

    3/31

    INCOMING MATERIAL INSPECTION REPORT FOR SOLI$ CEMENT CONCRETE BLOCKS

    ........................................................................................................................................................................2

    INCOMING MATERIAL INSPECTION REPORT FOR STRUCTURAL STEEL............................2!

    INCOMING MATERIAL INSPECTION REPORT FOR REINFORCEMENT STEEL....................2"

  • 8/12/2019 Birla Check

    4/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR SURVEYING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Identification of REFERENCE BASE LINES & PERMANENT

    BENCMAR!S

    ". E#ta$%i#'ent of S(B)BASE LINES and BENCMAR!S. I# it a#

    *er dra+ing#,

    -. Cec for MAR!IN/ OF BM#0 CL# & /RIDLINES on #r2e3

    *i%%ar#. I# it a# *er #*ecification#,

    4. Cec for PROTECTION of S(R5E6 PILLAR. I# it O!,

    7. E#ta$%i#'ent of $%oc %e2e%# 819' 19' grid;. I# it O!,

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Surveying

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    5/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR EARTHWORKS - EXCAVATION

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. I# te AREA to $e eca2ated c%ean and c%eared of a%% o$#trction#,

    ". I# te LA6O(T0 ALI/NMENT AND SIE of Eca2ation 'ared

    on te grond a# *er eca2ation *%an,

    -. Are adeate OR!IN/ SPACES *ro2ided a%% rond,

    4. Cec +eter FO(NDIN/ STRATA i# #ita$%e for %a3ing PCCi.e.0 free fro' an3 #oft *ocet#. 8if NO0 re'o2e #oft *ocet# and fi%%

    +it Lean ConcreteSand;

    7. Cec for DRESSIN/ of te eca2ated area. I# it O!,

    =. Cec for DEATERIN/ of +ater%ogged area. I# it O!,

    . Cec for DISPOSAL of eca2ated eart to #*ecified area.

    . Cec +eter BARRICADIN/ & CA(TION SI/NS are *ro2ided

    for dee* eca2ation#.

    19. Are GOINT INSPECTION RECORDS co'*%ete

    ORI/INAL /RO(ND LE5EL: FO(NDIN/ LE5EL: DEPT OF EHCA5ATION:

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Excavation

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    6/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR EARTHWORKS - BACKFILLING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec +eter APPRO5ED (ALIT6 SOIL i# $eing #ed for

    $acfi%%ing, I# it O!,

    ". I# $acfi%%ing $eing done in LA6ERS0 a# #*ecified,

    -. Cec +eter te $acfi%% i# ATERED #fficient%3,

    4. Cec +eter COMPACTION i# $eing done0 a# #*ecified,

    7. I# $acfi%%ing done *to SPECIFIED LE5EL,

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Backfilling

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    7/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR ANTI-TERMITE TREATMENT

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.N, $/0, YES NO NA

    1. Cec +eter eart+or# for te area to $e treated are COMPLETE,

    ". I# te area to $e treated i# in DR6 condition,

    -. I# te %oo#e eart re'o2ed fro' te area and 'ade CLEAN,

    4. I# te CEMICAL $eing #ed 'atcing +it te #*ecification#,

    7. Cec for CONCENTRATION of ce'ica% e'%#ion. I# it O!,

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Anti-Termite Treatment

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    8/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR PLAIN CEMENT CONCRETE

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    BEFORE CONCRETING

    1. Cec for co'*%etion of *receding acti2itie# for te area to $e

    co'*%eted

    ". Cec for for'+or and di'en#ion#, I# it O!,

    $URING CONCRETING1. Cec for 'i *ro*ortion. I# it a# #*ecified,

    ". Cec for *%ace'ent & co'*action. I# it O!,

    -. Cec for fini#ed %e2e%. I# it a# #*ecified,

    4. Cec for #rface fini#. I# it acce*ta$%e,

    AFTER CONCRETING

    1. Cec for cring. I# it O!,

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Plain Cement Concrete

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    9/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST PRIOR TO CONCRETING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for c%ean%ine## of te area to $e concreted. I# it O!,

    ". Cec for for'+or and reinforce'ent a# *er re%e2ant cec%i#t#.

    -. Cec for co'*%etion of oter *receding acti2itie# #c a# fiing ofin#ert# & e'$ed'ent# and #er2ice condit# etc.

    4. Cec for #**ort# to for'# and rigidit3 of te a##e'$%3. I# it O!,

    7. Cec for *ro2i#ion of acce## *%atfor'# & +a%+a3#.

  • 8/12/2019 Birla Check

    10/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST AFTER CONCRETING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for #ita$%e cring arrange'ent#.

    ". I# adeate cring $eing en#red for #*ecified *eriod,

    -. Cec for e*o#ing of in#ert# and e'$ed'ent# tat are f%# +it

    te concrete #rface.

    4. Cec for 'aring of %ocation of #er2ice condit# & fitting# +ere

    a**%ica$%e.

    7. Cec for correcti2e action on #rface defect# on e*o#ed concrete.

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Concreting

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    11/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR CONCRETE BLOCK MASONRY

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. A2ai%a$i%it3 of $%oc# a# *er dai%3 reire'ent#. I# it O!,

    ". C%eaning of +or# area off %oo#e 'ortar0 concrete de$ri# etc.

    -. Cec for a%ign'ent & %ocation of concrete $%oc 'a#onr3. I# it a#

    #*ecified in te con#trction dra+ing#

    4. Cec for #ita$i%it3 & #afet3 of #caffo%ding. I# it acce*ta$%e,

    7. Cec for 'oi#tring of concrete $%oc# $efore *%acing.

  • 8/12/2019 Birla Check

    12/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR CUTTING# BEN$ING % FIXING OF HYS$

    REINFORCEMENT

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. I# te BAR BENDIN/ SCED(LE *re*ared

    ". I# te Bar Bending Sced%e a2ai%a$%e for reference,

    -. Cec for correct C(TTIN/ & BENDIN/ OF BARS a# *er BBS.

    -.1 BAR DIAMETERS

    -." SAPES OF BARS

    -.- DIMENSIONS OF BARS

    -.4 N(MBER OF BARS

    4. Cec for CLEANLINESS of Bar#.

    7. Cec for correct FIHIN/ OF BARS a# *er Con#trction Dra+ing#.

    7.1 Re%ati2e *o#ition# of $ar#0 #*acing of $ar#

    7." Co2er# for reinforce'ent

    7.- Pro2i#ion of cair#0 co2er $%oc# & #*acer#

    7.4 La* %engt# & %ocation of %a*#

  • 8/12/2019 Birla Check

    13/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR FORMWORK 'SHUTTERING( $ESIGN

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. I# a STR(CT(RE)SPECIFIC S(TTERIN/ SCEME de#igned,

    ". I# te #ttering #ce'e 2erified for S(ITABILIT6 & SAFET6,

    -. Are S!ETCES #o+ing te a**ro2ed #ttering #ce'e a2ai%a$%e

    for reference,4. Cec for P6SICAL CONDITION of #caffo%d# and #tter#. Are

    da'aged and defecti2e e%e'ent# re'o2ed,

    7. Cec for CLEANLINESS of for'#. I# it acce*ta$%e,

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Shuttering !esign

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    14/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR SHUTTERING ASSEMBLY

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for A##e'$%3 of Scaffo%d# and Stter#

    ". Cec for Pro2i#ion and Arrange'ent of te fo%%o+ing:

    ".1 PROPS

    "." ADG(STABLE SPANS

    ".- CLAMPS & CO(PLERS

    ".4 CANNELS

    ".7 PIPES

    -. Cec for *ro2i#ion and arrange'ent of:

    -.1 PL6OOD OR TIMBER FORMS

    4. Cec for RI/IDIT6 of A##e'$%ed For'#

    7. Cec for CONFORMANCE of te A##e'$%ed For'# to

    DIMENSIONS0 SAPES0 LINES & /RADES

  • 8/12/2019 Birla Check

    15/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR SHUTTERING AFTER REMOVAL OF

    SHUTTERS

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for re'o2a% of Stter For'# & Scaffo%d# after SPECIFIEDD(RATION.

    ". Cec E*o#ed Srface# of Concrete for te *o##i$%e occrrence of

    te fo%%o+ing #rface defect#:

    ".1 ONE6 COMBIN/

    "." LOSS OF /RO(T

    ".- B(L/IN/

    ".4 RO(/ CORNERS OR ED/ES

    ".7 BI/ SIED AIR B(BBLES

    IF YES6# THEN ENGINEER IN-CHARGE SHALL TAKE

    SUITABLE CORRECTIVE ACTION AN$ RECHECK

    -. Cec for REPAIR & FINISIN/ of E*o#ed Concrete Srface. I#

    it #ati#factor3,

    4. Cec for CLEANIN/ of #caffo%d# & #tter# after re'o2a%.

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Shuttering After "emoval

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    16/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR PLASTERING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for co'*%etion of *receding acti2itie# %ie fiing of #er2ice

    condit#0 +ater #**%3 & #anitation %ine#0 etc.

    ". Cec for raing of 'a#onr3 Joint# and acing on RCC #rface#.

    -. Cec for #ita$i%it3 & #afet3 of #caffo%ding.

    4. Cec for 'ortar 'i *ro*ortion.

    7. Cec for te addition of +ater*roofing co'*ond0 if #*ecified.

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Plastering

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    17/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST AFTER PLASTERING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for tre %e2e% #rface and #'ootne## of *%a#ter.

    ". Cec for #traigt edge#.

    -. Cec for rigt ang%e# and *%'$.

    4. Cec for re'o2a% of dead 'ortar and de$ri#.

    7. Cec for #ea%ing of o*ening# in 'a#onr3 for #caffo%d#.

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Plastering

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    18/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR TILING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for c%ean%ine## of $a#e #rface. I# %oo#e 'ortar & de$ri#

    re'o2ed fro' te +or area,

    ". Cec for co'*%etion of *receding acti2itie# %ie fiing of door#0

    *artition#0 fa%#e cei%ing etc.

    -. Cec for %e2e%%ing of irreg%aritie# on $a#e #rface.

    4. Cec for *ro2i#ion of #er2ice condit#0 Jnction $oe#0 etc.

    7. I# te a**ro2ed *attern of %a3ing a2ai%a$%e for reference.

  • 8/12/2019 Birla Check

    19/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR TILING $A$O % SKIRTING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for raing of 'a#onr3 Joint# & acing on RCC #rface#.

    ". Cec for c%eaning & +a#ing of +a%%#.

    -. Cec for co'*%etion of *receding acti2itie# %ie fiing of door# &+indo+#0 #er2ice condit#0 #anitar3 fitting# etc.

    4. I# te a**ro2ed *attern of fiing of ti%e# a2ai%a$%e,

    7. Cec for 'ortar 'i *ro*ortion. I# it a# #*ecified,

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for Tiling

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    20/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR PLASTIC EMULSION PAINT

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    PRIOR TO PAINTING

    1. Are 'anfactrer# #*ecification# for *ainting a2ai%a$%e forreference.

    ". A2ai%a$i%it3 of a**ro2ed #ade detai%#.

    -. Cec for c%eaning of +a%% & cei%ing #rface. I# it free fro' dead

    'ortar0 dirt0 d#t0 a%gae0 grea#e etc.

    4. Cec for fi%%ing of *it# or nd%ation# in te *%a#ter

    7. Cec for #ita$i%it3 & #afet3 of #caffo%ding.

  • 8/12/2019 Birla Check

    21/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR WATERPROOF CEMENT PAINT

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    PRIOR TO PAINTING

    1. Are 'anfactrer# #*ecification# for *ainting a2ai%a$%e for

    reference.

    ". A2ai%a$i%it3 of a**ro2ed #ade detai%#.

    -. Cec for c%eaning of +a%% & cei%ing #rface. I# it free fro' dead'ortar0 dirt0 d#t0 a%gae0 grea#e etc.

    4. Cec for fi%%ing of *it# or nd%ation# in te *%a#ter

    7. Cec for #ita$i%it3 & #afet3 of #caffo%ding.

  • 8/12/2019 Birla Check

    22/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR FIXING ALUMINIUM $OORS

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. I# te in#*ection 'ateria% for te t3*e of te door a2ai%a$%e,

    ". Cec for *%'$ for te doorfra'e +.r.t. 'a#onr3 o*ening.

    -. Cec for fa#tening of door fra'e# to +a%%# $3 #cre+#

    4. Cec for te *ro2i#ion and *ro*er fnctioning of te fo%%o+ing:

    a; Gointing c%eat#

    $; Door c%o#er#

    c; Bo%t#

    d; Loc#

    e; eater #tri**ing

    f; /%aKing $ead#

    g; EPDM r$$er ga#et#

    ; Oter#

    Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    Checklist for fixing aluminium $oors

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    23/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    CHECKLIST FOR WATER PROOFING

    SITE: LOCATION: DATE:

    Ref. Drg. No:

    S+.

    N,

    $/0, YES NO NA

    1. Cec for #rface c%eaning.

    ". Cec for 'i *ro*ortion.

    -. Cec for te addition of +ater*roofing co'*ond0 if #*ecified.

    4. Cec for te %e2e%# *rior to %a3ing.

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    CORRECTIVE ACTION PROPOSE$

    >Signatre of Engineer In)carge after re)cecing?

    Checklist for %ater Proofing

  • 8/12/2019 Birla Check

    24/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR CEMENT

    DATE OF RECEIPT:

    CALLAN NO:

    S+.N

    ,

    $/0, YES NO NA

    1. Mae & grade of ce'ent ". Batc n'$er a# 'ared on te $ag#. Crrent +ee

    I# it acce*ta$%e,

    -. Cec for finene##. I# it acce*ta$%e,4. Cec for %'*#. I# it acce*ta$%e,

    7. I# te 'anfactrer# te#t certification for ce'ent

    a2ai%a$%e,

    'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(

    ACCEPTANCE OF THE MATERIAL BASE$ ON

    THE ABOVE INSPECTION REPORT

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    Checklist for %ater Proofing

  • 8/12/2019 Birla Check

    25/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR

    CERAMIC*MOSAIC TILES

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.N

    ,

    $/0, YES NO NA

    1. Mae of te ti%e# ". T3*e -. Sade code 4. Cec for #a*e# and #iKe# of ti%e#. I# it acce*ta$%e,

    7. Cec for 2ariation in #ade in ti%e#. I# it acce*ta$%e,

  • 8/12/2019 Birla Check

    26/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR COARSE

    AGGREGATES

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.N, $/0, YES NO NA

    1. No'ina% #iKe of te aggregate# ". I# te #a*e of te aggregate# acce*ta$%e,-. Cec for *re#ence of de%eterio# 'ateria%. I# it

    acce*ta$%e,

    4. Cec for c%ean%ine## of aggregate#. I# it acce*ta$%e,

    'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(

    ACCEPTANCE OF THE MATERIAL BASE$ ON

    THE ABOVE INSPECTION REPORT

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    Checklist for &ncoming Material &ns'ection

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    27/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR FINE

    AGGREGATES

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.N

    ,

    $/0, YES NO NA

    1. Si%t content a# o$#er2ed

    ". I# te fine aggregate acce*ta$%e,

    -. Cec for *re#ence of c%a3 %'*#. I# it acce*ta$%e,

    4. Cec for *re#ence of de%eterio# 'ateria%. I# itacce*ta$%e,

    7. Cec for c%ean%ine## of aggregate#. I# it acce*ta$%e,

    'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(

    ACCEPTANCE OF THE MATERIAL BASE$ ONTHE ABOVE INSPECTION REPORT

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    Checklist for &ncoming Material &ns'ection

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    28/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR $OORS %

    WIN$OWS

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.

    N,

    $/0, YES NO NA

    1. T3*e ". Are te #ection# 'atcing +it to#e of tecnica%

    #*ecification# or #o* dra+ing#,

    -. Cec for #rface defect#. I# it acce*ta$%e,

    4. Cec for di'en#ion#0 de#ign#0 etc.0 I# it acce*ta$%e,

    7. Rigidit3 & fini# of te a##e'$%3. I# it acce*ta$%e,

  • 8/12/2019 Birla Check

    29/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR SOLI$

    CEMENT CONCRETE BLOCKS

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.N

    ,

    $/0, YES NO NA

    1. SiKe of te $%oc# ". Cec for di'en#ion#. I# it acce*ta$%e,

    -. Cec for edge# & corner#. I# it acce*ta$%e,

    4. Cec for *re#ence of crac# or f%a+#. I# it acce*ta$%e,

    7. I# te 'anfactrer# te#t certificate for $%oc# a2ai%a$%e,

    'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(

    ACCEPTANCE OF THE MATERIAL BASE$ ON

    THE ABOVE INSPECTION REPORT

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@

    Checklist for &ncoming Material &ns'ection

    Shriram Signiaa Project

  • 8/12/2019 Birla Check

    30/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR

    STRUCTURAL STEEL

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.

    N,

    $/0, YES NO NA

    1. Section of #trctra% #tee% ". Cec for c%ean%ine## of #tee%. I# it free fro' r#t0 grea#e0

    *aint0 %oo#e #ca%e#0 etc,

    -. Cec for craced end#. I# it acce*ta$%e,

    4. Cec for #traigtne## of #ection#. I# it acce*ta$%e,

    7. Cec for #ectiona% di'en#ion#. I# it acce*ta$%e,

  • 8/12/2019 Birla Check

    31/31

    BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$

    INCOMING MATERIAL INSPECTION REPORT FOR

    REINFORCEMENT STEEL

    DATE OF RECEIPT:

    CALLAN NO:

    NAME OF TE S(PPLIER:

    S+.N

    ,

    $/0, YES NO NA

    1. /rade of #tee%

    ". Dia'eter of reinforce'ent #tee% -. Cec for c%ean%ine## of reinforce'ent #tee%. I# it free fro'

    r#t0 grea#e0 *aint0 %oo#e #ca%e#0 etc

    4. Cec for craced end#. I# it acce*ta$%e,

    7. I# te 'anfactrer# te#t certificate for reinforce'ent #tee%

    a2ai%a$%e,

    ACCEPTANCE OF THE MATERIAL BASE$ ON THE

    ABOVE INSPECTION REPORT

    SPL BAIL

    >Signatre of Engineer In)carge? >Signatre of Engineer In)carge?

    Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@