Name of work: - Estimated Cost Rs. 0.675 (M) Completion Period As per work Order S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs). 1 (03-04-c+03-18- a+b) Shingle Filling from Barrow pit excavation 49.12 M3 697.24 34248 2 (06-05-h) PCC (1:3:6) 34.22 M3 6302.26 215663 3 (06-05-i) PCC(1:4:8) 13.7 M3 5481.08 75091 4 (06-05-f) PCC (1:2:4) 46.49 M 3 7257.86 337418 5 (06-06-b-03) RCC in foundatin (1:24) 0.85 M3 8330.73 7081 6 (06-07-c) Steel 0.064 Tone 107564.41 6884 Total 676386 Say Rs:- 675000 Million 0.675 1 The quantities are liable to be increased or decreased during execution/Site Condition. 2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 , according to contractor Primium. Contractor Premium % above/Below On estimate Rates Contractor Signature . Peshawar BOQ Town Officer (I&S) TMA Town-III CONSTRUCTION OF STREETS,DRAINS AND CULVERT ETC AT MOHALLAH:ASHNAGHAR AND MOH:JIHAD AKBAR UC-59 SARBAND ,PESHAWAR. Earnest Money: - Rs. 13500/-

Upload: others

Post on 21-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.675 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1(03-04-c+03-18-

a+b)

Shingle Filling from Barrow pit

excavation 49.12 M3 697.24 34248

2 (06-05-h) PCC (1:3:6) 34.22 M3 6302.26 215663

3 (06-05-i) PCC(1:4:8) 13.7 M3 5481.08 75091

4 (06-05-f) PCC (1:2:4) 46.49 M3 7257.86 337418

5 (06-06-b-03) RCC in foundatin (1:24) 0.85 M3 8330.73 7081

6 (06-07-c) Steel 0.064 Tone 107564.41 6884

Total 676386

Say Rs:- 675000

Million 0.675

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTION OF STREETS,DRAINS AND CULVERT ETC AT MOHALLAH:ASHNAGHAR AND

MOH:JIHAD AKBAR UC-59 SARBAND ,PESHAWAR.

Earnest Money: - Rs. 13500/-

Page 2: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.325 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 NSI 8 Panels Grade A (GM Solar) 8 Each 21900 175200

2 NSI 3 Nos. Cell New (200 Volts, Dry Battery) 3 Each 42100 126300

3 NSI Stand (8 Nos) 8 Each 3000 24000

Total 325500

Say Rs:- 325000

Million 0.325

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

IMPROVEMENT OF SOLAR SYSTEM INSTALLED FOR BOARING AT MOHALLAH ANAN KHEL

SARBAND UC-59

Earnest Money: - Rs. 6500/-

Page 3: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

S.No Name of work: Unit Quantity Rate RS

1 Earth excavation in open cut upto 1.5m

depth for drains etc & disposal : in Hard

Soil

M3 42.48 183.75 7805

2 Formation of Embankment from Borrow

Excavation in

Common Material including compaction by

power roller.

M3 241.74 724.45 175127

3 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:4:8)M3 85.98 5481.08 471273

4 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:3:6)

M3 35.19 6302.26 221759

5 Plain Cement Concrete including placing,

compacting,finishing & curing (Ratio 1:2:4)M3 78.43 7257.86 569243

6 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 6" dia:

M 19.207 1018.38 19560

7 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 9" dia:

M 16.463 1264.25 20814

8 06-06-b-03 RCC in raft foundation slab,

base slab of column & ret. wall etc, not

including in . Type C(1:2:4)

M3 0.850 8330.73 7077

9 Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

Ton 0.07 107564.41 7174

TOTAL Rs1,499,833

Say Rs1,500,000

In Million Rs1.500

BOQPAVEMENT OF STREET, DRAIN, CULVERT AND SIDE WALL ETC AT MOH:

PISHTAKHARA UC -60 PESHAWAR

Page 4: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code
Page 5: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 1.0 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 (03-23-b) Earth excavation 36.25 M3 214.54 7776

2 (06-05-i) PCC(1:4:8) 9.63 M3 5,481.08 52771

3 (07-04-a-05) B.B Work in foundation (1:6) 19.54 M3 7,763.50 151691

4 06-22-a-02 DPC (1:2:4) 22.30 M2 647.05 14432

5 (07-05-a-05) B.B Work in ground floor (1:6) 27.18 M3 8444.27 229555

6 (06-05-f) PCC (1:2:4) 9.91 M3 7,257.86 71933

7 (06-06-b-03) RCC in foundatin (1:24) 1.53 M3 8330.73 12739

8 (06-06-a-03) RCC in slab,beam & column Etc(1:24) 5.31 M3 9538.28 50644

9 (06-07-c) Steel 0.62 Tone 107564.41 66415

10 09-45. Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with

chicken mesh, polythene, mud, tar

130.11 M2 2,229.74

290115

11 25-30. Making and fixing steel grated doors,

complete with locking arrangements &

angle iron frame

7.43 M2 8,088.33

60136

Total 1008208

Say Rs:- 1000000

Million 1.00

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTIONS OF JINAZA GAH AT MOH:SHAHEED BABA UC-49 BAZID KHEL,PESHAWAR.

Earnest Money: - Rs. 20000/-

Page 6: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Completion Period As per work Order

S.No. Qty Unit Rate Amount (Rs).

1 1040.51 M2 9.08 9,448 /-

2 31.86 M3 1,787.81 56,960 /-

3 67.96 M3 183.75 12,488 /-

4 99.82 M3 643.59 64,243 /-

5 64.90 M3 6,302.26 409,017 /-

6 198.47 M3 724.45 143,782 /-

7 546.51 M3 5,481.08 2,995,465 /-

8 1811.59 M2 1,030.35 1,866,572 /-

9 1811.59 M2 169.79 307,590 /-

10 362.46 M3 7,257.86 2,630,684 /-

11 650.32 M2 1,089.11 708,270 /-

12 29.27 M 2,179.05 63,781 /-

13 32.93 M 1,264.25 41,632 /-

14 54.88 M 1,018.38 55,889 /-

15 39.63 M 588.84 23,336 /-

16 13.17 M3 8,330.73 109,716 /-

17 1.03 Ton 107,564.41 111,222 /-

18 1.03 Ton 154,563.30 159,818 /-

Total 9,769,913 /-

Say Rs. 9,750,000 /-

Say Rs in Million 9.750

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017,

according to contractor Primium.

Contractor Premium % above/Below

Town Officer (I&S)

Providing and Laying RCC pipe, moulded with cement

concrete 1:1.5:3, including cost of reinforcement, testing etc :

9" dia: (23-01-c)

Providing and Laying cut, joint, test, disinfect PVC pipe line

BSS Class 'B'working pressure : 4" i/d (24-18-a-02)

RCC in raft foundation slab, base slab of column & ret. wall

etc, not including in 06-06. Type C(1:2:4) (06-06-b-03)

Supply & fabricate M.S. reinforcement for cement concrete

(Hot rolled deformed bars Grade 40). (06-07-c)

Providing and Laying RCC pipe, moulded with cement

concrete 1:1.5:3, including cost of reinforcement, testing

etc : 6" dia:

Small iron work, such as gusset plates, knees, bends, stirrups,

straps, rings etc excluding erection (25-09 )

Plain Cement Concrete including placing, compacting, finishing

& curing (Ratio 1:3:6).(06-05-h)

Providing and Laying RCC pipe sewers complete As per

ASTM C-76-79, Class II : 12" i/d, Wall B (23-03-a-01)

Esitmated Cost Rs. 9.750 (Million)

Transportation of earth all types beyond 250 m and upto

8KM. (03-18-a,b,c )

Contractor Signature .

P/F Precast Concrete 7000 psi TUFF Tiles over bed of 2"

thick sand & 4" thick brick ballast comp (10-45)

TMA Town-III

Peshawar

BOQ

Name of work :- CONSTRUCTION OF STREETS ,DRAINS CULVERTS ETC; AT NC.NO.110,111,112 &113 TEHKAL BALA

UC -40 PESHAWAR

Earnest Money Rs. 195,000 /-

Description.

Dressing slopes of banks or ground surface (03-21 )

Dismantling : Plain Cement Concrete 1:3:6 (04-19-b)

Earth excavation in open cut upto 1.5m depth for drains etc &

disposal : in Hard Soil (03-07-b)

Plain Cement Concrete including placing, compacting, finishing

& curing (Ratio 1:4:8) (06-05-i )

Brick on edge flooring, laid in 1:6 c/s mortar, over a bed of

3/4" thick cement mortar 1:6 (10-09)

Cement pointing 1:2 flush, on floor (11-17-a)

Plain Cement Concrete including placing, compacting, finishing

& curing (Ratio 1:2:4) (06-05-f )

Formation of Embankment from Borrow Excavation in

Common Material including compaction by power roller. (03-

61-c)

Page 7: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.707 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 NSI Mobilization of plant, equipment and camping

1.00 Job 7,000.00 7000

2 24-02-a-05 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d

30.49 M 2,075.85 63288

3 24-02-b-03 Tubewell boring in all soils except

shingle/rock From 100'to 200' below ground : 8" i/d

30.49 M 2,698.60 82274

4 24-02-c-03 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d

30.49 M 2,811.28 85710

5 24-02-d-01 Tubewell boring in all soils except shingle/rock From 300'to 400' below ground : 8" i/d

15.24 M 4,047.89 61690

6 24-09-c-01 24-12-b-01 Providing and installing PVC blind pipe in tubewell withstrainer BSS Class 'C' working

pressure : 6" i/d

106.71 M 3,097.77 330555

7 24-30-a-04 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427 including testing & disinfect complete (40mm dia)

173.78 M 214.97 37358

8 NSI Provide/Installation of submersible pump 2.0 HP along with all accessories as directed by engineer incharge

1.00 job 29000 29000

9 NSI Shrouding with graded material 1.00 Job 10,500.00 10500

Total 707374

Say Rs:- 707000

Million 0.707

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

BOQ

BORING & INSTALLATION OF WATER PUMP & PIPE LINE AT MALAKANDER

REGI LALMA PESHAWAR.

Earnest Money: - Rs. 14640

Page 8: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Town Officer (I&S)

Peshawar

TMA Town-III

Page 9: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Completion Period As per work Order

S.No. Qty Unit Rate Amount (Rs).

1 3.00 Each 7,000.00 21,000 /-

2 91.46 M 2,075.85 189,857 /-

3 91.46 M 2,698.60 246,814 /-

4 182.93 M 3,097.77 566,675 /-

5 169.21 M 197.60 33,436 /-

6 326.22 M 147.94 48,261 /-

7 3.00 Each 6,000.00 18,000 /-

8 3.00 Each 29,000.00 87,000 /-

Total 1,211,043 /-

Say Rs. 1,200,000 /-

Say Rs in Million 1.200

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017,

according to contractor Primium.

Contractor Premium % above/Below

Mobilization of plant, equipment and camping

arrangements etc & demobilization after completion (24-01 )

BOQ

Name of work :- 03 NOS. BOARINGS & INSTALLATION OF WATER PUMPS AT MANAKRO ETC & VARIOUS PLACES

Esitmated Cost Rs. 1.200 (Million) Earnest Money Rs. 24,000 /-

Description.

Contractor Signature .

Supply & Fixing of Submersible Motor 2 HP with all respect

as directed by Engineer Incharge (NSI)

Tubewell boring in all soils except shingle/rock From ground

upto 100' below ground : 8" i/d (24-02-a-05)

Tubewell boring in all soils except shingle/rock From 100' to

200' below ground : 8" i/d (24-02-b-03 )

Providing and installing PVC blind pipe in tubewell with

strainer BSS Class 'C' working pressure : 6" i/d (24-12-b-01)

Providing and Laying cut, joint, test, disinfect PVC pipe line

BSS Class 'D' working pressure : 1.25" i/d (24-18-c-01)

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-

4427 incl testing & disinfect

complete (32mm dia) (24-30-a-03 )Shrouding with graded pack grave 3/8" to 1/8" around

tubewell in bore hole (LumSum)

Town Officer (I&S)

TMA Town-III

Peshawar

Page 10: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 2.0 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 03-60-c Back filling 152.78 M3 442.26 67568

2 (06-05-i) PCC (1:4:8) 67.27 M3 5,481.08 368712

3 (06-05-f) PCC (1:2:4) 67.27 M3 7257.86 488236

4 (06-05-h) PCC(1:3:6) 105.09 M3 6,302.26 662305

5 (06-06-b-03) RCC in foundatin (1:24) 12.74 M3 8330.73 106134

6 (06-07-c) Steel 0.73 Tone 107564.41 77984

7 (23-01-c) RCC Pipe 9" dia 36.58 M 1264.25 46246

8 (23-03-a-01) RCC Pipe 12" dia 18.29 M 2179.05 39855

9 23-03-a-03 RCC Pipe 18' dia 21.95 M 3145.17 69036

10 23-03-a-05 RCC Pipe 24" dia 18.29 M 4304.75 78734

Total 2004811

Say Rs:- 2000000

Million 2.00

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTION OF STREET,DRAIN AND CULVERT ETC AT REGI PESHAWAR.

Earnest Money: - Rs. 40000/-

Page 11: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 NSI Mobilization of plant, equipment and camping

1.00 Job 7,000.00 7000

2 24-02-a-05 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d

30.49 M 2,075.85 63288

3 24-02-b-03 Tubewell boring in all soils except shingle/rock From 100'to 200' below ground : 8" i/d

30.49 M 2,698.60 82274

4 24-02-c-03 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d

18.29 M 2,811.28 51426

5 24-09-c-01 24-12-b-01 Providing and installing PVC blind pipe in tubewell withstrainer BSS Class 'C' working pressure : 6" i/d

79.27 M 3,097.77 245555

6 24-30-a-04 Providing and Laying HDPE pipe

Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (40mm dia)

79.27 M 214.97 17040

7 NSI Provide/Installation of submersible pump 2.0 HP along with all accessories as directed by engineer incharge

1.00 job 29000 29000

8 NSI Shrouding with graded material 1.00 Job 7,500.00 7500

Total 503084

Say Rs:- 500000

Million 0.500

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

BOQ

INSTALLATION OF PRESSURE PUMP AT AMJAD ABAD REGI LALMA UC-

MALKANDHER.

Earnest Money: - Rs. 10000/-

Town Officer (I&S)

TMA Town-III

Page 12: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Peshawar

Page 13: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 NSI Mobilization of plant, equipment and camping

1.00 Job 7,000.00 7000

2 24-02-a-05 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d

30.49 M 2,075.85 63288

3 24-02-b-03 Tubewell boring in all soils except

shingle/rock From 100'to 200' below ground : 8" i/d

30.49 M 2,698.60 82274

4 24-02-c-03 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d

18.29 M 2,811.28 51426

5 24-12-b-01 Providing and installing PVC blind pipe in tubewell withstrainer BSS Class 'C' working pressure : 6" i/d

79.27 M 3,097.77 245555

6 24-30-a-04 Providing and Laying HDPE pipe

Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (40mm dia)

79.27 M 214.97 17040

7 NSI Provide/Installation of submersible pump 2.0 HP along with all accessories as directed by engineer incharge

1.00 job 29000 29000

8 NSI Shrouding with graded material 1.00 Job 7,500.00 7500

Total 503084

Say Rs:- 500000

Million 0.500

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

BOQ

INSTALLATION OF PRESSUR PUMP AT POLICE COLONY,NASIR BAGH

ROAD,PESHAWAR.

Earnest Money: - Rs. 10000/-

TMA Town-III

Town Officer (I&S)

Page 14: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Peshawar

Page 15: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

S.No Name of work: Unit Quantity Rate RS

1 Earth excavation in open cut upto 1.5m

depth for drains etc & disposal : in Hard

Soil (03-07-b)

M3 35.39 183.75 6503

2 Formation of Embankment from Borrow

Excavation in

Common Material including compaction by

power roller. (03-61-C)

M3 50.96 724.45 36920

3 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:4:8)(06-05-

M3 11.21 5481.08 61453

4 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:3:6)(06-05-h)

M3 43.33 6302.26 273049

5 Plain Cement Concrete including placing,

compacting,finishing & curing (Ratio

1:2:4)(06-05-f)

M3 11.21 7257.86 81387

6 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 6" dia:(23-01-

b)

M 9.146 1018.38 9314

7 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 9" dia:(23-01-

c)

M 12.805 1264.25 16189

8 06-06-b-03 RCC in raft foundation slab,

base slab of column & ret. wall etc, not

including in 06-06. Type C(1:2:4)

M3 0.850 8330.73 7077

9 Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)(06-07-c)

Ton 0.07 107564.41 7174

TOTAL Rs499,066

Say Rs500,000

In Million Rs0.500

BOQCONSTRUCTION OF DRAIN, CULVERT , STREET AT MASTER KOROONA MOHALLAH

GULAB USTAB ETC; REGI MALKANDHER

Page 16: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code
Page 17: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 (03-07-b) Earth excavation 37.17 M3 183.75 6829

2 (04-19-b) Dismantling PCC(1:3:6) 16.46 M3 1,787.81 29426

3 (06-05-i) PCC (1:4:8) 8.41 M3 5,481.08 46097

4 (06-05-f) PCC (1:2:4) 48.53 M37257.86 352216

5 (23-01-c) RCC Pipe 9" dia 9.15 M 1264.25 11563

6 (23-03-a-01) RCC Pipe 12" dia 7.32 M 2179.05 15944

7 (06-06-b-03) RCC in foundatin (1:24) 1.02 M3 8330.73 8493

8 (06-07-c) Steel

0.08 Tone 107564.41 8609

9(25-09)

Small iron work, such as gusset plates,

knees, bends, stirrups. 0.14Tone

154563.321639

Total 500817

Say Rs:- 500000

Million 0.50

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTION/REPAIR OF ROAD/STREET NEAR SABAH-UD DIN KHATTAK

(ADOVCATE)KOROONA ETC;JAMRUD LANE,UNIVERSITY TOWN PESHAWAR.

Earnest Money: - Rs. 10000/-

Page 18: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 1.0 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 (03-07-b) Earth excavation 44.60 M3 183.75 8195

2 (06-05-h) PCC(1:3:6) 23.19 M3 6,302.26 146162

3 (06-05-i) PCC (1:4:8) 58.40 M3 5,481.08 320120

4 (06-05-f) PCC (1:2:4) 58.40 M37257.86 423892

5 (23-01-c) RCC Pipe 9" dia 9.15 M 1264.25 11563

6 (23-03-a-01) RCC Pipe 12" dia 12.80 M 2179.05 27902

7 (06-06-b-03) RCC in foundatin (1:24) 2.27 M3 8330.73 18872

8 (06-07-c) Steel

0.18 Tone 107564.41 19131

9(25-09)

Small iron work, such as gusset plates,

knees, bends, stirrups. 0.16Tone

154563.324730

Total 1000569

Say Rs:- 1000000

Million 1.00

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTION OF STREET,DRAIN,CULVERT ETC AT KUCHA HAJI MEHMOOD,GUL AHMAD

ETC;MOHALLAH DAUDZAI,TEHKAL PAYAN.

Earnest Money: - Rs. 20000/-

Page 19: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

S.No Name of work: Unit Quantity Rate RS

1 Formation of

Embankment

from Borrow

Excavation in

Common

M3 84.94 724.45 61533

2 Plain Cement

Concrete

including

placing,

M3 28.03 5481.08 153632

3 Plain Cement

Concrete

including

placing,

M3 5.42 6302.26 34131

4 Plain Cement

Concrete

including

placing,

M3 28.03 7257.86 203468

5 Providing and

Laying RCC

pipe, moulded

with cement

concrete

M 12.805 1018.38 13040

6 Providing and

Laying RCC

pipe, moulded

with cement

M 18.293 1264.25 23127

7 06-06-b-03

RCC in raft

foundation

slab, base slab

M3 0.680 8330.73 5662

8 Supply &

fabricate M.S.

reinforcement

for cement

Ton 0.05 107564.41 5739

TOTAL Rs500,332

Say Rs500,000

In Million Rs0.500

BOQCONSTRUCTION OF STREET, DRAIN, CULVERT ETC; AT SHAH VELLAS

OPP: POLICE COLONY NASIR BAGH ROAD PESHAWAR

Page 20: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code
Page 21: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.30 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 25-46

Supplying and Fixing 18SWG Steel

Almirah, 12" max depth including box

shelves, back, shelves, lock, spray paint

complete

41.08 M2 7,412.23 304480

Total 304480

Say Rs:- 300000

Million 0.30

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

INSTALLATION OF SHELF IN ACCOUNTS BRANCH TMA TOWN-III PESHAWAR.

Earnest Money: - Rs. 6000/-

Page 22: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

S.No Name of work: Unit Quantity Rate RS

1 Earth excavation in open cut upto 1.5m

depth for drains etc & disposal : in Hard

Soil (03-07-b)

M3 22.56 183.75 4146

2 Formation of Embankment from Borrow

Excavation in

Common Material including compaction by

power roller. (03-61-C)

M3 216.59 724.45 156909

3 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:4:8)(06-05-

M3 47.65 5481.08 261174

4 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:3:6)(06-05-h)

M3 27.62 6302.26 174070

5 Plain Cement Concrete including placing,

compacting,finishing & curing (Ratio

1:2:4)(06-05-f)

M3 47.66 7257.86 345896

6 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 6" dia:(23-01-

b)

M 18.293 1018.38 18629

7 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 9" dia:(23-01-

c)

M 16.463 1264.25 20814

8 06-06-b-03 RCC in raft foundation slab,

base slab of column & ret. wall etc, not

including in 06-06. Type C(1:2:4)

M3 1.274 8330.73 10616

9 Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)(06-07-c)

Ton 0.07 107564.41 7174

TOTAL Rs999,428

Say Rs1,000,000

In Million Rs1.000

BOQCONSTRUCTION OF STREET, DRAIN, CULVERT ETC; AT GHAZI ABAD REGI LALMA

UC-MALKANDHER

Page 23: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code
Page 24: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

S.No Name of work: Unit Quantity Rate RS

1 Earth excavation in open cut upto 1.5m

depth for drains etc & disposal : in Hard

Soil (03-07-b)

M3 35.93 183.75 6602

2 Formation of Embankment from Borrow

Excavation in

Common Material including compaction by

power roller. (03-61-C)

M3 143.83 724.45 104196

3 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:4:8)(06-05-

M3 49.81 5481.08 272999

4 Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:3:6)(06-05-h)

M3 8.91 6302.26 56150

5 Plain Cement Concrete including placing,

compacting,finishing & curing (Ratio

1:2:4)(06-05-f)

M3 37.73 7257.86 273860

6 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 6" dia:(23-01-

b)

M 5.488 1018.38 5589

7 Providing and Laying RCC pipe, moulded

with cement concrete 1:1.5:3, including cost

of reinforcement, testing etc : 9" dia:(23-01-

c)

M 3.659 1264.25 4625

8 Providing and Laying RCC pipe sewers

complete As per

ASTM C-76-79, Class II : 12" i/d, Wall B

M 107.927 2179.05 235178

9 06-06-b-03 RCC in raft foundation slab,

base slab of column & ret. wall etc, not

including in 06-06. Type C(1:2:4)

M3 2.549 8330.73 21231

10 Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)(06-07-c)

Ton 0.20 107564.41 21523

TOTAL Rs1,001,953

Say Rs1,000,000

In Million Rs1.000

BOQCONSTRUCTION OF STREET, DRAIN, CULVERT, ECT; BACKSIDE OF SHINWARI

MARKET AT REGI LALMA

Page 25: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code
Page 26: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Completion Period As per work Order

S.No. Qty Unit Rate Amount (Rs).

1 113.62 M3 183.75 20,878 /-

2 49.85 M3 1,787.81 89,122 /-

3 793.44 M3 6,302.26 5,000,487 /-

4 18.29 M 1,264.25 23,127 /-

5 21.95 M 2,179.05 47,833 /-

6 9.06 M3 8,330.73 75,489 /-

7 0.71 Ton 107,564.41 76,525 /-

8 0.20 Ton 154,563.30 30,913 /-

9 163.48 M3 617.00 100,868 /-

Total 5,465,242 /-

Say Rs. 5,463,000 /-

Say Rs in Million 5.463

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017,

according to contractor Primium.

Contractor Premium % above/Below

BOQ

Esitmated Cost Rs. 5.463 (Million) Earnest Money Rs. 109,260 /-

Description.

Earth excavation in open cut upto 1.5m depth for drains etc

& disposal : in Hard Soil (03-07-b)

TMA Town-III

Dismantling : Plain Cement Concrete 1:3:6 (04-19-b)

Plain Cement Concrete including placing, compacting,

finishing & curing (Ratio 1:3:6)(06-05-h)

Providing and Laying RCC pipe, moulded with cement

concrete 1:1.5:3, including cost of reinforcement, testing etc :

9" dia:(23-01-c)

Providing and Laying RCC pipe sewers complete As per

ASTM C-76-79, Class II : 12" i/d, Wall B(23-03-a-01)

06-06-b-03 RCC in raft foundation slab, base slab of

column & ret. wall etc, not including in 06-06. Type C(1:2:4)

Supply & fabricate M.S. reinforcement for cement concrete

(Hot rolled deformed bars Grade 40)(06-07-c)

Peshawar

25-09 Small iron work, such as gusset plates, knees, bends,

stirrups, straps, rings etc excluding erection (25-09)

CONSTRUCTION/ IMPROVEMENT/ REPAIR OF DRAIN / CULVERTS AT TEHKAL BALA, UC-40Name of work:

Transportation all soil Types

Contractor Signature .

Town Officer (I&S)

Page 27: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 (03-07-b) Earth excavation 29.73 M3 183.75 5463

2 (06-05-h) PCC(1:3:6) 15.46 M3 6,302.26 97441

3 (06-05-i) PCC (1:4:8) 24.76 M3 5,481.08 135731

4 (06-05-f) PCC (1:2:4) 24.76 M37257.86 179730

5 (23-01-c) RCC Pipe 9" dia 9.15 M 1264.25 11563

6 (23-03-a-01) RCC Pipe 12" dia 9.15 M 2179.05 19930

7 (06-06-b-03) RCC in foundatin (1:24) 1.70 M3 8330.73 14154

8 (06-07-c) Steel

0.13 Tone 107564.41 14348

9(25-09)

Small iron work, such as gusset plates,

knees, bends, stirrups. 0.16Tone

154563.324730

Total 503092

Say Rs:- 500000

Million 0.50

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTION OF STREET,DRAIN,CULVERT ETC AT GHARIB ABAD SHAHEEN TOWN

PESHAWAR.

Earnest Money: - Rs. 10000/-

Page 28: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 NSI Mobilization of plant, equipment and camping

1.00 Job 7,000.00 7000

2 24-02-a-05 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d

30.49 M 2,075.85 63288

3 24-02-b-03 Tubewell boring in all soils except

shingle/rock From 100'to 200' below ground : 8" i/d

30.49 M 2,698.60 82274

4 24-02-c-03 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d

18.29 M 2,811.28 51426

5 24-12-b-01 Providing and installing PVC blind pipe in tubewell withstrainer BSS Class 'C' working pressure : 6" i/d

79.27 M 3,097.77 245555

6 24-30-a-04 Providing and Laying HDPE pipe

Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (40mm dia)

79.27 M 214.97 17040

7 NSI Provide/Installation of submersible pump 2.0 HP along with all accessories as directed by engineer incharge

1.00 job 29000 29000

8 NSI Shrouding with graded material 1.00 Job 7,500.00 7500

Total 503084

Say Rs:- 500000

Million 0.500

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

BOQ

INSTALLATION OF PRESSUR PUMP AT LANDI AKHOON AHMAD VC-191.

Earnest Money: - Rs. 10000/-

TMA Town-III

Town Officer (I&S)

Page 29: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Peshawar

Page 30: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 NSI Mobilization of plant, equipment and camping

1.00 Job 7,000.00 7000

2 24-02-a-05 Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d

30.49 M 2,075.85 63288

3 24-02-b-03 Tubewell boring in all soils except

shingle/rock From 100'to 200' below ground : 8" i/d

30.49 M 2,698.60 82274

4 24-02-c-03 Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d

18.29 M 2,811.28 51426

5 24-12-b-01 Providing and installing PVC blind pipe in tubewell withstrainer BSS Class 'C' working pressure : 6" i/d

79.27 M 3,097.77 245555

6 24-30-a-04 Providing and Laying HDPE pipeDin-8074/Din-8075/ISO-4427

including testing & disinfect complete (40mm dia)

79.27 M 214.97 17040

7 NSI Provide/Installation of submersible pump 2.0 HP along with all accessories as directed by engineer incharge

1.00 job 29000 29000

8 NSI Shrouding with graded material 1.00 Job 7,500.00 7500

Total 503084

Say Rs:- 500000

Million 0.500

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Town Officer (I&S)

Peshawar

BOQ

INSTALLATION OF PRESSUR PUMP AT MOHALLAH ANAN KHEL,SARBAND

Earnest Money: - Rs. 10000/-

TMA Town-III

Page 31: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 0.50 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 03-07-a

03-07-a Earth excavation in open cut

upto 1.5m depth for drains etc & disposal

: in Ordinary Soil

24.78 M3 147 3643

2 (25-42)25-42 Providing and Fixing barbed wire

fencing of1.5"x1.5"x3/16" angle iron post

3.25' long, 5 to 6 ft. centre to centre

213.41 M3 584.67 124774

3 (25-30 )25-30 Making and fixing steel grated

doors, complete withlocking

arrangements & angle iron frame

4.88 M2 8088.33 39471

4 (06-05-h)

06-05-h Plain Cement Concrete including

placing, compacting,

finishing & curing (Ratio 1:3:6)

52.73 M3 6302.26 332318

Total 500206

Say Rs:- 500000

Million 0.500

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

FENCING FOR JANAZGAH/QABRUSTAN MOHALLAH ANAN KHEL,SARBAND.

Earnest Money: - Rs. 10000/-

Page 32: BOQ Name of work: - CONSTRUCTION OF STREETS,DRAINS AND CULVERT … · 2019-08-08 · Name of work: - Estimated Cost Rs. 0.325 (M) Completion Period As per work Order S.No. Item Code

Name of work: -

Estimated Cost Rs. 1.0 (M)

Completion Period As per work Order

S.No. Item Code Description. Qty Unit MRS Rate Amount (Rs).

1 (03-07-b) Earth excavation 52.03 M3 183.75 9561

2 (06-05-h) PCC(1:3:6) 27.06 M3 6,302.26 170539

3 (06-05-i) PCC (1:4:8) 55.13 M3 5,481.08 302194

4 (06-05-f) PCC (1:2:4) 55.13 M3

7257.86 400154

5 (23-01-c) RCC Pipe 9" dia 12.80 M 1264.25 16189

6 (23-03-a-01) RCC Pipe 12" dia 9.15 M 2179.05 19930

7 (06-06-b-03) RCC in foundatin (1:24) 2.72 M3 8330.73 22647

8 (06-07-c) Steel

0.21 Tone 107564.41 22957

9(25-09)

Small iron work, such as gusset plates,

knees, bends, stirrups. 0.24Tone

154563.337095

Total 1001266

Say Rs:- 1000000

Million 1.00

1 The quantities are liable to be increased or decreased during execution/Site Condition.

2 Any additional / unforseen item necessiatated / cropped up during execution will be paid on MRS 2017 ,

according to contractor Primium.

Contractor Premium % above/Below On estimate Rates

Contractor Signature .

Peshawar

BOQ

Town Officer (I&S)

TMA Town-III

CONSTRUCTION OF STREET,DRAIN,CULVERT ETC AT MOHALLAH HASSAN, ZIA

SHERPAO,AFZAL ABAD,DANISHABAD ETC;UC-UNIVERSITY TOWN.

Earnest Money: - Rs. 20000/-