board presentation - schematic design final · 2019. 11. 5. · bond 2016 design presentation 49...

49
Design Presentation Chief Operations Officer Willie Burroughs

Upload: others

Post on 18-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Design Presentation

Chief Operations Officer Willie Burroughs

Page 2: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Agenda

Introduction Community Feedback Project updates

2

Page 3: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Feedback

Citizens Advisory Committee meetings Growth and Development meetings Community meetings Stakeholder meetings Project Advisory Team meetings District-wide Department review meetings Campus leadership meetings Campus user group meetings

3

Page 4: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Feedback incorporated

Bowden Academy Windows into the classrooms –

increase size

Burbank High School IB World School

Edison High School Dance Studio – priority and size

Fox Tech High School Master Plan campus – consider

2016 bond as phase one

4

Jefferson High School Seating in the secondary gym IB World School

Lanier High School Band practice pad Murals

Sam Houston High School Band practice pad

Page 5: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

2016 Bond Projects at A Glance

5

Page 6: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bowden Academy

6

Total Project Budget: $11,078,573

• Classroom spaces (general learning, science, art, music, special education)

• Restrooms• Cafeteria/kitchen• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated

spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Roofing, building exterior and site improvements

Page 7: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bowden Academy

7

Page 8: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bowden Academy

8

Highlights• New secured vestibule• New windows into classrooms• New classroom infill addition• New Flex Lab• Mechanical and electrical system

upgrades• Improved site drainage• New roof• In new and renovated spaces

• New ceilings and finishes• New LED lighting• New storage cubbies• New white boards• New flexible furniture• New digital teaching wall

Page 9: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Brackenridge Elementary School

9

Total Project Budget: $11,966,712

Renovations and upgrades to include:• Classroom spaces (general learning, science, art,

music, special education)• Restrooms• Cafeteria/kitchen• Stage• Library• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated

spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Roofing, building exterior and site improvements

Page 10: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Brackenridge Elementary School

10

Page 11: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Brackenridge Elementary School

11

Highlights• Relocate library to the first floor• Relocate administration to main

entrance off parking lot• New secured vestibule• New science lab• Mechanical and electrical system

upgrades• New windows• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall• New entry canopy at student drop-

off

Page 12: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Brackenridge High School

12

Total Project Budget: $50,362,447• Classroom spaces (general learning, dance/pep room,

science, special education)• Restrooms• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated

spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Athletic track re-coating• Tennis court fencing• Roofing, building exterior and site improvements

Page 13: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bond 2016 – Brackenridge HS

13

Page 14: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bond 2016 – Brackenridge HS

14

Highlights• New rite sized classrooms and

science labs• New windows into classrooms• New secured vestibule• Mechanical and electrical system

upgrades• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 15: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Burbank High School

15

Total Project Budget: $79,439,675Renovations and upgrades to include:• Replace classroom buildings (general learning, science labs, special education)• Heating, ventilation and air conditioning• Auditorium and drama spaces• Cafeteria/kitchen• Black box theater• Administration/New Front Door• Plumbing and electrical• Technology infrastructure for new and renovated spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms, and other areas• Remodel special education classrooms• Front-entry modifications to improve security• Athletic track re-coating• Tennis court fencing• Address preservation and documentation of mural artwork in cafeteria• Roofing and exteriors of renovated buildings and site improvements

Page 16: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bond 2016 – Murals

16

Page 17: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Burbank High School

17

Page 18: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Burbank High School

18

Highlights• New three-story academic and

administration building• New future ready classrooms and

science labs• Mechanical and electrical system

upgrades• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall• Fine Arts renovations

• New Black Box

Page 19: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Davis Middle School

19

• Classroom spaces (general learning, science, special education)

• Restrooms• Art and Music spaces• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms, and

other areas• Front-entry modifications to improve security• Roofing, building exterior and site improvement

Total Project Budget: $20,286,485

Page 20: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Davis Middle School

20

Page 21: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Davis Middle School

21

Highlights• New main entrance• New secured vestibule• New rite sized classrooms• Mechanical and electrical system

upgrades• New windows• New roof• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 22: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Edison High School

22

Renovations and upgrades to include:• Field House Replacement• Athletic Facilities and Support Areas• Auditorium• Heating, Ventilation, and Air Conditioning• Plumbing and Electrical• Technology Infrastructure for New and Renovated

Spaces• Lighting• Roof Replacement• Fire Sprinkler Systems• Special Needs Accessibility in Entryways, Restrooms,

and Other Areas• Front-Entry Modifications to Improve Security• Athletic TRACK RE-COATING• TENNIS COURT FENCING• ROOFING, BUILDING EXTERIOR AND SITE

IMPROVEMENTS

Total Project Budget: $21,939,497

Page 23: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Edison High School

23

Page 24: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Edison High School

24

Highlights• New athletics field house• Renovated primary gymnasium• Renovated secondary

gymnasium• Fine Arts renovations

• Renovated auditorium• New dance studio• New black box

Page 25: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Fox Tech High School

25

• Classroom spaces (general learning, science, special education)

• Restrooms• Cafeteria/kitchen• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated

spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Roofing, building exterior and site improvements

Total Project Budget: $26,264,880

Page 26: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Fox Tech High School

26

Page 27: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Fox Tech High School

27

Highlights• Relocate child nutrition services to

the first floor• Mechanical and electrical system

upgrades• New future ready classrooms and

science labs• New maker spaces• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 28: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Sam Houston High School

28

• Classroom spaces (general learning, science, special education)

• Restrooms• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms, and

other areas• Front-entry modifications to improve security• Athletic track re-coating• Tennis court fencing• Roofing, building exterior and site improvements

Total Project Budget: $33,190,150

Page 29: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Sam Houston High School

29

Page 30: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Sam Houston High School

30

Highlights• New secured vestibule• New future ready classrooms and

science labs• New collaboration spaces• Mechanical and electrical system

upgrades• New windows• New roof• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 31: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Irving Dual Language Academy

31

Renovations and upgrades to include:

• Classroom spaces (general learning, science, fine arts, special education)

• Restrooms• Cafeteria/kitchen• Auditorium• Library• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modification to improve security• Roofing, building exterior and site improvements

Total Project Budget: $23,367,160

Page 32: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Irving Dual Language Academy

32

Science Labs Pre – K Classrooms

Page 33: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Irving Dual Language Academy

33

Highlights• New secured vestibule• New future ready classrooms and

science labs• New collaboration spaces• Windows into the classrooms• Mechanical and electrical system

upgrades• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 34: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Jefferson High School

34

• Classroom spaces (general learning, science, special education)

• Restrooms• Cafeteria/kitchen• Black box theater• Gymnasiums, athletic field house and support spaces• Restore auditorium and library• Foundation repairs• Heating, ventilation and air conditioning• Plumbing and electrical• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Technology infrastructure for new and renovated

spaces• Athletic track re-coating• Tennis court fencing• Roofing, building exterior and site improvements

Total Project Budget: $59,816,244

Page 35: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Jefferson High School

35

Page 36: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Jefferson High School

36

Highlights• New future ready classrooms and

science labs• New collaboration spaces• Mechanical and electrical system

upgrades• Foundation repairs• Roof replacement• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall• Athletics renovations

• Primary & secondary gyms• Fieldhouse

• Fine arts renovations• Auditorium preservation• Black Box renovations• Set shop renovations

Page 37: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Lanier High School

37

Total Construction Budget: $46,894,508Renovations and upgrades to include:• Classroom spaces (general learning, science, fine arts, special education)• Restrooms• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms, and other areas• Front-entry modifications to improve security• Athletic track re-coating• Roofing, building exterior and site improvements

Page 38: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Lanier High School Murals

38

Page 39: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Lanier High School

39

Page 40: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Lanier High School

40

Highlights• New main entrance• New secured vestibule• New future ready classrooms and

science labs• New collaborations spaces• Windows into the classrooms• Mechanical and electrical system

upgrades• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall• New Band practice pad

Page 41: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Rogers Middle School

41

Total Project Budget: $28,790,583• Classroom spaces (general learning, science, special

education)• Restrooms• Art and Music Spaces• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated

spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Roofing, building exterior and site improvements

Page 42: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Rogers Middle School

42

Page 43: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Rogers Middle School

43

Highlights• New three story academic and

administration building• New secured vestibule• New future ready classrooms and

science labs• New collaboration spaces• Mechanical and electrical system

upgrades• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 44: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Tafolla Middle School

44

• Classroom spaces (general learning, science, fine arts, music, special education)

• Restrooms• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated

spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms,

and other areas• Front-entry modifications to improve security• Roofing, building exterior and site improvements

Total Project Budget: $25,080,190

Page 45: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Tafolla Middle School

45

New Central Plant

New covered drop-off at entrance

Accessible Gym entrance

Remodeled parking lot with ADA parking

Renovated North Annex Building for swing space

5 New HVAC Penthouses

Completely Remodeled Classroom wing and Administration OfficesNew Security Entrance Vestibule

Page 46: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Tafolla Middle School

46

Highlights• New secured vestibule• New rite sized classrooms and

science labs• New future ready classrooms and

science labs• Mechanical and electrical system

upgrades• New ceilings and finishes• New LED lighting• New white boards• New flexible furniture• New digital teaching wall

Page 47: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bond 2016 – Timeline

47

Page 48: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bond 2016 – Timeline

48

Sam Houston HS

Irving MS

Jefferson HS

Lanier HS

Rogers MS

Tafolla MS

Page 49: Board Presentation - Schematic Design FINAL · 2019. 11. 5. · Bond 2016 design presentation 49 Questions. Title: Microsoft PowerPoint - Board Presentation - Schematic Design FINAL

Bond 2016 design presentation

49

Questions