bong mieu gold mine - infomine inc
TRANSCRIPT
Other titleBong Mieu gold mine
1Tuesday, 22 May, 12
THAILAND
LAOS
CAMBODIA
Socialist RepublicOf
VIETNAM
Gulfof
ThailandHo Chi MinhCity
Hanoi
Bangkok
Vientiane
Phnom Penh
Danang
Hue
EasternSea
Song Ma Suture
Truong Son Suture
Song Da Suture
Song Da Suture
Dong Trieu-Cam Pha
Dong Trieu-Cam Pha
Saga
ing
Faul
t Zo
ne
Phu BiaPhu Bia
Bong Mieu
Phuoc SonPhuoc Son
Sepon
Tien Thuan
Congplong
ChatreeChatree
Truong Son Fold Belt
Loei Fo
ld B
elt
Kon Tum MassifIndosinia Block
Indosinia Block
South China Block
Shan Thai Block
Bac Bo Fold Belt
5000
Ki lometers
Precambrian Craton
Granite
Significant fault
Ophiolite belt
Capital city
Olympus property
Gold/Copper mine
Legend
N
kilometers
2
Tectonic mapVietnam
Tuesday, 22 May, 12
Route mapBong Mieu
3
Bong MieuBasecamp
Bong Mieu Mine
Tuesday, 22 May, 12
Other title
4
Ho Gan(Open-pit)
Ho Ray(Proposed New Open-pit)
Nui Kem (Underground)Ho Gan-South(Underground)
1000
(meters approx)
0
N Bong Mieu
Tuesday, 22 May, 12
BONG MIEU ANTICLINE
Ho Ray -Thac TrangHo Ray -Thac Trang
Rung DeRung De
Nui Kem
Granite intrusive?Granite intrusive?
UNIT 5UNIT 5
UNIT 4UNIT 4
UNIT 3UNIT 3
UNIT 1UNIT 1
UNIT 1UNIT 1
UNIT 2UNIT 2
UNIT 3UNIT 3
UNIT 4UNIT 4
UNIT 5UNIT 5
UNIT 6UNIT 6
UNIT 7UNIT 7
B A
Section looking westBong Mieu Anticline
5
Faults + conjecturalfluid flow paths
Tentative correlation acrossthe axis of the Bong MieuAnticline (subject to review)
0 400
metersmeters
Tuesday, 22 May, 12
Thac Trang
Ho Ray
Simplified geology & drill hole locationHo Ray & Thac Trang
6
Road
Drillhole
River / creek
Delineated resource
Potential resource
Alluvium
Mica-feldspar-quartz schistintercalated with calc-silicate
Feldspar-biotite gneissic schist
Garnet-silimanite-mica-quartzschist and sericite quartz schist
Silimanite- biotite gneissic schist
Twomica granitic gneiss
Migmatized plagioclase graniticgneiss granitic gneiss
Legend
Road
Drillhole
River / creek
10
Ki lometer
N
Tuesday, 22 May, 12
Section SW-NEHo Ray
7
HR
DD
133
HR
DD
121
HR
DD
198
HR
DD
222
HR
G0
03
HR
DD
197
HR
DD
118
HR
DD
119
HR
DD
120
HR
DD
216
HRD
D22
4
300
250
200
150
m (a
sl)
0.1- 0.5 g/t Au
> 0.50 g/t Au
A B
50
meters
0
0.1- 0.5 g/t Au
> 0.50 g/t Au
HRDD102
HRG02
Diamond Drill Hole
Pit/Shaft
Fault
50
meters
0
Tuesday, 22 May, 12
Section SW-NEThac Trang
8
225
175
125
m (a
sl)
150
200
250
A
B
A
B
HRD
D13
5
HRD
D13
6
HRD
D14
3
HRD
D14
5
HRD
D15
0
HRD
D15
7
HRD
D15
8
HR
DD
239
HRDD135
Diamond Drill Hole
Fault
50
meters
0
Sericite- quartz schist intercalated with calc- silicate
Garnet- sillimanite- mica- quartz schist and sericite- quartz schist intercalated with thin bands of gneiss
0.1- 0.5 g/t Au
> 0.50 g/t Au
Legend
Tuesday, 22 May, 12
Main VeinNui Kem
9
Sa Ro Stope
Pyrite StopeKem Stope
AM Stope
AM StopeAD Stope
AD Stope
Sa Ro Stope
Pyrite StopeKem Stope
AM Stope
AM StopeAD Stope
AD Stope
Mine workings
Old French mine
Proposed mine plan
Mined out area
Old mine stopeMeasured
Indicated
Inferred
Historic Resource
5000
meters
N
meters
Tuesday, 22 May, 12
10
NKDDH017
NKDDH021
NKDDH018NKDDH020
NKDDH022
NKDDH019
1.0m @ 4.2 g/t Au1.0m @ 7.3 g/t Au
1.0m @ 1.83 g/t Au
1.3m @ 1.07 g/t Au0.9m @ 8.21 g/t Au
0.4m @ 7.08 g/t Au0.5m @ 27.86 g/t Au0.5m @ 7.57 g/t Au1.30m @ 0.71 g/t Au
0.65m @ 2.95 g/t Au
1.85m @ 2.13 g/t Au
0.65m @ 2.92 g/t Au
Projected ore body(Nui Kem Upper Vein)
Sarro Vein
surface
Sarro Lower Vein
300m300m
Level 22
Level 2
1
Projected Nui Kem Main Vein
N
S
E
W
Projected resource
meters (approx.)0 200
Legend
Mine workings
N
Nui KemUpper vein
Tuesday, 22 May, 12
Ho GanSouth deposit
11
Section
Adit 7 - 6 West
Adit
7 -
5 N
orth
Adit 7 - 4 South
Adit 7
Adit 6
1.20m11.39 Au g/t
1.00m11.32 Au g/t
0.90m2.0 Au g/t1.00m
4.63 Au g/t 0.90m9.69 Au g/t
1.10m5.99 Au g/t
1.00m7.53 Au g/t
1 703 700mN
1 703 800mN
222 900mE222 800mE222 700mE
222 780mE 222 790mE 222 800mE 222 810mE
255mRL
250mRL
50
meters
0
Site VisitTo: Level 7-6 West
(Underground)Ho Gan - South Deposit
N
Tuesday, 22 May, 12
As of 30 March 2012Resources & reserves
12
Bong Mieu Reserves & Resources
Bong Mieu Reserves Category 2012 Q 1 Residual Reserves
Tonnes (t) Grade (g/t) Oz AuHo gan Open Pit ProvenHo gan Open Pit Probable 111,656 2.06 7,385Total Total P&P 111,656 2.06 7,385
Bong Mieu Resources Category 2012 Q 1 Residual Resource
Tonnes (t) Grade (g/t) Oz AuHo Gan Measured 97,560 2.33 7,308
Indicated 343,414 1.45 16,004Inferred 66,320 2.13 4,542
Ho Ray/ Thac Trang Measured 940,100 1.92 57,730Indicated 2,153,900 1.47 101,797Inferred 4,885,600 1.38 216,764
*Other Metal Credits
Ho Ray/ Thac Trang Measured Tungsten (as Au Equivalent) 37,908Indicated 69,793Inferred 97,779
Tuesday, 22 May, 12
Historical productionBong Mieu
13
0
4000
8000
12000
16000
20000
2005 2006 2007 2008 2009 2010 2011
16911
10196
12613
1551415024
10619
119
1962
000000
3168
73217613
1770
000
11781
2875
5000
13744
15024
10619
119
Ho Gan Pit Nui Kem Pit Ho Gan UG Total
All figures Oz Au
Tuesday, 22 May, 12
2005500TPD
2006500TPD
2007500TPD
2008500TPD
2009500TPD
2010500TPD
2011500TPD
2012500TPD
2013800TPD
2014800TPD
2015800TPD
TimelineOperations
14
Ho Gan Pit
Mill Expansion for Ho RayOriginal Design for Pit Modified Design for UG
Ho Gan PitNui Kem underground
Ho Gan undergroundHo Ray pit
Tuesday, 22 May, 12
Bong MieuPersonnel
15
Mobile FleetMining Operation = 503Contractors = 98Other Services = 258Total = 761
4 Load-Haul-Dump Loaders3 Low Profile Trucks2 Jumbo Drills1 Scissor Lift
4 Shift Schedule Operation
Tuesday, 22 May, 12
Bong MieuMilling process
16
• Commissioned 2006• Gold recovery 70-75%• Nominal throughput 500 tpd• Batch process ( Ho Gan & Nui kem)• Conventional crush, grind, gravity, flotation• SCADA system to control & monitor process• ILR (Intensive leach reactors)• Inco Cyanide destruction process
Tuesday, 22 May, 12
Bong MieuRun of ore
17
Ho Gan (Open pit & underground
•Pyrite, quartz breccia•1-3% Sulfur grade (Oxidized ore)•3-5 g/t Au•Trace amounts of silver, galena & arsenopyrite
Nui kem
•Galena (pbs) & sphalerite (Zns) as high as 2%•5-6 % Sulfur grade•3-5 g/t Au
Tuesday, 22 May, 12
Original layout
18
MILL 02
Float Tails
BARRING
FURNACE
GOLD BULLION
INCO CYANIDE KILL UNIT
GRIZZLY
JAWCRUSHER
MILL 01
Falcon 01 Falcon 02
Shaking Tables
Thickeners
Flotation Circuit
Storage Area
2 Stage Cone Crusher Closed
Circuit
Run of Mine Ore
CRUSHING PLANT
MILL PLANT
TSFDAM-3
ILR 01
ILR 02
Carbon Columns
Carbon Ashing
Loaded Carbon
TSFDAM-1
Tuesday, 22 May, 12
Upgrade 2012
19
MILL 01
Float Tails
BARRING
FURNACE
GOLD BULLION
INCO CYANIDE KILL UNIT
GRIZZLY
JAWCRUSHER
MILL 02
Falcon 01 Falcon 02
Shaking Tables
Thickeners
Flotation Circuit
Storage Area
2 Stage Cone Crusher Closed
Circuit
Run of Mine Ore
CRUSHING PLANT
MILL PLANT
Tailings Area
CIL Circuit
Carbon Ashing
Loaded Carbon
Tuesday, 22 May, 12
Bong MieuGold recovery
20
Current
Gravity -Tables-Dore Melting
Flotation-ILR Leach-Carbon Adsorption-Ashing-Dore Melting
Future (underway)
Replace ILR with CIL
Tuesday, 22 May, 12
Bong MieuWater system
21
ToEnvironment
DecantSystem
Mill Pond
PumpHouse
Tailings
Area
ProcessWater
Tuesday, 22 May, 12
Bong MieuTailings facility
22
• 55 Acres• Subdivided in three compartments for Sulfide & non-Sulfide • Processed water is 100% recycled back to mill
Tuesday, 22 May, 12
23
Thank you
Tuesday, 22 May, 12