  • Presentation on MUL Bill of Material (BOM) by EN8

    EN8

  • Agenda Bill of Material ? Purpose of BOM. What does BOM contains ? How does Engg. Information Flow? Preparation of New BOM. Screen Shots of BOM. Model code ? Part Number ? BOM Maintenance. Logics followed for BOM updation. Block -Variant (EBOM) ECN process.

    EN8

  • Bill of Material ?

    BOM is a hierarchical representation of parts and their attributes for a model .BOM is of 2 types:

    a) EBOM Engg. BOM b) PBOM Production BOMEach Model spec has one BOM .BOM is uniquely identified by a Model code .(8 digit code)

    EN8

  • Differences b/w EBOM & PBOM

    EBOM based on block & variant concept.In EBOM part has linkages with Drwgs.EBOM is used for localization process (LP,LAR,ECP,ECR,etc.)

    PBOM is based on Reference No.PBOM contains Part classification (local,KD),shop codes,station no.,usage conditions,etc.PBOM is used for running MRP & consumption booking.Inventory Mgmt. Is done through PBOM.Cost control is done through PBOM.

    EN8

  • Purpose of BOM

    Managing Product design changes (ECN)

    Standard qty requirement as per design .

    Material Resource Planning / DI system

    Scheduling of Parts (SOB information is not stored in BOM )

    Receipt of Material

    Issue of material to vendor for further processing.

    EN8

  • Purpose of BOM contd.Consumption booking.

    To facilitates Spare Parts needs.

    Models Costing ( Price information is not stored in BOM ) .

    Inventory Management.

    EN8

  • What does BOM contain?BOM basically contains three main information related to parts : Design Information

    Procurement Information

    System Information

    EN8

  • Engg Information flowJapan IndiaTechnical part list Drawings /Data Paper Dwg Scan Images Satellllite link for UG,

    Catia, SCAD etc)ECN Standards (SES, SIS, JIS etc)Color list KD Partlist /SCAN

    EN8

  • Engg Information flowJapan IndiaLocalisation Plan (LP)Localisation Approval Request(LAR)Local -KD ClassificationECR,EI,ECP,NEC,Vendor Drawings,Draft TPL (Paper)

    EN8

  • Preparation of EBOM SMC TPL(xls)(Block and Variant)Loading in PDM (Block-VR Product structure for SMC and MUL configuration) New Model/ Family Maruti Part number for local parts and supplier relationParts classificication( Make or Buy)(Local/KD)Identification of Common /uncommon parts Creation of MUL Model codesLinking of Block-VR to MUL Models Creation of MUL specific blocksCreation of Vehicle FamilyLoading ofSMC Drawings EBOM Ready EBOM release to PPCModification of EBOM through ECN Life Cycle

    EN8

  • Snap shots of EBOM View

    EN8

  • Engg BOM(Based on Block and Variant concept)

    EN8

  • Engg BOM(Based on Block and Variant concept)

    EN8

  • Integration of Engg and Production BOMProduction BOM product structure is reference number based and has non-uniform product structure to fulfillMUL specific requirements. CMS - Link between EBOM and PBOM for partlist updation through ECN system

    EN8

  • EN8

  • Model Code

    MES N 2004

    Basic vehicle code

    Selection Code

    Sub Model Code

    Variant Code

    Specification Code

    Alphabet

    Numeral

    1

    2

    4

    5

    6

    7

    8

    3

  • EN8

  • Model Code explanation

    C

    R

    4

    H

    S

    7

    0

    0

    Car (M800)

    RHD (M/T)

    4 Door

    Heater

    Standard

    NCR Model

    For Domestic Mkt (India)

  • SMC Model Coding

    AlphabetNumeral12456783YProduct ClassificationY- 4 WheelerDestinationBasic Series CodeMinor ChangeSpec Code** 1. Body style, Seating Capacity 2. T/M , Strg Handle Position 3. Grade etc. Body type Code

    EN8

  • Part Number coding

    Basic NumberModel type Number Hyphen (- for KD , M for Local, N for other than SMC import, E -KD Part with extra processingType number (Source)Design Change NumberColor code , etc

    EN8

  • Standard part : No Part DrawingCommonly used in Many products e.g. Fasteners. Part number for standard items starts with 01-08 (first two digit of Part number)

    18Standardized part identification n umberUnique number by the typeNominal size,strength classification etcSurface treatment 0

    EN8

  • Semi standard parts : Non standard parts ,designed specially for specific purposes. Part number for semi standard items begins with 09 . These items are also called 09 series parts .09Semi standard part identification numberUnique number by the typeNominal size(main characteristic)Registration number (001-999)

    EN8

  • Regular parts: General design parts other than standard and non standard parts. Part number starts with 1 onwards . Starting digit specifies whether part is for Engine, Electrical, Suspension, body or Interior.Functional Classification numberDetailing numberModel Type numberType numberDesign change orderColor identification numberBasic Number

    EN8

  • Structure of basic part number

    Large classification1- Engine, 2-T/M 3-Electrical 4-Suspension 5- brake6- white body 7 Equipment(under cabin) 8- door seats 9 Etc (A/c) , 0- Fastners or bearings Part (0 is not assigned at fifth place )Comp ( less than 9 parts) --0 at fifth placeComp (more than 9 parts) - 0 at fourth place

    EN8

  • Design of a particular spec is represented as Product Structure in BOM .Parent - Child relationship. (Reference number )Design information is stored in following attributesPart number (00000M00000-000)Part Name (Description of item)Qty. ( Qty required / reference )ECN numberOptional (Y / N )

    Design information

    EN8

  • Product Structure

    EN8

    1.bin

  • BOM Maintenance BOM is a dynamic database which is regularly updated to give the latest status as on a particular day or a period.Parts detail is changed and maintained in BOM by ECN Process.ECN are issued by SMC as well as MUL .Localization of Parts (Deletion Proposal)BOM feedback system

    Contd.

    EN8

  • ENGINEERING BOM( Block-Variant)

    EN8

    88.bin

  • BLOCK CODE

    EN8

    Large Block

    A

    B

    C

    D

    E

    F

    G

    H

    J

    K

    L

    M

    P

    R

    S

    T

    C

    Engine

    Engine

    Auxiliary

    Transmission

    Engine

    Electric

    Body

    Electric

    ( Frame )

    Suspension

    Brake

    White Body

    ( E Pump )

    ( R Body )

    Equipment

    Special Equipment

    Unite Body

    Separate Frame

    Cabover

  • Engineering Change Process

    EN8

  • RequestEngg raisesECRPESCEngg/En8SMC/VENDORECNPPC/MCDENGGDistributionBOMECN WORK FLOW(Actual ECN)

    EN8

  • ECN Work Flow

    EN8

    ECN

    &C&"Arial,Bold"&14Simplefied flow chart for Formal SMC ECN life cycle

    &R&D&T

    SMC ECN

    EN8

    CD ROM

    Loading in PDM SMC ECN acceptance life cycle

    Engg to accept / Not to adopt SMC ECN

    Create ECR/ECN

    Raise NEC to SMC

    Not to be adopted

    e.g. R04-0001

    PE

    SC

    For concurrence

    Engg 1-5

    Conversion to ECN

    e.g. N04-0001

    File Transfer to CMS system

    PDM system

    ( Change Management system )

    PPC to assign final implementation date after checking inventory

    Updation of Production BOM and information to all concerned

    Engg identifies Distribution list e.g. PPC, SC, PE, Service, Spares, QA etc

    File Transfer to PDM system

    Updation of EBOM

    PDM sends E-mail as per distribution list

    system mail to all concerned

    CMS System

    Regulatory ECN , date of implemenation decided by Engg

    Homologation check done by EN8

    PDM

    System

    CMS

    system

    3 CD-Roms are received monthly

    CAD data

    &C&"Arial,Bold"&18CAD Data Flow Chart (YN4)

    &R&D&T

    SMC

    SMC DataExchange Server

    NAS data server

    EN8Carry out revision control

    EN8untar & unzipdata

    MUL dataExchange server

    SMC-Advisor

    All concerned departments

    EN8Make dataavailable

    Design gr.(comp. owner)Approve

    E-mail

    Data

    FTP download/Thru CD's/CDR

    upload data

    request(as per format)

    information

    data

    EN8

    EN8Data List is maintained at \\multad\smc cad dataFormal data : YN4 UG Foraml Data.xls

    All in the factory can see the list

    Advance ECN Flow Chart

    Advance ECN mail

    Advance ECN mail

    Advance ECN mail

    &C&"Arial,Bold"&18&UADVANCE ECN FLOW CHART (YN4)

    &R&D&T

    SMC

    SMC Advisor (Engg)

    EN8

    Parts Inspection

    Production Engg

    EN1-EN5

    Central data at multad server with hyperlinks

    Vendor

    Supply Chain

    Advance information

    Dicussion wth Engg

    Email from Neni

    Advance UG Data (CS, CJ ), B sheets , Drawings, Excel file on CD ROM ( weekly)

    SMC Advisor(Engg)

    EN8

    UG / SCAD data loading in CAD server

    B-Sheets data stored in Multad Server

    Information to Engg and PE

    Email to Engg on B sheets Data

    EN4-EN5 request through Notes system to SMC for Cad data

    System accepts the request

    System loads the requested data to FTP server

    Download through FTP server by MUL

    Notes system for CS-CJ

    TPL information

    Receipt of SMC TPL

    Weekly difference list is prepared by EN8

    Model K development status reporting

    &C&"Arial,Bold"&16Processing of SMC TPL at MUL

    &R&D&T

    SMC sends TPL(YN4) on weekly basis on CDROM

    SMC Advisor (Engg)

    EN8 receives email of TPL ( STD, DX,Super Dx)

    TPL is stored in MULTAD server (monthwise)multad\yn4_ref\TPL

    multad\yn4_ref\TPL\Apr'04

    Access to Engg and PI

    Week 1TPL ( std, Dx, Sup Dx)

    Week 2TPL ( std, Dx, Sup Dx)

    Difference list

    E-mail of difference list to Engg 1-5 and PI

    EN8 block coordinator update the Engg Matrix file

    Difference list are stored in MULTAD server

    TPL STD,DX, SUP DX

    EN1-MATRIX

    EN2-MATRIX

    EN3-MATRIX

    EN4-MATRIX

    EN5-MATRIX

    Splitting TPL in five files as per blocks with addition of Sequence number

    Updation of additional data for reporting.Formal Dwg, Cad data,Ref Dwg ,Local/KD, Classification, RFQ, LOC, Common, Exclusive, Functional, Vendor, Tool Maker, Material, Remarks , CAD data requirement, Notes system file name , Sample submission (T0, final), Spec mtg etc

    Engg updates the local/kd, classification vendor etc for records marked as MOD or ADD.

    Old records -->marked as DEL,New records--> ADD,Modified records--> MOD ,Qty-change---> Qty_Change

    EN1-MATRIX

    EN2-MATRIX

    EN3-MATRIX

    EN4-MATRIX

    EN5-MATRIX

    Reporting for Model K development status review

    PI has read only access to this data base

    EN8 block coordinator updates the SMC Enfiguration in PDM

  • ECN system in PDM Its an Electronic ECN (no Paper copy) .Concurrence and approval is through work flow as per ECN Life Cycle.ECNs can be tracked very efficiently.Concurrence bottlenecks can be easily identified and resolved .

    EN8

  • THANKS

    EN8