Attachment 1Drawing Calculations
Akram Faisal4212101018
Akram Faisal
Rev Date Prepared By Checked By Approved By
Document No. : 1
DEPARTMENT OF MARINE ENGINEERINGDOUBLE DEGREE PROGRAM
INSTITUT TEKNOLOGI SEPULUH NOPEMBER HOCHSCHULE WISMAR
-
8/12/2019 Book Calculation
2/8
Lines Plan Report
1
Table of ContentsDrawing Calculations ................................................................................... 2
1. Principal Dimension ........................................................................... 22. First Calculation ( Propeller fitting & stern tube ) ...................................... 23. Determine The Ship Boundary Area ........................................................ 34. Determine the L rules (BKI) .................................................................. 45. Determine the Lc value....................................................................... 56. Determine The Ship Bulkhead distance .................................................... 57. Calculation of Volume displacement & Cb ................................................ 6
REFERENCES ............................................................................................. 7
Table of FiguresFigure 1 ................................................................................................... 3
-
8/12/2019 Book Calculation
3/8
Lines Plan Report
2
Drawing Calculations
1. Principal DimensionTipe Kapal : Oil Carrier
Panjang (Lpp) : 172 meter
Panjang (Lwl) : 177,16 meter
Panjang (Ldisp) : 174,58 meter
Lebar
(B) : 30 meter
Cb : 0,77
Tinggi geladak (H) : 17,42 meter
Sarat air (T) : 11,22 meter
Kecepatan dinas (Vs) : 14,4 knot
2. First Calculation ( Propeller fitting & stern tube )Determine height of D:
D = 0,69 x T
= 0,69 x 11,22
= 7,7418 meter
Determine height of a :
D = 0,33 x T
= 0,33 x 11,22
= 3,7026 meter
Determine Height of D:
D = 0,12 x T
= 0,12 x 11,22
= 1,346 meter
Determine Height of b :
D = 0,35 x T
= 0,35 x 11,22
= 3,9270 meter
-
8/12/2019 Book Calculation
4/8
Lines Plan Report
3
Figure 1
3. Determine The Ship Boundary AreaDetermine the height value x for main deck
x = 2,8 ( Lpp/3 +10)
= 2,8 ( 172/3 + 10)
= 188,533 mm
Determine the height value y for main deck
y = 11,1 ( Lpp/3+10 )
= 11,1 ( 172/3 + 10 )
= 747,4 mm
Determine the height value z for main deck
z = 25,0 ( Lpp/3+10 )= 25,0 ( 172/3 + 10 )
= 1683,333 mm
Determine the height value a for main deck
a = 5,6 ( Lpp/3+10 )
= 5,6 ( 172/3 + 10 )
= 377,067 mm
-
8/12/2019 Book Calculation
5/8
Lines Plan Report
4
Determine the height value b for main deck
a = 22,2 ( Lpp/3+10 )
= 22,2 ( 172/3 + 10 )
= 1494,8 mm
Determine the height value c for main deck
a = 50 ( Lpp/3+10 )
= 50 ( 172/3 + 10 )
= 3366,667 mm
Determine the height value a for main deck
a = 5,6 ( Lpp/3+10 )
= 5,6 ( 172/3 + 10 )= 377,067 mm
Determine the postion for addition of deck value
Part of divided length = Lpp/6
= 172/6
= 28,667 mm
Determine the frame spacing for the shipao = L/500 + 0,48 [meter]
= (171,85/500) + 0,48
= 0,82 m
4. Determine the L rules (BKI)
Determine the L rules for the ship
96% Lwl = 96% x Lwl
= 96% x177,16
= 170,1 m
97% Lwl = 97% x Lwl
= 97% x177,16
= 171,85 m
Because the Lpp value is lower comparing to the L minimal as BKI regulation, so the
best L based on BKI is 171,85 m
-
8/12/2019 Book Calculation
6/8
Lines Plan Report
5
5. Determine the Lc valueDetermine the Lc value for the ship
Hc = 0,85 x H= 0,85 x 17,42
= 14,807 m
Lc1 = 96 % Lwl (Hc)
= 96% x 180,011
= 172,81 m
Lc2 = 173,1731 m
After comparing between Lc1 value with Lc2, so Lc2 is used that is 173,173 m
6. Determine The Ship Bulkhead distanceDetermine the collision Bulkhead distance from FP
= 0,0636 . Lc
= 0,0636 x 173,1731
= 11, 02 m
Determine the Machinery space Bulkhead distance from AP
= 18,27% x Lpp
= 18,27% x 172
= 31,42 m
-
8/12/2019 Book Calculation
7/8
Lines Plan Report
6
7. Calculation of Volume displacement & Cb
h = LWL / 20
h = 8,858 m
Volume Displacement
= 1/3 x h x 1= 47134,229 m
3
Coefficient Block (Cb) = Volume Displacement / (Ldisp x B x T)
= 0,80
STATION 1/2 AREA AREA FS FS X A M FS X A X M
AP 15,0294 30,0588 4 120,2352 -10 -1202,35
1 50,082 100,1636 2 200,3272 -9 -1802,94
2 84,259 168,517 4 674,068 -8 -5392,54
3 117,5981 235,1962 2 470,3924 -7 -3292,75
4 141,3867 282,7734 4 1131,0936 -6 -6786,56
5 165,1264 330,2528 2 660,5056 -5 -3302,53
6 165,1264 330,2528 4 1321,0112 -4 -5284,04
7 165,1264 330,2528 2 660,5056 -3 -1981,52
8 165,1264 330,2528 4 1321,0112 -2 -2642,02
9 165,1264 330,2528 2 660,5056 -1 -660,50610 165,1264 330,2528 4 1321,0112 0 0
11 165,1264 330,2528 2 660,5056 1 660,5056
12 165,1264 330,2528 4 1321,0112 2 2642,022
13 165,1264 330,2528 2 660,5056 3 1981,517
14 165,1264 330,2528 4 1321,0112 4 5284,045
15 164,3007 328,6014 2 657,2028 5 3286,014
16 158,5774 317,1548 4 1268,6192 6 7611,715
17 139,5102 279,0204 2 558,0408 7 3906,286
18 101,1924 202,3848 4 809,5392 8 6476,314
19 41,5431 83,0862 2 166,1724 9 1495,552
FP 0 0 1 0 10 0
Total 1= 15963,275 2 996,2028
-
8/12/2019 Book Calculation
8/8
Lines Plan Report
7
REFERENCES
MERANCANG RG,Jurusan Teknik Sistem Perkapalan, Fakultas TeknologiKelautan 2009