BNZ Gen-I Server Replacement National - 2007 Client: Gen-I (Direct) BNZ Bank (Indirect) Location National Services Type of Service Removal and Installation of Server Cabinets Scope of Services Downer Engineering's services include: • Risk Mitigation (via Dry Runs) • Removal of existing cabinets • Installation of new hardware Overview Downer Engineering recently secured and implemented the removal and installation of BNZ branch server cabinets through a joint service delivery, in contract with Gen-I. To successfully provide a results focused solution for our client and meet the high demand requirements, Downer Engineering and Gen-I completed “dry runs” to document a strategic implementation plan to allow suitable risk mitigation prior to service delivery. Downer Engineering took ownership of removing the existing server cabinets and the installation of new hardware. From this point, Gen-I completed software upgrades/testing, resulting in an end to end solution for BNZ. With BNZ’s IT business continuity sustained by the operation of the servers involved with this project, resulted in a high demand mission critical environment involving multiple parties and open channels of communication between Downer Engineering, Gen-I and BNZ IT staff. Downer Engineering provided a central point of contact for all project management, providing consistent high levels of service delivery. This project was completed over several months with the utilisation of a core team operating via our Wellington operation. Total value of the project $359k

Upload: jason-reid

Post on 17-Aug-2015

11 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: BNZ Gen-I

BNZ – Gen-I Server

Replacement

National - 2007

Client:

Gen-I (Direct)

BNZ Bank (Indirect)

Location National Services Type of Service

Removal and Installation of Server

Cabinets

Scope of Services

Downer Engineering's services

include:

• Risk Mitigation (via Dry Runs)

• Removal of existing cabinets

• Installation of new hardware

Overview

Downer Engineering recently secured

and implemented the removal and

installation of BNZ branch server

cabinets through a joint service

delivery, in contract with Gen-I.

To successfully provide a results

focused solution for our client and

meet the high demand requirements,

Downer Engineering and Gen-I

completed “dry runs” to document a

strategic implementation plan to allow

suitable risk mitigation prior to service

delivery.

Downer Engineering took ownership

of removing the existing server

cabinets and the installation of new

hardware. From this point, Gen-I

completed software upgrades/testing,

resulting in an end to end solution for

BNZ.

With BNZ’s IT business continuity

sustained by the operation of the

servers involved with this project,

resulted in a high demand mission

critical environment involving multiple

parties and open channels of

communication between Downer

Engineering, Gen-I and BNZ IT staff.

Downer Engineering provided a

central point of contact for all

project management, providing

consistent high levels of service

delivery.

This project was completed over

several months with the utilisation

of a core team operating via our

Wellington operation.

Total value of the project $359k