Page 1: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Booster and PS LIU workunits

EPC Project Meeting 06-09-2011Serge Pittet

TE EPC

Page 2: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

The LIU Project

“The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL-LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain.”

06/09/2011 TE-EPC - Serge Pittet 2

TE EPC

D. Nisbet D. Nisbet (inj.)S. Pittet

S.Pittet

Project leaderR. Garoby

Linac4M. Vretnar

PSBK. Hanke

PSS. Gilardoni

SPSB. Goddard

Deputy M. Meddahi

Page 3: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU Project status

• RCS option studied and rejected.

• LIU project approved in the 24th of august LMC.• Official date for project start on 1st of September 2011.• TDR to be completed by the end of 2011.• Startup of upgraded machines at the end of LS2 (2017?).

• Some budget codes already funded.• WBS and WUs will soon be transferred in APT.

06/09/2011 TE-EPC - Serge Pittet 3

TE EPC

Page 4: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Provisional planning

06/09/2011 TE-EPC - Serge Pittet 4

TE EPC

Page 5: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Manpower request overview

06/09/2011 TE-EPC - Serge Pittet 5

TE EPC

Page 6: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PSB 5.2 - Booster MPS

• Civil engineering included. To be done in LS1 as far as possible.

06/09/2011 TE-EPC - Serge Pittet 6

TE EPC

Provide Booster MPS Trims

Holder [email protected]

Budget code 99327 (not active yet)

Budget 700kCHF

unit(s) 3

Deadline LS2

Provide Booster MPS

Holder [email protected]

Budget code 99327 (not active yet)

Budget 15MCHF

unit(s) 1

Deadline LS2

Page 7: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

POPS based Baseline

06/09/2011 TE-EPC - Serge Pittet 7

TE EPC

Benefits• Overall voltage available increases and would allow a

reduction of the RMS current using a faster ramping.• The capacitor bank totally absorbs the peak power

on the 18kV network. Meyrin SVC would then become optional.

• Spare sharing between MPS A and B and eventually with POPS.

• Only a few new cables needed between the reference magnet (BCER) and the MPS.

• New B-field regulation to minimize eddy currents and saturation effects impact at higher current and acceleration rate.

Drawbacks• Cost estimation 14MCHF using POPS module.

Reference magnet

Ring 2&3

GND

MPS B2500V5500A

QFO600V450A

QDE600V450A

GND

MPS A2500V5500A

DC3

DC

DC +

-

MAGNETS

V_F3

UdcF3

AC

CC1

AC

MV7308

DC

DIP+QF+REF

DC3

DC

DC +

-

V_F3

UdcF3

AC

CC1

AC

MV7308

DC

DIP+QD+REF

DC3

DC

DC +

-

UdcF3

AC

CC1

AC

MV7308

DC

64 BHZ Rings 1&4

128 QFO Rings 1,2,3&4

64 QDE Rings 1,2,3&4

64 BHZ Rings 2&3

Reference magnet

Ring 1&4

Ring 1 B-filedmeasurement

Ring 2 B-filedmeasurement

Page 8: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Layout of MPS new building

06/09/2011 TE-EPC - Serge Pittet 8

TE EPC

New

MPSB

(2 GeV)

(26m x 16m)

TT

6

Cap bank #1 Cap bank #2 Cap bank #3

Control roomLocal for Cooling& Air Conditioning

AC/DC3 spare (1.2m x 10m) DC/DC3 floating (1.2m x 10m)

AC/DC1 (1.2m x 10m) AC/DC2 (1.2m x 10m)

DC/DC1 (1.2m x 10m) DC/DC2 (1.2m x 10m)

Out

put c

ubic

le

QF QD QS16

m

26m

4m4m

• 420m2 required, only 190m2 available in bdg. 271 ground floor.• Only 200kg/m2 allowed in bdg. 271 first floor.• No space left in bdg. 361.

With this new building:• We can install and commission during Booster operation.• We have a backup power supply during the first years.• Easy connection to existing cables and cooling services.

Page 9: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PSB 5.2 – ALG1&2

• The linear stage can handle the new rated current.

• The capacitor bank size needs to be increased.

06/09/2011 TE-EPC - Serge Pittet 9

TE EPC

Perform ALG1&2 upgrade

Holder [email protected]

Budget code 99327 (not active yet)

Budget 200kCHF

unit(s) 4

Deadline LS2

Page 10: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PSB 5.2 - Mididiscaps

• Design and production from Linac 4 project.

06/09/2011 TE-EPC - Serge Pittet 10

TE EPC

Provide Mididiscaps

Holder [email protected]

Budget code 99327 (not active yet)

Budget 50kCHF

unit(s) 5

Deadline LS2

Page 11: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PSB 5.2 – Beam Transfer

• Optimization still need to be done: pulsing converters and keep existing magnets, BT.BHZ10 magnet design, 2GeV quadrupoles optic, reuse of some converters or spares

06/09/2011 TE-EPC - Serge Pittet 11

TE EPC

Provide Transfer Bendings

Holder [email protected]

Budget code 99327 (not active yet)

Budget 3.2MCHF

unit(s) About 13 (+15 for Isolde?)

Deadline LS2

Page 12: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PS 5 – CBE

• Specification under study with OP.

• ACAPULCO power design with FGC3 and RegFGC3.

06/09/2011 TE-EPC - Serge Pittet 12

TE EPC

DHZ&DVT Power Converters

Holder [email protected]

Budget code 99263 PS Upgrade: Converters

Budget 560kCHF

unit(s) 75

Deadline LS1

QN&QSK Power Converters

Holder [email protected]

Budget code 99263 PS Upgrade: Converters

Budget 740kCHF

unit(s) 85

Deadline LS1

Page 13: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PS 5 – PI.SMH42

• 2 aimants en série• R bobinage:

2·0.08mOhms ≈ 0.2 mOhms

• L aimant: 2·0.9uH ≈ 2uH

• Inom: 31kA• Forme: Demi sinus+ 3ème harmonique + filtre actif• Largeur pulse demi sinus: 3ms

06/09/2011 TE-EPC - Serge Pittet 13

TE EPC

Manufacture and commission PI.SMH42 Power Converter

Holder [email protected]

Budget code 99263 PS Upgrade: Converters

Budget 400kCHF

unit(s) 2

Deadline LS2

Page 14: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PS 5 – PI.BSM42• R bobinage: 0.5 mOhms• L aimant: 1uH• Inom: 28kA• Forme: Demi sinus

+ 3ème harmonique + filtre actif

• Largeur pulse demi sinus: 0.8ms

• Temps de descente du courant: 0.4ms

• Pas de faisceau sur la portion de montée en courant.

• La descente en courant des 4 bumpers doit être aussi proche que possible.

06/09/2011 TE-EPC - Serge Pittet 14

TE EPC

Manufacture and commission PI.BSM42 Power Converter

Holder [email protected]

Budget code 99263 PS Upgrade: Converters

Budget 300kCHF

unit(s) 2

Deadline LS2

Page 15: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PS 5 – PI.BSM40, 43 & 44• R bobinage:

0.41 mOhms (20 tours)• L aimant: 0.5mH• Inom: 1.1kA• Largeur pulse demi sinus:

0.8ms• Temps de descente

du courant: 0.4ms

• Le nombre de tour peut encore être modifié ([email protected])

• Pas de faisceau sur la portion de montée en courant.• La descente en courant des 4 bumpers doit être aussi proche que possible.

06/09/2011 TE-EPC - Serge Pittet 15

TE EPC

Upgrade and commission PI.BSM40, 43 & 44 Power Converters

Holder [email protected]

Budget code 99263 PS Upgrade: Converters

Budget 360kCHF

unit(s) 4

Deadline LS2

Page 16: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Related consolidation

06/09/2011 TE-EPC - Serge Pittet 16

TE EPC

• Some consolidation items which are essential for the LIU project have been pushed/advanced.

• They have not been transferred and stay in S.Baird project.

status code 2011 kCHF

2012kCHF

2013kCHF

2014kCHF

2015kCHF

2016kCHF

started 68215 PS Main Ring

started 68217 PS Gamma Transition

started 68251 PSB Multipole/Dipole 16 92

Approv. EPC.04 SVC Meyrin Filter 647

Approv. EPC.03 Canada, BI.QNO, BIX.QNO 1118

Approv. EPC.05 PS Septum 16 & 26 527

Approv. EPC.16 East area 647

Approv. EPC.06 TT2 3835

Page 17: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Organization

• Bi-weekly LIU PSB project meetings followed by linkman.• Bi-weekly LIU PS project meetings followed by linkman.

• EPC LIU project meetings in January, May and September with a shot presentation by each WU holder.

• WU specific meetings when needed.

06/09/2011 TE-EPC - Serge Pittet 17

TE EPC

Page 18: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

Documentation

• Detailed information still available on TE-EPC-LPC website: http://te-epc-lpc.web.cern.ch/te-epc-lpc/general.stm

06/09/2011 TE-EPC - Serge Pittet 18

TE EPC

Page 19: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PSB Work Units

06/09/2011 TE-EPC - Serge Pittet 19

TE EPC

wu v1.0 Generated: 10-Feb-2011 11:19

cmd wu WU ID Baseline Status Description WBS Holders EMail Start Date Finish Date Comments

cmd Pxx # Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date Comments

cmd PSx # JobType Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date Comments

cmd PBU # Expenditure Description Org Code [Recharging] Amount Currency Start Date Finish Date Comments

cmd Mxx # Expenditure Description Org Code [Recharging] Amount Currency Start Date Finish Date Comments

cmd de # Weight Deliverable description Actual Qty Total Qty Unit Start Date Finish Date Comments

Specify command N, M, D; Commands: N (New ), M (Modify), D (Delete)

wu D2 Provide Booster MPS LIU-PSB 5.2 [email protected] 1-Jan-2011 30-Jun-2014

MSP 10 Budget 99327 15,000,000 CHF

de 10 1 Design & Specif ication 0 1 U 1-Jan-2011 31-Dec-2012

de 20 0 Market survey 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender 0 1 U 1-Jul-2012 31-Dec-2012

de 40 10 Converter manufacturing 0 1 U 1-Jan-2013 31-Dec-2014

de 50 2 Civil engineering 0 1 U 1-Jan-2013 31-Dec-2015

de 60 2 Installation and commissioning 0 1 U 1-Jan-2014 31-Mar-2016

wu D2 Provide Booster MPS Trims LIU-PSB 5.2 [email protected] 1-Jan-2011 30-Jun-2014

MSP 10 Budget 99327 700,000 CHF

de 10 100 Design & Specif ication 0 1 U 1-Jan-2011 31-Dec-2012

de 20 0 Market survey 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender 0 1 U 1-Jul-2012 31-Dec-2012

de 40 400 Converter manufacturing 0 1 U 1-Jan-2013 31-Dec-2014

de 50 200 Installation and commissioning 0 1 U 1-Jan-2015 31-Mar-2016

wu D2 Perform ALG1&2 upgrade LIU-PSB 5.2 [email protected] 1-Jan-2011 30-Jun-2014

MSP 10 Budget 99327 200,000 CHF

de 10 10 Design & Specif ication 0 1 U 1-Jan-2011 31-Dec-2012

de 20 150 Component supplies 0 1 U 1-Jan-2013 30-Jun-2014

de 30 40 Installation and commissioning 0 1 U 1-Jan-2015 31-Mar-2016

wu D2 Provide MidiDiscap LIU-PSB 5.2 [email protected] 1-Jan-2011 30-Jun-2014

MSP 10 Budget 99327 50,000 CHF

de 10 0 Design & Specif ication 0 1 U 1-Jan-2011 31-Dec-2012 from linac 4 project

de 20 0 Market survey 0 1 U 1-Apr-2012 30-Jun-2012 from linac 4 project

de 30 0 Call for tender 0 1 U 1-Jul-2012 31-Dec-2012 from linac 4 project

de 40 45 Converter manufacturing 0 5 U 1-Jan-2014 31-Dec-2014

de 50 5 Installation and commissioning 0 5 U 1-Jan-2015 31-Mar-2016

wu D2 Provide Transfer bendings LIU-PSB 5.2 [email protected] 1-Jan-2011 30-Jun-2014

MSP 10 Budget 99327 3,200,000 CHF

de 10 320 Design & Specif ication 0 1 U 1-Jan-2011 31-Dec-2012

de 20 0 Market survey 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender 0 1 U 1-Jul-2012 31-Dec-2012

de 40 2240 Converter manufacturing 0 1 U 1-Jan-2013 31-Dec-2014

de 50 640 Installation and commissioning 0 1 U 1-Jan-2015 31-Mar-2016

Page 20: Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC

LIU-PS Work Units

06/09/2011 TE-EPC - Serge Pittet 20

TE EPC

cmd wu WU ID Status Description WBS Holders EMail Start Date Finish Date

cmd Pxx # Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date

cmd PSx # JobType Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date

cmd PBU # Expenditure Description Org Code [Recharging] Amount Currency Start Date Finish Date

cmd Mxx # Expenditure Description Org Code [Recharging] Amount Currency Start Date Finish Date

cmd de # Weight Deliverable description Actual Qty Total Qty Unit Start Date Finish Date

Specify command N, M, D; Commands: N (New ), M (Modify), D (Delete)

wu D2

Design and specify Low Energy Quadrupoles (QN&QSK) power converters LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2011

MSP 10 Budget 99263 70,000 CHF

de 10 70 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2011

wu D2

Prototype and order Low Energy Quadrupoles (QN&QSK) power converters LIU-PS 5 [email protected] 1-Jan-2012 31-Oct-2012

MSP 10 Budget 99263 30,000 CHF

de 10 30 Prototype validated 0 1 U 1-Jan-2012 30-Jun-2012

de 20 0 Market survey completed 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender completed 0 1 U 1-Jul-2012 31-Oct-2012

wu D2

Manufacture Low Energy Quadrupoles (QN&QSK) power converters LIU-PS 5 [email protected] 1-Nov-2012 31-Dec-2013

MSP 10 Budget 99263 530,000 CHF

de 10 530 Pow er converters manufactured 0 85 U 1-Nov-2012 31-Dec-2013

wu D2

Install and commission Low Energy Quadrupoles (QN&QSK) power converters LIU-PS 5 [email protected] 1-Jan-2014 31-Mar-2014

MSP 10 Budget 99263 110,000 CHF

de 10 110 Pow er converters installed and commissioned 0 85 U 1-Jan-2014 31-Mar-2014

wu D2

Design, specify Low Energy Dipoles (DHZ&DVT) Power Converters LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2011

de 10 0 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2011

wu D2

Prototype and order Low Energy Dipoles (DHZ&DVT) Power Converters LIU-PS 5 [email protected] 1-Jan-2012 31-Oct-2012

de 10 0 Prototype validated 0 1 U 31-Dec-2011 30-Jun-2012

de 20 0 Market survey completed 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender completed 0 1 U 1-Jul-2012 31-Oct-2012

wu D2

Manufacture Low Energy Dipoles (DHZ&DVT) Power Converters LIU-PS 5 [email protected] 1-Dec-2012 31-Dec-2013

MSP 10 Budget 99263 470,000 CHF

de 10 470 Pow er converters manufactured 0 75 U 1-Nov-2012 31-Dec-2013

wu D2

Install and commission of Low Energy Dipoles (DHZ&DVT) Power Converters LIU-PS 5 [email protected] 1-Jan-2014 31-Mar-2014

MSP 10 Budget 99263 90,000 CHF

de 10 90 Pow er converters installed and commissioned 0 75 U 1-Jan-2014 31-Mar-2014

wu D2

Design, specify and order PI.SMH42 Power Converter LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2013

MSP 10 Budget 99263 60,000 CHF

de 10 60 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2013

de 20 0 Market survey completed 0 1 U 1-Apr-2013 30-Jun-2013

de 30 0 Call for tender completed 0 1 U 1-Jul-2013 31-Dec-2013

wu D2

Supply PI.SMH42 Power Converter conponents LIU-PS 5 [email protected] 1-Jan-2014 31-Dec-2014

MSP 10 Budget 99263 200,000 CHF

de 10 200 Component supplied 0 2 U 1-Jan-2014 31-Dec-2014

wu D2 LIU-PS 5 [email protected] 1-Jan-2015 31-Dec-2016

MSP 10 Budget 99263 100,000 CHF

de 10 100 Pow er converters manufactured 0 2 U 1-Jan-2015 31-Dec-2016

wu D2 LIU-PS 5 [email protected] 1-Jan-2017 31-Dec-2017

MSP 10 Budget 99263 40,000 CHF

de 10 40 0 2 U 1-Jan-2017 31-Dec-2017

wu D2 LIU-PS 5 [email protected] 1-Jan-2011 31-Mar-2016

MSP 10 Budget 99263 60,000 CHF

de 10 60 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2013

de 20 0 Market survey completed 0 1 U 1-Apr-2013 30-Jun-2013

de 30 0 Call for tender completed 0 1 U 1-Jul-2013 31-Dec-2013

wu D2 LIU-PS 5 [email protected] 1-Jan-2014 31-Dec-2014

MSP 10 Budget 99263 100,000 CHF

de 10 100 Component supplied 0 2 U 1-Jan-2014 31-Dec-2014

wu D2 LIU-PS 5 [email protected] 1-Jan-2015 31-Dec-2016

MSP 10 Budget 99263 100,000 CHF

de 10 100 Pow er converters manufactured 0 2 U 1-Jan-2015 31-Dec-2016

wu D2 LIU-PS 5 [email protected] 1-Jan-2017 31-Dec-2017

MSP 10 Budget 99263 40,000 CHF

de 60 40 0 2 U 1-Jan-2017 31-Dec-2017

wu D2 LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2013

MSP 10 Budget 99263 100,000 CHF

de 10 100 Linear stage designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2013

de 20 0 Integration study completed 0 1 U 1-Jan-2011 31-Dec-2013

de 30 0 Market survey completed 0 1 U 1-Apr-2013 30-Jun-2013

de 40 0 Call for tender completed 0 1 U 1-Jul-2013 31-Dec-2013

wu D2 LIU-PS 5 [email protected] 1-Jan-2014 31-Dec-2014

MSP 10 Budget 99263 80,000 CHF

de 10 80 Component supplied 0 4 U 1-Jan-2014 31-Dec-2014

wu D2 LIU-PS 5 [email protected] 1-Jan-2015 31-Dec-2016

MSP 10 Budget 99263 80,000 CHF

de 10 80 Linear stage manufactured 0 4 U 1-Jan-2015 31-Dec-2016

wu D2 LIU-PS 5 [email protected] 1-Jan-2017 31-Dec-2017

MSP 10 Budget 99263 100,000 CHF

de 10 100 0 4 U 1-Jan-2017 31-Dec-2017

cmd Pxx # Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date

cmd PSx # JobType Skill [Missing] Email or Profile Org Code [Recharging] Duration Unit (M.WK, %) Start Date Finish Date

cmd PBU # Expenditure Description Org Code [Recharging] Amount Currency Start Date Finish Date

cmd Mxx # Expenditure Description Org Code [Recharging] Amount Currency Start Date Finish Date

Specify command N, M, D; Commands: N (New ), M (Modify), D (Delete)

wu D2 LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2011

MSP 10 Budget 99263 70,000 CHF

de 10 70 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2011

wu D2 LIU-PS 5 [email protected] 1-Jan-2012 31-Oct-2012

MSP 10 Budget 99263 30,000 CHF

de 10 30 Prototype validated 0 1 U 1-Jan-2012 30-Jun-2012

de 20 0 Market survey completed 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender completed 0 1 U 1-Jul-2012 31-Oct-2012

wu D2 LIU-PS 5 [email protected] 1-Nov-2012 31-Dec-2013

MSP 10 Budget 99263 530,000 CHF

de 10 530 Pow er converters manufactured 0 85 U 1-Nov-2012 31-Dec-2013

wu D2 LIU-PS 5 [email protected] 1-Jan-2014 31-Mar-2014

MSP 10 Budget 99263 110,000 CHF

de 10 110 0 85 U 1-Jan-2014 31-Mar-2014

wu D2 LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2011

de 10 0 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2011

wu D2 LIU-PS 5 [email protected] 1-Jan-2012 31-Oct-2012

de 10 0 Prototype validated 0 1 U 31-Dec-2011 30-Jun-2012

de 20 0 Market survey completed 0 1 U 1-Apr-2012 30-Jun-2012

de 30 0 Call for tender completed 0 1 U 1-Jul-2012 31-Oct-2012

wu D2 LIU-PS 5 [email protected] 1-Dec-2012 31-Dec-2013

MSP 10 Budget 99263 470,000 CHF

de 10 470 Pow er converters manufactured 0 75 U 1-Nov-2012 31-Dec-2013

wu D2 LIU-PS 5 [email protected] 1-Jan-2014 31-Mar-2014

MSP 10 Budget 99263 90,000 CHF

de 10 90 0 75 U 1-Jan-2014 31-Mar-2014

wu D2 LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2013

MSP 10 Budget 99263 60,000 CHF

de 10 60 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2013

de 20 0 Market survey completed 0 1 U 1-Apr-2013 30-Jun-2013

de 30 0 Call for tender completed 0 1 U 1-Jul-2013 31-Dec-2013

wu D2

Supply PI.SMH42 Power Converter conponents LIU-PS 5 [email protected] 1-Jan-2014 31-Dec-2014

MSP 10 Budget 99263 200,000 CHF

de 10 200 Component supplied 0 2 U 1-Jan-2014 31-Dec-2014

wu D2

Manufacture PI.SMH42 Power Converter LIU-PS 5 [email protected] 1-Jan-2015 31-Dec-2016

MSP 10 Budget 99263 100,000 CHF

de 10 100 Pow er converters manufactured 0 2 U 1-Jan-2015 31-Dec-2016

wu D2

Install and commission PI.SMH42 Power Converter LIU-PS 5 [email protected] 1-Jan-2017 31-Dec-2017

MSP 10 Budget 99263 40,000 CHF

de 10 40 Pow er converters installed and commissioned 0 2 U 1-Jan-2017 31-Dec-2017

wu D2

Design, specify and order PI.BSM42 Power Converter LIU-PS 5 [email protected] 1-Jan-2011 31-Mar-2016

MSP 10 Budget 99263 60,000 CHF

de 10 60 Pow er converters designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2013

de 20 0 Market survey completed 0 1 U 1-Apr-2013 30-Jun-2013

de 30 0 Call for tender completed 0 1 U 1-Jul-2013 31-Dec-2013

wu D2

Supply PI.BSM42 Power Converter component LIU-PS 5 [email protected] 1-Jan-2014 31-Dec-2014

MSP 10 Budget 99263 100,000 CHF

de 10 100 Component supplied 0 2 U 1-Jan-2014 31-Dec-2014

wu D2

Manufacture PI.BSM42 Power Converter LIU-PS 5 [email protected] 1-Jan-2015 31-Dec-2016

MSP 10 Budget 99263 100,000 CHF

de 10 100 Pow er converters manufactured 0 2 U 1-Jan-2015 31-Dec-2016

wu D2

Install and commission PI.BSM42 Power Converter LIU-PS 5 [email protected] 1-Jan-2017 31-Dec-2017

MSP 10 Budget 99263 40,000 CHF

de 60 40 Pow er converters installed and commissioned 0 2 U 1-Jan-2017 31-Dec-2017

wu D2

Design, specify, integrate and order PI.BSM40, 43 & 44 Power Converters LIU-PS 5 [email protected] 1-Jan-2011 31-Dec-2013

MSP 10 Budget 99263 100,000 CHF

de 10 100 Linear stage designed and specif ied 0 1 U 1-Jan-2011 31-Dec-2013

de 20 0 Integration study completed 0 1 U 1-Jan-2011 31-Dec-2013

de 30 0 Market survey completed 0 1 U 1-Apr-2013 30-Jun-2013

de 40 0 Call for tender completed 0 1 U 1-Jul-2013 31-Dec-2013

wu D2

Supply PI.BSM40, 43 & 44 Power Converters component LIU-PS 5 [email protected] 1-Jan-2014 31-Dec-2014

MSP 10 Budget 99263 80,000 CHF

de 10 80 Component supplied 0 4 U 1-Jan-2014 31-Dec-2014

wu D2

Manufacture PI.BSM40, 43 & 44 Power Converters LIU-PS 5 [email protected] 1-Jan-2015 31-Dec-2016

MSP 10 Budget 99263 80,000 CHF

de 10 80 Linear stage manufactured 0 4 U 1-Jan-2015 31-Dec-2016

wu D2

Upgrade PI.BSM40, 43 & 44 Power Converters and commission systems LIU-PS 5 [email protected] 1-Jan-2017 31-Dec-2017

MSP 10 Budget 99263 100,000 CHF

de 10 100 Pow er converters upgraded and commissioned 0 4 U 1-Jan-2017 31-Dec-2017