BLM Diagnostic Thursday June 19, 2008 1 Jeff Dooling jcdooling@anl. gov SLAC SLAC Redwood Room A/B, SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 Thursday, June 19, 2008 BLM Testing at APS BLM Testing at APS Jeff Dooling Argonne National Laboratory

Post on 21-Dec-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

1 Jeff Dooling

[email protected]

SLAC SLAC Redwood Room A/B, SLACRedwood Room A/B, SLAC

Thursday, June 19, 2008Thursday, June 19, 2008

BLM Testing at APSBLM Testing at APS

Jeff DoolingArgonne National Laboratory

Page 2: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

2 Jeff Dooling

[email protected]

Measurements at APS

What do they tell us?

Page 3: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

3 Jeff Dooling

[email protected]

Cerenkov Detector (CD) loss monitors in the APS SR

Distributed around the SR, ~1 per sector

Generally on the outboard side ~10 cm from the beam centerline

Small fused-silica, cylindrical radiators (8-mm OD, 8-mm length), V=0.4 cc

Close-coupled to small PMT

Page 4: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

4 Jeff Dooling

[email protected]

APS CD

Page 5: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

5 Jeff Dooling

[email protected]

CD Loss Signals during Top-UP

Page 6: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

6 Jeff Dooling

[email protected]

CD Loss Signals during Top-Up--with large signals the amplitude saturates

but the width keeps growing

Page 7: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

7 Jeff Dooling

[email protected]

FO Beam Loss Position Monitor (BLPM)

Page 8: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

8 Jeff Dooling

[email protected]

BLPM Loss Signals during Top Up injection

Page 9: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

9 Jeff Dooling

[email protected]

Zooming in on the first injection loss case

Page 10: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

10 Jeff Dooling

[email protected]

Zooming in further on the first injection loss case

Page 11: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

11 Jeff Dooling

[email protected]

LCLS BLM

Page 12: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

12 Jeff Dooling

[email protected]

Prototype testing at APS

Page 13: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

13 Jeff Dooling

[email protected]

Prototype testing at APS—to go on in S35 and S9

Page 14: BLM Diagnostic Thursday June 19, 2008 Jeff Dooling jcdooling@anl.gov 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling

BLM Diagnostic Thursday June 19, 2008

14 Jeff Dooling

[email protected]

Acknowledgments

Bingxin Yang and Bill Berg have contributed many hours to this project

Also need to thank Adam Brill, Matt Kasa, Lester Erwin, Tony Pietryla, Mike Merritt, Liz Moog, and C.Y. Yao