Blowout Preventer Stack and Control Systems

Andrew ReesMatthewsDaniel

16th Lillehammer Energy Claims ConferenceMarch 3, 2011

Page 2: BOP and Control System

• What is a Blowout preventer and why is it important?

• How and when is a Blowout Preventer installed?

• Basic design and operating principles

• BOP control systems

• BOP limitations and reliability

Page 3: BOP and Control System

What is a Blowout Preventer and why is it important?

Page 4: BOP and Control System
Page 5: BOP and Control System
Page 6: BOP and Control System

What is a Blowout Preventer and why is it important?

• A mechanical device to seal the top of the well (a secondary means of well control)

• Once sealed, it allows access to the wellbore below the BOP to control the well

• The installation of a BOP is a normal regulatory requirement • The installation of a BOP is a common insurance warranty• The BOP is of fundamental importance to the EED 886

definition of a well out of control

Page 7: BOP and Control System

WARRANTIES

It is warranted that where the Assured is the operator or joint operator on anyinsured well being drilled, deepened, serviced, worked over, completed and/orreconditioned, a blowout preventer(s) of standard make will, when in accordancewith all regulations, requirements and normal and customary practices in theindustry, be set on surface casing or on the wellhead and installed and tested inaccordance with usual practice.

WELL OUT OF CONTROL DEFINITION

“…a well(s) shall be deemed to be out of control only when there is anunintended flow from the well(s) of drilling fluid, oil, gas or water above thesurface of the ground or water bottom,

which flow cannot promptly be…stopped by use of the equipment on site and/orthe blowout preventer, storm chokes or other equipment …”

WARRANTIES

It is warranted that where the Assured is the operator or joint operator on anyinsured well being drilled, deepened, serviced, worked over, completed and/orreconditioned, a blowout preventer(s) of standard make will, when in accordancewith all regulations, requirements and normal and customary practices in theindustry, be set on surface casing or on the wellhead and installed and tested inaccordance with usual practice.

WELL OUT OF CONTROL DEFINITION

“…a well(s) shall be deemed to be out of control only when there is anunintended flow from the well(s) of drilling fluid, oil, gas or water above thesurface of the ground or water bottom,

which flow cannot promptly be…stopped by use of the equipment on site and/orthe blowout preventer, storm chokes or other equipment …”

Page 8: BOP and Control System

How and when is a Blowout Preventer installed?

• The BOP attaches to the wellhead • Onshore – located below the rig floor in the cellar• Offshore (bottom supported drilling unit) – below the rig

floor on the Texas deck• Offshore (floating drilling unit) – on the seabed• It is attached to the wellhead using flanged or collet

connectors

Page 9: BOP and Control System

Blowout Preventer

Collet Connector

Wellhead

Page 10: BOP and Control System
Page 11: BOP and Control System
Page 12: BOP and Control System
Page 13: BOP and Control System
Page 14: BOP and Control System
Page 15: BOP and Control System
Page 16: BOP and Control System
Page 17: BOP and Control System
Page 18: BOP and Control System
Page 19: BOP and Control System
Page 20: BOP and Control System
Page 21: BOP and Control System
Page 22: BOP and Control System
Page 23: BOP and Control System
Page 24: BOP and Control System

Locking Dogs

Page 25: BOP and Control System
Page 26: BOP and Control System
Page 27: BOP and Control System
Page 28: BOP and Control System
Page 29: BOP and Control System
Page 30: BOP and Control System
Page 31: BOP and Control System

How and when is a Blowout Preventer installed?

• The BOP attaches to the wellhead • Onshore – located below the rig floor in the cellar• Offshore (bottom supported drilling unit) – below the rig

floor on the Texas deck• Offshore (floating drilling unit) – on the seabed• It is attached to the wellhead using flanged or collet

connectors• Normally installed after setting the surface casing string

Page 32: BOP and Control System

Basic design and operating principles

• Main design considerations To make an annular seal for equipment of different

shapes and sizes

Page 33: BOP and Control System

Plan View

Bore of the BOP

Tubular

Page 34: BOP and Control System

Basic design and operating principles

• Main design considerations making an annular seal for equipment of different

shapes and sizes to cut through equipment in the bore of the BOP

Page 35: BOP and Control System

Plan View

Page 36: BOP and Control System

Basic design and operating principle

• Main design considerations making an annular seal for equipment of different

shapes and sizes the ability to cut through equipment in the bore of the

BOP• How is the power delivered?

Very early days – using a screwing mechanism

Page 37: BOP and Control System

Abercrombie and Cameron patented design circa 1920

Page 38: BOP and Control System
Page 39: BOP and Control System

Basic design and operating principle

• Main design considerations making an annular seal for equipment of different

shapes and sizes the ability to cut through equipment in the bore of the

BOP• How is the power delivered?

Very early days – using a screwing mechanism Subsequently – using hydraulic power

Page 40: BOP and Control System

A B

Drillpipe

Page 41: BOP and Control System

Plan view through BOP pipe ram

Bore of the BOP

Drillpipe

Piston

Pipe Ram

Cylinder

Hydraulic Ports

Page 42: BOP and Control System

Drillpipe

Page 43: BOP and Control System

Plan view through BOP pipe ram

Page 44: BOP and Control System

BOP Control Systems

• The function of the control system is to ensure that hydraulic pressure is conveyed to the right place, at the correct pressure as quickly as possible

• Onshore – fairly basic system

Page 45: BOP and Control System

Onshore Koomey Unit

Page 46: BOP and Control System

Onshore BOP Control Panel

Page 47: BOP and Control System

Onshore BOP and Control Lines

Page 48: BOP and Control System

BOP Control Systems

• The function of the control system is to ensure that hydraulic pressure is conveyed to the right place, at the correct pressure as quickly as possible

• Onshore – fairly basic system • Offshore (from floating units) – things start to get a lot

more complicated

Page 49: BOP and Control System
Page 50: BOP and Control System

LMRP

BOP

Page 51: BOP and Control System
Page 52: BOP and Control System

Flexjoint Riser Adapter

Upper Annular Preventer

Lower Annular Preventer

Blind Shear Ram

Casing Shear Ram

Pipe Ram

Pipe Ram

Test Ram

Wellhead Connector

LMRP / BOP connectors

Page 53: BOP and Control System
Page 54: BOP and Control System

BOP Control Systems

• The function of the control system is to ensure that hydraulic pressure is conveyed to the right place, at the correct pressure as quickly as possible

• Onshore – fairly basic system • Offshore (from floaters) – things start to get more

complicated• Early offshore drilling from floaters – similar to onshore

control systems

Page 55: BOP and Control System

BOP Control Systems

• As BOP activation response time increased with longer hoses in deeper water, designs developed to include a reservoir of pressurised hydraulic fluid stored sub-sea

• The pilot signals to operate the subsea control valves were initially transmitted hydraulically

• However, an instantaneous response time for the operation of the subsea control valves can be achieved using an electrical signal

• All modern deepwater BOPs use a multiplex control system

Page 56: BOP and Control System

Driller’s Panel Toolpusher’s PanelCentral Control Unit

Redundant System

Surface Accumulators

Hydraulic Fluid

Reservoir and HPU

Sub-seaAccumulators

Accumulator PressureRegulatorRegulated Fluid Pressure

MUX Cable Reel

Active PodElectrical Signal

BOP/LMRP

BASIC MULTIPLEX SYSTEM

Page 57: BOP and Control System

BOP Control Systems

• During normal use, the BOP is operated from one of the rig control panels

• Whilst in drilling modeo Annularo Pipe Ramo Blind Shear Ram

Page 58: BOP and Control System

Upper Annular Preventer

Pipe Ram

Blind Shear Ram

Page 59: BOP and Control System

BOP Control Systems

• During normal use, the BOP is operated from one of the rig control panels

• Whilst in drilling modeo Annularo Pipe Ramo Blind Shear Ramo Choke and kill line operations

Page 60: BOP and Control System

Choke Line

Kill Line

Page 61: BOP and Control System

BOP Control Systems

• During normal use, the BOP is operated from one of the rig control panels

• Whilst in drilling modeo Annularo Pipe Ramo Blind Shear Ramo Choke and kill line operations

• Emergency Modeso AutoShear / Emergency Disconnect Function

Page 62: BOP and Control System

Blind Shear Ram

Page 63: BOP and Control System

BOP Control Systems

• During normal use, the BOP is operated from one of the rig control panels

• Whilst in drilling modeo Annularo Pipe Ramo Blind Shear Ramo Choke and kill line operations

• Emergency Modeso AutoShear / Emergency Disconnect Functiono Deadman

Page 64: BOP and Control System

Surface Accumulators

Sub-seaAccumulators

Regulator

MUX Cable Reel

Active Pod

BOP/LMRP

Page 65: BOP and Control System

Surface Accumulators

Sub-seaAccumulators

Regulator

MUX Cable Reel

Active Pod

BOP/LMRP

Page 66: BOP and Control System

BOP Control Systems

• During normal use, the BOP is operated from one of the rig control panels

• Whilst in drilling modeo Annularo Pipe Ramo Blind Shear Ramo Choke and kill line operations

• Emergency Modeso AutoShear / Emergency Disconnect Functiono Deadmano Acoustic

Page 67: BOP and Control System

Acoustic Emergency System

• Normally unaffected by damage to the primary system• Surface transducers send signal to transceivers on the BOP• Regulatory requirement in some areas• Not always reliable

Page 68: BOP and Control System

BOP Control Systems

• During normal use, the BOP is operated from one of the rig control panels

• Whilst in drilling modeo Annularo Pipe Ramo Blind Shear Ramo Choke and kill line operations

• Emergency Modeso AutoShear / Emergency Disconnect Functiono Deadmano Acoustic o ROV intervention

Page 69: BOP and Control System

ROV intervention panel on BOPROV Intervention Panel

Page 70: BOP and Control System

BOP Limitations and Reliability

• Maximum BOP pressure rating is struggling to keep pace with drilling technology

• Shear rams cannot cut through some drillstringcomponents (e.g. drillpipe connections) or certain extraordinary obstructions in the bore of the BOP

• Routine full emergency testing of all functions is not deemed to be practicable

• Despite continuing R&D by the BOP manufacturers, component failures are random events and may still occur

Page 71: BOP and Control System

Component Quantity Subsea Cycles All CyclesAccumulators 24 NACheck Valves 22 1,050 1,900Pilot Check Valves 6 1,300 2,000Pilot Valves, Dual Action 38 14,850 24,600Pilot Valves, Single Action 42 20,600 29,750Regulators 12 NA NAShuttle Valves 74 11,550 20,450Solenoid Valves 142 38,000 60,600

TOTAL 360 87,350 139,300

Summary of Component Testing Cycles over 5 Years

Page 72: BOP and Control System
Page 73: BOP and Control System
Page 74: BOP and Control System
Page 75: BOP and Control System

BOP Limitations and Reliability

• Maximum BOP pressure rating is struggling to keep pace with drilling technology

• Shear rams cannot cut through jointed drillpipeconnections or certain extraordinary obstructions in the bore of the BOP

• Routine full emergency testing of all functions is deemed not practicable

• Despite continuing R&D by the BOP manufacturers and drilling contractors, component failures are random events and may still occur

• Despite all reasonable precautions, some events remain unseen

Page 76: BOP and Control System
Page 77: BOP and Control System
Page 78: BOP and Control System

Any Questions?