Date of Meeting: October 14, 2016 # 4 BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE INFORMATION ITEM SUBJECT: Update on Eastern Loudoun Transportation Study ELECTION DISTRICT: Countywide STAFF CONTACTS: Susan Glass, Transportation and Capital Infrastructure Joe Kroboth, III, Transportation and Capital Infrastructure PURPOSE: To provide an update on the County’s progress in addressing the missing links, bottlenecks and planned interchanges and overpasses identified in the Eastern Loudoun Transportation Study (ELTS). BACKGROUND: At the January 3, 2012 Business Meeting, the Board directed staff to provide a report transportation study of the road network in Eastern Loudoun (defined as the area east of Route 659 and Route 659 Relocated from the Potomac River on the north, Prince William County to the south and Fairfax County to the east). The purpose of the study was to provide information relating to the Countywide Transportation Plan (CTP) road network to include: 1) network deficiencies; 2) missing links; 3) cost estimates to build the interim condition; 4) development proffers/conditions related to the missing links and network deficiencies; 5) the proffer/condition triggers; 6) right-of-way availability; and 7) potential funding sources if the projects are not funded wholly or in part through proffers/conditions. On March 7, 2012, staff presented a report to the Board of Supervisors (Board) that reviewed recent and on-going efforts to address network deficiencies and missing links in the CTP road network, provided an existing conditions inventory of the deficiencies and missing links (103 road segments), provided a cost estimate to build out the CTP road network to the interim condition, and offered a funding outlook of non-proffer funding sources. The Board item also included a work plan and timeframe to analyze the proffer and right-of-way availability for each of the 102 road segments. The study area was divided into three phases: Phase 1 – the CTP road network north of Waxpool Road/Church Road; Phase 2 – the CTP road network south of Ryan Road; and Phase 3 – the CTP road network south of Waxpool Road/Church Road and north of Ryan Road. Attachment 1 contains map depicting the ELTS study area as it existed at the beginning of the ELTS project. Each phase of the ELTS was prepared by an interdepartmental team comprised of County staff from the Department of Transportation and Capital Infrastructure, Zoning Administration, Office of Mapping and Geographic Information, and Building and Development who performed the

Upload: others

Post on 29-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Date of Meeting: October 14, 2016

# 4

BOARD OF SUPERVISORS

TRANSPORTATION AND LAND USE COMMITTEE INFORMATION ITEM

SUBJECT: Update on Eastern Loudoun Transportation Study

ELECTION DISTRICT: Countywide

STAFF CONTACTS: Susan Glass, Transportation and Capital Infrastructure Joe Kroboth, III, Transportation and Capital Infrastructure

PURPOSE: To provide an update on the County’s progress in addressing the missing links, bottlenecks and planned interchanges and overpasses identified in the Eastern Loudoun Transportation Study (ELTS).

BACKGROUND: At the January 3, 2012 Business Meeting, the Board directed staff to provide a report transportation study of the road network in Eastern Loudoun (defined as the area east of Route 659 and Route 659 Relocated from the Potomac River on the north, Prince William County to the south and Fairfax County to the east). The purpose of the study was to provide information relating to the Countywide Transportation Plan (CTP) road network to include: 1) network deficiencies; 2) missing links; 3) cost estimates to build the interim condition; 4) development proffers/conditions related to the missing links and network deficiencies; 5) theproffer/condition triggers; 6) right-of-way availability; and 7) potential funding sources if theprojects are not funded wholly or in part through proffers/conditions.

On March 7, 2012, staff presented a report to the Board of Supervisors (Board) that reviewed recent and on-going efforts to address network deficiencies and missing links in the CTP road network, provided an existing conditions inventory of the deficiencies and missing links (103 road segments), provided a cost estimate to build out the CTP road network to the interim condition, and offered a funding outlook of non-proffer funding sources. The Board item also included a work plan and timeframe to analyze the proffer and right-of-way availability for each of the 102 road segments. The study area was divided into three phases: Phase 1 – the CTP road network north of Waxpool Road/Church Road; Phase 2 – the CTP road network south of Ryan Road; and Phase 3 – the CTP road network south of Waxpool Road/Church Road and north of Ryan Road. Attachment 1 contains map depicting the ELTS study area as it existed at the beginning of the ELTS project.

Each phase of the ELTS was prepared by an interdepartmental team comprised of County staff from the Department of Transportation and Capital Infrastructure, Zoning Administration, Office of Mapping and Geographic Information, and Building and Development who performed the

Page 2: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 2

work in addition to their routine duties by working overtime. Phase 1 of the study contained 27 segments and took seven and a half months to complete; it was presented to the Board on November 7, 2012. Phase 2 contained 36 segments and took four months to complete; it was presented to the Board on April 3, 2013. Phase 3 contained 39 segments and took eight months to complete; it was presented to the Board on January 15, 2014. A detailed analysis was prepared for each segment to assess right-of-way availability, which considered whether right-of-way had been reserved or dedicated and whether it is proffered or conditioned. Additional analysis included whether proffers or conditions exist for the road improvement, whether cash has been proffered or whether any cash proffers exist in the event that the road improvement is constructed by others. Each segment analysis also includes a map depicting a graphical representation of the road segment and a synopsis of the detailed analysis. While the study took a considerable amount of time to prepare, the information has been very useful in developing the proposed Capital Improvement Plan (CIP) transportation projects and in preparing an application for Smart Scale (formerly known as HB2). The ELTS has been published to the County’s web site and is accessible at this link: www.loudoun.gov/easternloudountransportationstudy. The County has made progress in addressing the missing links and bottlenecks identified in the ELTS. As of October 14, 2016, 17 segments are complete; 6 segments are partially complete; 34 segments are in progress; 5 segments are funded in the FY 2017 Adopted CIP but not yet started; and 39 segments are not funded in the CIP. The following tables provide a synopsis of segments categorized by their status: complete, partially complete, in progress, funded in the Adopted CIP but not yet started, and not funded in the CIP. The on-line mapping component of the ELTS has been updated to reflect the status of each segment as reported in this item; the individual segment analysis reports have not been updated. Attachment 2 contains a map that reflects the ELTS updates that are reported in this item. COMPLETE:

PHASE SEGMENT # SEGMENT PROJECT

OWNER

DATE OPENED

TO TRAFFIC

1 30

Gloucester Parkway – Loudoun County Parkway to Pacific Boulevard

County funded; VDOT administered project

August 4, 2016

1 31 Pacific Boulevard – Gloucester Parkway to Severn Way

Funded by VTIB loan obtained by Kincora; VDOT administered project

August 4, 2016

Page 3: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 3

PHASE SEGMENT # SEGMENT PROJECT

OWNER

DATE OPENED

TO TRAFFIC

1 7

Russell Branch Parkway – Ashburn Village Boulevard to Ashburn Road

County funded and administered August 2, 2016

2 57

Loudoun County Parkway – Evergreen Ridge Drive to Creighton Road

Toll Brothers pursuant to Loudoun Valley Estates II proffer

August 23, 2016

3 44 Moran Road – Glenn Drive to Davis Drive

County funded; VDOT administered Belfort Park Area Roads project

June 2015

3 45 Moran Road – Glenn Drive to Shaw Road

County funded; VDOT administered Belfort Park Area Roads project

June 2015

3 43 Glenn Drive – Cedar Green Road to existing Glenn Drive

County funded; VDOT administered Belfort Park Area Roads project

June 2015

3 23 Waxpool Road – Faulkner Parkway to Ashburn Road

Constructed by the developer of Fairfield at Ryans Corner pursuant to proffer

August 2013

1 28

Loudoun County Parkway – Gloucester Parkway to W&OD Trail

Constructed by Lerner February 2016

1 19 Route 7/Sterling Boulevard intersection improvements

County Route 7 Traffic Operations Project

August 2014

1 20 Route 7/Potomac View Road intersection improvements

County Route 7 Traffic Operations Project

August 2014

1 21 Route 7/Augusta Drive intersection improvements

County Route 7 Traffic Operations Project

August 2014

Page 4: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 4

PHASE SEGMENT # SEGMENT PROJECT

OWNER

DATE OPENED

TO TRAFFIC

1 22

North Collector Road (Maple Leaf Place) – Tamarack Square to Lakeland Drive

Constructed by developer (Zadnik) June 2014

2 72

Creighton Road – Belmont Ridge Road to Loudoun County Parkway

Developer (Toll Brothers) pursuant to Loudoun Valley Estates II proffer

August 2013

2 73

East Gate View Drive – Tall Cedars Parkway to Pleasant Valley Drive

Constructed by developer (EG Development/MI Homes) pursuant to East Gate One proffer

2012

2 89 Route 50 widening – Poland Road to Fairfax County

VDOT December 2015

3 33 Pacific Boulevard – Dresden Street to Relocation Drive

VDOT Spring 2007

PARTIALLY COMPLETE:

PHASE SEGMENT # SEGMENT COMPLETED PORTION

DATE

OPENED TO

TRAFFIC

2 77

Northstar Boulevard – Braddock Road to Prince William County line

The developer of Kirkpatrick West constructed a half section from Braddock Road to their southern property line. Other half section is outstanding, plus whole section between Ruffed Grouse Court and county line.

2015

Page 5: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 5

PHASE SEGMENT # SEGMENT COMPLETED PORTION

DATE

OPENED TO

TRAFFIC

2 81

Pleasant Valley Road – Dulles Airport to Fairfax County line

The developers of Woodburn and East Gate One constructed the segment between Route 50 and the Fairfax County line. Outstanding portion is located north of Route 50.

2014

2 88

Route 50 Eastbound – Northstar Boulevard to Loudoun County Parkway

Van Metre, the developer of Stone Ridge, constructed improvements from Stone Springs Boulevard eastward. Outstanding portion is between Northstar Boulevard and Stone Springs Boulevard.

2014

2 100

West Spine Road (Gum Spring Road) – South of Braddock Road to Prince William County line

Woodlawn, the developer of Seven Hills and Dawsons Corner, constructed improvements between Braddock Road to Dawsons Corner Boulevard. Outstanding portion is located south of Dawsons Corner Boulevard.

2013

1 27

Smith Switch Road – Gloucester Parkway to Farmwell Road

Two lanes between W&OD and Gloucester Parkway constructed by developer of Stonegate pursuant to reimbursement agreement

April 2014

2 70

Braddock Road – Northstar Boulevard to Fairfax County line

Developer (Kirkpatrick West) constructed segment along frontage adjacent to Braddock Road. County FY 2017 CIP funds widening road in vicinity of Supreme Drive/Summerall Drive

2015

Page 6: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 6

IN PROGRESS:

PHASE SEGMENT # SEGMENT PROJECT

OWNER STATUS

1 18 Route 7/Belmont Ridge Road Interchange

Federal, state and County funded; County administered

Under construction

1 1 Belmont Ridge Road – Route 7 to Gloucester Parkway

Federal, state and County funded; County administered

Under construction

1 2

Belmont Ridge Road – Gloucester Parkway to Hay Road

County, state and NVTA funded; VDOT administered

In right-of-way acquisition; construction expected to commence Fall 2016

1 3 Belmont Ridge Road – Bridge over the Greenway

State and federal funded; VDOT administered

In design

1 16 Route 7/Ashburn Village Boulevard Interchange

Miller & Smith pursuant to One Loudoun proffer; County provided $5M contribution

Under construction

1 9

Riverside Parkway – Ashburn Village Boulevard to Lexington Drive

County funded; administered by Miller & Smith pursuant to reimbursement agreement

Under construction

1 10

Riverside Parkway – Lexington Drive to Loudoun County Parkway

Funded by cash proffers, Revenue Sharing and NVTA 30%; County administered

In design

1 11 Route 7 - George Washington Boulevard Overpass

RSTP funded; VDOT administered In design

1 32

Pacific Boulevard – Russell Branch Parkway to Gloucester Parkway

Funded by VTIB loan obtained by Kincora; VDOT administered

Under construction; anticipated completion date December 2016

Page 7: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 7

PHASE SEGMENT # SEGMENT PROJECT

OWNER STATUS

1 103 Farmwell Road – Smith Switch Road to Ashburn Road

Funded by cash proffers, Revenue Sharing and NVTA 30%; County administered

In design

2 58 Loudoun County Parkway – Creighton Road to Route 606

Brambleton pursuant to proffer; Route 606 Widening project constructing intersection

Under construction; Brambleton is required to open their section of Loudoun County Parkway between Creighton Road and Shreveport Drive within 30 days of the installation and activation of a traffic signal at the intersection of Belmont Ridge Road/Shreveport Drive. Route 606 intersection to open September 2017.

2 78 Northstar Boulevard – Route 50 to Tall Cedars Parkway

Funded by cash proffers, Revenue Sharing and NVTA 30%; County administered

In design

2 79 Northstar Boulevard – Shreveport Drive to Route 50

Funded with local tax funding, Revenue Sharing, NVTA 70% and NVTA 30%; County administered

In design

Page 8: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 8

PHASE SEGMENT # SEGMENT PROJECT

OWNER STATUS

2 48

Old Ox Road (Route 606) – Greenway to Evergreen Mills Road

County, state and MWAA funded; VDOT administered

Under construction; interim configuration to open September 2017; project completion date September 2018

2 87

Route 50 Westbound – Loudoun County Parkway to Arcola Boulevard

Developers: Dulles Landing and Arcola Center (Buchanan)

Under construction

2 97

Shreveport Drive – Northstar Boulevard to Loudoun County Parkway

Developers: Brambleton and Evermont Trace

Under construction

2 98 Tall Cedars Parkway – Pinebrook Road to Riding Center Drive

Developer: Peterson Companies pursuant to Avonlea Plaza proffer

Under construction

2 99 Tall Cedars Parkway – Gum Spring Road to Pinebrook Road

Funded with cash proffers; County administered

Construction to commence September 2016

3 5

Belmont Ridge Road – Broadlands Boulevard to Truro Parish Drive

Developer: Brookfield Homes pursuant to Goose Creek Preserve proffer and reimbursement agreement with County

Under construction; road improvements to be completed October 2016

3 6 Belmont Ridge Road – Truro Parish Road to Croson Lane

Funded with local tax funding, general obligation bonds, cash proffers and NVTA 30%; County administered

In design

3 69 Claiborne Parkway – Croson Lane to Ryan Road

Funded with Revenue Sharing, gas tax and cash proffers; County administered

Construction to commence upon completion of Columbia Gas line

Page 9: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 9

PHASE SEGMENT # SEGMENT PROJECT

OWNER STATUS

3 67

Greenway Transit Connector Bridge (Old Ryan Road to Shellhorn Road with Bridge)

Funded with gas tax, cash proffers and lease revenue; County administered

Design/build contract issued to Dewberry/Shirley Contracting

3 41

Innovation Avenue (realignment) – Route 28 interchange to Fairfax County line

Developer pursuant to Dulles World Center proffer Under

construction

3 61

Moorefield Boulevard – Loudoun County Parkway to Mooreview Parkway

Developers: Atapco and Claude Moore Charitable Foundation (CMCF) pursuant to Moorefield Station proffer

Portion from Old Ryan Road to Croson Lane being constructed by Atapco; segment from Croson Lane to Metro Center Drive in design

3 62

Mooreview Parkway – South of Croson Lane to Old Ryan Road

County pursuant to reimbursement agreement with CMCF

Construction to commence following relocation of Columbia Gas line

3 85 Route 28 Hot Spot widening

NVTA and Route 28 Tax District funded; VDOT administered

Under construction

3 86 Route 28/Innovation Avenue Interchange

Developer pursuant to Dulles World Center proffer; administered by VDOT

Under construction

3 53 Sterling Boulevard – Pacific Boulevard to Moran Road

Funded with Revenue Sharing, NVTA 30% and proceeds from sale of land; County administered

In design

Page 10: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 10

PHASE SEGMENT # SEGMENT PROJECT

OWNER STATUS

3 24 Waxpool Road – Unbridled Way to Faulkner Parkway

Funded with State capital assistance, gas tax and cash proffers; County administered

Partially constructed; remainder to be constructed following utility relocation

1 25

Waxpool Road – Loudoun County Parkway to Smith Switch Road

Developer: Dupont Fabros constructing third eastbound lane pursuant to Worldcom proffer

Design complete; under construction

2 71 Arcola Boulevard – Loudoun County Parkway to Route 50

Developers: Van Metre to construct segment from Route 50 to Dulles West Boulevard pursuant to Glascock Field at Stone Ridge; remainder proffered to be constructed by Arcola Center (Buchanan Partners); in County CIP with funding in FY2019-2020

In design

2 76

Glascock Boulevard (Dulles West Boulevard) – Northstar Boulevard to Loudoun County Parkway

Developers: Dulles Landing and Arcola Center; in County CIP with funding in FY2020 and FY2022

Partially constructed; road open from Loudoun County Parkway to western boundary of Dulles Landing; Arcola Center design complete to Arcola Boulevard

3 66 Croson Lane – Belmont Ridge Road to Old Ryan Road

Cash proffer funding; County administered

Under construction

3 51 Shaw Road – Belfort Park Drive to Sterling Boulevard

Local tax funding and cash proffers; County administered

In design

Page 11: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 11

FUNDED IN THE ADOPTED CIP; NOT YET STARTED:

PHASE SEGMENT # SEGMENT FUNDING YEARS

2 80 Northstar Boulevard – Tall Cedars Parkway to Braddock Road

NVTA 70% and cash proffers FY2022

2 101 Westwind Drive- Ladbrook Drive to State Street

Revenue sharing, NVTA 30% and NVTA 70%

FY2019-FY2020

3 54 Shellhorn Road – Greenway Loop Road to Lockridge Road

General obligation bonds and NVTA 70%

FY2017-FY2020

3 55 Shellhorn Road – Loudoun County Parkway to Greenway Loop Road

General obligation bonds and NVTA 70%

FY2017-FY2020

2 74 Evergreen Mills Road – Belmont Ridge Road to Loudoun County Parkway

Local tax, general obligation bonds FY2021-

FY2022

NOT FUNDED IN CIP

PHASE SEGMENT # SEGMENT

1 12 Ashburn Road – Gloucester Parkway to Stubble Road 1 13 Ashburn Road – Russell Branch Parkway to Gloucester Parkway 1 29 Ashburn Road – Beaverdam Run Bridge to Farmwell Road 3 14 Ashburn Road – Faulkner Parkway to Waxpool Road 1 15 Lexington Drive – Atwater Drive to Russell Branch Parkway 1 17 Route 7/Lexington Drive Overpass

1 8 Russell Branch Parkway – Belmont Ridge Road to West of Tournament Drive

1 26 Waxpool Road – Route 28 to Loudoun County Parkway 2 4 Belmont Ridge Road – Shreveport Drive to Evergreen Mills Road

2 75 Foley Branch Boulevard – Northstar Boulevard to Loudoun County Parkway

2 60 Loudoun County Parkway – Braddock Road to Fairfax County line

2 82 Route 50/Pleasant Valley Road Overpass 2 84 Poland Road Realignment – Poland Road to Tall Cedars Parkway

2 83 Poland Road Realignment – South Riding Boulevard to existing Poland Road

2 90 Route 50/Arcola Boulevard Interchange 2 91 Route 50/Northstar Boulevard Interchange

Page 12: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 12

PHASE SEGMENT # SEGMENT

2 92 Route 50/Loudoun County Parkway Interchange 2 93 Route 50/South Riding Boulevard Interchange 2 94 Route 50/Tall Cedars Parkway Interchange

2 96 Route 50 North Collector Road – Wade Drive to Pleasant Valley Road

2 95 Route 50 North Collector Road – South Riding Boulevard to Wade Drive

2 102 Willard Road – Route 50 to Dulles Airport

3 64 Centergate Drive – Moorefield Boulevard to Claude Moore Avenue

3 65 Claude Moore Avenue – Centergate Drive to Old Ryan Road

3 63 Claude Moore Avenue – Loudoun County Parkway to Centergate Drive

3 42 Davis Drive – Yeager Court to Sunrise Valley Drive 3 39 Greenway Loop Road – Bridge over the Greenway 3 38 Greenway Loop Road – Lockridge Road to the Greenway

3 40 Greenway Loop Road –Greenway to east of Loudoun County Parkway

3 68 Greenway Loop Road –West of the Greenway to Moorefield Boulevard

3 37 Lockridge Road – Loudoun County Parkway to Waxpool Road 3 36 Lockridge Road – Moran Road to Loudoun County Parkway 3 56 Loudoun County Parkway – Shellhorn Road to the Greenway 3 46 Moran Road – Lockridge Road to the Bridge over Route 28 3 47 Moran Road – Bridge over Route 28

3 34 Pacific Boulevard – Old Ox Road (Route 606) to Route 28/Innovation Avenue Interchange

3 35 Relocation Drive – Pacific Boulevard to Old Ox Road (Route 606)

3 50 Shaw Road – Sterling Boulevard to Old Ox Road (Route 606) 3 49 Shaw Road – Old Ox Road (Route 606) to Innovation Avenue

ISSUES: Updating the individual segment analysis documents is a labor intensive endeavor that cannot be supported by County staff at this time due to existing workloads. The CTP has been amended since the ELTS was prepared. One segment of Shaw Road is no longer considered a CTP road (Davis Drive to Sterling Annex) and was removed through the CTP Technical Amendment, CPAM-2014-0001, adopted June 11, 2014; therefore, it has been deleted from this update. Prentice Drive was added to the CTP on July 1, 2015 (CPAM-2014-0002); it was not included on the original list of ELTS segments and is not reflected in this report. It is also noted that the Silver Line Small Area Comprehensive Plan amendment is being

Page 13: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

Item 4, Update on Eastern Loudoun Transportation Study Transportation and Land Use Committee Meeting

October 14, 2016 Page 13

processed which will affect the alignment of Lockridge Road. It is further noted that the County has embarked on a significant revision to the Comprehensive Plan, which includes updating the CTP; this revision will likely result in changes to the ELTS road segments.

FISCAL IMPACT: County, state and federal funds continue to be needed to build out the County’s road network. In preparation for updating the CIP, the County is working on a model to refine cost estimates associated with road projects.

ATTACHMENTS:

1. ELTS Overview Map2. ELTS Update Map

Page 14: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

75

77

32

60

95

76

79

42

71

36

8

69

57

53

58

54

98

78

30

3365

83

6761

99

97

62

34

10

64

37

38

7

40

49

15

73

11

55

72

9

63

101

4352

47

22

6839

99

98

70

74

48

100

1

41

51

89

35

88

6

2

25

87

27

85

31

80

26

102

46

28

29

4

50

81

12

13

103

96

66

20

56

23

1921

84

2414

16

3

18

50

DULLES

LEESBURG

SULL

Y RD

DULLES GREENWAY

BRADDOCK RD

HARRY BYRD HWY

EVERGREEN MILLS RD

JAME

S MON

ROE

HWY

OLD OX RD

WATS

ON R

D

SYCOLIN RD

ASHB

URN

RD

LOUD

OUN C

OUNTY PKWY

TRACON RD

HAY RD

SHAW RD

CASC

ADES

PKW

Y

VORTAC RD

RYAN RD

GUM

SP

RING RD

RADA

R R

D

GLE E

DSVIL

LE R

D ALGONKIAN PKWYCLAIB O RNE

PKWY

PERIMETER RD

WAXP OOL RD

SERV IC E RDLENA

H RD

DAVIS DR

JOHN MOSBY HWY

ANTE

NNA

RD

CHURCH RD

OPER

ATIO

NS R

D

ATLA

NTIC

BLVD

BEECH RD

RUNWAY RD

BELM

ONT R

IDGE

RD

NORTHST

AR BL

VD

RED HI LL RD

FLEETWOOD RD

POLAND RD

COCHRAN MILL R

D

STER

LING

BLVD

INSTR

UMEN

T RD

FLIG

HT LI

NE R

D

NEW RD

CROSON LA

TALL CE DARS PKWY

EDGEWA TER ST

LIGHTRIDGE FARM RD

MAPLE AV

RESERVOIR RD

ELK

LICK

RD

CENTER ST

MORAN RD

ROCK

HILL R

DFLAP RD

AMEL

IA ST

DEMOTT DR

RADIAL RD

GAP RD

THE WOO DS RD

BEAVERDAM DR

HOLLY AV

LINCO

LN A

V

NOKES BLVD

ARFF RD

ASHBURN FARM PKWY

PLEASA

NT VA

LLEY

RD

PAINT RD STRUCTURES RD

ECHO RD

GLENN DR

PEA CH ORCH ARD LA

RIDING CENTER DR

GLOUCESTER PKWY

FARMWELL RD

POPLAR RD

JUDI TH LA

DELTA RD

EXCHANGE S T

WI LL

ARD

RD

CLAUDIA DR

COTTA GE RD

IRON BIT PL

BROADLANDS BLV D

BRAVO RD

MIN

ERV A DR

T ICONDERO

GA

RD

MASONS LA

GULIC K MI LLRD

BROAD RUN DR

CREIGHTON RD

BULL

RUN P

OSTO

FFICE

RD

SHR EVE MILL RD

CEDAR RI D GE BLVD

LUCK L A

RELOCATION DR

DULLES ACCESS RD

MA RIES RD

RIVERSIDE PKWY

CHARLIE RD

PACIFIC B LVD

CREIGHTON FARMS DR

GOS HEN RD

HAU L RD

AUGU

STA

DR

OATLANDS M

ILL R

D

NATIONS ST

EASTGATE VIEW DR

MEDALIST DR

PADDOCK

TRAIL

PL

POTOMAC VIEW RD

HARMONY CHURCH RD

SOUSA PL

ATWATER DR

GOLF VIEW DR

WEATHER SERVICE RD

DESTINY DR

GREA

T WOO

DS D

R

LITTLE RIVER LA

ARIAN

E WY

LENAH RUN CIR

SMITH

SWITC

H RD

OLYM

PIA DR

YOUNGS CLIFF RD

CAB IN RD

YORK

RD

S A ULTY DR

PALISADE PKWY

UUNET DR

PRENTICE DR

DONEGAL DR

LOCKRID GE RD

FREEDOM ST

BROD

ERIC

K DR

RIVERPOINT DR

HOGELAND MILL RD

MOUNT GILEAD RD

GANT LA

MARBLEHEAD DR

TRAD

EWIND

DR

ARGO

NNE

AV

KINC

AID

BLVD

FOUNDERS DR

JUSTIC

E DR

TAIL RACE RD

DONOVAN DR

VESTALS GAP DR

CARTERS SCHOOL RD

SMITH

CIR

G LEBE VIEW DR

FR ONT ST

LENA

H FA

RM L

A

PARAMOUNT PL

CEDAR DR

ARCOLA RD

WOODLAND RD

KING

ST

OAKGR

OVE

RD

WOODSIDE P L

WORK ORDER RD

MEADE DR

TRIPLESEVEN RD

DAIRY LA

HEMI

N GWAY

DR

FOX FIELD LA

SHELLHOR N RD

FLI NT ON BRIDGE DR

REVIVAL DR

LOWER PERIM

ETER

RD

FREDERICK DR

CRUS

HER

DR

RED RUM DR

STUKELY DR

DUNL

OP M

ILL R

D

AIRPLANE

RD

REGAL WOOD DR

SUGARLAND RD

LOGBOOK DR

WHITEWAT

ER

DR

TAVISTOCK DR

AVIATION DR

STON

ECRO

FT B

LVD

FR EEPOR T PL

BEAVER MEADOW RD

STRI

KER

AV

SOUTHPA W PL

FAIRHUNT DR

ALPHA RD

GLASGOW DR

RACEFIELD LA

SINEGARPL

COURTLAND FARM LA

FORES

T FAR

M LA

LAND

S END

DR

RED CEDAR DR

LANS

DOWNE

BLV

D

LO

NGACRE DR

STUBBLE RD

EVERFIELD DR

KENNE DY R

D

MAGNOLIA RD

JUNI

PER

AV

LOWE

S ISLAND BLVD

STATE ST

CHAR TER OAK DR

RIDGEWAY DRWYNRIDGE DR

ELK PL

CITY

CEN

TER

BLVD

BLOSSOM DR

FOX RD

D

ABNE R DR

WAXWING DR

RIDG

ETOP CI

R

KENT WELL PL

ELLZEY DR

WINDING RD

CHARLO TTE ST

M AYHEW LA

ASH RD

ELLIO

T LA

OAK LA

CONTACT RD

RUDDER RD

GUILFORD DR

WES T

WIND

DR

LE IERPL

ALFORD RD

DICK

ENSO

N AV

BROWNS CREEK PL

EXPLORE R DR

FAIRWAY DR

B RIARFIELD LA

PEYT

ON R

D

OVERLAND DR

ORIBI PL

MIDDLEFIELD DR

STAUNTON AV

REDR

OSE

DR

LEGACY PA RK DR

SUGARLAND RUN DR

GREE

NTHO

RN AV

HELIX DR

KUDU CT

TAVERN DR

CARG

O D

R

STEGE R PL

MARRW

OOD DR

ASPE

N AV

LENAH W

OODS PL

LOUD OUN PARK LA

VERN

ON S

T

VILLAGE DR

MER

CURE CIR

WIN TERGROV E DR

RURITAN RD

DULLES SOUTH PKWY

CRIMSON PL

LAKELAND DR

MILLSTREAM DR

GEORGE WASHINGTON BLVD

LEWIS CT

BOWFO NDS ST

AIR FR

EIGH

T LA

LOUDOUN RESERVE DR

CIRCLE D

R

DULLES TOWN CIR

ROAN CT

INDIGO PL

CASABLANCA DR

WILLIAMSBURG RD

FLE MMING DR

JULIA ST

SOPHIES RUN LA

ENVIRONS RD

SWEETWATER LA

MANB AR LA

GALLORETTE PL

MANOR HOUSE RD

DEFENDER DR

URAL DR

GLIDE SLOPE DR

SEVERN WY

MINDFUL CT

BEA

UMEADE CIR

VALI A NT DR

WIND M ILL DR

POTOMAC DR

HIDDENWOOD LA

BLACK BRANCH PKWY

WEAVER CT

LOBO DR

SAARINEN C IR

CHELTENHAM CIR

MILL DA M PL

LO GQUARTER LA

NAVAJO D R

CARROLLTON RD

DULLES CENTER BLVD

GREENSTONE DR

AUCTION BARN DR

GR

E NATA PRESERVE PL

BREEZYHILL DR

NOLEN CT

LADBROOK DR

BURKE DALE ST

RECT

OR S

T

TOWER RD

QUICKSILVER DR

AWBREY PL

LOIS LA

MILL BRA NCH DR

FINCASTLE DR

COCHR ANS LO

CK DR

CIS

CO LA

HAS TINGS DR

LANGLEY OAKS DR

MARKHAM PL

WHITE

OAK

DR

HOLLYHOCK TE

AUGUSTINE PL

LENNOX HALE DR

LAUREL WOOD CT

SPRIN

GVALLEY LA

LENAH M ILL BLVD

EM

ERALD PARK DR

TWIN

POND

LA

BANSHEE DR

AUTO

PILOT

DR

PALMER CLA

SSIC PKW

Y

BRYN BACH LA

HYLAND HILLS ST

WIND

SOC

K D

R

BELGREEN DR

LEE RD

APPLE GATE D

R

TERR

IE DR

GOLF CLUB RD

TALENT ST

WINKLE DR

EDEN

DR

AVON

LEA

DR

O AK MARR LA

UP PERC LUB HO USE D R

TOLBERT LA

BLOOMFIELD PATH ST

ENTERPRISE ST

TOUC

HDOW

N LA

FALC ON PL

SARANAC ST

HAMPSHIRE STATION DR

FOXDEN LA

FOREST RUN DR

KATEBINI LA

CROSSROADS DR

KEILLER TE

CHISHOLM DR

LO UISA DR

KINS A LE PL

CUTWATER PLWAYSI DE CIR

CHRISTIANA DR

MA LDEN PL

EQUIPMENT RD

RUSSELL BRANCH PKWY

DIGGINS CT

TANA

GER P L

SPOTSWOOD RD

COCKPIT CT

PLEASANT FOREST CT

BRISTOW MANOR DR

CROSS

TRAIL

BLVD

STONEYRUN PL

FRONTIER DR

RAWLEY S PRINGS DR

SUSCON SQ

BE A CH PL

MIDDLE BLUFF PLHEARFORD LA

ENGLISH YEW PL

OATLANDS PLAN TATION LA

LAUR

A AN

NE D

R

CHRISTOPHER LA

DISKIN PL

PARTRIDGE PL

LACE

YS TA

VERN

CT

CRANSTON ST

CAMER

ON HU

NT P

L

LA BELLE PL

CEDARHURST DR

VIC TORIA PL

TOMEY CT

HIGBEE LA

PAR KSIDE CI R

RAMP RD

TOWLERN PL

MASTERY PL

PIDGEON HI LL DR

WEYBRIDGE SQ

NEWTON PL

SPYD ER PL

CORRO PL

COTON COMMONS DR

ZION C

HAPE

L DR

BERYL TE

RISING MOON PL

WESTWOO D PL

TIPPECANOE TE

VANCE RD

MYERS PL

HYDE P ARK DR

MADTURK EY RUN PL

SOUTHPOINT DR

NICKENS PL

JENKINS LA

MCNAIR PL

BARTHOLO MEW FAIR DR

EDDS LA

PARTLOW RD

ALDIE SPRINGS DR

MCPHERSON CIR

BATTLEFIELD PKWY

TRASK PL

TIMBERBROOKE PL

DIABASE SQ

LOFT

HILL

DR OGDEN PL

GRE YHOUSE PL

SHOPS RD

EVER

GREE

N ST

WYCKOFF DR

JOHN

SON

RD

FORES T GLEN DR

PAG ET TE

PAMPLIN TE

FURMAN DR

CALA

IS TE

CONQU EST CIR

RUBY DR

GENERATION DR

FLEE

T TE

LIV E RY SQ

SYKES TE

BRET

HOUR CT

AZALEA LA

LESL

IE C

T

RAVENGLASS DR

CAPRI PL

HARRIS STTA

MARA

CK C

T

STI NGE

R DR

CRESTED QUAIL DR

BUOY PL

LISA

TE

MITCHAM SQ

ASHBURN F ARM PKWY

ARGONNE AV

PERIM E TER RD

SULLY RD

RIVERSIDE PKWY

SERV

ICE

RD

ARFF R D

RIVERSIDE PKWY

SEVERN WY

ARFF

RD

MAPLE AV

PERIMETER RD

ALGONKIAN PKWY

LANSDOWNE BLVD

NORT

HSTA

R BL

VD

DULLES GREENWAY

WILL

ARD

RD

Status of Road SegmentsPhases One Through Three

0 1 2 30.5Miles Office of Mapping and Geographic Information

Map Number 2012-332Date: October 22, 2012

Update Date: March 19, 2013

PHASE 1PHASE 3

SUBJECT TO AN ALIGNMENT STUDY

PHASE 3PHASE 2

County BoundaryOverpassInterchangePhase LinesBottleneckMissing LinkCompletedStreet CenterlineParcel BoundaryMap Item Number19

68

PHASE 3

PHASE 2

PHASE 1

Attachment 1

Page 15: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE …

XY

XY

XY

XY

XY

XY

XY

XY

!(

!(

!(

!(DULLES GREENWAY

HARRY BYRD HWY

EVERGREEN MILLS RD

OLD OX RD

WATS

ONRD

SYCOLIN RDGUM

SPRINGRD

ASHB

URN

RD

BRADDOCK RD

HAY RD

TRACON RD

SHAW RDRYAN RD

RAMP

RADA

R RD

LOUDOUN COUNTY PKWY

GLEE

DSVIL

LERD

ALGONKIAN PK WY

BELM ON T RIDGERD

VORTAC RD

WAXPOOL RD

LENA

H RD

SERV

ICE

RD

PERIMETER RD

CROSON LA

CASC

ADES

PKWY

SULL

Y RD

ANTE

NNA

RD

CHURCH RD

DAVIS DR

BEECH RD

OPER

ATIO

NS R

D

CLAIB

ORNE PK

WY

RUNWAY RD

RED H ILL RD

FLEETWOOD RD

COCHRAN MILL RD

GLENN DR

INST

RUME

NT R

D

TALL CED ARS PKWY

STER

LING B

LVD

MAPLE AV

GANT LA

ELK

LICK

RD

RESERVOIR RD

MORAN RD

CENTER ST

AMEL

IAST

NORTHSTA RBLVD

NOKES BLVD

RADIAL RD

DEMOTT DR

THE WO ODS RD

BEAVERDAMDR

HOLLY AV

LINCO

LNAV

ATLANTICBLVD

PAINT RD

ASHBURN FARM PKWY

ECHO RD

STRUCTURES RD

RIDING CENTER DR

PEACHORCHARD

LA

STONE SP

RINGS B LVD

JUDITHLA

POPLARRD

FARMWELL RD

GLOUCESTER PKWYDELTA RD

EXCHANGE ST

WILL

ARD

RD

CREIGHTON RD

CLAUDIA DR

SHELLHORN RD

JAME

S MON

ROE HW

Y

IRON BIT PL

BRAVO RD

OLD RY

ANRD

BROADLANDS BLVD

MIN ERV A DR

TICONDEROGA RD

MASONS LA

GULICKM IL L RD

ASHBURN VILLAGE BLVD

BROAD RUN DR

RUSSELL BRANCH PKWY

SHREVE MILL RD

BULL

RUN

POST

OFFIC

E RD

LUCKLA

CEDAR RI DGE BLVD

MARIES RD

RELOCA

TION DR

PALISADE PKWY

MOOR EVIEWPKWY

RIVERSIDE PKWY

CHARLIE RD

GOSHENRD

ROCK

HILL

RD

NATIONS ST

AUGU

STA

DR

EASTGATE VIEW DR

MEDALIST DR

MILLER DR

SOUSA PL

PADDOCK

TRAIL

PL

JOHN MOSBY HWY

ATWATER DR

DESTINY DR

GOLF VIEW DR

WEATHER SERVICE RD

ARIAN

E WY

EVER

FIELD DR

GREA

TWOO

DSDR

GAP RD

OLYM

PIADR

LENAH RUN CIR

SMITH

SWITCH RD

YORK

RD

COTT

AGE RD

S A ULTY DR

YOUNGS CLIFF RD

UUNET DR

SUCCESS DR

PRENTICE DR

DONEGAL DR

FREEDOM ST

FAIRHUNT DR

BROD

ERIC

KDR

LOCKRIDGERD

LITTLE RIVER LA

NEW RD

HOGELAND MILL RD

LIGHTRIDGE FARM RD

ARGO

NNE A

V

TRAD

EWIND

DR

JU

STICE DR

FOUNDERS DR

CROSS TRAI

L BLV

D

DONOVAN DR

LAKE

DR

SMITH

CIR

RACHEL HILL D R

FRONT ST

SARAZENDR

VESTALS GAP DR

CARTERS SCHOOL RD

REVIVAL DR

GLEBEV IEW DR

CEDAR DR

CRUS

HER

DR

LENA

H FA

RM LA

GOLF RD

PARAMOUNT PL

LENNOX HALE DR

WOODLAND RD

WOODSIDE P L

DAIRY LA

OAKGR

OVE R

D

WORK ORDER RD

SUGARLAND RUN DRTRIPLESEVENRD

HEMI

N GWA

Y DR

FOXFIELD LA

SHREVEP ORT DR

RED RUM DRFREDERICK DR

FLINTON BRIDGED R

STUKELY DR

RIVE RPOINT DR

REGAL WOOD DR

LOGBOOK DR

WHITEWATER

DR

AVIATION DR

STRI

KER A

V

FR EEPOR T PL

ALPHA RD

SOUTHPAW PL

BEAVER MEADOW RD

GLASGOWDR

RACEFIELD LA

INNOVATION AV

FORE

STFA

RMLA

ELK PL

LAND

S EN

D DR

LONGACRE DR

HAUL RD

RED CEDAR DR

F O X

RD

LANSDO

WNE

BLVD

STATE ST

ARCOLA BLVD

KENNEDY R

D

JUNI

PER

A VMAGNOLIA RD

TAN K FARMRD

SINEGAR PL

POTOMAC VIEW RD

WYNRIDGE DR

BLOSSOMDR

SOUT

H RIDING BLV

D

CHAR T EROAK

DR

RUDDER RD

ASH RD

CITY

CENT

ERBL

VD

D

ABNE R DR

ELLZEY DR

WAXWING DR

RIDG

ETOP

CIR

OAK LA

WIND ING RD

ARFF

RD

ELLIO

T LA

PLEA

SANT

VALL

EYRD

KENTWELL PL

M AYHEW LA

C HARLOTT E ST

MARBLEHEAD DR

KENNETH PL

COMPASS CREEK PKWY

SOUTHER DR

LEIERPL

GUILFORD DR

WES

T WIN

DD R

JAWA

HER PL

ALFORD RD

ALDIE SPRINGS DR

MARRWOOD D R

RACI

NG S

UN D

R

COURTLAND FARM LA

VINEGAR HILL DR

ORIBI PL

PEYT

ONRD

FAIRWAY DR

DICK

ENSO

N AV

EXPLORE R DR

TAVIST OCKDR

OVERLAND DR

BLOOMFIELD PATH ST

KING ST

HE L IX DR

REDR

OSE D

R

STAUNTON AV

POLAND RD

KUDU CT

MIDDLEFIELD DR

LEGACY P A RK DR

TAVERN DR

GREE

NTHO

RN AV

CARG

O DR

VERN

ONST

RHONDA PL

VILLAGE DR

STEG E R PL

LENAH WOODS PL

RURITAN RD

LOUD O UN PARK LA

MER

CURE CIR

CRIMSON PL

WIN TERGRO VE DR

LEWIS CT

ROAN CT

CIR CLE DR

LAKELAND DR

INDIGO PL

MILLSTREAM DRMOOREFIELD BLVD

BROWNS CREEK PL

FOXTROT RD

BOWFONDS ST

ASHBROOK PLAI

R FR

EIGHT

LA

GEORGE WASHINGTON BLVD

MOORE PL

CASABLANCA DR

FLE MMING DR

DULLES TOWN CIR

LOUDOUN RESERVE DR

WILLIAMSBURG RD

BRIARFIELD LA

SUGARLAND RD

ENVIRONS RD

URAL DR

JACKPIT LA

GALLORETTE PL

HAZEL PL

MANOR HOUSE RD

SEVERN WY

MINDFULCT

VALI ANT DR

GRASSLAND GROVE DR

PARK CHALET PL

WIND MILL DR

GLIDE SLOPE DR

LOBO DR

N ORWALK

SQ

BEAUMEADE CIR

POTOMAC DR

EDGE

WATER

ST

WEAVER CT

UNDERWOOD LA

HIDDENWOOD LA

MILL DA M PL

SA A RINEN C IR

NAVAJO DR

CHELTENHAM CIRJULIA ST

CARROL LTON RD

NOLEN CT

GREENSTONE DR

BREEZYHILL DR

AUCTION BARN DR

SUMM E RALL D R

LOIS LA

GR

E NATA PRESERVE PL

ROUND TA BLE PLAZA

LADBROOK DR

AWBRE Y PL

CISCO LA

BLACK BRANCH PKWY

ADAG

IOTE

QUICKSILV

ER DR

MIL L BRA NCH DR

FINCASTLE DR

LEE RD

H AS TINGS DR

WADE DR

MARKHAM PL

COCHR ANS LOCK

DR

STUBBLE RD

LANGLEY OAKS DR

WHITE

OAK

DR

AUGUSTINE PL

HOLLYHOCK TE

BANSHEE DR

KYLE

MORE DR

LAUREL WOOD CT

EM

ERALD PARK DR

SPRIN

GVALLEY LA

BRYN BACH LA

BELGREEN DR

WIND

SOCK

DR

AUTO

PILOT

DR

GREATBE

RKHA

MSTE

DDR

TANN

ER LA

EDEN

DR

TERR

IE DR

TALENT ST

WINKLE DR

APPLEGATE DR

ENE RGY P

ARK

DR

MADTU RKEY RUN PL

AVON

LEA D

R

SOMERBY DR

O AK MARR LA

TRADE WEST DR

TOLBE RT LA

TULIP POPLAR PL

DULLES CENTER BLVD

FALC ON PL

FOXDEN LA

KINSALE PL

ENTERPRISE ST

ACACIA LA

SARANAC ST

TOUC

HDOW

N LA

BRUNSWICK ST

UPPERCLUBHOUSE

DR

KATEBINI LA

FOREST RUN DR

KINCORA DR

KEILLER TE

LO UIS A DR

CHISHOLM DR

CROSSROADS DR

HAMPSHIRE STATION DR

WRIGHTW OOD PL

YOUNGWOOD

LA

MA LDEN PLWAYSI DE CIR

CUTWATER PL

CHRISTIANA DR

DIGGINS CT

EQUIPMENT RD

TWIN

POND

LA

AMHURST ST

TANAGE R

PL

COCKPIT CT

SPOTSWOOD RD

FRONTIER DR

SUSCON SQ

KNOB

HILL PL

STONEYRUN PL

PLEASANT FOREST CT

DISKIN PL

ENGLISH YEW PL

RAWLEY S PRINGS DR

MIDDLE BLUFF PL

COLDSP RING PL

PARTRID GE PL

GOLF CLUB RD

LAUR

A ANN

E DR

CHRISTOPHER LA

LA BELLE PL

PALMER CLASSIC

PKWY

CAMER

ONHU

NTPL

CEDARHURST DRPAR KSIDE CIR

TOWLERN PL

KILKE

RRAN DR

MASTERY PL

KNO LL SQ

CODMAN DR

NEWTON PL

SPY D ER PL

CORRO PL

WEYB RIDGE SQ

CAMERON PARISH DR

WOODRIDGE PKWY

WEAT

HERV

ANE P

L

BERYL TE

ZION

CHAP

EL DR

FELI CITY PL

RISING MOON PL

RESEARCH PL

COTON COMMONS DR

VANCE RD

MYERS PL

WES TWOOD PL

TIPPECANOE TE

LEARNI NG CIR

HEPATICA CT

TURKEY OAK DR

AMESFIELD PL

DONNINGTON PL

TALL PINES CT

HYDE P ARK DR

EDDS LA

NICKENS PL

TR IBE SQ

SOUTHPOINT DR

CLARECASTLE DR

JENKINS LA

STO NECUTTER ST

OCEAN CT

IRIS DR

SWEETWATER LA

PARTLOW RD

TRASK PL

AKER

S AL

EMPEROR DR

BU RBANK TE

YUKON DR

MCPHERSON CIR

CLELAND DR

MILL

STEA

D DR

SUGA

RVIEW

DR

OGDEN PL

DIABASE SQ

TIMBERBROOKE PL

LOFT

HILL DR

ESTA

TE PL

COBB

WOOD

SLA

SHOPS RD

GRE YHOUSE PL

VALLEYVISTA LA

EVER

GREE

N ST

WYCKOFF DR

LUCARNO

LA

PAG ET TE

WHITE CAP TE

FORES T GLEN DR

PAMPLIN TE

PINE T

OP C

T

BRONTE PL

CALA

IS TE

FURMAN DR

RUBY DR

TILNEY DR

FLEE

T TE

GENERATION DR

GOLDEN MEADOW CIR

BUILDERS LA

DOUG

LAS C

T

WELLNESS BLVD

LIV ERY SQ

GRAVES LA

REUSE LA

POTOMAC RUN PLAZA

AZALEA LA

SYKES TE

AMY CT

BRETHOUR CT

LESL

IE CT

JOHN

SON

RD

CAPRI PL

HARRIS ST

TAMA

RACK

CTYE

W CT

CRESTED QUAIL DR

IBEX DR

BUOY PL

USK TE

MITCHAM SQ

GABLE SQ

SEVERN WY

ASHBUR N FARM PKWY

RAMP

RAMP

RAMP

RAMP

EDGEWATER ST

RIVERS IDE PKWY

RAMP

SERV

ICE

RD

RA MP

RAMP

RAMP

RAMP

RAMP

RAMP

RAMP

RAMP

RAMP

RAMP

ALGONKIAN PKWY

RAMP

MOOREVIEW PKWY

RAMP

RA

MP

RAMP

RAMP

RAMP

LOUD

OUN

C OU N

T YP K

WY

RAMP

RAMP

RAMP

RAMP

STERLING BLVD

RA MP

RAMP

ARFF

RD

R AM P

RAMP

RAMP

RAMP

PLEA

SANT

VALL

EYRD

DULLES GREENWAY

PERIMETERRD

RAMP

RAMP

RAMP

RAMP

ARGONNE AV

MAPLE AV

RAMP

RAMPSULLY RD

RAMP

RAMP

RAMP

RAMP

RAMP

GOSH ENRD

RAMP

RAMP

WILL

ARD

RD

R AMP

RAMP

RAMP

RAMP

T70

T85

T48

T2

T74

T 6

T87

T80

T35T13

T1T26

T46

T89

T5

T25

T50

T 29

T88

T28

T41

T81

T4

T31

T84

T103 T27

T24

T12

T23

T66

T56

T100

T51

T 100T100

T66

T100

T88

T66

T100

T66

T70

T88

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T17

T47

T39

T82

T67

T11

EASTERN LOUDOUN TRANSPORTATION STUDY*UPDATE*

µ0 1 2 3 40.5

Miles LOUDOUN COUNTYDEPARTMENT OF TRANSPORTATION & CAPITAL INFRASTRUCTURE

UPDATE DATE: OCTOBER 4, 2016

PHASE 1

PHASE 2

PHASE 3

DULLESAIRPORT

MISSING LINKSBOTTLENECKS

MAP ITEM NUMBER

OVERPASS INTERCHANGES!( No Change'­ In Progress

X No ChangeX In Progress

COUNTY BOUNDARYSTREET CENTERLINEPHASE LINESPARCELS

Adopted FY 2017 CIPNo ChangePartially CompletedCompletedIn ProgressIn Progress (Portion)

Adopted FY 2017 CIPNo ChangePartially CompletedCompletedIn ProgressIn Progress (Portion)