Page 1: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Boiler MACT: Energy Assessmentsf hConference on the Environment

November 12, 2013

Alex Mentzer, EITConsultant

Page 2: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

OverviewOverview

˃ Boiler Rules – Brief Recap˃ Boiler Rules Brief Recap˃ Energy Assessments

R i t Requirements Qualified Energy Assessor

A Assessment Preparation Assessment Day Report

Page 3: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Boiler Rules: BackgroundBoiler Rules: Background

˃ Final rules released Dec 20 2012 ˃ Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT Major Source Boiler MACT

♦ 40 CFR 63 Subpart DDDDD

Area Source Boiler GACT Area Source Boiler GACT♦ 40 CFR 63 Subpart JJJJJJ

˃ Major Source ˃ Area Source˃ Major Source >25 TPY total HAP >10 TPY single HAP

˃ Area Source <25 TPY total HAP

10 TPY i gl HAP >10 TPY single HAP <10 TPY single HAP

Page 4: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Boiler Rules: ApplicabilityBoiler Rules: Applicability

˃ Major Source Boiler MACT˃ Major Source Boiler MACT Industrial, commercial and institutional

boilers & process heaters (major sources only)boilers & process heaters (major sources only)

19 subcategories of boilers

˃ Area Source Boiler GACTI d t i l i l d i tit ti l Industrial, commercial and institutional boilers

7 subcategories of boilers 7 subcategories of boilers

Page 5: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Boiler Rules: Important DatesBoiler Rules: Important Dates˃ Major Source Boiler MACTj Existing

♦ Initial notification: May 31, 2013♦ Compliance date: January 31, 2016*

˃ Area Source Boiler GACT Existing

♦ Initial notification: January 20, 2014♦ Compliance date: March 21, 2014*

˃ Units installed after compliance date t tif ithi 15 d f t tmust notify within 15 days of startup

* 1 year compliance extension possible

Page 6: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Boiler Rules: RequirementsBoiler Rules: Requirements˃ Emission limits ˃ Work practice standards (cont.)

Major Source BMACT♦ Units ≥ 10 MMBtu/hr♦ Gas 1 units & units < 10

MMBt /h W k ti l

Energy Assessment♦ Major sources: One-time for

ALL existing unitsOnly exemption is limited use MMBtu/hr: Work practices only

Area Source BGACT♦ Units ≥ 10 MMBtu/hr (solid/liquid fuel)

♦ Units < 10 MMBtu/hr: Work

– Only exemption is limited-use units

♦ Area sources: Existing coal, biomass or oil ≥ 10 MMBtu/hr

C li d t ti♦ Units < 10 MMBtu/hr: Work practices only

˃ Work practice standards Tune-ups

˃ Compliance demonstrations Performance testing Monitoring

R dk i /R i Tune ups

♦ Major sources (§63.7540(a)(10-12)): – Annual, Biennial, Every 5 years

♦ Area sources (§63.11223):Biennial Every 5 years

Recordkeeping/Reporting

– Biennial, Every 5 years

♦ Timing depends on size, fuel, operating characteristics

Page 7: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment?Energy Assessment?

˃ Evaluation to identify energy savings Evaluation to identify energy savings opportunities In this case, to boiler systems

˃ New to NESHAPs˃ Similar assessments have been showing up:

PSD and Title V Permitting Guidance for Greenhouse Gases – March 2011 guidanceEnergy Management Systems Energy Management Systems♦ ISO 50001, Energy Star, Superior Energy Performance

Energy Auditinggy g♦ Energy assessment is scaled back version

Page 8: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Affected Unitsgy

˃ What sources are required to conduct EA? Major sources:

♦ ALL existing unitsC li d J 31 2016♦ Compliance date – January 31, 2016

Area sources: E i ti l bi il 10 MMBt /h♦ Existing coal, biomass or oil ≥ 10 MMBtu/hr

♦ Compliance date – March 21, 2014

Page 9: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Steam Loops Can Be Complicated!Steam Loops Can Be Complicated!

Page 10: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Scopegy p˃ Boiler system means the boiler and associated

components such as the feed water components, such as, the feed water, combustion air, fuel, blowdown, combustion control, steam, and condensate return systems.control, steam, and condensate return systems.

Page 11: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Scopegy p˃ Energy use systems are only those systems using

energy clearly produced by affected boilers and energy clearly produced by affected boilers and process heaters.

Page 12: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Scopegy p˃ Boiler Systems

E U SPre‐planning the 

scope is essential to˃ Energy Use Systems Which are included?

scope is essential to conducting an 

efficient site visit!

Page 13: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Requirements˃ Visually inspect the boiler or process heater system˃ Evaluate operating characteristics ˃ Review specs of energy use systems˃ Assess facility O&M procedures and unusual operating

constraintsconstraints˃ Inventory all major energy use systems consuming

energy from affected boilers and process heaters and energy from affected boilers and process heaters and which are under control of the boiler/process heater owner or operator

˃ Document minor energy use systems˃ Review available architectural and engineering plans,

facility operation and fuel usage recordsfacility operation and fuel usage records

Page 14: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Analysis Requirements

˃ List major energy conservation measures that are within the facility’s controly

˃ Record energy savings potential of the energy conservation measures identifiedconservation measures identified

˃ Provide a comprehensive report detailing: Efficiency improvements Efficiency improvements

Improvement costs

Improvement benefits Improvement benefits

Payback period (i.e., the time frame for recouping those investments)those investments)

Page 15: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Durationgy˃ Duration/Scope

Annual Heat Input Capacity of Affected Boilers (TBtu/year)

Maximum On‐siteTechnical Labor Hours

Evaluate boiler system(s) and energy use systems accounting for  X% of affected boiler(s) 

energy productionenergy production

< 0.3  8 50%

0.3 ‐ 1.0 24 33%

≥ 1.0  24 + 8 hours for each 

additional 1.0 TBtu/yr (not to exceed 160 hours)

20%

Page 16: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: QEAEnergy Assessment: QEA˃ “Qualified energy assessor”

Someone who has demonstrated capabilities to evaluate energy savings opportunities for steam generation and major energy using systems, including, but not limited to:g j gy g y g♦ Boiler combustion management♦ Boiler thermal energy recovery, including

– Conventional feed water economizer, – Conventional combustion air preheater, and – Condensing economizer.g

♦ Boiler blowdown thermal energy recovery♦ Primary energy resource selection, including

– Fuel (primary energy source) switching, and– Applied steam energy versus direct-fired energy versus electricity

♦ Insulation issues♦ Steam trap and steam leak management♦ Condensate recovery♦ Steam end-use management

Capabilities and knowledge includes, but is not limited to:Background experience and recognized abilities to perform the assessment ♦ Background, experience, and recognized abilities to perform the assessment activities, data analysis, and report preparation

♦ Familiarity with operating and maintenance practices for process heating systems♦ Additional potential steam system improvement opportunities including improving

steam turbine operations and reducing steam demand♦ Additional process heating system opportunities including effective utilization of

waste heat and use of proper heating methods♦ Boiler-steam turbine cogeneration systems♦ Industry specific steam end-use systems

Page 17: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

What does it really mean?What does it really mean?

˃ No formula for a “perfect” EA˃ No formula for a perfect EA˃ Every site is different

E ˃ Energy assessors are learning the process too!

˃ What do we do Visit prep-data request Visit day on-site activities Writing the reportg p

Page 18: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Initial ActivitiesEnergy Assessment: Initial Activities

˃ Assemble site visit data request Facility A/E drawings for footprint and heating

envelope analysis Fuel use records by unit O&M plans

I i /T h d l♦ Inspection/Tune up schedules

Stack data (CEMS, performance testing, etc.) Current air permit Current air permit

˃ Review inventory of affected sourcesC di i i i h il bili f ˃ Coordinate visit with availability of most knowledgeable staff

Page 19: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Initial ActivitiesEnergy Assessment: Initial Activities

˃ Lessons learned Effective planning

can save valuable on-site hours

Information may ynot be in one place/Under one pperson

Page 20: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: On-site ActivitiesEnergy Assessment: On site Activities

˃ Visual inspectionsp Boiler Piping Insulation Insulation Steam-traps Energy use systems

˃ Measurements Standard

♦ Losses, Feedwater temperature, Combustion info (CO2, O2, CO)♦ Losses, Feedwater temperature, Combustion info (CO2, O2, CO)

Case-by-Case♦ Load/Power Factors (motors, drives, at least for feedwater pump

and fan motors), Lighting efficiency, Relative humidity, and fan motors), Lighting efficiency, Relative humidity, Ventilation, Facility use

Page 21: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: On-site A i i iActivities˃ Lessons learnedLessons learned

BMACT EA requires lots of information related to

tioperations Talk to the people that DO

the operationthe operation♦ Operational staff is a VERY

valuable resource♦ O&M “plans” are often ♦ O&M plans are often

unwritten ♦ “If it ain’t broke” mentality

is commonis common

Page 22: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Identify E C ti MEnergy Conservation Measures˃ Equipment upgradesEquipment upgrades

Boilers/Burners, HVAC, Lighting, etc.

Effi i i t˃ Efficiency improvements Related to O&M

˃ Load reduction

˃ Waste Heat Recovery˃ Waste Heat Recovery Economizers

h˃ Other

Page 23: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: Cost & PaybackEnergy Assessment: Cost & Payback

˃ Simple payback The time required to recover the capital

investment from the annual savingsSimple Payback = Costs/Annual Energy Savings

˃ Consider Reduction in energy consumption Capital costsp Facility improvement

♦ Emissions reductions, reliability , yimprovements, etc.

Page 24: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Energy Assessment: ReportEnergy Assessment: Report˃ Evaluate and provide list of major energy

conservation measures identified Cost of improvements

P t ti l t i & b k i d Potential cost savings & payback period

˃ Implementation of ECM’s is encouraged ˃ Implementation of ECM s is encouraged, but not required

Page 25: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

SummarySummary

˃ EA requirement for some area and all ˃ EA requirement for some area and all major source boilers 3/21/2014 Compliance for Area sources 3/21/2014 Compliance for Area sources 1/31/2016 Compliance for Major sources

Q lifi d E g A ˃ Qualified Energy Assessor ˃ Pre-visit activities˃ On-site activities˃ Information analysis & report˃ Information analysis & report

Page 26: Boiler MACT: Energy Assessments - AWMA-UMS...Boiler Rules: Background ˃Final rules released Dec 20 2012 Final rules released Dec 20, 2012 (reconsidered) Major Source Boiler MACT ♦40

Questions?Questions?

Alex MentzerAlex [email protected]

(651) 251 9900(651) 251-9900