Page 1: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Chris Ferguson

Boeing

February 6, 2013

Boeing Commercial Crew Transportation System

Page 2: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Boeing Brings History of Human Space Flight & Commercial Airplanes Together

Copyright © 2011 Boeing. All rights reserved.

Page 3: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Commercial Crew Transportation System (CCTS)

• Complete transportation system – Crew/Launch Vehicle – Ground/Mission Operations

• High TRL systems and proven components – Safe and reliable – Low development risk /

cost

• Compatible with a variety of launch vehicles – Atlas V for initial flight tests

and verification

• Operational in 2016

Boeing CST-100 Partners & Subs

Bigelow Aerospace PWR

General Dynamics Airborne Systems

Spincraft

3

Page 4: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Concept of Operations

4

Page 5: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Spacecraft Segment (CST-100)

Crew

Module

Service

Module

Ascent Cover

CM SM Umbilical

Radiators Thruster

Doghouse

Side Hatch

Forward Window

5

Page 6: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Launch Abort System

• Abort capability from the launch pad

through orbit insertion. Protects for:

– Complete or partial loss of ascent propulsion

– Loss of attitude/trajectory control

–Time-critical system failures

Full Envelope Abort Capability

Bantam Engine

Launch Abort Engine Test Firing

OMAC RCS Engine Test Firing 6

Page 7: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CST-100 Key Design Features

Reusable Crew Module (CM)

Expendable Service Module (SM)

Land Landing on Airbags

Crew of Seven or

Combination of Crew and Cargo

Liquid Propellant

Launch Abort System

7

Page 8: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Atlas V: TDRS – K Launch

617th launch for Atlas program since 1957

206th mission for the Centaur upper stage

35th launch of an Atlas V since 2002

27th Atlas V under United Launch Alliance

8th NASA launch on Atlas V

4th TDRS launched on an Atlas vehicle

1st Atlas V launch for TDRS

Page 9: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Landing Opportunities

Nominal returns to WSMR

Emergency water landing opportunities

Edwards AFB available for additional landing opportunities

9

Page 10: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CST-100 CCDev Design Landing Drop Tests

10

Page 11: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CM/SM Assembly in KSC OPF-3

Base Heat Shield Installation

Fueling Operations Before Flight

11

Page 12: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CCTS Design Maturation Under CCiCap Thru Jan 2013

Integrated System Review

Production Design Review

Phase 1 Safety Review Board

CST-100 Interior Layout Evaluation

Software Engineering Release 2.0

Landing & Recovery/Ground Comm

Design Review

12

Page 13: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CCTS Design Maturation Under CCiCap 2013 Milestones

13

Boeing’s CCTS 2013 Plan:

– CST-100 / Atlas V integration

– Mission Control demonstrations

– Continued re-development of the ULA Dual Engine Centaur

– Launch Vehicle Adapter PDR & CDR

– Continued development of KSC OPF-3

Page 14: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Reliable, Safe Transportation Soon

Affordable Access to LEO Enables Exploration Beyond

Boeing Commercial Crew Summary

• Significant Progress under CCDev and

CCiCap

– Critical Design Review in Apr, 2014

• Low Risk Development

– Simple systems

– Proven launch vehicles

– Commercial approach with NASA

involvement

• Low Operational Costs

– Leverages Boeing’s commercial

aircraft experience

– Multiple mission capsule

14

Page 15: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.