SUMMARY OF MAJOR BOPs FOR 11 TH PLAN THERMAL PROJECTS (INCLUDING ADDITIONAL AND BEST EFFORTS PROJECTS) As on December 23, 2008 Sl No Name of BOP BOPs required for projects Commissioned & Under Construction BOPs required for projects where LOA is yet to be placed # Total BOPs required Order already placed Balance order to be placed 1 Coal Handling Plant (CHP) 83 9 92 61 31 - 9=22 2 Ash Handling Plant (AHP) 83 9 92 61 31 - 9=22 3 Demineralized(DM) water Plant 88 10 98 60 38- 10=28 4 Cooling Tower 93[167]* 10 [15] 103 [182] 69 [125] 34- 10=24 5 Chimney 95[139]* 10 [13] 105[152] 71 [93] 34- 10=24 6 Fuel Oil (FO) System 94 10 104 52 52- 10=42 7 PT Plant 91 10 101 63 38 - 10=28 TOTAL 627 437 (69.70 %) 190 (30.30 %) * Number in square brackets indicates number of Cooling Towers, Chimneys. # Order for main plant is placed in case of KVK Nilachal (1x300 MW) and Malaxmi (2x520 MW) but financial closure not yet achieved.

Upload: mahendra-champawat

Post on 14-Sep-2014

84 views

Category:

Documents


6 download

TRANSCRIPT

SUMMARY OF MAJOR BOPs FOR 11TH

PLAN THERMAL PROJECTS

(INCLUDING ADDITIONAL AND BEST EFFORTS PROJECTS)

As on December 23, 2008

Sl

No

Name of BOP BOPs required for

projects Commissioned &

Under Construction

BOPs required

for projects

where LOA is

yet to be placed

#

Total BOPs

required

Order already

placed

Balance order to

be placed

1 Coal Handling Plant

(CHP)

83 9 92 61 31 - 9=22

2 Ash Handling Plant

(AHP)

83 9 92 61 31 - 9=22

3 Demineralized(DM)

water Plant

88 10 98 60 38- 10=28

4 Cooling Tower

93[167]* 10 [15] 103 [182] 69 [125] 34- 10=24

5 Chimney

95[139]* 10 [13] 105[152] 71 [93] 34- 10=24

6 Fuel Oil (FO) System

94 10 104 52 52- 10=42

7 PT Plant

91 10 101 63 38 - 10=28

TOTAL 627 437 (69.70 %) 190 (30.30 %)

* Number in square brackets indicates number of Cooling Towers, Chimneys.

# Order for main plant is placed in case of KVK Nilachal (1x300 MW) and Malaxmi (2x520 MW) but financial closure not yet

achieved.

Orders for BOP’s already placed

Coal Handling Plant

S.No. Name of the Supplier/

Erecting Agency

No. of orders

placed

Remarks

1. M/s Elecon Engg. Co. Ltd.

Anand Sojitra Road, Vallabh Vidyanagar Gujarat-388120

8 1. NCTPP (2x490 MW)

2. Mejia TPS Extn. U-5&6 (2x250 MW)

3. Mejia TPS Extn. U-7&8 (2x500 MW)

4. Lehra Mohabbat TPS U-3&4 (2x250 MW)

5. Surat Lignite (2x125 MW)

6. Rayalaseema (2x210 MW) Extn. of existing CHP

7. Paras TPP Extn. U-1 (1x250 MW)

8. Hissar TPP (2x600 MW)

2. M/s L&T

Chairman & Managing Director

L&T House Ballard Estate,

Mumbai-400001

8 1. Kahalgaon (3x500 MW)

2. Barh TPS (3x660 MW)

3. Bakreshwar TPS U-4&5 (2x210 MW)

4. Korba East TPS St-II (2x250 MW)

5. O.P.Jindal Unit 1 to 4 (4x250 MW)

6. Simhadri STPP STAGE-II (2X500 MW)

7. Kodarma U-1&2 (2x500 MW)

8. Raghunathpur (2x600 MW)

3. M/s TRF

Managing Director

11th Floor, Himalaya House 23,

Kasturba

Gandhi Marg,

New Delhi-110001

4 1. Bhilai Expn (2x250 MW)

2. Amarkantak (1x210 MW)

3. Sanjay Gandhi TPS Extn. (1x500 MW)

4. Aravali STPP U-1,2&3 (3x500 MW)

4. M/s Thyssenkrupp, Pune

Thyissons Korrups Industries

Ltd.

407A, Hemkund Tower,

98 Nehru Place

New Delhi

4 1. Sipat St-II (2x500 MW)

2. Sipat St-I (3x660 MW)

3. Harduaganj Extn. (2x250 MW)

4. Durgapur Steel U-1&2 (2x500 MW)

5. M/s NCPE 1 1. Korba STPP St-III (1x500 MW)

6. M/s Mc Nally Baharat

Chairman

4 1. Chandrapura Extn. U-7 & 8 (2x250 MW)

2. Santaldih TPP Extn. U-5 (1x250 MW)

7th Floor 4 Mangoe Lane

Kolkata

3. Sagardighi TPP U-1&2 (2x300 MW)

4. Durgapur TPP U-7 (1x300 MW)

7. M/s MBE Lignite Handling 2 1. Barsingsar Lignite TPP U-1&2 (2x125 MW)

2. Khaperkheda TPP (1x500 MW)

8. M/s BGR*

Chairman & Managing Director

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

2 1. Kakatiya TPP (1x500 MW)

2. Vijayawada TPP Extn. (1x500 MW)

9. M/s MECON Lignite Handling 1 1. Neyveli Expn. St-II TPP (2x250 MW)

10. M/s Techpro System Pvt Ltd.

Techpro System (P) Ltd

202-204, Pacific Square Sector-15, Part-II Gurgaon

8 1. DCR Yamunanagar (2x300 MW)

2. Chhabra U-1&2 (2x250 MW)

3. Lanco Amarkantak (Pathadi) U-1&2 (2x300 MW)

4. Torangallu U-3&4 (2x300 MW)

5. Adani Power Pvt.Ltd. Mundra Ph-I (2x330 MW)

6. Adani Power Pvt.Ltd. Mundra Ph-II (2x330 MW

7. Anpara-C (2x600 MW)

8. Jalipa Lignite (8x135 MW)

11. M/s TPL *

1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

3 1. Kota TPS (1x195 MW)

2. Bhusawal TPP Extn. U-1&2 (2x500 MW) 3. Giral Lignite St-II (1x125 MW)

12. M/s Indure

Indure House GK-II

NewDelhi-48

1 1. Suratgarh TPP (1x250 MW)

13. M/s REL *

Reliance Energy Centre,

Santa Cruz (East)

Mumbai-400055

1 1. Parichcha Extn. (2x250 MW) – Extn of existing CHP

14. M/s FFE Minerals Pvt. Ltd.

1 1. Kutch Lignite (1x75 MW)

15. M/s Promac Engg. Industries 1 1. Bellary TPP U-1 (1x500 MW)

Ltd.

Chairman

Avahalli, Anjanapura Post,

Bangalore-62

16. M/s BHEL * BHEL House,

Siri, Fort,

New Delhi.

1 1. Trombay (1x250 MW)

17. M/s Bengal Tools , Kolkata

2 1. Budge-Budge (1x250 MW)

2. Farakka STPS St-II U-6 (1x500 MW)

18. M/s Techpro,Chennai 2 1. Rosa TPP U-1&2 (2x300 MW)

2. Raichur U-8 (250 MW)

19. M/s Energo

A-57/4, Okhla Industrial Area,

Phase-II

New Delhi-110020

1 1. Nagarjuna TPS (2x507.5 MW)

20. M/s Sunil Hitech 2 1. New Parli TPP U-2 (1x250 MW)

2. Paras TPP Extn. U-2 (1x250 MW)

21. M/s Fenner

Khivraj Complex II, v Floor, 480, Anna Salai, Nandanam, Chennai-600 035

Nil

22. M/s SEPCO-III 2 1. Adani Power Pvt.Ltd.Mundraa (2x660 MW)

2. Sterlite TPP (4x600 MW)

23. Order placed but agency name

not available

1 1. Santaldih TPP Extn. U-6 (250 MW)

24. M/s BSBK Engineers 1 1. JSW Ratnagiri (4x300 MW) 61

* EPC contractor

Ash Handling

S.No. Name of the Supplier/ Erecting

Agency

No. of orders

placed

Remarks

1. M/s Indure

Indure House GK-II

NewDelhi-48

17 1. NCTPP Dadri (2x490 MW)

2. Kahalgaon (3x500 MW)

3. Farakka (1x500 MW)

4. Bhilai Extn. (2x250 MW)

5. Sipat St-II U-4&5 (2x500 MW)

6. Amarkantak (1x210 MW)

7. Bellary TPS-I (1x500 MW)

8. Rayalaseema (2x210 MW)

9. Bakreshwar U-4&5 (2x210 MW)

10. Durgapur U-7 (1x300 MW)

11. Lanco Amarkantak 92x300 MW)

12. OP JIndal (4x250 MW)

13. Yamunanagar (2x300 MW)

14. Simhadri STPP STAGE-II (2X500 MW)

15. Hissar TPP (2x600 MW)

16. Durgapur Steel U-1&2 (2x500 MW)

17. Kodarma U-1&2 (2x500 MW)

2. M/s D C Industrial Plant Services

Chairman

White House Block -2 B, C&D 119

Park Street, Kolkata

7 1. Barh (3x660 MW)

2. Korba STPS (1x500 MW)

3. Mejia Extn. U-5&6 (2x250 MW)

4. Chandrapura U-7&8 (2x250 MW)

5. Sagardighi U-1&2 (2x300 MW)

6. Aravali STPP (3x500 MW)

7. Santaldih TPP Extn. U-6 (250 MW) 3. M/s Mahindra Ash Technology

Ltd.

Sagar Complex, A wing 3rd floor, Kasarwadi , pune road mumbai

4 1. Sipat St-I (3x660 MW)

2. Paras U-1 (1x250 MW)

3. Barsingpur Lignite TPP U-1&2 (2x125 MW)

4. Nagarjuna (2x507.5 MW)

4. M/s Macnally Bharat

Chairman

7th Floor 4 Mangoe Lane

Kolkata

3 1. Neyveli Expn. St-II TPP (2x250 MW)

2. New Parli (1x250 MW)

3. Paras TPP Expn U-2(250 MW)

5. M/s Mecawber Beekay

Beekay House, L-8 Green Park Extension New Delhi - 110016

10 1. Lehra Mohabbat U-3&4 (2x250 MW)

2. Chhabra U-1&2 (2x250 MW)

3. Suratgarh (1x250 MW)

4. Torangallu (2x300 MW)

5. Budge-Budge (1x250 MW)

6. Korba East St-V U-1&2 (2x250 MW)

7. Adani Power Pvt.Ltd. Mundra Ph-I (2x330 MW)

8. Adani Power Pvt.Ltd. Mundra Ph-II (2x330 MW)

9. Jalipa Lignite (8x135 MW)

10. Rayalaseema St-III (1x210 MW) 6. M/s TPL *

1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

3 1. Kora TPS St-I (1x195 MW)

2. Bhusawal TPP Extn. U-1&2 (2x500 MW) 3. Giral Lignite St-II (1x125 MW)

7. M/s REL*

Reliance Energy Centre,

Santa Cruz (East)

Mumbai-400055

1 1. Parichcha (2x250 MW)

8. M/s UCC, Kolkata

Unitech Conveyor Corporation

32 chowringhee road ,

14 floor Kolkatta

3 1. Sanjay Gandhi (1x500 MW)

2. Surat Lignite (1x125 MW)

3. Santaldih U-5 (1x250 MW)

9. M/s Energo, New Delhi

A-57/4, Okhla Industrial Area,

Phase-II

New Delhi-110020

1 1. Kutch Lignite (1x75 MW)

10. M/s BGR *

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

3 1. Khapaerkheda (1x500 MW)

2. Kakatiya (1x500 MW)

3. Vijayawada (1x500 MW)

11. M/s BHEL* 1 1. Trombay (1x250 MW)

BHEL House,

Siri, Fort,

New Delhi.

12. M/s IGN 1 1. Mejia TPS Extn. (2x500 MW)

13. M/s Techpro Ash tech ltd, Pune 2 1. Raichur U-8 (250 MW)

2. Kothagudam (1x500 MW) 14. M/s Techpro systems ltd, Pune 1 1. Anpara-C (2x600 MW)

15. M/s Mecon

Chairman & Managing Director

Mecon Limited Ranchi P.O.

Doranda,

Ranchi

Nil

16. M/s UEEPL 1 1. Rosa TPP (2x300 MW) 17. M/s SEPCO-III 2 1. Adani Power Pvt.Ltd.Mundraa (2x660 MW)

2. Sterlite TPP (4x600 MW) 18. M/s Burn Standard Nil

19. M/s BSBK Engineers 1 1. JSW Ratnagiri (4x300 MW)

61

* EPC contractor

DM Plant

S.No. Name of the Supplier/ Erecting

Agency

No. of orders

placed

Remarks

1. M/s Driplex Water Engg Ltd.

Managing Director

Driplex House 1-Panchsheel

Community

Centre , New Delhi

13 1. Kahalgaon (3x500 MW)

2. Barh (3x660 MW)

3. Bhilai Extn. (2x250 MW)

4. Sipat St-II (2x500 MW)

5. Mejia Extn (2x250 MW)

6. Chandrapura (2x250 MW)

7. Neyveli Extn-II (2x250 MW)

8. Lehra Mohabbat (2x250 MW)

9. Simhadri STPS ST-II (2X500 MW)

10. NCTPP Dadri (2x490 MW)

11. Farakka St –III (1x500 MW)

12. New Parli-II (250 MW)

13. Harduaganj Extn (2x250 MW) 2. M/s Thermax

Thermax ltd

Sai Chambers, 15 Mumbai Pune Road

Wakdewadi,

Pune-411003

5 1. Barsingsar (2x125 MW)

2. Yamunanagr (2x300 MW)

3. Chhabra (2x250 MW)

4. Torangallu (2x300 MW)

5. Hissar TPP (2x600 MW)

3. M/s REL * Reliance Energy Centre,

Santa Cruz (East)

Mumbai-400055

1 1. Parichcha Extn. TPS (2x250 MW)

4. M/s Doshi Ion Exchange

Commissioned-178, Madhuban, Mr

Universal Public School

New Delhi=1100092

9 1. Amarkantak TPS Extn (1x210 MW)

2. Sanjay Gandhi (1x500 MW)

3. Lakwa WHRB (1x37.5 MW)

4. Korba East (2x250 MW)

5. Sagardighi (2x300 MW)

6. Surat Lignite (2x125 MW)

7. Adani Power Pvt.Ltd. Mundra Ph-I (2x330 MW)

8. Adani Power Pvt.Ltd. Mundra Ph-II (2x330 MW)

9. Jalipa Lignite (8x135 MW) 5. BGR, Chennai *

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

6 1. Khaperkheda (1x500 MW)

2. Kakatiya (1x500 MW)

3. Vijayawada (1x500 MW)

4. Valuthur CCPP (92.2 MW)

5. Kothagudam (1x500 MW)

6. Dholpur (330 MW) 6. Ion Exchange, Faridabad

Tiecicon House Dr. E Moses Road

Mahalaxmi

Mumbai-400011

6 1. Bellary (1x500 MW)

2. Bakreshwar Extn. (2x210 MW)

3. OP Jindal (4x250 MW)

4. Aravali STPP U-1,2&3 (3x500 MW)

5. JSW Ratnagiri (4x300 MW)

6. Rosa TPP (2x300 MW) 7. M/s Subir Engg. Works Pvt. Ltd. 1 1. Durgapur TPS Extn (1x300 MW)

8. M/s Triveni 3 1. Lanco Amarkantak (2x300 MW)

2. Nagarjuna TPP (2x507.5 MW)

3. Anpara-C (2x600 MW) 9. M/s Gondwana Engg. 1 1. Paras U-1 (1x250 MW)

10. M/s TPL * 1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

2 1. Bhusawal TPP Extn. U-1&2 (2x500 MW)

2. Giral Lignite St-II (1x125 MW)

11. M/s L&T Chairman & Managing Director

L&T House Ballard Estate,

Mumbai-400001

1 1. Mejia U 7&8 (2x500 MW)

12. M/s Kirloskar Brothers 1 1. Kodarma U-1&2 (2x500 MW)

13. M/s VA Tech 1 1. Durgapur Steel TPS (2x500 MW)

14. M/s Makintosh Burn 1 1. Raghunathpur (2x600 MW) 15. Order placed but agency name not

available 5 1. Santaldih TPP Extn. U-6 (2x250 MW)

2. Santaldih TPP U-5 (250 MW)

3. Paras TPP Extn. U-2 (1x250 MW)

4. Rayalaseema TPS (2x210 MW)

5. Dhuvaran ST (40 MW) 16. M/s Siemens AG, Germany 1 1. Sugen CCPP Blk-1, 2, 3 (3x376 MW) 17. M/s SEPCO-III 2 1. Adani Power Pvt.Ltd.Mundraa (2x660 MW)

2. Sterlite TPP (4x600 MW) 18. M/s UEM India Ltd 1 1. Bongaigaon (3x250) 60

* EPC contractor

Cooling Tower

S.No. Name of the Supplier/ Erecting

Agency

No. of orders

placed [No. of Cooling

Towers to be

constructed]

Remarks

1. M/s Paharpur Cooling Towers

Pharpur Cooling Tower

Pharpur House

8/1/B Diamond Harbour Road

Kolkata – 700027

30 [61] 1. NCTPP Dadri (2x490 MW) [2]

2. Kahalgaon (2x500 MW) [2]

3. Barh (3x600 MW) [3]

4. Sipat St-II (2x500 MW) [2]

5. Mejia TPS U-7&8 (2x500 MW) [2]

6. Yamunanagar (2x300 MW) [2]

7. Lehra Mohabbat (2x250 MW) [2]

8. Chhabra (2x250 MW) [2]

9. Amarkantak (1x210 MW) [1]

10. Kutch Lignite (1x75 MW) [1]

11. Sagardighi (2x300 MW) [2]

12. Durgapur (300 MW) [1]

13. Lakwa WHRB (37.2 MW) [1]

14. Lanco Amarkakntak (2x300 MW) [2]

15. OP Jindal (4x250 MW) [4]

16. Torangallu U-3&4 (2x250 MW) [2]

17. Nagarjuna TPP (2x507.5 MW) [2]

18. Korba East St-I U-2(250 MW) [1]

19. Mejia TPS U-5&6 (2x250 MW) [2]

20. Budge-Budge TPS U-3 (1x250 MW) [1]

21. Hissar U-1&2 (2x600 MW) [2]

22. Koderma (2x500 MW) [2]

23. Kota TPS St.V (195 MW) [1]

24. Durgapur Steel TPP (2x500 MW) [2]

25. Lanco Kondapalli (GT+ST: 366 MW) [1]

26. Santaldih U-6 (250 MW) [1]

27. Konaseema (2x140 + 165 MW) [1]

28. Jalipa Lignite (8x135 MW) [8]

29. JSW Ratnagiri (4x300 MW) [4]

30. Raghunathpur (2x600 MW) [2] 2. M/s Gammon (I) Ltd. 16 [27] 1. Bhilai (2x250 MW) [2]

Gammon House Veer savarkar

Marg

Prabha Devi

Mumbai-25

2. Sipat-I (3x360 MW) [3]

3. Chandrapura U-7&8 (2x250 MW) [2]

4. New Parli TPP U-2 (1x250 MW) [1]

5. Paras TPP Expn U-2 (1x250 MW) [1]

6. Paras TPP U-1 (1x250 MW) [1]

7. Barsingsar U-1&2 (2x125 MW) [2]

8. Neyveli Exp St-II (2x250 MW) [2]

9. Bellary TPS-I (1x500 MW) [1]

10. Surat Lignite Power Plant (2x125 MW) [2]

11. Aravali U – 1 to 3 (3x500 MW) [3]

12. Simhadri (2x500 MW) [2]

13. Korba STPP St.-III (1x500 MW) [1]

14. Anpara-C (2x600 MW) [2]

15. Bellary-II (1x500 MW) [1]

16. Rayalaseema St.III (1x210 MW) [1] 3. M/s Indure

Indure House GK-II

NewDelhi-48

1 [1] 1. Suratgarh U-6 (1x250 MW) [1]

4. M/s REL *

Reliance Energy Centre,

Santa Cruz (East)

Mumbai-400055

1[2] 1. Parichcha U-5&6 (2x250 MW) [2]

5. M/s TPL *

1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

2[3] 1. Bhusawal TPP Extn. U-1&2 (2x500 MW) [2]

2. Giral Lignite St.II (125 MW) [1]

6. M/s BGR, Chennai *

Chairman & Managing Director

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

5 [5] 1. Khaperkheda TPS Expn U-1 (1x500 MW) [1]

2. Kakatiya (1x500 MW) [1]

3. Vijayawada (1x500 MW) [1]

4. Dholpur CCGT (2GT+ST) [1]

5. Kothagudem (1x500 MW) [1]

7. M/s NBCC

3 [3] 1. Raichur U-8 (1x250 MW) [1]

2. Rayalaseema U-4 (210 MW) [1]

Chairman & Managing Director

NBCC Tower 15 Bhikaji Cama

Place

New Delhi

3. Farakka STPS U-6 (500 MW) [1]

8. M/s L&T

Chairman & Managing Director

L&T House Ballard Estate,

Mumbai-400001

1 [2] 1. Bakreshwar TPS Expn U-4&5 (2x210 MW) [2]

9. M/s Hamon SriramCottrel Pvt.Ltd.

2 [4] 1. Adani Power Mundra Ph-I (2x330 MW) [2]

2. Adani Power Mundra Ph-I (2x330 MW) [2]

10. M/s BDT

M/s BDT Ltd.

2-E/28,first floor,

jhandewalan Extension

New Delhi- 110055

Nil

11. Order placed but agency name not

available

3[3] 1. Santaldih U – 5 (250 MW) [1]

2. Gautami (2x145+174 MW) [1]

3. Dhuvaran ST (40 MW) [1]

12. M/s UEEPL 1[2] 1. Rosa TPP U 1 & 2 (2x500 MW) [2] 13. M/s Siemens AG, Germany 1[3] 1. Sugan CCPP (3GT+3 ST)(3x376 MW) [3] 14. M/s SEPCO-III 2[6] 1. Adani Power Mundra (2x660 MW) [2]

2. Sterlite TPP (4x600 MW) [4] 15. M/s Subhash Projects Marketing

Limited

1[3] 1. Bongaigaon (3x250) [3]

69 [125]

* EPC contractor

Sanjay Gandhi (500 MW), Trombay (1x250 MW), CT is not required.

Chimney

S.No. Name of the Supplier/ Erecting

Agency

No. of orders

placed [No. of Chimneys

to be constructed]

Remarks

1. M/s NBCC

Chairman & Managing Director

NBCC Tower 15 Bhikaji Cama

Place

New Delhi

13 [15] 1. NCTPP Dadri (2x490 MW) [1]

2. Kahalgaon (3x500 MW) [2]

3. Harduaganj (1x500 MW) [1]

4. Barh (3x660 MW) [2]

5. Farakka (1x500 MW) [1]

6. Sipat STPP St-II (2x500 MW) [1]

7. Mejia TPS Extn. U-7&8 (2x500 MW) [1]

8. Parichcha U-5&6 (2x250 MW) [1]

9. Korba East St-I U-2(250 MW) [1]

10. Paras-I (1x250 MW) [1]

11. Rayalaseema U-4 (210 MW) [1]

12. Kodarma U-1&2 (2x500 MW) [1]

13. Durgapur Steel TPS (2x500 MW) [1] 2. M/s Unitech Conveyor Corporation

Unitech Conveyor Corporation

32 chowringhee road ,

14 floor kolkatta

5 [5] 1. Bhilai Expn (2x250 MW) [1]

2. Mejia TPS Extn. U-5&6 (2x250 MW) [1]

3. Yamunanagar U-1&2 (2x300 MW) [1]

4. Lehra Mohabbat U-3&4 (2x250 MW) [1]

5. Sanjay Gandhi U-5 (1x500 MW) [1]

3. M/s Gammon (I) Ltd.

Gammon House ,

Veer Savarkar Marg

Prabha Devi

Mumbai-25

15 [19] 1. Sipat STPP St-I (3x660 MW) [2]

2. Korba STPP St-III (1x500 MW) [1]

3. Chhabra U-1&2 (2x250 MW) [1]

4. Surat Lignite U-3&4 (2x125 MW) [1]

5. OP Jindal Unit 1-4 (4x250 MW) [2]

6. JSW Ratnagiri (4x300 MW) [2]

7. Barsisngsar Lignite (2x125 MW) [1]

8. Neyveli Expn (2x250 MW) [1]

9. BellaryI (1x500 MW) [1]

10. Raichur U-8(1x250 MW) [1]

11. Simhadri STPS STAGE-II (2X500 MW) [1]

12. Aravali STPP U-1,2&3 (3x500 MW) [2]

13. Paras TPP Extn. U-2 (1x250 MW) [1]

14. Vallur TPP U-1&2 (2x500 MW) [1]

15. Rayalaseema St-III(1x210 MW) [1]

4. M/s Simplex

Chairman & Managing

DirectorSimplex House 27,

Shakespeare Sarani,

Kolkata-700017

6 [6] 1. Chandrapura (2x250 MW) [1]

2. Suratgarh (1x250 MW) [1]

3. Sagardighi (2x300 MW) [1]

4. Budge Budge (1x250 MW) [1]

5. Adani Power Pvt.Ltd. Mundra Ph-I (2x330 MW) [1]

6. Adani Power Pvt.Ltd. Mundra Ph-II (2x330 MW) [1]

5. M/s GDCL

3 [3] 1. Amarkantak TPS Extn.. U-5 (1x210 MW) [1]

2. Santaldih U-5 (1x250 MW) [1]

3. Santaldih TPP Extn. U-6 (250 MW) [1] 6. M/s BGR, Chennai *

Chairman & Managing Director

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

5 [6] 1. Khapaerkheda (1x500 MW) [1]

2. Vijayawada (1x500 MW) [1]

3. Kakatiya (1x500 MW) [1]

4. Valuthur CCPP (92.2 MW) [2]

5. Kothagudam (1x500 MW) [1]

7. M/s L&T

Chairman & Managing Director

L&T House Ballard Estate,

Mumbai-400001

3 [6] 1. Bakreshwar (2x210 MW) [1]

2. Trombay (1x250 MW) [1]

3. Jalipa Lignite (8x135 MW) [4]

8. M/s DEC, China*

1 [1] 1. Durgapur (1x300 MW) [1]

9. M/s Northern Power

Construction Corp. China

2 [2] 1. Rosa (2x300 MW) [1]

2. Hissar TPP (2x600 MW) [1]

10. M/s RS Pabla Construction Ltd. 2 [3] 1. Lanco Amarkantak (2x300 MW) [2]

2. Anpara-C (2x600 MW) [1]

11. M/s Paharpur

Pharpur Cooling Tower

Pharpur House

8/1/B Diamond Harbour Road

Kolkata – 700027

1 [1] 1. Torangallu (2x300 MW) [1]

12. M/s Bygging India 1 [1] 1. Nagarjuna (2x507.5 MW) [1]

13. M/s TPL *

1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

2 [2] 1. Bhusawal TPP Extn. U-1&2 (2x500 MW) [1]

2. Giral Lignite St-II (1x125 MW) [1]

14. M/s Shree Vijaya Engg. 1 [1] 1. Kota TPS St-V (195 MW) [1]

15. M/s Mc Nally Bharat

Chairman

7th Floor 4 Mangoe Lane

Kolkata

1[1] 1. New Parli-II (250 MW) [1]

16. M/s North west power 1[1] 1. Raghunathpur (2x600 MW) [1]

17. M/s LITL 2 [6] 1. Lanco Kondapalli (GT+ST: 366 MW) [2]

2. Konaseema (2x140+164 MW) [4] 18. M/s BHEL 1 [4] 1. Dholpur (330 MW) [4]

19. M/s Siemens AG, Germany 1 [3] 1. Sugen CCPP Blk-1, 2, 3 (3x376 MW) [3]

20. M/s SEPCO-III 2 [3] 1. Adani Power Pvt.Ltd.Mundraa (2x660 MW) [1]

2. Sterlite TPP (4x600 MW) [2] 21. Order placed but agency name not

available 2 [2] 1. Dhuvaran ST (40 MW) [1]

2. Chandrapur TPP (2x500 MW) [1] 22. M/s Subhash Projects Marketing

Limited 1 [2] 1. Bongaigaon (3x250) [2]

71 [93]

* EPC contractor

FUEL OIL SYSTEM

S.No. Name of the Supplier/ Erecting

Agency

No. of orders

placed

Remarks

1. BHEL Scope

BHEL House

Siri Fort

New Delhi

12 1. Farakka STPS St-II (1x500 MW)

2. Bhilai Expn (2x250 MW)

3. Kota TPP St-V (1x195 MW)

4. Surat Lignite Power Plant (2x125 MW)

5. Trombay Extn (1x250 MW)

6. Simhadri STPP STAGE-II (2X500 MW)

7. Neyveli Exp.II TPP (2x250 MW)

8. NCTPP Dadri (2x490 MW)

9. GHTPP (2x250 MW)

10. Raichur U-8 (250 MW)

11. Kodarma U-1&2 (2x500 MW)

12. Kahalgaon U-5,6,7 (3x500 MW) 2. M/s Techno Elect. & Engg. Co.Ltd

Ideal Plaza South Block Room No. S-307,S-309 11/1 Sarat Bose Road Kolkata - 700020

7 1. Barh STPP (3x660 MW)

2. Mejia TPS Extn U-5&6 (2x250 MW)

3. Bellary TPS-I (1x500 MW)

4. Amarkantak TPP Extn (1x210 MW)

5. Sanjay Gandhi TPs Extn (1x500 MW)

6. Bakreshwar TPS Extn (2x210 MW)

7. Hissar TPP (2x600 MW)

3. M/s Unitech 3 1. Chandrapura TPS (2x250 MW)

2. Mejia TPS Extn. U-7 & 8 (2x500 MW)

3. Rosa TPP (2x300 MW) 4. M/s United Machines

344/3, Lado Sarai,

New Delhi - 110030

2 1. DCR Yamuananagar TPP (2x300 MW)

2. OP Jindal (4x250 MW)

5. M/s Renuka Industries

1 1. Chhabra TPP (2x250 MW)

6. M/s REL*

Reliance Energy Centre,

Santa Cruz (East)

Mumbai-400055

1 1. Parichcha TPS Extn U-5&6 (2x250 MW)

7. M/s Zuberi Engg. Co. Jaipur 1 1. Kutch Lignite TPS Extn (1x75 MW)

8. M/s BGR , Chennai *

Chairman & Managing Director

5 1. Khaperkheda TPS Expn (1x500 MW)

2. Kakatiya (1x500 MW)

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

3. Vijayawada (1x500 MW)

4. Kothagudam (1x500 MW)

5. Dholpur (330 MW)

9. Huanggong Machinging Group Co

Ltd

1 1. Sagardighi TPP Extn (2x300 MW)

10. M/s L&T

Chairman & Managing Director

L&T House Ballard Estate,

Mumbai-400001

1 1. Durgapur TPS Extn U-7 (1x300 MW)

11. M/s Technofab

Plot No.5 , Sector 27 C Mathura Road, Faridabad

4 1. Lanco Amarkantak (2x300 MW)

2. Lanco Nagarjuna (2x507.5 MW)

3. Anpara-C (2x600 MW)

4. Korba East TPP St-V U- 1&2 (2x250 MW)

12. M/s SEC, China * 1 1. Torangallu (2x300 MW)

13. M/s TPL *

1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

2 1. Bhusawal TPP Extn. U-1&2 (2x500 MW)

2. Giral Lignite St-II (1x125 MW)

14. M/s GMW, Chennai 1 1. Barsingsar lignite TPP (2x125 MW)

15. M/s Thermo Systems 1 1. Raghunathpur (2x600 MW)

16. M/s Kowa/SFPML 1 1. Adani MundraTPP, Ph-II (2x330MW)

17. Raunak International Nil

18. M/s Siemens AG, Germany 1 1. Sugen CCPP Blk-1, 2, 3 (3x376 MW) 19. M/s SEPCO-III 2 1. Adani Power Pvt.Ltd.Mundraa (2x660 MW)

2. Sterlite TPP (4x600 MW) 20. Order placed but agency name not

available

4 1. Paras TPP Extn. U-2 (1x250 MW) 2. Santaldih TPP Extn. U-5 (250 MW)

3. Jalipa Lignite (8x135 MW)

4. Adani Power Pvt.Ltd. Mundra (4x330 MW) 21. M/s Shanghai Electric 1 1. JSW Ratnagiri (4x300 MW) * EPC contractor 52

Water PT Plant

S.No. Name of the Supplier/ Erecting

Agency

No. of orders

placed

Remarks

1. M/s Driplex

Managing Director

Driplex House 1-Panchsheel

Community

Centre , New Delhi

10 1. NCTPP Dadri (2x490 MW)

2. Bhilai Expn(2x250 MW)

3. Amarkantak (1x210 MW)

4. Bakreshwar U-4&5 (2x210 MW)

5. Farkka STPS St.III U-6 (1x500 MW)

6. Barh STPP (3x660 MW)

7. Aravali STPP U-1,2&3 (3x500 MW)

8. Simhadri STPP STAGE-II (2X500 MW)

9. Neyveli Exp.II TPP (2x250 MW)

10. Harduaganj U-5 & 6 (2x250 MW)

2. M/s Degremont India Ltd.

Vice President, Unitech Bussiness

park Tower -A II floor

South City-I

Gurgaon-122001

2 1. Kahalgaon STPP (3x500 MW)

2. Sipat STPP (2x500 MW)

3. M/s Subhash Projects

4. M/s VA Tech

Managing Director

11 Murray's Gate Road Alwarpet

Chennai 600018

2 1. Sipat STPP St-I (3x660 MW) 2. Durgapur Steel(2x500 MW)

5. M/S GEO MILLER

Director

GM House F-3/2, Okhla Industrial

Area,

Phase-I

New Delhi-110020

5 1. Korba STPP St-III (1x500 MW)

2. Mejia U-5&6 (2x250 MW)

3. Chandrapura U-7&8 (2x250 MW)

4. Sanjay Gandhi TPP U-5 (1x500 MW)

5. Bellary TPS U-1 (1x500 MW)

6. M/s Thermax, Pune

Thermax ltd

Sai Chambers, 15 Mumbai Pune

Road

Wakdewadi,

5 1. Barsingsar TPP (2x125 MW)

2. Yamunanagar (2x300 MW)

3. Chhabra (2x250 MW)

4. Kota TPS St-V (195 MW)

5. Hissar TPP (2x600 MW)

Pune-411003

7. M/s REL *

Reliance Energy Centre,

Santa Cruz (East)

Mumbai-400055

1 1. Parichcha U-5&6(2x250 MW)

8. M/s Doshi Ion

Commissioned-178, Madhuban, Mr

Universal Public School

New Delhi=1100092

3 1. Kutch Lignite U-4 (1x75 MW)

2. Surat Lignite (2x125 MW)

3. Kutch Lignite U 4 (75 MW)

9. M/s Hydro Air 1 1. New Parli U-2 (1x250 MW)

10. M/s Gondwana Engineering 1 1. Paras TPP U-2 (1x250 MW)

11. M/s BGR , Chennai *

Chairman & Managing Director

BGR Group, 443, Anna Salai,

Teynampet

Chennai-600018

6 1. Vijayawada TPP (1x500 MW)

2. Khaperkheda TPP (1x500 MW)

3. Kakatiya (1x500 MW)

4. Valuthur CCPP (92.2 MW)

5. Kothagudam (1x500 MW)

6. Dholpur (330 MW) 12. M/s L&T

Chairman & Managing Director

L&T House Ballard Estate,

Mumbai-400001

2 1. Sagardighi U-1&2 (2x300 MW)

2. Mejia TPS Extn. U-7 & 8 (2x500 MW)

13. M/s S N Nandi & Co.

1 1. Durgapur U-7 (1x300 MW)

14. M/s Acquatech 1 1. Lakwa WHRB (1x37.2 MW)

15. M/s Triveni 3 1. Lanco Amarkantak U-1&2 (2x300 MW)

2. Nagarjuna (2x507.5 MW)

3. Anpara-C (2x600 MW) 16. M/s Ion Exchange

Tiecicon House Dr. E Moses Road

Mahalaxmi

Mumbai-400011

4 1. OP Jindal U-1 to 4 (4x250 MW)

2. Adani Power Ltd. Mundra Ph-I (2x330 MW)

3. Rosa TPP (2x300 MW)

4. JSW Ratnagiri (4x300 MW)

17. M/s Deekpak Cables 1 1. Torangallu U-3&4 (2x300 MW)

18. M/s Clear Water 2 1. Korba East U-1&2 (1x250 MW)

2. GHTPP (2x250 MW)

19. M/s TPL * 1-10-60/3, Suryodaya,

Begumpet

Hyderabad-500 016

2 1. Bhusawal TPP Extn. U-1&2 (2x500 MW)

2. Giral Lignite St-II (1x125 MW)

20. M/s Kirloskar Brothers 1 1. Kodarma U-1&2 (2x500 MW)

21. M/s Perfect 1 1. Raichur U-8 (250 MW)

22. M/s Nuchem Whirl Ltd. 20/6, Mathura Road,

Faridabad Haryana

Nil

23 M/s Makintosh Burn 1 1. Raghunathpur (2x600 MW)

24 M/s Siemens AG, Germany 1 1. Sugen CCPP Blk-1, 2, 3 (3x376 MW) 25 M/s Gannon & Dunkerly Pvt Ltd 1 1. Jalipa Lignite (8x135 MW) 26 M/s SEPCO-III, China 1 1. Adani Power Pvt.Ltd.Mundra Ph-II (2x660

MW)

2. Sterlite TPP (4x600 MW) 26 Order placed but agency name not

available 4 1. Santaldih TPP Extn. U-5 (250 MW)

2. Santaldih TPP Extn. U-6 (250 MW)

3. Dhuvaran ST (40 MW)

4. Santaldih U-5 (250 MW) 63

* EPC contractor