Blue & Green Trails: Getting in and out! Mass. Trails Conference November 2, 2019 Alison Field-Juma, OARS Executive Director

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS

Blue & Green Trails:

Getting in and out!

Mass. Trails ConferenceNovember 2, 2019

Alison Field-Juma, OARS Executive Director

Page 2: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS
Page 3: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS

Blue—In the river

• Chapter 91 Simplified Waterways License Application

• Wetlands Protection Act NOI

• Pulled out and stored each winter by DPW, and cleaned

TASK 1: Install a kayak/canoe dock for

handicapped-friendly access

Page 4: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS
Page 5: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS

Green--Along the river

• Wetlands Protection Act• Lots of scavenged materials—

boardwalk wood, reused kiosk, reused paving

• LOTS of volunteer time, local business pitched in, weather-dependent

• Super enthusiastic leadership• Took time and flexibility

TASK 2: Build 2,875’ of trail along the Powdermill

Impoundment

TASK 3: Build two 18’x24’ gravel-surface public

parking lots

TASK 4: Design and install an educational panel near

each of the two trail heads

TASK 5: Build one trailhead kiosk for each parking

area.

Page 6: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS

Blue-Green

• Change from original design• Took longer!• Water level controlled by dam

owner (hydro)

Page 7: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS

TASK 6: Formalize public access to the informal trail along

the edge of the river in Maynard.

TASK 7: Ensure public access across private land in Acton

But—new site opening up for redevelopment along river with boat access.

Reporting and tracking expenses and match . . .

The hard stuff

TASK 8: Add “canoe access” signs to 16 existing sites along

the Assabet River

Project duration: 2+ years

No sweat!

Page 8: Blue & Green Trails: Getting in and out! · Green--Along the river • Wetlands Protection Act • Lots of scavenged materials— boardwalk wood, reused kiosk, reused paving • LOTS

Thank you to:

DCR Recreational Trails Program

Intrepid volunteers

Acton Natural Resources Dept.

Maynard Conservation Commission