  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    1/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    2/75

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    PACKAGE 3: 150 KV CONVENTIONAL SUBSTATIONS FOR JAVA

    SCHEDULE No. 4 : INSTALLATION AND OTHER SERVICES

    BILL NO 1A : CONTROL BUILDING

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    3/75

    UNIT PRICE TOTAL PRICE

    (IDR) (IDR)

    1 2 3 4 5 6 = 4 X 5

    I PREPARATION WORK

    1 Building Permit ( Ijin Mendirikan Bangunan / IMB ) ls 1.00 -

    2 Site clearing m2

    206.00 -

    3 Setting survey and installation of setting plan ls 1.00 -4 Site office ( 4m x 6 m ) ls 1.00 -5 Site storage ( 4 m x 10 m ) ls 1.00 -6 Soil investigation for controle building :

    SPT, DCPT, Core Drilling and Test Lab Pcs 1.00 -

    Report Sets 3.00 -

    II EARTH WORK

    1 Excavation work m3

    76.30 -

    2 Backfiil m3

    49.20 -

    3 Sand layer ( compacted sand )m

    3

    8.20 -

    III CONCRETE REINFORCEMENT AND INSTALATION WORK

    1 Lean concrete K100 ( for foundation and plain thickness 5 cm ) m3

    4.00 -

    2 Foundation work ( concrete K 225, Fe : 125 kg/m3 ) m3

    12.90 -

    3 Sloof work ( concrete K 225, Fe : 150 kg/m3 ) m3

    4.10 -

    4 Column work ( concrete K 225, Fe : 150 kg/m3 ) m3

    2.50 -

    5 Ring balk work ( concrete K 225, Fe : 150 kg/m3 ) m3

    1.50 -

    6 Cannopy work ( concrete K 225, Fe : 125 kg/m3 ) m3

    3.80 -

    7 Column, sloof and ring balk practical work

    ( concrete K 175, Fe : 100 kg/m3 ) m3

    - -

    8 Stone masonry ad 1 pc : 3 sand m3

    - -

    9 A half brick wall ad 1 pc : 4 sand m3

    32.87 -

    10 Ceramic of floor ad 1 pc : 3 sand m2 137.50 -11 Ceramic of wall m

    213.20 -

    12 Plaster ad 1 pc : 4 sand m2

    438.20 -

    13 Drainage for control building m1

    47.00 -

    IV ROOF AND CELLING WORK

    1 Steel trusses complete with conection kg 1,142.50 -

    2 Purlin kg 40.00 -

    3 Wind bracing and tie rod kg 30.00 -

    4 Corrugated metal sheet complete with accessories m2

    220.00 -

    5 Plywood thickness 4 mm complete with hanger and frame m2

    137.50 -

    6 Listplank wooden 3/30 m1

    0.50 -

    7 Pipe vertical PVC dia 4 inc m1

    - -

    V DOOR AND WINDOWS WORK

    1 Glass window & ventilation complete with aluminium frame and accessories:

    - Type J1 ( I unit = 1 hole ) unit 2.00 -

    - Type J1A ( I unit = 2 hole ) unit - -

    - Type J2 ( I unit = 1 hole and 1 fixed ) unit 11.00 -

    - Type J3 ( I unit = 1 hole and 2 fixed ) unit 2.00 -

    - Type J4 ( I unit = 1 hole ) unit - -

    - Type J5 Naco ( 1 unit = 2 hole ) unit - -

    2 Wooden door & glass ventilation complete with aluminium frame and accessories:

    - Type P1 unit 2.00 -

    - Type P3 unit 1.00 -

    Glass door & ventilation complete with aluminium frame and accessories:

    - Type P2 unit 3.00 -

    - Type P4 unit - -3 Glass ventilation complete with aluminium frame and accessories:

    - Type V1 unit - -

    - Type V1A unit - -

    - Type V2 unit - -

    - Type V3 unit - -

    - Type V6 unit - -

    4 Aluminium rolling door complete with frame and accessories Type P5 unit - -

    5 Fixed aluminium louver complete with frame and accessories (1 unit = 2 hole ) unit - -

    6 Fibre door complete with frame and accessories unit - -

    NO. DESCRIPTION UNIT QTY

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    4/75

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    UNIT PRICE TOTAL PRICE

    (IDR) (IDR)

    1 2 3 4 5 6 = 4 X 5

    VI SANITARY WORK

    1 Bath basin complete with accessories No - -

    2 Squatting water closed complete with accessories No 1.00 -

    3 Wash basin complete with accessories No 1.00 -

    4 Installation of water supply pipe PVC dia 1/2 inc complete with clamp ls 1.00 -

    and accessories

    5 Installation of water waste pipe PVC dia 3 inc complete with clamp ls 1.00 -

    and accessories

    6 Water tank and jet pump included steel structures tower unit 1.00 -

    ( cap : 1 m3 ) and installation of pipe

    7 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with

    palm fibre and sand stone unit 1.00 -

    VII PAINTING WORK

    1 Steel painting m2

    - -

    2 Wall and celling painting m2

    438.00 -

    VIII FINISHING WORK

    1 Door closer No 3.00 -

    2 Hinge for window (1 set= 2 pcs) set 12.00 -

    3 Hinge for door (1 set= 3 pcs) set 7.00 -

    4 Grendel for window (1 set= 2 pcs) No 12.00 -

    5 Grendel for door double swing No 3.00 -

    6 wind hook of window (1 set = 2 pcs) set 12.00 -

    7 Key door No 7.00 -

    IX CABLE DUCT

    1 Concrete cable duct ( K 175; Fe : 100 kg m3 )

    included galvanized cable tray steel anggle 50.50.4 and plate bordes for type cable duct

    I, II, III, IV m3

    9.70 -

    X INSTALATION OF ELECTRICAL AND MECANICAL WORK

    1 AC split 1PK complete with accessories (stop contact and wiring) No 2.00 -

    2 AC split 3/4 PK complete with accessories (stop contact and wiring) No 2.00 -

    3 Exhaus fan 40 Watt complete with accessories (stop contact and wiring) No 1.00 -

    4 Box panel MCB complete with accessories No 1.00 -

    5 Price for capacity electrical 20000 VA ls 1.00 -

    6 Emergency lighting included wiring and lamp 100 watt No 6.00 -

    7 indoor luminaires type flourescent fitting 2 x 40 watt inluded installation

    wiring and switch No 10.00 -8 Clear lamp celling 60 watt inluded installation wiring and switch No 12.00 -

    9 Stop contact inluded installation wiring No 6.00 -

    XI LIGHTNING PROTECTION

    1 Arder/ground rod icluded pipa and cable BC 25 mm2 and all accessories Lot 1.00 -

    clamps steel plate, material support and pole, grounding system for

    controle building

    XII FIRE ALARM

    1 Alarm bell 6'' ( 150 mm ) diameter included installation wiring No 1.00 -

    2 Smoke detector included installation wiring No 4.00 -

    3 Fixed and rate of rice temperature detector included installation wiring No 3.00 -

    4 MCFA ( Master control fire alarm ) included indication lamp, battery

    rectifier and all accessories No 1.00 -

    XII FIRE FIGHTING EQUIPMENT

    1 Portable fire extinghuister ( 5 kg hallon ) No 1.00 -

    2 Hydrant and accessories included installation of pipe lot 1.00 -

    3 Underground water tank (cap : 10 m3) and jet pump included installation of pipe lot 1.00 -

    - 2TOTAL

    NO. DESCRIPTION UNIT QTY

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    5/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    6/75

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    UNIT PRICE TOTAL PRICE

    (IDR) (IDR)1 2 3 4 5 6 = 4 X 5

    I PREPARATION WORK

    1 Building Permit ( Ijin Mendirikan Bangunan / IMB ) ls 1.00 -

    2 Site clearing m2

    299.00 -

    3 Setting survey and installation of setting plan ls 1.00 -

    4 Site office ( 4m x 6 m ) ls 1.00 -

    5 Site storage ( 4 m x 10 m ) ls 1.00 -

    6 Soil investigation for controle building :

    SPT, DCPT, Core Drilling and Test Lab Pcs 1.00 -

    Report Sets 3.00 -

    II EARTH WORK

    1 Excavation work m3

    66.00 -

    2 Backfiil m3

    20.00 -

    3 Sand layer ( compacted sand ) m3

    7.00 -

    III CONCRETE REINFORCEMENT AND INSTALATION WORK

    1 Lean concrete K100 ( for foundation and plain thickness 5 cm ) m3

    6.00 -

    2 Foundation work ( concrete K 225, Fe : 125 kg/m3 ) m3

    4.00 -

    3 Sloof work ( concrete K 225, Fe : 150 kg/m3 ) m3

    6.00 -

    4 Column work ( concrete K 225, Fe : 150 kg/m3 ) m

    3

    9.00 -5 Ring balk work ( concrete K 225, Fe : 150 kg/m3 ) m

    35.00 -

    6 Cannopy work ( concrete K 225, Fe : 125 kg/m3 ) m3

    13.70 -

    7 Column, sloof and ring balk practical work

    ( concrete K 175, Fe : 100 kg/m3 ) m3

    0.60 -

    8 Stone masonry ad 1 pc : 3 sand m3

    26.00 -

    9 A half brick wall ad 1 pc : 4 sand m3

    43.50 -

    10 Ceramic of floor ad 1 pc : 3 sand m2

    209.00 -

    11 Ceramic of wall m2

    32.00 -

    12 Plaster ad 1 pc : 4 sand m2

    576.00 -

    13 Drainage for control building m1

    80.00 -

    14 Floor Hardener m2 144.00 -

    IV ROOF AND CELLING WORK

    1 Steel trusses complete with conection kg 1,905.00 -

    2 Purlin kg 40.00 -

    3 Wind bracing and tie rod kg 62.50 -

    4 Corrugated metal sheet complete with accessories m2

    385.00 -

    5 Plywood thickness 4 mm complete with hanger and frame m2

    264.00 -

    6 Listplank wooden 3/30 m1

    0.60 -

    7 Pipe vertical PVC dia 4 inc m1

    80.00 -

    V DOOR AND WINDOWS WORK

    1 Glass window complete with aluminium frame and accessories:

    - Type J1 ( I unit = 1 hole and 2 fixed ) unit - -

    - Type J1A ( I unit = 2 hole ) unit - -

    - Type J2 ( I unit = 2 hole and 2 fixed ) unit - -

    - Type J3 ( I unit = 1 hole and 1 fixed ) unit 1.00 -

    - Type J4 ( I unit = 1 hole ) unit - -

    - Type J5 Naco ( 1 unit = 2 hole ) unit - -

    2 Glass door complete with aluminium frame and accessories:

    - Type P1 unit - -

    - Type P2 unit - -

    - Type P3 unit 3.00 -

    - Type P4 unit 2.00 -

    3 Glass ventilation complete with aluminium frame and accessories:

    - Type V1 unit - -

    - Type V1A unit 11.00 -

    - Type V2 unit - -

    NO. DESCRIPTION UNIT QTY

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    7/75

    - Type V3 unit - -

    - Type V6 unit 1.00 -

    4 Aluminium rolling door complete with frame and accessories Type P5 unit 1.00 -

    5 Fixed aluminium louver complete with frame and accessories (1 unit = 2 hole ) unit - -

    6 Fibre door complete with frame and accessories unit - -

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    UNIT PRICE TOTAL PRICE

    (IDR) (IDR)

    1 2 3 4 5 6 = 4 X 5

    VI SANITARY WORK

    1 Bath basin complete with accessories No 1.00 -

    2 Squatting water closed complete with accessories No 1.00 -

    3 Wash basin complete with accessories No - -

    4 Installation of water supply pipe PVC dia 1/2 inc complete with clamp ls 1.00 -

    and accessories

    5 Installation of water waste pipe PVC dia 3 inc complete with clamp ls 1.00 -

    and accessories

    6 Water tank and jet pump included steel structures tower unit 1.00 -

    ( cap : 1 m3 ) and installation of pipe

    7 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with

    palm fibre and sand stone unit 1.00 -

    VII PAINTING WORK

    1 Steel painting m2

    5.00 -

    2 Wall and celling painting m2

    840.00 -

    VIII FINISHING WORK

    1 Door closer No 2.00 -

    2 Hinge for window (1 set= 2 pcs) set 1.00 -

    3 Hinge for door (1 set= 3 pcs) set 5.00 -

    4 Grendel for window (1 set= 2 pcs) No 1.00 -

    5 Grendel for door double swing No - -

    6 wind hook of window (1 set = 2 pcs) set 1.00 -

    7 Key door No 5.00 -

    IX CABLE DUCT

    1 Concrete cable duct ( K 175; Fe : 100 kg m3 )

    included galvanized cable tray steel anggle 50.50.4 and plate bordes for type

    cable duct I, II, III, IV m3

    37.00 -

    X INSTALATION OF ELECTRICAL AND MECANICAL WORK

    1 AC split 1PK complete with accessories (stop contact and wiring) No 1.00 -

    2 AC split 3/4 PK complete with accessories (stop contact and wiring) No - -

    3 Exhaus fan 40 Watt complete with accessories (stop contact and wiring) No 10.00 -

    4 Box panel MCB complete with accessories No 1.00 -

    5 Price for capacity electrical 20000 VA ls 1.00 -

    6 Emergency lighting included wiring and lamp 100 watt No 7.00 -

    7 indoor luminaires type flourescent fitting 2 x 40 watt inluded installation

    wiring and switch No 11.00 -

    8 Clear lamp celling 60 watt inluded installation wiring and switch No 5.00 -

    9 Stop contact inluded installation wiring No 7.00 -

    XI LIGHTNING PROTECTION

    1 Arder/ground rod icluded pipa and cable BC 25 mm2 and all accessories Lot 1.00 -

    clamps steel plate, material support and pole, grounding system for

    controle building

    XII FIRE ALARM

    1 Alarm bell 6'' ( 150 mm ) diameter included installation wiring No 5.00 -

    2 Smoke detector included installation wiring No 8.00 -

    NO. DESCRIPTION UNIT QTY

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    8/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    9/75

    SCHEDULE No. 4 : INSTALLATION AND OTHER SERVICES

    BILL NO 2 : SWITCHYARD FOR CIVIL WORKS

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    UNIT PRICE TOTAL PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL

    PORTION

    (RUPIAH) (RUPIAH)

    1 2 3 4 5 6 = 4 x 5

    I Foundation for 150 kV

    1 Circuit Breakers Set 4 -2 Capacitor Voltage Transformer Set 2 -

    3 Current Transformer Set 5 -

    4 Surge Arrester Set 3 -

    5 Post Insulator Unit 0 -

    6 Marshalling Kiosks Unit 4 -

    7 Neutral Grounding Resistors Unit 1 -

    8 Power Transformer Unit 1 -

    9 Voltage Transformers Set 0 -

    10 Disconnecting /& Earthing Switches (DS/E) Set 10 -

    11 Gantries Unit 19 -

    12 Service Transformers Unit 1 -

    TOTAL -

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    UNIT PRICE TOTAL PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL

    PORTION

    (RUPIAH) (RUPIAH)

    1 2 3 4 5 6 = 4 x 5

    II Site Works

    1 Earth Work

    a. Site Clearing m2

    6440 -

    b. Common Excavation m3

    0 -

    c. Back fill with selected material m3

    0 -

    d. Import fill with selected material m

    3

    0 -e. Slope protection (stone masonry) m

    30 -

    2 Road (new)

    a. Prepare compacted subgrade m2

    552 -

    b. Macadam surface course m2

    552 -

    c. Sub base course m2

    552 -

    d. Base course m2

    552 -

    e. 50 mm Asphalt hot mix m2

    552 -

    f. 50 mm Asphalt penetration m2

    552 -

    3 Kerbs (15/30) m' 184 -

    4 Fence complete with barbed wire,accessories andfoundation

    - BRC 1.20 m height m' 0 -

    - BRC 1.9 m height m' 324 -

    - Fabricated concrete 1.00 m height (lower part) and BRC

    1.20 m height (upper part) m' -

    PACKAGE 3: 150 KV CONVENTIONAL SUBSTATIONS FOR JAVA

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    10/75

    5 Gate complete with pole, accessories and foundation

    - BRC 1.90 m height, 1.20 m width unit 2 -

    - BRC 1.20 m height, 6.30 m width unit -

    6 Landscaping m2

    0 -

    7 Gravel (dia 3 - 5 cm); t = 10 cm m2

    2940 -

    8 Cable duct (K175,BJTP40,incld cover, galvanized cable tray

    L 50.50.5 and PVC pipe)

    a. Cable trench type 1 (large) m' 131 -

    b. Cable trench type 2 (medium) m' 132 -

    c. Cable trench type 3 (small) m' 127 -

    d. Cable trench (Crossing road) m' 10 -

    9 Soil investigation for switchyard :

    SPT, DCPT, Core Drilling and Test Lab Pcs 1 -

    Report Sets 3 -

    10 Drainage m3

    0 -

    11 Sub soil Drainage dia 30 including gravel & Palm fibre m' 184 -

    12 Fire wall reinforced concrete grade 225/20; t = 15 cm m3

    0 -

    13 Post security (2m x 4 m) unit 0 -

    14 Loading test NO 0 -

    15 Oil Pit Capacity 50 ton unit 1 -

    TOTAL -

    2. CIKEDUNG 150 KV CONVENTIONAL SUBSTATION (NEW)

    UNIT PRICE TOTAL PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL

    PORTION

    (RUPIAH) (RUPIAH)

    1 2 3 4 5 6 = 4 x 5

    16 Site and Road Lighting

    1. Mercury Vapour Flouresent light 1 x 250 W complete with

    lighting column 9 m high, fuse box, grounding system and

    installation of cable conduit and wiring and all accessories

    and foundation of column NO 1 -

    2. Mercury Vapour Flouresent light 1 x 250 W complete with

    support, fuse box, grounding system and installation of cable

    conduit and wiring and all accessories for Switchyard NO 11 -

    3. Mercury Vapour Flouresent light 1 x 80 W complete with

    lighting column 2 m high, fuse box, grounding system and

    installation of cable conduit and wiring and all accessories

    and foundation of column NO 1 -

    4. Lighting panel outdoor complete with foto cell switch fuse,

    mcb, grounding system indicator wiring and all accessories

    (foto cell) and foundation of panel Set 1 -

    TOTAL - -

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    11/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    12/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    13/75

    R SERVICES

    KS

    UNIT PRICE TOTAL PRICE

    LOCAL CURRENCY LOCAL

    PORTION

    (RUPIAH) (RUPIAH)

    5 6 = 4 x 5

    -

    -

    -

    -

    -

    -

    -

    -

    -

    ONS FOR JAVA

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    14/75

    -

    -

    -

    -

    -

    -

    - 2.00

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    15/75

    BREAKDOWN PRICE FOR CI

    UNIT PRICE

    NO DESCRIPTION UNIT

    1 1 (one) unti plank name of project

    - Material

    - playwood 12 mm shett

    - Beam meranti 6/12 frame

    - Colour paint kg

    - Nail kg

    - Concrete 1 pc : 3 sand : 5 split m3

    - Remuneration

    - Paint worker man/day

    - Worker man/day

    - Supervisor man/day

    2 1 (one) m fence security of project 2 m hight

    - Material

    - Dolken NO

    - Plank meranti 2/20 frame

    - Zinc sheet

    - Nail kg

    - Remuneration

    - Carpenter man/day

    - Supervisor man/day

    3 1 (one) m Bowplank

    - Material

    - Plank meranti 2/20 m3- Beam meranti 5/7 m3

    - Nail kg

    - Remuneration

    - Carpenter man/day

    - Worker man/day

    - Supervisor man/day

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    16/75

    4 1 m3 Excavation of Soil, incl. Buang keluar

    - Worker man/day

    - Supervisor man/day

    5 1 m3 Excavation of Rock

    - Worker man/day

    - Supervisor man/day

    6 1 m3 Back Filling

    - Worker man/day

    - Supervisor man/day

    7 1 m3 Import Filling

    - Material

    - Soil m3

    - Remuneration

    - Worker man/day

    - Supervisor man/day

    8 1 m3 Compacted Sand layer

    - Material

    - Sand m3

    - Remuneration

    - Worker man/day

    - Supervisor man/day

    1 m2 Compacted Sand layer

    9 1 m3 Brick 1 pc : 4 ps

    - Material

    - Red brick unit

    - Portland cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    17/75

    - Worker man/day

    - Supervisor man/day

    10 1 m2 plaster cement 1 pc : 4 ps thickness 10 mm

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    11 1 m2 Brafend 1 pc : 2 ps

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    12 1 m2 Brafend 1 pc : 4 ps

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    13 1 m3 Concrete 1 pc : 3 sand : 5 split

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Split m3

    - Equipment

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    18/75

    - Mollen hour

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    1 m2 Concrete 1 pc : 3 sand : 5 split t=5cm

    14 1 m3 Concrete K 175

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Split m3

    - Equipment

    - Mollen hour

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    15 1 m3 Concrete K 225

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Split m3

    - Equipment

    - Mollen hour

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    16 1 m3 Concrete K 500

    - Material

    - Portland cement (PC) kg

    - Sand m3

    - Split m3

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    19/75

    - Equipment

    - Mollen hour

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    17 1 m3 stone Masonry 1 PC : 2 Sand

    - Material

    - Crushed stone m3

    - Portland cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day- Worker man/day

    - Supervisor man/day

    18 1 m3 stone Masonry 1 PC : 3 Sand

    - Material

    - Crushed stone m3

    - Portland cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    19 100 kg steel work :

    - Material

    - Steel Bar (Reinforcement) U 24 kg

    - Wire kg

    - Remuneration

    - Steel worker man/day

    - Worker man/day

    - Supervisor man/day

    Per kg

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    20/75

    20 100 kg steel work :

    - Material

    - Steel Bar (Reinforcement) U 32 kg

    - Wire kg

    - Remuneration

    - Steel worker man/day

    - Worker man/day

    - Supervisor man/day

    Per kg

    21 1.00 ton stell Structure

    - Material

    - Steel Structure (HTS) ton

    - Steel Structure (MS) ton- Bolt and Nuts NO

    - Band plate ton

    - Remuneration

    - Steel worker man/day

    - Worker man/day

    - Supervisor man/day

    Per kg

    22 1 m3 Formwork

    - Material

    - Wooden m3

    - Nail kg

    - Remuneration

    - Carpenter man/day

    - Worker man/day

    - Supervisor man/day

    23 1 m' Pilling Bored Pile)

    - Material

    - Bored pil 60 cm

    - Concrete K 175 m3

    - Steel U 32 kg

    - Casing ls

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    21/75

    - Equipment

    - Drilling Machine hour

    - Tremie Pipa hour

    - Mollen hour

    - Theodalite hour

    - Support Equipment hour

    - Mobilization

    - Mobilization Equipment ls

    - Remuneration

    - Worker man/day

    - Supervisor man/day

    - Operator man/day

    - Mechanic man/day

    - Superyor man/day

    24 1 m' Pilling (Driven Pile)

    - Material

    - Driven pile 30 cm

    - Concrete K 500 m3

    - Steel U 32 kg

    - Formwork m2

    - Fuel lt

    - Equipment

    - Diesel hummer hour

    - Theodolite hour

    - Support Equipment hour

    - Mobilization

    - Mobilization Equipment ls

    - Remuneration

    - Worker man/day

    - Supervisor man/day

    - Operator man/day

    - Mechanic man/day

    - Superyor man/day

    25 1 m2 Ceilling (include. Frame & hanger)

    - Material

    - Playwood (4 mm 4'x8'x4) pc

    - List Profile m1

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    22/75

    - Nail kg

    - Wooden m3

    - Remuneration

    - Carpenter man/day

    - Worker man/day

    - Supervisor man/day

    26 1 m2 Floor 1 pc : 2 Sand

    - Material

    - Ceramic tile 30x30 m2

    - Portland Cement (PC) kg

    - Sand m3

    - Remuneration

    - Brick layer man/day

    - Worker man/day- Supervisor man/day

    27 1 m2 Wall Ceramic

    - Material

    - Ceramic tile 10x10 m2

    - Portland Cement (PC) kg

    - Remuneration

    - Brick layer man/day

    - Worker man/day

    - Supervisor man/day

    28 1 m2 Roofing

    - Material

    - Corrugated metal steel m2

    - Nail drat pcs

    - Remuneration

    - Carpenter man/day

    - Worker man/day- Supervisor man/day

    29 1 m2 Steel painting

    - Material

    -Naturally Paint (Meni) kg

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    23/75

    - Colour painting steel kg

    - Sand Paper sheet

    - Kuas NO

    - Remuneration

    - Worker Paint man/day

    - Worker man/day

    - Supervisor man/day

    30 1 m2 Wall painting

    - Material

    - Plamur kg

    - Colour painting wall kg

    - Sand Paper sheet

    - Kuas / Rol NO

    - Remuneration

    - Worker Paint man/day

    - Worker man/day

    - Supervisor man/day

    31 1 m2 Road (New)

    1 m2 Base Structure

    - Soil Excavation

    - Common Excavation m3

    - Back fill m3

    - Sub Base Coarce

    - Comp. Sand gravel (sirtu) 300 mm thick m3

    - Base Coarce

    - Crush stone 3 - 5, 250 mm thick m3

    - Remuneration

    - Worker man/day

    - Supervisor man/day

    - Stomwalls hour

    31a 1 m2 Penetration thickness 5 cm

    - Material- Aspalt hot 60/70 kg

    - Crushed stone 2 - 3 cm m3

    - Dust split m3

    - Split m3

    - Firewood m3

    - Remuneration

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    24/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    25/75

    - Compacted sand layer m3

    - Lean concrete 1:3:5 m3

    - Reinforced Concrete Grade 175/20 m3

    37 1 m' Sub Soil Drainage

    - Excavation of soil m3

    - Backfilling m3

    - Compacted sand layer m3

    - Pipe Concrete 30 cm m1

    - Palm Fibre kg

    - Gravel m3

    38 1 Unit Piled Load Test (compression)

    - Material

    - Bored Pile or Driven Pile m- Plate Loading kg

    - Oil Machine (Hidrolis) lt

    - Equipment

    - Gauge hour

    - Jack Hydrolic hour

    - Generator hour

    - Fasilitas Lamp hour

    - Shelter hour

    - Support Equipment hour

    - Remuneration

    - Wolker man/day

    - Supervisor man/day

    - Operator man/day

    - Mechanic man/day

    - Surveryor man/day

    - Final Report ls

    39 1 m3 Erection Gabion :

    Material- Crused Stone m3

    - Wire Mash dia 4 mm Kg

    Remuneration

    - Brick Layer Orang/hari

    - Worker Orang/hari

    - Supervisor Orang/hari

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    26/75

    40 1 Point Wooden Driven Pile ( L = 8.0 m )

    Material

    - Dolken dia 10 cm, lenght 4 m Batang

    - Fuel ( BBM/Solar ) lt

    Rent of Equipment

    - Driven Pile of Machine Jam

    - Theodolit Jam

    - Support Equipment Jam

    Mobilisasion

    - Mobilisasion Equipment ls

    - Remuneration

    - Wolker Orang/hari

    - Supervisor Orang/hari- Operator Orang/hari

    - Mechanic Orang/hari

    - Surveryor Orang/hari

    41 1 Unit Tes ( Up Lift )

    - Foundation P&C / Bored Pile m

    - Beam and Plate Loading Kg

    - Oil Machine ( Hidrolis ) lt

    Rent of Equipment

    - Gauge Jam

    - Jack Hydralic Jam

    - Generator Jam

    - Fasility of Lamp Jam

    - Place of Work Jam

    -Support Equipment Jam

    - Remuneration

    - Wolker Orang/hari

    - Supervisor Orang/hari

    - Operator Orang/hari

    - Mechanic Orang/hari- Surveryor Orang/hari

    42 1m' Fence BRC height 2.00 m

    Material

    - BRC height 1.20 m m

    - Steel pipe dia 2 inc and clamp m

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    27/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    28/75

    Fe : 100 kg/m3

    - Colom 20/40 reinforced concrete K 175; m3

    Fe : 100 kg/m3

    Remuneration

    - Excavation of Soil m3

    - Back Filling m3

    - Erection of Gate ls

    46 1m' Fence dari Concrete height 2.00 m

    Material

    - Concrete height2.00 m m3

    (K 175; Fe : 100 kg/m3)

    - Foundation 1,50x1,50 m2 reinforced concrete K 175; m3

    Fe : 120 kg/m3

    - Colom 30/50 rinforced concrete K 175; m3

    Fe : 120 kg/m3- Sloof 30/40 reinforced concrete K 175; m3

    Fe : 120 kg/m3

    Remuneration

    - Excavation of Soil m3

    - Back Filling m3

    - Erection of Fence ls

    47 1 m2 Formwork Str

    - Material

    - Multiplex 12 mm sheet

    - Wooden m3

    - Nail kg

    - Remuneration

    - Carpenter man/day

    - Worker man/day

    - Supervisor man/day

    48 pipe works for sanitary ls

    49 pipa galvanized for instalasi f.fighting

    - Material

    - fitting bh

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    29/75

    50 fire fighting

    - Material

    - jockey pump to ground tank bh

    Remuneration

    - bor pompa jet pump m'

    - instalasi pompa & pipe m'

    51 WATER SUPPLY TO WATER TANK

    - Material

    - Jet pump 250 watt bh

    - tangki steel 1000 ltr bh

    - pipe galvanized 1" btg

    - fitting galv bh

    - tower 10 m bh

    - stoop kran pompa bh

    - stop kran di roof tank bh

    Remuneration

    - bor pompa jet pump bh

    - Wolker Orang/hari

    - Supervisor Orang/hari

    52 HIDRANT PILLAR & BOX

    - Material

    -Hydrant pillar two way bh

    - out door hydrant box bh

    - pondasi ls

    - pipe galvanized 4" m'

    Remuneration

    - Wolker Orang/hari

    - Supervisor Orang/hari

    - Weld electrodes kg

    53 MCFA

    - Material-PANEL MCFA +BATTERY unit

    - material bantu ls

    Remuneration

    - install unit

    - conectivity unit

    - perbaikan / finishing ls

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    30/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    31/75

    - Material

    Exhoust Fan 40 watt bh

    material bantu ls

    Remuneration

    - Worker Orang/hari

    - Supervisor Orang/hari

    Fixed and rate of rice temperature detector

    - Material

    temperatur detector bh

    material bantu ls

    Remuneration

    - Worker Orang/hari

    - Supervisor Orang/hari

    smoke detector

    - Material

    detector ckh - as bh

    material bantu ls

    Remuneration

    - Worker Orang/hari

    - Supervisor Orang/hari

    Alarm bell

    - Material

    module for bell(3 zone) bh

    material bantu ls

    Remuneration

    - Worker Orang/hari

    - Supervisor Orang/hari

    Portable fire extinghuister ( 5 kg hallon )

    - Material

    fire extinguisher 5 kg(quell halon alternative) bh

    Remuneration- Worker Orang/hari

    Emergency lighting lamp 100 watt.

    - Material

    ceiling mounted emergency lamp 100 w bh

    material bantu ls

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    32/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    33/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    34/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    35/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    36/75

    - Grounding rod clamp

    - Cable clamp

    - Square clamp

    - Cable BC

    - Coper tape 35 x 5 mm

    - Test clamp

    - Earth pit, HD galvanied

    Total material

    Install Cost

    42 1m' Fence BRC height 1.90 m 100

    Material

    - BRC height 1.90 m panel

    - Steel pipe dia 2 inc m

    - strut pipe dia 2 inc m- barbed wire m

    - Foundation 0,70x0,70 m2 reinforced concrete K 175; m3

    Fe : 100 kg/m3

    - Foundation 0,70x0,70 m2 reinforced concrete K 175; m3

    Fe : 100 kg/m3

    - Sloof 20/30 reinforced concrete K 175; m3

    Fe : 100 kg/m3

    Remuneration

    - Excavation of Soil m3

    -Back fill m3

    - Erection of Fence m

    44 GATE BRC height 1.90 m wide 1.20 m

    Material

    - BRC height 1.90 m m

    - Steel pipe dia 3 inc m

    - Pipe of supporr dia 2 inc and clamp (frame) m

    - Foundation 1,00x1,00m2 reinforced concrete K 175; m3

    Fe : 100 kg/m3

    - Colom 20/40 reinforced concrete K 175; m3Fe : 100 kg/m3

    Remuneration

    - Excavation of Soil m3

    -Back fill m3

    - Erection of Gate m

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    37/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    38/75

    -grounding complete bh

    Remuneration

    - upah pasang bh

    - Supervisor man/day

    FIRE WALL 8x12 m incl foundation

    Foundation :

    Excavation m3

    Backfill material m3

    Compacted sand layer m3

    Lean concrete m3

    Formwork m2

    Reinforcement kg

    Concrete grade 225/20 m3

    Wall :

    Formwork m2

    Reinforcement kg

    Concrete grade 225/20 m3

    1 m2 graveling

    - Material

    - Crushed stone m3

    Remuneration

    - laying m2

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    39/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    40/75

    IL WORKS

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    41/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    42/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    43/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    44/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    45/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    46/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    47/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    48/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    49/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    50/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    51/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    52/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    53/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    54/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    55/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    56/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    57/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    58/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    59/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    60/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    61/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    62/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    63/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    64/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    65/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    66/75

    1x 80 W complete according BOQ unit

    63 Triplex 12 mm sheet

    64 Triplex 4 mm sheet

    65 Urinoir unit

    66 Wastafel including spectacles unit

    67 Wire Mash ( dia 3,2 ~ 4 mm ) kg

    68 Soil m3

    69 list profil m

    70 MCCB 64-80A, 25 KA no

    70a MCCB 16 A, 5 KA no71 Kansteen m

    72 Landscaping m2

    73 Stop contact incl installation wiring no

    74 Exhoust Fan 40 watt no

    75 Lighting protection Complete no

    76 Steel guard ( dia of steel 10 mm, seel angle 40.40.4) m2

    77 Frame steel guard for rolling door m

    78 Emergency lighting lamp 20 W complite no

    II REMUNERATION

    1 Worker man/day

    2 Engeneer expert man/day

    3 Geometer man/day

    4 Supervion man/day

    5 Engeneer man/day6 Operator man/day

    7 Driver man/day

    8 Brick Layer man/day

    9 Steel worker man/day

    10 Carpeter man/day

    III RENT OF EQUIPMENT

    1 Molen of machine hour

    2 Communication of equipment unit/day

    3 Stringing of equipment unit/day

    4 Cassing hour

    5 Fasility of lamp hour

    6 Forklift hour

    7 Gauge hour

    8 Generator hour 9 Jack Hydrolic hour

    10 Pully unit/day

    11 Car ( truck ) unit/day

    12 Computer + printer unit/day

    13 Dril ling pile of machine hour

    14 Driven pile of machine hour

    15 Cutting of machine hour

    16 Mobilisasion driven of machine or drilling machine ls

    17 Support equipment ( key + safety belt ) unit/day

    18 Welder of machine hour

    19 Pipe Tremi hour

    20 Stamper /Stomwalls hour

    21 Cord meter

    22 Place of work hour

    23 Theodolit hour 24 Vibrator hour

    25 Drilling of machine hour

    shelter hour

    -Barb wire length 60 m ( 1 roll) m

    - pump house and ground water tank unitIMB Proses cell bld Lot

    - enclosure 80 x 60 outdoor ip 66 unit

    fotocell switch unit

    - enclosure 80 x 60 ip 55 unit

    - mccb 125-160 A unit

    - Mcb unit

    page 66 of 75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    67/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    68/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    69/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    70/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    71/75

    Foundation : Capacitor Voltage Transformer / set; 1 set = 3 unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    BQ PORTION as per Dwg

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    25.87 -

    2 Back Filling m3

    18.63 -

    3 Compacted sand t : 0.10 m m3

    1.48 -

    4 Lean Concrete t : 0.10 m m3

    1.48 -

    5 - Concrete m3

    3.90 -

    - Reinforced Bar (contract 115kg/m3) BJTD-35 kg 448.50 -

    - Bekisting m2 15.60 -

    6 PVC 2" for Earthing Cable m 2.00 -

    7 PVC 4" for Cable Trench m 4.00 -

    8 Anchor bolt 30 mm,4 ea icl grouting ls 1 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

    Foundation : Current Transformer / set; 1 set = 3 unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    BQ PORTION as per Dwg

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    25.60 -

    2 Back Filling m3

    18.39 -

    3 Compacted sand t : 0.10 m m3

    1.40 -

    4 Lean Concrete t : 0.10 m m3

    1.40 -

    5 - Concrete m3

    3.90 -

    - Reinforced Bar (contract 115kg/m3) BJTD-35 kg 448.50 -

    - Bekisting m2 15.60 -

    6 PVC 2" for Earthing Cable m 2.00 -

    7 PVC 4" for Cable Trench m 4.00 -

    8 Anchor bolt 24 mm, 4ea icl grouting ls 1 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    72/75

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    73/75

    Foundation : Marshalling Kiosk / Unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    BQ PORTION as per Dwg

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    1.57 -

    2 Back Filling m3

    1.17 -

    3 Compacted sand t : 0.10 m m3

    0.17 -

    4 Lean Concrete t : 0.10 m m3

    0.17 -

    5 - Concrete m3

    0.36 -

    - Reinforced Bar (contract 115kg/m3) BJTD-35 kg 41.40 -

    - Bekisting m2 1.44 -

    6 PVC 2" for Earthing Cable m 0.00 -

    7 PVC 4" for Cable Trench m 0.00 -

    8 Plate Bordes t : 3,2 mm m2

    2.25 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

    Foundation : NGR ( NER) / Unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    BQ PORTION as per Dwg

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    3.09 -

    2 Back Filling m3

    1.86 -

    3 Compacted sand t : 0.10 m m3

    0.72 -

    4 Lean Concrete t : 0.10 m m3

    0.54 -

    5 Reinforced Concrete Fe : 115 kg/m3; BJTD-35 m3

    2.13 -

    6 PVC 2" for Earthing Cable m 2.00 -

    7 PVC 4" for Cable Trench m 4.00 -

    8 Anchor bolt 36 mm ls 1 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    74/75

    Foundation : Power Transformer / Unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    PORTION

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    27.30 -

    2 Back Filling m3

    2.80 -

    3 Compacted sand t : 0.10 m m3

    3.00 -

    4 Lean Concrete t : 0.10 m m3

    3.00 -

    5 Reinforced Concrete Fe : 115 kg/m3; BJTD-35 m3

    24.50 -

    6 PVC 2" for Earthing Cable m 2.00 -

    7 PVC 4" for Cable Trench m 4.00 -

    8 Anchor bolt 36 mm ls 1 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

    Foundation : Gantry (Steel Structure) / Unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    PORTION

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    55.00 -

    2 Back Filling m3

    43.85 -

    3 Compacted sand t : 0.10 m m3

    2.50 -

    4 Lean Concrete t : 0.10 m m3

    2.50 -

    5 Reinforced Concrete Fe : 115 kg/m3; BJTD-35 m3

    14.34 -

    6 PVC 2" for Earthing Cable m 2.00 -

    7 PVC 4" for Cable Trench m - -

    8 Anchor bolt 36 mm ls 1.00 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

    Foundation : Service Transformers / Unit

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    PORTION

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    5.44 -

    2 Back Filling m3

    3.00 -

    3 Compacted sand t : 0.10 m m3

    0.40 -

    4 Lean Concrete t : 0.10 m m3

    0.40 -

    5 Reinforced Concrete grade 225/20 m3

    2.04 -

    6 PVC 2" for Earthing Cable m 2.00 -

    7 PVC 4" for Cable Trench m 4.00 -

    TOTAL -

    Note:

  • 7/28/2019 Blank Package 3 (CIKEDUNG)

    75/75

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4

    Foundation : New Oil Pit (Cap. 60 ton)

    UNIT PRICE

    NO DESCRIPTION UNIT QTY LOCAL CURRENCY TOTAL PRICE

    PORTION

    (RUPIAH) (RUPIAH)

    1 Excavation of Soil m3

    64.00 -

    2 Back Filling m3

    43.00 -

    3 Compacted sand t : 0.10 m m3

    16.00 -

    4 Lean Concrete t : 0.10 m m3

    16.00 -

    5 Reinforced Concrete Fe : 115 kg/m3; BJTD-35 m3

    16.00 -

    6 Grille Oil Pit m 16.00 -

    7 PVC 2" for Earthing Cable m 2.00 -

    8 PVC 6" m 4.00 -

    TOTAL -

    Note:

    1. Schedule 7 (only owner Refference)

    2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2

    3. Shall be installed in Schedule 4