boq - foundation (general smart) - 16 apr 09

Upload: qkrenst14

Post on 30-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    1/13

    VENDOR VENDOR

    No Material Item TOTAL PRICE TOTAL PRICE

    STANDARD ELEVATED 1 M

    A. GENSET FOUNDATION G STD G E1

    TOTAL A Rp6,578,336 Rp10,865,691B. MONTHLY / BULK TANK FOUNDATION CAPACITY 1000 L T1 STD T1 E1

    TOTAL B Rp3,213,908 Rp6,277,564

    C. MONTHLY / BULK TANK FOUNDATION CAPACITY 3000 L T3 STD T3 E1

    TOTAL C Rp6,717,189 Rp12,289,342

    D. MONTHLY / BULK TANK FOUNDATION CAPACITY 5000 L T5 STD T5 E1

    TOTAL D Rp6,717,189 Rp12,289,342

    E. DOUBLE GENSET FOUNDATION DG STD DG E1

    TOTAL E Rp10,459,065 Rp17,694,286

    GRAND TOTAL (A+B+C+D+E) Rp33,685,686 Rp59,416,225

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    2/13

    VENDOR

    TOTAL PRICE

    ELEVATED 2 M

    G E2

    Rp8,250,152T1 E2

    Rp5,769,607

    T3 E2

    Rp11,388,229

    T5 E2

    Rp11,388,229

    DG E2

    Rp11,997,701

    Rp48,793,918

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    3/13

    BOQ - FOUNDATION - GENERAL DESIGNsites 1

    16-Apr 16-Apr

    No Material Item TYPE TYPE

    A. GENSET FOUNDATION QTY QTY

    G STD G E1

    1 Site Preparation

    a Site Clearing and grubbing, removal of scrubs, grass, and soft trees, 1.00 1.00

    b Leveling & benchmark setting 1.00 1.00

    2 Foundation Structure

    a Soil Excavation & Compaction 6.60 12.71

    b Sand fill (Thickness 150 mm) 0.56 0.45

    c Aanstamping 1.11 1.29

    d Stone masonry 3.44 8.30

    e Concrete Floor (K-225) 1.65 1.83

    f Land fill (compacted) 1.72 2.48

    g Concrete layer (50mm) - -

    h Stair (stone masonry) - -

    i Finishing with cement plaster & black painting 14.05 19.85

    TOTAL A - PER SITE

    TOTAL

    B. MONTHLY / BULK TANK FOUNDATION CAPACITY 1000 L

    1 Foundation Structure

    a Soil Excavation & Compaction 3.70 6.34

    b Sand fill (Thickness 150 mm) 0.26 0.31

    c Aanstamping 0.79 0.92

    d Stone masonry 1.41 4.75e Concrete Floor (K-225) 1.20 1.35

    f Land fill (compacted) 1.23 2.42

    g Concrete layer (50mm) - -

    h Stair to shelter (stone masonry) - -

    i Finishing with cement plaster & black painting 8.00 13.00

    TOTAL B - PER SITE

    TOTAL

    C. MONTHLY / BULK TANK FOUNDATION CAPACITY 3000 L

    1 Foundation Structure

    a Soil Excavation & Compaction 6.97 11.95b Sand fill (Thickness 150 mm) 0.50 0.58

    c Aanstamping 1.49 1.74

    d Stone masonry 2.66 8.96

    e Concrete Floor (K-225) 2.80 2.95

    f Land fill (compacted) 2.32 7.12

    g Concrete layer (50mm) - -

    h Stair to shelter (stone masonry) - -

    i Finishing with cement plaster & black painting 17.12 24.92

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    4/13

    TOTAL C

    TOTAL

    D. MONTHLY / BULK TANK FOUNDATION CAPACITY 5000 L

    1 Foundation Structure

    a Soil Excavation & Compaction 6.97 11.95

    b Sand fill (Thickness 150 mm) 0.50 0.58

    c Aanstamping 1.49 1.74d Stone masonry 2.66 8.96

    e Concrete Floor (K-225) 2.80 2.95

    f Land fill (compacted) 2.32 7.12

    g Concrete layer (50mm) - -

    h Stair to shelter (stone masonry) - -

    i Finishing with cement plaster & black painting 17.12 24.92

    TOTAL D

    TOTAL

    E. DOUBLE GENSET FOUNDATION

    1 Foundation Structurea Soil Excavation & Compaction 9.07 15.55

    b Sand fill (Thickness 150 mm) 0.65 0.76

    c Aanstamping 1.94 2.27

    d Stone masonry 6.80 14.58

    e Concrete Floor (K-225) 2.94 3.46

    f Land fill (compacted) 3.83 10.24

    g Concrete layer (50mm) - -

    h Stair to shelter (stone masonry) - -

    i Finishing with cement plaster & black painting 22.40 32.58

    TOTAL E

    TOTAL

    GRAND TOTAL (A+B+C+D+E)

    TERMS OF PAYMENT

    CUBE TEST/MASTER MIX DESIGN

    WARRANTY SERVICE

    DELIVERY TERM

    DELIVERY TIME

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    5/13

    UNIT PRICE STANDARD FOUNDATION ELEVATED 1M FOUNDATION

    16-Apr 1 1 1

    TYPE Unit VENDOR VENDOR VENDOR

    QTY UNIT PRICE TOTAL PRICE TOTAL PRICE

    G E2 G STD G E1

    S1 S1

    1.00 ls Rp3,189 Rp3,189 Rp3,189

    1.00 ls Rp739,200 Rp739,200 Rp739,200

    14.83 m3 Rp30,916 Rp204,043 Rp392,937

    0.50 m3 Rp165,150 Rp92,484 Rp74,318

    1.24 m3 Rp321,907 Rp356,351 Rp415,743

    - m3 Rp680,065 Rp2,342,145 Rp5,646,241

    4.59 m3 Rp1,572,000 Rp2,593,800 Rp2,878,725

    3.70 m3 Rp26,580 Rp45,809 Rp65,905

    - m3 Rp165,150 Rp- Rp-

    - m3 Rp680,065 Rp- Rp-

    26.02 m2 Rp100,080 Rp1,406,124 Rp1,986,588

    Rp7,783,145 Rp12,202,846

    SITES Rp7,783,145 Rp12,202,846

    T1 STD T1 E1

    6.34 m3 Rp30,916 Rp114,264 Rp195,881

    0.30 m3 Rp165,150 Rp43,600 Rp50,866

    0.90 m3 Rp321,907 Rp254,951 Rp297,442

    - m3 Rp680,065 Rp957,532 Rp3,231,6703.73 m3 Rp1,572,000 Rp1,886,400 Rp2,122,200

    3.42 m3 Rp26,580 Rp32,747 Rp64,217

    - m3 Rp165,150 Rp- Rp-

    - m3 Rp680,065 Rp- Rp-

    20.00 m2 Rp100,080 Rp800,640 Rp1,301,040

    Rp4,090,133 Rp7,263,317

    SITES Rp4,090,133 Rp7,263,317

    T3 STD T3 E1

    14.04 m3 Rp30,916 Rp215,544 Rp369,5030.70 m3 Rp165,150 Rp82,245 Rp95,952

    2.10 m3 Rp321,907 Rp480,929 Rp561,084

    - m3 Rp680,065 Rp1,806,253 Rp6,096,104

    7.04 m3 Rp1,572,000 Rp4,401,600 Rp4,637,400

    8.19 m3 Rp26,580 Rp61,772 Rp189,356

    - m3 Rp165,150 Rp- Rp-

    - m3 Rp680,065 Rp- Rp-

    40.12 m2 Rp100,080 Rp1,713,370 Rp2,493,994

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    6/13

    Rp8,761,712 Rp14,443,394

    SITES Rp8,761,712 Rp14,443,394

    T5 STD T5 E1

    14.04 m3 Rp30,916 Rp215,544 Rp369,503

    0.70 m3 Rp165,150 Rp82,245 Rp95,952

    2.10 m3 Rp321,907 Rp480,929 Rp561,084- m3 Rp680,065 Rp1,806,253 Rp6,096,104

    7.04 m3 Rp1,572,000 Rp4,401,600 Rp4,637,400

    8.19 m3 Rp26,580 Rp61,772 Rp189,356

    - m3 Rp165,150 Rp- Rp-

    - m3 Rp680,065 Rp- Rp-

    40.12 m2 Rp100,080 Rp1,713,370 Rp2,493,994

    Rp8,761,712 Rp14,443,394

    SITES Rp8,761,712 Rp14,443,394

    D STD D1 E1

    16.24 m3 Rp30,916 Rp280,466 Rp480,799

    0.82 m3 Rp165,150 Rp107,017 Rp124,853

    2.46 m3 Rp321,907 Rp625,788 Rp730,086

    - m3 Rp680,065 Rp4,627,164 Rp9,915,351

    7.09 m3 Rp1,572,000 Rp4,621,680 Rp5,434,797

    10.47 m3 Rp26,580 Rp101,908 Rp272,232

    - m3 Rp165,150 Rp- Rp-

    - m3 Rp680,065 Rp- Rp-

    43.20 m2 Rp100,080 Rp2,241,792 Rp3,260,606

    Rp12,605,814 Rp20,218,725

    SITES Rp12,605,814 Rp20,218,725

    Rp42,002,516 Rp68,571,675

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    7/13

    ELEVATED 2M FOUNDATION 1.65

    1

    VENDOR

    TOTAL PRICE

    G E2

    S1

    Rp3,189

    Rp739,200

    Rp458,478

    Rp82,575

    Rp398,360

    Rp-

    Rp7,219,017

    Rp98,452

    Rp-

    Rp-

    Rp2,604,082

    Rp11,603,353

    Rp11,603,353

    T1 E2

    Rp195,881

    Rp49,545

    Rp289,716

    Rp-Rp5,867,490

    Rp90,797

    Rp-

    Rp-

    Rp2,001,600

    Rp8,495,030

    Rp8,495,030

    T3 E2

    Rp434,055Rp115,605

    Rp676,005

    Rp-

    Rp11,073,168

    Rp217,624

    Rp-

    Rp-

    Rp4,015,210

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    8/13

    Rp16,531,666

    Rp16,531,666

    T5 E2

    Rp434,055

    Rp115,605

    Rp676,005Rp-

    Rp11,073,168

    Rp217,624

    Rp-

    Rp-

    Rp4,015,210

    Rp16,531,666

    Rp16,531,666

    D1 E2

    Rp501,946

    Rp135,258

    Rp790,926

    Rp-

    Rp11,144,301

    Rp278,293

    Rp-

    Rp-

    Rp4,323,456

    Rp17,174,179

    Rp17,174,179

    Rp70,335,895

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    9/13

    No Material Item Vol Unit Unit Price Total Price

    1 Site Preparation

    a1.00 ls Rp3,189 Rp3,189

    b Leveling & benchmark setting 1.00 ls Rp739,200 Rp739,200

    2 Foundation Structure

    a Soil Excavation & Compaction 2.52 m3 Rp30,916 Rp77,907

    b Sand fill (Thickness 50 mm) 0.18 m3 Rp165,150 Rp29,727

    c Aanstamping 0.54 m3 Rp321,907 Rp173,830

    d Stone masonry 1.68 m3 Rp680,065 Rp1,142,510

    e Back filling with compaction 1.60 m3 Rp30,916 Rp49,465

    f Concrete Floor (K-225) 0.27 m3 Rp1,729,200 Rp466,884

    i Finishing with cement plaster & black painting 3.81 m2 Rp100,080 Rp381,305

    TOTAL Rp3,064,016

    Site Clearing and grubbing, removal of scrubs,grass, and soft trees,

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    10/13

    No Material Item Vol Unit Unit Price Total Price

    1 Site Preparation

    a1.00 ls Rp3,189 Rp3,189

    b Leveling & benchmark setting 1.00 ls Rp739,200 Rp739,200

    2 Foundation Structure

    a Soil Excavation & Compaction 2.44 m3 Rp30,916 Rp75,434

    b Sand fill (Thickness 150 mm) 0.48 m3 Rp165,150 Rp79,272

    c Aanstamping 0.91 m3 Rp321,907 Rp292,936

    d Stone masonry 2.88 m3 Rp680,065 Rp1,958,588

    e Concrete Floor (K-225) 0.92 m3 Rp1,572,000 Rp1,440,974

    f Land fill (compacted) 1.28 m3 Rp26,580 Rp34,022

    gFinishing with cement plaster & black painting 7.81 m2 Rp100,080 Rp781,375

    Total Rp5,404,989

    Site Clearing and grubbing, removal of scrubs,grass, and soft trees,

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    11/13

    1.65

    0.92

    2.44 1.83

    6.6 4.95

    7.81

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    12/13

    BOQ - CUSTOM FOUNDATION 2x1,5m FOR HCPT

    No Material Item QTY Unit UNIT PRICE TOTAL PRICE

    1 Site Preparation

    a

    1.00 ls Rp3,189 Rp3,189

    bLeveling & benchmark setting 1.00 ls Rp739,200 Rp739,200

    2 Foundation Structure

    aSoil Excavation & Compaction 2.64 m3 Rp30,916 Rp81,617

    bSand fill (Thickness 50 mm) 0.22 m3 Rp170,000 Rp37,740

    c Aanstamping (Thickness 150 mm)0.67 m3 Rp340,000 Rp226,440

    d Stone masonry1.21 m3 Rp710,000 Rp857,680

    e Concrete Floor (K-225)1.16 m3 Rp1,572,000 Rp1,815,660

    f Land fill (compacted) 0.54m3 Rp26,580 Rp14,460

    gFinishing with cement plaster & black painting 4.28 m2 Rp100,080 Rp428,342

    Total Rp4,204,328

    Site Clearing and grubbing, removal of scrubs,

    grass, and soft trees,

  • 8/14/2019 Boq - Foundation (General Smart) - 16 Apr 09

    13/13

    HPP PG 135KVA 2,2m x 4,8m

    No Material Item QTY Unit UNIT PRICE TOTAL PRICE

    1 Site Preparation

    a 1.00 ls Rp3,189 Rp3,189

    bLeveling & benchmark setting 1.00 ls Rp739,200 Rp739,200

    2 Foundation Structure

    aSoil Excavation & Compaction 8.45 m3 Rp30,916 Rp261,175

    bSand fill (Thickness 50 mm) 0.42 m3 Rp170,000 Rp71,400

    c Aanstamping (Thickness 150 mm)1.26 m3 Rp380,000 Rp478,800

    d Stone masonry2.27 m3 Rp741,000 Rp1,683,552

    e Concrete Floor (K-225)3.38 m3 Rp1,572,000 Rp5,312,102

    f Land fill (compacted) 4.50m3 Rp26,580 Rp119,504

    gFinishing with cement plaster & black painting 11.96 m2 Rp100,080 Rp1,196,957

    Total Rp9,865,879

    Site Clearing and grubbing, removal of scrubs,grass, and soft trees,