01.08.2015PlantSaponification

Page 2: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Dismantle pump P-117.6.2. reported motor trip. Dismantle pump P-126.3.2 reported low pressure at dischargePump P-118.B motor bearing damage- discouple from the pumpReactor pump P-206.2C retigthen bolting at pump casingInstall back multistage pump P-126.1A.1.2B after replace new mech seal dismantle pump mech. leaking P-117.6B bring to workshop mechanicalinstall back after recond double mech seal alfa laval pump P-126.20 Install new pump casing gasket at pump P-126.20CCoupling Pump PU-22 damageInstall back Pump P-126.1A.2Modification drive shaft Dryer DDryer B suspect scrapper broken.check and remove small scarpper and hand over to productionInstall back Turbo mixer pump P-117.1C

Page 3: Book1

Status

installation done pending run testdone pending for run testInstallation and alignment done pending for run testneed to replace new coupling SW150. PR 1000164319done pending for run testInstall back dryer shaft and nozzle. Dismantle scafolding and handover to production.donetemp. remove the scrapper. Next to replace the broken bolting during shutdowndone. Pending for test rundismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil sealInstall back after repair and service. Pending for testingDismantle and check internal pump. Install back and pending for testing.motor repair done. Install coupling donedone- pump to be monitordone- pending for testing

Page 4: Book1

02.08.2015PlantSaponification

Page 5: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Dismantle pump P-117.6.2. reported motor trip. Dismantle pump P-126.3.2 reported low pressure at dischargePump P-118.B motor bearing damage- discouple from the pumpReactor pump P-206.2C retigthen bolting at pump casingInstall back multistage pump P-126.1A.1.2B after replace new mech seal dismantle pump mech. leaking P-117.6B bring to workshop mechanicalinstall back after recond double mech seal alfa laval pump P-126.20 Install new pump casing gasket at pump P-126.20CCoupling Pump PU-22 damageInstall back Pump P-126.1A.2Modification drive shaft Dryer DDryer B suspect scrapper broken.check and remove small scarpper and hand over to productionInstall back Turbo mixer pump P-117.1C

Page 6: Book1

Status

installation done pending run testdone test okInstallation and alignment . Test okneed to replace new coupling SW150. PR 1000164319done pending for run testInstall back dryer shaft and nozzle. Dismantle scafolding and handover to production.donetemp. remove the scrapper. Next to replace the broken bolting during shutdowndone. Pending for test rundismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil sealInstall back after repair and service. Pending for testingDismantle and check internal pump. Install back and pending for testing.motor repair done. Install coupling donedone- pump to be monitordone- pending for testing

Page 7: Book1

03.08.2015PlantSaponification

Page 8: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Dismantle pump P-117.6.2. reported motor trip. Dismantle pump P-126.3.2 reported low pressure at dischargePump P-118.B motor bearing damage- discouple from the pumpReactor pump P-206.2C retigthen bolting at pump casingInstall back multistage pump P-126.1A.1.2B after replace new mech seal dismantle pump mech. leaking P-117.6B bring to workshop mechanicalinstall back after recond double mech seal alfa laval pump P-126.20 Install new pump casing gasket at pump P-126.20CCoupling Pump PU-22 damageInstall back Pump P-126.1A.2Modification drive shaft Dryer DDryer B suspect scrapper broken.check and remove small scarpper and hand over to productionInstall back Turbo mixer pump P-117.1C

Page 9: Book1

Status

installation done pending run testdone test okInstallation and alignment . Test okneed to replace new coupling SW150. PR 1000164319done pending for run testInstall back dryer shaft and nozzle. Dismantle scafolding and handover to production.donetemp. remove the scrapper. Next to replace the broken bolting during shutdowndone. Pending for test rundismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil sealInstall back after repair and service. Pending for testingDismantle and check internal pump. Install back and pending for testing.motor repair done. Install coupling donedone- pump to be monitordone- pending for testing

Page 10: Book1

04.08.2015PlantSaponification

Page 11: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valverectify blockage dryer D and plodder DFeeder pump Drumming GlycerineTake out gasket strainer Pump P-126.1D

Dismantle pump P-117.6.2. reported motor trip. Dismantle pump P-126.3.2 reported low pressure at dischargePump P-118.B motor bearing damage- discouple from the pumpReactor pump P-206.2C retigthen bolting at pump casingInstall back multistage pump P-126.1A.1.2B after replace new mech seal dismantle pump mech. leaking P-117.6B bring to workshop mechanicalinstall back after recond double mech seal alfa laval pump P-126.20 Install new pump casing gasket at pump P-126.20CCoupling Pump PU-22 damageInstall back Pump P-126.1A.2Modification drive shaft Dryer DDryer B suspect scrapper broken.check and remove small scarpper and hand over to productionInstall back Turbo mixer pump P-117.1C

Page 12: Book1

Status

installation done pending run testdone test okInstallation and alignment . Test okneed to replace new coupling SW150. PR 1000164319done pending for run testInstall back dryer shaft and nozzle. Dismantle scafolding and handover to production.donetemp. remove the scrapper. Next to replace the broken bolting during shutdowndone. Pending for test rundismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downdonedismantle and fab. New shaftdone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil sealInstall back after repair and service. Pending for testingDismantle and check internal pump. Install back and pending for testing.motor repair done. Install coupling donedone- pump to be monitordone- pending for testing

Page 13: Book1

05.08.2015PlantSaponification

Page 14: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveopen Dryer A chain for manual cleaningGllycerine drumming plant repair clamp bracket

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 15: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downdonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 16: Book1

06.08.2015PlantSaponification

Page 17: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveinstall back feed pump at glycerine drumming plantReplace gasket at cautic soda line at plate heat exchanger.

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 18: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downdone test ok. Spare part ordered.done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 19: Book1

07.08.2015PlantSaponification

Page 20: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveInstall back Plodder D framereplace new mech. Seal pump multistage P-126.2.1

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 21: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downdonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 22: Book1

08.08.2015PlantSaponification

Page 23: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Install back Pump P126.2 after replace mech seal 16mm

Page 24: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downdone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 25: Book1

09.08.2015PlantSaponification

Page 26: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 27: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 28: Book1

10.08.2015PlantSaponification

Page 29: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 30: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 31: Book1

11.08.2015PlantSaponification

Page 32: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveRectify steam strap leakage

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 33: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downdone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 34: Book1

12.08.2015PlantSaponification

Page 35: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Sapo Bagging 1 ton gear box mounting brokensend for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveTurbo Reactor pump R117.1B mech seal leak and bearing damage

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 36: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdowndismantle. Replace from flaker jumbo bag line.GP 2381 to AES Sealpending to be rectify during shut downreplace new spare part and run test ok

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 37: Book1

13.08.2015PlantSaponification

Page 38: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveReplace Lub. Oil Blower C and DInstall back roller at sub conveyor bagging machine

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 39: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdownGP 2381 to AES Sealpending to be rectify during shut downdonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 40: Book1

14.08.2015PlantSaponification

Page 41: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveReplace gasket caustic line

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 42: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdownGP 2381 to AES Sealpending to be rectify during shut downdone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 43: Book1

15.08.2015PlantSaponification

Page 44: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveTurbo Reactor pump R117.1B

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 45: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdownGP 2381 to AES Sealpending to be rectify during shut downtest run ok

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 46: Book1

16.08.2015PlantSaponification

Page 47: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 48: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdownGP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 49: Book1

17.08.2015PlantSaponification

Page 50: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Page 51: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdownGP 2381 to AES Sealpending to be rectify during shut down

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 52: Book1

18.08.2015PlantSaponification

Page 53: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valve

Dimantle and service cutting blade plodder D

Coupling Pump PU-22 damageDryer B suspect scrapper broken.check and remove small scarpper and hand over to production

Pump P-2016.2B jammed. Dismantle and found water hose clogged at impeller shaft

Page 54: Book1

Status

need to replace new coupling SW150. PR 1000164319temp. remove the scrapper. Next to replace the broken bolting during shutdownGP 2381 to AES Sealpending to be rectify during shut downservice and install back.done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 55: Book1

19.08.2015PlantSaponification

Page 56: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmdismantle pipe line to PHE due to no flow. Check jammed. To be replace new check valveDismantle Pump P-117.7.2 replace new mech seal

Coupling Pump PU-22 damage

Page 57: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Sealpending to be rectify during shut downinstall back done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 58: Book1

20.08.2015PlantSaponification

Page 59: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmCoupling Pump PU-22 damage

Page 60: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Seal

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 61: Book1

21.08.2015PlantSaponification

Page 62: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmCoupling Pump PU-22 damage

Page 63: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Seal

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 64: Book1

22.08.2015PlantSaponification

Page 65: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmRectify and clear punchlistReplace gasket as per punchlist

Coupling Pump PU-22 damage

Page 66: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Sealdonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 67: Book1

23.08.2015PlantSaponification

Page 68: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmPunchlist clearing

Coupling Pump PU-22 damage

Page 69: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Sealdone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 70: Book1

24.08.2015PlantSaponification

Page 71: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmchange Lubrication Oil at all pumpChange Blower lubrication oil A&B

Coupling Pump PU-22 damage

Page 72: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Sealdonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 73: Book1

25.08.2015PlantSaponification

Page 74: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

send for re-cond Mech Seal AES Seal CMS 55mmInstall Conveyor Belt PressReplace lubrication oil Pump P-126.2Install Mech Seal turbo pump R-126.1Replace flange welding steam line

Coupling Pump PU-22 damage

Page 75: Book1

Status

need to replace new coupling SW150. PR 1000164319GP 2381 to AES Sealdonedonedonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 76: Book1

26.08.2015PlantSaponification

Page 77: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Install back dryer B nozzleInstall back bracket for polybag support

Coupling Pump PU-22 damage

Page 78: Book1

Status

need to replace new coupling SW150. PR 1000164319donedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 79: Book1

27.08.2015PlantSaponification

Page 80: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Dismantle plodder D frame for cleaningInstall back Scrapper B at dryer Replace gasket at blow point dryer BDismantle pump grundfos to swap from boilerBall valve 3"Automa passingDismantle piping to pump reactor water flushing block with soap

Coupling Pump PU-22 damage

Page 81: Book1

Status

need to replace new coupling SW150. PR 1000164319donedonedonedonereplace new valve.done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 82: Book1

28.08.2015PlantSaponification

Page 83: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Dismantle plodder D frame for cleaningInstall back Scrapper B at dryer Replace gasket at blow point dryer BDismantle pump grundfos to swap from boilerBall valve 3"Automa passingDismantle piping to pump reactor water flushing block with soap

Coupling Pump PU-22 damage

Page 84: Book1

Status

need to replace new coupling SW150. PR 1000164319donedonedonedonereplace new valve.done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 85: Book1

29.08.2015PlantSaponification

Page 86: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Install back flushing mech sela PumpP-126.20B after cleaningOpen main hole cap dust collectorAdjust conveyor sapo Add steam tracing at dust collector

Coupling Pump PU-22 damage

Page 87: Book1

Status

need to replace new coupling SW150. PR 1000164319donedonedonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 88: Book1

30.08.2015PlantSaponification

Page 89: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Dryer A nozzle blockedCoupling Pump PU-22 damage

Page 90: Book1

Status

need to replace new coupling SW150. PR 1000164319

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 91: Book1

31.08.2015PlantSaponification

Page 92: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Rectify steam line leakageEHDP Pump Multistage leaking

Coupling Pump PU-22 damage

Page 93: Book1

Status

need to replace new coupling SW150. PR 1000164319donedismantle and service.

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 94: Book1

01.09.2015PlantSaponification

Page 95: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Check valve at steam blow from dryer A to kettle blockDismantle manhole cyclone D for cleaningDryer B check for any scrapper issue , operation report abnormal sound.Check Dryer D scrapper , operation report abnormal sound

Coupling Pump PU-22 damage

Page 96: Book1

Status

need to replace new coupling SW150. PR 1000164319dismantel and cleaningdonedonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 97: Book1

02.09.2015PlantSaponification

Page 98: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Check internal dryer D. abnormal soundInstall Hose at conveyor

Coupling Pump PU-22 damage

Page 99: Book1

Status

need to replace new coupling SW150. PR 1000164319suspect bearing scrapper issue.done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 100: Book1

03.09.2015PlantSaponification

Page 101: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Pump P-117.1B mech seal leak. Bearing damageChecking plodder D internal and external due to abnormal soundchecking pump P117.7

Coupling Pump PU-22 damage

Page 102: Book1

Status

need to replace new coupling SW150. PR 1000164319replace new sleeve, bearing and mech seal. Donedonedone

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 103: Book1

04.09.2015PlantSaponification

Page 104: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Box-up plodder D Coupling Pump PU-22 damage

Page 105: Book1

Status

need to replace new coupling SW150. PR 1000164319done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 106: Book1

05.09.2015PlantSaponification

Page 107: Book1

ActivityDismantle cyclone plodder B due sprocket wear need to be replace

Plodder D open frame and manhole due abnormal sound and high AMPCoupling Pump PU-22 damage

Page 108: Book1

Status

need to replace new coupling SW150. PR 1000164319done

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 109: Book1

06.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 110: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 111: Book1

Activity

Monitor AR1302PVC pipe leak at WWTP

Send Mech seal Low spec for recondinstal Mech seal Pump 2500P01 and alignment.

Dismantle Pump P-0111A TRG YellowCondensate pump butterfly valve mulfunction

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Dismantle cyclone plodder B due sprocket wear need to be replace

Heat exchanger E126.1 flange leakDismantle pump P-118.2B service

Shaft roller conveyor broken. Shaft need to be repairRun test Buffer tank pump

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.Dismantel Pump 2000P05B

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1023 mech seal leak dismantle pump Pump P-1020 reported low discharge pressure. Dismantle and check internal pump okMech Seal P-1022 leakingP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 112: Book1
Page 113: Book1

Status

daily checkto be replace new fitting.

Gate Pass 2404. PR raised for recond.hand over to production.done. Monitor pump pac and pump.

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone- internal ok . Need to replace carbon bearing and shaft sleeve.to be replace new valve. Pending production cannot stop plant

new sleeve ready. Pending on the mech seal.

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingreplace recond mech seal cartex by valvola. Test ok to be monitorpump mech seal to be monitor2nd time replace mech seal Cartex 45mm. To be monitormech seal to be replace

need to replace new coupling SW150. PR 1000164319replace gasket done.test ok.

temp swap from sapo bagging line- send to Wan Yew Gate pass 2450test ok with SAJ water.

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 114: Book1
Page 115: Book1

07.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Page 116: Book1

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 117: Book1

Activity

Monitor AR1302PVC pipe leak at WWTPTop Up Lub. Oil Pump

Send Mech seal Low spec for recondinstal Mech seal Pump 2500P01 and alignment. Small drippingChange glycerine at pump pac

Dismantle Pump P-0111A TRG YellowCondensate pump butterfly valve mulfunctioninstall flanges at steam trap level 1 dismantle and serviceReplace flange 1" 600 E123 due to steam cut

Dismantle strainer pump 2100P08AAnkesah start open 2100E50 top and bottom capChange new check valve at 2100V08

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Top up lub. Oil at all pump

Dismantle cyclone plodder B due sprocket wear need to be replace

Dismantle pump P-118A serviceinstall scaffolding internal dryer D.

Shaft roller conveyor broken. Shaft need to be repair

Top up Oil at high pressure pump

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.Dismantel Pump 2000P05B

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 118: Book1
Page 119: Book1

Status

daily checkto be replace new fitting.done

Gate Pass 2404. PR raised for recond.hand over to production.done. Monitor pump pac and pump.done

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone- internal ok . Need to replace carbon bearing and shaft sleeve.to be replace new valve. Pending production cannot stop plantdonedone

new sleeve ready. Pending on the mech seal.doneto be monitor

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacedone

need to replace new coupling SW150. PR 1000164319donecheck scrapper down 1/2"

temp swap from sapo bagging line- send to Wan Yew Gate pass 2450

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 120: Book1
Page 121: Book1

08.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 122: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 123: Book1

Activity

Monitor AR1302PVC pipe leak at WWTPP-1801A AMP high. Dismantle

Send Mech seal Low spec for recondinstal Mech seal Pump 2500P01 and alignment. Small dripping. Pump pac drop 10bar. Plant need to stop

Dismantle Pump P-0111A TRG YellowCondensate pump butterfly valve mulfunctionTeikoku pump P-207B cooling not sufficient. Install support for steam trap E123

Openmanhole 2402V03A &B

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Pump P-1007A mech seal leakCheck and PCV tank 1506Install Check valve at discharge portable pump.

Dismantle cyclone plodder B due sprocket wear need to be replace

Cyclone plodder D sprocket worn offPlodder D scrapper internal issue drop

Shaft roller conveyor broken. Shaft need to be repairrectify steam leakage at level 1

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.Install Pump 2000P05B new mech seal form Sharveena. New sleeve

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 124: Book1

Test run submrsible pump

Page 125: Book1

Status

daily checkto be replace new fitting.impeller and internal pump clean.

Gate Pass 2404. PR raised for recond.send pump pac for replace new pump.Gate Pass 2461

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone- internal ok . Need to replace carbon bearing and shaft sleeve.to be replace new valve. Pending production cannot stop plantrectify cooling to avoid pump over heat. Done to be monitor.done

donedone

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacereplace recond mech seal. Done pending testdonedone

need to replace new coupling SW150. PR 1000164319to be replace new sprocketto be rectify

temp swap from sapo bagging line- send to Wan Yew Gate pass 2450done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 126: Book1

test ok. Done

Page 127: Book1

09.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 128: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 129: Book1

Activity

Monitor AR1302

Send Mech seal Low spec for recondReplace new gear pump PACRe-tighten 2500E01 flange

P-111A impeller and rotorCondensate pump butterfly valve mulfunction

Install back submersible pump at pre-treatment plantOpen nozzle dryer 2402 V01 level 2

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Pump P-1007A mech seal leak

Dismantle cyclone plodder B due sprocket wear need to be replace

Dryer D scarpper rectify Install back frame plodder DInstall worm gear cyclone D

Shaft roller conveyor broken. Shaft need to be repair

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 130: Book1
Page 131: Book1

Status

daily check

Gate Pass 2404. PR raised for recond.done. Handover to production run test ok.done

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partreceived from repairto be replace new valve. Pending production cannot stop plant

donedone

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacereplace recond mech seal. Done pending test

need to replace new coupling SW150. PR 1000164319donedonedone

temp swap from sapo bagging line- send to Wan Yew Gate pass 2450

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 132: Book1
Page 133: Book1

10.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 134: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 135: Book1

Activity

Monitor AR1302Top up Lub oil Dismantle Agitator

Send Mech seal Low spec for recond2500P01 and pump pac

P-111A impeller and rotorCondensate pump butterfly valve mulfunction

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Pump P-1007A mech seal leakRectify steam leakag at tank T-1106, T-1302

Dismantle cyclone plodder B due sprocket wear need to be replace

Dryer D scarpper rectify Soap jumbo bag vibrator mounting broken

apply greasing at all bearing area

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 136: Book1
Page 137: Book1

Status

daily checkdonedone

Gate Pass 2404. PR raised for recond.daily monitor

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partreceived from repairto be replace new valve. Pending production cannot stop plant

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacereplace recond mech seal. Done pending testdone

need to replace new coupling SW150. PR 1000164319done temp.Hand over to productionweld new bolting and install back done.

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 138: Book1
Page 139: Book1

11.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 140: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 141: Book1

Activity

Monitor AR1302Agititor worm gearTop Up Lub Oil Install P-1701A after replace new bearing

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionreplace gasket 2200 E-124 and install back capInstall back Teikoku pump P-0111A

Dismantle top spool 2100V02 and 2100V03

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Pump P-1007A mech seal leak

Dismantle cyclone plodder B due sprocket wear need to be replace

install name plate

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 142: Book1
Page 143: Book1

Status

daily checksend to Wan Yew GP2474donetest ok done

Gate Pass 2404. PR raised for recond.daily monitor

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone. Monitor during heat up.done pending test

done

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacereplace recond mech seal. Done pending test

need to replace new coupling SW150. PR 1000164319

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 144: Book1
Page 145: Book1

12.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 146: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 147: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

open cap 2402E50open sight glass section 2100

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Pump P-1007A mech seal leakInstall 6" valve at tank T-1506

Dismantle cyclone plodder B due sprocket wear need to be replace

Screw conveyor chain broken

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 148: Book1
Page 149: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.change glycerine

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

donedone

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacereplace recond mech seal. Done pending testdone

need to replace new coupling SW150. PR 1000164319

change new chain pin

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 150: Book1
Page 151: Book1

13.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 152: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 153: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

2000P05A rubber flender coupling damage

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Dismantle cyclone plodder B due sprocket wear need to be replace

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 154: Book1

Test submersible pump

Page 155: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily monitor

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

replace new rubber

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replace

need to replace new coupling SW150. PR 1000164319

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 156: Book1

ok

Page 157: Book1

14.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 158: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 159: Book1

Activity

Monitor AR1302Agititor worm gearTop Up lub oil pump

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

Install new rubber coupling 2000P05AAbnormal sound pump 2402P030

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Top Up Lub oil pumpPump P-1023 mech seal minor leak

Dismantle cyclone plodder B due sprocket wear need to be replace

Open manhole buffer tankDismantle bottom buffer tank suction pipe spool

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 160: Book1
Page 161: Book1

Status

daily checksend to Wan Yew GP2474done

Gate Pass 2404. PR raised for recond.daily monitor

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

doneto be monitor

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacedonefeed pump to hydrogenation plant pending handover.

need to replace new coupling SW150. PR 1000164319

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 162: Book1
Page 163: Book1

15.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 164: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 165: Book1

Activity

Monitor AR1302Agititor worm gearDismantle pump P-1801A motor trip. Check no mechanical Issue

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling coverTop Up Lub Oil Pump 2500P03

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

Open Manhole 2401V02,V03,V04Dismantle cap 2401E51Dismantle cap 2000E01

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Dismantle cyclone plodder B due sprocket wear need to be replace

Dismantle gear pump P-124.6 check oil seal size

Dismantle bearing Pillow Flaker 1 drum

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 166: Book1

Dismantle pump houisng 2402P030

Page 167: Book1

Status

daily checksend to Wan Yew GP2474done

Gate Pass 2404. PR raised for recond.daily monitordone

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

donedonedone

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replace

need to replace new coupling SW150. PR 1000164319done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 168: Book1

done

Page 169: Book1

16.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 170: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 171: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

Open Sight Glass 2000V07 and 2000V08,2000V02,03Dismantle Cap 2401E50Open Manhole 2000V04/05/06/10Dismantle Cap 2000E51A/B

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Install ball valve and pressure Gauge at PumpP-1013

Dismantle cyclone plodder B due sprocket wear need to be replace

Open Cyclone 1C and 2CCheck Pump P-177.1B abnormal soundFix back worm gear Cyclone C

Buffer Tank Pump leak

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 172: Book1
Page 173: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily monitor

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

donedonedonedone

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacedone

need to replace new coupling SW150. PR 1000164319donedone. Motor electriacl issuedone

replace ne mech seal.done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 174: Book1
Page 175: Book1

17.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 176: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 177: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111ADismantle Teikoku pump P-210 . Bearing and shaft sleeve damage

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Pump P-1023 drain and cleaning and replac new recond mech seal

Dismantle cyclone plodder B due sprocket wear need to be replace

Fix back motor coupling P-117.1 Dismantle flange at supply steam line. Clogged with soapWelding leakage at pipe joint

Buffer tank Pump dismantle and check mech seal

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 178: Book1

Shifting manual cleaning from SILO 1 to SILO 14

Page 179: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily monitor'. Pressure drop dismantle çleaning glycerine tubing and install back.

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending testto be dismantel and replace new spare part

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacedone. Test ok

need to replace new coupling SW150. PR 1000164319test okdonedone'. Test ok

replace new mech seal.

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 180: Book1

done

Page 181: Book1

18.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 182: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 183: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111ARetighten flanges level 3 2300-E-0212

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Dismantle cyclone plodder B due sprocket wear need to be replace

Scrapper Dryer D mulfuncation Dismantel plodder D frame

Pump B running minor leak at check valvePump A rubber coupling allen cap screw damage

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 184: Book1

Top up Greasin at Flaker 2 drumming

Page 185: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily monitor.

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending testdone

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replace

need to replace new coupling SW150. PR 1000164319to be adjust the scarpper gap.done

doneto be replace new part.

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 186: Book1

done

Page 187: Book1

19.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 188: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 189: Book1

Activity

Monitor AR1302Agititor worm gearChange new butterfly valve

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

release pressure air receiver

PU-08 reported by Utilities team jammed- dismantle with grundfos technician

Dismantle cyclone plodder B due sprocket wear need to be replace

Replace belting palletizerChange belt type at weighting machine

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 190: Book1

Adjust conveyor press beltAdjust cone inside flaker chute

Page 191: Book1

Status

daily checksend to Wan Yew GP2474done

Gate Pass 2404. PR raised for recond.daily monitor.Change glycerine every 4 batch

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

done

installation on going by grundfos.

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replace

need to replace new coupling SW150. PR 1000164319

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 192: Book1

donedone

Page 193: Book1

20.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

Page 194: Book1

RODM plant

Loading Bay

Workshop Mechnical

Page 195: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

Dismantle cyclone plodder B due sprocket wear need to be replace

Palletizer chain broken

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 196: Book1

Dismantel Flange for Tank T-1907 and T-1908 for drain water

Page 197: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily monitor.Change glycerine every 4 batch. AesSeal service the pump pac

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partto be replace new valve. Pending production cannot stop plantdone pending test

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replace

need to replace new coupling SW150. PR 1000164319

replace new part. Done. Test ok

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 198: Book1

done

Page 199: Book1

21.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 200: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 201: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Condensate pump butterfly valve mulfunctionInstall back Teikoku pump P-0111A

Box-up 2100V02,V03 2402T01 sight glassBox-up Air Receiver

Top Up Lubrication oil pump

Dismantle cyclone plodder B due sprocket wear need to be replace

adjust scrapper inside dryer D

Sewing needle broken. Take from sapo bagging machineRetighen flaker 2 drum packing sealAdjust palletizer beltingRealign conveyor belt weighting hopperAdjust cone

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 202: Book1

replace new belt at palletizer at beader line

Page 203: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.Dismantle and service pumppac by AESSeal

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partreplace new valve done.done pending test

donedone

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacedone

need to replace new coupling SW150. PR 1000164319done

donedonedonedonedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 204: Book1

done

Page 205: Book1

22.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 206: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 207: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling coverdismanle mech. seal 2500AG08

Install back Teikoku pump P-0111ADismantle Teikoku Pump P-210

Box-up Spool at 2100V10 and 2000V10Box-up 2000V09Box-up 2000V04, 2100V04,2401E01,2400E01

Open Manhole Tank T-1606

Dismantle cyclone plodder B due sprocket wear need to be replace

Belting at palletizer damage

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantleP-1019 pump jammed suspect bearing damage. Lub. Oil mix with water

Coupling Pump PU-22 damage

Page 208: Book1
Page 209: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.Dismantle and service pumppac by AESSealdone

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone pending testdone

donedonedone

assemble with new shaft , bearing and oil seal done. Pending new Couplingmech seal to be replacedone

need to replace new coupling SW150. PR 1000164319

replace new belt

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 210: Book1
Page 211: Book1

23.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 212: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 213: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling cover

Dismantle and service condensate pumpReplace gasket steam Line Level 2, 4, E202 for CV0007

Box-up 2400E01Box-up 2100V02 and V03,V08, V07Box-up 2401V02

Install Blow Point suction Pump P-1017

Dismantle cyclone plodder B due sprocket wear need to be replace

Install blind 2" at Steam line new coil at buffer tankReplace belt both side

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 214: Book1
Page 215: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.Dismantle and service pumppac by AESSeal

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdonedone

donedonedone

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone

need to replace new coupling SW150. PR 1000164319

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 216: Book1
Page 217: Book1

24.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 218: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 219: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 and pump pac. Fix back coupling coverInstall Mech seal AG08

Box-up 2100V10

Dismantle cyclone plodder B due sprocket wear need to be replace

Install new key bar silo 1

Retighten PHE bolting

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 220: Book1

Remove blind at NG line

Page 221: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.Dismantle and service pumppac by AESSealdone

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new part

done

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 222: Book1

done

Page 223: Book1

25.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 224: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 225: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recondInstall back mech seal pump 2500P01 and alignment

Install back strainer Pump 2100P05ABox-up 2401E50, 2000E01

Dismantle cyclone plodder B due sprocket wear need to be replace

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 226: Book1
Page 227: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.done.test run

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new part

donedone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 228: Book1
Page 229: Book1

26.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 230: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 231: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 monitor mech seal and install coupling cover

Install back 2402P030Box-up 2401V01, 2402V03A, V03B

Adjust pump Impeller P-1006B

Dismantle cyclone plodder B due sprocket wear need to be replace

Sapo glycerine drumming filter basket o-ring

Install scrapper weigthing hopper

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 232: Book1
Page 233: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.done

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new part

donedone

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone

need to replace new coupling SW150. PR 1000164319done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 234: Book1
Page 235: Book1

26.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 236: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 237: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 monitor mech seal

Box-up 2402V05,2402E50,E51,E52Remove blind hotwell 2401

Dismantle cyclone plodder B due sprocket wear need to be replace

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 238: Book1
Page 239: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily check

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new part

donedone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 240: Book1
Page 241: Book1

28.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 242: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 243: Book1

Activity

Monitor AR1302Agititor worm gear

Send Mech seal Low spec for recond2500P01 monitor mech seal

Retighthen cap E213Replace gaske at E201

Box-up 2402E02,2402C02Box-up 2000V04,V05,V06,V07,V08,V102402E03A/BInstal blind 2402T50 Hot Well

Dismantle cyclone plodder B due sprocket wear need to be replace

Dryer D scrapper adjust gap and try run

Screw Conveyor beader plant clogged. Dismantle and clean

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 244: Book1
Page 245: Book1

Status

daily checksend to Wan Yew GP2474

Gate Pass 2404. PR raised for recond.daily check

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone. Monitor pressure testdone

donedonedonedone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 246: Book1
Page 247: Book1

29.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Page 248: Book1

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 249: Book1

Activity

Monitor AR1302Agititor worm gear

Dismantle pump coupling cover for plant startup

Rotor Pump Teikoku P-210B send for repairPU-16 vibrate and trip

Plunger URACA Pump Send to Value Coatremove blind at hotwell

Box-up T-1606Top Up Lub Oil P-1020A

Dismantle cyclone plodder B due sprocket wear need to be replace

Top-up gear oil Plodder DReplace Blower filter as per punch list A&DRectify steam leakage as per punch list

Open Manhole Buffer tankSetting belting at bagging 25kg machineReplace new packing seal at Flaker 2 drum

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG072500P01 monitor mech seal

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.Box-up 2000E01, 2402V07,2000E50. Box-up activity completed

Dismantle pump P-1021 mech. Seal leak. Replace new mech seal Cartex 45mmFeed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 250: Book1

Cleaning and service grunfos pump

Page 251: Book1

Status

daily checksend to Wan Yew GP2474. Received back

daily checkdone

Done. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone GP2492Check electical issue

doneGP2493done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonedone

need to replace new coupling SW150. PR 1000164319donedonedone

donedonedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Internal pump surface deep groove mark. Rotor de skinned. Pending for repair

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

done. Install back.Test run ok to be monitor

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 252: Book1

done

Page 253: Book1

30.09.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Page 254: Book1

Loading Bay

Workshop Mechnical

Page 255: Book1

Activity

Monitor AR1302Agititor worm gear

Fat trap pipeline check valve clogged with debris. Clean and service install backInstall back pump 2500P01 coupling cover

Rotor Pump Teikoku P-210B send for repairRectify steam leakage as per plant punchlist

Install blind for pressure test splitting 2000T50

Replace gasket at pump P-1030 dischargerPipe line from Pump P-1013B to sapo leak

Dismantle cyclone plodder B due sprocket wear need to be replace

Install back plodder D front frame

Retighten packing seal at Flaker 2 drum

Rectify steam drain line at High pressure boiler

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG072500P01 monitor mech seal

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyRemove Teikoku pump P-118B and install new pumpDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 256: Book1
Page 257: Book1

Status

daily check- abnormal sound accoursend to Wan Yew GP2474. Received back to be install on 01.10.2015

daily checkdonedone

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionto be test the new pump P-0118B. Test low flow rate. Need to check with electrical the amp and rpm.return back by Value Coat. Unable to repair the pump. Raise PR for new partdone GP2492done

done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonescafolding erection and rectifucation by Landfeld

need to replace new coupling SW150. PR 1000164319done

done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 258: Book1
Page 259: Book1

01.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Page 260: Book1

Loading Bay

Workshop Mechnical

Page 261: Book1

Activity

Monitor AR1302Agititor worm gear A-3F install back after repair

Dismantle pumppac 2500P01.1

Rotor Pump Teikoku P-210B send for repair

Install blind at hot well T50 2000Retighten Manhole 2000V10

Dismantle cyclone plodder B due sprocket wear need to be replace

Alignment new soap kettle pumpRepair pipe leakage from P-1013B to Sapo plant

Retigthen gland packing flaker 2 drumDismantle vaccum pump for chillerPump At Fat Trap Beader leak. Replace new mech seal

Top Up Lub Oil high pressure pump

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG072500P01 monitor mech seal

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Teikoku pump P-118B new pump

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 262: Book1
Page 263: Book1

Status

daily check- abnormal sound accour dismantle gear worn done. Test ok

daily checkdone

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partdone GP2492 received back from Wan Yewtest ok TRG 0.2 32meter cube per hour Amp 26.92 , 49.9Hz

donedone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319donedone

donedismantle and indentify damage partdone. Test ok

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 264: Book1
Page 265: Book1

02.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

Page 266: Book1

RODM plant

Loading Bay

Workshop Mechnical

Page 267: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run testDismantle pump pac and serviceInstall back hammering at level 2

Rotor Pump Teikoku P-210B replace new spare parts.

retigthen manhole bolting 2000V10

Dismantle and service fat trap pump. Check valve clogged with debris

Dismantle cyclone plodder B due sprocket wear need to be replace

Open plodder D frame and onstall back after cleaningReplace lock for dryer manholeRemove blind plate and replace gasket

Palletizer belt broken. Dismantle replace new beltChange drive belt weighting conveyorInstall back chain cover at screw conveyor

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 268: Book1

Send Mikuni valve for repair 4" - 1 unit, 2" 3 unit

Page 269: Book1

Status

daily check- abnormal sound accour dismantle gear worn

donedonedone

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new part GP2492 received back from Wan Yew

done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone. Test ok

need to replace new coupling SW150. PR 1000164319donedonedone

done.done.done.

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 270: Book1

GP 2503

Page 271: Book1

03.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

Page 272: Book1

RODM plant

Loading Bay

Workshop Mechnical

Page 273: Book1

Activity

Monitor AR1302Pump P-1401B abnormal sound

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.

Swap Buterfly valve 3" from 2000V05 to 2100V05

Install back Caustic Soda Pump P-1026

Dismantle cyclone plodder B due sprocket wear need to be replace

Brine line leaking at pipe

Replace gasket at steam header

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 274: Book1

Dismantle fat trap submersible pump Clogged with rubbish debris. Clean and service

Dismantle fat trap submersible pump Clogged with rubbish debris. Clean and service

Page 275: Book1

Status

daily check- abnormal sound accour dismantle gear worn to check and monitor

Daily Monitor

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new part GP2492 received back from Wan Yew

done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone. Pending Testing

need to replace new coupling SW150. PR 1000164319to repair welding joint

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 276: Book1

done

Temp. use wilden pump

Page 277: Book1

04.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Page 278: Book1

Workshop Mechnical

Page 279: Book1

Activity

Monitor AR1302Pump P-1401B abnormal sound

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.

Feed pump to Hydrogenation P-1023 mech seal leak

Dismantle cyclone plodder B due sprocket wear need to be replace

dismantle pipe spool at dryer B clogged with soap.disconnect pipline in&out chiller line and belitng motor

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 280: Book1
Page 281: Book1

Status

daily check- abnormal sound accour dismantle gear worn to check and monitor

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new part GP2492 received back from Wan Yew

assemble with new shaft , bearing and oil seal done. Pending new Couplingto be replace recond mech seal.

need to replace new coupling SW150. PR 1000164319donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Raise PR for spare part PR-1000160706- (Bearing and oil seal received) and send sprocket for replace new Gate Pass 2177. Pending gland packing rope and oil seal

Page 282: Book1
Page 283: Book1

05.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Page 284: Book1

Loading Bay

Workshop Mechnical

Page 285: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run testDismantle and service all steam trap at plant

Rotor Pump Teikoku P-210B replace new spare parts.Rectify leakage accorfing to plant punch listReplace gasket at pump P-0106A suction

Retighten packing at valve at high pessure line

Swap Ball valve 4" at pump P-1019

Pump P-126.1A1B mech seal leak. Dismantle and replace new mech sealRepair pipe leakage at basket strainerDismantle pump P-118.2 for replace new mech seal

Replace gasket at steam lineRectify valve leakage at buffer tank

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 286: Book1

Swap Fat trap pump from tank areaRepair hot water pipe inside glass tank

Send for repair stator submersible pumpReplace new chain at cyclone plodder

Page 287: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.done

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507on-goingdone

done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone

need to replace new coupling SW150. PR 1000164319donedonedone

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 288: Book1

donedone

GP2511done

Page 289: Book1

06.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 290: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.Replace gasket level 6 2300 C202Rectify steam tracing

install back pump P-126.1A1

Dismantel PHE gasket for replacement

Top-up lub oil at high pressure pump

Service drum clamp/sapo

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Replace mech seal pump multistage P-126.1A1

Page 291: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507donedone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319done

done

done

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 292: Book1

07.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 293: Book1

Activity

Monitor AR1302check and dismantle pump P-2101B

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run testDismantle and replace mech seal pump 2500P07

Rotor Pump Teikoku P-210B replace new spare parts.Install Pump Teikoku P-210A at plantReplace gasket and rectify steam tracing leakage

Install back worm gear at cylone plodder dryer BTop-up lub. Oil at plodder A and B gearbox

Replace gasket PHE at flaker lineRectify pipe line leakage change gasket

Dismanlte and service cyclone plodder

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 294: Book1

Status

daily check- abnormal sound accour dismantle gear worn done

Daily Monitor pump pac pressure and temp.done

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507donedone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319donedone. To be monitor lub oil level.

done. Peding a few plate need to clean by operation.done

on-going

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 295: Book1

08.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 296: Book1

Activity

Monitor AR1302Dismantle Pump P-1701B inside pump clogged with rubbish. Service and clean

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.

Check Pump PU-07 and PU-09 NRV

Check Pump P-1032 report abnormal soundOpen manhole T-1107 and top manhole and install 6" ball valve

Install conveyor stopper at drumming line

replace gasket PHE and install back

assamble pump P-1701

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 297: Book1

Status

daily check- abnormal sound accour dismantle gear worn done

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507

done

assemble with new shaft , bearing and oil seal done. Pending new Couplingcheck okdone

need to replace new coupling SW150. PR 1000164319done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 298: Book1

09.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 299: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.Install Strainer plug 6 point

Swap mec seal from Pump P-1026B to P-1203Open Manhole and top Manhole T-1601

Top -up lubrocation pump Blower A

Replace gasket at beader buffer tank

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 300: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonedone

need to replace new coupling SW150. PR 1000164319done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 301: Book1

10.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 302: Book1

Activity

Monitor AR1302Install back pump P-1701B

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.Start-up teikoku pump fract and dist.

rectify steam tracing leakage line tank T-1702Repair sight glass broken

Fix- back pipe nozzle dryer B

Rectify steam tracing leaking at flow meterBuffer tank pump B trip electrical issue

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 303: Book1

Status

daily check- abnormal sound accour dismantle gear worn done. Test ok

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507witness production start up.

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonedone

need to replace new coupling SW150. PR 1000164319done

donehandover to electical

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 304: Book1

11.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Page 305: Book1

Workshop Mechnical

Page 306: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rotor Pump Teikoku P-210B replace new spare parts.Witness pump teikoku start up for dist.

replace gasket feed pump to hydro pump P-1023Install blind at valve between tank T-1203 and T-1204

Replace gasket at turbo pump

retighten gland packing flaker 2 drummWeighting conveyor roller abnormal sound and damage. Dismantle and replace bearingAdjust and set back belt at beader palletizerRetighten valve at beader header

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BInstall back Teikoku pump P-0207B after repair and dismantle centrifugal pump temp. standbyDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 307: Book1
Page 308: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partDone. Pending run test by productionreturn back by Value Coat. Unable to repair the pump. Raise PR for new partrecond front and rear pump. GP2507done

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonedone

need to replace new coupling SW150. PR 1000164319done

donedonedonedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 309: Book1
Page 310: Book1

12.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Page 311: Book1

Workshop Mechnical

Page 312: Book1

Activity

Monitor AR1302Alignment pump P-1401A

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run testInstal cover coupling pump 2500P01

Pump Teikoku P-115B TRG RedReplace wilden Pump at Fat Trap

Repair Sight Glass at Tank T-1108

Install Hose at RSTVConveyor belt top weighting hopper damage replace with new partModifify drain line chiller

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 313: Book1
Page 314: Book1

Status

daily check- abnormal sound accour dismantle gear worn done

Daily Monitor pump pac pressure and temp.done

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new partto be dismantle during shut downdone

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone

need to replace new coupling SW150. PR 1000164319donedonedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 315: Book1
Page 316: Book1

13.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Page 317: Book1

Workshop Mechnical

Page 318: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Rectify steam tracing dryer BInstall new belt at Silo disconnect chiller line to Plodder BReplace new mech seal at pump grundfos CR1 flushing hot waterDismantle weighting belt chainDismantle Motor Dryer A and install back with new motorAdjust belitng lifitng pallet

Replace chain at weighting belt

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 319: Book1
Page 320: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new part

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319donedonedonedonedonedonedone

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 321: Book1
Page 322: Book1

14.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 323: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

fix back dryer B motor and chiller pipe

Retighten packing chiller at Flaker 2

Replace spare part for pump Teikoku P-210Replace new Sprocket and chain cyclone plodder saponification plant

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 324: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new part

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319done

done

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 325: Book1

15.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 326: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Dismantle pump P-103B

Belting for pallet lifting damage replace new beltreplace belt at bagging machine statec binder

Replace lub. Oil at high pressure pump Welding bracket at beader chamber

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 327: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new partdone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319

donedone

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 328: Book1

16.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 329: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Dismantle pump centrifugal pump at Pump P-210Replace mech seal pump grundfosInstall pump Teikoku P-201BInstall back wilden pump

Box-up tank T-1107Replace gasket at tank T-1203

Dismantle and serivce pump P-126.1 mech seal

Replace screw conveyor to belt conveyor at SILO 4

Replace mech seal pump P-1033

Fabricate nozzle for clear blockage at sapo plant

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 330: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new partdonedonedonedone

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonedone

need to replace new coupling SW150. PR 1000164319done

done

done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 331: Book1

17.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 332: Book1

Activity

Monitor AR1302dismantel pump P-1701A pump clogged

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

replace ball valve between tank T-1203 and T-1204

replace back 1" pressure valve

Retigthen bolting at warehouse

dismantle mech seal pump P-1004 repair and servicewelding drummng bracket

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 333: Book1

Status

daily check- abnormal sound accour dismantle gear worn done

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new part

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone

need to replace new coupling SW150. PR 1000164319done

done

donedone

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 334: Book1

18.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 335: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run testWelding bracket for wilden pump base support

Box-up Tank T-1601 and install 6" valve

Gearbox Flaker 2 product block inside drumming. Service and test ok

Welding braket for loading bay MOC

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 336: Book1

Status

daily check- abnormal sound accour dismantle gear worn

Daily Monitor pump pac pressure and temp.done

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new part

assemble with new shaft , bearing and oil seal done. Pending new Couplingdone

need to replace new coupling SW150. PR 1000164319

done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 337: Book1

19.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 338: Book1

Activity

Monitor AR1302Running test pump 1201B for support Air at CAT

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

Install blind at dist. Line tank T-1204Install pipe spool and flexible hose for header C202 and C203Install blind plate c203 to T-1701Check melting tank abormal sound. Check ok

Glycerine Drumming replace impeller pump

Re-tighten gland packing drumming flaker 2Dismantle gear pump Beader plant reported jammed. Check pump no issue handover to electrical

Dismantle bunner Thermax Boiler A to replace gasket

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 339: Book1

Status

daily check- abnormal sound accour dismantle gear worn done

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new part

assemble with new shaft , bearing and oil seal done. Pending new Couplingdonedonedonedone

need to replace new coupling SW150. PR 1000164319done

donedone

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing

Page 340: Book1

20.10.2015PlantWaste water treatment Plant

Hydrogenation

F&D

Splitting and Glycerine

Cooling tower

Tank Farm

Saponification

Oliec Acid

Flaker Beader

Boiler House

Soap bar

RODM plant

Loading Bay

Workshop Mechnical

Page 341: Book1
Page 342: Book1

Activity

Monitor AR1302

2500P01 dismantle mech seal for recond. AES Seal install back mech. Seal and run test

relocate Wildeb pump at fat trap and install flexibel hose at discharge pumpMonttor start-up pump Teikkoku P-103A

Dismantle pump 2000P09A mech seal leakDismantle Pump P03A. Impeller loosen. Retighten and fix back

Test run Gear Pump at buffer tankinstall vaccum pump pending testing

Replace gasket at basket strainer

Assambel vaccum pump chiller

Dismantle gearbox pump P-2101B and bring to MT workshop

Plant start-up. Testing flushing agitator AG08 and AG07

Dismantle Pump P-115BDismantle Teikoku pump P-111B

Pump 2402 P02B vibration occur at motor.

Feed Pump to Flaker P-1012C coupling damage- dismantle

Coupling Pump PU-22 damage

Page 343: Book1
Page 344: Book1

Status

Remove gear for install belting

Daily Monitor pump pac pressure and temp.

Internal pump surface deep groove mark. Rotor de skinned.PR raised for new partreturn back by Value Coat. Unable to repair the pump. Raise PR for new partdonedone

to be replace new mech sealdone

assemble with new shaft , bearing and oil seal done. Pending new Coupling

need to replace new coupling SW150. PR 1000164319

Test Ok. Donedone

done

done

Found out rubber inside the pump and need to order spare part rubber swivel coupling damage. Pending

Testing not done due to flushing water leak into vessel. Temporary plug inlet outlet until furhter instruction from JJ-Lurgy

Production swap to pump 2402 P02A. Relignment and retighten bolting done 2403P02B. Pending for testing