    150 m (original pipe length)+ 10 % (allowance for pipe fittings)

    = 165 m (revised pipe length)

    Unit heater

    at 6.6 bar g

    270 kg/h

    Revised loadto supply the heater battery is

    270 kg/h + 5.8% = 286 kg/h

    Boilerat

    7.0 bar g

    286 kg/ h

    L = 150 mP1 =7 bar g P2 =6.6 bar g

  • 8/13/2019 Block 10 Module 2

    6/18

    ( )( )

    ( ) ( )( )

    ( )

  • 8/13/2019 Block 10 Module 2

    7/18

  • 8/13/2019 Block 10 Module 2

    8/18

  • 8/13/2019 Block 10 Module 2

    9/18

    ( )( )

    ( )

    ( )

    =

    =

  • 8/13/2019 Block 10 Module 2

    10/18

  • 8/13/2019 Block 10 Module 2

    11/18

  • 8/13/2019 Block 10 Module 2

    12/18

    ( ) ( )

  • 8/13/2019 Block 10 Module 2

    13/18

  • 8/13/2019 Block 10 Module 2

    14/18

  • 8/13/2019 Block 10 Module 2

    15/18

  • 8/13/2019 Block 10 Module 2

    16/18

  • 8/13/2019 Block 10 Module 2

    17/18

  • 8/13/2019 Block 10 Module 2

    18/18