M cKenney’s implemented a large-scale access control and lighting upgrade for an international data center based in Atlanta. THE CHALLENGE The live critical area at the data center exceeded 500,000 square feet and downtime needed to be minimized. The facility has more than 150 standalone enclosures that house customers’ data equipment. Each enclosure is equipped with access control card readers. Prior to the upgrade, all lighting remained on 24/7, resulting in high energy costs and premature light fixture failure. THE SOLUTION McKenney’s designed a custom engineered, system to integrate lighting with access control. The system allows the lights through- out the data center to remain off until a user presents their access credentials—card and/or biometric reader—which activates only those lights within the affected areas and turns them off upon departure. The solution was staged in phases to mitigate disruption of data center operations. THE RESULTS The upgrade was completed on time, under budget and has become a highlighted safety and security marketing point for the data center to use with prospective clients. Boosting Security & Energy Savings PROJECT NAME Data Center Access and Lighting Control Upgrade PROJECT LOCATION Atlanta, Georgia PROJECT TEAM Owner: International Telecommunication Company Engineer: McKenney’s, Inc. SPECIALIZATIONS Energy Management MARKETS Mission Critical Commercial Office The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Upload: mckenneys-inc

Post on 19-Jul-2015

50 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Boosting Security & Energy Savings

McKenney’s implemented a large-scale access control and lighting upgrade for an

international data center based in Atlanta.

THE CHALLENGEThe live critical area at the data center exceeded 500,000 square feet and downtime needed to be minimized. The facility has more than 150 standalone enclosures that house customers’ data equipment. Each enclosure

is equipped with access control card readers. Prior to the upgrade, all lighting remained on 24/7, resulting in high energy costs and premature light fixture failure.

THE SOLUTIONMcKenney’s designed a custom engineered, system to integrate lighting with access control. The system allows the lights through-out the data center to remain off until a user presents their access credentials—card

and/or biometric reader—which activates only those lights within the affected areas and turns them off upon departure. The solution was staged in phases to mitigate disruption of data center operations.

THE RESULTSThe upgrade was completed on time, under budget and has become a highlighted safety and security marketing point for the data center to use with prospective clients.

Boosting Security & Energy SavingsPROJECT NAME

� Data Center Access and Lighting Control Upgrade

PROJECT LOCATION

� Atlanta, Georgia

PROJECT TEAM

� Owner: International Telecommunication Company

� Engineer: McKenney’s, Inc.

SPECIALIZATIONS

Energy Management

MARKETS

� Mission Critical

� Commercial Office

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214