Sl. NoTNBP/
NBC No.Description of item/Work Unit QTY
CIVIL WORKS
PILE WORKS
1 BORED PILE WORKS (Cast in Situ)
30A Mobilisation of pile rig and its related equipments,bringing into site of all plant and machinery along withaccessories etc.. including transportation and installationof vertical cast in situ bored piles of following diameterusing reinforced cement concrete Design Mix M30 Gradeby setting the bored cast in situ pile equipments with allaccessories and tools at each locations based on thesequence of operations as directed by the Engineer-in-charge., boring for the piles from ground level in all soilsto the required depth below cut off level to carry a safeworking load not less than specified, by Direct Mud
Circulation Method ( using bentenite clay of required
density) inclusive of pile accessories, temporary casingpipe, bentenite solution of 10% of concrete with requireddensity and routine test as per IS 2911 (Part- IV) -1985 etc.complete as directed by the Engineer-in-charge..
excluding the cost of steel and fabrication reinforcementgrills but including Bentenite solution to carry safeworking load not less than specified, machinery charges,labour charges and assembling, erecting the equipmentand dismantling, trimming the pile concrete above cutofflevel, cleaning the debris & slushy, carting away thesurplus from the site inclusive of loading and unloadingof transportation, the cost of shoe and the length of the
pile to be embedded in the pile cap and removal of plantand machinery from site after completion of work. etc.,allcomplete, complying with relevant standard specificationand as directed by the Engineer-in-charge.. (Pile shall bemeasured from the top of the shoe to the bottom of thepile cap.)
Design Mix M30 Grade concrete should be prepared withordinary Portland Cement with water cement ratio notexceeding 0.45 including the use of Plasticizer of requiredGrade and Hard Broken Granite Stone Jelly of 20mm sizeand down graded as per requirement. Mix Design Datahas to be got approved by the Engineer-Incharge beforecommencement of work.
a 500mm dia pile of 98 MT safe load RMT 10419
b 600mm dia pile of 141 MT safe load RMT 6210
c 750mm dia pile of 220 MT safe load RMT 1380
ons ruc on o u s or es es en a a s an ce omp ex or a nnanagar es ern
![Page 2: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2/2939
2 Vertical load testing of piles in accordance with IS 2911 (part iv) including installation of loading platform andpreparation of pile head or construction of test capand dismantling of test cap after test etc, as perspecification and as directed by the Engineer-in-charge...
Initial test
a upto 100 tonne capacity pile. Nos. 5
b Above100 tonne and upto 200 tonne capacity pile. Nos. 5
c Above200 tonne and upto 400 tonne capacity pile. Nos. 1
Total of Bored Pile Works
EARTH WORK EXCAVATION
3 23 V, VIS2
Earth work excavation for foundation in all type of soilsand sub soils to the required depth as may be directedincluding dense soil, disintegrated/weathered/soft rocknot requiring blasting for Footings of columns, Pile capsand hydrant trenches, catch basins,collection chambers,boundary walls, security cabins, rainwater harvestingpit,Tennis court etc.including manual excavation forlevelling, dressing of sides and ramming of bottom withall leads and lifts,shoring,strutting and bailing out waterwherever necessary etc.all complete as directed byEngineer-Incharge.
a 0 to 2m depth. Cum 8786
b 2 to 3m depth. Cum 203
4 23 & 24 V,VI S2
Earth work excavation in open excavation in all type ofsoils including stiff clay for UG Sump. STP etc.,includinglevelling, dressing of sides and ramming of bottomwith all leads and lifts, shoring, strutting and bailing outwater wherever necessary etc.. all complete as
directed by Engineer-Incharge.
a 0 to 2m depth. Cum 1100
b 2 to 3m depth. Cum 550
c 3 to 4m depth. Cum 550
d 4 to 5m depth. Cum 550
e 5 to 6m depth. Cum 447
f 6 to 7m depth. Cum 1100
![Page 3: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/3.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 3/2939
5 24 & 25 V,VIS2
Supplying and filling in foundations and the areawherever specified with approved good quality fillingmaterials in plinths, area development etc. whereverspecified in layers of not exceeding 150 mm thickincluding breaking clods,storing,transportation ,doublehandling, watering, compacting each layer with vibratorycompactor and at un-accessible places with wooden/steelrammers to achieve 95% proctor density at optimummoisture content, all leads and lifts, bailing/ pumping outof water to keep site dry while backfilling; cost shallinclude conveyance of all materials, labour, machineryetc. complete as directed.The rate to includes loading,unloading, hire and fuel charges for tools and plants andother incidental charges etc., as complete with all respectscomplying with relevant standard specification, asdirected by the Engineer-in-charge.
a Approved quality gravel Cum 9888
b Approved quality river sand Cum 744
c Quarry dust Cum 11340
d Filling with excavated earth with necessary ramming Cum 36006 Carting away surplus earth/excavated material/debris
and like materials outside the site and disposing off thesame to the outside the city limit as directed by theEngineer-in-charge for dumping of suchmaterial,including spreading etc.,as per the norms by thelocal authorities.
Cum 7478
Total of Earth work Excavation Works
ANTI-TERMITE TREATMENT
7 Providing Pre - construction Anti - termite treatment andcreating a chemical barrier to the building by injectingchemical emulsion of required concentration under grade
slab and grade beam, all round the Pile Caps, Catchbasins, trenches, pits, tunnels, wall trenches, back fill,plinth filling, junction of wall and floor. Externalperimeter of building, surrounding of pipes, expansion joints, below U.G. sump and retaining/side walls etc. asper instructions of chemical manufacturer as directed bythe Department officer/ Architect. The treatment shall becarried out strictly in accordance with the technicalspecification and conforming to IS 6313 or equivalent BSspecification. The chemical to be used as insecticide forthe treatment shall be Biflex Tc, TC stands for TermiticideConcentrate for Termite Control (Bifenthrin) and theapplication shall be diluted 1 part of chemical Biflex Tc
with 49 parts of water to get 0.05% emulsion and strictlyin accordance with the manufacturer‟s specification.
![Page 4: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/4.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 4/2939
The work should be carried out by an approved andregistered specialist pest control agency only. Tenderer tofurnish the name of the proposed specialist firm. A 10years post application guarantee against defects shall befurnished by the main Contractor. Note : Horizontal planarea at ground floor level of the building will be measuredand paid.The chemical to be used for the treatment andconcentration of the chemical solutions should be as laiddown in IS - 6313 Part II.as directed by the Engineer-in-charge.
Sqm. 5115
Total of Anti Termite Works
CONCRETE WORKS
8 28 V, VIS2 (SS.A)
VII
Providing and laying plain cement concrete 1:5:10 (1 ofcement : 5 of course sand : 10 of hard broken stone jelly )using coarse graded aggregate of 40 mm for levellingcourse under floors ( Ground Floor level ) etc. includingform work wherever necessary and well compacted etc.all complete, as directed by the Engineer-in-charge...
Cum 421
9 28 V, VIS2 (SS.A)
VII
Providing and laying plain cement concrete 1:4:8 (1 ofcement : 4 of course sand : 8 of hard broken stone jelly)using coarse graded aggregate of 40 mm for levellingcourse under pilecaps, steps, walls, platform etc.including form work wherever necessary and wellcompacted etc. all complete, as directed. and as directedb the En ineer-in-char e..
Cum 210
10 28 V, VI(S2) (S5A)
VII
Providing and laying P.C.C. 1:3:6 (1 of cement : 3 ofcourse sand : 6 of hard broken stone jelly ) of specifiedthick wherever specified using river sand, 20mmincluding base reperation, Compaction, levelling fordrains, trenches and collection chamber all leads and lifts,curing for all structures at all locations etc., Complete
.(Footings)s and as directed by the Engineer-in-charge..
Cum 747
Total of Concrete Works
REINFORCED CEMENT CONCRETE (RMC)
DESIGN MIX CONCRETE
NOTE: RMC SHALL BE PROCURED FROM SITE
BATCHING PLANT
![Page 5: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/5.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 5/2939
11 Cement Concrete M30 Design Mix for all reinforcedcement concrete works namely Pile cap,Grade beam, RaftSlab,Retaining walls,Shear wall,RCC walls,Liftwalls,Plinth beams, Column,Column footings,Gradeslab,Roof slab & beam,Curved beams, Grid beams,Flatslab / Column drops,Pergola,Staircase waist and landingslab lintel, Sunshades, parapet cum drops, Steps,canopy,fin projects, window boxing slab, Loft,chajjas,Planterbox,Deck slab and other similar works and other similarstructures etc..using ordinary Portland cement of grade 53from approved manufacturer, river sand, 20mm anddown size coarse aggregates, necessary approvedadmixtures as per requirement and using fly ash contentnot excedding the 15 % in structural and non structuralworks excluding the cost of reinforcement grills,fabrication charges, shuttering and centering butincluding all leads and lifts,pumping using line pump orboom placer,
scaffolding wherever necessary,laying,vibrating,
finishing, curing etcall complete complying with relevant standardspecification & as directed by the Engineer-in-charge..Mix Design Data has to be got approved by the Engineer-in-charge. before commencement of work. etc. complete
(Design mix shall be as approved by the Engineer-in-
charge.)
M30 GRADE (Structural Concrete)
a In Foundation and Plinth
i Upto 1.5 M depth Cum 4451
ii From 1.5 M to 4.5 M depth Cum 396
iii From 4.5 M depth to 9 M depth Cum 97b Ground/Stilt Floor Cum 1527
c First Floor Cum 1478
d Second Floor Cum 1258
e Third Floor Cum 1127
f Fourth Floor Cum 428
g Fifth Floor Cum 298
h Sixth Floor Cum 298
i Seventh Floor Cum 298
j Eighth Floor Cum 298
k Ninth Floor Cum 298
l Tenth Floor Cum 298
m Eleventh Floor Cum 298n Twelfth Floor Cum 300
o Thirteenth Floor Cum 205
p Fourteenth Floor Cum 195
q Fifteenth Floor Cum 195
r Sixteenth Floor Cum 195
s Seventeenth Floor Cum 198
t Eighteenth Floor Cum 122
u Terrace Floor-1 Cum 76
![Page 6: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/6.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 6/2939
v Terrace Floor-2 Cum 68
12 Supplying and fixing of Precast slab for the followingthickness made in CC 1:1.5:3 (One cement, one and halffine aggregate and three coarse aggregate) using 12mmsize hard broken stone jelly including the cost of slab,moulding, laying,finishing smooth 6mm thick cementplaster 1:3 (one cement and three fine aggregate) onexposed surfaces, curing, transportation, pointing, andalso include for providing necessary MS angles ofrequired size based on the thickness of precast slab and tobe fixed on the edges of the precast slab includinggrouting the lugs with Cement concrete 1:1.5:3, forapproach slab and other similar works but excluding costof reinforcement and as directed by the Engineer-in-charge..
a 100mm thick Precast slab Sqm. 720
b 75mm thick Precast slab Sqm. 379
13 Providing, precasting and placing to the requiredgradient, M25 grade precast Concrete cover slab of 50mm
thick with perforation of size as specified in drawingsover storm water drain / trenches / ducts / pulloutchambers etc., as per the drawing includingreinforcement, addition of polypropelene fibers, casting inyards, curing, edge protection of all edges using ISA25x25x4, finishing all surfaces with all leads and lifts,transportation, placing, cost of PVC sleeves, MS hooks,finishing the joints with CM 1:3 curing etc., complete asdirected by Engineer-Incharge.
Sqm. 1971
14 Providing and fixing reinforcement for RCC work withThermo Mechanically Treated Bars (TMT) or equivalentHYSD bar of various diameters and grade of steel
conforming to IS 1786 latest version specificationincluding cutting and waste, bending, hoisting,fabricating and placing in position according to drawingsand binding the reinforcement with 18 gauge double foldGI binding wire and providing precast cement concrete /approved PVC cover blocks for placing thereinforcements in position and for maintaining the coverspecified and / or according to relevant IS codes.Rate toinclude transport from the plant to site of work etc.,complete as directed by the Engineer-in-charge..
![Page 7: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/7.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 7/2939
Note : Unless noted otherwise the measurements inaccordance with IS 1200. However reinforcement shall bemeasured only in lengths of bars as actually placed inposition on standard weight basis, no allowance beingmade in the weight for rolling margin. Authorised lapsand splices only will be measured. Chairs of any shape &profile, Spacer bar of any shape & profile, cover block,wastage and binding wire will not be measured and shallbe included in the quoted rates. Quoted rate shall bedeemed to have considered the above stipulation. Quotedrate to include lead, lift, placing at all levels and asdirected.
a Grade of reinforced steel - Fe 500 - TMT bars MT 2925
Total of RCC Works
FORM WORK
15 Supplying and erecting centering for sides and soffitsincluding supports and strutting up to 3.30 m height withall cross bracing for plane surfaces as detailed below,using mild steel sheets of 90 X 60 cm 10 gauge stiffened
with MS angle of 25 X 25 X 3mm for boarding, laid overadjustable span & jacks and supported by 50mm dia pipesfor general pipes scaffolding systems @ a spacing of 1.20mc/c and vertical connected at a height of 2.0m c/cincluding 'C' & 'U' clamps and base receiver cup at bottomfor connecting pipes etc and removable systems etccomplete.
a 30(S) 86 86A V, VI(S3) VII
All reinforced cement concrete Footings, plinth beam, pilecap, staircase steps, sill beam, grade beams & slab etc.
Sqm. 9920
b Columns,(Rectangular/Square) chajjas, loft andsunshades etc for all floors
Sqm. 22708
c Lintels, conventional slab & beams, staircase waist slab &landings, pergolas, etc for all floors
Sqm. 42757
d Walls (any thickness) including, core walls, shear wall,retaining wall, parapet wall etc. for all floors.
Sqm. 3648
16 Extra for additional height in centering, shutteringwherever required with adequate bracing, propping etc.including cost of de-shuttering and decentring at alllevels, over a height of 3.30m ( height shall be thedimension as measured from the top of the lower slab /pcc sub base to the bottom of the subsequent upper slab /soffit of the beam as the case may be.) , for every
additional height of 1m or part thereof for: (Plan area tobe measured). Suspended floors, flat slabs, drops, posttensioned slabs, slabs curved in plan to any radius, gridslab, roofs, landings, beams including spiral and curvedbeams of all radius, post tensioned beams, grid beams,plinth beams, girders, bressumers, cantilevers andbalconies.
Sqm. 11153
Total of Formwork Works
MASONRY WORKS
![Page 8: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/8.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 8/2939
17 31 &similar to31C V, VI(S5) VII
Brick work with II class ground moulded well burntchamber bricks of size 9"x4-1/2"x3" (23x115x7.5 cm)withminimum compressive strength of 50 Kg per Sq.cm. incement mortar 1:5 (1cement : 5 coarse sand) etc. completeand as directed by the Engineer-in-charge.. - ForFoundation and Basement
Cum 906
18 31 &similar to31C V, VI(S5) VII
Brick work with II class ground moulded well burntchamber bricks of size 9"x4-1/2"x3" (23x115x7.5 cm) withminimum compressive strength of 50 Kg per Sq.cm. incement mortar 1:6 ( 1cement : 6 coarse sand) forsuperstructure at all levels etc. complete and as directedby the Engineer-in-charge..
a Ground/Stilt Floor Cum 58
b First Floor Cum 40
c Second Floor Cum 33
d Third Floor Cum 33
e Fourth Floor Cum 33
f Fifth Floor Cum 35
g Sixth Floor Cum 35
h Seventh Floor Cum 35
i Eighth Floor Cum 35
j Ninth Floor Cum 35
k Tenth Floor Cum 35
l Eleventh Floor Cum 35
m Twelfth Floor Cum 26
n Thirteenth Floor Cum 26
o Fourteenth Floor Cum 26
p Fifteenth Floor Cum 26
q Sixteenth Floor Cum 30
r Seventeenth Floor Cum 13
s Eighteenth Floor Cum 15
19 35-J&K Providing and constructing Cement Concrete Solid BlockMasonry in cement mortar 1:5 ( one cement and fivecoarse sand ) 190mm thick for Foundations using precastmachine moulded blocks using standard size of 390 x 190mm of solid cement concrete blocks with minimumcompressive strength of 5N / Sq.mm conforming to IS2185 or equivalent BS including all scaffolding, staging,curing, and all leads etc. complete and as directed by theEngineer-in-charge..
Sqm. 188
20 35-J&K Providing and constructing Cement Concrete Solid Block
Masonry in cement mortar 1:6 ( one cement and fivecoarse sand ) 190mm thick for Super structure in thefollowing floors using precast machine moulded blocks atall levels using standard size of 390 x 190 mm of solidcement concrete blocks with minimum compressivestrength of 5N / Sq.mm conforming to IS 2185 orequivalent BS including all scaffolding, staging, curing, alllifts and leads etc. complete and as directed by theEngineer-Incharge.
a Ground/Stilt Floor Sqm. 1859
b First Floor Sqm. 913
c Second Floor Sqm. 976
![Page 9: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/9.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 9/2939
d Third Floor Sqm. 650
e Fourth Floor Sqm. 382
21 Providing and constructing Cement Concrete Solid BlockMasonry in cement mortar 1:5 ( one cement and fivecoarse sand ) 90mm thick in the following floors usingprecast machine moulded blocks at all levels usingstandard size of 390 x 190 mm of solid cement concrete
blocks with minimum compressive strength of 5 N/Sq.mm conforming to IS 2185 or equivalent BS includingall scaffolding, staging, curing, all lifts and leads etc.complete and as directed by the Engineer-in-charge.
a Ground/Stilt Floor Sqm. 25
b First Floor Sqm. 13
c Second Floor Sqm. 45
d Third Floor Sqm. 35
22 Providing and constructing Glass Block masonry work atall levels in Fire escape staircase wherever necessary (asper drawing), to be set in sealent of approved qualityusing standard size of 190x190x80 mm of Glass Brick of
approved vendor of approved by Engineer-in-charge /Consultant, manufactured as per Manufacturer'sspecification etc.. Rate shall include accessories forsupporting the system Polystyrene foam over an ezylayframe, Acc-Speed jamb connectors and straightconnectors, galvanised reinforced rods and necessarystaging and scaffolding arrangement, verticality (Plumblevel) of the walls, Skilled labour,loading and unloading,lead & Lift, Tools & Plants, Finishing and curing etc. ascomplete in all respects complying with relevant standardspecifications and as directed by the Engineer-in-charge..
Sqm. 116
23 31c Providing and constructing 115 mm. thick, masonry wall,at all levels, with approved best quality well chamberburnt moulded bricks(230X115X75mm), with minimumcompressive strength of 50 Kg / Sq.cm, in Cement Mortar1:4 with M20 reinforced cement concrete binders - 80 mmthick, using coarse graded aggregate of 12 mm and down-size, reinforced with 4 nos. of 8 mm dia. Fe-500 grade steel-and 6 mm dia. Mild steel stirrups at 200 mm c/c, andbinders placed at 2 M intervals. Rate shall include for costof reinforcements and tying in postion using binding wiremade out of 18 gauge G.I. annealed only or 18 gauge S.S.,form work, scaffolding, raking out joints, curing etc
complete as directed by the Engineer-in-charge..
a Ground/Stilt Floor Sqm. 74
b First Floor Sqm. 37
c Second Floor Sqm. 17
d Third Floor Sqm. 17
e Fourth Floor Sqm. 17
f Fifth Floor Sqm. 17
![Page 10: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/10.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 10/2939
g Sixth Floor Sqm. 17
h Seventh Floor Sqm. 17
i Eighth Floor Sqm. 17
j Ninth Floor Sqm. 17
k Tenth Floor Sqm. 17
l Eleventh Floor Sqm. 17
m Twelfth Floor Sqm. 17
n Thirteenth Floor Sqm. 17o Fourteenth Floor Sqm. 17
p Fifteenth Floor Sqm. 17
q Sixteenth Floor Sqm. 23
r Seventeenth Floor Sqm. 9
s Eighteenth Floor Sqm. 24
24 Providing and constructing Autoclaved Cellular
(Aerated) Concrete Blocks work at all levels, in cementmortar 1:4 using standard size of 400 x 200 mm , as perapproved manufacturer's specification etc. complete andas directed. Blocks manufactured under strict qualitycontrol conditions confirming to IS 2185 - Part - 3 latest
version shall be used. Rate shall include the following:
a) Fixing the panels at all levels and supported on slabsoffit with suitable arrangement including necessarystaging, scaffolding arrangement, alignment andverticality (plumb level) of the walls. Rate Shall alsoinclude cutting necessary grooves / chases of requiredsize and at required height for concealing electrical,plumbing, conduits / pipes, holdfasts, bolts etc. andmaking good surfaces after concealing is complete.
b)Grouting of cores in blocks to complete course for fixing
of frames and all joinery works etc complete, as directed.All materials required to carry out all related worksincluding specialised work required around and aboveopening to receive the Frame and to ensure that the loadof the panels are not transferred on to the frames orshutters of the doors, windows and ventilators so as toavoid bending of door frames/shutters and affecting theopening / closing operation of the door shutter. etccomplete and as directed.
c) Finished work should be sand papered to receiveplaster and any unevenness or undulations on the blockshould be made good by the application putty
) If required to do so the test at an approved laboratory toensure the compression strength of blocks confirming toIS standardsRate shall include accessories for supporting the systeminto the ceiling with cleats & Anchor fasteners,scaffolding, loading and unloading, lead & Lift, Tools &Plants etc. complete and as directed.
i Autoclaved Cellular (Aerated) Concrete Blocks wall of
200 mm thick
a Ground/Stilt Floor Sqm. 1938
![Page 11: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/11.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 11/2939
b First Floor Sqm. 1587
c Second Floor Sqm. 912
d Third Floor Sqm. 744
e Fourth Floor Sqm. 744
f Fifth Floor Sqm. 754
g Sixth Floor Sqm. 754
h Seventh Floor Sqm. 754
i Eighth Floor Sqm. 754 j Ninth Floor Sqm. 754
k Tenth Floor Sqm. 754
l Eleventh Floor Sqm. 754
m Twelfth Floor Sqm. 678
n Thirteenth Floor Sqm. 487
o Fourteenth Floor Sqm. 407
p Fifteenth Floor Sqm. 407
q Sixteenth Floor Sqm. 507
r Seventeenth Floor Sqm. 301
s Eighteenth Floor Sqm. 256
t Terrace Floor-1 Sqm. 262u Terrace Floor-2 Sqm. 323
ii Autoclaved Cellular (Aerated) Concrete Blocks wall of
100 mm thick
a Ground/Stilt Floor Sqm. 29
b First Floor Sqm. 287
c Second Floor Sqm. 305
d Third Floor Sqm. 305
e Fourth Floor Sqm. 305
f Fifth Floor Sqm. 281
g Sixth Floor Sqm. 281
h Seventh Floor Sqm. 281
i Eighth Floor Sqm. 281 j Ninth Floor Sqm. 281
k Tenth Floor Sqm. 281
l Eleventh Floor Sqm. 281
m Twelfth Floor Sqm. 277
n Thirteenth Floor Sqm. 277
o Fourteenth Floor Sqm. 277
p Fifteenth Floor Sqm. 277
q Sixteenth Floor Sqm. 336
r Seventeenth Floor Sqm. 115
s Eighteenth Floor Sqm. 100
t Terrace Floor-1 Sqm. 3
![Page 12: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/12.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 12/2939
25 Extra rate over & above Solid Masonry wall for providingR.C.Binder - 80 mm thick with M20 reinforced cementconcrete using coarse graded aggregate of 12 mm anddownsize, reinforced with 4 nos. of 8 mm dia. Tor steeland 6 mm dia. Mild steel stirrups at 200 mm c/c andbinders placed at intervals not more than 1000 mm,including cost of reinforcements and tying in positionusing binding wire made out of 18 gauge GI annealedonly or 18 gauge SS, form work, scaffolding, all labour,hire and fuel charges for all tools and plants employedand all other incidental charges etc. all complete, asdirected by the Engineer-in-charge.
a Solid block wall of 200mm thick for all floor. Rmt 17837
b Solid block wall of 100mm thick for all floor Rmt 4929
Total of Masonry Works
IRON AND STEEL WORKS
26 86 & 86A Supply and fixing in position Hot rolled structural steelMembers / Sections at all levels and to any shape &profile consisting of MS joists, channels, angles, purlins,
runners, insert plates, flats and sag rods with necessarysleeves, bolts and nuts, gratings, pipes including cutting,straightening, welding as per standards for connectionsincluding consumables etc.complete. Rate shall includepreparation of surface, All MS members shall be paintedwith anti corrosive, low VOC PU paint (metallic finish)with compatible primer to a minimum film thickness of 75microns and 2 coats of low VOC PU paint and total dryfilm thickness 225 microns etc. all complete, as directed bythe Engineer-in-charge..
MT 260
27 Providing and fixing in position Hot rolled structural steelMembers / Sections at all levels and to any shape &profile consisting of MS joists, channels, angles, purlins,runners, insert plates, flats and sag rods with necessarysleeves, bolts and nuts, gratings, pipes including cutting,straightening, welding as per standards for connectionsincluding consumables etc.complete. Rate shall includepreparation of surface, applying two coats of Zincchromate/Phosphate primer before and after erection andtwo coats of first quality synthetic enamel paint ofapproved make after erection, sand blasting etc. complete,as directed by the Engineer-incharge.
MT 42
![Page 13: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/13.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 13/2939
28 86 & 86A Supplying, fabricating and placing in positionM.S.chequered plate of required thickness for duct
closing and shafts closing at all floors at all levels withnecessary supports such as M.S. angles/M.S. flatsincluding stiffeners to be placed on angle iron framework. (Frame work, angles, stiffeners will be measuredunder relevant structural steel item). Rate shall includemaking necessary cutouts for inserts, All MS membersshall be painted with anti corrosive, low VOC PU paint(metallic finish) with compatible primer to a minimumfilm thickness of 75 microns and 2 coats of low VOC PUpaint make and total dry film thickness 225 microns. etcall complete complying with relevant standardspecifications & as directed by the Engineer-Incharge.
MT 30
29 86 & 86A Providing and fixing welded M.S. grills to the window
openings,along the compound wall details as per drawingwith necessary screws, bolts and fixed with necessaryM.S. lugs embedded in masonry with C.C. 1:2:4 andfinishing the surface neatly. Rate shall include for two
coats of first quality synthetic enamel paint over a coat ofzinc phosphate primer, necessary tools & plants, weldingand consumables, etc. complete, as directed. Design ofgrills and the size of members to be used shall be gotapproval before put into use & as directed by theEngineer-in-charge.
MT 60
30 84A Supplying and fixing Motorised rolling shutters fromapproved fabricator as per IS 6248 made out of electrogalvinized/ galvolume laths of 75 x 1.20 mm size dulyinterlocked together through their entire length includingperforated galvolume lath strip at 1000mm lenght fromstandard eye level in the amid of shutter and jointedtogether at the end by end locks mounted plate witharrangements for inside and outside locking with pushand pull operation, suspension pipe shaft roller steel pipeconforming to heavy duty as per IS 1161 shall be designeddeflection shall not be exceed 5mm per 1m width withM.S. brackets plate size not less than 450 x 450 x 6 mm,M.S. side guide channel thichness shall not be less than3.14mm with necessary depth as per IS 6248. Rateincluding the cost of providing and fixing necessary goodquality high tensile steel wire springs.
Rate including 0.9mm thick GI sheet top cover. Rate
includes one coat of grey epoxy primer and automationsystem comprising of side one operator with manualchain override in case of power failure and key selectoretc.. all complete as directed by Engineer-Incharge.
Sqm. 72
![Page 14: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/14.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 14/2939
31 Supplying and fixing in position of M20 grade 2.28m longRCC precast concrete struts of size 150 mm x 150 mm and125 mm x 125 mm for bottom and top respectively usingand 20 mm and down graded metal for Chain link fencingincluding necessary shuttering for precasting, oiling,concreting and removing, curing appropriately, includingthe cost of fabricating and fixing of reinforcements 4 nosof 8 mm dia as main rods and 8mm dia stirrpus at 150mm ctc. The struts are to be laid in position vertically ordiagonally as shown in drawing. The rate shall includethe cost of conveyance, material, labour and duties , taxesetc all complete as directed by Engineer-Incharge.
Nos 426
32 Providing, supplying and fixing GI Chain link 50 x50mm using 10 gauge with posts of specified material andof standard design placed steel wire fabric fixed betweenthe posts fitted and fixed with G.I. staples / G.I Boltscomplete all as per specifications and drawings and asdirected at site.
Sqm. 614
33 Providing and fixing pre-polished Stainless steel railingusing 50mm dia bent to shape as shown in drawing and32mm dia for vertical and 25mm dia three bracing bar asper drawing. Rate shall be inclusive of fixing the railinginto the concrete surface with necessary hardware's, SScaps, grouting for the same etc. complete.(forstaircase,balcony,open to sky) and as per drawing SS shallconforming of grade AISI 304.etc. all complete, as directedby the Engineer-in-charge
Kgs 11725
34 Providing and fixing of GI hand railing , in general it shallbe made with 50mm dia bend to shape as shown indrawing fixed at top and three 25mm dia pipe for bracing
bar as per drawing. Vertical post shall be 32mm dia Rateshall be inclusive of fixing the railing into the concretesurface with necessary hardware's, GI caps, grouting forthe same etc. complete. The rate shall be inclusive offinishing the GI surfaces with Duco paint of approvedcolor to the required level after the base prepration(forstaircase height 1050mm) etc. all complete, as directed bythe Engineer-in-charge
Rmt 939
![Page 15: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/15.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 15/2939
35 86,86A Supplying, fabricating, erecting and fixing in positiongates , bottom rail for gates, monkey ladders and allmiscellaneous steel works as shown in the drg. or asdirected by the Engineer at all heights and depths aboveand below finished floor level using MS angles channels,rails, tees, plates, flats, rounds, squares etc., of varioussizes and other structural steel sections including,straightening, cutting, fabricating, welding, bending toshape bolting, fixing in position, welding to insert plateembedded in concrete and inclusive of the followingfinishes : I) Sand blasting as specified ii) 2 Coats of epoxypaint over one coat of red oxide primer. etc. all complete,as directed by the Engineer-in-charge
MT 4
Total of Iron & Steel Works
FLOORING WORKS
36 28 & 39 H Providing and laying in panels not more than 20 sqm. inplan granolithic flooring with cement concrete 1:2:4 byusing coarse graded aggregate of 6 to 12 mm size laidmonolithic with floor concrete and finished smooth with
power trowel including preparation of concrete surfaceand form work. The screed shall be laid for effectiveseparation of panels not exceeding 20 sqm. in plan etc.complete as per Specifications and as directed.Unevenness in floor finish shall not exceed +2mm in onesquaremetre area. Rate to include lead , lift at all levels,pumping, placing, necessary formwork, curing etc., allcomplete, as directed by the Engineer-in-charge
a 50 mm thick. Sqm. 3241
b 40 mm thick. Sqm. 1255
37 Providing and laying self levelling epoxy of 1000 micron
thick joint less floor topping from approved make,application over the granolithic flooring as per approvedmanufacturer's specification, including preparation ofsurface, application, wastage, equipment, tools andplants, work at all levels etc. complete as directed by theEngineer-in-charge..
Sqm. 777
38 Providing flooring with best quality approved make White ceramic tiles ranges, Size of tiles shall be 6mmthick of 305 x 305 mm size set in CM 1:4, 20mm thick andpointing the joints with Laticrete and pointing withLaticrete of approved make and as directed. Rate shallinclude for preparation of base surface, and finishing thesurface, cleaning the surface, and protecting and with
Gypsum / POP layer over Plastic sheet and removing thesame before handing over, work at all levels etc. ascomplete in all respects and complying with relevantstandard specifications and as directed by the Engineer-in-charge..( Over Head Tanks & U.G.Sump)
Sqm. 715
![Page 16: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/16.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 16/2939
39 39A Providing and fixing wall dado with best qualityapproved make White Glossy ceramic tiles ranges, sizes150 x 150 mm x 6 mm thick set in CM 1:2, 10mm thick andpointing with white cement and as directed. Rate shallinclude for preparation of base surface, and finishing thesurface, cleaning the surface, work at all levels etc. ascomplete in all respects and complying with relevantstandard specifications and as directed by the Engineer-incharge.( Over Head Tanks & U.G.Sump)
Sqm. 1158
Total of Flooring Works
INTERNAL & EXTERNAL FINISHES
40 56&57 Plastering to R.C walls, slabs, peripheral beams andcolumns with Cement Mortar 1:3,(1cement : 3 fine sand)10 mm thick according to the specification. Rate shallinclude for necessary hacking,staging,scafolding andcuring at all levels and elevations etc.complete as directed.and as directed by the Engineer-incharge.
Sqm. 26204
41 56&57 Plastering for external surfaces with 12 mm thick in
Cement Mortar 1:5 (1 cement : 5 fine sand ) and asdirected. Rate shall include for include for providing andfixing of GI plastermesh and corner bead inludingnecessary hacking,staging,scafolding and curing at alllevels and elevations and for providing drip bands /moulds / grooves to any size and shape as directed by theEngineer-in-charge..
Sqm. 81634
42 63 Applying white washing three coats to ceilings and wallswith pure shell lime or fat lime conforming to IS-712 all asper Specification including cost of lime, brush etc..complying with relevant standard specification, asdirected by the Engineer-in-charge. .
Sqm. 11741
43 Providing and applying External texture paint ofapproved colour and Granito Spray (1947) of Spectrumpaints or equivalent approved make . Rate shall includesurface preparation, with two coats of primer and 2 coatsof natural granite based approved Granito Spray (Greycolour) Paint followed by two coats of silicon based clearcoat for excellent weatherability and contrast grooves asper manufacturer specification with necessarystaging,scaffolding etc..as complete in all respectscomplying with relevant standard specifications and asdirected by the Engineer-in-charge..
Sqm. 7037
![Page 17: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/17.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 17/2939
44 Providing and applying External texture paint ofapproved colour and Granito Smooth (1901) of Spectrumpaints or equivalent approved make . Rate shall includesurface preparation, with two coats of primer and 2 coatsof sand,silica and mica based approved Texture Paintfollowed by two coats of silicon based clear coat forexcellent protection and weatherability and contrastgrooves as per manufacturer specification with necessarystaging,scaffolding etc..as complete in all respectscomplying with relevant standard specifications and asdirected by the Engineer-in-charge..
Sqm. 645
45 Providing and applying External texture paint ofapproved colour and Rustic fine (1004) texture ofSpectrum paints or equivalent approved make . Rate shallinclude surface preparation, with two coats of primer and2 coats of approved Texture Paint followed by two coatsof silicon based clear coat for excellent protection andweatherability and contrast grooves as per manufacturerspecification with necessary staging,scaffolding etc..as
complete in all respects complying with relevant standardspecifications and as directed by the Engineer-in-charge..
Sqm. 8058
46 Providing and applying External texture paint ofapproved colour and Spray coat bubble (1018) texture ofSpectrum paints or equivalent approved make . Rate shallinclude surface preparation, with two coats of primer and2 coats of approved Texture Paint followed by two coatsof silicon based clear coat for excellent protection andweatherability and contrast grooves as per manufacturerspecification with necessary staging,scaffolding etc..ascomplete in all respects complying with relevant standard
specifications and as directed by the Engineer-in-charge..
Sqm. 8058
47 Providing and applying External Emulsion paint ofapproved colour of Compo Silicon W55 of SKKAKEN orequivalent make. Rate shall include surface preparation,with two coats of primer followed by 2 coats of siliconbased approved emulsion paint for excellent protectionand weatherability as per manufacturer specification withnecessary staging,scaffolding etc..as complete in allrespects complying with relevant standard specificationsand as directed by the Engineer-in-charge..
Sqm. 4096
Total of Internal & External Finishes Works
WATERPROOFING WORKS
48 Treatment to side wall, base slab of Lift pit from exteriorsurface covering the following sequence of operations :
![Page 18: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/18.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 18/2939
Providing and applying 3 coats of crystallinewaterproofing slurry containing highly active, deeppenetrative, reactive catalysts and shall have a mixdensity of 2.0 kg/litre.. The product shall be applied in 3coats one over the other at a time gap of 4 to 6 hoursdepending on the climatic conditions, including curing ofthe same for at least 5 days fog spraying water. Rate isinclusive of material and labour. ProvidingCovings/Chamfers at junction of slab and wall with75mm X 75 mm fillet with cement sand mortar 1:2 mixedwith polymer modifier of styrene-butadiene co-polymerlatex liquid, produced from styrene and butadiene byhigh pressure emulsion polymerisation @ 5 L per bagcement. The product shall have minimum butadienecontent of 40% by weight. Protective Plaster: The coatedsurface should be protected with 1:3CM admixed withlignosulphonate polymer based, waterproofing cumplasticing liquid integral waterproofer at a dosage of 100ml per 50 kg of cement and shall comply with IS: 2645-2003. Treat the construction joints wherever necessary as
per below item specification.
Rate shall include for preparation of surface bymechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,scaffolding, waterproofing chemicals, wastage,conveyance, tools and plants, mixing device and gauge,Shuttering etc.as complete with all respects complyingwith relevant manufacturer's specification as directed bythe En ineer-in-char e.
Sqm. 233
49 Treatment to side wall,base slab of UG sump fromexterior surface covering the following sequence of
operations :Providing and applying 3 coats of of crystallinewaterproofing slurry containing highly active, deeppenetrative, reactive catalysts and shall have a mixdensity of 2.0 kg/litre. The product shall be applied in 3coats one over the other at a time gap of 4 to 6 hoursdepending on the climatic conditions, including curing ofthe same for at least 5 days fog spraying water. ProvidingCovings/Chamfers at junction of slab and wall with75mm X 75 mm fillet with cement sand mortar 1:2 mixedwith polymer modifier of styrene-butadiene co-polymerlatex liquid, produced from styrene and butadiene byhigh pressure emulsion polymerisation @ 5 L per bagcement. The product shall have minimum butadienecontent of 40% by weight. Protective Plaster: The coatedsurface should be protected with 1:3CM admixed withlignosulphonate polymer based, waterproofing cumplasticing liquid integral waterproofer at a dosage of 100ml per 50 kg of cement and shall comply with IS: 2645-2003. Treat the construction joints wherever necessary asper below item specification.
![Page 19: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/19.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 19/2939
Rate shall include for preparation of surface bymechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,scaffolding, waterproofing chemicals, wastage,conveyance, tools and plants, mixing device and gauge,Shuttering etc.as complete with all respects complyingwith relevant manufacturer's specification as directed bythe Engineer-in-charge.
Sqm. 1919
50 Treatment for STP tanks covering the following sequenceof operation :
The STP tanks has to be protected with High build, pitchextended epoxy coating which shall be formulated toresist exposure to accelerated weathering test as perASTM D4587 and shall not exhibit any flaking orblistering. It shall be a 100% solids, solvent free, toughabrasion resistant protective coating used over pile caps.The product shall exhibit excellent bond strength with thesubstrate at least exceeding 2.5 MPa, when tested as perASTM D4541. The product shall be formulated to have
high build thickness exceeding 150 microns per coat onaverage and shall be applied to achieve overall thicknessof 300 microns in two coats.
Rate shall include for preparation of surface bymechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,scaffolding, waterproofing chemicals, wastage,conveyance, tools and plants, mixing device and gauge,Shuttering etc.as complete with all respects complyingwith relevant manufacturer's specification as directed bythe En ineer-in-char e.
Sqm. 1194
51 Treatment to side wall,base slab of OH Tank fromexterior surface covering the following sequence ofoperations :Providing and applying 3 coats of a two componentreactive polymer composite. The product shall be appliedin minimum three coats to achieve total DFT of 2 mm. Theproduct shall resist 7 bars pressure when tested as perDIN 1048 at 2mm DFT. The cured coating shall have thefollowing diffusion co-effiecient. Carbon dioxide – 4.21x107 cm2/s Oxygen – 7.60x10-6 cm2/s Chloride ion – 1.04x107 cm2/s. Rate is inclusive if material and labour.Providing Covings/Chamfers at junction of slab and wallwith 75mm X 75 mm fillet with cement sand mortar 1:2mixed with polymer modifier of styrene-butadiene co-polymer latex liquid, produced from styrene andbutadiene by high pressure emulsion polymerisation @ 5L per bag cement. The product shall have minimumbutadiene content of 40% by weight.
![Page 20: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/20.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 20/2939
Protective Plaster: The coated surface should be protectedwith 1:3CM admixed with lignosulphonate polymerbased, waterproofing cum plasticing liquid integralwaterproofer at a dosage of 100 ml per 50 kg of cementand shall comply with IS: 2645-2003. Treat theconstruction joints wherever necessary as per below itemspecification.Rate shall include for preparation of surfaceby mechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,scaffolding, waterproofing chemicals, wastage,conveyance, tools and plants, mixing device and gauge,Shuttering etc.as complete with all respects complyingwith relevant manufacturer's specification as directed bythe Engineer-in-charge.
Sqm. 607
52 Treatment to sunken slab and its walls covering thefollowing sequence of operations
Providing and applying 3 coats of a two componentreactive polymer composite. The product shall be applied
in minimum three coats to achieve total DFT of 2 mm. Theproduct shall resist 7 bars pressure when tested as perDIN 1048 at 2mm DFT. The cured coating shall have thefollowing diffusion co-effiecient.Carbon dioxide – 4.21x107 cm2/sOxygen – 7.60x10-6 cm2/sChloride ion – 1.04x10-7 cm2/s.Rate is inclusive if material and labour. ProvidingCovings/Chamfers at junction of slab and wall with75mm X 75 mm fillet with cement sand mortar 1:2 mixedwith polymer modifier of styrene-butadiene co-polymerlatex liquid, produced from styrene and butadiene byhigh pressure emulsion polymerisation @ 5 L per bagcement.
The product shall have minimum butadiene content of40% by weight. Protective Plaster: The coated surfaceshould be protected with 1:3CM admixed withlignosulphonate polymer based, waterproofing cumplasticing liquid integral waterproofer at a dosage of 100ml per 50 kg of cement and shall comply with IS: 2645-2003. Treat the construction joints wherever necessary asper below item specification.( Note: Wall upto 1 M ht )
Rate shall include for preparation of surface bymechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,scaffolding, waterproofing chemicals, wastage,conveyance, tools and plants, mixing device and gauge,Shuttering etc.as complete with all respects complyingwith relevant manufacturer's specification as directed bythe Engineer-in-charge.
Sqm. 2396
53 Water proofing treatment over RCC roof slab laid to
slope in terrace and gutter slab with Thermal Insulation
covering the following sequence of operation andspecifications:
![Page 21: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/21.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 21/2939
a) SURFACE PREPARATION: The roof slab laid in slope/ gutter slab shall be thoroughly cleaned by removing thedebris and dust, to receive the water proofing treatment.The cleaning and preparation of the substrate to whichthe asphalt-modified polyurethane based membranesystem is applied must be carried out thoroughly to leavea sound base for the application. Any laitance present onthe surface must be removed mechanically. Release oiland other contaminants which may impair adhesion mustbe removed prior to the application of the primer.
b) Waterproofing Membrane: Providing and applyingliquid, cold-applied elastomeric waterproofing membranesystem a single component moisture curing, asphalt-modified polyurethane based coating that cures byreaction with atmospheric moisture to form a tough butflexible waterproofing membrane. It is elastomeric,seamless waterproof membrane applied in 1 or 2 coats toa total DFT of 1.20 mm thick, having an elongation
capacity of over 600%(ASTM D 412) and with solidcontent more than 85% applied on the RCC surfaceincluding priming (if required), crack filling, grouting, tierod filling, coving, ponding etc complete. It shall resistbacterial attack and many acids, alkalis and salts. It shallhave a yield of 0.61-0.74 m2/L at 1.1 – 1.4mm drythickness SEPARATION LAYER: Providing and laying aseparation layer of non-woven polypropylene geo-textileof 200 gsm over the entire surface of insulation board.
-
c) INSULATION BOARD: Supplying and installation ofExpanded polystyrene board for thermal insulation on the
terrace of approved make. The insulation board shall beshape moulded and the insulation board shall avoidthermal bridging and have Tongue & groove arrangementfor fixing. The board shall have a K-value of 0.032 W/mKand Water Absorption of (% vol) : <0.05% (by totalimmersion) as per BS EN 12087.The board shall be freefrom CFC, HCFC and HFC. The board shall be selfextinguishing and shall have HF1 rating as per UL94 Teststandard. The Actual area covered would be used formeasurement. Refer technical data sheet for details.
-
d) SEPARATION LAYER:Providing and laying aseparation layer of non-woven polypropylene geo-textile
of 200 gsm over the entire surface of insulation board.
![Page 22: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/22.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 22/2939
e) SLOPE/PROTECTION SCREED:Providing and layinglight-weight site batched trowel finished EPS concreteusing selective grade of EPS beads with a density of 12-18kg/m3, on the geotextile separation layer as in Item-3.The mix shall offer Thermal conductivity of 0.23 – 0.26W/m-ok,Comp strength (28 days) of 30-60 kg/cm2.Drydensity of 750-950 kg/m3. The mix shall have a watercement ratio of 0.28-0.32 and the hyper-plasticiser rangeof admixture shall have 1 – 2 % dosage by weight ofcement. The slope built-up cum protection layer shall belaid with a slope gradient of 1:100 (Rate considered for100mm thickness). It shall be laid to the required level andfinish as directed including curing by ponding for aminimum of 7 days. The mix proportion shall be pre-approved by Engineer-in-charge. Refer data sheet ofTHERMOCRETE for mix proportion.
f) FINISHING/WEARING LAYER: Providing andlaying China mosaic finish as the final exposed layer
of the floor complete as directed. The bedding mortarshall be cementitious polymer modified tile adhesivecapable to maintain adhesion under submergedconditions. The product shall have BS 5980 Type 1standards compliance. It shall have a fresh wet density of2.1 kg / litre and have 0.18 water/powder ratio, byweight. Immediately after setting of the tiles, rake joints &clean to a uniform depth corresponding to the thickness ofthe tile. All the ceramic tile joints shall be grouted using,crack resistant, cementitious, water resistant joint grout.The joint grout shall be formulated to maintain waterpowder ratio of 0.33 by weight and shall comply with BS5980.
Rate shall include for preparation of surface bymechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,scaffolding, supply and adding water proofing chemicalsat the specified proportion as per manufacturer'sspecifications, all materials, wastages, conveyance, toolsand plants, mixing device and gauge, shuttering and alsoinclude for conducting leakage test at terrace by storingwater on the terrace for about 25 mm depth continuouslyfor a period of 7 days etc.as complete with all respectcomplying with relevant manufacturer specification asdirected by the Engineer-in-charge.
Sqm. 2605
54 Water proofing treatment over RCC roof slab laid to
slope in terrace and gutter slab without Insulation
covering the following sequence of operation andspecifications:
![Page 23: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/23.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 23/2939
a) SURFACE PREPARATION: The roof slab laid in slope/ gutter slab shall be thoroughly cleaned by removing thedebris and dust, to receive the water proofingtreatment.The cleaning and preparation of the substrate towhich the asphalt-modified polyurethane waterproofingmembrane is applied must be carried out thoroughly toleave a sound base for the application. Any laitancepresent on the surface must be removed mechanically.Release oil and other contaminants which may impairadhesion must be removed prior to the application of theprimer.
b) Waterproofing Membrane: Providing and applyingliquid, cold-applied elastomeric waterproofing membranesystem a single component moisture curing, asphalt-modified polyurethane based coating that cures byreaction with atmospheric moisture to form a tough butflexible waterproofing membrane. It is elastomeric,seamless waterproof membrane applied in 1 or 2 coats toa total DFT of 1.20 mm thick, having an elongation
capacity of over 600%(ASTM D 412) and with solidcontent more than 85% applied on the RCC surfaceincluding priming (if required), crack filling, grouting, tierod filling, coving, ponding etc complete. It shall resistbacterial attack and many acids, alkalis and salts. It shallhave a yield of 0.61-0.74 m2/L at 1.1 – 1.4mm drythickness SEPARATION LAYER: Providing and laying aseparation layer of non-woven polypropylene geo-textileof 200 gsm over the entire surface of insulation board.
c) SEPARATION LAYER: Providing and laying aseparation layer of non-woven polypropylene geo-textile
of 200 gsm over the entire surface of insulation board.
d) Providing and laying light-weight site batched trowelfinished EPS concrete using selective grade of EPS beadswith a density of 12-18 kg/m3, on the geotextileseparation layer as in Item-3. The mix shall offer Thermalconductivity of 0.23 – 0.26 W/m-ok,Comp strength (28days) of 30-60 kg/cm2.Dry density of 750-950 kg/m3. Themix shall have a water cement ratio of 0.28-0.32 and thehyper-plasticiser range of admixture shall have 1 – 2 %dosage by weight of cement. The slope built-up cumprotection layer shall be laid with a slope gradient of 1:100
(Rate considered for 100mm thickness). It shall be laid tothe required level and finish as directed including curingby ponding for a minimum of 7 days. The mix proportionshall be pre-approved by Engineer-in-charge. Refer datasheet of THERMOCRETE for mix proportion.
![Page 24: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/24.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 24/2939
e) FINISHING/WEARING LAYER: Providing and layingChina mosaic finish as the final exposed layer of thefloor complete as directed. The bedding mortar shall becementitious polymer modified tile adhesive capableto maintain adhesion under submerged conditions.The product shall have BS 5980 Type 1 standardscompliance. It shall have a fresh wet density of 2.1 kg /litre and have 0.18 water/powder ratio, by weight.Immediately after setting of the tiles, rake joints & clean toa uniform depth corresponding to the thickness of the tile.All the ceramic tile joints shall be grouted using, crackresistant, cementitious, water resistant joint grout. The joint grout shall be formulated to maintain water powderratio of 0.33 by weight and shall comply with BS 5980.
Rate shall include for preparation of surface bymechanical upgrading to remove all loose mortar andlaitance, oil, grease etc. and washing the surface withwater to get neat surface, dewatering, finishing, curing,
scaffolding, supply and adding water proofing chemicalsat the specified proportion as per manufacturer'sspecifications, all materials, wastages, conveyance, toolsand plants, mixing device and gauge, shuttering and alsoinclude for conducting leakage test at terrace by storingwater on the terrace for about 25 mm depth continuouslyfor a period of 7 days etc.as complete with all respectcomplying with relevant manufacturer specification asdirected by the Engineer-in-charge.
Sqm. 2398
55 Providing and laying brickbat coba in CM 1:4( one ofcement & four of brickjelly) using well burnt half bricks /bats of 20mm size brickjelly for using toilets and other
specified areas including ramming, curing etc.. allcomplete as directed by Engineer-v
Cum 746
![Page 25: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/25.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 25/2939
56 Providing chemical injection in the form of pressure
grouting to the base slab of Lift pit,retaining walls of liftpit,underground sump and STP from interior surfacesworks at any depth, height and level by Drilling 12mmdia holes with percussive drilling machine at areas withhoneycombs and at weak zones in the concrete in astaggered pattern at to a depth of 50mm and fixing PVCnozzle of 10mm dia in place using quick settingcompound Masterseal 505 of approved maket.Pressuregrouting cement slurry mixed with shrinkagecompensating additive Flowcable 50, at 250 gms per bagof cement, using hand operated pressure grouting pumpwith a pressure of 2 to 3 kg/sq.cm through the nozzles bystarting from one nozzle and stopping when the groutstarts coming out from adjacent nozzle or getting rejectedfrom the same nozzle and similarly carrying out groutingoperation in all the nozzles as per approved manufacturerspecifications in all the points including the cost ofchemical, labour for carrying grouting operations etc.. ascomplete.
Rate shall include for preparation of surface, de-watering,drilling holes, using pneumatic hammer for fixing of PVCnozzles to the required depth, grouting admixture andfinally cutting the projected nozzles and sealing of thePVC nozzles after injection operation is over withapproved equivalent admixed with cement, finishing,curing, etc., as per manufacturer‟s specification. Rate shallinclude for preparation of surface by mechanicalupgrading to remove all loose mortar and laitance, oil,grease etc. and washing the surface with water to get neatsurface, dewatering, finishing, curing, scaffolding,waterproofing chemicals, wastage, conveyance, tools and
plants, mixing device and gauge, shuttering, Nozzles etc.complete as per manufacturer's specification and asdirected by the Engineer-in-charge.
Sqm. 3113
Total of Waterproofing Works
MISCELLANEOUS WORKS
57 Providing, supplying and spraying/spreading the Fire
sealing in shaft chequered plate for pipeoutlets,trays,cables,openings of required dia.outlets usingpenetration seals of approved make inclusing necessarymechanical equipments,tools and tackles etc
complete.cost to include cotton pads,sealing of jointsusing self sealing, non shrink cement penetration seals /grouts of approved makes either single or doublecomponent with necessary formwork, staging, tools, etc.,complete with minimum of 30 mm depth for two hoursfire rating.Hilti or Promat or Equivalent make areapproved by the Engineer-in-charge.
Sqm. 498
![Page 26: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/26.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 26/2939
58 Making Core Cutting in slabs / beams / retaining wallsand any other R.C members to any dia & depth by using'HILTI' or equivalent make diamond drilling machinewith tolerance for any type of inserts, anchor fasteners etc.Rate shall include for all charge, preparation of surface,cutting of reinforcement, cleaning the surface, staging,scaffolding application of necessary chemical / foil (HAV)as per manufactures specification with necessary toolsand equipments water and power, removal of debris fromthe site, staging scaffolding etc complete, as directed bythe Engineer-in-charge.
a 75 to 100 mm dia to the following depth:
i 150 mm Depth Nos 10
ii 200 mm Depth Nos 10
iii 250 mm Depth Nos 10
iv 300 mm Depth Nos 10
b 100 to 150 mm dia to the following depth:
i 150 mm Depth Nos 10
ii 200 mm Depth Nos 10
iii 250 mm Depth Nos 10
iv 300 mm Depth Nos 10
c 150 to 225 mm dia to the following depth:
i 150 mm Depth Nos 10
ii 200 mm Depth Nos 10
iii 250 mm Depth Nos 10
iv 300 mm Depth Nos 10
d 225 to 300 mm dia to the following depth:
i 150 mm Depth Nos 10
ii 200 mm Depth Nos 10
iii 250 mm Depth Nos 10
iv 300 mm Depth Nos 10e 300 to 450 mm dia to the following depth:
i 150 mm Depth Nos 10
ii 200 mm Depth Nos 10
iii 250 mm Depth Nos 10
iv 300 mm Depth Nos 10
59 Supplying and fixing poly-propelene rungs of 25 mmsquare bar of size 260 x 170 mm for access way includinganchorage in walls to a minimum depth of 100 mm withC.C 1:2:4 (one cement,two fine aggregate and four coarseaggregate) etc. complete and as directed by the Engineer-in-charge.( Duct ,Shafts & UG sump,Over Head Tank and
wherever necessary) Note: Rungs to be fixed beforeconcreting and necessary provision to be made in theshuttering.etc complete, as directed by the Engineer-in-charge.
No's 100
![Page 27: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/27.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 27/2939
60 TRANSPLANTING Transplanting of Tree fouling in theproposedbuilding layout in ONGC project to the suitable place asper the Architectual drawing and as directed by theEngineer in charge,includingtrimming the tree branches excavating earth around thetree to required length,width and depth to remove thetree with required roots to transport the tree to newlocation as per the drawing inside thesite and digging the new pit,torequired size to transplantthe tree including cost for earth workexcavation,trimming the tree branches to requiredsize,removing and shifting the tree using machinaries andequipments to new location as per the drawing and asdirectedby the Engineed in charge, digging required size of pit totransplant the tree, refilling the pit after planting the treewith river sand,poring water and providing manure etc.,and maintaining the tree planter for a further period ofTwenty Four months including watering etc.,complete as
directed,includes for all operations as discribed andnothing extra shall be paid for
Rain Tree,Coconut Tree. Etc., Nos 30
61 CUTTING, AND REMOVING Cutting the dead treesand trees which are not able to transplant etc., in to piecesincluding uprooting the trees,by excavating earth torequired size and levelling the ground after removal ofthe trees and cutting pieces of trees stacked in site asdirected by the engineer in charge. Note: Prior permissionfrom the forest department shall be obtained beforecutting.
Rain Tree,Neem tree etc., Nos 32
62 Clearing light / scrub jungle and removal of rubbish upto a distance of 50 m outside the periphery of the areacleared etc all complete as directed by the engineer incharge.
Sqm. 30000
63 18 Credit to Client towards the dismantling and takingaway from the site of existing old dilapidated Asbestos
Cement (AC) sheet roof buildings having the followingdimensions. The rate shall inclusive of dismantling thesuperstructure with any type to any thickness, masonry,walls, lintels, beams, plastering, flooring, wooden/steeltrusses, rafters, pulins, AC roof sheeting, anyReinforcement Concrete members, ,joineries like doors,
windows, ventilators, internal & external electrical wiringwith fixtures, water supply and sanitary installations andthe like as exists at site including substructures to therequired full depth as directed. The rate shall includedisposing of unserviceable materials away from the site,including clearing the site neatly etc. all complete asdirected by the engineer in charge. Note: Prior approvalshall be obtained from the concerned department.
AC sheet roof building of size 7.20 x 4.50m No. 1
![Page 28: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/28.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 28/2939
AC sheet roof building of size 6.40 x 6.40m No. 1AC sheet roof building of size 7.60 x 7.60m No. 1AC sheet roof building of size 21.50 x 9.70m No. 1
64 18 Credit to Client towards the dismantling and takingaway from the site of existing reinforced cement concrete
(RCC) roof buildings having the following dimensions.The rate shall inclusive of dismantling the superstructure
with any type to any thickness, masonry, walls, lintels,beams, columns, plastering, flooring, roof slab, ,joinerieslike doors, windows, ventilators, internal & externalelectrical wiring with fixtures, water supply and sanitaryinstallations and the like as exists at site includingsubstructures to the required full depth as directed. Therate shall include disposing of unserviceable materialsaway from the site, including clearing the site neatly etc.all complete as directed by the engineer in charge. Note:
Prior approval shall be obtained from the concerneddepartment
Community center building 17.50 x 9.50m Nos. 1
65 18 Dismantling of Brick Work / Stone work / Solid Block
Work including plastering/pointing to any depth andwidth, at all levels below & above Ground Levelincluding removal of debris, disposing the same awayfrom the site, loading and unloading, making the surfacegood etc. complete. Rate shall include for dismantling ofBrick Work / Solid Block Work includingplastring/pointing, removal of debris by manual /mechanical means with necessary tools and plants,scaffolding, water and power charges, cleaning thesurface, preparation of surface. Rate shall include forstacking the serviceable materials and disposing the
unserviceable materials/debris away from the site bymechanical means including loading, unloading clearingthe site etc. complete as directed by the Engineer-in-charge.
Cum 141
66 Providing and laying of light weight concrete fill on
structural slab using Hemalite/Vermiculite cement basedcomposition having physical elasticity , chemicalinertness, firm adhesion, fire resistance with thermal /acoustic insulation properties, anti-corrosion, anti-condensation, etc in the required proportion to get thedesired density, mixing, transportation, placing,compacting and finishing to the required level withnecessary side supports, equipments and its density is600kg/cum wherever necessary areas to be fill as directedby the Engineer-in-charge.etc as complete with allrespects complying with relevant standarad specificationas directed by the Engineer-in-charge.
Cum 39
![Page 29: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/29.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 29/2939
67 Supplying and fixing 40mm dia. and 150mm or more longG.I. pipe spouts in sun shades including painting twocoats of first quality synthetic enamel paint of approvedmake and tint over one coat of primer as complete in allrespects complying with relevant standard specificationand as directed by the Engineer-in-charge.
No's 50
68 Supplying and fixing Ductile Iron manhole cover andframe as per approved make ,cover weight and being sizementioned below and specified size in the drawing etc.,including painting with two coats of anticorrosive paintover a coat of primer etc., fixing locking arrangements,fixing Man-hole over, grouting the anchors with CC 1:2:4(one cement,two fine aggregate and four coarseaggregate), as complete in all respects complying withrelevant standard specifications and as directed by theEngineer-in-charge.
a 600X600 mm Medium duty DI manhole cover not lessthan 65kgs
No's 10
b 600X600 mm Heavy duty DI manhole cover not less than90kgs
No's 49
69 Providing Plinth protection with PCC 1:3:6 (One cement,three fine aggregate and six coarse aggregate) 50mm thickusing coarse graded aggregate of 20 mm and downsize,top finished smooth while wet and laid with a nominalslope, over a sand bed of 75 mm thick including necessaryexcavation wherever, necessary form work etc . The endslab shall have 115 mm thick brick retaining walls withCM 1:4 (one cement and four fine aggregate) at the edge300 mm high. The exposed faces of wall shall be plasteredwith cement mortar 1:5 - 15 mm thick. The effectiveseparation of panels not exceeding 10 sqm in plan by
making grooves or by using glass or other metals stripsetc.and also including for providing necessary form work,excavation, refilling, consolidation and compaction offilled earth, plastering, pointing, curing and reinforcementas complete in all respects complying with relevantstandard specification and as directed by the Engineer-in-charge.
Sqm. 872
70 Providing and laying in position the RCC
humepipes(NP2) of approved quality and makeincluding collars,. necessary Excavation, PCC 1:2:4supports, Sand cushion of 150mm on all sides, Refilling
with earth, Compaction and making good the level,alignment etc.,complete as directed by the Engineer-in-charge.
a 300 mm dia RMT 410
![Page 30: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/30.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 30/2939
71 Supplying and fixing single skin bare Galvalume metalsheet Roof cladding for car shed at all heights using 0.47mm TCT 550 Mpaprofiled Galvalume steel (Aluminium zinc alloy coating150 gms / sqm total of both sides) sheet includingnecessary structural steel frame work consisting of allvertical / horizontal members,purlins, and all otherfixtures etc. The rate should inclusive of cutting,fabricating, erection at all levels, providing openings, allfixtures and fixing accessories such as self drilling, selftapping fasteners, butyl or acrylic sealants, profiled foam/neoprene fillers etc. including necessary civil works toerect the vertcal struts, two coats of PU painting over onecoat of zinc chromate primer, cost of all materials, steelmembers, purlins, labour,scaffolding, wastage, tools,tackles, equipment,transportation, preparation of shopdrawings etc. all complete as per specifications, drawingsand asdirected by the Engineer-incharge.
Sqm. 1323
72 Supplying, fabricating, erecting, testing andcommissioning of Cylinder Manifold system,centralizedGas Bank with individual connection toall kitchens using reticulated LPG pipeline with (Schedule40) 25 mm dia C class MS pipe and appropriate 16mm /20mm razor composite pipe tothe required length as per the site condition up to theconnection point inside the kitchen in the C&D typeresidential block. The rate should include the cost of gasmeter, inlet, outlet fittings, all other necessary accessorieslike butterfly valves, pressure gauges, gas filters, non-return valves, flexible hoses, composite brass fittingsetc..as requied to complete the work in all respects and
testing and commissioning all as per IS6044 Part-1 2000specification and as per the approved firm. The rate shallinclude all necessary materials and accessories, civilworks, painting,scaffolding, core cutting wherevernecessary, and making goodcondition, power etc.. as directed.
Job (One Job). 66
Total of Miscellaneous Works
ROAD & PAVEMENT WORKS
Concrete Road
73 Preparation & sectioning the area road surface and
compacting with 10 ton power roller including formingcamber and gradients watering and rolling to reachrequired density as complete.as directed by the Engineer-in-charge.
Sqm. 11808
![Page 31: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/31.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 31/2939
74 Construction of 300mm thk Granular subbase (GSB) byproviding coarse graded material 53mm to 4.75 mm,spreading in uniform layers with motor grader onprepared surface mixing by mix in place method withrotavator at OMC and compacting with vibratory roller toachieve the desired density, as complete in all respectscomplying with relevant standard IRC,MORTH andMOST Specifications and as directed by the Engineer-in-charge.
Cum 3543
75 Providing, Laying, Spreading and compacting 45 mm to4.75 mm graded stone aggragate of 200mm thk wet mix
macadam (WMM) specification including premixing thematerial with water at OMC in mechanical mixplant,carriage of mixed material by tipper to site,laying inuniform layers with paver in subbase / sub course onwell prepared surface and compacting with vibratoryriller to achieve the desired density,as complete in allrespects complying with relevanat standard MOSTspecification,as directed by the Engineer-in-charge.
Cum 2362
76 Providing and laying 100mm thk. Plain cementconcrete1:3:6 (One cement, three fine aggregate and sixcoarse aggregate) by using coarse graded aggregate of 25mm and down size for levelling course in road andpavement areas wherever necessary (as per drawing)including laying in layers of thickness not exceeding100mm and in alternative bays not exceeding 40 sqm asdirected including form work wherever necessary andwell compacted etc. as complete in all respects complyingwith relevant standard specification as directed by theEngineer-in-charge
Cum 1181
77 Providing and laying controlled cement concrete mix ofM20 grade to a thickness of 150 mm for roads andpavements laid to required slope and camber in panelsconfirming to IRC standard. Rate shall include forproviding IRC Weldmesh of size 100x100 - 12 Gauge - onelayersconfirming to IS: 1566 & IS: 4948 or equivalentBS,necessary formwork, shuttering,props, bracing andwedges, sufficiently strong & stable, providing 25 mmwide expansion joints and construction joints& closing the joints using polyurethene sealant -"VULKEM" - 202 PU from Supreme or approvedequivalent make etc.complete, as directed by the
En ineer-in-char e .
Cum 1771
78 Kerb and Pavement works
![Page 32: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/32.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 32/2939
Providing and fixing vacuum wetpress concrete precastSplay kerb to shape by using reinforced cement concreteM20 grade road kerbs of size 150X375X600 mm made toshape using 20 mm down size Coarse graded Basaltaggregate including form work and nominalreinforcement of Fe 415 grade, 12 mm dia at 150 c/c with8 mm dia stirrups at 150 mm c/c fixing in cement concrete1:3:6 nominal mix (one cement,three sand and six hardstone jelly) including all materials and labourcomponents,laying,finishing,curing and the pointingexposed faces with C.M 1:3 (one cement and three finesand) and colour washing with acrylic emulsion over acoat of primer etc..as complete in all respects complyingwith relevant standard specifications and as directed bythe Engineer-incharge.
RMT 3280
79 Supplying and laying Shotblasted Flexi Pavers of
approved design - 65 mm thick, total weight shall be 25kg approximately per one set or 1.94 Sft of flexi paverscontains five pieces including transportation of the blocks
to the site ,preparation of surface,supplying and fillingwith dry river sand to 50 mm thick, leveling andcompacting with plate vibrator and laying of the flexipaver blocks with sand binding and final compactionwith plate vibrator of 3 tone capacity finishing the surfaceincluding cutting of blocks at the edges including alllabour and materials etc as complete in all respectscomplying with relevant standard specification, asdirected by the Engineer-incharge. (For Pathway)
Sqm. 2792
80 3000 Providing thermoplastic painting for car park and road
line and arrow marks with 100mm wide involvingcleaning the surface free of dirt and loose particles
applying one coat of primer and applying one layer ofthermoplastic paint wih drop on glass beads. Rate shallinclude for all materials & labour components etc., ascomplete all respects complying with relevant IRCspecifications, as directed by the Engineer-incharge.
RMT 1808
Total of Road & Pavement Works
Tennis Court
81 Preparation, Formation & Construction of Tennis court asper the ITF (International Tennis Federation) specificationhaving the following sequence of works:
i Earth work excavation to the required depth as shown in
the drawing by manual/mechanical including levellingthe base, dressing of sides and ramming with all leadsand lifts, shoring, strutting and bailing out of water ifrequired.The rate shall include disposing the excavatedearth away from the site or dumping & levelling insidethe campus as directed.
![Page 33: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/33.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 33/2939
ii Filling and levelling of good earth brought from outsideand to be laid in layers of 150mm thick and compactedwith 10tonne power vibrating roller including formingrequired gradient (1:10),watering and rolling to reach therequired density etc., as directed.
iii Providing Anti-termite treatment over the prepared basesurface using approved chemical in appropriateproportion to avoid the growth of weeds and termites, asdirected.
iv Construction of 200mm thk Granular subbase (GSB) byproviding coarse graded material, spreading in uniformlayers with motor grader on prepared surface mixing bymix in place method with rotavator at OMC andcompacting with vibratory roller to achieve the desireddensity, as directed.
v Providing, Laying, Spreading and compacting gradedstone aggragate of 150mm thk wet mix macadam (WMM)
specification including premixing the material with waterat OMC in mechanical mix plant,carriage of mixed
material by tipper to site, laying in uniform layers overthe granular sub-base and compacting with vibratoryroller to achieve the desired density,as directed.
vi Providing and laying Dense Bitumen Macadam forcompacted thickness of 30mm using 20mm down sizemetals mixed with 80/100 grade hot bitument at 4% ofweight and mix from central hot mix plant and laid bypaver finishing and compacting with vibratory roller.Rate shall be include with all plants and machineries, cost,conveyance and incidential charges, as directed.
vii Providing and laying of 30 mm compacted thick asphalt
concrete (HOT MIX) over the dense bituminousmacadam base with IRC standard 12mm and downcoarse graded basalt aggregate and binder content byusing 80/100 grade Bitumen, adopting suitable job mixformula as directed, including surface preparation,heating and mixing in central hot mix plant to therequired temperature, cost and conveyance of allmaterials to site, laying the mix to the requiredtemperature, specified lines, grades, gradient and crosssection using mechanical paver finisher and consolidationby 10 tonne power roller to get the required densityincluding all labour charges, hire and fuel charges for all
tools and plants employed etc., as directed.
![Page 34: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/34.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 34/2939
viii Providing and laying of 20 mm compacted thick asphalt
concrete (HOT MIX) over the dense bituminousmacadam base with IRC standard 6mm and down coarsegraded basalt aggregate and binder content by using80/100 grade Bitumen, adopting suitable job mix formulaas directed, including surface preparation, heating andmixing in central hot mix plant to the requiredtemperature, cost and conveyance of all materials to site,laying the mix to the required temperature, specifiedlines, grades, gradient and cross section using mechanicalpaver finisher and consolidation by 10 tonne power rollerto get the required density including all labour charges,hire and fuel charges for all tools and plants employedetc., as directed.
ix Providing and laying tack coats over the prepared surfaceof WMM,DBM,30mm thk asphalt as per the MORTHspecification, as directed.
x Providing and laying seal coat (Type-B) over theprepared surface of 20mm thk asphalt as per the MORTH
specification, as directed.xi Providing and laying ITF certified Ultra cushion nine
layer system Synthetic surface over the 20mm thickAsphalt Base, it shall be made ready by cleaning withWater and is checked for any Bird Baths. Minor Patchwork if required shall be carried out done with acrylicresurfacer. The ratio of mixing of resurfacer for Patchwork is 3 (acrylic resurfacer): 1 ½ (Silica Sand) : 1 (Water)The rate shall include for supply and installation of a)Resurfacer to make an underlay for the cushion surfacecomprising of Mixing ratio is 3:1.25 (Silica Sand) : 1(water). b) Five Cushion layers above the resurfacercomprising of Mixing ratio of 4 (cushion) : 1 Water. c)First & Second Layer of Colour shall be provided andinstalled on top of the Cushion layer. Mixing Ratio is 5(acrylic Colour) : 3 (sand) : 2 ½ (Water)d) Third layer ofColour is poured on top of the first layers of Colour.Mixing Ratio is 2:1 (Water). e) Supply and installing LineMarking.All Acrylic is poured onto the surface and spreadwith a Squeejie.
xii In addition to the above sequence of works, the quotedrates shall inclusive of power, water, CIF values ofsynthetic surface, transportation, installation, all dutiesand taxes, etc.,as complete in all respects complying withrelevant standard specification .as directed by the
Engineer-Incharge.
Sqm. 674
82 Providing and constructing of Edge wall/Retaining RCCwall in cement concrete M25 grade, around the perimeterof the tennis court including necessary form work,reinforcement, base PCC, etc., all as shown in thedrawing, as directed by the Engineer-incharge.
RMT 110
83 Providing and constructing of Saucer Drain with gratingsalong the longer end of the tennis court, all as shown inthe drawings.
RMT 37
![Page 35: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/35.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 35/2939
84 Supplying, fabricating and fixing in position of PVCcoated 10 gauge chain link Wire mesh fencing fixed alongwith GI Pole pipes measuring 3.0m high from toe walland one metre insert the toe wall around the perimeter ofthe tennis court (as per drawing) at all levels with theprovision of door opening of the required size & profileconsisting of channels, angles, runners, insert plates, flatsand sag rods with necessary sleeves, bolts andnuts,pipes,embedding the poles in concrete etc.. includingcutting, straightening, welding as per standards forconnections including consumables etc.as complete. Rateshall include preparation of surface, applying two coats ofZinc chromate/Phosphate primer and two coats ofsynthetic enamel paint of approved make etc.. as directedby the Engineer-incharge.
Sqm. 279
85 Supplying,fabricating and Fixing ITF certified Tennis Net
of size 42X 3 feet fixed to the MS net post of size80x80X3mm as shown in the drawing and as perapproved make and specification including ITF certified
Water Removing Roller as per approved make andspecification.etc., as directed by the Engineer-incharge.
No. 1
Total of Tennis Court
86 Golf Fencing
Supply and installation of High strength weather proofpolyolefin Golf Fencing Net of approved brand using1.5mm twisted and 2mm mesh square to height of 20malong with the 100mm dia MS hollow pipe erected atequal intervals including plates,nutbolts,cleats, ladder,8mm dia PVC coated Steel wire rope for net erectionetc..as per the specification. The rate shall be including of
all necessary civil works, Structural works, epoxy paintingworks, power, electricity,erection machneries etc.. asdirected by the Engineer-incharge.
Golf Fencing RMT 140
Total of Golf Fencing
87 Garbage Chute
Supplying, Fabricating and commissioning of CentralizedGarbage chute of approved make (SS430 X 1.2mm thk),450mm dia ( Ground to Eighteenth Floor ) .with aprovision of autoclosing intake down at every floor leveland a fire rated door (90 minutes rating-UL label 10B) at
the discharged end, with required garbage trolley, etc.,complete as per BS 1703:2005,IS6924-2001& NBC 2005specification. The rate shall include all installationcomponents, scaffolding for erection, required structuralbrackets with anchor fasteners, Sprinklers for fire andcleaning, necessary vent with bird netting etc.. as directedby the Engineer-incharge.
No. 1
Total of Garbage Chute
![Page 36: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/36.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 36/2939
A - SANITARY FIXTURES & FITTINGS: (PROVIDING &
INSTALLATION)
- Note:
Detail of Sanitary fixture are for the information of theContractor, however model / makes of all sanitary fixtureshall be selected by Engineer-Incharge and the same shallbe binding for execution
No additional all fixing cost shall be paid for change intype of sanitary fixture or fitting.Provision of extension piece for final connection of CPfitting shall be supplied and installed by the contractoraccordingly (as required)
88 102 Providing & Fixing, testing and commissioning of whitevitreous China wall mounting type European water
closet (RS346467460) including providing & fixing C.P.bolts, nuts (C8152), bakelite / poly propylene seat & cover(RA80P467001) with C.P. hinges & rubber buffers, C.P.brass screw, washer with all accessories. Including cutting& making good the walls, floors, slab wherever requiredand as complete, as directed by Engineer-Incharge (Make
:- ROCA / Equal approved make, Model:-GIRALDAWALL HUNG WC WITH SOFT CLOSE SEATCOVER)
Nos. 191
89 102 Providing & Fixing, testing and commissioning of whitevitreous China wall mounting type European water
closet (RS346247000) including providing & fixing C.P.bolts, nuts (C8152), bakelite / poly propylene seat & cover(RA8012A2004) with C.P. hinges & rubber buffers, C.P.brass screw, washer with all accessories. Including cutting& making good the walls, floors, slab wherever requiredas directed by the Engineer-incharge. (Make :- ROCA/Equal approved make, Model NEW MERIDIAN WALLHUNG WC WITH SOFT CLOSE SEAT COVER- )
Nos. 8
90 102 Providing & Fixing, testing and commissioning of whitevitreous China wall mounting type European water
closet (RS346477000) including providing & fixing C.P.bolts, nuts (C8152), bakelite / poly propylene seat & cover(RA8012A2004) with C.P. hinges & rubber buffers, C.P.brass screw, washer with all accessories. Including cutting& making good the walls, floors, slab wherever requiredand as complete, as directed by Engineer-Incharge (Make:- ROCA/ Equal approved make, Gap wallhung with soft
close seat cover )
Nos. 4
![Page 37: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/37.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 37/2939
91 102 Providing & Fixing, testing and commissioning of whitevitreous China wall mounting type European water
closet (C0255) including providing & fixing C.P. bolts,nuts (C8152), bakelite / poly propylene seat & cover(RA8012A2004) with C.P. hinges & rubber buffers, C.P.brass screw, washer with all accessories. Including cutting& making good the walls, floors, slab wherever requiredand as complete, as directed by Engineer-Incharge(Make :ROCA/ Equal approved make, Model:- Indus Walvit Panwith seat cover )
Nos. 2
92 102 Providing&Fixing, testing and commissioning of whitevitreous China Indian type(orissa patern) water closet.Including cutting & making good the walls, floors, slabwherever required and as complete, as directed byEngineer-Incharge (Make :- ROCA/ Equal approvedmake, Model & No.Orissa Pan 500mm - C0111)
Nos. 2
93 102 Providing, fixing, testing and commissioning of exposedplastic low level cistern for WC, with dual flush facility
complete with all necessary fittings, flush pipes &accessories including all supports and making good andas complete, as directed by Engineer-Incharge (Make :-ROCA/ Equal approved make, Model & No.SlimlineEconomy Dual flush - C8109)
Nos. 2
94 102 Providing&Fixing, testing & commissioning of concealed
type cistern with dual flush facility comprising ofactuator button facia assembly and Push plat includingbrass / SS screws and washer complete, providingprotection cover over cistern, cutting and making goodthe walls wherever required and as complete, as directedby Engineer-Incharge (Make :- ROCA/ Equal approvedmake, Model:- Slendra concealed cistern 80 mm , No:-RA890031410, Chrome Push plate round knob No:-RA8900450B1 )
Nos. 205
Health Faucet
95 102 Providing&Fixing, testing & commissioning of ABSRinsing spray with regulator of approved quality withplastic flexible pipe 1.5 m long, wall hook complete asrequired and as complete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:-Health faucet No:- ALD-563)
Nos. 197
96 102 Providing&Fixing, testing & commissioning of ABS
Rinsing spray with regulator of approved quality withplastic flexible pipe 1.5 m long, wall hook complete asrequired and as complete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:-Health faucet No:- ALD-577)
Nos. 8
Wash basin
![Page 38: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/38.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 38/2939
97 Providing&Fixing first quality white vitreous china oval /round / square wash basin (RS327465000) (size as perarchitectural drawing) for counter top mounting, 32 mmCP brass waste coupling and CP brass cast bottle trap(Make :- Jaquar/ Equal approved make, Model:- ALD-709& ALD-769 ) and pipe to wall with CP brass flange andrubber adopter for waste connection complete includingfilling gap between counter and wash basin withapproved type poly sulphide sealant, cutting and makinggood the walls wherever required and as complete, asdirected by Engineer-Incharge (Make :- ROCA// Equalapproved make , Model:- Giralda countertop basin600*475 mm, )
Nos. 228
98 Providing&Fixing first quality white vitreous china oval /round / square wash basin (RS327240000) (size as perarchitectural drawing) for counter top mounting, 32 mmCP brass waste coupling and CP brass cast bottle trap(Make :- Jaquar/ Equal approved make, Model:- ALD-709& ALD-769 ) and pipe to wall with CP brass flange and
rubber adopter for waste connection complete includingfilling gap between counter and wash basin withapproved type poly sulphide sealant, cutting and makinggood the walls wherever required and as complete, asdirected by Engineer-Incharge (Make :- ROCA/ Equalapproved make, Model:- Meridian N wall hung washbasin 700*460, )
Nos. 2
99 Providing&Fixing first quality white vitreous china oval /round / square wash basin (RS327115000) (size as perarchitectural drawing) for under counter mounting, 32mm CP brass waste coupling and CP brass cast bottle trap(Make :-Jaquar/ Equal approved make, Model:- ALD-709
& ALD-769 ) and pipe to wall with CP brass flange andrubber adopter for waste connection complete includingfilling gap between counter and wash basin withapproved type poly sulphide sealant, cutting and makinggood the walls wherever required and as complete, asdirected by Engineer-Incharge (Make :- ROCA// Equalapproved make, Model:- Diverta UC washbasin620*440mm)
Nos. 22
100 Providing&Fixing first quality white vitreous china oval /round / square wash basin (C0471) (size as perarchitectural drawing) for counter top mounting, 32 mmCP brass waste coupling and CP brass cast bottle trap(Make :- Jaquar/ Equal approved make, Model:- ALD-709& ALD-769 ) and pipe to wall with CP brass flange andrubber adopter for waste connection complete includingfilling gap between counter and wash basin withapproved type poly sulphide sealant, cutting and makinggood the walls wherever required and as complete, asdirected by Engineer-Incharge (Make :- ROCA/ Equalapproved make, Model:- Indus basin (500*400mm),
Nos. 2
![Page 39: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/39.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 39/2939
101 Providing&Fixing first quality white vitreous china oval /round / square wash basin (RS327874000) (size as perarchitectural drawing) for counter top mounting, 32 mmCP brass waste coupling and CP brass cast bottle trap(Make :- Jaquar/ Equal approved make, Model:- ALD-709& ALD-769 ) and pipe to wall with CP brass flange andrubber adopter for waste connection complete includingfilling gap between counter and wash basin withapproved type poly sulphide sealant, cutting and makinggood the walls wherever required and as complete, asdirected by Engineer-Incharge (Make :- ROCA/ Equalapproved make, Model:- kalahari vanity Basin650*450mm)
Nos. 16
102 Providing&Fixing first quality white vitreous china oval /round / square wash basin (RS32751A000) (size as perarchitectural drawing) for counter top mounting, 32 mmCP brass waste coupling and CP brass cast bottle trap(Make :- Jaquar/ Equal approved make, Model:- ALD-709& ALD-769 ) and pipe to wall with CP brass flange and
rubber adopter for waste connection complete includingfilling gap between counter and wash basin withapproved type poly sulphide sealant, cutting and makinggood the walls wherever required and as complete, asdirected by Engineer-Incharge (Make :- ROCA/ Equalapproved make, Model:-Dama Senso Compacto squarewashbasin 650*470mm )
Nos. 2
Basin mixer
103 Providing&Fixing, testing and commissioning of Basinmixer with Aerator and wall flange (as required) andmaking good as required and as complete, as directed byEngineer-Incharge (Make :- Jaquar/ Equal approved
make, Model:- OPL 15051B)
Nos. 268
104 Providing&Fixing, testing and commissioning of Basinmixer with Aerator and wall flange as required andmaking good as required and as complete, as directed byEngineer-Incharge (Make :- Jaquar/ Equal approvedmake, Model:- KUB 35051B).
Nos. 4
Urinal
105 Providing&Fixing, testing and commissioning of whiteviterous china urinal including providing & fixing CI /MS bracket (duly painted with 2 coats of paints over acoat of primer), including CP brass waste with dome typegrating, complete with all accessories and as complete, asdirected by Engineer-Incharge (Make :- ROCA/ Equalapproved make,Model:-Integrated EFS - Smart AC withPower Source, C8195)
Nos. 7
![Page 40: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/40.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 40/2939
106 Providing, fixing, testing and commissioning of whiteviterous china large flat back / half stall urinal supportedby CI / MS bracket (duly painted with 2 coats of paintsover a coat of primer), including CP brass waste withdome type grating, CP cast brass bottle trap withextension piece, wall flanges complete with all accessoriesand as complete, as directed by Engineer-Incharge ((Make:- ROCA/ Equal approved make,Model:-Euret urinal425*797 mm back inlet, RS35945F000)
Nos. 8
107 Providing, fixing, testing and commissioning of automaticflushing systems for urinal to ensure pre-flush & flushingonly immediately after use, comprising of all plumbing,electronic and electrical items. CP brass flush pipe withCP brass elbow, CP brass spreader, CP wall flange,infrared photo cells, eyes electrically operated solenoidvalve, step down transformer / equipment and any otheritem required to provide satisfactory functioning.Including necessary wall cutting / chasing and makinggood, as required and as complete, as directed by
Engineer-Incharge (Make :- ROCA/ Equal approvedmake,Model:-Urinal sensor powered by 220 volts - AC,RT5X9415E00)
Nos. 15
108 Providing & Fixing, testing, and commissioning of Acrylicbath tub (Vythos drop-in bathtub 1700*800mm)completely leveled, including waste overflow drain set(RF506403010) , chain plug, legs, grouting of legs etc withcement concrete all complete as required and as complete,as directed by Engineer-Incharge (Make :- ROCA/ Equalapproved make, Model:- RW247701000)
Nos. 2
109 Providing & Fixing Deck mount bath tub mixer with
spout and telephonic hand shower and as complete, asdirected by Engineer-Incharge.((Make :- ROCA/ Equalapproved make, Model:- AMURA 4 HOLE HIGHNECKTUB FILLER +H.SWR, RT527306580)
Nos. 2
Shower area
110 Providing&Fixing Concealed bath shower divertor, Singlelever divertor exposed parts, spout, shower arm,overhead shower and wall flanges complete and ascomplete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:-ALD - 065, KUB -35065K, SPJ- 35429, SHA - 479 L 450, and OHS-1823 ).
Nos. 4
111 Providing&Fixing Concealed bath shower divertor, Single
lever divertor exposed parts, spout, shower arm,overhead shower and wall flanges complete and ascomplete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:-ALD - 065, OPL -15065K, SPJ- 429, SHA - 483 L 450, and OHS-1779).
Nos. 174
![Page 41: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/41.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 41/2939
112 Providing&Fixing Thermostatic shower column completeand as complete, as directed by Engineer-Incharge (Make:- ROCA/ Equal approved make, Neo Basic Thermostaticshower cloumn, Model No. RP2H035800 ),
Nos. 2
113 Providing&Fixing Thermostatic shower column completeand as complete, as directed by Engineer-Incharge (Make:- ROCA/ Equal approved make, Neos II BasicThermostatic shower cloumn, Model No. RP2H0348000 ),
Nos. 2
114 Providing&Fixing Overhead shower with short / longarm and wall flange complete and as complete, asdirected by Engineer-Incharge (Make :- ROCA/ Equalapproved make,Model: Single flow overhead shower-T9901A1),
Nos. 4
115 Providing&Fixing push type liquid soap dispenser withPVC rawl plug & C.P. brass screw complete as requiredand as complete, as directed by Engineer-Incharge(Make :ROCA/ Equal approved make,)
Nos. 10
Towel Rail & Ring
116 Providing & fixing C.P. brass towel rail with C.P. brasswall brackets & C.P brass screws complete as requiredand as complete, as directed by Engineer-Incharge (Make:- Jaquar/ Equal approved make, Model:- ACN-1111n).
Nos. 183
117 Providing & fixing C.P. brass towel ring with C.P. brasswall brackets & C.P brass screws complete as requiredand as complete, as directed by Engineer-Incharge (Make:- Jaquar/ Equal approved make, Model:-ACN-1121 BN).
Nos. 96
118 Providing & fixing C.P. brass towel with C.P. brass wallbrackets & C.P brass screws complete as required and ascomplete, as directed by Engineer-Incharge (Make :-
Jaquar/ Equal approved make, Model:- QUA - 61723).
Nos. 4
119 Providing & fixing C.P. brass Double coat hook with PVCrawl plug & C.P. brass screw complete as required and ascomplete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:- AKB - 35761).
Nos. 69
120 Providing&Fixing C.P brass toilet paper holder with PVCrawl plug & C.P. brass screw complete as required and ascomplete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:- ACN - 1155N).
Nos. 181
121 Providing&Fixing C.P brass toilet paper holder with PVC
rawl plug & C.P. brass screw complete as required and ascomplete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:- ACN - 1153N).
Nos. 24
![Page 42: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/42.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 42/2939
122 Providing&Fixing, testing and commissioning of Kitchensink including providing & fixing C.I./M.S. Brackets(duly painted with 2 coats of paint over a coat of primer)C.P. cast brass bottle trap with extension piece, rubberadaptor, wall flange, union, C.P. brass chainrubber plug &making good and as complete, as directed by Engineer-Incharge (Make-Nirali / Equal approved make, ModelNo. C853199, C854399)
Stainless steel sink without drain board. No. 20
123 Supplying and fixing 600 x 450 mm Reflextion mirror ofParryware make or approved equivalent with necessaryscrews, nuts and washer and as complete, as directed byEngineer-Incharge Model:No:C 8608 - Parryware make orapproved equivalent make.
No. 194
124 Providing&Fixing, testing and commissioning of C.P.brass wall / counter mounted Sink Cock with RegularSwinging Casted Spout with Wall Flange complete asrequired and making good and as complete, as directedby Engineer-Incharge (Make :- Jaquar/ Equal approved
make, Model:- FLR-5347N).
No. 115
125 Providing&Fixing solid state, no touch operting, fullyhygienic hand drier of approved shade with
single/double blower, with time delay, summer & wintercontrol, music while drying, volume ON/OFF controlsincluding providing necessary brackets, cable from drierto Plug, Plug top key and lock etc, complete as directed bythe Engineer-incharge.(Make-Eronics / Equal approvedmake, Model No. - EH06S )
No. 10
126 Providing&Fixing, testing and commissioning of C.PCopper connection 450 mm long including nuts andwashers and making connection to fixtures and fittingscomplete as required and as complete, as directed by
Engineer-Incharge (Make :- Jaquar/ Equal approvedmake, Model:- ALD-805B).
No. 389
127 Providing & Fixing, testing and commissioning of C.P.brass angle valve with C.P. wall flange, Nut and Washeretc. complete as required and as complete, as directed byEngineer-Incharge (Make :- Jaquar/ Equal approvedmake, Model:- FLR-5053N).
No. 598
128 Providing, fixing, testing and commissioning of 15 mmdia C.P. brass long body bib cock with C.P. wall flange ofapproved quality and making good as required and ascomplete, as directed by Engineer-Incharge (Make :- Jaquar/ Equal approved make, Model:- CON-107KN).
No. 22
129 Providing and fixing Heavy class SS grating withCockroach proof SS strainer of approved design includingsetting in floor with cement motor to match with floorfinish as per architect requirement & suitable for wasteand FD and as complete, as directed by Engineer-Incharge(Make :- Chilly- India King or equal approvedmake,)
No. 568
![Page 43: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/43.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 43/2939
130 Providing&Fixing, testing and commissioning ofAdjustable Type of Washbasin 65x35 with one pair ofmounting brackets, EWC and cistern complete withfittings and seat cover, one no hinged rail, 76 cm and fiveno grab rails 60 cm and as complete, as directed byEngineer-Incharge (Make :- ROCA/ Equal approvedmake, Model:-(Carron PP Closet with Antimicrobial seatcover - C0250 + C8094), (Hand Rails 600 - C8154), (HingedArms - C8153), (Plastic cistern - C8157), Indus basin(500*400mm - C0471), (Pillar Cock with Aerator -T1602A1))
No. 4
Total of 'Sanitary Fixtures & Fittings
B COLD WATER SUPPLY
131 Providing and fixing in position Class 'C' GI pipe work forall pump suction / discharge line with common headercomplete with all fittings like elbow, tee, reducer, flange,union etc. conforming to IS:1239 (Part 1) for pipes and IS :1879 (Part 1 to 10) for fittings including fixing in wall /ceiling / floor level, supported by galvanized clamps,hangers, vertical pipe support etc. and as complete, as
directed by Engineer-Incharge.
a 80 mm dia RMT 10
b 100 mm dia RMT 20
c 150 mm dia RMT 10
132 Providing and fixing CPVC (Chlorinated Poly VinylChloride) water supply pipes confirming to IS:15778/2007with pipe as per CTS SDR 11 (operating pressure - 7 Bar @82 Deg C and 28 Bar @ 23 Deg C)for pipes from 1/2 Inchto 2 Inch. Schedule 40 Pipe to be used from 2-1/2 Inch to 6Inch Schedule 40 Pipe to be used . Pipes shall be joinedusing solvent welded CPVC fittings i.e. Tees, Elbows,
Couplers, Unions, Reducers, brushings etc. includingtransition fittings (connection between CPVC & metalpipe/GI) i.e. Brass Adaptors (both Male & Femalethreaded) conforming to ASTM D-2846. ASTM F441 withonly CPVC solvent cement conforming to ASTM F-493.All termination points for installation of faucets shall havebrass termination fittings. Installation shall be to as perTechnical Manual of manufacturer of pipes & fittings.
Cost shall be inclusive of (a)Making maximum of 7.5 x 7.5cm chase in wall and floors for the pipe, making good thesame by using 1:3:6 cement mortar over the wire mesh
and providing protection to embedded pipes and fittings(in wall chase) by wrapping two layers of 400 micronpolythene sheet including proper overlaps on jointscomplete as required.and as complete, as directed byEngineer-Incharge.
a 3/4" dia (20 mm) RMT 3945
b 1" dia (25 mm) RMT 4
![Page 44: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/44.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 44/2939
133 Providing and fixing CPVC (Chlorinated Poly VinylChloride) water supply pipes as above.Fixing/supporting the pipes (& fittings) at wall/ceilinglevel supported by galvanized clamps, fastener, hangersetc, as per specification. Exposed pipes to be painted oflegends with direction arrow. GI pipe sleeves suitablehigher size shall be provided wherever the pipes arecrossing the fire rated walls / floors slab and sealing thesleeves with glass wool in between and fire sealantcompound at either end and as complete, as directed byEngineer-Incharge.
a 3/4" dia (20 mm) RMT 4
b 1" dia (25 mm) RMT 2735
c 1.1/4: dia (32 mm) RMT 2756
d 1.5" dia (40 mm) RMT 1278
e 2" dia (50 mm) RMT 170
f 2-1/2" dia (65 mm) RMT 2
134 Providing & fixing male/ female screwed end full waylever operated forged brass ball valve of brass body withforged brass hard chromeplated ball & teflon seat testedto a pressure 15 Kg / sqcm with (threaded joints)complete as required and as complete, as directed byEngineer-Incharge
a 20 mm dia No. 2
b 25 mm dia No. 830
c 32 mm dia No. 68
d 40 mm dia No. 33
e 50 mm dia No. 25
135 Providing and fixing C.I. Butterfly valve (Body : GreyCast Iron, shaft : SS, Disc : SG Iron (nickel plated), Liner :HT - EPDM/Nylon) of approved make with flange,washer, nuts & bolts and PN 16 pressure rating including
rubber gasket & painting complete.and as directed byEngineer-Incharge.
a 65 mm dia No. 1
b 80 mm dia No. 2
136 Providing & fixing C.I. wafer type check valve of ratingPN 16 including rubber gasket, flanges, union, nuts, bolts,washers & painting complete as required and as complete,as directed by Engineer-Incharge
a 65 mm dia No. 1
b 80 mm dia No. 2
137 Providing & fixing dual flanged C.I. `Y' Strainer withstainless steel fine wire mesh perforated sheet basket with
necessary flange/ unions nuts, bolts and washerscomplete as required and as complete, as directed byEngineer-Incharge
a 65 mm dia No. 1
b 80 mm dia No. 2
![Page 45: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/45.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 45/2939
138 Providing and fixing in position of approved quality highpressure rated Gun Metal Float Valve with copper ballfloat and brass rods of required length suitable for testpressure of not less than 15 Kg/sqcm of the followingsizes and as complete, as directed by Engineer-Incharge.
a 25 mm dia No. 5
b 32 mm dia No. 7
c 40 mm dia No. 10
139 Providing and fixing pressure reducing station for coldwater supply comprising of 2 Nos Gun Metal ball valveson inlet & outlet & 1 no. globe valve for by-pass 1 Nopressure reducing valve with flanged/ screwedconnection, 1 No. `Y' strainer, 2 Nos Pressure gauge oninlet & outlet, and 1 No. 15 mm dia safety valve. Thecomplete system is tested to a pressure not less than 15Kg/Sq.cm and suitable to reduce the pressure upto 2Kg/Sq.cm) Including necessary pipe & fittings; i.e.flanges/ unions, nuts, bolts and washers complete asrequired and as complete, as directed by Engineer-
Inchar ea 25 mm dia (Brass Housing - PRV) No. 6
b 32 mm dia (Brass Housing - PRV) No. 74
c 40 mm dia (Brass Housing - PRV) No. 27
140 Providing, fixing , testing and commissioning water metrewith direct reading dial in KL with all necessary fittingsuch as threaded pieces, unions pressure gauge, isolationcock, flanges piece for future removal, flanges / unionscomplete with all necessary testing charges and obtainingtest certificates from municipal authorities and ascomplete, as directed by Engineer-Incharge., on followingsize pipe lines (1 no. strainer shall be provided at inlet &
outlet and cost shall be inclusive for the same).
a 50 mm dia (CI) No. 1
b 65 mm dia (CI) No. 2
141 Providing & fixing Auto Air vent for cold water supplyrisers, suitable for pressure not less than 15 Kg/Sq.cm.
a 25 mm dia No. 22
142 31 Constructing brick masonary chamber (for housingvalves,metres etc.) of brick work with bricks of230X115X75mm class 50 with cement mortar 1:5 (1cement:5 fine sand) plastering internal face & (with a
floating coat of neat cement) cement mortar 1:3 (1 cement:3 fine sand and rough plaster on outer face. R.C.C top slabwith medium duty D.I. manhole cover and frame of600x600 mm (weight : 60 KG). Including excavation,dewatering, refilling, watering, ramming and removingthe surplus excavated material complete as required andas complete, as directed by Engineer-Incharge (All sizesare clear internal sizes).Size 600 x 600 x 600 mm deep No. 3
![Page 46: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/46.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 46/2939
143 Providing & fixing of LOFT Tank (Make: Sintex, ModelNo:IWS 30.01,Cap-300 lts)(Location :Toilet).as complete,as directed by Engineer-Incharge
No. 202
144 Providing & fixing of SS Tank ( 304 grade ) For RO Watersupply (Cap-500 lts) (Location : Terrace).as complete, asdirected by Engineer-Incharge
No. 4
Total of Cold Water Supply
C - INTERNAL DRAINAGE : (RAIN,SOIL, WASTE &VENT)
145 Providing, fixing, jointing, testing and commissioning ofUPVC pipe conforming to I S 4985 with 6kg/sq.cm. wastepipe from fixture to floor trap cut to required lengthsincluding all necessary fittings and specials such as bends, junctions offsets, access pieces (plain or door) & ventcowl. Fixing at wall / ceiling level supported by G.I.clamps, hangers etc. duly epoxy coated. As complete, asdirected by Engineer-Incharge.
a 40 mm dia RMT 596
b 50 mm dia RMT 103
146 Providing, fixing, jointing, testing and commissioning ofUPVC pipe confirming to I S 4985 with 6kg/sq.cm cut torequired lengths including all necessary fittings andspecials such as bends, junctions offsets, access pieces andmaterial and making good the same complete as requiredand as directed by Engineer-Incharge Cost shall beinclusive of providing protection to pipe all round /haunches as per specification. (Running at toiletsunken,shaft, Rain water down take, data cabling &balcon )
a 75 mm dia RMT 2311
b 110 mm dia RMT 4843
c 160 mm dia RMT 1760147 Providing, fixing, jointing, testing and commissioning of
UPVC pipe confirming to IS : 13592, and confirming to IS :4985 (Pipe Class II -6 kg / sq.cm) cut to required lengthsincluding all necessary fittings and specials such as bends, junctions offsets, access pieces (plain or door) & ventcowl. Fixing at wall / ceiling level supported by G.I.clamps, hangers etc. duly epoxy coated and as complete,as directed by Engineer-Incharge(Location for Shaft )
a 63 mm dia RMT 656
b 75 mm dia RMT 200
c 110 mm dia RMT 1162
d 160 mm dia RMT 786
![Page 47: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/47.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 47/2939
148 Providing, fixing, jointing, testing and commissioningUPVC (Class III) Rain water down take pipe conformingto IS:4985 cut to required lengths including all necessaryfittings and specials. Fixing at wall/ceiling levelsupported by galvanized steel clamps & hangers etc.Making proper connection with cement solvent joint asper BIS / manufacturer. Cutting, chases / holes in floors /walls / slab. and as complete, as directed by Engineer-Incharge
a 75 mm dia RMT 737
b 110 mm dia RMT 103
c 160 mm dia RMT 970
149 Supplying and fixing of approved make UPVC multi inletfloor trap with110mm dia inlet & 75mm dia outlet and itis fixed in Sunken slab .and as complete, as directed byEngineer-Incharge.
Nos. 635
150 Supplying and fixing in position of Custom Made P trapof the following sizes from UPVC 6kg/cm2 pipe bymaintaing 50mm water seal including providing
necessary support and as per Specification as complete, asdirected b En ineer-Inchar e.110mm dia inlet & 110mm dia outlet No. 4
151 Providing & fixing rain water `Khurras' size 450x450 mmrequired depth with lead flashing around the pipe withone piece lead sheet of 3 mm thick set on a layer of coldbitumen. Including Heavy duty CI/MS grating as perdrawing complete as required and as directed byEngineer-Incharge
No. 28
Total of Internal Drainage :(Rain,Soil,Waste & Vent)
D - EXTERNAL SEWAGE / STORM WATER
DRAINAGE/WATER SUPPLY:
External Water supply152 Providing and fixing CPVC (Chlorinated Poly Vinyl
Chloride) water supply pipes confirming to IS:15778/2007with pipe as per CTS SDR 11 (operating pressure - 7 Bar @82 Deg C and 28 Bar @ 23 Deg C)for pipes from 1/2 Inchto 2 Inch. Schedule 40 Pipe to be used from 2-1/2 Inch to 6Inch Schedule 40 Pipe to be used . Pipes shall be joinedusing solvent welded CPVC fittings i.e. Tees, Elbows,Couplers, Unions, Reducers, brushings etc. includingtransition fittings (connection between CPVC & metalpipe/GI) i.e. Brass Adaptors (both Male & Femalethreaded) conforming to ASTM D-2846. ASTM F441 withonly CPVC solvent cement conforming to ASTM F-493.
All termination points for installation of faucets shall havebrass termination fittings. Installation shall be to as perTechnical Manual of manufacturer of pipes & fittings.
![Page 48: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/48.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 48/2939
Providing and fixing CPVC (Chlorinated Poly VinylChloride) water supply pipes as above.Fixing/supporting the pipes (& fittings) at wall/ceilinglevel supported by galvanized clamps, fastener, hangersetc, as per specification. Exposed pipes to be painted oflegends with direction arrow. GI pipe sleeves suitablehigher size shall be provided wherever the pipes arecrossing the fire rated walls / floors slab and sealing thesleeves with glass wool in between and fire sealantcompound at either end. As complete, as directed byEn ineer-Inchar e.External Water supply
a 1" dia (25 mm) RMT 252
b 1.1/4" dia (32 mm) RMT 401
c 1.1/2" dia (40 mm) RMT 355
d 2" dia (50 mm) RMT 420
e 2-1/2" dia (65 mm) RMT 343
f 3" dia (80 mm) RMT 343
g 4" dia (100 mm) RMT 10
153 Providing, fixing, jointing and testing in position thefollowing UPVC pipes confirming to IS:4985 of 6 Kg /Sq.cm for drainage system cut to required length. Pipe tobe laid below ground level in trenches upto requireddepth including excavation in all kind of soil (hard rock),dewatering, refilling, watering, ramming and removingthe surplus excavated material and making good the samecomplete as required. Cost shall be inclusive of providingprotection to pipe all round / haunches as perspecification and also as complete, as directed byEngineer-Incharge (For sewer and Sullage line)
a 160 mm dia RMT 604
b 200 mm dia RMT 367154 Providing, fixing, jointing and testing in position the
following UPVC pipes confirming to IS:4985 of 6 Kg /Sq.cm for drainage system cut to required length. Pipe tobe laid below ground level in trenches upto requireddepth including excavation in all kind of soil (hard rock),dewatering, refilling, watering, ramming and removingthe surplus excavated material and making good the samecomplete as required. Cost shall be inclusive of providingprotection to pipe all round / haunches as perspecification and also as complete, as directed byEngineer-Incharge (For storm water line)
200 mm dia RMT 606155 Providing and fixing square mouth cast iron gully trap
complete in brick masonry 300 x 300 mm chamber ofstandard detail with first class bricks and water tightdouble seal CI cover with frame of 300 x 300 mm internalsize. The weight of cover and frame to be not less than 10Kg as per standard design and also as complete, asdirected b En ineer-Inchar e
![Page 49: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/49.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 49/2939
(Note : Cost shall include excavation dewatering andwatering proofing of chambers as directed at site)300 x 300 mm chamber with 150 x 100 mm size“GULLEY” trap
Set 33
156 Designing and constructing brick masonry inspection
chamber of the following sizes in brick work of class 75 incement mortar 1:5 (1 cement:5 fine sand), R.C.C. top slabwith 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stoneaggregate 20mm. nominal size) embeded with frame formanhole, RCC foundation slab. 1:2:4 mix (1 cement : 2coarse sand:4 graded stone aggregate 40 mm nominalsize) both inside and outside of plastering 12 mm thickwith cement motar 1:3 (1 cement : 3 coarse sand) with afloating coat of neat cement on inside face, proper waterproofing to ensure no ground water seepage in themanhole, Poly propylene (conforming to ASTMD - 4101)foot rests (meeting the 224 kg load requirement as per IS5455) at 300 mm spacing, benching and making channelswith 1:2:4 cement concrete neatly finished, includingnecessary centering and shuttering, reinforcement,
excavation, in all kind of soil, dewatering, refilling,watering, ramming and removing the surplus excavatedearth, making good the same complete as required.
Contractor shall submit the structural design anddrawings for the approval of Engineer-incharge prior toexecution.
a 900 x 800 mm size(UP TO 900mm) No. 38
b 1200 x 900 mm size(UP TO 2.4M) No. 19
c 1500mm Dia Circular(2.4 to 3.0m Depth) No. 4
157 Providing & fixing Cast Iron Manhole cover with framein Cement concrete 1:2:4 (one of cement two of sand andfour of hardbroken stone jally) finished neatly etc..ascomplete, as directed by Engineer-Incharge.- For
inspection chamber
a 600 x 600 mm, Heavy Duty (B-125), Wt 115 kg No. 61
158 Designing and constructing brick masonry Rain water
collection chamber for fire protection valve chamber
and for data cabling of the following sizes in brick worksize 230x115x75mm of class 50 in cement mortar 1:5 (1cement:5 fine sand), R.C.C. top slab with 1:2:4 mix (1cement : 2 coarse sand : 4 graded stone aggregate 20mm.nominal size) embeded with frame for manhole, RCCfoundation slab. 1:2:4 mix (1 cement : 2 coarse sand:4
graded stone aggregate 40 mm nominal size) both insideand outside of plastering 12 mm thick with cement motar1:3 (1 cement : 3 coarse sand) with a floating coat of neatcement on inside face,
![Page 50: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/50.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 50/2939
proper water proofing to ensure no ground water seepagein the manhole, Poly propylene (conforming to ASTMD -4101) foot rests (meeting the 224 kg load requirement asper IS 5455) at 300 mm spacing, benching and makingchannels with 1:2:4 cement concrete neatly finished,including necessary centering and shuttering,reinforcement, excavation, in all kind of soil, dewatering,refilling, watering, ramming and removing the surplusexcavated earth, making good the same all complete asdirected by Engineer-incharge.
a 600 x 600 x 600 mm size No. 34
b 900 x 800 mm size x 900 mm size No. 171
159 Providing & fixing Ductile Iron Manhole cover withframe in Cement concrete 1:2:4 (one of cement two ofsand and four of hardbroken stone jally) finished neatlyetc..as complete, as directed by Engineer-Incharge.- For
Rain water collection chamber
600 x 600 mm, Medium Duty (B-125), Wt 115 kg No. 205
Total of 'External Sewage/Storm Water Drainage/Water Supply
E - CIVIL WORKS / MISCELLANEOUS ITEMS:
160 Providing and fixing 600 mm long MS hot dip galvanizedPUDDLE FLANGES fabricated out of 6 mm thick MSplates of suitable size and IS:1239 heavy class pipesproperly fixed in walls & top slab of tanks. The entirefittings shall be hot dipped galvanized after fabrication.Length shall be minimum 600 mm or wall thickness plus200 mm on either side (which ever is more). etc. ascomplete, as directed by Engineer-Incharge.
a 50 mm dia (flanged ends) No. 62
b 80 mm dia (flanged ends) No. 49
c 100 mm dia (flanged ends) No. 48d 150 mm dia (flanged ends) No. 9
e 200 mm dia (flanged ends) No. 2
161 Providing and fixing electronic type level indicator forwater tanks mounting in panel with the followingfeatures, level display, alarm when water level is low orhigh, full range from one level to four level display andmanual reset for alarm etc. with electrical wiring conduitsupports from wall & ceiling probs and all otheraccessories etc as complete, as directed by Engineer-Incharge.
No. 6
Total of Civil Works/Miscellaneous Items
F - WATER SUPPLY, DRAINAGE, PUMPS &EQUIPMENT
Hydropneumatic System:
162 Supply, Installation, Testing And Commissioning OfCompact Self Contained Skid Mounted HydropneumaticSystem As Follows:
a. In-Line, Multisage, centrifugal pumps with SS-304 casingand impeller and SS-316 shaft, CI base & head TEFCmotor (with mechanical seal)
![Page 51: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/51.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 51/2939
(Vendor to submit performance curves and technicalcatalog of the proposed model for review & information)
The pump shall be selected for performance at bestefficiency point. However, the pump selection shall besuitable for performance with set point @ + 20% of therated head.Nos. of Pumps : 3 (2W +1S)
Water Flow Rate : 4.09 LPS each
Head : 108 M
Purpose :- Cold water supply
b. Electric control panel with change over swich, relays,electrical wiring, cabling from panel to pumps, levelcontroller complete with all accessories as permanufacturer specification.
c. Complete (Skid mounted wall mounted / floor mounted)electrical control panel comprising of all accessories suchas PLCs, pressure switches, pressure transducers, controlwiring and any other necessary imports etc. (list to beprovided by the vendor)
d. Precharged diaphram pressure vessel with food grademembrane, charging connection, connected to outletheader with necessary flanges, gaskets, isolating valves,nuts/bolts etc complete.
e. Set of accessories such as pressure switches, pressuretransducers, inter connecting power and control cablingetc. complete
f. Accessories like NRVs, isolating valves, SS-304 (non-Magnetic) suction and delivery header, pressure gauge,MS base frame (Synthetic enamel painted over a coat ofprimer)Hydropneumatic System as described above Set 1
163 Supply, installation, testing and commissioning of terrace
Booster pump comprising of the following:
Horizontal mono-block centrifugal pump, suitable foroperation on 415 volts ± 6%, 3 phase, 50 HZ A.C supply.
The pump casing shall be CI, shaft shall be CS & impeller/ shaft sleeve / casing wearing ring shall be bronze. Thesystem shall be complete with necessary pressure gaugewith gun metal shut off cock on delivery side. (The pumpshould meet the condition and shall be gotten approvedby the Local fire Authority).
Squirrel cage induction motor TEFC type for operation on415 V, 3 phase 50 HZ AC supply for the above pump withspeed of 2900 R.P.M.
Suitable cement concrete foundation with plaster, (designand drawing to be provided by the Contractor while thefoundation will be done by others) complete withAntivibration arrangement of cushy foot mounting.
Nos. of Pumps : 2 (1W +1S) Set 5Water Flow Rate : 1.0 LPS each
![Page 52: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/52.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 52/2939
Head : 25 M
Purpose :- Terrace booster pump
- Submersiable Pumps
Submersiable Centrifugal Non-clog Drainage Pumps
Supply, installation, testing and commissioning ofcontinuous duty submersible centrifugal non-cloggingdrainage pumps complete with 3 phase motor with all
necessary protection and mechanical seal etc.Cost shall beinclusive of auto pumping arrangement. (IW +1S)
164 Flow rate : 3.3 LPS
Head : 25 Mts
Solid Handling : 10-12 MM
Location : Rain water storage sump-1 &2
Purpose : Rain water transfer to Fire water tank.
MOC : CI Body, impeller and SS Shaft Set 2
165 Flow rate : 3.3 LPS
Head : 25Mts
Solid Handling : 10-12 MMLocation: Plumbing Plant Room
MOC : SS body SS Impeller & Shaft Set 1
Total of Water Supply,Drainage,Pumps & Equipment
G - ELECTRICAL INSTALLATION FOR PLUMBING
166 Design, fabrication, assembling, wiring, supply,installation, testing and commissioning of motor controlcentre shall be fabricated out of 14 gauge CRCA sheetsteel in form in 3b formation with reinforcement ofsuitable size angle iron, channel „T‟ sections irons and/orflats wherever necessary. Cable gland plates shall beprovided on top as well as at the bottom of the panels.
Panels shall be treated with all anticorrosive processbefore painting as per specifications with 2 coats of redoxide primer and final approved shade of powder coatedpaint. 2 Nos. earthing terminals shall be provided for 3phase, 4 wire, 50 Hz supply system. Lifting hooks shallalso be provided in case of large panels. Approval shall betaken for each panel before fabrication. Cadmium Platedhardware shall be used in fabrication of panels. Quotedrates shall inclusive of cables (in accordance tospecification) with earthing from panel to each motor /equyipment.
PLUMBING SYSTEM
![Page 53: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/53.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 53/2939
Design, fabrication, assembling, wiring, supply,installation, testing and commissioning of motor controlcentre shall be fabricated out of 14 gauge CRCA sheetsteel in form in 3b formation with reinforcement ofsuitable size angle iron, channel „T‟ sections irons and/orflats wherever necessary. Cable gland plates shall beprovided on top as well as at the bottom of the panels.Panels shall be treated with all anticorrosive processbefore painting as per specifications with 2 coats of redoxide primer and final approved shade of powder coatedpaint. 2 Nos. earthing terminals shall be provided for 3phase, 4 wire, 50 Hz supply system. Lifting hooks shallalso be provided in case of large panels. Approval shall betaken for each panel before fabrication. Cadmium Platedhardware shall be used in fabrication of panels. Quotedrates shall inclusive of cables, cable trays, control cabling,cabling, earthing (in accordance to specification) withearthing from panel to each motor / equipment.
a - MCC –1 (Plumbing Panel)- Incoming
100 amps TPN MCCB with the following accessories:
a. 0-500 volts 96 x 96 mm square voltmeter with selectorswitch protected by 2 amps TP MCB. 1 Setb. 0-200 amps 96 x 96 mm square ammeter with selectorswitch and 200/5 amps 10 VA CL:1 CTs. 1 Set
c. Phase indicating lamps protected by 2 amp SP MCB 3Sets
- Bus Bar
125 amps TPN (25 KA) aluminium bus bar with heatshrinkable insulation sleeves.
- Outgoings
a. 1 No. 32 amps TPN MCCB outgoing feeder to ROWater Hydro-pneumatic.b. 1 No. 63 amps TPN MCCB outgoing feeder to DomesticWater Hydro-pneumatic.c. 2 No. 32 amps TPN MCCB for 3 HP DOL starter andoutgoing feeder to Water treatment pump motor(including 1nos. standby). Each compartment shallcontain auto / manual selector swtich and indicating /pushbutton lamps with MCB for ON / OFF / TRIP ofmotor.d. 2 No. 32 amps TPN MCCB for 2 HP DOL starter and
outgoing feeder to plumbing plant room drain pump(including 1nos. standby). Each compartment shallcontain auto / manual selector swtich and indicating /pushbutton lamps with MCB for ON / OFF / TRIP ofmotor.
![Page 54: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/54.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 54/2939
e. 4 No. 32 amps TPN MCCB for 5 HP DOL starter andoutgoing feeder to Storm water transfer pump (including1nos. standby). Each compartment shall contain auto /manual selector swtich and indicating / pushbuttonlamps with MCB for ON / OFF / TRIP of motor. (Note : -Starter to be located at near storm water sump. so seprateencloser required for starter with all nessacery items.)
f. Spare MCCB‟s of following capacities:
i. 32 amps TPN MPCB‟s 2 Nos.
iii. 63 amps TPN MPCB‟s 1 Nos.
Necessary cable alleys, internal wiring, andinterlocking, earthing for all equipment shall also beincluded.
- Notes :
a. All MCCBs shall be of 25 KA breaking capacity andsuitable for motor duty application.b. Provision shall be made for providing potential freecontacts to all pumps starters for connection to BAS
c. Provision shall be made to ensure system protectionfrom dry running of the pumpMCC - 1 (Plumbing panel) as described above. Set 1
Total of Electrical Installation for Plumbing
167 Water Treatment Plant-90,000Liter/Day
Providing, Installing, testing and commissioning of SS
vertical centrifugal pump. Each pump shall have TEFC2900 RPM three phase electric motor. The pump shallhave cast iron head, base plate SS Shaft / Impeller /Intermediate chamber. Pump shall be provided withmechanical seal. The pump shall be suitable for auto /manual operation. The installation shall be complete with
all necessary ancillaries & accessories including base platecomplete as required. (1Working + 1Standby).
Flow rate : 11250 LPH each
Head : 30 Mts
Required for : Raw water treatment for Feed pump
Providing, Fixing, Testing & Commissioning of verticalMSEP filter with adequate dirt holding capacity.Fabricated from MS sheet as per manufacturer'sspecifications complete with initial charge filter mediaincluding painting inside with two coats of non toxicepoxy and with one coat of zinc chromate two coats of
synthetic enamel paint outside. Including concretefoundation with cement plaster complete as required. Thefilter shall also be provided with set of internals for rawwater inlet and bottom collecting system. Complete withfrontal piping (heavy) and butterfly valves designed on1.50 m / sec velocity.
Pressure Sand Filter for Domestic Water services.
Filtration Rate 15000L/Sqm/Hr
Working pressure 3 Kg/Sq.cm
![Page 55: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/55.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 55/2939
Capacity : 11250 LPH
Activated Carbon Filter
Filtration Rate 15000L/Sqm/Hr
Working pressure 3 Kg/Sq.cm
Capacity : 11250 LPH
Providing, Fixing, Testing & Commissioning of MSEP
water softening plant (suitable for 3 Kg/Sqcm working
pressure) complete with initial charge with T-40 NAResin, multiport valve with built in ejector for controllingall operations), regeneration system and HDPE tank,pressure gauge at inlet, outlet and back wash (each withisolation cock), valves, fittings and water hardness testingkit & associated works. Softener shall be suitable for thefollowing duty:Raw water hardness 800 Mg/L
Treated water harness 100 Mg/L
Regeneration Period 8 Hrs.
Capacity : 11250 LPH
Providing, Installing, testing and commissioning of
dosing system (for domestic water treatment plant)consisting of one HDPE tank of 100 liters capacity with apositive displacement diaphragm dosing pump havingvariable flow rate of 0-4 lph. The motor shall be suitablefor operation at 240 V/Single phase/50 Hz. Supply. Thepump shall be supplied complete with necessarypolypropylene piping, valves, strainers, low level switchand injection fittings. The pump shall be speed & strokecontrol Asia LMI / equivalent make.
The cost shall be inclusive of providing salt for the testingand operation of system before handover to the owner.
Supply, installation, testing & commissioning of HighFlow UV system for tertiary water treatment. The UVchamber shall be internally & externally electro polishedwith double side flange, drain part & probe bar. The unitshall use quartz glass technology for superior UVtransmission and specialized high intensity UV lamprated for 16000 hour operation. The UV dosage shall begreater than 30,000 uW-Sec / sq.cm system to be completewith monitoring units.Unit flow : 90 Cum / Day ( 11.25 KL/hr)
Providing, Fixing, Testing & Commissioning of pressure
switch for water pumps to start/stop the pump at set
pressure. Including wiring, cabling from pump to panel &all other accessories as required to operate the systemautomatically.
![Page 56: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/56.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 56/2939
Providing, Fixing, Testing & Commissioning of thefollowing heavy class GI pipes conforming to IS:1239 cutto required lengths including all necessary fittings(conforming to IS:1879) and specials such as bends, tees,unions, reducers, flanges & plugs etc. fixing at wall /ceiling level supported by clamps, hangers etc, (to begalvanized after fabrication) cutting hole in wall / floor /slab and making good the same good with cementconcrete 1:2:4 / fire sealant complete as required.
Painting two coats of Synthetic enamel paint ofapproved shade on pipes and supports as per pipe colorcode over a coat of primer. Including painting of legendswith direction arrow as per the approval of the Engineer-Incharge.Providing, Installation, testing and commissioning oftanker inlet connection complete with 80 mm dia GI inletpiping, hose inlet connection, MS cabinet enclosure(epoxy painted after fabrication), pad lockingarrangement, inlet flexible hose complete with all
necessary arrangement.Providing, Fixing, Testing & Commissioning of butterfly
valve (Body : Grey Cast Iron, Shaft : SS, Disc : SG Iron(Rilson coated), Liner : HT - EPDM) (up to 150mm diawith hand lever operation & above with gear boxoperation). Tested to a pressure not less than 15Kg/Sq.cm. Including rubber gasket, flanges, nuts, bolts,washers & painting complete as required.Providing, Fixing, Testing & Commissioning of CI wafer
type check valve tested to a pressure of 15 Kg/sqcm.Including rubber gasket, flanges, union, nuts, bolts,washers & painting complete as required.
Providing, Fixing, Testing & Commissioning of CI `Y'Strainer (screwed/ flanged) with stainless steel fine wiremesh perforated sheet basket with necessary flange/unions nuts, bolts and washers complete as required (onpump suction).
Providing, Fixing, Testing & Commissioning of on lineturbine type flowmetre with preamplifier electronicflowmetre mounted in plumbing plant room electricalcontrol panel with the following features. Monitoring thetotal flow, Flow rate, high low arm batching and blendingetc. Including electrical wiring from preamplifier tomicroprocessor based flowmetre. Complete with all typeof Plumbing & Electrical connections, accessories, wiring,
conduits & supports complete with all respect.
Providing, Fixing, Testing & Commissioning of Heavy
class header complete for pump suction / dischargemanifold comprising of expansion bellows, flanges,unions, check nuts, tee elbow etc. including all flangedconnections as per drawing / site requirement. Supportsfrom wall, floor and ceiling etc. Including dead endflanged connection complete as required.
![Page 57: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/57.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 57/2939
Rate shall include all the above works / specification asdirected by Engineer-incharge.
Set 1
Total of WTP
168 RO TREATMENT Plant Capacity of 2000 Liter/Day
Supply, installation, testing and commissioning of 500liters/day @ 4hr per day capacity of RO plant and suitableFilter Feed pump, Pressure Sand Filter, Activated Carbon
Filter, antiscalant dosing system, reverse osmosis systemsikd mounted, high pressure pump, membrane pressurevessel, Ro membrane with CIP system , ph correctiondosing system, Pressure Gauge, Flowmetre, Piping,Electrical panel and cable etc...
Note :- 1. Outlet water from the RO plant meeting thedrinking water quality requirement with chemicalparameters in acceptable limits as per the : IS 10500, 1991,2. and also all pumps are provide ( 1 work +1 standby ).
Hydropneumatic System:
Supply, Installation, Testing And Commissioning Of
Compact Self Contained Skid Mounted HydropneumaticSystem As Follows:In-Line, Multisage, centrifugal pumps with SS-304 casingand impeller and SS-316 shaft, CI base & head TEFCmotor (with mechanical seal)(Vendor to submit performance curves and technicalcatalog of the proposed model for review & information)
The pump shall be selected for performance at bestefficiency point. However, the pump selection shall besuitable for performance with set point @ + 20% of therated head.Nos. of Pumps : 2 (IW +1S)
Water Flow Rate : 0.23 LPS each
Head : 108 M
Purpose :- RO water supply Set 1
Total of RO Treatment
169 Sewage Treatment Plant Capacity of 2, 50,000Litres/Day,
Design, supplying, installing, testing &commissioning of Sewage Treatment Plant
(excluding excavation, back filling & disposal of surplusearth Civil construction work) for the followingduty:
Nature of effluent - Domestic Sewage fromresidential toilets & kitchens.Daily average flow - 225 KldpH - 7.5 – 8.5
BOD5 - 250 – 400 Mg/L
S. Solids - 150 – 200 Mg/L
COD - 300 – 600 Mg/L
Oil & Grease - 50 Mg / L
Effluent discharge standard after treatment
![Page 58: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/58.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 58/2939
pH - 6.0 – 8.5
BOD5 - Less than 5 Mg/L
S. Solids - Less than 5 Mg/L
COD - Less than 30 Mg/L
Oil & Grease - Less than 5 Mg/L
Sewage treatment plant shall include the following
items:
Screen ChamberSewage equalization tank/sump
Aerobic MBBR Reactor Floating Media
Secondary Clarifier tank
Flocculator
Tertiary Clarifier Tank
Sludge holding tank
Air Blowers, Pumps & equipment
Screw Pump & Filter Press
Piping, valves etc
Electrical Panel & Cabling
Flushing / Irrigation water storage tankCommon plant room adjacent to STP.
Multigrade sand filters and Activated carbon filters.
Supply, installation, testing & commissioning of 2 NosStainless Steel Coarse & Fine Perforated Screen withsuitable lifting arrangement (size 600 mm wide x 1000mm high approx)Supply of MS hot dip galvanized puddle flanges inaccordance to BS:10 table D as required to be provided (inthe structural slab and wall) of various diameters. Puddleflanges shall be provided for all the structuralcomponent of the STP. The installation of the puddleflanges shall be carried out by the Civil contractor in
accordance to the Civil GA drawing (to be prepared bythe STP contractor) at the required levels & position;under the supervision of the STP contractor
Supply of plastic manhole step/foot rest (@ 300 mm c/C)with polypropylene compound injection molded around12 mm dia (Fe-415) steel reinforcing bar. Provision of thefoot rest is envisaged in various tanks/ components of theSTP for the purpose of accessibility. The installation of thefoot rest shall be done by the civil contractor as per civilGA drawinSupply, installation, testing & commissioning of CImedium duty rectangular manhole cover with frame forthe feasibility of access in the tankSize : 600 x 600 (175 kg)
Supply of vent pipes of 100 mm dia with mosquito proofgrating suitable for the ventilation purpose of the varioustanks
![Page 59: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/59.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 59/2939
Supply, installation, testing & commissioning of electronictype level controller for automatic operation of the systemwith high/low level alarm complete with auxillaryNO/NC contacts for Raw Sewage Pumps
Contractor shall ensure submission of detailed GA
drawings (Plan & Section), P & I diagram, schematic
diagram for the above mentioned component and
additional component if so required for the completeworking of the STP and got it approved by the Engineer
Incharge.
Supply, installation, testing & commissioning of nonclogging type pumps capable of handling solids upto 38mm having CI casing & impeller complete with allaccessories, motor of required capacity. Delivery headerwith isolation valve, pressure gauge on delivery line withisolation cock, level controller (with wiring) to control thelevel of sump automatically. Pumps shall have followingdut :Submersible Sump Pumps (1W + 1S)
Flow rate (each) = 11.25 cum / hrHead = 10 Mtr
Plant room sump pump with CI body & CI impellerpump(1W + 1S)
Flow rate (each) = 5 cum / hr
Head = 15 Mtr
(Solid handling size for this pump shall be 8 to 15 mm).
Cost shall be inclusive of PVC flexible Hose pipe ( forpiping submeged in effluent) with PVC/GI piping (forpiping non-submerged in effluent)
Provision of guide ropes to guide submersible pump fromupper level to operational level in sump basin withchannels / angle section shall be made by the STPcontractor. (If Required)Contractor is requested to submit quote rate for abovepumps with CI Casing & SS impeller, material ofconstruction.Air diffusion system shall include the following:
Twin lobe rotary air blowers capable of delivering 450cum/hr. of free air at 0.5 kg.cm2. driven through “V” beltor directly coupled through flexible coupling to aTEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3
phase, 50 cycles A/C supply (1W +1S). Blower to behoused in an acoustically treated room such that theiroperating noise does not exceed 80 DB at 3 mtrs. from theblower enclouser.Air piping shall comprise of pipes droppers/ laterals withGI Header complete with all fittings such as tees, crosses,plugs, sockets, elbows, reducers, supports & clamps,puddle flanges etc . Contactor to submit detailed P & Iindicating their proposal.
![Page 60: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/60.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 60/2939
Non clog type air dispersion system . Air dispersion gridshall be assembled in modular form so that they can bereplaced / repaired easily from plat form at the top.
Supply of MBBR media consisting of Virgin PE carriermodules with Surface are not less than 500 M2/M3
Bronze Ball valve and air dispersion grid as required forSTP as described above.Note :
Air dispersion system shall be provided for SewageSump, Aerobic digester cum Thickner & Aeration Tank.
Providing and fixing all piping (as described below) andisolation control valves for making the system complete.
SS /GI / PVC : Submerged air piping
GI : Air piping
PVC Piping : Pumped effluent , tank overflow pipe line &Process Piping .
GI Heavy : Interconnecting pipe line after deliveryheader of pump/ filterDesigning, supplying, providing, fixing, testing andcommissioning of STP as mentioned above.Supplying, installation, testing and commissioning ofhorizontal sludge recirculation pumps coupled withmotor of capacity 10 cum/hr at 10 m head of C.I. Partsand mechanical seal complete with isolation and non-return valves. (1working + 1 standby)Capacity : 10 cum/hr
Head : 10 M
Supplying, installing, testing & commissioning of
Horizontal centrifugal filter feed water pumps CIImpeller along with motor, pressure gauge with isolationcock, Isolation valve, NRV on delivery line. Isolationvalve, strainer at suction.Mechanical seal, suitablevibration elimination pads of approved design, drain pipewith valve (25 dia.) for the pump. The pump shall besuitable for 415±10% volts 3 phase AC supply (solidhandling size for this pump shall be - 5 mm) (1W + 1S).
Capacity : 11.25 cum/hr
Head : 30 M
Supplying, installing, testing and commissioning ofcentrifugal Horizontal water supply pump C.I Body, CI
Impeller with mechanical seal along with motor. Pressuregauge with isolation cock, NRV, Isolation valve ondelivery line. Isolation valve, strainer at suction. Suction &delivery header (sized at velocity of 1.5m/sec.). Suitablevibration elimination pads of approved design for thepump. The pump shall be suitable for 415±10% volts 3phase AC. Supply.Capacity : 2 LPS (1W + 1S)
Head : 50 M
![Page 61: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/61.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 61/2939
Purpose : Irrigation water transfer
pumpNote
Operation of pump shall be based on level controllerproposed to be installed in tank as per site location. Thecontractor to recheck the Head required for pumps as persite conditions and provide accordingly.
Supplying, installing, testing and commissioning ofcomposite MSEP vessel filter with MS frontal piping.Filter shall be suitable for working pressure of 5 kg / cm2and shall include media, standard fittings like pressuregauges, sampling cock, backwash, rinse drain, vacuumbreaker, including multiport valve, &1 no. waterflowmetre at outlet (flowmetre shall be approved by dept.of wei hts & measures).Multigrade pressure sand filter
Flow rate : 11..25 cum/hr (1W)
Filtration velocity 15000 Ltrs./ Hr./ Sq.m.
Activated Carbon Filter
Flow rate : 11..25 cum/hr (1W)Filtration velocity 12000 Ltrs./ Hr./ Sq.m.
Supply, installation, testing & commissioning of HighFlow UV system for tertiary water treatment. The UVchamber shall be internally & externally electro polishedwith double side flange, drain part & probe bar. The unitshall use quartz glass technology for superior UVtransmission and specialized high intensity UV lamprated for 16000 hour operation. The UV dosage shall begreater than 60,000 uW-Sec / sq.cm system to be completewith monitoring units.Unit flow : 11.25 Cum / hr
Supply, installation, testing & commissioning of polyelectro type dosing system comprising of 100 ltrs HDPEtank with 0-6 lph electronicmetreing type pump and SSagitator complete with motor.Supply, installation, testing & commissioning of singlescrew double stage, flanged end, CI body alloy steel screwand rotateing parts, pump to filter press 400 LPH 60 mtr.head complete.Supply, installation, testing & commissioning of Manual
closing mechanism filter press comprising of CI bodygrade FG 20, polypropylene plate with sludge cakeholding capacity of 650 ltrs.
![Page 62: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/62.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 62/2939
Providing, fixing, testing and commissioning watermetrewith direct reading dial in KL with all integral parts ofgun metal or brass with necessary fitting such as threadedpieces, unions pressure gauge and isolation cock, flangespiece for future removal, flanges / unions complete withall necessary testing charges and obtaining test certificatesfrom municipal authorities, on following size pipe lines (1no. strainer & 2 nos. pressure gauges shall be provided atinlet & outlet and cost shall be inclusive for the same).
50 mm dia
Total of STP Works
WATER SUPPLY, DRAINAGE, PUMPS &
EQUIPMENT
Hydropneumatic System:
Supply, Installation, Testing And Commissioning OfCompact Self Contained Skid Mounted HydropneumaticSystem As Follows:In-Line, Multisage, centrifugal pumps with SS-304 casing
and impeller and SS-316 shaft, CI base & head TEFCmotor (with mechanical seal)(Vendor to submit performance curves and technicalcatalog of the proposed model for review & information)
The pump shall be selected for performance at bestefficiency point. However, the pump selection shall besuitable for performance with set point @ + 20% of therated head.Nos. of Pumps : 3(2W+1S)
Water Flow Rate : 2.08 LPS each
Head : 107 M
Purpose :- Flush water supplyApproval from pollution board at initial & various otherstages of works including preparation of report /drawings as per pollution board requirementarrangement of raw sewage testing & commissioning.Contractor shall include the cost of all chemicals(consumed during testing & commissioning) and the costof such items of works which are not explicitly mentionedabove, but are mendatory to have pollution boardapproval.(Consent to operate only)
Total of Water Supply,Drainage,Pumps & Equipment
Works
170 Elecrtical Installation for Sewage Treatment Plant
Control Panel for Sewage Treatment Plant
![Page 63: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/63.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 63/2939
Design, fabrication, assembling, wiring, supply,installation, testing and commissioning of motor controlcentre shall be fabricated out of 14 gauge CRCA sheetsteel in form in 3 formation with reinforcement of suitablesize angle iron, channel „T‟ sections irons and/or flatswherever necessary. Cable gland plates shall be providedon top as well as at the bottom of the panels. Panels shallbe treated with all anticorrosive process before painting asper specifications with 2 coats of red oxide primer andfinal approved shade of powder coated paint. 2 Nos.earthing terminals shall be provided for 3 phase, 4 wire,50 Hz supply system. Lifting hooks shall also be providedin case of large panels. Approval shall be taken for eachpanel before fabrication. Galvanised hardware with zincpassivation shall be used in fabrication of panels.
MCC-1 (STP Motor Control Centre)
Incoming
100 amps TPN MCCB with the following accessories:
a. 0-500 volts 96 x 96 mm square digital electronicvoltmeter with selector switch shall be protected by 2amps TP MCB. 1 Setb. 0-100 amps 96 x 96 mm square digital electronicammeter with selector switch and 100/5 amps 15 VA CL:1 CTs. 1 Setc. Phase indicating lamps shall be protected by 2 amp SPMCB 3 SetsBus Bar
125 amps TPN (25 KA) copper bus bar with heatshrinkable insulation sleeves.Outgoing
a. 2 Nos. suitable rating MPCB for 2.0 HP direct on linestarter and outgoing feeder to EQT sewage transfer
pumps motor - Main (including 1nos. standby). Eachcompartment shall contain auto / manual selector switchand indicating / pushbutton lamps with MCB for ON /OFF / TRIP of motor.
b. 2 Nos. 63A MCCB for 10.0 HP Star delta starter ndoutgoing feeder to air blowers (including 1 no. standby).Each compartment shall contain auto/manual selectorswitch and indicating lamps with MCB‟s for„ON/OFF/TRIP' status of motor.
c. 2 Nos. suitable rating MPCB for 1.0 HP direct on line
starter and outgoing feeders to sludge recirculationpump (including 1 no. standby). Compartment shallcontain auto/manual selector switch and indicatinglamps with MCB‟s for „ON/OFF/TRIP‟ status of motor.
![Page 64: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/64.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 64/2939
d. 2 Nos. TPN MPCB for 3.0 HP direct on line starter andoutgoing feeders to (1W+1S) filter feed pump. Eachcompartment shall contain direct operated digitalammeter of 0-63 amps range, auto/manual selector switchand indicating lamps with MCB and „ON/OFF/TRIP‟
status of motorf. 1 No. suitable rating MPCB for 1 HP direct on linestarter and outgoing feeders to Helical Screw Pump.Compartment shall contain auto/manual selector switchand indicating lamps with MCB‟s for „ON/OFF/TRIP‟
status of motor.g. 1 Nos. 40A TPN MCCB for 6.5 HP direct on line starter(2W+1S) and outgoing feeders to fluhing water supply
by hydropnumatic system. Each compartment shallcontain C T operated 0-63 amps range digital ammeterwith selector switch, auto/manual selector switch andindicating lamps with MCB‟s and „ON/OFF/TRIP‟ statusof motor
h. 2 Nos. TPN MPCB for 5 HP direct on line starter(1W+1S) and outgoing feeders to irrigation pump. Each
compartment shall contain C T operated 0-32 amps rangedigital ammeter with selector switch, auto/manualselector switch and indicating lamps with MCB‟s and„ON/OFF/TRIP‟ status of motor
e. 2 Nos. TPN MPCB for 1 HP direct on line starter andoutgoing feeders to (1W+1S) plant room floor drian pit
pump. Each compartment shall contain direct operateddigital ammeter of 0-32 amps range, auto/manual selectorswitch and indicating lamps with MCB‟s and„ON/OFF/TRIP‟ status of motor
n. Spare of following capacities:
i. 32 amps TPN MCCB 2 Nos.
ii. 63 amps TPN MCCB 1 Nos.o. Necessary cable alleys, internal wiring, andinterlocking, earthing for all equipment shall alsoincludedNotes:
a. All MCCBs shall be of 25 KA breaking capacity andsuitable for motor duty application.b. All motor starter shall be provided with Automaticlevel controller.c. Provision shall be made for providing potential freecontacts to all pumps starters for connection toBAS
MCC-1 for Upper Level STP as described aboveCABLE & CABLE TRAYS
Supplying, laying & suitable no.of termination offollowing 1100 volt grade PVC sheathedaluminum/copper conductor armoured cables as perspecification in existing trenches, cable trays, ducts overbed of sand, clamped to wall with suitable clamps,saddles fixing bolts including connecting testing andcommissioning.4 core 4 sq. mm copper cable
![Page 65: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/65.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 65/2939
4 core 6 sq. mm copper cable
3 core 2.5 sq. mm copper cable
3 core 4 sq. mm copper cable
Supply and fixing of perforated type GI cable trays withsupports, hangers, fastners of the following sizes as perspecification.300 mm x 40 x 40 x 2 mm thick
200 mm x 40 x 40 x 2 mm thick150 mm x 25 x 25 x 2 mm thickEARTHING
Supply and fixing of following bare GI tapes / wiresincluding all necessary fixing accessories and effectingconnections as per specifications.25 x 6 mm thick GI strip.
8 SWG GI wire Set 1
Total of Electrical Installation for STP Works
171 Solar Hot Water system-capacity - 13000 Liters/day
Supplying, fixing, testing & commissioning of blackpainted copper collector panel (each panel capcity 200
liter / day) housed in aluminum casing with top of glassshall be as per specifications including all requiredstructural support, necessary inter connecting piping,drain point with valve auto air vent valve etc. complete asre uired.(Note : Civil work to be executed by other agency underrequirement of Solar Hot water Heating Contractor.However this vendor to provide details of all such civilrequirements & also ensure his supervision during thecivil works execution).Solar Water Storage Cum Calorifier Tank :
Supply, installation, testing & commissioning of SS 304horizontal / vertical Solar hot water storage cum
calorifier tank (Capacity 1000 Lts) suitable for minimum8 Kg /Sq.cm working pressure and having SS-304 tube forheat exchange of ____ Kcal/Hr heat transfer capacity,duly mounted by removable type SS-304 flange withgasket, nuts & bolts. Tank shall be provided inlet / outlet,overflow / drain connection with MH cover (550 mm I.D.)pressure relief valves, thermometer at inlet / outlet. Allthe valves & accessories shall be suitable for an operatingpressure as mentioned above. Tank shall be mounted on450 mm high steel structural supports with access ladderpainted with 2 coats of red oxide paint.
![Page 66: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/66.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 66/2939
Supply, installation, testing & commissioning of SS 304horizontal / vertical Solar hot water storage cum
calorifier tank (Capacity 450Lts) suitable for minimum 8Kg /Sq.cm working pressure,duly mounted by removabletype SS-304 flange with gasket, nuts & bolts. Tank shall beprovided inlet / outlet, overflow / drain connection withMH cover (550 mm I.D.) pressure relief valves,thermometer at inlet / outlet. All the valves & accessoriesshall be suitable for an operating pressure as mentionedabove. Tank shall be mounted on 450 mm high steelstructural supports with access ladder painted with 2coats of red oxide paint.
Tank shall be insulated as per specification, including 24gauge aluminium cladding. The flanges shall be of SS 304with dimensions confirming to AN SI, B 16.5 No. 150. Thenozzles shall be SS ERW pipes. (Tank shall be fabricatedas per unfired pressure vessel code IS 2825-1969, IS 226 /IS 2062).Hot water mixing tank complete with insulation & MS
supporting structure with access ladder duly paint withred oxide.Cold Water inlet Suitable pipe dia with PN 1.0 ButterflyValve.Cold Water inlet line Suitable pipe dia with Check Valve.
inlet / outlet connections for solar system.
Suitable pipe dia with PN 1.0 Butterfly Valve.
Hot water outlet connection to Mixing tank
Suitable pipe dia with PN 16 Butterfly Valve.
Spare outlet 50 mm dia PN 16 Butterfly Valve
Tank Drain connection 25 mm Ball Valve
Temperature sensor at calorifier tank suitable fordifferential temperature setting shall be made for start /stop of the water recirculation pump. The control /system shall be complete with necessary cabling / wiringalong with support.Providing, fixing, jointing and testing in position thefollowing dia of copper pipes confirming to BS2871(Table X) with ISR, Endex, Endbraze fitting confirming toBS:864 part 2 such as copper tees, crosses, plugs, elbows,reducers, union sleeve pieces etc. Cutting hole in wall /floor / slab and making good the same. Cost shall beinclusive of Fixing/supporting the pipes (& fittings) atwall/floor level supported by galvanized clamps, hangers
etc, as per specification. Exposed pipes to be insulated(seprate item) and painting of legends with directionarrow on insulation.
![Page 67: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/67.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 67/2939
Providing and fixing CPVC (Chlorinated Poly VinylChloride) water supply pipes with pipe as per CTS SDR11 (operating pressure - 7 Bar @ 82 Deg C and 28 Bar @ 23Deg C)for pipes from 1/2 Inch to 2 Inch. Schedule 80 Pipeto be used from 2-1/2 Inch to 6 Inch. Pipes shall be joinedusing solvent welded CPVC fittings i.e. Tees, Elbows,Couplers, Unions, Reducers, brushings etc. includingtransition fittings (connection between CPVC & metalpipe/GI) i.e. Brass Adaptors (both Male & Femalethreaded) conforming to ASTM D-2846. ASTM F441 withonly CPVC solvent cement conforming to ASTM F-493.Cost shall be inclusive of Fixing/supporting the pipes (&fittings) at wall/ceiling level supported by galvanizedclamps, hangers etc, as per specification. Exposed pipes tobe insulated (seprate item) and painting of legends withdirection arrow on insulation.
Providing, fixing, jointing and testing in position thefollowing heavy class (Class C) G.I. pipes for HWS/HWR
conforming to IS:1239 cut to required lengths including allnecessary fittings (All fittings shall confirm to IS:1879 -part 1 to 10) and specials such as bends, tees, unions,reducers, flanges & plugs etc. Threading, jointing, andmaking proper connections. Cost shall be inclusive ofFixing/supporting the pipes (& fittings) at wall/floorlevel supported by galvanized clamps, hangers etc, as perspecification. Exposed pipes to be insulated (seprate item)and painting of legends with direction arrow oninsulation.
Providing and fixing nitrle rubber insulation on hotwater supply / return pipes.
Providing and fixing proprietary polyshield outermechanical protection ON nitrile rubber insulation
comprising of wrapping with poly glass tape helicallywound and subsequently applying 2 coats of polyshieldmaterial (resin & hardner) as per manufacturersspecification and approved by Project Manager /Consultnats.Providing and fixing forged brass ball valves with brassball / stem, union/flange, washer, nuts & bolts. Rated totemperature of 85 Deg C and tested to a pressure not lessthan 16 Kg/Sq.cm. Including covering with nitrile rubberinsulation having protective coating against mechanicaldamage as per manufacturer‟s specification (GI boxing tobe provided).
Providing & fixing dial type (100 mm) pressure gaugewith isolation ball valve suitable for working pressure of250 PSI. Cost shall be inclusive of providing any shortpieces, nipples, elbows etc as required.
Providing and Fixing of Temprature Gauges withisolation valve suitable for system Temprature.
![Page 68: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/68.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 68/2939
Providing and fixing auto air vent for Hot water supplysystem suitable for pressure not less than 15 Kg / Sqcmincluding water expension tank of 100 mm dia. & 400 mmlong expension tank complete as requitrd.
Providing, installation, testing and commissioning offollowing insulated pumps suitable for 415 Voltsconnected with T.E.F.C. induction motor, M.S. channel,base plate with nuts & bolts complete with vibrationisolators, isolating valve on suction and discharge, nonreturn valve on discharge, pressure gauges with stop cockand dial type thermometer on suction or discharge,necessary Termination with connecting cable from pumpto electrical panel, lugs, earthing wire, cable tray etc. Thepump shall have mechanical seal. The pump shall be SS -304 casing, impeller, shaft and CI (Epoxy coated) base(suitable for hot water temperature).
Flow - 33 LPM
Head - 30 Mtr
HEAT PUMP HOT WATER SYSTEMSupplying,fixing, testing and commissioning, Air to waterheat pump of with LCD display thermo controller & tankprobe .the heat pump outer surface should be millfinished painted alluminum cabinet provides corrosionand having ss condensation pan . the heat pump shoul behaving scroll type copland make compressor , with high& low pressure switch protection with lakout realy &thermal motor protection againest over heating. heatpump should having factory installed inbuilt auto on/offcirculation pump for condensor side. & 15 paskal staticpressure centrafigul fan for Evaporator side. And havingheating capacity 9.5
KW and colloing capacity around 6 KW the COP isaround 3.6 the heat pumps should be suitable for 240voltas , 50 Hz, power supplay operations.SOLAR PUMP STATIONS
Pump Station with intergraded automatic LCD controller& Temperature sensors with internal temperature sensorcables with probes & suitable for single phase 230 volts,50 Hz. -.Leading & positioning of tanks, solar panels etc. -1set
Commissioning & Handing over charges for Electricl withsolar system -1 set
Freight -Chennai to site - 1jobFreight -Chennai to site - 1job
![Page 69: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/69.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 69/2939
Providing, installation, testing and commissioning offollowing insulated hot water recirculation pumpssuitable for 415 Volts connected with T.E.F.C. inductionmotor, M.S. channel, base plate with nuts & boltscomplete with vibration isolators, isolating valve onsuction and discharge, non return valve on discharge,pressure gauges with stop cock and dial typethermometer on suction or discharge, necessaryTermination with connecting cable from pump toelectrical panel, lugs, earthing wire, cable tray etc. Thepump shall have mechanical seal. The pump shall be SS -304 casing, impeller, shaft and CI (Epoxy coated) base(suitable for hot water temperature).(1 W + 1 S)
Flow - 15 LPM
Head - 30 MtrELECTRICAL INSTALLATION FOR SOLAR SYSTEM
Design, fabrication, assembling, wiring, supply,installation, testing and commissioning of outdoor type
motor control centre shall be fabricated out of 14 gaugeCRCA sheet steel in form in 3b formation withreinforcement of suitable size angle iron, channel „T‟
sections irons and/or flats wherever necessary includingnecessary civil foundation. Cable gland plates shall beprovided on top as well as at the bottom of the panels.Panels shall be treated with all anticorrosive processbefore painting as per specifications with 2 coats of redoxide primer and final approved shade of powder coatedpaint. 2 Nos. earthing terminals shall be provided for 3phase, 4 wire, 50 Hz supply system. Lifting hooks shallalso be provided in case of large panels. Approval shall betaken for each panel before fabrication. Cadmium Platedhardware shall be used in fabrication of panels. rateincludes all power, control cables and cable trays with allnecessary item.
MCC
Incoming
63 amps TPN MCCB with the following accessories:
a. 0-500 volts 96 x 96 mm square digital electronicvoltmeter with selector switch through 415 V/ Ö : 3 110V/ Ö 3 PT primary and secondary of PT‟s shall beprotected by 2 amps TP MCB. 1 Setb. 0-63. amps 96 x 96 mm square digital electronic
ammeter with selector switch and 63 / 5 amps 10 VA CL:1CTs. 1 Setc. Phase indicating lamps through 415/110 V PT primary& secondary of PT‟s shall be protected by 2 amp SP MCB3 SetsBus Bar
100 amps TPN (25KA) aluminium bus bar with heatshrinkable insulation sleeves.Outgoings
![Page 70: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/70.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 70/2939
a. 1 Nos. 40 amps TPN MCCB with 1 Nos. 6 KW DOLstarter to Heat Pump. Each compartment shall contain CToperated digital electronic ammeter of 0-40 amps rangewith auto/manual selector switch and indicating lampswith MCB‟s and „ON/OFF/TRIP‟ status of motor
a. 2 Nos. 32 amps TPN MCCB with 2 Nos. 4 KW DOLstarter to Hot water recircua;ltion pump. Eachcompartment shall contain CT operated digital electronicammeter of 0-32 amps range with auto/manual selectorswitch and indicating lamps with MCB‟s and„ON/OFF/TRIP‟ status of motora. 2 Nos. 16 amps TPN MPCB with 2 Nos. 1.5 KW DOLstarter to solar sun pump. Each compartment shallcontain CT operated digital electronic ammeter of 0-16amps range with auto/manual selector switch andindicating lamps with MCB‟s and „ON/OFF/TRIP‟ statusof motorb. digital temperature controller, indicatores,includingnecessary wiring and accessories as required.
Spare:
d. 1 No. 40 amps TPN MCCB
d. 1 No. 16 amps TPN MPCB
e. Necessary cable alleys, internal wiring, andinterlocking, earthing for all equipment shall alsoincludedNotes :
a. All MCCB/MPCBs shall be of 25 KA breaking capacityand suitable for motor duty application.b. Provision shall be made for providing potential freecontacts to all pumps starters for connection to BAS
c. Provision shall be made to ensure system protectionfrom dry running of the pumpMCC - For Solar water system as described above. Set 1
Total of Solar Hot Water System Works
Interior Works
FLOORING WORKS
![Page 71: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/71.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 71/2939
172 Providing and fixing of flooring with Premium qualityapproved make of full bodied vitrified floor tiles
(seamless joint) confirming to IS 13006/EN 176Group BIa with tech.specification as Mohs scratchhardness greater than 6,Water Absorption of 0.06%,Modulus of Rupture greater than 27 N/mm, DeepAbrasion resistant less than 204 mm cube, Surfaceflatness, Straightness of sides ± 0.25%, thickness ± 5%of size of approved colour and size & thick as specifiedbelow, set in 20mm thick C.M.1:4 and pointing withapproved make epoxy grout of to matching colour shadeas per Manufacturer's Specification and as directed. Rateshall include wastages, for preparation of base surface,cleaning, acid wash, and finished surface, protection withGypsum / Pop layer over Plastic sheet and removingthe same before handing over,work at all levels and asdirected.Rate shall be inclusive of forming pattern asshown in dwg and wastages etc; as complete in allrespects and complying with relevant standardspecifications and as directed by the Engineer-incharge.
Size of tiles shall be 600mmx600mmx10mm.
Sqm. 8510
173 Providing and fixing of flooring with Premium qualityapproved make of Matt finish, outdoor full bodied
vitrified tiles (seamless joint) confirming to IS 13006/EN176 Group BIa with tech.specification as Mohs scratchhardness greater than 6,Water Absorption of 0.06%,Modulus of Rupture greater than 27 N/mm, DeepAbrasion resistant less than 204 mm cube, Surfaceflatness, Straightness of sides ± 0.25%, thickness ± 5%of size of approved colour and size & thick as specifiedbelow, set in 20mm thick C.M.1:4 and pointing withapproved make epoxy grout of to matching colour shadeas per Manufacturer's Specification and as directed. Rateshall include wastages, for preparation of base surface,cleaning, acid wash, and finished surface, protection withGypsum / Pop layer over Plastic sheet and removingthe same before handing over,work at all levels and asdirected.Rate shall be inclusive of forming pattern asshown in dwg and wastages etc; as complete in allrespects and complying with relevant standardspecifications and as directed by the Engineer-incharge.Size of tile shall be 300x300x10mm size.
Sqm. 1220
![Page 72: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/72.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 72/2939
174 Providing and fixing of flooring with Premium qualityapproved make of full bodied vitrified floor tiles
(seamless joint) confirming to IS 13006/EN 176 Group BIawith tech.specification as Mohs scratch hardness greaterthan 6,Water Absorption of 0.06%, Modulus of Rupturegreater than 27 N/mm, Deep Abrasion resistant less than204 mm cube, Surface flatness, Straightness of sides ±0.25%, thickness ± 5% of size of approved colour and size& thick as specified, the tile shall be laid with 4mm thickspacer semi glossi / honed finish joints are fillied withapproved make Epoxy grout (office area) and tile set incombination of Laticrete adhesive L 111 and L 73 (cementtiious powder and latex rubberised liquid ) orEquivalent approved make to a thick not less than 6mm(for surface contact of the bottom of the virtified tile)protection with Gypsum / Pop layer over Plastic sheetand removing the same before handing over,work at alllevels & as per approved pattern/design usingirrespective of size and shape, Rate shall include forpreparation of base surface & finishing as per
manufacturer's Specification and as directed.(600x600x10mm)
Sqm. 3000
175 Providing flooring with best quality approved make Anti
Skid Ceramic tiles ranges, sizes as listed below shall8.0mm thick set in CM 1:4, 20mm thick and pointing the joints with Laticrete adhesive L 290 and pointing withLaticrete make Latapoxy SP 100 of approved make as perManufacturer's Specification and as directed. Rate shallinclude for preparation of base surface, and finishing thesurface, cleaning the surface, and protecting and withGypsum / POP layer over Plastic sheet and removing thesame before handing over, work at all levels etc. as
complete in all respects and complying with relevantstandard specifications and as directed by the EngineersIn-charge.. Size of tiles shall be 300mmx300mm.
Sqm. 480
176 Providing flooring with best quality approved colournatural marble slab thick 20mm of size not less than 1200x 900 mm/ 900 x 600mm, machine cut with water (without kerosene ), set in combination of Laticreteadhesive L 111 and L 73 ( cementtiious powder and latexrubberised liquid ) or Equivalent approved make to athick not less than 9mm (for surface contact of the bottomof the marble slab) as per approved pattern/design
drawing using irrespective of size and shape, includingfinishing the joints with Laticrete make UnsandedCementitious grout L 600 series or Rate shall include forpreparation of base surface & finishing the joints withwhite cement slurry, cutting, edge chamfering andpolishing rough, medium, nice and acid wash and tin-oxide polish as per manufacturer's Specification and asdirected.
![Page 73: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/73.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 73/2939
a Rate shall include for preparation of base surface &finished the surface, protection with gypsum/pop layerover plastic sheet and removing the same before handingover, work at all levels and as complete in all respects andcomplying with relevant standard specifications and asdirected by the Engineers In-charge.. The tolerance inlevel shall be +/-1mm.
Sqm. 1340
177 Providing and laying with best qualityof approved colurItalian marble perlato sicilio 20mm of size not less than1200 x 900 mm/ 900 x 600mm, machine cut with water (without kerosene ), set in combination of Laticreteadhesive L 111 and L 73 ( cementtiious powder and latexrubberised liquid ) or Equivalent approved make to athick not less than 9mm (for surface contact of the bottomof the marble slab) as per approved pattern/designdrawing using irrespective of size and shape, includingfinishing the joints with Laticrete make UnsandedCementitious grout L 600 series or Rate shall include forpreparation of base surface & finishing the joints withwhite cement slurry, cutting, edge chamfering and
polishing rough, medium, nice and acid wash and tin-oxide polish as per manufacturer's Specification and asdirected by the Engineer-incharge.
b Rate shall include for preparation of base surface &finished the surface, protection with gypsum/pop layerover plastic sheet and removing the same before handingover, work at all levels and as complete in all respects andcomplying with relevant standard specifications and asdirected by the Engineers In-charge.. The tolerance inlevel shall be +/-1mm.
Sqm. 345
178 Providing flooring with best quality approved colour
granite slab not less than 18 mm thick of size not less than1200 x 900 mm/ 900 x 600 mm, machine cut with water (without kerosene ) and factory high pre-polished, set incombination of Laticrete adhesive L 111 and L 73 (
cementtiious powder and latex rubberised liquid ) or
Equivalent approved make to a thick not less than 9mm(for surface contact of the bottom of the granite slab) asper approved pattern/design drawing using irrespectiveof size and shape, including finishing the jointswith Laticrete make Unsanded Cementitious grout L 600
series or equivalent and cutting, edge chamfering andpolishing with tin-oxide / high gloss factory polish as permanufacturer's Specification and as directed. Grindingafter laying for level adjusment shall not be permitted.Rate shall include for preparation of base surface &finished the surface, protection with gypsum/pop layerover plastic sheet and removing the same before handingover,work at all levels and as directed.For steps (Raiserand Treads) instead of floor (including edge mouldingwith polishing and non slippery stripes etc;)
Sqm. 580
![Page 74: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/74.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 74/2939
179 Supplying and fixing 20 mm thick granite of approvedcolur for counter top for wash basin laid in 20 mm thickcement mortar 1:4 over the concrete surface and edgechamfering and providing the hole in the granite forfixing the pillar cock tap etc., complete and as directed bythe Engineer -incharge.
Sqm. 184
180 Providing flooring with best quality jet Black or approvedcolour of leather finish granite slab not less than 18 mmthick of size not less than 1200 x 900 mm/ 900 x 600,machine cut and machine high pre-polished, set in C.M1:4, 20 mm thick topped with white cement slurry (forsurface contact of the bottom of the granite slab) as perapproved pattern/design drawing, including finishingthe joints with white cement slurry, cutting, edgechamfering and polishing rough, medium, nice and acidwash and tin-oxide polish as per manufacturer'sSpecification and as directed. Rate shall include forpreparation of base surface & finished the surface,protection with gypsum/pop layer over plastic sheet andremoving the same before handing over, work at all levels
and as complete in all respects and complying withrelevant standard specifications and as directed by theEngineers-Incharge. The tolerance in level shall be +/-1mm.
Sqm. 212
181 Providing and fixing flooring with cement based pressed
button tile of approved make, thick not not less than 22mm thick of approved colour / pattern of specified shape& size (as per drg), over a bed of CM 1:4, 20mm thickincluding jointed with matching cement slurry includingpreparation of base surface, and finished the surface,cleaning the surface, work at all levels etc.,as complete inall respects and complying with relevant standard
specifications and as directed by the Engineers-Incharge.
Sqm. 74
182 Providing flooring with best quality approvedKotah stone slab not less than 20 mm thick and the sizeof slab in general not less than 1200mm long and widthas per drg. machine cut and machine high pre-polished,set in C.M 1:4, 20 mm thick topped with white cementslurry (for surface contact of the bottom of the Kotah slab)as per approved pattern/design drawing by usingirrespective of size and shape, including finishing the joints with white cement slurry, cutting, edge chamferingand polishing rough, medium, nice and acid wash
and tin-oxide polish as per manufacturer'sSpecification and as complete with all respectscomplying with relevant standard specfication asdirected by the department Engineer-Incharge/Consultant. Rate shall include for preparationof base surface & finished the surface, protection withgypsum/pop layer over plastic sheet and removingthe same before handing over, work at all levels, asdirected.
Sqm. 143
![Page 75: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/75.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 75/2939
183 Providing flooring with best quality approved Kotah
stone slab not less than 20 mm thick and the size ofslab in general not less than 1200mm long and width asper drg. machine cut and machine high pre-polished, setin C.M 1:4, 20 mm thick topped with white cementslurry (for surface contact of the bottom of the Kotahslab) as per approved pattern/design drawing byusing irrespective of size and shape, including finishingthe joints with white cement slurry, cutting, edgechamfering and polishing rough, medium, nice and acidwash and tin-oxide polish as per manufacturer'sSpecification and as complete with all respectscomplying with relevant standard specfication asdirected by the department Engineer-Incharge/Consultant. Rate shall include for preparationof base surface & finished the surface, protection withgypsum/pop layer over plastic sheet and removingthe same before handing over, work at all levels, asdirected. For steps (Raiser and Treads) instead offloor (including edge moulding with polishing and non
slippery stripes etc;)
Sqm. 1192
184 Providing and laying of laminated wooden flooring butin general it shall be provided with 8mm thick HDFplanks of size 194mmx1286mm with factory tongue andgroove joints, glue fixed and edges finished withnecessary profiles of skirting / reducer as permanufactures specification. Rate shall be inclusive ofproviding 4mm polyethene sheets as under lay on theexisting floor. The tolerance in level shall be +/-1mm.Note: Approved make shall be Tarkett Sommer orequivalent, as completed with all respect and complying
with relevant standard specification as directed by theEngineer-Incharge.
Sqm. 80
185 Supplying and fixing Imported Vinyl flooring with roll
form vinyl tile of approved make & shade 2mm mm thickof standard sizes as per IS –3462 / BS 3261 of
manufacturers specification over the existing floor. Therate shall include all cuttings and wastages, cutting andproviding tile above electrical trunking, cost of allmaterials adhesives of SR-505 FEVICOL of M/s. PIDILITEIndustries Ltd., make etc, including welding of joints.,complete. Only laid area will be measured for payment.Rate quoted shall be for the complete finished work
including all the materials and labour mentioned above.
Sqm. 73
186 Providing, supplying & installing imported Broad loom
carpet / ROLL TYPE of approved make in the specifiedareas as per specifications, patterns/drawing specifiedbelow.
i Face Construction
Construction - Roll Type
Yarn- recyclable Nylon
![Page 76: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/76.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 76/2939
Gauge - 1/10 to 1/12
Pile stitches per inch : 9 to 12
Pile Height Average : 5mm
Density factor Minimum 25000 to 37500 oz/cubic yard
Over All Thickness : 7 to 8 mm
Fiber System : Nylon
Dye Method - Solution dyed yarnSoil / stain protection - suitable pretreatmentrequired (protect)
ii Backing System
Backing System : Polypropylene
iii Product Testing
Surface Flammability
Flooring radiant panel -Class1
Electrostatic property-3.0 kv or lower
Colour fastness to light-great->_4 after 100 hours
iv Adhesive system
Tackifier applied to the floor meeting low VOC (Volatile
Organic compound) specificationsv Installation Method
Adhesive applied on the floor.
vi Warranties
Minimum 15 year warranty with replacementagainst excessive wear, edge ravel, zippering & backingreiliency loss. Warranty certificate from manufacturer tobe furnished.
vii Product
Size : 3.66m width
viii Cost
Cost to include plastic covering protection after
installation, shampooing before hand over, 2% attic stock,all handling, transportation, wastage, taxes and dutiesthat are applicable etc; complete.
Sqm. 205
187 False Flooring
Providing and fixing Access floor systems of Unitile® or
approved equivalent make all as per followingspecifications confirming to PSA MOB -PF2 PS/SPU orNFPA 262 standards.
System : Access floor system to be installed shall providea maximum finished floor height of upto 600mm from theexisting floor level. The system shall provide for suitablepedestal and under-structure designed to withstand
various static loads and rolling loads subjected to it in anoffice / server / DCS / panel / rack area. The entireAccess floor system shall provide for adequate fireresistance, acoustic barrier and air leakage resistance.
![Page 77: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/77.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 77/2939
Panels : Access Floor panel of size 600x600 mm shall beall steel welded construction, with an enclosed bottompan of 64 hemispherical cones and top plain sheet whichare fuse welded at 124 locations to form a panel of anoverall depth of 37 mm. The inner empty core of thepanel is injected with a light weight fire retardant, noncombustible cementitious compound at high pressure tofill in all the crevices of the panel and ensures support ofnot less than 85% of the top surface area of the panel. Thepanel after cleaning, degreasing, phosphate by 7 tankprocess is coated with 40 micron epoxy coat and is heatedto achieve maximum adhesion and surface resistance. ThePanels shall be UL listed/ FM approved.
The panel is then laminated with 1.5 mm thick fire
retardant floor grade antistatic laminate/pvc on a semi -automated lamination line to ensure maximum bondingto the steel surface. The edges of the laminated/PVC areprotected with black PVC edge trim 5mm wide on allsides. This edge trim is mechanically locked and sealed in
place to avoid detachment
Pedestals : Pedestal installed to support the panel shall besuitable to achieve a finished floor height of 75 to 600mm.Pedestal design shall confirm speedy assembly andremoval for relocation and maintenance. Pedestal base tobe permanently secured to position on the sub floor.Pedestal assembly shall provide for easy adjustment ofleveling and accurately align panels to ensure lateralrestrain. Pedestals shall support an axial load of 2000 Kgs,without permanent deflection and an ultimate load of3500 Kegs. Pedestal head shall be designed to avoid anyrattle or squeaks.
Pedestal Assembly : Consisting of 100 x 100 x 2mm thickgalvanized epoxy polyester coated MS Base plate die-pressed orbitally riveted to a 21mm O.D. 2.5mm thickepoxy coated MS pipe to engage the pedestal headassembly. The pedestal head assembly consists of anembossed steel plate having 4 holes with ¼ th tapping forfastening and locating of tile ; orbitally riveted to acorresponding threaded stud 16mmdia. (O.D), length100mm which is designed to engage the pedestal baseassembly. The assembly shall provide a range of heightadjustment upto 25mm, with the help of check nuts.
Understructure : Understructure system consists ofstringers of size 570 x 32x 20 x 1.5mm to form a grid of 600x 600mm. These stringers are locked into the pedestalhead and run both ways. The US system shall provideadequate solid, rigid and quiet support for access floorpanels. The US system shall provide a minimum clear,uninterrupted height of 550 mm between the bottom ofthe floor and bottom of the access floor for electricalconduiting and wiring.
![Page 78: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/78.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 78/2939
Stringers : Stringer system is all steel construction,rectangular channels 30 x 20 x 1.6mm thick with pre-punched counter sunk holes at both ends for securing thestringers onto the pedestal head ensuring maximumlateral stability in all directions. The grid formed by thepedestal and stringer assembly shall receive the floorpanel.Panel Loading: The panel dimensions and performancemust confirm with PSA MOB - PF2 PS/SPU standards fora heavy duty panel and must comply with the,Concentrated Point Load : 450 kgs on a 25 x 25 mm squareon the centre of the panel with a maximum permissibledeflecting of not more than 2.5mm & UniformlyDistributed Load (UDL): 1200 kg/M2 with a maximumpermissible deflection of not more than 2.0mm. Fire
Rating : The Panels shall confirm to Class O & Class 1 FireRatings tested as per BS 476 Part 6 & 7
Rate shall include to produce a test certificate for theabove load of approved laboratory, preparation of
surface, cutting for supply/return Air Grills and forGrommet of required size, wastages, lead & lift, groutingthe system with anchor fastener, removing all debris fromthe premises etc. complete, as directed and for providingclass O Armaflex Nitrile rubber of 15mm thick as a sub
floor insulation with SSR 98 adhesives to the entire areaof existing (Below false flooring) as per manufacturer'sspecification. Rate shall inclusive of providingramp/Steps in false flooring in the entry as shown indrawing.
The height of the jacks shall be 600 mm . Sqm. 375
188 Providing and fixing Unitile® or approved equivalent
makes panel lifter. The panel lifter having special twocup suction panel lifting tool, designed for heavy dutyload carrying capacities with safety lever attachmentwhich requires deliberate manual movement to unlockthe panel.
Nos 2
189 Supplying and fixing of barrier mat of Esplanade Plusfrom GRADUS MATTING. The rate inclusive of necessaryedging strips/mat well frame ect, all as per manufactureslandered specification. Size as per approved drawings.
Sqm. 6
190 Providing and fixing of SS Box section for edge guard tobarrier mat as per approved drawingSize 25x25mm RMT 18
![Page 79: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/79.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 79/2939
191 Providing and laying 3mm thk self smoothing Epoxy
floor topping over the grano flooring in recreational blockareas.Grinding the surfaces, cleaning the surfacethoroughly & removing laitance completely and thenapplying solvent free primer on the concrete surface andseeding with fine aggregates so as to get a goodmechanical key and allow it dry and then applying andlaying 3mm thick self-smoothing epoxy toppingflowshield SL or approved equivalent make in approvedcolour and allow it dry. Rate shall include chipping,levelling, applying, tool & tackles,electricity, water etc.. asdirected by the Engineer-Incharge.
Sqm. 450
SKIRTING WORKS
192 Providing skirting 100 mm high with full bodied
vitrified floor tiles of approved equivalent make, 10 mmthick set in Laticrete adhesive L290 including pointingwith Latapoxy SP 100 joint filler compound of Laticrete orapproved matching shade and all as per Manufacturer'sSpecification. Rate shall include for chasing of wall for
flushing the tile inline with wall surface, preparation ofbase surface and acid wash at all levels and as perdrawing.
a Vitrified tile – Matt finish. RMT 460
b Vitrified tile – Polished. RMT 11220
193 Providing 100 mm high skirting with best qualityapproved colour marble slab of thickness not less than
18 mm, machine cut and machine high pre-polished set inLaticrete adhesive L 290 to a thick of 4mm uniformly andfinishing the joints with Latapoxy SP 100 of Laticrete orequivalent make, at all levels and all as per drawingdirected. Rate shall include for preparation of surface,
with tin-oxide / high gloss factory polish. Rate also toinclude filleting/ chamfering of the edges along withpartial recessing of the skirting into masonry / gypsumwall
RMT 3820
194 Providing 100 mm high skirting with 2.0 mm thickArmstrong or approved equivalent make quartzreinforced Anti static vinyl over existing cement skirtingincluding preparation of surface and fixing the tile usingFevicol SR998 / Vamicol FC100B adhesive and finishingthe surface neat etc., complete. The rate shall inclusivepreparation of base surface and protection with plasticsheet at all levels etc as complete as directed by theEngineer-incharge.
RMT 200
![Page 80: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/80.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 80/2939
195 Providing 100 mm high skirting with best qualityapproved Kotah slab of thickness not less than 20 mm,
machine cut and machine high pre-polished set inLaticrete adhesive L 290 to a thick of 4mm uniformly andfinishing the joints with Latapoxy SP 100 of Laticrete orequivalent make, at all levels and all as per drawing . Rateshall include for preparation of surface, with tin-oxide /high gloss factory polish. Rate also to include filleting/chamfering of the edges along with partial recessing ofthe skirting into masonry / gypsum wall etc as completeas directed by the Engineer-incharge.
RMT 4061
196 Providing 100 mm high skirting with best qualityapproved Jet Black granite slab of thickness not less
than 18 mm, machine cut and machine high pre-polishedset in Laticrete adhesive L 290 to a thick of 4mmuniformly and finishing the joints with Latapoxy SP 100of Laticrete or equivalent make, at all levels and all as perdrawing. Rate shall include for preparation of surface,with tin-oxide / high gloss factory polish. Rate also to
include filleting/ chamfering of the edges along withpartial recessing of the skirting into masonry / gypsumwall etc as complete as directed by the Engineer-incharge.
RMT 885
197 Providing and fixing 100 mm high skirting made from 12mm thick BWP board finished with 1.5mm laminate ofapproved shade & colour, bottom and top edge coveredwith 4mm thick polished teak wood lipping as perarchitectural drawing with 4 mm grooves at top enamelpainted of approved colour. The ply being grouted to theGI channel etc as complete as directed by the Engineer-incharge.
RMT 100
198 Providing and fixing of aluminiumskirting (Gradus/ALLOY or approved equivalent make)100mm high and 1mm thick of aluminium profile ofapproved colour fixed at wall/partition etc as complete asdirected by the Engineer-incharge.
RMT 2000
WALL DADO
199 Providing dadoing with machine cut and machine highpre-polished best quality approved colour granite tile of
thickness not less than 10mm of size
600x600mm/600x300mm, set in cement mortar 1:3,pointing the joints with approved Tile‟ joint filler grout
compound matching to the granite color and as directed.Rate shall include for preparation of base surface, such ashacking, cleaning, wastages, smooth joint, necessarycorner/edge guards of matching color, cleaning and acidwash etc. etc as complete as directed by the Engineer-incharge.( Lift Lobby, Corridor )
Sqm. 1604
![Page 81: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/81.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 81/2939
200 Providing Dadoing with best quality Ceramic tile ofapproved make and size of 300x450mm set in cementmortar 1:3, pointing the joints with approved Tile‟ joint
filler grout compound as per Manufacturer's Specificationand as directed. Rate shall include for preparation of basesurface, such as hacking, cleaning and acid wash completeall as directed. Rate shall include wastages, smooth joint,necessary corner/edge guards of matching color, cleaningand acid wash etc. etc as complete as directed by theEngineer-incharge. (toilets)
Sqm. 3929
201 Providing and fixing Natural Marble Cladding slab ofthickness not less than 25 mm size of approved colour &shade of size not less than 900x600 / 1200x600 mm orapproved size, using dry fixing method. Each marble slabis to be individually supported using 4 Nos. of stainlesssteel cramps, screws & bolts are 316 'L' grade two each attop and bottom. Each SS cramp will be of size 75 x 50 x 5mm thickness as shown in drawing and as directed.Each SS cramp will be fixed to the wall using two
numbers of MS oxidized non-corrosive expansion anchorfasteners of size 10 mm head, 6 mm dia. and 100 mmlength for masonry work , 10 mm head, 6 mm dia. and 50mm length for RCC areas. Each marble slab will have twoSS cramps at the bottom with the lipping of 12 mm heightembedded in the groove cut in the marble, the groovedepth being 20 mm and width being 6 mm etc ascomplete as directed by the Engineer-incharge.
Each slab will also have similar 2 cramps at the top,balance gaps in the grooves will be filled with metal paste.There will be no gaps seen between the marble slabs in
elevation. Any corner or junction slab which may be ofsmaller size should also be supported similarly. It has tobe ensured that the slabs are perfectly vertical and inplumb. The gaps between the marble slabs is to be filledwith water proof cement paste GRIPFIX (CICO, powderand liquid mix) as per manufacturer specifications, usingmatching colour pigments depending on the slabs. Thegaps on the top and sides of the marble fixing will have tobe closed using coping slabs to prevent water fromcoming in. Rate shall include for fabrication and fixing ofSS cramps, anchor fasteners, supplying and fixing „M-
seal‟, water proofing compound, groove cutting in granite
and double scaffolding to the required heights, wastagesetc as complete as directed by the Engineer-incharge. for
lift lobby.
Sqm. 420
![Page 82: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/82.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 82/2939
202 Providing and fixing in wall dado with best qualityapproved make Screen printed ceramic tiles ranges, sizesas listed below shall 6.0mm thick with matching bordersand set in CM 1:4, 15 mm thick and pointing the jointswith Laticrete adhesive L 290 and pointing with Laticretemake Latapoxy SP 100 of approved make as perManufacturer's Specification and as directed. Rate shallinclude for preparation of base surface, and finishing thesurface, cleaning the surface, and work at all levels etc. ascomplete in all respects and complying with relevantstandard specifications. Rate shall include wastages,smooth joint, necessary corner/edge guards of matchingcolor, cleaning and acid washetc as complete as directedby the Engineer-incharge.
Size of tiles shall be 300mmx300mm (Kitchen, utility etc..) Sqm. 340
Total of Flooring Works
PAINTING WORKS
203 Providing Acrylic emulsion paint - Painting with acrylic
emulsion paint of Low VOC paint ( complying with allgreen rating systems) and of approved make and colouror equivalent make two or more coats as permanufacturers specifications and as directed. The rateshall be inclusive of necessary scaffolding or staging etc.ascomplete with all respects complying with relevantstandard specification, as directed by the Engineer-Incharge.
Sqm. 75746
204 Providing and applying of "Royal Play" paint from Asian
or approved equivalent make. to walls of approvedcolour over a coat of primer as per manufacturespecification. The rate shall be including preparation ofsurface by thorough cleaning and as per manufacturer‟s
specification fully to give an even shade s directed by theEngineer-Incharge.
Sqm. 50
205 Providing & applying POP punning plaster 6-10 mmthick over exposed wall surface including scaffolding etc.complete. Rate to include for making the wall with plumbline and get smooth surface to receive the paint.( allplaster surface) and also include cost of material, labour,unloading and shifting of material,water etc..as completeand as directed by Engineer-Incharge.
Sqm. 75746
206 Providing two coats of synthetic ready mixed Enamel
paint to wooden / steel work of approved colour over acoat of respective primer includingpreparation of surface by through cleaning as permanufacture's specification fully to give an even shadeetc..as complete and as directed by Engineerin-charge.
Sqm. 1855
Total of Painting Works
FALSE CEILING WORKS
![Page 83: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/83.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 83/2939
207 Providing & Fixing of Eco Perforated metal Lay in
ceilings System (Fameline/Armstrong or approvedequivalent make) consisting of 600x600mm Lay in tilesmade of Aluminium Alloy 1100 with powdercoated(polyester base) to 60 microns in 0.7 mm thicknessin approved colour with standard perforation of 2.6mmdia & open area of 17% and Freudenberg Soundtexacoustical fleece glued to the back of the tile to be laid ongrid systems with 15mm wide T - section flanges colourwhite having rotary stitching on the Main Runner, 1200mm & 600 mm Cross Tees. The T Sections have aGalvanizing of 120 grams per M2 & passed through 500hrs of Salt test. The tiles should have Humidity Resistance(RH) of 100%, NRC of 0.70, Fire Performance A2-s1.d0 inmodule size of 600 X 600 mm, suitable for Green Buildingapplication, with Recycled content of 50%. The Tile &Grid system used together should carry a 15 yearwarrantee.
INSTALLATION: To comprise main runner spaced at
1200mm centers securely fixed to the structural suffix at1200mm maximum centre & not more than 150mm fromspliced joints. The First/Last suspension system at theend of each main runner should not be greater than600mm from the adjacent wall. 1800mm long cross tees tobe interlocked between main runners at 300mm centre toform 1800 x 300 mm module. Cut cross tees longer than600mm require independent support. Perimeter trim to bewall angles, secured to walls at 450 mm maximumcenters. The rate shall be inclusive of making openings forlight fittings, grills, diffusers, cutouts, wastage and
necessary hardware etc. as complete in all respectscomplying with relevant standard specifications andas directed by the Engineer-in-charge.(hall )
a For the above specification for Grid system Sqm. 2434
b For the above specification for board (measurement onlylaid area)
Sqm. 2434
![Page 84: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/84.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 84/2939
208 Providing and fixing in true horizontal level false ceiling
of 15mm T-section grid system Manufactured by M/s.Saint Gobain/Armstrong/USG/Daiken or approvedequivalent make using hot dipped galvanized steelsection, exposed surface chemically cleaned capping pre-finished in baked polyester paint, wall angle of size 3000 x19 x 19mm used in the periphery of the ceiling fixed to thewall partition / R.C. Column / band walls with the helpof screws at 600 mm C/C. Main runner spaced at a1200mm C/C suspended by using 2mm dia G.I. wirehanger securely fixed to the structural soffit of RC slab byusing 6mm anchor fastener at every 1200mm (max) and1200mm long cross tee to be interlocked between in Mainrunner at 600mm C/C (max) to form a grid of 1200 x600mm. 600mm long cross tee fixed in between 1200mmlong cross tee for forming a grid of 600 x 600mm.
Laying of FINE FISSURED (MICRO LOOK) tiles shouldhave Humidity Resistance (RH) of 99%, NRC 0.55, Light
Reflectance >85%, Thermal Conductivity k = 0.052- 0.057w/m K, Colour White, Fire Performance Class 0/ Class 1(BS476 Part 6&7) in module size of 600 X 600 X 16 mmwith Bio Block coating on the face of the tile, suitable forGreen Building application, with Recycled content of 63%.as complete in all respects complying with relevantstandard specifications and as directed by the Engineer-incharge.
a For the above specification for Grid system Sqm. 1665
b For the above specification for Fine fissured board(measurement only laid area)
Sqm. 1665
209 Providing and fixing mositure resistant seamless
gypsum ceiling with Gyproc MR or approved equivalentmake of 12.5 mm thick, fixed to the underside of thesuspended grid formed of GI perimeter channel of size 20x 28 x 30 mm fixed along the wall by using wood screwsand metal expansion rawl plugs. The GI intermediatechannel of size 15 x 45 x 15 x 0.90 mm shall be fixed to thesuspended strap hanger / GI ceiling angle at intervals notmore than 1220 mm. The suspended GI ceiling angle /.Strap hanger is to be connected with GI soffit cleat of size37 x 27 x 25 x 1.6 mm and it should be fixed on the roofslab / beam, by using metal expansion fasteners (wt.Type) of 12.5 mm dia. to a length of 35 mm with 6 mm
dia. bolt / screw at top ends.
![Page 85: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/85.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 85/2939
The GI ceiling section of size 80 x 26 x 0.5 mm (MF 5) is tobe provided across the intermediate channel at intervalsnot more than 457 mm centres at bottom and the sameshall be fixed by GI connection clips 2.64 mm dia. at theintersection points. The ends of ceiling section channel byadopting an overlap length of minimum 150 mm,connected with intermediate channel shall be fixed toperimeter channel in insertion. The gypboard shall befixed to the under side of the suspended grid by using 25mm long dry wall screws. The joints shall be finished with joint paper tape by using jointing compound of SaintGobain Gyproc or approved equivalent make andapplying over it 3 layers of the filler compound to providea smooth surface. The ceiling surface shall be painted withthree coats of approved first quality acrylic emulsion overa coat of primer etc. complete. The rate shall includemaking cutouts for tube lights, spot lights, duct doors, forspecified size, grills etc. for which no extra will be paidseparately.
Rate shall include providing additional trimming aroundcutouts for light fittings etc. and grills also for providingadditional supports from ceiling where main / crossmembers are cut for light fittings etc. Rate shall includevertical as well as horizontal surfaces as per detaileddrawing. Actual “seen” surface of horizontal and verticalwill be measured and paid for, as complete in all respectscomplying with relevant standard specifications and asdirected by the Engineer-in-charge.
Sqm. 1917
Total of False Ceiling Works
PARTITIONS
210 Providing and fixing of Partition total four layers of
GYPROC FIBRE CEMENT BOARD or approvedequivalent, each layer 12mm thick (in staggered pattern)is screw fixed with drywall screws(zinc chromium plated,self drilling ) of 25mm/35mm at 300mm centres twolayers on each side of 70mm Rondo™/Gypsteel ultra GI
C-stud {0.5mm thick having one flange of 34mm andanother flange of 36mm) placed at 610mm centre to centrein 72mm Rondo™/Gypsteel ultra GI floor Channel (0.55
mm thick have equal flanges of 32mm) which is anchoredto the floor & true ceiling using anchor fasteners. Finallysquare and tapered edges of the boards are to be jointedand finished so as to have a flush look which includes
filling and finishing with Jointing compound, Joint Papertape.
![Page 86: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/86.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 86/2939
The additional supports shall be provided to the verticalstud and RCC slab above the false ceiling at top with 'Y'type supports. Air gap between the plasterboards is linedwith 50mm rock wool of density 48 Kg/m3 of approvedmake shall be placed in the cavity rock wool rapped with40GSM fiber glass tissue. The contractor must ensure thatthe wool is wire-braced to prevent it from „lumping down‟
over a period of time. Fixing of channels shall also toprovide suitable for attachment of fixtures to thepartitions and the perimeter opening should be trimmedwith studs packed with best quality treated timber frameto a required size and shape with 2 coats of fire proofpaint over a coat of anti-termite treatment / anti-corrosiveprimer to receive screws / anchor fasteners to fix Joineryframe in position etc. as per drawing as complete in allrespects complying with relevant standard
specifications and as directed by the Engineer-in-charge.
a rate shall be inclusive of 12mm thick BWR ply boxing forfixing Switches, sockets, Backup box etc on the partition toa required size and shape.(all lab partition)
Sqm. 2710
b Specification same as above but providing two layers ofboard at one side of the stud for wall paneling/columnpaneling
Sqm. 375
211 Extra rate for over the above, for providing Resin bondedrock wool 50mm to (acoustic insulation material) densityof 48kg/cum in solid partition to make it as acousticproof.
Sqm. 2160
212 Providing and fixing of 1.0mm thick laminate ofapproved color and shade with grooves and lines and in
patterns drawing on specified area as instructed byEngineer-Incharge. The cost of necessary hardware's,adhesives, wastages etc; as required for complete theworks. Actual visible surfaces only will be measured andpaid.
Sqm. 950
213 Providing and fixing of 3.5mm thick veneer of approvedcolor and shade with grooves and lines and in patternsdrawing on specified area as instructed by Engineer-Incharge, exposed surfaces of veneer shall be finishedwith melamine polish of required level. The cost ofnecessary hardware's, adhesives, wastages etc; asrequired for complete the works. Actual visible surfacesonly will be measured and paid. Finishes shall made atFactory only installation at site(portal and DH cabin)
Sqm. 810
![Page 87: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/87.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 87/2939
214 Providing and Fixing of 12.5mm Gypboard and the jointsbetween the gyp-boards are finished flush and even with jointing compound and paper tape and the surface shallbe painted with 3 coats of acrylic emulsion paint ofapproved make and shade over a coat of primer suitablefor gyp-board after E-Mix / Pop / Gypsum putty and allas per manufacturer‟s specification etc complete and all as
directed. Rate shall include for providing all hardware's,etc.complete as per drawing as directed..
Sqm. 5
215 Providing and fixing toughened glass panel to thespecified thickness as given in below in the solid partition(laminated/Veneer/ calcium silicate/Gypsum board).The frame work in the the glass panel circumference shallbe fixed with 75mmx19mm size first class teak woodframe and fixing the toughened glass at the centre of teakwood frame using first class teak wood beadings to shapeand size as per drawing. The exposed teak wood surfacesshall be finished with melamine polish. The rate to beinclude the cost of necessary hardware's, adhesives,
wastage etc; as required for complete the works. Actualseen glass surface area will be measured and paid.
a Single layer 8mm thick toughened clear glass Sqm. 5
b 6mm thick lacquered glass of approved colour and SaintGobain or equivalent make
Sqm. 5
216 Providing and fixing of 6mm thick lacquered glass ofapproved colour and Saint Gobain or equivalent makeover the existing partition, paneling or wall surfaces asper drawing as directed. The rate shall be inclusive ofnecessary SS Stud/Double side 3M sticker, hardware andwastage etc; complete.
Sqm. 15
217 Providing and fixing Partition above the false ceiling
level using total two layers of GYPROC FIBRE CEMENT
BOARD or approved equivalent, each layer 12mm thick(in staggered pattern) is screw fixed with drywall screwsof 25mm / 35mm at 300mm centres one layers on eachside of 70mm Rondo™/Gypsteel ultra GI C-stud {0.5mm
thick having one flange of 34mm and another flange of36mm) placed at 610mm centre to centre in 72 mmRondo™/Gypsteel Ultra GI floor Channel (0.55 mm thick
have equal flanges of 32mm) which is anchored to thepartition bottom & true ceiling using an anchor fasteners.Finally square and tapered edges of the boards are to be
jointed and finished so as to have a flush look whichincludes filling and finishing with Jointing compound, Joint Paper tape as per manufacturers specification, ascomplete in all respects complying with relevant standardspecifications and as directed by the Engineer-in-charge.
Sqm. 630
![Page 88: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/88.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 88/2939
218 Providing and fixing of single layer 9mm thick calciumsilicate board in the existing aluminium/GI partitionsexcept the cost of aluminium/GI frame work. The jointsare to be finished with jointing compound as permanufacturers specification. The boards shall be fixedwith counter sunk stainless steel / fully threaded selftapping screws of suitable dia and length at every 300 mmc/c. The rate shall be inclusive of necessary scaffolding,hardware etc.complete. (above false ceiling solid
artition)
Sqm. 950
219 Straight Glazed Partition-(Type "A" partition) Slim linepartition of JEB/Alloy Make or equivalent approvedmake: Supply and installation of full height straight glasspartition 12mm thick toughened glass and proprietaryanodized aluminium sections of the SLIM LINE series of40x18mm size as per drawing as directed. The sectionsshall be matt natural anodized and Alloy sectionscombination of 40.02 , 40.03, 40.05 & 40.06 and 40.07would be used on all four sides as per specifications andshall be inclusive of all accessories. for FFL to the bottom
of false ceiling height.
Sqm. 1200
220 Wide line Section at around Door as per drawing, JEB/ALLOY Make or equivalent approved make at threesides of door opening : Supply and installation of wideline door frames using Alloy sections combination 100.02 ,100.03, 100.05 & 100.06 and 100.07 would be used at sidesand top etc. as per specifications and shall be inclusive ofall accessories.. The section shall be matt natural anodizedas per manufacturer's specification. The rate shall beinclusive of necessary additional plate provision for fixingof card reader and access control switch etc.
RMT 10
221 Supplying and fixing Fully openable Patch Fitting
partition and door of ' DORMA' "PT" range Fittings to geta clear height with top & Side Fixed panels as per drawingas directed. In general, the openable door cum Fixedpanel consists of sliding channel with all fitting andCorner Fittings PT90/91, Standard Spindle US10, cornerlock at bottom and US20 with GK50, Euro profile cylinderwith 4keys, lock keeper plate, Pull handle(TGDI35025) SSSatin Finish and 12mm thick clear toughened glass as perdesign and all confirming to manufacturers specification.SS fixtures shall conform Grade SS 304 to BS 7352.
Rate shall include for providing Glass Fin to support thePatch Fitting Door, transport charges, handling, loadingand unloading, Installation, protecting the module andglass till handing over, testing, commissioning allnecessary hardware's, Structural supports if any, etc.complete and all as per manufacturers specifications asdirected.
a Rate for partition only Sqm. 5
b Rate for single/double leaf doors only. Sqm. 10
![Page 89: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/89.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 89/2939
222 Glass Etching: Fixing to glass panels using 3M filmstickers as per required pattern drawing and shape and asdirected by the Engineer-Incharge.
Sqm. 403
223 Providing and fixing of 2hr fire rated partition total fourlayers of GYPROC FIRELINE BOARD or approvedequivalent, each layer 15mm thick (in staggered pattern)is screw fixed with drywall screws of 25mm/35mm at300mm centres two layers on each side of 70mm GypsteelUltra / Rondo™ GI C-stud {0.50mm thick having one
flange of 33.5mm and another flange of 35mm) placed at610mm centre to centre in 72mm Gypsteel Ultra /Rondo™ GI floor Channel (0.55 mm thick have equal
flanges of 32mm) which is anchored to the floor & trueceiling using M6 x 40 anchor fasteners. Finally square andtapered edges of the boards are to be jointed and finishedso as to have a flush look which includes filling andfinishing with Jointing compound, Joint Paper tape.
The additional supports shall be provided to the verticalstud and RCC slab above the false ceiling at top with 'Y'
type supports. Air gap between the plasterboards is linedwith 50mm rock wool of density 64 Kg/m3 of approvedmake shall be placed in the cavity rock wool rapped with40GSM fiber glass tissue. The contractor must ensure thatthe wool is wire-braced to prevent it from „lumping down‟
over a period of time. Fixing of channels shall also toprovide suitable for attachment of fixtures to thepartitions and the perimeter opening should be trimmedwith studs packed with best quality treated timber frameto a required size and shape with 2 coats of fire proofpaint over a coat of anti-termite treatment / anti-corrosiveprimer to receive screws / anchor fasteners to fix Joineryframe in position etc. complete as per drawing as
complete in all respects complying with relevant standardspecifications and as directed by the Engineer-in-charge.
Rate shall be inclusive of 12mm thick BWR ply boxing forfixing Switches, sockets, Backup box etc on the partition toa required size and shape.(all lab partition)
Sqm. 1450
![Page 90: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/90.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 90/2939
224 Providing and fixing of fully glazed steel fire ratedpartition and door with 120 minutes of integrity (E=120)fabricated with 1.6 mm thick galvanized steel sheet. Thedoor frames are manufactured from 1.6 mm galvanizedsteel sheet pressed to form a profile of 35 mm x 60 mmonthe vertical sides and 50 x 60 mm on the horizontalside. The door shutter would have a top rail and side rail60 mm x 60 mm and a bottomrail of 110 mm x 60 mm. Theoverall door opening is 1800 mm x 2100+fixed1800x1700mm. The test is conducted in CBRI, Roorkee asper BS 476 Part 22. The glass should be SGGCFDL 11mmclear 120 min rated ( E120) Non Wired Toughened glasswith a light transmission of 89% and a sound reduction of32 db. The glass should be class 1C1 category of ImpactResistance as per EN 12600. The glass should be held in itsplace with the help of 2 mm GI beading and a specialceramic tape with cross section of 5 x 20 mm..
The shutters should be fixed to the frame using 4nos of
Dorma SS Ball Bearing Hinges of size 100 mm x 75 mmand 3 mm thickness. Beading should be attached using 4mm x 35 mm SS screws at a distance of 75 mm from theedges and 150 mm c/c henceforth. The door should befitted with Dorma Mortise Sash lock 952F and door closerTS 68 of Dorma make or equivalent. The inactive leafshould be fixed to the frame using 1200mm long Dormatower bolt no 9114306 or equivalent. (SAINT GOBAIN11mm CONTRA FLAME or approved equivalent make)
a For partition only(UPS and server) Sqm. 40
b For single/double leaf doors only(lobby) Sqm. 19
225 GUIDE SPECIFICATIONS FOR OPTRA ACOUSTICAL
WALL PANELLING:Providing and supplyingArmstrong „Optra Acoustical Wall Panelling‟ or approved
equivalent make with square edges made of fibre glasssubstrate 25mm thick and wrapped on the front side withan acoustically transparent and fire-resistant fabric withan option of colours as per the choice of the Engineer-Incharge/Consultant of size 2100x600 or 600x600 mmproviding a minimum sound absorption level of 0.90 NRCto be affixed to wall using Wall panel impalers suppliedby M/s Armstrong Industries India Pvt. Ltd andconstruction adhesives as per the instructions laid downby the manufacturer.
![Page 91: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/91.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 91/2939
INSTALLATION: Armstrong or approved equivalentwall panel impalers of adequate quantity as specified bythe manufacturer shall be fixed to the wall surface usingself tapping screws. Silica based construction adhesiveshall be dabbed on to the projecting elements (spikes) ofthe impalers. Armstrong Optra wall panels shall bepierced through the spikes of the impalers ensuring theline and level of the panels are maintained. The rate shallbe inclusive of wastage, hardware and necessarybackings etc.
Sqm. 214
226 GUIDE SPECIFICATIONS FOR ARMSTRONG OR
APPROVED EQUIVALENT MAKE CHANNELED
WOODWORKS WALL PANELLING OF SIZE:
128X2440X16MM Providing and Fixing ArmstrongChanneled Woodworks perforated panels of width128mm, thickness of 16mm and length 2440 mm or asrequired by the Engineer-Incharge/Consultant, made of ahigh density particle board substrate with a laminatedfacing as per the approved shade/ species & finish and a
melamine balancing layer on the reverse side. The boardsshall have a special perforation pattern where the visiblesurface has a (“Helmholtz” fluted perforation of 2mm
width and 14mm of visible panel / 4mm width and 28mmvisible panel) each. The panels shall provide a minimumsag resistance of RH90 and a fire rating class of 1 as perPart 7 of BS 476. The edges of the panels shall be “tongue-
and-grooved” to receive special clips for installation. The
back of the perforated panel shall have sound absorbingnon-woven acoustical fleece. The panels shall be mountedon special aluminium splines using clips provided byArmstrong or approved equivalent make and approvedby the Engineer-in-Charge
![Page 92: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/92.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 92/2939
INSTALLATION:Install wooden battens (provided byothers) of section 50mmx50mm or as approved by theEngineer-Incharge/Consultant on the solid wallhorizontally using screws and plugs at spacing of 600mmcentre-to-centre. Screw the aluminium extruded keel forchannelled woodworks (GTPT001) over the lowest andsecond wooden batten at an on-center distance of 600mm.Install the first set of wooden panels by inserting the clipsfor border channelled woodworks (GTPT002) and insertthe groove of the panel into the projecting flange of thealuminium clip. Continue installing rows of panels byinserting the tongue into the groove of the earlier insertedpanel and progressively installing clips for insidechannelled woodworks (GTPT003) into the next keel tillthe actual height is achieved. Use clips for borderchannelled woodworks (GTPT002) to finish off theinstallation. Finish off the edges using wooden mouldingof matching colour. The rate shall be inclusive of wastage,hardware and necessary backing etc.
Sqm. 232
Total of Partition Works
Joinery
227 72 Providing and fixing of well seasoned teak wood door
frame approved size and as per drawing detail. Allexposed wooden surfaces are duly polished withmelamine polish of required level. The rate shall beinclusive of making necessary design as per drawing, inthe frame and necessary hold fastener and hardware ect,.The rate shall be inclusive of supply and fixing of 6 nosMS flat iron holdfast for each door of size 40mmx3mmand 40CM long fixing with CC 1:2:4 and 75mm long10mm dia anchor fastener to RCC location where everrequired. Finishes shall made at Factory only installationat site
a Scantling shall be up to 2000mm length CUM 2
b Scantling shall be above 2000mm and below 3000mm CUM 7
228 74 Providing and fixing of 35mm thk.Teak wood panelled
shutter with door frame of approved size and all as perdrawing. All the wooden surfaces are duly polished withmellamine. The rate shall be inclusive of necessary anchorfastener and excluding hardwares, as directed byEngineer-Incharge/Consultant.
Sqm. 139
229 74 Providing and fixing of factory finished solid woodmahogani door jamb of size as mentioned below (full
wall thick) with necessary door stoper(40x22mm),
architrave(40x15mm) or approved size and all as perdrawing detail. All the wooden surfaces are duly polishedwith PU finish of required level. The rate shall beinclusive of making necessary design as per drawing, inthe frame and necessary hilti fastener and hardware etc,.Finishes shall made at Factory only installation at site.
![Page 93: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/93.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 93/2939
i size of the door frame 230x37mm with two side architrave RMT 647
ii size of the door frame 230x37mm with one side architrave RMT 380
iii size of the door frame 115x37mm with two side architrave RMT 3075
iv size of the door frame 115x37mm with one side architrave RMT 35
230 74 Providing and fixing 35mm thick flush door shutters ofsolid core block board type bonded with phenolformaldehyde synthetic resin thermo pressed with 8mmthick teak wood external edge lipping finished withmelamine polish of approved make, colour & pattern asper drawing. The construction procedure of the shuttershould be as per IS:2202.The size of block, shall perfectlycorrespond to the maximum size of lock, covered inIS:2209. All the four edges of the door shutter shall besquare. The shutter shall be free from twist or warp in itsplane and of required size etc. The rate shall exclusive ofhinges and other hardwares; complete as directed.
a specification same as above but the finishing of doorshutters on both sides with 1.0mm thick laminate ofapproved color pattern.
Sqm. 259
b specification same as above but the finishing of doorshutters on both sides with 3.5mm thick veneer ofapproved color and finishing with melamine polish.etc.complete, directed by the Engineer -incharge The basiccost of veneer. The rate should be quoted for single sidearea of the door shutter.
Sqm. 1059
231 Providing and fixing in position first quality teak wood
beading / architrave of finished size as given below,made to shape and pattern approved with necessary pins,
nails, screws, bolts using teakwood conforming tospecification. Rate shall include two coats of Duco Paintover a coat of wood primer etc. as directed.
Size : 25 x 12 mm RMT 3970
232 2hr. Fire rated hollow metal doors - Painted
Providing and fixing of Hollow metal fire rated doors atall levels from ISO 9001-2000 certified Manufacturer. Firedoor should be as per IS 3614 part-1 & part-2 and BS 476part 2 or EN 1634. Recommended fire door shall be testedand certified by a third party evaluation program fromapproved international agency like CERTIFIER and
labeled. Where third party evaluation is not required firedoors should be tested at CBRI or ARAI for maximumrating of 2hrs both with vision panel and without visionpanel. Pressed Galvanized steel Single /Double leaf doorof approved make shakti met-dor or approved equivalentwhich consists of frame, shutter, infill and finish asdetailed below and conforming to IS 277.
![Page 94: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/94.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 94/2939
Door frame shall be double rebate profile of size 143 x 57mm made out of 1.60mm (16gauge) thick galvanized steelsheet. Frames shall be Mitered and field assembled withself tabs. All provision should be mortised, drilled andtapped for receiving appropriate hardware. Rubber doorsilencers should be provided on the striking jamb. Framesshould be provided with back plate bracket and anchorfasteners for installation on a finished plastered masonrywall opening. Once frame installed should be groutedwith cement & sand slurry necessary for fire doorson the clear masonry opening.
Door leaf shall be 46mm thick fully flush double skin doorwith or without vision lite. Door leaf shall bemanufactured from 1.2mm (18guage) thick galvanizedsteel sheet. The internal construction of the door shouldbe rigid reinforcement pads for receiving appropriatehardware. The infill material shall be resin bondedhoneycomb core. All doors shall be factory prepped forreceiving appropriate hardware and provided with
necessary reinforcement for hinges, locks, and doorclosers. The edges should be interlocked with a bendingradius of 1.4mm. For pair of doors astragals has to beprovided on the meeting stile for both active and inactiveleaf. Vision lite wherever applicable should be of size200x300mm provided as per manufacturersrecommendation with a beading and screws from inside.The glass should be 6mm clear borosilicate fire rated glassof relevant rating of the door.
All doors and frames shall be finished with etched primercoating, stove zinc phosphate primer and thermosettingpolyurethane aliphatic grade paint of approved RAL
colour. The door leaf and frame shall have passedminimum 250 hours of salt spray test. Rate should includesupply and installation of door and hardware size asmentioned below
a 2Hrs Fire Rated Door Single leaf of size : 600x1500mmwithout vision panel (shaft door)
Sqm. 255
b 2Hrs Fire Rated Door Single leaf of size : 900x2100mmwith vision panel with Self adhesive sponge seal forframes 188S
Sqm. 27
c 2Hrs Fire Rated Door Single leaf of size : 1000x2100mmwith vision panel with Self adhesive sponge seal forframes 188S,
Sqm. 206
d 2Hrs Fire Rated Door Single leaf of size : 1200x2100mm
with vision panel with Self adhesive sponge seal forframes 188S,
Sqm. 30
e 2Hrs Fire Rated Door Double leaf of size : 1500x2100mmwith vision panel with Self adhesive sponge seal forframes 188S.
Sqm. 28
233 Providing and fixing of hardware set of DORMA or
approved equivalent make for the below said item as
listed below.
![Page 95: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/95.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 95/2939
a Dorma BB 4330- 2 Ball bearing butt hinges size 4" x 3" x3mm in SS 304 for Flush Doors
Nos 2403
b Dorma BB 4330- 2 Ball bearing butt hinges size 4" x 3" x3mm in SS 304 for Fire Doors
Nos 1202
c Push Plate Dorma 9160010 of size 350 X 100 mm x 1.2mmin SS 316 grade
Nos 10
d Dorma H type TGDI 350 x 25 in SS 304 Nos 255
e Dorma D type Handle 150 x 19mm in SS 304 for shaftdoors
Nos 271
f Dorma Flush Pull Sliding door rectangular Nos 4
g Dorma Mortise dead lock 278 with Europrofile Cylinder60mm Length Type 2 (one side key other side thumb turn)with 4 level Master Key
Nos 211
h Dorma Mortise dead lock 278 with Europrofile Cylinder60mm Length Type 1 (both side key) with 4 level MasterKey
Nos 12
i Dorma TH 123 Type 2 Lever Handle with Mortise sashlock as per DIN 18251-1, class 3 & Europrofile Cylinder60mm Length one side key other side thumb turn with 4level Master Key
Nos 48
j One point panic device PHA 2001 - PHA 2102 PHA 2105L = 1300mm, External Trim PHT 3905 preferred for EuroProfile Cylinder, EP Half Cyl 3010, 5 Pin one side keywith 4 level Master Key
Nos 96
k SL - 400- Sliding Door Lock Nos 4
l Dorma Mortice shaft dead bolt 57 mm backset as per DIN18251-1 Class 3 with Alan Key
Nos 263
m Dorma TS 92 cam action door closer Nos 190
n Concealed flush bolt Dorma 3100 Nos 1
o Dorma Flush Bolt Nos 743
p Door stopper Dorma-3108 Nos 46
q Dorma Door Stopper for Residence Nos 597
r Patch Fittings from Dorma Bottom Patch - PT 10, FloorSpring - BTS 75 V, Top Patch - PT 20, Top Pivot - PT 24 Nos 158
s Patch Fittings from Dorma Bottom Patch - PT 10, FloorSpring - BTS 80 V, Top Patch - PT 20, Top Pivot - PT 24
Nos 37
t Dorma SLM 120 Sliding door system for Flush door, 2 MtsLength, SLM 120 Accessories- 01 set , SLM Track - 2 Mts -01 set
Nos 4
234 Providing hardware set of YALE / LOCKWOOD or
approved equivalent make for the below said item as
listed below.
a YALE - M8773 D3 - ENTRANCE HANDLE SET EleganceSeries D Handleset Design with 2 keys and 3 level MasterKey
Nos 4
b YALE - 6688 SC - ENTRANCE HANDLE SET BALISERIES with 2 keys and 3 level Master Key
Nos 97
c YALE - CA5137 ENTRANCE KNOB LOCK with 2 keysand 3 level Master Key
Nos 533
d YALE - CA5132 PRIVACY LATCH with 2 keys and 3level Master Key
Nos 146
e LOCKWOOD - DSS 03- 180 Degree Door Viewer Nos 102
![Page 96: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/96.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 96/2939
f LOCKWOOD - DSS 02- Security Door Guard Nos 102
Total of Joinery Works
MISCELLANEOUS
235 Providing and fixing Reception table made to shape andpattern identical as per Drawing. and to a height of twolevels 1050 mm/ 750 mm , but in general it shall be madeof 18mm thick BWR plywood as table top, sides, front and
rear side with adequate supports as directed in bothhorizontal and vertical directions. Providing drawers unitwith three drawer as per drawing, and side storage withopenable postformed edge shutters and one intermediateshelf at one sides of the table. All the front, side‟s surfacesfinished with combination of corian material of approvedcolor and 6mm thick milky white glass with inside lightprovision as per drawing detail, Table top at 750mm with25mm thick exterior grade particle board with postformedlaminate (campagne shade from Merino) and at 1050mmht top shall be finished with corian material of approvedcolor.
Rate shall be inclusive of providing edge molding ofapproved shape, making cut open in the table as perdrawing detail, storage shutter and drawer are made with18mm thick BWR ply finished with 1.5mm thick laminateof approved colour and other recessed surfaces arefinished with 1mm thick laminate. Rate shall include fornecessary wastages, hardware's(Hettich) like slidingrunners, auto closing hinges, locking facility with onemaster key for Two drawers and storage, aralditeadhesive for fixing corian etc. Rate to include forproviding teakwood lipping, teak wood foot rest dulyfinished with melamine polish etc. All factory finished asper drawing.
RMT 12
236 Providing and fixing soft board panel of specified sizeshaving 12 mm thick soft board covered with felt fabric ofapproved make and shade of premium quality The boardshall have beech wood beading, lipping all-round. Theboard shall be fixed on prepared surface with necessaryhardware fittings etc. complete. All concealed woodworks shall have sealer polish as directed. Rate quotedshall be for the complete finished work including all thematerials and labour mentioned above.
Sqm. 165
237 Providing and fixing Pelmet made to shape and sizes as
given in below, but in general it shall be made out of18mm thick BWR plywood and lined with 1.5mm thicklamination of approved colour as directed. The rate shallbe inclusive of necessary accessories like hangers rods/Hilti anchor fasteners, sunken screws etc; complete. Allfactory finished
a Same as above specification but the size of the pelmetshall be 150x150mm
RMT 15
b Same as above specification but the size of the pelmetshall be 300x150mm
RMT 465
![Page 97: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/97.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 97/2939
238 Providing and fixing Drapery rod, using decorativealuminium tubular pipe with approved color powdercoating of required length. Rate to include side coveringheads, required number of holding bracket and necessaryhardwares etc.
RMT 1126
239 Providing sill level covering 150mm to 300mm wide with18mm thick 1st quality jet black granite of approvedshade set in Laticrete adhesive L290 including pointingwith Latapoxy SP 100 joint filler compound of Laticrete orapproved matching shade and all as per Manufacturer'sSpecification. Rate shall include for making edge bullnoising with good polishing, preparation of base surfaceand acid wash at all levels and as directed.
RMT 465
240 Providing and fixing of Digitally reproduced Scotch printdecorative 3M graphics (with controltac & comply featurefor direct, bubble-free application on walls) as per thetheme selected by clients with UV protective matte overlaminate. Customized imagery. The rate shall be inclusiveof material, Hardware for fixing the graphics and fixing
charges etc.
Sqm. 10
241 Providing and fixing of imported wall paper of approveddesign, fixing details as per manufacturer standard etc allcomplete as directed by the Engineer-Incharge.
Sqm. 20
242 Providing and fixing matt finish white mark writing
board of enamelled sheet steel front, GI back overapproved inner core, of specified size black or chocolatecolour anodised aluminium beading to form the screenincluding the necessary accessories such as magneticsymbols, magnetic letters, magnetic strips, magneticeraser, magnetic dry marker 4 Nos., spare felt for eraser,board fixing clips etc. and the board shall be made out ofenamelled sheet with backing of AC sheet to suitablethickness etc. complete and all as per manufacturer'sspecification and as directed by the Engineer-Incharge.The rate include excise duty, sales tax and surcharge,central excise duty, delivery charges and fixing charges, ifany etc. complete and all as directed by the Engineer-Incharge/Consultant. Rate shall inclusive of making andfixing wooden ledge for full length of the board forkeeping marker pen, eraser etc. Rate quoted shall be forthe complete finished work including ledgeboard to keepaccesories , and all materials and labour mentioned above.
a Size of 2400 x 1200mm(meeting room) Nos 3
b Size of 1800 x 1200mm Nos 1
c Size of 1500 x 1200mm (Head room) Nos 3
d Size of 450x600mm(cabins) Nos 94
![Page 98: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/98.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 98/2939
243 Providing and fixing vertical blinds with 89/75 mm wide
imported superior polyster base fabric vanes withScotchguard application as per approved sample, make ofVista Levellor or approvred equivalent make and theranges of louver shall be in ' Select and Classsic'. Thevertical blinds shall have a head rail of extruded anodisedhigh strength aluminium alloy, shall be 25 mm x 50 mmhigh or equivalent with wall thickness of 1.2 mm orequivalent. End control units consists of reductiongearbox having the reduction ratio of 3.:5:1 for a verysmooth operation of the blind.This unit consists ofplanetry gear in the outer housing,four small tranmissiongears fitted in the middle assembly and a end receivinggear attached to central sprocket unit.
Tilter chain is made of 4.5mm plastic beads moulded on2.2mm thick polyster card.The pitch of the beads is6mm.The end control unit have the facility to rotate thelouver by 180 degrees.Tilt rod is made of extrudedaluminium having 3 keyways and the average dia shasll
be 5.8 mm .Carrier ( Runner ) is made of moulded plastichaving anti friction additive.It consists of polymerhousing with wheels mounted on sides & has a gear andworm mechanism with vertical worm fixed with atongued poly-carbonate stem to hold the louvers. Spaceris made of Moulded Derlin having friction additive.
The vanes shall be capable of 180 deg. rotation in positionand shall be of polyester / viscose yarn dyed in fast colorsa strain resistant chemicals treatment or equivalentprotective coating shall be applied on vanes. Theinstallation shall be complete in all respects.(N&S)
Sqm. 841
244 Specification same as above but the fabric shall be madeof specially coated non-curl Blackout fabric to repel oil /water / stains, with complete fittings and front valance asper approved sample and make including reduction geartilter louver (E)
Sqm. 2
245 Providing & fixing Motorized Black out Roller blinds
conforming to specifications
The Drive units -Shall be of Moulded plastic withrectangular support pin and inserted into the tube end .Itshall be driven by a ball chain pulley with ball chain andcan be positioned at right hand or left hand side of theshade. The shade when lowering or raising ,shall be
automatically locked in position upon release of the ballchain by means of built in friction lock
End Plug-Shall be Moulded of plastic with allocation pin.The plug shall be inserted into tube end.(Opposite todrive unit)
![Page 99: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/99.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 99/2939
Support Brackets-Shall be of zinc plated steel & providedwith moulded plastic covers and used in right hand or lefthand positions differentiated by the acceptance of therectangular drive unit support or the round idler plug pin
Bottom Rails-Shall be stiffening element inserted into abottom rod pocket. The material may be timber ,PVCcovered steel tube or VB bottom rail.Ball Chain -Shall be 2mm diameter cord with 4.5mmdiameter acetal balls moulded co-axially to it on 6mmpitch to form a endless ball chain .It is used for raising orlowering action of the shades.Fabric-1)Basic material -100% polyster2)fabric weight -170g/sqm3)Thickness -4mm 5)Finishing -Blackout fabric,reverse & front side pigment color coatedLight Fitness -Confirming to DIN54004/DIN EN ISO 105-B02>/5-6 Shrinkage % ge-Confirming DIN 53892 B2<0.5% Light reflection -82% Light transmission -0% Lightabsorption -18%
Sqm. 60
246 Providing and fixing of window curtain with necessary
fleecy and folds of approved make, color and pattern etc..all complete as directed by the Engineer-Incharge.
Sqm. 170
247 Providing and fixing plywood 8mm BWR ply, rate shallbe inclusive of necessary hardware, adhesives wastageand necessary edge beading etc. at level.
Sqm. 5
248 Preparing the surface, making and fixing of POP cornice
at the junction of wall and ceiling. The rate shall beinclusive wastage, mould, scaffolding, cleaning thesurface etc. size as mentioned below
a size diagonally 150mm RMT 1350
b size diagonally 200mm RMT 6500
249 Providing and fixing of key cupboard all as per drawing
detail, using 18mm thick BWR ply for all vertical andhorizondal, providing glass shutter with necessary framesand all the surfaces of ply shall be finished with 1mmthick laminate of approved shade. The rate shall beinclusive of wastage, necessary hardware hinges, handle,Key hooks, lock and tower bolt etc. all the woodensurfaces shall be finished with sealer polish. size600x900x300mm
Nos 4
250 Supplying and fixing of MS powder coated Letter Box ofapproved size and shape as per drawing as directed 1150ht x 900 w x 100D. Cluster of 21 Boxes
Nos 3
251 Providing and fixing of mirror But in general 6mm thick
mirror with aluminium frame for backing frame fixingwith 12MM thick BWR ply fixing with stainless steelstuds.
Sqm. 35
![Page 100: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/100.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 100/2939
252 Providing and fixing of 50mmx50mm size Column
Corner Guard (DURAL or equivalent make), for verticalcorner's of RCC columns, Brick pillars, Brick walls,Partitions, using sub frame of 1.5mm thick aluminiumprofile fixed in to the above corner surfaces by usinganchor fasteners. Then the top covering with Rigid PVCpanel profile is to be fixed on the sub frame byinterlocking. The rate shall be inclusive of necessaryhardwares etc; complete as per drawing as directed.
RMT 87
253 Providing and fixing of netlon, using necessary all roundVelcro on the window frame and netlon. The rate shall beinclusive of necessary hardware, stapler etc.
Sqm. 413
254 Pigeon hole Rack: Providing and installing pigeon holerack size as shown in Dwg.but in general it shall be madeof 18mm BWR ply all exposed surfaces are finished with1.5mm tk. Laminate of approved colour shade. Rate shallbe inclusive of providing teakwood lipping of specifiedsizes, necessary hardware's etc;complete.(Size shall be
450mm deep and 2100mm ht. and pigeon hole size375mmx375mm).
Sqm. 2
255 Providing and fixing storage unit to a width of 600mm
and 2100mm height as per drawing but in general, it shallbe made out of 19 mm thick BWR plywood on all sidesand intermediate shelves with necessary and the openableshutter shall be made out of 19mm thick BWR plywoodwith necessary teakwood supports etc complete. Allexposed surfaces shall be finished with 1.5 mm thick
Laminate of approved shade and all inner / recessedsurfaces shall have 1mm thick laminate finish ofapproved shade. Rate to include all hardware's, autoclosing cabinet heavy duty hinges, handles - of approvedmake, including locking arrangements with master key ofapproved make etc. complete.(lab sample record)
RMT 170
![Page 101: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/101.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 101/2939
256 Providing and fixing storage unit to a width of 600mmand 2700mm height and as per drawing but in general, itshall be made out of 1 mm thick BWR plywood on allsides and intermediate shelves with necessary and theopenable shutter shall be made out of 18mm thick exteriorgrade partical board for all vertical and horizontal.etccomplete. All exposed and hiden surfaces shall befinished with Merino Chem+ (Lab Grade) Chemical
Resistance Laminate or approved equivalent make
shade. All the exposed edges of 18mm thick particalboards shall be of postformed laminate and other hidenedges are finsied with 2mm thick PVC edge band. Rate toinclude all hardware's, auto closing cabinet heavy dutyhinges, SS handles - of approved make, including lockingarrangements with master key of approved make etc.complete.(lab sample storage RGL)
RMT 38
257 Lab Counter with Storage Cabinet:Providing and fixinggranite counter to a minimum width of 600 mm and to
a specified height as shown in drawing(750 to900mm) but in general, the counter top shall be made of18mm thick water proof plywood topped with graniteslab of 18 mm thick Black colour. The rate shallinclude for the providing storage unit below withopenable shutters. The top, bottom and intermediate shelfhaving 18 mm thick water proof plywood with 1.5 mmthick laminate. The openable shutter shall be made of 18mm thick BWR plywood finished with laminate includinghardwares like handles,hinges, ball catches etc.complete.Rate shall be inclusive of providing SS sink with drainboard, garbo drain of approved make at specifiedlocation. Rate shall be inclusive providing watersupply inlet and drainage outlet for each floor as per sitecondition. The rate shall be inclusive of all CP sanitaryaccessories such as pillar cock, bottle trap, angle valve etc.of Jaguar make.
RMT 100
258 Sink and wash basin bottom covered with louvered
shutter:
Providing and fixing of to a specified height as shown indrawing(750 to 900mm) but in general the counter bottomframe of 75x37mm first class teak wood at top andverticals at 900mm c/c. The openable shutter shall be
made of 18 mm thick BWR plywood with louvered all theexposed surfaces of ply finished with 1.5mm thicklaminate including hardwares like handles, tower bolt,hinges, ball catches etc.complete. All the exposed edges ofply shall covered with teak wood lipping. Rate shall beinclusive of applying melamine polish at all the teakwood surfaces and other hidden inside surfaces arecovered with sealer polish.
RMT 100
![Page 102: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/102.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 102/2939
259 Providing Display unit as per drawing as directed madeof 19mm thick BWR ply on all sides with open frontconsisting of 10mm thick tinted toughened glass shelvesof 450/ 600mm width supported on to the plywood at 3levels in height and made to shape and pattern. Allexposed, internal ply surfaces shall be finished with3.5mm thick veneer of approved shade. Rate to includeproviding necessary hardware's, SS studs, etc .The totalheight of the unit shall be 2100mm. Rate quoted shall befor the complete finished work including all the materialsand labour mentioned above.( Size of display unit shall be3000x450x2100mm)
RMT 6
260 Providing and fixing book shelf storage unit to a width of300mm and 2100mm height as per drawing but ingeneral, it shall be made out of 19 mm thick BWRplywood on all sides and intermediate shelves withnecessary and the openable shutter shall be made out of19mm thick BWR plywood with necessary teakwoodsupports etc complete for bottom up to 900mm ht and
above providing 6mm thick toughened glass with pivetshutter. All exposed surfaces shall be finished with 1.5mm thick Laminate of approved shade and all inner /recessed surfaces shall have 1mm thick laminate finish ofapproved shade. Rate to include all hardware's, autoclosing cabinet heavy duty hinges, handles - of approvedmake, including locking arrangements with master key ofapproved make etc. complete.
RMT 15
261 Providing and fixing of backdrop at reception as perdrawing and as directed, in general it shall be made with12mm thick BWR ply with Acrylic sheet ONGC logo andnecessary backing lighting of LED etc all as per drawingdetails.
Sqm. 25
Total of Miscellaneous Works
TOILET CUBICLES of approved make Stelatex-
Singapore/ Merino/Greenlam Height of the door shall
be 1850mm and Height of the fixed, divider shall be
2100mm.Specification as follows and refer all as per drg.
And also Technical specification. (SOLID COLOUR)
262 Men's Rest Room
a 12mm thick HPL board with Standard necessaryaccessory and hardware form approved make pole base
Aluminium Nylon Polyamide Accessories of approvedmodel including Top rail of "U" channel.i)2100mm long (including 2 no of door 650mm width andfixed panel as per site condition)ii)Fixed divider panels 1500mm - 1no Set 3
b 12mm thick HPL board with Standard necessaryaccessory and hardware form approved make pole baseAluminium Nylon Polyamide Accessories of approvedmodel including Top rail of "U" channel.
![Page 103: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/103.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 103/2939
i)1780mm long (including 2 no of door 650mm width andfixed panel as per site condition)ii)Fixed divider panels 1500mm - 1no Set 1
263 Supplying and fixing of Urinal partition to the size of size1290 X 500 mm made out of 12mm thick toughened glasswith approved design and pattern of etching, includingthree sides of beveled edge polishing and finishing. Thepartition is to be fixed into the wall using suitable size SSbrackets with anchor Bolts, Nuts, washers, grouting etccomplete in all respects as directed by the Engineer-In-charge.
Set 14
264 Ladies Rest Room
a 12mm thick HPL board with Standard necessaryaccessory and hardware form approved make pole baseAluminium Nylon Polyamide Accessories of approvedmodel including Top rail of "U" channel.i)2185mm long (including 2 no of door 650mm width andfixed panel as per site condition)ii)Fixed divider panels 1550mm - 1no Set 3
b 12mm thick HPL board with Standard necessary
accessory and hardware form approved make pole baseAluminium Nylon Polyamide Accessories of approvedmodel including Top rail of "U" channel.i)2550mm long (including 3 no of door 650mm width andfixed panel as per site condition)ii)Fixed divider panels 1550mm - 2no Set 1
c 12mm thick HPL board with Standard necessaryaccessory and hardware form approved make pole baseAluminium Nylon Polyamide Accessories of approvedmodel including Top rail of "U" channel.i)1000mm long (including 1 no of door 650mm width andfixed panel as per site condition)
Set 2
265 Providing and fixing MTS Multi Trim System-
ATT42/PBT12-Aluminium Top & PVC-u Base. (Providing& fixing Gradus ATT-42/12 transition plate of approvedsample section of size 42mmx42mm for the junction oftiles/granite flooring with carpet. Aluminium anodisedprofiles shall be screwed neatly to the flooring withDowelRib screws)
RMT 20
266 Providing and fixing Transition T Profile Aluminium-TP291F4 ( Old type SP20AS). (Providing & fixing GradusSP20-AS - new code TP291F4 tansition plate of approvedsample section of size 20mm width for the junction oftiles/granite flooring with carpet. Aluminium anodisedprofiles shall be screwed neatly to the floooring with
DowelRib screws)
RMT 20
Total of Cubical Works
MODULAR WORKS
![Page 104: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/104.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 104/2939
267 Single Person Workstation(Rockworth or
approved equivalent make) of overall Size 1200 X1500mm x 1200 H as per drawing and consisting ofthe following for each person: a) The work top shallbe of 25mm thick exterior grade prelaminated particleboard cut as per shape and design as shown in drawing.The edge of the top shall be finished with 2mm thick PVCedge banding, one no of PVC wire manager with covermatching the laminate. b) Providing & keeping inposition of Pedestal Storage unit of size 450mm x 450mmx 700mm ht, it shall be made of CRC framework on threeside & MDF with laminate finish on the front side with2mm thick PVC edge banding / Postformed top surface.Storage units to have three drawers (one filing drawerand two equal drawers), with required locking system.With necessary accessories like locks, SS brush finishedhandle, 4nos of Nylon double wheel with lockingprovision and required hardware etc., c) 1 No.magnetic writing board . d) 1 No fabric Pin-upboard (approved fabric costing not less than Rs. 150 /
RM)
e) Shall be provided with UPS / Raw Power and Data /Telephone raceways - 2 nos. 1 No. shall be providedbeneath the work top and the other one shall be at floorskirting level.f) The partition shall be made of allaluminium frame finished with powdercoating/anodized, covered with combination of fabricand exterior grade laminated board. Each workstation tohave one writing board and a pin up board. The thicknessof partition shall be 65/60 mm and the height shall be of1200mm.g) Providing and fixing of acrylic sheet nameplate holder (size 60mm wide x 300mm long)h) The end
trims, top runners shall be aluminium anodized/powdercoated in finish and sharp corners shall be avoided. i)Powder coated key board tray
j) 1 No. Mobile CPU trolley made of CRC steel powdercoated or MDF epoxy painted finish.Note: Rate to include intermediate and end partitions alsoas per drawings and as instructed by Engineering-incharge.
a Workstation size 1800x1500mm : Nos 6
b Workstation size 2100x2600mm : Nos 10
![Page 105: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/105.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 105/2939
268 Providing and fixing of DH cabin table (Hermanmiller
posh or approved equivalent make) of size2700x1200mm side table 1600 x 600mm, made to shapeand design, but the table top shall be made of 25 mm thickexterior grade prelaminated particle board with necessarysupports in criss-cross manner, details as directed/ shownin dwg, and the table top and all exposed surfaces shall befinished with approved shade. Rate shall be inclusive ofproviding MS powdercoated articulated keyboard, 50mmdia wire manager and PVC edge banding with necessaryhardwares etc., complete. 1 No. Providing & keeping inposition of Pedestal Storage unit of size 450mm x 450mmx 700mm ht, it shall be made of CRC framework on threeside & MDF with laminate finish on the front side with3mm thick PVC edge banding / Postformed top surface.Storage units to have three equal drawers, with individuallocking system. With necessary accessories like locks, SSbrush finished handle, 4nos of Nylon double wheel withlocking provision and required hardware etc.. as directed.
But the finishes shall be with veneer and melamine polish. Nos 6
269 Providing and fixing of cabin table (Rockworth orapproved equivalent make) of aproximate size 2400length x 900mm, side table size 1500x600mm, made toshape and design, but the table top shall be made of 25mm thick exterior grade prelaminated particle board withnecessary supports in criss-cross manner, details asdirected/ shown in dwg, and the table top and allexposed surfaces shall be finished with approved shade.Rate shall be inclusive of providing MS powdercoatedarticulated keyboard, 50mm dia wire manager and PVC
edge banding with necessary hardwares etc., complete.
Nos 19
270 Providing & keeping in position of Pedestal Storage unitof size 450mm x 450mm x 675mm ht, it shall be made ofCRC framework on three side & MDF with laminatefinish on the front side with 3mm thick PVC edgebanding / Postformed top surface. Storage units to havethree drawers(one filing drawer and two equal drawer),with individual locking system. With necessaryaccessories like locks, SS brush finished handle, 4nos ofNylon double wheel with locking provision and requiredhardware etc.. as directed.
a Size shall be 2100x750 and side table size 1200x600mm Nos 53
b Size shall be 1800x750 and side table size 1050x450mm Nos 39
c Size of the table shall be 900x600mm for sample stores Nos 8
![Page 106: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/106.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 106/2939
271 Running counters:Providing and fixing counter top(Rockworth or approved equivalent make) to a width of600 mm and 750 mm high made to shape and size shownin drawing ,using 25mm thick exterior gradeprelaminated particle board with necessary bracketsupports both in horizontal and vertical directions. All theedges of table top shall be provided with matching edgebanding. Each person shall have one key board tray,hanging drawer unit consists of 2 drawers, using 18mmthick exterior prelaminated particle board etc withnecessary hardwares and 1 No. of MS powder coated wiremanager 50 mm dia. should be provided for each personand powder coated articulated metal key board / drawerunit shall run on sliding runners of approved make. ( Forserver, printer station etc). Storage shutters shall be madeout of 18mm prelaminated particle board in. The rate shallbe all inclusive of providing privacy partitions of 10mmfrosted glass/ fabric wrapped panel of size 600mm wideand height 450mm as per drawing.
RMT 28
272 Running counter with partition :(Rockworth or
approved equivalent make)
Providing and fixing of counter top of width 600mm ingeneral it shall be made of 25mm thick exterior gradeprelaminated partial board of approved shade with 2mmthick PVC edge bands, all exposed front edges of thework surfaces to be rounded. The top shall be be fixed to69/60mm thick Partition facing outside to the corridor ofworkstation to be of panels of pre laminated boards ofexterior grade/fire retardant fabric facing inside write onboard and magnetic soft board at above table top andbelow table top shall be pre laminated boards of exteriorgrade/fire retardant fabric .
The frames & caps to be of extruded aluminium sectionspowder coated to approved colour(not less than 50microns thick) Trim at 1200 mm height, exposed end to berounded Tile to glued to the frame with clip-onmechanism or set into grooves as the case may be ,but tobe highly modular & elastic. The corner post of all framesto be designed for 90 degree connections in cluster ofvarious sizes.The partitions to comprise of at least two raceways foreffective wire management(one for power & other for
data, one above table top & other at skirting level) Withvertical raceway (If any) .The cover to be provided withnecessary cutout for electrical & data socket outlets. Theraceway to consist of necessary clipping mechanisms tofasten cables.Cost to include wastages mockup, all handling,transportation etc., Note: No Formaldehyde should beused in making of workstation or during placing of thework stations
RMT 2
![Page 107: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/107.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 107/2939
273 Supplying and fixing of freestanding storage units(Rockworth or approved equivalent make), 450mm depthand 750mm height ( matching to the workstation table topheight ) made of 18 mm thick both sides prelaminatedparticle boards of exterior grade for vertical andhorizontals and intermediate shelves. The openable doorshutters shall be provided with SS handles, locks, autoclosing hinges and necessary hardwares etc; complete.The exposed edges shall be finished with 2mm thick PVClipping.(rear side storage )
RMT 185
274 Storage Units: Providing and fixing rear storage unit to awidth of 600mm and 750mm height as per drawing No....It shall be made out of 25 mm thick exterior gradeprelaminated board on all surfaces including top, withintermediate shelves and the openable shutter shall bemade out of 18mm exterior grade prelaminated particleboard laminated on both sides. Rate shall include forproviding edge banding etc. complete. Rate to include allhardwares, auto closing cabinet heavy duty hinges,
handles - of approved make, including lockingarrangements with master key of approved make etc.complete.(meeting)
RMT 10
275 Storage Units:Providing and fixing rear storage unit to awidth of 450mm and 1200mm height as per drawingdetails It shall be made out of 25 mm thick exterior gradeprelaminated board on the top and all surfaces other thanthe top with intermediate adjustable shelves and theopenable shutter shall be made out of 18mm exteriorgrade prelaminated particle board laminated. All edgesshall be PVC edge banded of 2mm thick on the exteriorand all internal surfaces with 1mm thick PVC edge
banding. Rate to include all hardwares, auto closingcabinet heavy duty hinges, handles -of approved make,including locking arrangements with master key ofapproved make.
RMT 5
276 Storage Units: Providing and fixing rear storage unit to awidth of 600mm and 1200mm height as per drawingdetails It shall be made out of 25 mm thick exterior gradeprelaminated board on the top and all surfaces other thanthe top with intermediate adjustable shelves and theopenable shutter shall be made out of 18mm exteriorgrade prelaminated particle board laminated. All edges
shall be PVC edge banded of 2mm thick on the exteriorand all internal surfaces with 1mm thick PVC edgebanding. Rate to include all hardwares, auto closingcabinet heavy duty hinges, handles - of approved make,including locking arrangements with master key ofapproved make.
RMT 2
![Page 108: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/108.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 108/2939
277 Storage Units: Providing and fixing rear storage unit to awidth of 450mm and 2100mm height as per drawingdetails It shall be made out of 25 mm thick exterior gradeprelaminated board on the top and all surfaces other thanthe top with intermediate adjustable shelves and theopenable shutter shall be made out of 18mm exteriorgrade prelaminated particle board laminated. All edgesshall be PVC edge banded of 2mm thick on the exteriorand all internal surfaces with 1 mm thick PVC edge
banding. Rate to include all hardwares, auto closingcabinet heavy duty hinges, handles - of approved make,including locking arrangements with master key ofapproved make.
RMT 2
278 Storage Units:Providing and fixing rear storage unit to awidth of 600mm and 2100mm height as per drawingdetails It shall be made out of 25 mm thick exterior gradeprelaminated board on the top and all surfaces other thanthe top with intermediate adjustable shelves and theopenable shutter shall be made out of 18mm exterior
grade prelaminated particle board laminated. All edgesshall be PVC edge banded of 2mm thick on the exteriorand all internal surfaces with 1 mm thick PVC edgebanding. Rate to include all hardwares, auto closingcabinet heavy duty hinges, handles -of approved make,including locking arrangements with master key ofapproved make as directed.
RMT 2
279 Providing and fixing of filing compactor (Optimizer 457x915 x 1980mm) units of Godrej or approved equivalentmake as per manufacturer's specification.(all sample &record room)
RMT 73
280 Providing and fixing Discussion table of circular shape
of 1200mm dia, made to shape and design, but in generalthe table top shall be made out of 25 mm thick exteriorgrade prelaminated particle board over 150mm diapowder coated MS pipe with necessary supports, baseand framing, and the table top and all exposed surfacesshall be finished with approved shade of 1mm thicklaminate finish. Rate shall inclusive of matching edgebanding with necessary hardwares etc., complete.(library& recreational block first floor)
Nos 4
![Page 109: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/109.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 109/2939
281 Making and assembling of reading Table (Hermanmiller
posh or approved eauivalent make) of specified size1800x1200mm, made to shape and design, but in generalthe table top shall be made of 25 mm thick exterior gradeparticle board with 0.8mm thick post-formed laminate ofapproved shade, with adequate CRC metal supports incriss-cross manner as per your standard with modestypanel. (supporting system shall be approved by Engineer-Incharge), Rate shall be inclusive of two side 2mm thickPVC edge band, cable raceway, necessary hardware'sinclusive of supply and fixing of Magnum POP-up boxesas per mock up approval) etc., complete. The bottomsupport structure shall have openable arrangement for thepurpose of easy cable management.
Nos 3
282 Making and assembling of Meeting Room Table
(Hermanmiller posh or approved eauivalent make) ofspecified size made to shape and design, but in generalthe table top shall be made of 25 mm thick exterior grade
particle board with 0.8mm thick post-formed laminate ofapproved shade, with adequate CRC metal supports incrisscross manner as per your standard with modestypanel. (supporting system shall be approved by Engineer-Incharge), Rate shall be inclusive of two side 2mm thickPVC edge band, cable raceway, necessary hardware'sinclusive of supply and fixing of Magnum POP-upboxes(required number of POP box as per mock upapproval) etc., complete. The bottom support structureshall have openable arrangement for the purpose of easycable management also the cables shall not visible. as perdrawing.
a Table of size - 5500mm x 1200mm Nos 2b Specification same as above but the finishes shall be with
veneer and melamine polish instead of laminate.Nos 1
283 Providing & keeping in position of Pedestal Storage unit
of size 450mm x 450mm x 675mm ht, it shall be made ofCRC framework on three side & MDF with laminatefinish on the front side with 2mm thick PVC edgebanding / Postformed top surface. Storage units to havethree drawers(one filing drawer and two equal drawers),with individual locking system. With necessaryaccessories like locks, SS brush finished handle, 4nos of
Nylon double wheel with locking provision and requiredhardware etc.
Nos 5
284 Supplying of 1 No. Mobile CPU trolley made of CRC steelpowder coated or MDF epoxy painted finish.
Nos 5
285 Providing and fixing of 1 No. powder-coated metal Keyboard tray of size 530 (W) x 350 (D) x 40mm H withtelescopic drawer slides as per drawing
Nos 5
![Page 110: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/110.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 110/2939
286 Supplying and installation of dining table of size
1000x1000mm. Frame made with 12 gauge SS pipe 50mmdia for supporting leg and 25mm dia pipe for crossbrazing frames shall be as per drawing. Table top shall bemade with 25mm exterior grade MDF covered with0.8mm thick post-formed laminate on 2 sides and other 2sides finished with PVC edge band.
Nos 6
Total of Modular Works Wardrobe
287 Providing and fixing Wardrobe including loft as perdrawing but in general, it shall be made out of 18 mmthick Particle Board of Action Tesa make or approvedequivalent on all sides including top, with intermediateshelves with necessary PVC supports, finishedwith approved shades of Laminate. The open ableshutter and shall be post formed and shall be made out of18mm thick Particle Board and external surface shallbe finished with MR Grade Laminate of Merino orapproved equivalent. Rate shall include forproviding matching 2mm PVC Lipping for shelves and
dividers, made of Particle Board of Action Tesa make orapproved equivalent ,as required. All exposed surfacesshall be finished with 1.5 mm thick laminate of approvedshade and all inner / recessed surfaces shall finishedwith 1mm laminate. Shutter back side shall be finishedwith 1mm thick Laminate of approved shade.
Rate shall be inclusive of providing and fixing mirror onshutter as per drawing. The rate shall also include forfixing all the hardware and accessories fixing labour,electricity, all complete from Hettich / Haffele / Blum orapproved equivalent. The hardware shall be inclusive ofbut not limited to the following hardware and accessoriesin Hettich or approved equivalent make-Ecomat serieshinges, Garment Rails 30x15mm for required length asper drawing including supports as necessary, telescopicrunner channel for drawers, locking arrangements for allinternal drawers and external shutter including masterkey with Multipurpose Drawer Square Lock 32mm etc.complete. Note: All wire baskets, accessories, handles etcshall be of SS 304 grade. (Type C,
Bachelor Units, Transit Room Wardrobes)
a Wardrobe of size 3000x600mm x 2850mm Ht. (incl Loft) Set 64
b Wardrobe of size 1000x600mm x 2100mm Ht. Set 64
c Wardrobe for dresser unit of size 700x600mm x 2100mmHt.
Set 64
d Wardrobe of size 1590x500mm x 2850mm Ht. (incl Loft) Set 128
e Wardrobe of size 1850x600mm x 2850mm Ht. (incl Loft) Set 28
![Page 111: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/111.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 111/2939
f Wardrobe of size 1200x600mm x 2850mm Ht. (incl Loft) Set 2
g Wardrobe of size 1950x600mm x 2850mm Ht. (incl Loft) Set 12
h RC Loft above Store (only shutters) of length 1630mm x750mm Ht.
Set 66
288 Providing and fixing Wardrobe including loft as perdrawing but in general, it shall be made out of 18 mmthick Particle Board of Action Tesa make or approvedequivalent on all sides including top, with intermediateshelves with necessary PVC supports, finished withapproved shades of Laminate. The open able shutter andshall be post formed and shall be made out of 18mm thickParticle Board . Rate shall include for providing matching2mm PVC Lipping for shelves and dividers, made ofParticle Board of Action Tesa make or approvedequivalent ,as required. All exposed surfaces shall befinished with 1.5 mm thick laminate of approved shadeand all inner / recessed surfaces shall finished with 1mmlaminate. Shutter back side shall be finished with 1mm
thick Laminate of approved shade.
Rate shall be inclusive of providing and fixing mirror onshutter as per drawing. The rate shall also include forfixing all the hardware and accessories fixing labour,electricity, all complete from Hettich / Haffele / Blum orapproved equivalent.The hardware shall be inclusive ofbut not limited to the following hardware and accessoriesin Hettich or approved equivalent make-Sensys serieshinges for the wardrobes and Ecomat series hinges for theloft shutters, Garment Rails 30x15mm for required lengthas per drawing including supports as necessary,telescopic runner channel for drawers in Quadro Series,
locking arrangements for all internal drawers and externalshutter including master key with Multipurpose DrawerSquare Lock 32mm etc. complete. Note: All wire baskets,accessories, handles etc shall be of SS 304 grade.(Type D
and VIP Transit Rooms Wardrobes)
a Wardrobe of size 3000x600mm x 2850mm Ht. (incl Loft) Set 4
b Wardrobe of size 1000x600mm x 2100mm Ht. Set 2
c Wardrobe for dresser unit of size 700x600mm x 2100mmHt.
Set 2
d Wardrobe of size 1590x500mm x 2850mm Ht. (incl Loft) Set 4
e RC Loft above Store (only shutters) of length 1630mm x750mm Ht.
Set 2
f Wardrobe of size 1350x500mm x 2850mm Ht. (incl Loft) Set 2
g Wardrobe of size 3350x500mm x 2850mm Ht. (incl Loftand space for luggage rack and microoven as perdrawing)
Set 2
Total of Wardrobe
![Page 112: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/112.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 112/2939
289 Crockery Unit
Providing and fixing Crockery Unit including loft as perdrawing but in general, it shall be made out of 18 mmthick Particle Board of Action Tesa make or approvedequivalent on all sides including top, with 10mmtoughened glass intermediate shelves with necessary PVC/ Steel supports. The open able shutter and shall be of10mm toughened glass with Aluminum frame. Rate shallinclude for providing matching 2mm PVC Lipping forvertical dividers, made of Particle Board of Action Tesamake or approved equivalent ,as required. All exposedsurfaces shall be finished with 1.5 mm thick laminate ofapproved shade and all inner / recessed surfaces shallfinished with 1mm laminate.
The rate shall include for fixing all the hardware andaccessories fixing labour, electricity, all complete fromHettich / Haffele / Blum or approved equivalent. Note:
All wire baskets, accessories, handles etc shall be ofminimum SS 304 grade. The hardware shall be inclusive
of but not limited to the following hardware andaccessories in Hettich or approved equivalent make-Intermat-9943 Alu Frame Hinge '0' Crank hingesincluding supports as necessary, Ecomat series hinges forthe loft shutters, etc. complete. (Type C & Type D)
Crockery Unit of size 3000x420mm x 2850mm Ht. (inclLoft)
Set 66
Total of Crockery Unit
Kitchen
290 Providing and fixing Modular Kitchen of approved makeincluding loft as per drawing but in general, it shall bemade out of 18 mm thick BWR Ply of Action Tesa make orapproved equivalent on all sides including top, withaccessories, drawers and intermediate shelves as perdrawings and specification with necessary PVC / Steelsupports. The open able shutter and drawer front shall bepost formed on 2 sides and 2 mm pvc edge banding onother 2 sides and shall be made out of 18mm thick BWRPly and external surface shall be finished with MR GradeLaminate of Merino or approved equivalent. Rate shallinclude for providing matching 2mm PVC Lipping forshelves and dividers, made of 18mm thk BWR Ply ofAction Tesa make or approved equivalent ,as required.All exposed surfaces shall be finished with 1.5 mm thick
laminate of approved shade and all inner / recessedsurfaces shall finished with 1mm laminate.
![Page 113: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/113.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 113/2939
The counter top shall be finished with suitable supportsand shall be made of two layers of 18mm thick BWRplywood. Rate shall be inclusive providing and fixing ofSS sink with drain board of Nirali or approved equivalentmake (Model: Super Slider Satin finish-850X510mm),garbo drain of approved make at specified location etc.,complete. Rate shall be inclusive of making provision forfixing of Chimney hood including ducting till the externalwall and exhaust outlet point, of approved make atspecified location etc., complete, as directed.
The rate shall include for fixing all the hardware andaccessories fixing labour, electricity, all complete fromHettich / Haffele / Blum or approved equivalent. Thehardware shall be inclusive of but not limited to thefollowing hardware and accessories in Hettich orapproved equivalent make-Ecomat series hinges, Intermat9943 Alu Frame Hinge '0' Crank hinges includingsupports as necessary, telescopic runner channel fordrawers, skirting clip, etc. complete.
a Type C Kitchen of size 2550x600mm x 2850mm Ht. (incl
Loft) + 1800x600mm x 2850mm Ht. (incl Loft) as per
drawing. Rate shall include for providing and fixingAccessories as mentioned below in Hettich or approvedequivalent make-Note: All wire baskets, accessories,handles etc shall be of minimum SS 304 grade.
Set 64
2 nos Wire Basket Plain with Channels, hardware andsupports as required for drawer of Size 900 x 600 x Ht325mm each with 300mm Handle4 nos Wire Basket Plain with Channels, hardware andsupports as required for drawer of Size 450 x 600 x Ht325mm each with 150mm Handle2 nos Wire Basket - Plate with Channels, hardware andsupports as required for drawer of Size 600 x 600 x Ht300mm each with 150mm Handle2 nos Wire Basket - Cup & Saucer with Channels,hardware and supports as required for drawer of Size 600x 600 x Ht 200mm each with 150mm Handle2 nos Cutlery Tray with Channels, hardware and supportsas required for drawer of Size 600 x 600 x Ht 150mm eachwith 150mm Handle1 nos Bottle Pull Out with Frame Silent H599 Silver,Frame Silent Front Angle, 2 nos Frame Baskets of 160mm
each, hardware and supports as required for drawer ofSize 300 x 600 x Ht 650mm each with 150mm Handle
1 nos Tall Unit with Dispensa Frame Silver 362/1900-2300, Dispensa Full Extension Silent 1000 N Silver, 2 nosDispensa Front Stabilisator Silver, 5 nos Dispensa Clip-OnBasket of 400mm each, hardware and supports asrequired for tall unit of Size 450 x 600 x Ht 2100mm eachwith 450mm Handle
![Page 114: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/114.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 114/2939
1 nos Dish Drainer Rack Set SS 600 with shutter in cabinetof size of size 600 x 300 x Ht 650mm each with shutter,hardware and supports as required for each with 150mmHandle6 nos Above Counter wall cabinets with 2 Flap Stay Basicin each shutter, hardware and supports as required forcabinets of size 600mm Width x 350mm Ht each with150mm Handle1 nos Waste Bin It Classic 13lts capacity fixed to the insideof shutter in the cabinet below the sink of size 600x 600 xHt 650mm with shutter, hardware and supports asrequired for each with 150mm HandleRemaining cabinets and loft with size as per drawing withshutters, ecomat hinges, hardware and supports asrequired for each with 150mm Handles
b Bachelor Units Kitchen of size 2850x600mm x 2850mm
Ht. (incl Loft) + 1000x600mm x 800mm Ht as per
drawing. Rate shall include for providing and fixingAccessories as mentioned below in Hettich or approvedequivalent make-Note: All wire baskets, accessories,
handles etc shall be of minimum SS 304 grade.
Set 28
4 nos Wire Basket Plain with Channels, hardware andsupports as required for drawer of Size 450 x 600 x Ht325mm each with 150mm Handle2 nos Wire Basket - Plate with Channels, hardware andsupports as required for drawer of Size 600 x 600 x Ht300mm each with 150mm Handle2 nos Wire Basket - Cup & Saucer with Channels,hardware and supports as required for drawer of Size 600x 600 x Ht 200mm each with 150mm Handle2 nos Cutlery Tray with Channels, hardware and supportsas required for drawer of Size 600 x 600 x Ht 150mm eachwith 150mm Handle1 nos Waste Bin It Classic 13lts capacity fixed to the insideof shutter in the cabinet below the sink of size 600x 600 xHt 650mm with shutter, hardware and supports asrequired for each with 150mm HandleRemaining cabinets and loft with size as per drawing withshutters, ecomat hinges, hardware and supports asrequired for each with 150mm Handles
c Transit - Common Kitchen of size 4150x600mm x
2850mm Ht. (incl Loft) as per drawing. Rate shall includefor providing and fixing Accessories as mentioned belowin Hettich or approved equivalent make-Note: All wire
baskets, accessories, handles etc shall be of minimum SS304 grade.
Set 1
2 nos Wire Basket Plain with Channels, hardware andsupports as required for drawer of Size 900 x 600 x Ht325mm each with 300mm Handle4 nos Wire Basket Plain with Channels, hardware andsupports as required for drawer of Size 450 x 600 x Ht325mm each with 150mm Handle
![Page 115: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/115.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 115/2939
2 nos Wire Basket - Plate with Channels, hardware andsupports as required for drawer of Size 600 x 600 x Ht300mm each with 150mm Handle2 nos Wire Basket - Cup & Saucer with Channels,hardware and supports as required for drawer of Size 600x 600 x Ht 200mm each with 150mm Handle2 nos Cutlery Tray with Channels, hardware and supportsas required for drawer of Size 600 x 600 x Ht 150mm eachwith 150mm Handle2 nos Bottle Pull Out with Frame Silent H599 Silver,Frame Silent Front Angle, 2 nos Frame Baskets of 160mmeach, hardware and supports as required for drawer ofSize 300 x 600 x Ht 650mm each with 150mm Handle
1 nos Dish Drainer Rack Set SS 600 with shutter in cabinetof size of size 600 x 300 x Ht 650mm each with shutter,hardware and supports as required for each with 150mmHandle8 nos Above Counter wall cabinets with 2 Flap Stay Basicin each shutter, hardware and supports as required for
cabinets of size 600mm Width x 350mm Ht each with150mm Handle1 nos Waste Bin It Classic 13lts capacity fixed to the insideof shutter in the cabinet below the sink of size 600x 600 xHt 650mm with shutter, hardware and supports asrequired for each with 150mm HandleRemaining cabinets and loft with size as per drawing withshutters, ecomat hinges, hardware and supports asrequired for each with 150mm Handles
291 Providing and fixing Modular Kitchen of approved makeincluding loft as per drawing but in general, it shall bemade out of 18 mm thick BWR Ply of Action Tesa make orapproved equivalent on all sides including top, with
accessories, drawers and intermediate shelves as perdrawings and specification with necessary PVC / Steelsupports. The open able shutter and drawer front shall bepost formed on 2 sides and 2 mm pvc edge banding onother 2 sides and shall be made out of 18mm thick BWRPly and external surface shall be finished with MR GradeLaminate of Merino or approved equivalent. Rate shallinclude for providing matching 2mm PVC Lipping forshelves and dividers, made of 18mm thk BWR Ply ofAction Tesa make or approved equivalent ,as required.All exposed surfaces shall be finished with 1.5 mm thicklaminate of approved shade and all inner / recessedsurfaces shall finished with 1mm laminate.
![Page 116: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/116.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 116/2939
The counter top shall be finished with suitable supportsand shall be made of two layers of 18mm thick BWRplywood. Rate shall be inclusive of providing and forfixing of SS sink with drain board of NIRALI orequivalent of approved make at specified location etc.,complete. ( Model. No. SUPER SLIDER SATIN FINISH )Rate shall be inclusive of making provision for fixing ofChimney hood including ducting till the external wall andexhaust outlet point, of approved make at specifiedlocation etc., complete.
The rate shall include for fixing all the hardware andaccessories fixing labour, electricity, all complete fromHettich / Haffele / Blum or approved equivalent. Thehardware shall be inclusive of but not limited to thefollowing hardware and accessories in Hettich orapproved equivalent make-Drawers in Innotech Series,Sensys series hinges, Intermat-9943 Alu Frame Hinge '0'Crank hinges including supports as necessary, telescopicrunner channel for drawers in Quadro Series, skirting clip,
etc. complete.
a Type D Kitchen of size 2550x600mm x 2850mm Ht. (incl
Loft) + 1800x600mm x 2850mm Ht. (incl Loft) as per
drawing. Rate shall include for providing and fixingAccessories as mentioned below in Hettich or approvedequivalent make-Note: All wire baskets, accessories,handles etc shall be of minimum SS 304 grade.
Set 2
2 nos Innotech Basket Plain with Channels, hardware andsupports as required for drawer of Size 900 x 600 x Ht325mm each with 300mm Handle4 nos Innotech Basket Plain with Channels, hardware andsupports as required for drawer of Size 450 x 600 x Ht325mm each with 150mm Handle2 nos Innotech Basket - Plate with Channels, hardwareand supports as required for drawer of Size 600 x 600 x Ht300mm each with 150mm Handle2 nos Innotech Basket - Cup & Saucer with Channels,hardware and supports as required for drawer of Size 600x 600 x Ht 200mm each with 150mm Handle2 nos Cutlery Tray with Channels, hardware and supportsas required for drawer of Size 600 x 600 x Ht 150mm eachwith 150mm Handle1 nos Bottle Pull Out with Frame Silent H599 Silver,
Frame Silent Front Angle, 2 nos Frame Baskets of 160mmeach, hardware and supports as required for drawer ofSize 300 x 600 x Ht 650mm each with 150mm Handle
1 nos Tall Unit with Dispensa Swing 2000-2200 B. 400Silver, Dispensa Swing Over Extn. Silver, 2 nos DispensaFront Stabilisator Silver, 5 nos Dispensa Clip-On Basket of400mm each, hardware and supports as required for tallunit of Size 450 x 600 x Ht 2100mm each with 450mmHandle
![Page 117: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/117.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 117/2939
1 nos Dish Drainer Rack Set SS 600 with shutter in cabinetof size of size 600 x 300 x Ht 650mm each with shutter,hardware and supports as required for each with 150mmHandle6 nos Above Counter wall cabinets with 2 Flap Stay Basicin each shutter, hardware and supports as required forcabinets of size 600mm Width x 350mm Ht each with150mm Handle1 nos Waste Bin It Classic 13lts capacity fixed to the insideof shutter in the cabinet below the sink of size 600x 600 xHt 650mm with shutter, hardware and supports asrequired for each with 150mm HandleRemaining cabinets and loft with size as per drawing withshutters, ecomat hinges, hardware and supports asrequired for each with 150mm Handles
Total of Modular Kitchen
Chairs (Hermanmiller posh or approved equivalent
make)
292 Making and Supply of Ergonomically designed approvedchairs which will meet all of the technical specifications
and features listed below approved model. i)Seat:-Approved color leather covered Moulded polyurethanefoam together with Moulded ABS seat with revolving.ii)Back:-Approved color leather covered Moulded
polyurethane foam together with Moulded ABS andextra adjustable lumber support. iii)Tilting:-
Synchronized tilting mechanism with revolving andmultiple locking. iv)Armrests :- The armrests are to bescratch and weather resistant with swivel & deothadjustable arm pad & option of PVC pad. v)Lifting:-
Gaslift provision to be provided. iv)Base:-Nylon basewith 5nos of wheel pedestal should be provided asdirected.
High back Executive chair with HEAD RESTsynchronized tilting mechanism with Multiple lockingsystems, ABS for seat, Leather back with extra lumberSupport with fine tuning for depth adjustment, withswivel & depth, Height and width Adjustable arm rest &gas lift for height adjustment, Nylon base withcastors.(DH, incharge )
Nos 84
![Page 118: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/118.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 118/2939
293 Making and Supply of Ergonomically designed approvedchairs which will meet all of the technical specificationsand features listed below approved model.i)Seat:-
Approved color Fire Retardant Fabric covered Mouldedpolyurethane foam together with Moulded ABS seat withrevolving.ii)Back:-Approved color Fire Retardant Fabriccovered Moulded polyurethane foam together withMoulded ABS and extra adjustable lumbersupport.iii)Tilting:-Synchronized tilting mechanism withrevolving and multiple locking.iv)Armrests :- Thearmrests are to be scratch and weather resistant withswivel & deoth adjustable arm pad & option of PVCpad.v)Lifting:-Gaslift provision to be provided.iv ) B
Nylon base with 5nos of wheel pedestal should beprovided as directed.
a Medium Back with synchronized tilting mechanism withMultiple locking systems, ABS for seat, Mesh back withextra lumbar Support with fine tuning for depthadjustment, with fixed armrest, gas lift for heightadjustment, Nylon base with castors. (Lab area and visitorto incharge meeting)
Nos 338
b AERON Medium Back with synchronized tiltingmechanism with Multiple locking systems, Mesh for seatand back with extra lumbar Support with fine tuning fordepth adjustment, with fixed armrest, gas lift for heightadjustment, Nylon base with castors. (Conference)
Nos 51
294 Medium Back visitor chair with mesh back lumbersupport fixed armrest with cantilever base(lab visitor,library)
Nos 72
295 Supplying Breakout chairs of approved model in general
it shall be made with rigid polycarbonate sheet, framemade with 20mm dia SS 16 gauge thickness pipe for legs.The chairs are to be delivered in packed condition. Nodamage of any sort will be accepted before taking overand chairs damaged in transit shall be replaced free ofcost.Required warranty for the chairs for a period of oneyear shall be given.(SS 304 grade)
Nos 24
296 Providing and fixing sofa (Model: SQP -Hermanmillerposh or equivalent make) made to shape and pattern asper Approved model, but in general the sofa shall bemade out adequate size of teakwood frames in bothhorizontal and vertical directions and 2 nos. 4 mm thick
plywood in curved shape portion with necessary teakwood frames and supports to shape and profile. Rate toinclude to provide MM foam 150mm thick, leatheriteupholstery of approved make and design and ISI markhard wares etc. complete as directed.
a Single seater (App. Size 900 x 825 x 800) Nos 16
b Two seater ( App. Size 1400 x 825 x 800) Nos 20
![Page 119: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/119.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 119/2939
297 Providing and fixing sofa side table (Model: SLO -Hermanmiller posh or equivalent make) made to shapeand pattern as per Approved model, side / centre table asper shape shown in the drawing made out of 19 mm thickBWR plywood as supports and at top provided with 12mm thick tinted etched glass with bevelled edge to thespecified shape and size. All exposed surface shall befinished with 3.5mm thick veneer of approved shadefinish with melamine as directed.
a a)600x450mm Nos 15
b b)1200x600mm Nos 7
Total of Chair Works
External Facade and Associated Works
General Note : Refer Particular specifications andTechnical specification, while quoting the rate for therespective items under this schedule. Also, the BOQ itemdescriptions shall be read in conjunction withcorresponding material specification and design criteria asspecified in the tender specification as well as particular
specification, in addition to the detailed specification andstandards specified in the corresponding codes andstandards. The quoted rate under this schedule shall bedeemed to have considered Technical specification andparticular specification.
298 Vision panel, Spandrel panel & Vision on spandrel panel(System with glass): For complete system designing,providing and fixing Semi Unitized structural glazingsystem with aluminium anodized extruded frames, HDGbrackets & SS anchors with vision panel, spandrel paneland vision on spandrel panel glass shall be Insulated
Glazed unit - 24 mm thick with 6 mm thick Reflective lowE coated glass on # 2 surface - Green Radiance of Asahimake or KT 455 Reflective coated glass of Saint Gobainmake as outer pane and 12 mm airgap and 6 mm thickuncoated clear glass as inner pane of same make. Bothpanes are heat treated. Rate including supplying andfixing of glass and Off site proto type test etc. The glasswill be selected at appropriate time by Engineer-Incharge.Refer Particular relevant technical Specification.
Sqm. 2300
299 Spandrel panel with ACP (System with ACP): Completesystem designing, providing and fixing Semi Unitized
structural glazing system with Spandrel panel havingLaminated sandwiched composite panel (Aluminiumcomposite panel) -4mm thick of approved make andcolour. Refer Technical specification for detailedspecification of Laminated sandwiched composite panel,which shall form part of this item. Rate shall include thecost for supplying and fixing of Laminated sandwichedcomposite panel with LDPE core (ACP), sealant and etccomplete. Refer Particular relevant Specification.
Sqm. 5
![Page 120: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/120.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 120/2939
300 Spandrel panel (System glass): Complete systemdesigning, providing and fixing Semi Unitized structuralglazing system with aluminium anodized extrudedframes, HDG brackets & SS anchors with Spandrel panelwith Single Glazed unit (Monolithic glass) - 6mm thickReflective coated glass on # 2 surface - Super Silver Greenof Asahi make or ST 467 Reflective coated glass of SaintGobain make. Rate including supplying and fixing theglass. The glass will be selected at appropriate time byEngineer-Incharge. Refer Particular relevant technicalSpecification.
Sqm. 5
301 Hardware for top hung window: Extra rate over & abovethe Semi unitized structural glazing item above fordesigning, providing and fixing hardwares for top hungopenable outward shutter as per particular specification.Rate shall exclude cost of Glass and main frame, butinclude cost of sub frame for shutter. Refer Particularrelevant Specification.
Each 113
302 Insulation for Spandrel: Rock wool slab - 64 Kg/cum and
having 'K' value of 0.033 w/Mok - 50 mm thick wrappedwith factory pressed Black glass tissue and using 1.0mmthick Aluminium anodized tray with fold alround to aheight of 100mm minimum as thermal insulation to befixed behind Spandrel glass / Composite panel claddingarea as mentioned. All the edges between aluminiumanodized tray and frame to be sealed with Non-Stainingweather silicon sealant of approved make. ReferParticular relevant technical Specification.
Sqm. 690
FRAMELESS GLAZING (POINT FIXED / SPIDER
GLAZING) SYSTEM.
303 Frameless glazing system with Tensile Cable nettruss frame: Complete system forFrame less glazing with Cable truss / net system asmentioned in Particular Specification. Rate shall includecost of spiders suitable for laminated single / doubleglazed unit, Articulated bolts, required dia double /single stand SS pre tensioned cables to satisfy thestructural criteria, off site proto type test etc,.
![Page 121: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/121.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 121/2939
a Frameless glazing system with Laminated DGU: Frameless glazing system with supplying and fixing of 33.52mm thick (13.52mm + 12mm Air gap + 8mm) LaminatedDouble glazed unit having 13.52 mm thick with 6mmthick Reflective low E coated Grey Lite of Asahi make or
Green Radiance of Asahi make or KT 455 Reflective
coated glass of Saint Gobain make as outer panel and 6mm thick uncoated clear glass as inner panel withinterlayer of 1.52 mm thick Sentry Glas (R) of DuPontmake + 12 mm Air gap + 8mm thick uncoated clear glassof same make. All glass panels shall be heat treated andheat soak tested. Refer Particular relevant technicalSpecification.
Sqm. 425
b Frameless glazing system with Laminated glass: Frameless glazing system with supplying and fixing of 19.52mm thick laminated glass having 10 mm thick as outerpanel and 8 mm thick as inner panel with interlayer of1.52 mm thick Sentry Glas (R) of DuPont make. Outerpane glass shall be Reflective coated glass on # 2 surface
Pebble Blue Grey of Asahi make or Super Silver Greenof Asahi make or ST 467 of Saint Gobain make. Innerpane shall clear glass and both panes shall heat treatedand heat soak tested. Refer Particular relevant technicalSpecification.
Sqm. 5
304 Frameless glazing system with Glass Fin:
Complete system for Frameless glazing as mentioned inParticular Specification. Rate shall include cost of spiders,Articulated bolts and supply and fixing the Glass fin withrequired size to satisfy the structural criteria and rate shallexclude the cost of Off site proto type test. The thickness
of glass fin shall be 21.52mm thick (Min) laminatedtoughened and heat soak tested as per specification.
a Frameless glazing system with Laminated DGU: Frameless glazing system with supplying and fixing of 33.52mm thick (13.52mm + 12mm Air gap + 8mm) LaminatedDouble glazed unit having 13.52 mm thick with 6mmthick Reflective low E coated Grey Lite of Asahi make or
Green Radiance of Asahi make or KT 455 Reflective
coated glass of Saint Gobain make as outer panel and 6mm thick uncoated clear glass as inner panel withinterlayer of 1.52 mm thick Sentry Glas (R) of DuPont
make + 12 mm Air gap + 8mm thick uncoated clear glassof same make. All glass panels shall be heat treated andheat soak tested. Refer Particular relevant technicalSpecification.
Sqm. 110
![Page 122: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/122.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 122/2939
b Frameless glazing system with Laminated glass: Frameless glazing system with supplying and fixing of 19.52mm thick laminated glass having 10 mm thick as outerpanel and 8 mm thick as inner panel with interlayer of1.52 mm thick Sentry Glas (R) of DuPont make. Outerpane glass shall be Reflective coated glass on # 2 surface
Pebble Blue Grey of Asahi make or Super Silver Green
of Asahi make or ST 467 of Saint Gobain make. Innerpane shall clear glass and both panes shall heat treatedand heat soak tested. Refer Particular relevant technicalSpecification.
Sqm. 5
305 System for Standard Sliding Door: Providing and fixingthe Standard sliding door with ES 200 operator with ST
Flex profile with both side fixed panel of Dorma make
or EC Drive operator with ST Flex profile with both sidefixed panel of Geze make with the required structuralsupport. Rate shall include the cost for supplying andfixing 12.52 mm thick laminated glass having 6 mm thickas outer panel and 5 mm thick as inner panel with
interlayer of 1.52 mm thick Sentry Glas (R) of DuPontmake. Outer pane glass shall be reflective coated glass -Sunergy Clear of Asahi make or ST 167 of Saint Gobainmake. Inner pane shall be uncoated clear glass and bothpanes shall be heat treated and heat soaked. All MSmembers shall be painted with anti corrosive, low VOCPU paint (metallic finish) with compatible primer to aminimum film thickness of 75 microns and 2 coats of lowVOC PU paint of Akzonoble make and total dry filmthickness 225 microns. (If MS work is involved) ReferParticular relevant technical Specification.
Sqm. 13
306 Providing and fixing colour anodized aluminium PivotedDouble leaf / Single leaf door with openable side hungshutter as per drawing and fixed at all levels, elevationsand heights. Rate shall include the cost of Necessaryhardwares, accessories as given in the particularspecification and supplying and fixing og glass as givenbelow. Refer Particular relevant technical Specification.
Openable swing door with Insulated Glass - 24 mm thickwith 6 mm thick Reflective low E coated Grey Lite ofAsahi make or Green Radiance of Asahi make or KT 455Reflective coated glass of Saint Gobain make as outerpane and 12 mm airgap and 6 mm thick uncoated clearglass as inner pane of same make. Both panes are heattreated. Rate including supplying and fixing the glass.The glass will be selected at appropriate time by Engineer-Incharge.
a Single Leaf door Sqm. 10
b Double Leaf door Sqm. 20
![Page 123: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/123.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 123/2939
307 Designing, providing and fixing Aluminium Twin StyleDouble leaf / Single leaf door with openable side hungshutter with Top & Bottom rails TP/TA of Dorma make
or Geze make. Rate shall include the cost for supply &fixing of hardwares like Floor spring, Handle and Locketc with necessary accessories etc and supplying & fixing12.52 mm thick laminated glass having 6 mm thick asouter panel and 5 mm thick as inner panel with interlayerof 1.52 mm thick Sentry Glas (R) of Dupont make. Outerpane glass shall be reflective coated glass -Sunergy Clearof Asahi make or ST 167 of Saint Gobain make. Inner paneshall be uncoated clear glass and both panes shall be heattreated and heat soaked. Refer particular specification fortype and make of hardwares to be considered for tenderquote. Refer Particular relevant technical Specification.
a Single Leaf door Sqm. 5
b Double Leaf door Sqm. 12
308 Providing and fixing Fixed cum Openable windows with
Aluminium anodized frames of Schuco / Kawneer makeor approved equivalent make with Specified glass belowand fabricated as per drawing and fixed at all levels. Rateshall include the cost of Necessary hardwares foropenable shutter and fixed panels, aluminium colouranodized subframe, accessories and supplying and fixingof glass. Refer Particular relevant technical Specification.
a Fixed cum Openable windows with Monolithic Glass 6mm thick Reflective coated glass on # 2 surface - Supersilver Green of Asahi make or ST 467 Saint gobain make.All panels are heat treated. Rate including supplying andfixing the glass. The glass will be selected at appropriatetime by Engineer-Incharge.
Sqm. 170
b Fixed cum Openable windows with Monolithic Glass 6mm thick Reflective coated glass on # 2 surface - PebbleBlue Grey of Asahi make or Super silver Green of Asahimake or ST 467 Saint gobain make. All panes are heattreated. Rate including supplying and fixing the glass.The glass will be selected at appropriate time by Engineer-Incharge.
Sqm. 1535
309 Providing and fixing Fixed cum Sliding windows withAluminium anodized frames of Schuco / Kawneer makeor approved equivalent make with Specified glass below
and fabricated as per drawing and fixed at all levels. Rateshall include the cost of Necessary hardwares for slidingshutter and fixed panels, aluminium colour anodizedsubframe, accessories and supplying and fixing of glass.Refer Particular relevant technical Specification.
![Page 124: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/124.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 124/2939
a Fixed cum Sliding windows with Insulated Glass -24 mmthick with 6 mm thick Reflective low E coated Grey Lite ofAsahi make or Green Radiance of Asahi make or KT 455Reflective coated glass of Saint Gobain make as outerpane and 12 mm airgap and 6 mm thick uncoated clearglass as inner pane of same make. Both panes are heattreated. Rate including supplying and fixing the glass.The glass will be selected at appropriate time by Engineer-Incharge.
Sqm. 70
b Fixed cum Sliding windows with Monolithic Glass 6 mmthick Reflective coated glass on # 2 surface -Super silverGreen of Asahi make or ST 450 Saint gobain make. Allpanes are heat treated. Rate including supplying andfixing the glass. The glass will be selected at appropriatetime by Engineer-Incharge.
Sqm. 255
c Fixed cum Sliding windows with Monolithic Glass 6 mmthick Reflective coated glass on # 2 surface -Pebble BlueGrey of Asahi make or Super silver Green of Asahi makeor ST 467 Saint gobain make. All panes are heat treated.
Rate including supplying and fixing the glass. The glasswill be selected at appropriate time by Engineer-Incharge.
Sqm. 10
Laminated sandwiched composite panel cladding and
Associated works
310 Dry wall cladding : Providing and fixing the systemto clad the Laminated sandwiched compositepanel of Alucobond or Alubond or Durabuild orAludecor make with approved colour and shade (4 mm(0.5 + 3.0 + 0.5) ACP with Mineral core / polyethylene100% Virgin Core) as per the specification describedin Technical specifications, on the external surface theexternal surface like column, wall, jambs, sills, projected
area, ceiling or any surface to any profile and shape,horizontally, vertically, sloped, curved, circular etccomplete. Rate shall include the cost of supplying andfixing of Laminated sandwiched composite panel(ACP with Mineral core / polyethylene 100%virgin Core), Non staining weather for Vertical &horizontal joints in general the frame work for ACPcladding consists of aluminium box frame with 'C' cleatframe on the Box frame with HDG bracket etc, complete.All anchors, bolts and screws shall be SS 316 grade of Hilti/ Fischer make. Refer Particular relevant technicalSpecification.
Sqm. 1500
![Page 125: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/125.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 125/2939
311 Canopy / Pergola cladding: Designing, Providing andfixing the system to clad the Laminated sandwichedcomposite panel of Alucobond or Alubond or Durabuildor Aludecor make with approved colour and shade (4 mm(0.5 + 3.0 + 0.5) ACP with Mineral core / polyethylene100% Virgin Core) as per the specification described inTechnical specifications for Canopy, screen wall, fin and
Pergola as per profile and shape shown in the Drawingwith necessary Hot dip Galvanized Structural steelsupport to clad the ACP and all support to be designed towithstand the Design wind pressure and the specificationspecified in Particular specifications etc complete. Mainstructural steel support will be measured under respectiveitem separately.
Rate shall include the cost of supplying and fixing ofLaminated sandwiched composite panel (ACP withMineral core / polyethylene core), Non staining weatherfor Vertical & horizontal joints in general the frame work
for ACP cladding consists of aluminium box frame with'C' cleat frame on the Box frame with HDG bracket etc,complete. All anchors, bolts and screws shall be SS 316grade of Hilti / Fischer make. Refer Particular relevanttechnical Specification. NOTE :-Main structural steel frame work for Canopy, screen wall,fin and Pergola to clad the canopy with ACP shall bemeasured under respective Items, but the aluminiumframe work and supporting bracket required for claddingshall be part of the rate quoted under this item.
Sqm. 5775
312 Providing and applying Cold Bituminous coating
(Vapour barrier) on the External wall behind Composite
panel / Granite cladding area etc. Refer Particularrelevant technical Specification.
Sqm. 1530
313 Providing and fixing aluminium extruded louver "Z"
type as described below and to be designed to with standthe design wind pressure. Refer Particular relevanttechnical Specification.
a Support system to fix the Louver:Complete systemhaving colour anodized aluminium box frame, aluminiumbase plate and aluminium angles etc.Note : Weight will beconsidered only for the assembled frame part and hencenecessary wastage shall form part of the rate quoted.
Kg 795
b Fixed Louver: Providing and fixing Storm proof louver"Z" type made out of specially extruded aluminium withanodized finish and as specified in Particularspecifications and to be fixed with pitch not less than 50mm and overlapping shall be 25 mm as minimum asshown in the drawing.
Sqm. 105
![Page 126: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/126.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 126/2939
314 Providing and fixing Luxalon SL - 4 Stringer with 84R
plain Louvers panel of Hunter Douglas make or
equivalent Fameline make with Luxacote finish and thelouver system shall be designed to with stand the designwind pressure. Rate shall include louver Panel, Carrier,Carrier Splice, Panel Splice and accessories etc. ReferParticular relevant technical Specification.
Sqm. 10
315 Providing and fixing Aluminium Grille of Fameline
make with specified product code as below PVDF finishand the louver system shall be designed to with stand thedesign wind pressure with pitch not less than 75 mm asshown in the drawing. Louver thickness not less than0.8mm. Rate shall include louver Panel, aluminiumframes, aluminium end caps, aluminium brackets /clamps, SS anchors, bolts and accessories etc. ReferParticular relevant technical Specification.
a Product code 2050RT Sqm. 1600
b Product code 1050RT Sqm. 10
316 Dry wall granite cladding: Quote rate for providing andfixing Granite slab - Dry type fixing using approvedcolour granite slab (Basic cost of Granite not less thanRs.140/- per sq.ft) cladding the external surface on anysurface to any profile and shape, horizontally, vertically,sloped, curved, circular etc with approved shade ofGranite thickness not less than 25 mm thick and as per thesizes shown in the Drawing etc complete and as directed.(On the Facade areas). Granite shall be fixed with agroove of 6mm and to be filled with weather sealantrecessed by 2mm. Refer Particular relevant technicalSpecification.
a Projection in line with Façade finishes as per drawing. Sqm. 30
b Projection upto 75 mm from the Main base structure. Sqm. 10
317 Providing dadoing with machine cut and machine highPre-polished best quality granite tile of approved colourand shade with thickness not less than 12 mm of size600x300 mm, set in C.M. 1:3 of 20mm thick, includingpointing with matching cement and fixing with stainlesssteel clamps with suitable size at two ends to right angleby using SS anchor fastners and SS pin, the former withhorizontal position to be embedded in brick wall/concretesurface and the later with vertical position to be insertedand caulked in to the holes of the slab, drilled for thepurpose, both forming 'T' shape and cement groutedincluding edge polishing wherever required and forminggroove at joints as directed at all levels. Rate shall includefor preparation of base surface, SS clamps, SS anchorfastner, cleaning, chamfering, edge polishing, acid washand protection etc. complete, as directed.
Sqm. 10
![Page 127: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/127.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 127/2939
318 Supplying and fixing of 16mm thick Multi wall insulatedpolycarbonate sheet roof cladding on the Structural steelframe structure at all levels as per pattern for sky LightRoof including single skin - 10 mm thick insulated polycarbonate sheet capping & specials with necessaryaluminium extrusion, cutting, fabricating, erection at alllevels as specified in the particular specification. Rateshall include the cost of all materials involved in this itemlike poly carbonate sheet and accessories etc. Rate shallexclude the cost of base M.S structural base supports shallbe measured separately under respective item specifiedabove. Refer Particular relevant technicalSpecification.Note : Surface area will be measured andpaid for.
Sqm. 395
319 Providing and fixing 3M tape (Code No: 4412NTranslucent white) of approved type and pattern withminimum 50 mm wide in addition to the Sealant at thedesired location. 3M Tape shall be provided as permanufacturer specification and methodology.
Rmt 100
320 Providing and applying over the granite / stone surfaceone coat of environment friendly silicon based WaterRepellent as per manufacturers specification with noundulations and waviness as per the specification asdirected by Engineer-Incharge.
Sqm. 50
Total of External Facade and Associated Works
Facade Access System
321 Operating System
Design, supply, install and commission Facade Accesssystem with the following equipments to make sure thatthe entire facade will be cleaned with the proposedsystem and to reach any shape and profile and the systemshall with stand a minimum design wind pressure of 200Kg/sqm conforming to IS 875-Part 3 and Lateral forces asper IS 1893 (Latest Revision) and the system support atparapet wall as specified.Bidderr shall be responsible todetermine the maximum design wind pressure and lateralforces, moments, stresses etc. applicable for the system.Negative / suction pressures if determined as per IS 875 -part - 3 and Lateral forces as per code IS 1893 shall makeallowances as described in the code for corner effects onthe system. Quoted rate shall include the following, butnot limited to
a) Designing the system, preparation of shop drawing forapproval, supply, fabricate, erect as per approveddrawing at all levels, elevation & heights includingconducting necessary test according to the codes etccom lete.b) In general, system comprising, Traverse Trolley(Permanent) system with two manual gondola and whichshall suspend Standard 2 Metre long cradle withImported wire ropes and winches.
![Page 128: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/128.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 128/2939
c) Supply & Install the necessary supporting brackets withSS anchor bolts,etc complete.d) All support system necessary for installation includingscaffolding, hoists, minor civil works and any other worksequipment related thereto for complete installation of thesystem as per specification and approved shop Drawing.
e) Supply and anchoring the Soffit / Face mountedbrackets at a minimum spacing specified elsewhere in thestraight / curved portion and extra bracket if anyrequired at corners / projected area shall be providedwith hot dip galvanized steel anchor bolt assemblies withbase Plates.f) Providing and anchoring brackets with suitable dia ofHilti make Anchor bolts permanently on the wall ceilingas specified in the approved shop drawing.g) Obtain & submit certification of design by independentprofessional engineer / consultant along with final designand shop drawings. h) Manufacture / fabrication,transport and handling, installation / fixing, testing,
commissioning and Insurance. i) Taxes, Duties, levies andimparting training to owners representatives in operationand maintenance of the system.
j) Rate shall included for maintenance of the all systems asspecified in the conditions of contract during the defectsliability period.k) Rate shall deemed to be included the above stipulatedprovision.
a Hot dip galvanized Parapet mounted combination bracket(Upper and Lower Brackets) of suitable size and Long andto be fixed at a required spacing as per design withsuitable dia & type of SS 316 grade anchor fasteners at
specified locations including grouting the surface with allother accessories etc complete.
No. 20
b Hot dip galvanized Hot rolled sections"I"Beam of 200 x100 mm or suitable size (Size given is indicative and thebidder shall confirm the size of member based onstructural requirements) and to be fixed on the Upper andLower brackets with suitable dia & type of SS 316 gradebolts at specified locations including grouting the surfacewith all other accessories etc complete.
RMT 50
c Aluminium Swivel traverse trolley (Permanent) and to befixed on the Upper and Lower Beams to manually operate
the system at specified locations with all other accessoriesetc complete. (Each set containing 2 Arm)
Set 4
322 Accessible System
Providing and fixing of Cradle platform with completesystem, the type and capacity given below and in generalthe cradle made out Aluminium tubes with Frame workand in accordance with the technical specification anddrawing.
![Page 129: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/129.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 129/2939
a Standard - 2 Metre Cradle platform with all otheraccessories etc complete.
No. 1
b Providing and fixing Imported Aerial work platform withcomplete system and the working height of 21 M andabove and in accordance with the technical specificationand drawing.
No. 1
c Providing and fixing Imported Electro Hydraulic elevatedVertical platform with complete system and the workingheight of 16M and above and in accordance with thetechnical specification and drawing.
No. 2
Total of 'Facade Access System
ELECTRICAL WORKS
SECTION-A: TRANSFORMERS AND HT BREAKERS
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
Ring Main Switichgear (Indoor) - 11KV
323 Design, Supply, Installation, Testing and Commissioningof INDOOR Weather & Dust proof Type, floor mounting,free standing 11kV Ring Main Gear unit made out of M.Ssheet steel clad dust and vermin proof with 630A CopperBusbars, Interconnections, necessary protections,Measuring Instruments, Indicating Instruments,Protection Relays, CTs, PT with necessary controlfuses/MCBs, Termination arrangements for Incomingand Outgoing Cable of 11 kV 3Core 185 Sq mm XLPEAlu.Armoured earthed cable, Terminal Blocks,
Earthing,Powder coated painting, Sign writing and Basechannels etc., with complete all accessories as required forsatisfactory operations and as per the detailed TechnicalSpecifications enclosed and as per EB Requirementscomprising of the following.
INCOMER (2 Sources) :
11kV, 630A, 500MVA LOAD Break Switch (Air Break )with necessary required accessories -2NosOUTGOING :
11kV, 630A, 500MVA VACCUM Circuit Breaker withnecessary required accessories : 1No
The RMG panel shall be manufactured as required by theelectrical authorities and approval shall be obtainedincluding testing & commissioning and any additionalfeatures required by the supply authorities shall becarried out at no extra cost.
No. 1
![Page 130: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/130.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 130/2939
324 Design, supply, installation, testing and commissioning of11KV 630A, 500MVA, 26.2kA VCB Breaker HT indoorthree Panel Board with all accessories and allmetreingprotection for satisfactory operation and as required bythe statutory Electrical authorities as per the detailedspecification enclosed.
No. 1
325 Design, supply, installation, testing and commissioning of1250KVA, 11kV/433V outdoor, Oil cooled Transformer
with on load tap changer & RTCC panel as per thedetailed specification enclosed. Transformer Protectionrelays should be provided at each Transformer such asTransformer Buchholz relay, restricted earth faultrelay,OLTC surge relay, Oil temperature relay, windingtemp relay, Auxiliary relays as per standards. Thetransformer shall be provided with cable termination boxon HT side to terminate 3 core 185 Sqmm XLPE cableandsuitable for terminating air insulated aluminium busducton LT side 2000A Amps rating all as per the detailedspecification enclosed. (THE TRANSFORMER SHALL
BE SUPPLIED WITH FIRST FILL OF OIL)
Nos. 2
326 Design, supply, laying, testing and commissioning of 3
core 185 sqmm 11KV, XLPE Aluminium conductor
individual core screened, flat steel strip armoured, PVC
sheathed cable inside the building in the preparedtrench/under ground (from 11KV RMG to outdoor HTVCB panel, HT indoor VCB panel & Transformer)
RMT 100
HT Terminations:
327 Design, supply, termination, testing and commissioning
of OUTDOOR type termination kit and accessoriessuitable for 11KV, 3 core 185 Sqmm XLPE cable.
No. 1
328 Design, supply, termination, testing and commissioningof INDOOR type termination kit and accessories suitablefor 11KV, 3 core 185 Sqmm XLPE cable.
No. 6
329 Design, supply, erection, testing and commissioning of2000 Amps outdoor type air insulated Aluminium FP
busduct with flexible joints at every 4.5Mtr. Interval(RYBN) and with suitable support from ceiling as per thedetailed specification enclosed. The busduct should be
with straight run, 90 deg. Horizontal and vertical bends.(The busduct shall be Aluminium busbars of suitable size.The busbar should be support by epoxy insulators atregular intervals) The busduct shall run from Transformersecondary and DG to MPCC. The bus duct shall befabricated as per the detailed specification enclosed.Current Density of busbars shall not exceed 0.8 Amps/
Sq.mm.
RMT 60
![Page 131: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/131.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 131/2939
330 Design, supply, erection, testing and commissioning of2000 Amps indoor type air insulated Aluminium FP
busduct with flexible joints at every 4.5Mtr. Interval(RYBN) and with suitable support from ceiling as per thedetailed specification enclosed. The busduct should bewith straight run, 90 deg. Horizontal and vertical bends.(The busduct shall be Aluminium busbars of suitable size.The busbar should be support by epoxy insulators atregular intervals) The busduct shall run from Transformersecondary and DG to MPCC. The bus duct shall befabricated as per the detailed specification enclosed.Current Density of busbars shall not exceed 0.8 Amps/
Sq.mm.
RMT 66
331 Design, supply, erection, testing and commissioning of1250 Amps indoor type air insulated Aluminium FP
busduct with flexible joints at every 4.5Mtr. Interval(RYBN) and with suitable support from ceiling as per thedetailed specification enclosed. The busduct should bewith straight run, 90 deg. Horizontal and vertical bends.
(The busduct shall be Aluminium busbars of suitable size.The busbar should be support by epoxy insulators atregular intervals) The busduct shall run from MPCC toCapacitor Panel. The bus duct shall be fabricated as perthe detailed specification enclosed. Current Density of
busbars shall not exceed 0.8 Amps/ Sq.mm.
RMT 24
332 Design, supply, erection, testing and commissioning ofBattery Charger 110V DC 100 AH Trip unit combinedwith trickle & boost charge facilities with batterybank(SMF) & Distribuition Board and as per the detailed
specification / drawing enclosed.
No. 1
333 Removing the existing indoor HT RMG Panel (630A LBSas incomer and 630A VCB as outgoing) and existing HTCables and handing over to customer
No. 1
334 Removing the existing indoor HT Panel (630A VCB asincomer and 630A LBS-2Nos as outgoings) and existingHT Cables and handing over to customer
No. 1
335 Removing the existing Transformer and HT Cables andhanding over to customer
Nos. 1
336 Removing the existing LT Main Panel and incoming LTCable and handing over to customer
Nos. 1
337 Removing the existing Emergency LT Panel and incomingLT Cable and handing over to customer
Nos. 1
338 Removing & re-laying the existing LT cables withterminations from LT Main Panel & Emergency LT Panel(12 runs of cables, 1R-3.5Cx240, 7R-3.5Cx185, 2R-4Cx16,2R-3.5Cx35), 10mtr length (approx)
LS 1
339 Removing the existing capacitor bank and LT Cable andhanding over to customer
Nos. 1
SECTION – B : LT PANEL BOARDS
All installation works should be as complete and as
directed by Engineer-Incharge.
![Page 132: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/132.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 132/2939
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
Note: All themetres Should be provided with RS 485
BMS integration. All themetres should be connected in
series thro' bus cable terminated at commonmetre
chamber340 Design, supply, erection, testing and
commissioning of cubicle type floor mounting mainpower control centre made out of MS sheet enclosurewith Aluminium busbars, single busbar system, cablechamber, interconnection, painting, earthing, protectionrelays etc. comprising of the following : (MPCC)
INCOMING
EB Incomer
2 Nos. 2000 Amps 4 Pole 65KA electrical draw out typeAir circuit breaker with shunt release shutter assembly,
door interlock and all other accessories.Instruments Panel
Digital type Ammeter & Voltmeter, Maximum demandcontroller, Instantaneous earthfault relay (2 O/C+ 1 E/F),Low set earth fault relay (51G), CTs control fuses, RYBIndication lamps and “ON/OFF/Trip" indicating lamp ineach incomer, and also refer the drawing. The rate shall beinclusive of neutral CT connected with E/F Relay & spaceHeater
DG Incomer
2 Nos. 2000 Amps 4 Pole 65KA electrical draw out typeAir circuit breaker with shunt release shutter assembly,door interlock and all other accessories.Instruments Panel
Digital type Multifunctionmetre, CTs control fuses, RYBIndication lamps and “ON/OFF/Trip" indicating lamp ineach incomer, and also refer the drawing.
Buscoupler
1No.2000 Amps 4 pole 65KA electrical draw out type Aircircuit breaker with shunt release, shutter assembly, doorinterlock and all other required necessary accessories andON/OFF lamps.The buscoupler shall be provided with mechanical &
electrical Inetrlocking arrangements.OUTGOINGS
1250A 4P MDO ACB, 50 KA – 4Nos
800A 4P MCCB, 50 KA – 4Nos
630A 4P MCCB, 50 KA – 5Nos
400A 4P MCCB, 50 KA – 6Nos
![Page 133: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/133.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 133/2939
All the Outgoing feeder should be ON/OFF/Tripindication lamps, Digital type Multifuctionmetre(Exceptcapacitor feeder which is provided with Ammeter),CTs,Fuse, Switch control,Front operting handles etc. Allswitch boards shall be fabricated as per the detailedspecification enclosed. Suitable size outgoing cablechamber and extra busbars should be provided forconnecting the number of outgoing cables as per theschematic drawing. Additional NO + NC contact shouldbe provided for BMS monitoring. All the NO+NC contactwiring should be terminated on commonmetre chamber.The board shall be fabricated for future extension of thepanel board.
The transformers incomer shall be provided withprotection relays such as IDMT (2 O/C +1 E/F),Maximum demand controller, REFR (Restricted Earthfault Relay),etc., and bus coupler shall be both mechanicaland electrical interlocking arrangements by hardwarecontrol wiring alongwith PLC (Programmable Logic
Controls). The Hardware control wiring & PLC operationshall be feasible to extend for future Transformer if anyand all as per the detailed specification and drawingsenclosed. -This incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc.Incomingmetre for Transformer shall be with demandcontroller , Harmonic THD and individual harmonicdisplay+ Regular parameters like V, I, KVA, KVAR, KW,KWH, KVARh, PF, Freq, Max, AVGIncomingmetre for Generator shall be with Loadmonitoring without demand control and with regular
parameter & Harmonics THD & Individual harmonicdisplayAll Outgoing Feeders in Main panel shall be with MFMmonitoring V,I, KWH, KVARH, PF with RS 485 BMSintegration. All themetres to be connected in series thro'bus cable terminated at commonmetre chamber
Main Power Control Centre (MPCC)
2000Amps 4P Aluminium busbars:- All the neutral
busbars shall have the same capacity of phase
busbars.(0.8A/Sq. mm.)
No. 1
341 Design, supply, fixing, testing and commissioning of
cubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (APFCR Panel)
Incoming
1250A TP MDO ACB 50 KA Drawout type with Autopower factor correction relay with necessary CT, controlwiring etc.- 1 No. as incomer.Outgoing: Total 425 KVAR
![Page 134: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/134.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 134/2939
2 sets of 100 KVAR (4 x 25 KVAR) with 400A TP MCCB35KA, suitable contactors with switching steps in therating of 100 KVAR as required.3 sets of 50 KVAR (2 x 25 KVAR) with 200A TP MCCB25KA, suitable contactors with switching steps in therating of 50 KVAR as required.3 sets of 25 KVAR (1 x 25 KVAR) with 100A TP MCCB16KA, suitable contactors with switching steps in therating of 25 KVAR as required.Each All KVAR capacitor bank in a separate compartmentwith necessary ventilation arrangemnts or weld mesharrangements as required by the Electrical Authorities .
With necessary Aluminium busbars, interconnections,providing Ammeter with selector switches, phaseindication lamp, control fuse and switch control, PFmetreetc. with RS 485 BMS integration as per the specification.
Capacitor Panel - 425 kVAR
1250 Amps TPN Aluminium busbars:- All the neutral
busbars shall have half the capacity of phase busbars(0.8A/Sq. mm)
Nos. 2
342 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (Utility Panel)
INCOMING
250A 4P MCCB 25 KA with connected accessories –
2Nos.as incomer with 2 lock and 1 key mechanicalinterlock arrangementOUTGOINGS
63A TPN MCCB, 16 KA – 3Nos
32A TPN MCCB, 16 KA – 5NosWith necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration250A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.)
No. 1
343 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. SUB SWITCH BOARD-1
(OFFICE AREA)
INCOMING
1250A TP&N MDO ACB 50 KA Drawout type withconnected accessories – 1No.as incomer
OUTGOINGS
![Page 135: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/135.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 135/2939
800A TPN MCCB, 50 KA – 2Nos
630A TPN MCCB, 35 KA – 1No
400A TPN MCCB, 35 KA – 1No
200A TPN MCCB, 25 KA – 1No
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer the
drawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration1250A Amps TPN Aluminium busbars : All the neutral
busbars shall have half the capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
344 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. SUB SWITCH BOARD-2
(OFFICE AREA)
INCOMING
1250A TP&N MDO ACB 50 KA Drawout type withconnected accessories – 1No.as incomerOUTGOINGS
800A TPN MCCB, 50 KA – 2Nos
630A TPN MCCB, 35 KA – 1No
400A TPN MCCB, 35 KA – 2Nos
200A TPN MCCB, 25 KA – 1No
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,
Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration1250A Amps TPN Aluminium busbars : All the neutral
busbars shall have half the capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
345 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per the
detailed specification enclosed. LIGHTING POWERSWITCH BOARD -REGIONAL STORE
INCOMING
125A 4P MCCB 25 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA – 5Nos
32A TPN MCCB, 16 KA – 8Nos
![Page 136: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/136.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 136/2939
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
346 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. LIGHTING POWER
SWITCH BOARD -RECREATIONAL BLOCK
INCOMING
125A 4P MCCB 25 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA – 3Nos
32A TPN MCCB, 16 KA – 5Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,
KVARH, PF with RS 485 BMS integration125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
347 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. POWER PANEL -
RECREATIONAL BLOCK
INCOMING
250A TPN MCCB 25 KA with connected accessories –
1No.as incomer
OUTGOINGS125A TPN MCCB, 25 KA – 2Nos
63A TPN MCCB, 16 KA – 1No.
32A TPN MCCB, 16 KA – 7Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.
![Page 137: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/137.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 137/2939
The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration250A Amps TPN Aluminium busbars : All the neutral
busbars shall have half the capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
348 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (LPSB-1) LIGHTING
POWER SWITCH BOARD - TYPE-C&D
INCOMING
100A 4P MCCB 16 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA + KWHmetre – 2Nos
32A TPN MCCB, 16 KA + KWHmetre – 2NosWith necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration100A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
349 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (LPSB-2,8,14 &18)
LIGHTING POWER SWITCH BOARD - TYPE-C&D
INCOMING
125A 4P MCCB 25 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA + KWHmetre – 5Nos
32A TPN MCCB, 16 KA + KWHmetre – 1Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration
![Page 138: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/138.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 138/2939
125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
Nos. 4
350 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (LPSB-3, 4 to 7, 9 to 13 &
15 to 17) LIGHTING POWER SWITCH BOARD - TYPE-C&D
INCOMING
125A 4P MCCB 25 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA + KWHmetre – 5Nos
32A TPN MCCB, 16 KA + KWHmetre – 1Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.
The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS inte ration125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
Nos 13
351 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. LIFT PANEL - TYPE-
C&D + BACHELOR & TRANSIT
INCOMING
125A 4P MCCB 16 KA with connected accessories –
2Nos.as incomer with 2 lock and 1 key mechanicalinterlock arrangementOUTGOINGS
32A TPN MCCB, 16 KA + KWHmetre – 6 Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,short
circuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
Nos. 2
![Page 139: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/139.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 139/2939
352 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (LPSB-1) LIGHTING
POWER SWITCH BOARD - BACHELOR & TRANSIT
INCOMING
100A 4P MCCB 16 KA with connected accessories –1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA + KWHmetre – 3Nos
32A TPN MCCB, 16 KA + KWHmetre – 4Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS inte ration100A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
353 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (LPSB-3 to 12)
LIGHTING POWER SWITCH BOARD - BACHELOR &
TRANSIT
INCOMING
100A 4P MCCB 16 KA with connected accessories –
1No.as incomerOUTGOINGS
32A TPN MCCB, 16 KA + KWHmetre – 6Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration
100A Amps 4P Aluminium busbars : All the neutralbusbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
Nos 10
354 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (LPSB-2) LIGHTING
POWER SWITCH BOARD - TYPE-C&D
![Page 140: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/140.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 140/2939
INCOMING
100A 4P MCCB 16 KA with connected accessories –
1No.as incomerOUTGOINGS
32A TPN MCCB, 16 KA + KWHmetre – 4Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,
Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration100A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
355 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per the
detailed specification enclosed. (LSB-1) LIGHTING
SWITCH BOARD -(OFFICE AREA)
INCOMING
100A 4P MCCB 16 KA with connected accessories –
1No.as incomerOUTGOINGS
32A TPN MCCB, 16 KA – 4Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall be
Microprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH,PF with RS 485 BMS integration100A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 4
356 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (PSB-1) POWER
SWITCH BOARD -1 (OFFICE AREA)INCOMING
125A 4P MCCB 25 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA – 4Nos
32A TPN MCCB, 16 KA – 2Nos
![Page 141: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/141.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 141/2939
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
357 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (PSB-2) POWER
SWITCH BOARD -2 (OFFICE AREA)
INCOMING
630A 4P MCCB 35 KA with connected accessories –
1No.as incomerOUTGOINGS
100A TPN MCCB, 16 KA – 7Nos
63A TPN MCCB, 16 KA – 9Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration
630A Amps 4P Aluminium busbars : All the neutralbusbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
358 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (PSB-3) POWER
SWITCH BOARD -3 (OFFICE AREA)
INCOMING
400A 4P MCCB 35 KA with connected accessories –
1No.as incomerOUTGOINGS
100A TPN MCCB, 16 KA – 1No.63A TPN MCCB, 16 KA – 11Nos
32A TPN MCCB, 16 KA – 8Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.
![Page 142: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/142.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 142/2939
The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration400A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
359 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (PSB-4) POWER
SWITCH BOARD -4 (OFFICE AREA)
INCOMING
200A 4P MCCB 25 KA with connected accessories –
1No.as incomerOUTGOINGS
63A TPN MCCB, 16 KA – 5Nos
32A TPN MCCB, 16 KA – 9Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration200A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
360 Design, supply, fixing, testing and commissioning of
cubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. LIFT PANEL - OFFICE
AREA
INCOMING
125A 4P MCCB 25 KA with connected accessories –
2Nos.as incomer with 2 lock and 1 key mechanicalinterlock arrangementOUTGOINGS
63A TPN MCCB, 16 KA – 2Nos
32A TPN MCCB, 16 KA – 2Nos
With necessary Aluminium busbars, interconnections,
providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration
![Page 143: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/143.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 143/2939
125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
361 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (UPS O/G PANEL) UPS
O/G PANEL -OFFICE AREAINCOMING
630A TP+2N MCCB 35 KA with connected accessories –
2 Nos as incomerOUTGOINGS
630A TP+2N MCCB 35 KA with connected accessories –
2 Nos as incomerWith necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration630A Amps TP+2N Aluminium busbars (0.8A/Sq. mm.). Nos. 1
362 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (AC PANEL ) OFFICE
AREA
INCOMING
125A 4P MCCB 25 KA with connected accessories –
1 No.as incomerOUTGOINGS
100A TPN MCCB, 16 KA – 1No.
63A TPN MCCB, 16 KA – 4Nos
32A TPN MCCB, 16 KA – 6Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shall
be with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration125A Amps 4P Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
![Page 144: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/144.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 144/2939
363 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (EMERGENCY
LIGHTING PANEL ) -OFFICE AREA
INCOMING
100A TP+2N MCCB 16 KA with connected accessories –
1 No.as incomerOUTGOINGS
32A TPN MCCB, 16 KA – 8Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration100A Amps TP+2N Aluminium busbars : All the neutral
busbars shall have the same capacity of phase busbars(0.8A/Sq. mm.).
No. 1
364 Design, supply, fixing, testing and commissioning ofcubicle type floor mounting switch board comprising ofthe following, the board shall be fabricated as per thedetailed specification enclosed. (SSB) -SUBSWITCH
BOARD FOR EXISTING RESIDENCE
INCOMING
800A TP+N MCCB 25 KA with connected accessories –
1 No.as incomerOUTGOINGS
400A TPN MCCB, 16 KA – 4Nos
250A TPN MCCB, 16 KA – 4Nos
63A TPN MCCB, 16 KA – 4Nos
With necessary Aluminium busbars, interconnections,providing , ON,OFF,TRIP, phase indication lamp, Fuse,Switch control etc.in the incomer and also refer thedrawing.The incoming and outgoing breakers shall beMicroprocessor based release such as overload,shortcircuit,earth fault,neutral protection,etc. The incomer shallbe with Mutlifunctionmetre monitoring V, I, KWH,KVARH, PF with RS 485 BMS integration
800A Amps TP+N Aluminium busbars : All the neutralbusbars shall have half the capacity of phase busbars
(0.8A/Sq. mm.).
No. 1
365 SUPPLY, FIXING, TESTING AND COMMISSIONING OFTHE SURGE & TRANSIENT PROTECTION ANDCONNECTED WORKS WITH ALL NECESSARY FIXINGACCESSORIES ETC COMPLETE AS PER STANDARSAND AS REQUIRED AT SITE SIMILAR TO THEFOLLOWINGS:
![Page 145: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/145.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 145/2939
a Supply of Class B Surge protection device to be installedbetween L-N and N-PE as per the followingspecifications: (PROTECTION PROVISION FOR MPCCINCOMER AT INCOMING SIDE)
Nos. 2
Surge Suppressor system shall consist of Single Spark GapClass I as per IEC and Class B as per VDE standards,capable of carrying 50 KA,10/350microsec lightning surgebetween phase to neutral ( 3 Nos for R, Y & B) & 100 KA,10/350 microsecond neutral to earth (1 no for N-PE)having maximum protection <0.9 KV between phase &neutral and < 1.5 KV between neutral and earth. SurgeProtection devices shall be suitable for operation on 415 V,50 Hz, 3 phase, 4 wire AC supply in TT configurationcomplying with IEC 61024, IEC 61312 and VDE 0100-534and tested as per IEC 61643 and VDE 0675 standards.Itshall be installed at the input of LT Main panel and themounting shall be on 35 mm DIN rail
OBO Model : 3 nos. – Line to Neutral : MCD 50 - B 1no. –
Neutral to Earth : MCD125-B + NPEb Supply of co-ordinated surge protection to be installed
between L-N and N-PE as per the following
specifications (FOR ALL SUBPANEL INCOMER SIDE)
Nos 55
Surge Suppressor system shall consist of Single SparkGap, Class I as per IEC and Class B as per VDE standards,capable of carrying 50 KA at 10/350 microsec lightningsurge between phase to neutral & MOV type category IIas per IEC and Class C as per VDE Standards: Pluggabledevice should be capable of carrying 20 KA,8/20microsecond surges between phase to neutral and havingprotection 1.6 KV between phase to neutral and 100 KA at10/350 microsecond between neutral to earth with amaximum protection of < 1.5 KV between neutral to earth.Surge Protection devices shall be suitable for operation on415 V, 50 Hz, 3 phase, 4/3 wire AC supply in TTconfiguration complying with IEC 61024, IEC 61312 andVDE 0100-534 and tested as per IEC 61643 and VDE 0675standards.
OBO Model : V25 – B+C/3 +NPE
c Supply of Class C type Surge Protection Device
connection between Phase to Neutral & between
Neutral to Earth for Sub distribution system as per the
following specifications (FOR ALL UPS RELATEDDISTRIBUTION BOARDS)
Nos. 8
![Page 146: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/146.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 146/2939
Surge Suppressor MOV type category II as per IEC andClass C as per VDE Standards: Pluggable device shouldbe capable of carrying 20 KA,8/20 microsecond surgesbetween phase to neutral as well as neutral to earth,having protection 1.6 KV between phase to neutral at <1.0 KV between neutral to Earth including wiring remoteindication at all the three phases and visual indication fordefects at R, Y, B and Neutral. It shall be installed at theinput of Sub Distribution panel and the mounting shall beon 35 mm DIN rail. Surge Protection devices shall besuitable for operation on 415 V, 50 Hz, 3 phase, 4 wire ACsupply in TT configuration complying with IEC 61024,IEC 61312 and VDE 0100-534 and tested as per IEC 61643and VDE 0675 standards
OBO Model : V20-C/3+NPESECTION – C : DISTRIBUTION BOARDS
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.No extra payment will be made for the same.
366 LPDB / LDB / ELDB :-
LOC: OFFICE AREA + RECREATIONAL BLOCK +
REGIONAL STORE + BACHELOR & TRANSIT + TYPE
C&D + Sub station
Supply, fixing, testing and commissioning of the double
door type compartmental 4way MCCB DB comprising ofthe following :32A 4P MCCB 16KA – 1 No. as incomer.
25A DP MCB with 25A DP ELCB 30mA – 3 Nos. asoutgoings.Each 25A DP MCB outgoing consist of 4nos.16/20A 10KA SPMCB in a separate compartment with necessaryphase segregation as required by the ElectricalInspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos 61
367 LPDB / LDB :-
LOC: OFFICE AREA + REGIONAL STORE +BACHELOR & TRANSIT
Supply, fixing, testing and commissioning of the double
door type compartmental 6way MCCB DB comprising ofthe following :32A 4P MCCB 16KA – 1 No. as incomer.
25A DP MCB with 25A DP ELCB 30mA – 3 Nos. asoutgoings.
![Page 147: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/147.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 147/2939
Each 25A DP MCB outgoing consist of 6nos.6/10/16/20A, 10 KA SP MCB in a separate compartmentwith necessary phase segregation as required by theElectrical Inspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 6
368 LPDB / LDB :-
LOC: OFFICE AREA + BACHELOR & TRANSIT
Supply, fixing, testing and commissioning of the double
door type compartmental 8way MCCB DB comprising ofthe following :63A 4P MCCB 16KA – 1 No. as incomer.
40A DP MCB with 40A DP ELCB 30mA – 3 Nos. asoutgoings.Each 40A DP MCB outgoing consist of 8nos.6/10/16/20A 10 KA SPMCB in a separate compartment
with necessary phase segregation as required by theElectrical Inspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos 72
369 VTPN DB (AC DB)/ PDB: OFFICE AREA
Supply, fixing, testing and commissioning of the double
door type VTPN 8way MCCB DB comprising of thefollowing :
100A TPN MCCB 16KA with ELR and all other requiredaccessories – 1 No. as incomer.
32A TP MCB 10KA – 8 Nos. as outgoings.
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 2
370 AC DB / VENTILATION DB (7 segment DB) - 6 WAY
LOC: OFFICE + REGIONAL STORE
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 6way MCCBDB comprising of the following :
63A TPN MCCB – 1No. as incomer.
40A DP MCB 10KA (C-Curve) with 40A DP ELCB 100mA– 3 Nos. as outgoings.
Each 40A DP MCB outgoing consist of 6nos.16/20A 10KASPMCB (C-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.
![Page 148: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/148.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 148/2939
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 7
371 AC DB / VENTILATION DB (7 segment DB) - 4 WAY
LOC: OFFICE + RECREATIONAL BLOCK
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 4way MCCB
DB comprising of the following :
63A TPN MCCB – 1No. as incomer.
40A DP MCB 10KA (C-Curve) with 40A DP ELCB 100mA– 3 Nos. as outgoings.
Each 40A DP MCB outgoing consist of 4nos.16/20A 10KASPMCB (C-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.With necessary tinned copper busbars, interconnections,
separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 2
372 UPS DB (7 segment DB) - 6 WAY
LOC: OFFICE AREA
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 6way MCCB
DB comprising of the following :
63A TPN MCCB – 1 No. as incomer.
40A DP RCBO Type: Hpi-A with 10KA & 30mA – 3 Nos.
as outgoings.Each 40A DP RCBO outgoing consist of 6nos.16/20A,10KA SPMCB (D-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 3
373 UPS DB (7 segment DB) - 4 WAY
LOC: OFFICE + RECREATIONAL BLOCK
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 4way MCCB
DB comprising of the following :
32A TPN MCCB – 1 No. as incomer.
25A DP RCBO Type: Hpi-A with 10KA & 30mA – 3 Nos.as outgoings.
![Page 149: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/149.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 149/2939
Each 25A DP RCBO outgoing consist of 4nos.16/20A,10KA SPMCB (D-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 4
374 UPS DB (VTPN DB) - 8 WAY
LOC: OFFICE AREA
Supply, fixing, testing and commissioning of the double
door type VTPN 8way MCCB DB comprising of thefollowing :100A TPN MCCB 16KA with ELR and all other requiredaccessories – 1 No. as incomer.
32A TP MCB 10KA – 8 Nos. as outgoings.
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.
The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 1
375 PDB/LDB (7 segment DB) - 12 WAY
LOC: OFFICE AREA + RECREATIONAL BLOCK
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 12way
MCCB DB comprising of the following :
63A TPN MCCB – 1No. as incomer.
63A DP MCB 10KA (C-Curve) with 63A DP ELCB 100mA– 3 Nos. as outgoings.
Each 63A DP MCB outgoing consist of 12nos.6/10/16/20A 10KA SPMCB (C-Curve) in a separatecompartment with necessary phase segregation asrequired by the Electrical Inspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 3
376 PDB (7 segment DB) - 8 WAY
LOC: OFFICE AREA + RECREATIONAL BLOCK
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 8way MCCB
DB comprising of the following :
63A TPN MCCB – 1No. as incomer.
40A DP MCB 10KA (C-Curve) with 40A DP ELCB 100mA– 3 Nos. as outgoings.
Each 40A DP MCB outgoing consist of 8nos. 16/20A10KA SPMCB (C-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.
![Page 150: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/150.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 150/2939
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 8
377 PDB (7 segment DB) - 6 WAY
LOC: REGIONAL STORE
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 6way MCCB
DB comprising of the following :
63A TPN MCCB – 1No. as incomer.
40A DP MCB 10KA (C-Curve) with 40A DP ELCB 100mA– 3 Nos. as outgoings.
Each 40A DP MCB outgoing consist of 6nos.6/10/16/20A10KA SPMCB (C-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.
The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
No. 1
378 PDB (7 segment DB) - 4 WAY
LOC: REGIONAL STORE + TYPE C&D + Sub station
Supply, fixing, testing and commissioning of the double
door type compartmental Phase segregated 4way MCCB
DB comprising of the following :
63A TPN MCCB – 1No. as incomer.
40A DP MCB 10KA (C-Curve) with 40A DP ELCB 100mA
– 3 Nos. as outgoings.Each 40A DP MCB outgoing consist of 4nos. 16/20A10KA SPMCB (C-Curve) in a separate compartment withnecessary phase segregation as required by the ElectricalInspectorate.With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
No. 3
379 PDB (VTPN DB) - 12 WAY
LOC: OFFICE AREA
Supply, fixing, testing and commissioning of the double
door type VTPN 12way MCCB DB comprising ofthe following :125A TPN MCCB 16KA with ELR and all other requiredaccessories – 1 No. as incomer.
32A TP MCB 10KA – 12 Nos. as outgoings.
![Page 151: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/151.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 151/2939
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 1
380 PDB (VTPN DB) - 4 WAY
LOC: REGIONAL STORE
Supply, fixing, testing and commissioning of the double
door type VTPN 4way MCCB DB comprising of thefollowing :63A TPN MCCB 16KA with ELR and all other requiredaccessories – 1 No. as incomer.
32A TP MCB 10KA – 4 Nos. as outgoings.
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos. 1
381 ELDB (SPN DB) - 12 WAYLOC: OFFICE AREA + BACHELOR & TRANSIT +
TYPE-C&D
Supply, fixing, testing and commissioning of the double
door type 12way SPN DB comprising of the following :
32A DP MCB with 32A dp ELCB 30 mA – 1 No. asincomer.6/10A SP MCB 10KA (C-Curve) – 6 Nos. as outgoings.
With necessary tinned copper busbars, interconnections,separate earth bus, separate neutral bus for each phases.
The board shall be powder coated type fixed withconcealed system in wall. The rate shall include necessaryconnected civil works like chipping, rough plastering etc.
Nos 37
382 EXTERNAL LDB (FEEDER PILLAR BOX)
Supply, fixing, testing and commissioning of the double
door type VTPN 4 way MCCB DB comprising of thefollowing :32A 4P MCCB 16KA with 32A 4P Timer & Contactor –
1No. as incomer16A TP MCB 10KA – 4Nos. as outgoings.
With necessary tinned copper busbars, interconnections,earth bus, neutral bus. The board shall be powder coatedtype fixed with concealed system in wall. The rate shallinclude necessary connected civil works like chipping,rough plastering etc.
Nos. 4
SECTION – D : ALUMINIUM CONDUCTOR
COMPACT AIR INSULATED BUSDUCT & TAP-OFF
BOXES
All installation works should be as complete and as
directed by Engineer-Incharge.
![Page 152: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/152.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 152/2939
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
383 200A Aluminium conductor Compact Air insulated
Design Rising Main
a Supply, Installation, Testing and Commissioning of
TP+2N, 4Wire, 200A Aluminium conductor Air insulatedDesign Rising Mains with 15 X 3 (2) External Copperearthing, Plug in Point at every 500mm, Fire Barriers atevery Floor Crossing : Indoor : 30kA (Busbar Size 20mm X6mm (1 Runs))Enclosure is 1.6mm GI; Insulation is ClassFThe product shall be based on Temp. rise & not oncurrent density
RMT 30
b 200A End Feed Unit with 25kA TP+2N MCCB Nos. 2
c End Covers Nos. 2
d Mounting Brackets (Recommended 1No. per 1.5 Mtrs) Nos 20
e 100A Tap Off Box with 16kA TP+2N MCCB Nos. 1
f 63A Tap Off Box with 16kA TP+2N MCCB Nos. 6
384 400A Aluminium conductor Compact Air insulatedDesign Rising Main
a Supply, Installation, Testing and Commissioning of 4P,4Wire, 400A Aluminium conductor Air insulated DesignRising Mains with 25 X 3 (2) External Copper earthing,Plug in Point at every 500mm, Fire Barriers at every FloorCrossing : Indoor : 30kA (Busbar Size 50mm X 6mm (1Runs)) Enclosure is 1.6mm GI; Insulation is Class F Theproduct shall be based on Temp. rise & not on currentdensit
RMT 21
b 400A End Feed Unit with 35kA 4P MCCB Nos. 1
c End Covers Nos. 1
d Mounting Brackets (Recommended 1No. per 1.5 Mtrs) Nos 14e 100A Tap Off Box with 16kA 4P MCCB Nos. 5
385 630A Aluminium conductor Compact Air insulated
Design Rising Main
a Supply, Installation, Testing and Commissioning of 4P,4Wire, 630A Aluminium conductor Air insulated DesignRising Mains with 25 X 3 (2) External Copper earthing,Plug in Point at every 500mm, Fire Barriers at every FloorCrossing : Indoor : 50kA (Busbar Size 90mm X 6mm (1Runs)) Enclosure is 1.6mm GI; Insulation is Class F Theproduct shall be based on Temp. rise & not on currentdensity
RMT 36
b 630A End Feed Unit with 50kA 4P MCCB Nos. 1
c End Covers Nos. 1
d Mounting Barckets (Recommended 1 per 1.5 Mtrs) Nos 24
e 100A Tap Off Box with 16kA 4P MCCB Nos 14
386 800A Aluminium conductor Compact Air insulated
Design Rising Main
![Page 153: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/153.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 153/2939
a Supply, Installation, Testing and Commissioning ofTP+N, 4Wire, 800A Aluminium conductor Air insulatedDesign Rising Mains with 25 X 3 (2) External Copperearthing, Plug in Point at every 500mm, Fire Barriers atevery Floor Crossing : Indoor : 50kA (Busbar Size 50mm X6mm (2 Runs))Enclosure is 1.6mm GI; Insulation is ClassFThe product shall be based on Temp. rise & not oncurrent density
RMT 114
b 800A End Feed Unit with 50kA 4P MCCB Nos. 4c End Covers Nos. 4
d Mounting Barckets (Recommended 1 per 1.5 Mtrs) Nos 76
e 630A Tap Off Box with 35kA 4P MCCB Nos. 1
f 400A Tap Off Box with 35kA 4P MCCB Nos. 1
g 200A Tap Off Box with 25kA 4P MCCB Nos. 1
h 125A Tap Off Box with 25kA 4P MCCB Nos 21
i 100A Tap Off Box with 16kA 4P MCCB Nos. 2SECTION – E : WIRING AND CONNECTED
ACCESSORIES
All installation works should be as complete and as
directed by Engineer-Incharge.The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
387 Wiring to the Circuit mains (DB to switch board / firstpoint of light fitting) (avg. length - 40 Mtrs)using 2 Runsof 2.5 and 1 Run of 1.5sqmm multi strand PVC insulatedcopper conductor (FRLS) in 25mm dia. MS pipe in opensystem in above false ceiling and concealed system inbelow false ceiling, all complete complying with relevantstandard specifications
Pts. 110
388 Wiring to the Circuit mains (DB to switch board / firstpoint) (avg. length - 40 Mtrs)using 2 Runs of 2.5 and 1Run of 1.5sqmm multi strand PVC insulated copperconductor (FRLS) in existing MS pipe in open system inabove false ceiling and concealed system in below falseceiling, all complete complying with relevant standardspecifications
Pts. 90
389 Wiring to the light points/ 6A plug point using 2 Runs of2.5 and 1 Run of 1.5sqmm for primary point (switch tofirst point) and 3 Runs of 1.5 Sqmm for secondary point)(looping), multi strand PVC insulated copper conductor(FRLS) in suitable size MS pipe in open system in abovefalse ceiling and concealed system in below false ceiling.
The primary point rate should inclusive of supply andfixing of 6A modular type switch in a suitable sizemodular box in concealed system,the secondary point rateshould inclusive of supply, laying of GI flexible hose forlighting drops from ceiling, all complete complying withrelevant standard specifications
a Primary point Pts. 650
b Secondary point Pts. 850
![Page 154: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/154.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 154/2939
390 Wiring to the lift well light and power points using 2 Runsof 2.5 sqmm and 1 Run of 1.5 sqmm multi strand PVCinsulated copper conductor (FRLS),separate circuit (fromDB) shall be laid for power points in suitable size MS pipein open system.The rate should inclusive of supply andfixing of 1 No. of 6A switch for control the light and 1 No.6A socket controlled by 6A modular type switch in asuitable size modular box with face plate and all othernecessary accessories.
Pts. 78
391 Wiring to the 6/16A 5Pin or 6Amps Raw power / UPS
socket using 3C X 2.5 sqmm copper flexible cable (FRLS)in existing raceway / conduits (under floor) with all othernecessary accessories.
RMT 4800
392 Wiring to the 6/16A 5Pin or 6Amps Raw power / UPS
socket and also wiring to IBMS systems using 2 Runs of2.5 sqmm and 1Run of 1.5 sqmm multi strand PVCinsulated copper conductor (FRLS) in 25mm dia. MS pipein open system above false ceiling and concealed systemin below false ceiling in wall / column etc.
RMT 4700
393 Wiring to the 6/16A 5Pin or 6Amps Raw power / UPS
socket using 2 Runs of 2.5 sqmm and 1Run of 1.5 sqmmmulti strand PVC insulated copper conductor (FRLS) inexisting MS pipe in open system above false ceiling andconcealed system in below false ceiling in wall / columnetc.
RMT 300
394 Wiring to the 6/16A 5Pin Raw power / UPS socket using3C X 4 sqmm copper flexible cable (FRLS) in existingraceway / conduits (under floor) with all other necessaryaccessories.
RMT 2900
395 Wiring to the power plugs using 2 Runs of 4 sq.mm and 1
Run of 2.5 sqmm multi strand PVC insulated copperconductor (FRLS) in a suitable size MS pipe in opensystem at above false ceiling and concealed system inbelow false ceiling in wall / column etc. (For Airconditioner)
RMT 2100
LOC : Type C&D + Regional store
396 Wiring to the Circuit mains (DB to switch board / firstpoint of light fitting) (avg. length - 18Mtrs)using 2 Runs of2.5 and 1 Run of 1.5sqmm multi strand PVC insulatedcopper conductor (FRLS) in suitable size PVC HMS pipein open system in above false ceiling and concealedsystem in below false ceiling, all complete complying withrelevant standard specifications
Pts. 500
![Page 155: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/155.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 155/2939
397 Wiring to the light/fan points, primary & secondary point(switch to first point and looping) using 3 Runs of 1.5Sqmm multi strand PVC insulated copper conductor(FRLS) in suitable size PVC HMS pipe in open system inabove false ceiling and concealed system in below falseceiling. The primary point rate should inclusive of supplyand fixing of 6A modular type switch in a suitable sizemodular box in concealed system, all complete complyingwith relevant standard specifications
a Primary point Pts. 3195
b Secondary point Pts. 1232
398 Wiring to the 6/16A 5 pin or 6 amps Raw power / UPS
socket using 2 Runs of 2.5 sqmm and 1Run of 1.5 sqmmmulti strand PVC insulated copper conductor (FRLS) in25mm dia. PVC HMS pipe in open system above falseceiling and concealed system in below false ceiling in wall/ column etc.
RMT 9500
399 Wiring to the 6/16A 5 pin or 6 amps Raw power / UPS
socket using 2 Runs of 2.5 sqmm and 1Run of 1.5 sqmm
multi strand PVC insulated copper conductor (FRLS) inexisting PVC HMS pipe in open system above false ceilingand concealed system in below false ceiling in wall /column etc.
RMT 4700
400 Wiring to the power plugs using 2 Runs of 4 sq.mm and 1Run of 2.5 sqmm multi strand PVC insulated copperconductor (FRLS) in a suitable size PVC HMS pipe inopen system at above false ceiling and concealed systemin below false ceiling in wall / column etc. (For Airconditioner)
RMT 11000
401 Supply, fixing, testing and commissioning of 2Nos. 6/10 /13A modular type Universal socket for UPS Power
supply and switch combination in a suitable size modularbox in recessed system. (2Nos.6/10/13A modular socketcontrolled by 2Nos.16A Switches)
Nos. 176
402 Supply, fixing, testing and commissioning of 1No. 6/16Amodular type socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem. (1No.6/16A modular socket controlled by1No.16A Switch)
Nos. 460
403 Supply, fixing, testing and commissioning of 1No. 6/16Amodular type socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem. (1No.6/16A modular socket controlled by1No.16A Switch). Similar to Legrand Myrius
Nos 275
404 Supply, fixing, testing and commissioning of 1No. 6/16Amodular type socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem. (1No.6/16A modular socket controlled by1No.16A Switch). Similar to Legrand Arteor
Nos 10
![Page 156: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/156.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 156/2939
405 Supply, fixing, testing and commissioning of 1No. 16Amodular type socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem. (1No.16A modular socket controlled by 1No.16ASwitch)
Nos. 55
406 Supply, fixing, testing and commissioning of 1No.6Amodular socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem.(1No.6A modular socket controlled by 1No.6Aswitch)
Nos. 404
407 Supply, fixing, testing and commissioning of 1No. 6Amodular type socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem. (1No.6A modular socket controlled by 1No.6ASwitch). Similar to Legrand Myrius
Nos 1912
408 Supply, fixing, testing and commissioning of 1No. 6Amodular type socket for Raw Power supply and switchcombination in a suitable size modular box in recessedsystem. (1No.6A modular socket controlled by 1No.6ASwitch). Similar to Legrand Arteor
Nos 82
409 Supply, fixing, testing and commissioning of 1No.6Amodular socket for Raw Power supply in a suitable sizemodular box in recessed system.(1No.6A modular typesocket ) (For exhaust fan point) Similar to Legrand Myrius
Nos. 250
410 Supply, fixing, testing and commissioning of 1No.16Amodular socket for Raw Power supply in a suitable sizemodular box in recessed system.(1No.16A modular typesocket ) (For Gyser ) Similar to Legrand Myrius
Nos. 177
411 Design, supply,fixing, testing and commissioning of 20A3 pin metal clad socket controlled by 20A DP MCB in a
suitable size MS enclosure fixed in open system. (For Airconditioner)
Nos. 478
412 Design, supply,fixing, testing and commissioning of 32A5 pin metal clad socket controlled by 32A 4P MCB in asuitable size MS enclosure fixed in open system.
Nos. 22
413 Design, supply, fixing, testing and commissioning of 20A,5 pin metal clad socket controlled by 20A 4P MCB in asuitable size MS enclosure fixed in open system. ( For ACsystem)
Nos. 9
414 Design, supply,fixing, testing and commissioning of 16A,3 pin polycorbonite socket controlled by 16A DP MCB in asuitable size weatherproof enclosure fixed in open system.
Nos. 20
415 Design, supply, fixing, testing and commissioning of 32A4P MCB in a suitable size weatherproof enclosure fixed inopen system.
Nos. 22
416 Design, supply, fixing, testing and commissioning of 63ATPN MCCB in a suitable size weatherproof enclosurefixed in open system.
Nos. 9
417 Design, supply, fixing, testing and commissioning of125A TPN MCCB in a suitable size weatherproofenclosure fixed in open system.
Nos. 1
![Page 157: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/157.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 157/2939
418 Design, supply, fixing, testing and commissioning of 63ATPN MCCB in a suitable size MS enclosure fixed in opensystem.
Nos. 3
419 Design, supply, fixing, testing and commissioning of125A TPN MCCB in a suitable size MS enclosure fixed inopen system.
Nos. 5
420 Supply and fixing of suitable size metal box to fix the RJ45Data socket. The rate shall include the wall cutting,chipping and rough finishing etc.,
Nos. 10
421 Supply, fixing, testing and commissioning of RJ45 Datasocket with suitable modular plate and metal box.. Similarto Legrand Myrius
Nos. 4
422 Supply, fixing, testing and commissioning of RJ45 Datasocket with suitable modular plate and metal box.. Similarto Legrand Arteor
Nos. 4
423 Supply and fixing of suitable size metal box to fix the RJ11Telephone socket. The rate shall include the wall cutting,chipping and rough finishing etc.,
Nos. 10
424 Supply, fixing, testing and commissioning of RJ11Telephone socket with suitable modular plate and metal
box. Similar to Legrand Myrius
Nos 406
425 Supply, fixing, testing and commissioning of RJ11Telephone socket with suitable modular plate and metalbox. Similar to Legrand Arteor
Nos 18
426 Supply, fixing, testing and commissioning of TV socketwith suitable modular plate and metal box.
Nos. 75
427 Supply, fixing, testing and commissioning of TV socketwith suitable modular plate and metal box. Similar toLegrand Myrius
Nos 169
428 Supply, fixing, testing and commissioning of TV socketwith suitable modular plate and metal box. Similar toLegrand Arteor
Nos. 8
429 supply, fixing, testing and commissioning of 1 No. of 6A 1
way modular switch in a suitable size face plate withmetal box and all other necessary accessories.
Nos. 10
430 supply, fixing, testing and commissioning of 1 No. of 6A2way modular switch in a suitable size face plate withmetal box and all other necessary accessories. Similar toLegrand Myrius
Nos. 564
431 supply, fixing, testing and commissioning of 1 No. of 6A2way modular switch in a suitable size face plate withmetal box and all other necessary accessories. Similarto Legrand Arteor
Nos. 35
432 supply, fixing, testing and commissioning of 1 No. of 16Amodular switch in a suitable size face plate with metal boxand all other necessary accessories. Similar to Legrand
Myrius
Nos. 190
433 supply, fixing, testing and commissioning of 1 No. ofelectronic regulator in a suitable size face plate with metalbox and all other necessary accessories. Similar toLegrand Myrius
Nos 546
434 supply, fixing, testing and commissioning of 1 No. ofelectronic regulator in a suitable size face plate with metalbox and all other necessary accessories. Similar toLegrand Arteor
Nos 26
![Page 158: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/158.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 158/2939
435 Supply, fixing, testing and commissioning of Calling bell/Buzzer with push type switch and Buzzer / Bell. Similarto Legrand Myrius
Nos 105
436 Supply, fixing, testing and commissioning of Calling bell/Buzzer with push type switch and Buzzer / Bell.Similar to Legrand Arteor
Nos. 6
437 Supply and fixing of fan hook with all other necessaryaccessories.
Nos 572
438 Supply and laying of following size PVC / MS conduits infloor / wall /ceiling etc. including necessarybends,elbow,etc, in concealed system below the falseceiling on wall/floor and open system on above falseceiling. FOR ELECTRICAL, DG, IBMS , DATA &TELEPHONE SYSTEMS)The rate shall includes minor civil works such aschipping, plastering and to make good finished surface tomatch with the original surface.
a 20mm dia MS conduit. RMT 100
b 25mm dia MS Conduit RMT 3800
c 32mm dia MS Conduit RMT 50
d 50mm dia MS Conduit RMT 50e 20mm dia PVC HMS Conduit RMT 100
f 25mm dia PVC HMS Conduit RMT 100
g 32mm dia PVC HMS Conduit RMT 700
h 50mm dia PVC HMS Conduit RMT 100
439 Supply and installation of under floor pregalvanised sheetsteel channel (raceways) as per the detailed specificationas below:
a Supply, fixing of the 100 x 38 X 1.6mm pregalvanisedsheet steel Channel (Raceways) including stiffner atrequired intervals in recessed system in floor includingcutting chippling, plastering in the floor/wall to make
good finish to match with the floor /wall etc. (Similar toMK list No. - UMDX 100/1/6)
RMT 340
b Joint Sleeve for UMDX 100/1/6 Nos 136
c Supply, fixing of the 150 x 38 X 1.6mm pregalvanisedsheet steel Channel (Raceways) including stiffner atrequired intervals in recessed system in floor includingcutting chippling, plastering in the floor/wall to makegood finish to match with the floor /wall etc. (Similar toMK list no. - UMDX 150/2/6)
RMT 120
d Joint Sleeve for UMDX 150/1/6 Nos 48
e Supply, fixing of the 300 x 38 X 1.6mm pregalvanisedsheet steel Channel (Raceways) including stiffner atrequired intervals in recessed system in floor includingcutting chippling, plastering in the floor/wall to makegood finish to match with the floor /wall etc. (Similar toMK list no. - UMDX 300/3/6)
RMT 200
f Joint Sleeve for UMDX 300/1/6 Nos 80
![Page 159: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/159.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 159/2939
g Supply, fixing of the 50 x 25 X 1.6mm pregalvanised sheetsteel Channel (Raceways) including stiffner at requiredintervals in recessed system in floor including cuttingchippling, plastering in the floor/wall to make goodfinish to match with the floor /wall etc. (Similar to MK listno. - UMDX 50/1/6)
RMT 75
h Joint Sleeve for UMDX 50/1/6 Nos 30
i Supply, fixing of the 100 x 25 X 1.6mm pregalvanisedsheet steel Channel (Raceways) including stiffner atrequired intervals in recessed system in floor includingcutting chippling, plastering in the floor/wall to makegood finish to match with the floor /wall etc. (Similar toMK list no. - UMDX 100/1/6)
RMT 25
j Joint Sleeve for UMDX 100/1/6 Nos 10
440 Supply, fixing, testing of under floor access outlet box /Floor junction box / crossover junction box as per thedetailed specification as below:The rate shall includes cutting the existing floor with use
of cutting machine and chipping the cement mortar andthe debris shall be removed from the site. After fixing thetrunking the floor shall be plastered to match the originalsurface.Floor access outlet boxes
Supply of MK access outlet boxes, manufactured fromhigh-pressure die cast material with trap frame & trapmade of flame retardant Engineering Plastic . ABS.Patented screwless polyamide ratchets are provided forself adjusting of the floor box for any floor finishes. Trapcover is reinforced with a 2.5mm thick pre-galvanizedsteel plate with a recess of 8mm for accommodating theflooring.The trap cover is provided with ElectrostaticPolyester Epoxy Coating, to prevent rust accumulation.
The system has provision to accommodate threecompartment trunking to run Mains Voltage & Extra LowVoltage cables. The system has Positive Double EarthingConnections to ensure safety.The system also has theprovision to accommodate 25/38mm deep trunking witha Knockout of 65,100,150,200,225mm. Load bearingCapacity: 2 tons; Dimensions: 250*250mm similar to MKList No.ESB 250/3/1 in the Existing floor with concealedsystem. Combination of switch & sockets will be decidedat the time of execution
Nos. 1
441 Floor Junction Boxes without flyover
Supply and fixing of Junction boxes manufactured fromhigh-pressure die cast material. The Trap Cover & Trapframe of the box should be made of 2.5mm thick pre-galvanized steel plate made of Electrostatic Polyesterepoxy coating. The recess should be 8mm on the trap lidto accommodate the specified flooring.
![Page 160: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/160.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 160/2939
The junction boxes should have the provision to route anddistribute either the power or networking cables. Thesystem must have smooth curved die cast pillars for easeof pulling cables. The system must have the provision toaccommodate 25/38mm deep and upto 225mm wide GItrunking. similar to MK List No.JB 150 / 250 / 300 / 350 /400Height adjustment: The system must have the stainlesssteel leveling screws; Load bearing Capacity: 3.6 tons onthe trap lid; Standards: The system must comply with therelevant specification & IEC 61084
a JB 150 Nos 60
b JB 250 Nos 25
c JB 300 Nos 25
d JB 350 Nos 40
e JB 400 Nos 20
442 Cross Over Junction Boxes without flyover
Supply and fixing of Junction boxes manufactured fromhigh-pressure die cast material. The Trap Cover & Trap
frame of the box should be made of 2.5mm thick pre-galvanized steel plate made of Electrostatic Polyesterepoxy coating. The recess should be 8mm on the trap lidto accommodate the specified flooring.The cross over boxes should have flyover units made ofABS plastic or metal to route and distribute power, dataand voice cables. The system must have smooth curveddie cast pillars for ease of pulling cables. The system musthave the provision to accommodate 25/38mm deep andupto 225mm wide GI trunking. similar to MK List No.EJB250 / 300 / 350 / 400Height adjustment: The system must have the stainless
steel leveling screws; Load bearing Capacity: 3.6 to 4.8tons on the trap lid; Standards: The system must complywith the relevant specification & IEC 61084
a EJB 250 Nos. 5
b EJB 300 Nos. 2
c EJB 350 Nos. 5
d EJB 400 Nos. 1
443 Telephone and lan cabling
a Supplying, fixing, connecting and commissioning ofreputed Brand 10Pair Krone Connector Type Telephone
Tag Block in 16G Thick sheet steel enclosure at each flatfixed flush with the wall.
Nos. 32
b Supplying, fixing, connecting and commissioning 20 PairKRONE CONNECTOR TYPE Telephone Tag Block - Sub
Tag Block in 14 G Thick sheet steel enclosure at EachFloor.
Nos. 32
c Supplying,fixing,connecting and commissioning 200 PairKRONE CONNECTOR TYPE Telephone Tag Block -
Main Tag Block in 14 G Thick sheet steel enclosure atGround Floor
Nos. 4
![Page 161: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/161.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 161/2939
d Supplying, laying, connecting & commissioning ofreputed brand 3 Pair un armoured with colour coded 0.5Sq.mm. annealed copper conductor Telephone cable in
already laid PVC Conduits/ raceways concealed in floor/ Ceiling /wall with necessary clamps,screws etc from 5pair Krone Connector to each telephone points.
RMT 5500
e Supplying, laying, connecting & commissioning ofreputed brand 10Pair un armoured with colour coded 0.5Sq.mm. annealed copper conductor Telephone cable in
already laid PVC Conduits / raceways concealed in floor/ Ceiling / wall with necessary clamps, screws etc.
RMT 1500
f Supplying, laying and concealing of PVC pipe of 25mm
dia with necessary specials and other materialsincluding Run off 1 No. Fish wire (G.I. 22g) for drawingcable for Telephone / data etc., all complete and as perspecifications
RMT 2500
g Supplying, laying, connecting & commissioning 20 pair
un armoured with colour coded 0.5 Sq.mm annealedcopper conductor Telephone cable in already laid PVC
Conduits concealed in floor / Ceiling /wall withnecessary clamps, screws etc from Man Tag block atGround floor to Sub Tag block at each floor
RMT 1500
444 TV CABLING
a Supplying, connecting and commissioning of reputedbrand RG 6 Trunk Co-axial cable in already laid PVC
Conduits concealed in wall / ceiling / floors withnecessary clamps, screws etc.
RMT 7000
b Supplying, fixing, connecting and commissioning of
6Way Splitter at Each Flat
Nos. 40
c Supplying, laying and concealing of PVC pipe of 25mm
dia with necessary specials and other materialsincluding Run off 1 No. Fish wire (G.I. 22g) for drawingcable for T.V. etc., all complete and as per specifications
RMT 2500
SECTION – F : POWER AND CONTROL CABLES /
TERMINATIONS:
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
![Page 162: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/162.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 162/2939
445 Supply, laying of following size XLPE / PVC (FRLS)insulated armoured cables with aluminium / copperconductors partly laid in existing cable tray and partlylaid in wall/ ceiling with suitbale clamps for workingvoltages up to and including 1100V conforming to IS 1554part I 1988 for PVC and IS 7098 Part I for XLPE. Cable traywill be measured and paid separately. FORELECTRICAL, DG, IBMS , FPS & HVAC SYSTEMS)
a 3.5 Core 400 Sq.mm XLPE Aluminium armoured Cable RMT 2830
b 3.5 Core 300 Sq.mm XLPE Aluminium armoured Cable RMT 400
c 3.5 Core 240 Sq.mm XLPE Aluminium armoured Cable RMT 900
e 3.5 Core 150 Sq.mm XLPE Aluminium armoured Cable RMT 55
f 3.5 Core 120 Sq.mm XLPE Aluminium armoured Cable RMT 32
i 3.5 Core 50 Sq.mm XLPE Aluminium armoured Cable RMT 2700
j 3.5 Core 35 Sq.mm XLPE Aluminium armoured Cable RMT 750k 4 Core 25 Sq.mm XLPE Aluminium armoured Cable RMT 2900
l 4 Core 16 Sq.mm XLPE Aluminium armoured Cable RMT 3800
n 4 Core 6 Sq.mm PVC Copper armoured Cable (FRLS) RMT 3200
o 3 Core 4 Sq.mm PVC Copper armoured Cable (FRLS) RMT 95
p 3 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) RMT 7900
s 1 Core 150 Sq.mm PVC Copper Unarmoured Cable(FRLS)
RMT 440
t 1 Core 70 Sq.mm PVC Copper Unarmoured Cable (FRLS) RMT 650
u 1 Core 35 Sq.mm PVC Copper Unarmoured Cable (FRLS) RMT 900
v 1 Core 25 Sq.mm PVC Copper Unarmoured Cable (FRLS) RMT 230
w 1 Core 16 Sq.mm PVC Copper Unarmoured Cable (FRLS) RMT 20
x 1 Core 10 Sq.mm PVC Copper Unarmoured Cable (FRLS) RMT 330
z 24 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) RMT 100
aa 12 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) RMT 100
ab 7 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) RMT 50
ac 4 Core 4 Sq.mm PVC Copper armoured Cable (FRLS) RMT 2500446 Supply and termination of the following size cables with
suitable double compression glands with suitablecrimping socket. (copper sockets for copper cables andAlu. Sockets for alum. Cable) FOR ELECTRICAL, DG,IBMS , FPS & HVAC SYSTEMS)
a 3.5 Core 400 Sq.mm XLPE Aluminium armoured Cable Nos. 36
b 3.5 Core 300 Sq.mm XLPE Aluminium armoured Cable Nos. 4
![Page 163: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/163.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 163/2939
c 3.5 Core 240 Sq.mm XLPE Aluminium armoured Cable Nos. 26
d 3.5 Core 150 Sq.mm XLPE Aluminium armoured Cable Nos. 4
e 3.5 Core 120 Sq.mm XLPE Aluminium armoured Cable Nos. 4
f 3.5 Core 50 Sq.mm XLPE Aluminium armoured Cable Nos. 58
g 3.5 Core 35 Sq.mm XLPE Aluminium armoured Cable Nos. 56
h 4 Core 25 Sq.mm XLPE Aluminium armoured Cable Nos. 222
i 4 Core 16 Sq.mm PVC Aluminium armoured Cable(FRLS)
Nos. 244
j 4 Core 6 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 66
k 3 Core 4 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 2
l 3 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 132
m 1 Core 150 Sq.mm PVC Copper Unarmoured Cable(FRLS)
Nos. 80
n 1 Core 70 Sq.mm PVC Copper Unarmoured Cable (FRLS) Nos. 20
o 1 Core 35 Sq.mm PVC Copper Unarmoured Cable (FRLS) Nos. 44
p 1 Core 25 Sq.mm PVC Copper Unarmoured Cable (FRLS) Nos. 16
q 1 Core 16 Sq.mm PVC Copper Unarmoured Cable (FRLS) Nos. 4
r 1 Core 10 Sq.mm PVC Copper Unarmoured Cable (FRLS) Nos. 32
s 24 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 4
t 12 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 4
u 7 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 4
v 4 Core 4 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 80
w 4 Core 2.5 Sq.mm PVC Copper armoured Cable (FRLS) Nos. 27
SECTION – G : Earthing system ( FOR ELECTRICAL,
DG, IBMS , FPS & HVAC SYSTEMS)
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
![Page 164: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/164.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 164/2939
447 Supply and installation of earth pipe electrode as per IS3043 complete with 3mtr long with 40mm dia 'B' class G.I.pipe and GI earth plate of size 600mm x 600mm x 6mmincluding 2 runs of 50 x 6mm GI flat upto test link fromplate earth electrode, watering funnel and necessary bolt,nut and double washer. Including 750mm x 750mm x3mtr long excavation and construction of 850mm x850mm x 300 mm high brick wall chamber with cementmortor. The chamber shall be provided with 450mm x450mm x 10mm cast iron / RCC cover with frame andlockable facility. The plate electrode shall be filled withalternate layer of salt and charcoal as required full depth.The Cover shall be heavy duty to suit heavy vehiclemovements
Nos 24
448 Supply and installation of earth pipe electrode as per IS3043 complete with 3 mtr long with 40mm dia 'B' class G.I.pipe and copper earth plate of size 600mm x 600mm x3mm including 2 runs of 25 x 6mm CU. flat upto test linkfrom plate earth electrode, watering funnel and necessarybolt, nut and double washer. Including 750mm x 750mm
x 3mtr long excavation and construction of 850mm x850mm x 300 mm high brick wall chamber with cementmortor. The chamber shall be provided with 450mm x450mm x 10mm cast iron / RCC cover with frame andlockable facility. The plate electrode shall be filled withalternate layer of salt and charcoal as required full depth.The Cover shall be heavy duty to suit heavy vehiclemovements
Nos 36
449 Supply and laying of 50 x 6 mm G.I flat RMT 370
450 Supply and laying of 25 x 6 mm G.I flat RMT 350
451 Supply and laying of 25 x 3 mm Cu flat RMT 340
452 Supply and laying of 8 gauge bare copper wire RMT 2580
453 Supply and laying of 50 x 10 mm copper flat for Neutral RMT 150
454 Supply, erection of following sizes GI ladder / perforatedtype cable rack system made out of sheet steel folded torequired shape with adequate number of supports. ( FORELECTRICAL, DG, IBMS , FPS & HVAC SYSTEMS)
The cable rack shall have runners rugs of suitable size,horizontal elbow, vertical elbow 90 Deg. Up verticalelbow 90 Deg. Down, re-deep, coupler plates, materials.The cable racks shall be suspended from ceilingsupported from side walls in columns etc. with adequatesize supporting angles / channels with fastners, welding,
anchor bolts, nuts etc. The rack shall have suitable cableclamping arrangements etc. complete with all civil worksfor fabrication details. Refer enclosed drawing.
![Page 165: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/165.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 165/2939
The rate shall be inclusive of suitable hanging support -gripple make cable with crimp arrangement supports,spacing and fixing as per standards. The height of thehanging arrangement shall be as per drawing and with allaccesories to fix the hangers at purlin, rafter beam withrequired clamps nuts & bolts to be considered.
Perforated type
a 300mm x 75mm x 2.0mm RMT 400
b 450mm x 75mm x 2.0mm RMT 350Ladder type
c 450mm x 75mm x 2.0mm RMT 900
d 600mm x 75mm x 2.0mm RMT 50
e 750mm x 75mm x 2.0mm RMT 800
f 1000mm x 75mm x 2.5mm RMT 60
455 Sheet steel of 14G for connecting the tray. Sqm. 70
456 25 x 6 mm copper Earth busbar - 1 mtr long withnecessary insulator supports
Nos 10
SECTION – H : SAFETY EQUIPMENTS
All installation works should be as complete and asdirected by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
457 Supply and laying of class B, 2.5mm thickness 1M X 2Mwide chequered rubber mat with dielectric strength of45KV suitable for 11KV installation as per IS 15625 / 2006
Nos. 3
458 Supply and laying of class 2, 3mm thickness 1M X 2Mwide chequered rubber mat suitable for 440V installation
as per IEC 61111
Nos 25
459 Supply and fixing of HT/LT cable route indicator madeout of MS flat and angle iron. The cable route marker shallbe fixed at both the ends of cable at joints at 50Mtrs.Spacing for straight runs.
Nos 200
460 Supply and providing shock treatment chart in English,Hindi and Tamil duly framed with 2mm thick glass infront & 6mm thick ply on back as required
Nos 10
461 Supply and fixing of GI fire buckets with round bottom,each set comprising 4Nos.fire buckets of 9Kg capacityincluding supply of M.S pedestal stand with hookssuitable for holding of 4Nos of fire buckets, painted with
Post Office Red oil paint and letter FIRE on each bucketand filling with sand complete as required. .
Nos 10
462 Supply of tested hand gloves of 11KV grade. Nos. 2
463 Supply and providing St. John make first aid box 18SWGMS sheet duly painted as approved by Indian red crosssoceity complete with all first aid medicines.
Nos. 6
![Page 166: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/166.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 166/2939
464 Supply & Fixing HT danger notice plate 250mm x 200mmmade of MS steel 2mm thick & Vitreous enameled whiteon both sides and with inscriptions in signal Red on frontside as required by the electrical authorities.
Nos. 2
465 Supply & Fixing LT danger notice plate 200mm x 150mmmade of MS steel 2mm thick & Vitreous enameled whiteon both sides and with inscriptions in signal Red on frontside as required
Nos. 6
466 Supply & Fixing of Artificial Respirator forInspiration with chart showing the use of it.
Nos 10
467 Supply & Fixing of MS sheet board of size 500mm x300mm of 16 SWG with Entry Restricted To Authorised
Persons Only near the Main entrance of the Substation.The lettering shall be Black painted on Yellow Background.
Nos 10
SECTION – I: EXTERNAL WORKS
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.No extra payment will be made for the same.
468 Supply & laying of 40 mm dia. GI pipe for cable entry inthe pole foundation
RMT 170
469 Design, supply & laying of the 8 SWG bare copper wirefor earthing.
RMT 350
470 Supply and Installation of 20mm dia., 1.5mtr long GIearthing spike for street light pole earthing
Nos 92
471 Similar to SCHREDER-Teceo 1 Glass Extra Clear Flat
Smooth 27W LED
Teceo 1 luminaire made up of Die cast aluminium alloy
body should be of IP66 Tightness level for both the opticalcompartment and the control gear compartment.The LEDchip should be arranged on a stainless steel plate andshould be sealed with a extra clear toughned glass for aoptimal luminous flux and ensuring a tightness level ofIP66 for the optical compartment. LensoFlex2®:Photometric engine specifically dedicated to offeringphotometric flexibility and performance.Leds in Neutralwhite (4100K) should be equpped with Special developedlenses for proper road lighting photometry. Future Proof:The optical unit should be easily removed and replaced atthe real site at the end of the service life in order to takethe advantage of the future technological developments.THermix ®:Large surface area for better heatmanagement.
![Page 167: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/167.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 167/2939
The LED engine should contain 16 nos of LED with 1.2 Weach LED.The luminaire should be protected agaisntsurge up to 10 KV.The optical compartmnet and theelectronic compartment should be separate compartmentsfor heat management.The electrical connections should beautomatically cutoff while opening the control gearcompartment.The luminaire should be provided withuniversal mounting clamp which also allows theluminaire to change the inclination as required at site.Allthe wires used inside the luminaire should be of siliconwires and all the screws used should be of stainless steel.
The LED engine should contain 16 nos of LED driven at acurrent of 500mA to give an total wattage of around 41W.System luminous flux < 4176 lumens; Burning life : 90%output at 60,000 burning hrs and 70% output at 1Lburning hrs; Colour tempearture: 4100K; CRI > 65;
Nos 92
LED :Rebel-ES NW 174lm@500mA
472 Similar to KESELEC SCHREDER CONICAL POLE GI
OF6 MTR HT.The column should be made up of hot dipped galvanizediron which should be bended and tapered towards thetop. The total height of the pole should be 6200 mm andthe lighting luminaire should be mounted at a height of6000 mm.The column should be given with two coats ofepoxy primer and above that it should be given withpolyeruthane UV resistantt coating.The column shall alsobe provided with flush door at the bottom with properstrengthening to the cutout of the door opening. A junction/ looping box with Heavy duty 3 phase connectorshall be built into the pole. COLOR - As per standardshade card.
Nos 92
473 Similar to Keselec Schreder Neos3/IB/250W/1312 /IP66
The floddlight luminaire with a tightness level of IP66suitable for 250W Metal halide .The body should consistof two parts made of painted,die cast aluminiumalloy.The body contains a reflector made of polioshed andanodized aluminium and a removable control gear plate.The protector is made of hardened glass .It is sealed tothe cover with a silicone gasket.The luminaire should behaving a powder coating finish.The Impact resistance ofthe glass should be IK08 Electrical insulation class should
be I or II in accordance with standard EN 60598.All thecables used inside the luminaire should be silicon cableswhich is fire resisitant.The empty weight of the fixtureshould be around 8 Kg.A mounting bracket has to beprovided inorder to adjust the flood light luminaire as perthe required angle.Lamp Color:830
Nos 30
Lamps: 1 x 250W MHL
![Page 168: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/168.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 168/2939
474 Similar to Keselec Schreder Corus/IB/70W/1602/CDMT
.Lamp Color Code:830
Corus Consisting of painted die-cast aluminium alloybody and hardened glass protector sealed onto the bodyby means of a silicone gasket.The floodlight is closed atone end by a painted,die cast aluminium alloy cover,andat the other end,by a frame and door assembly also made
of painted,die cast aluminium alloy.The reflector made ofpolished and anodised aluminium and the control gearare removable. Suitable for 70W CDMT Lamp.
Nos 10
Lamps: 1 x 70W CDMT
475 Similar to KESELEC SCHREDER ZIA LED
TILTABLE/24 DEG/1216MM/70WLED /IP67/Blue
• Illumination in continuous lines • Continuous lineswith an easy & invisible in-out system • Variousinstallation possibilities: fixed or adjustable on-site •
Linear floodlight 400mm lengths . Numerous symmetricallight distributions • Monochromatic or RGB versions •
Static or dynamic versions • Sturdy mechanical
conception: aluminium, fiber-glass reinforced polyester &glass • IP 67 tightness level • Optimized thermaldissipation
Nos 42
Lamps: 70W LED
476 Similar to Keselec Schreder
Corus/IB/70W/1639M/CDMT .Lamp Color Code:830
Corus Consisting of painted die-cast aluminium alloybody and hardened glass protector sealed onto the bodyby means of a silicone gasket.The floodlight is closed atone end by a painted,die cast aluminium alloy cover,andat the other end,by a frame and door assembly also madeof painted,die cast aluminium alloy.The reflector made of
polished and anodised aluminium and the control gearare removable. Suitable for 70W CDMT Lamp. Color PureWhite
Nos 4
Lamps: 1 x 70W CDMT
477 Similar to Keselec Schreder
FOCAL/CMHB/150W/1576/IP66/830
FOCAL Floodlight (IP66)consisting of a painted ,die castaluminium alloy body and cover.The body contains thecontrol gear plate and the lamp holder support with a fineadjustment screws for the fine adjustment of the focusingof the lamp when switched on.The optical compartmentconsists of hardened glass sealed onto the body and areflector made of deep drawn,polished and anodisedaluminium.suiable for 150W CDMT lamp.All the cablesused inside the luminaire should be silicon cables which isfire resisitant.It should be provided with a mountingclamp which enables the mounting of the luminaire at 3mtr ht on th facade of the building.
Nos. 4
Lamps: 1 x 150W CDMT
RECREATIONAL BLOCK
![Page 169: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/169.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 169/2939
478 Similar to Keselec Schreder
Corus/IB/35W/1639M/CDMT .Lamp Color Code:830
Corus Consisting of painted die-cast aluminium alloybody and hardened glass protector sealed onto the bodyby means of a silicone gasket.The floodlight is closed atone end by a painted,die cast aluminium alloy cover,andat the other end,by a frame and door assembly also made
of painted,die cast aluminium alloy.The reflector made ofpolished and anodised aluminium and the control gearare removable. Suitable for 35W CDMT Lamp. Color PureWhite
Nos 10
Lamps: 1 x 35W CDMT
479 Similar to Keselec Schreder Enyo 3 LED Static Version
Warm white
Schreder Enyo:Hyper-compact spotlight • Numeroussymmetrical light distributions • It should be of Static(mono) with 3 High power LEDs of 1.2W • Sturdymechanical conception: aluminium, stainless steel & glassshule be made up of aluminim,Glass and Stainless steel •
IP 67 tightness level • Optimized thermal dissipation
Nos 32
480 Similar to Keselec Schreder
Corus/IB/35W/1639M/CDMT .Lamp Color Code:942
Corus Consisting of painted die-cast aluminium alloybody and hardened glass protector sealed onto the bodyby means of a silicone gasket.The floodlight is closed atone end by a painted,die cast aluminium alloy cover,andat the other end,by a frame and door assembly also madeof painted,die cast aluminium alloy.The reflector made ofpolished and anodised aluminium and the control gearare removable. Suitable for 35W CDMT Lamp. Color PureWhite
Nos 10
Lamps: 1 x 35W CDMT481 Similar to Keselec Schreder
FOCAL/CMHB/150W/1576/IP66/942
FOCAL Floodlight (IP66)consisting of a painted ,die castaluminium alloy body and cover.The body contains thecontrol gear plate and the lamp holder support with a fineadjustment screws for the fine adjustment of the focusingof the lamp when switched on.The optical compartmentconsists of hardened glass sealed onto the body and areflector made of deep drawn,polished and anodisedaluminium.suiable for 150W CDMT lamp.All the cablesused inside the luminaire should be silicon cables which isfire resisitant.It should be provided with a mountingclamp which enables the mounting of the luminaire at 3mtr ht on th facade of the building.
Nos. 2
Lamps: 1 x 150W CDMT
482 Similar to Keselec Schreder Terra Maxi/IB/150W/1453M
with Kit Lamo Color Code:830
![Page 170: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/170.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 170/2939
Embedded flood light (IP 67) - a pressure die castaluminium alloy body and cover – cover attached to thebody with 4 nos. stainless steel rapid closing mechanisms;toughened 19mm thick glass protector capable ofwithstanding load of 3 tons; a double gasket recessed intothe body, removable control gear tray, pre-wired with 2.5sq mm, 3 core copper flexible cable 1.5m long with spunand anodised aluminium reflector and suitable for 150WCDMT lamps
Nos. 6
Lamps: 150W CDMT
483 Similar to Keselec Schreder Corus/IB/70W/1602/CDMT
.Lamp Color Code:942
Corus Consisting of painted die-cast aluminium alloybody and hardened glass protector sealed onto the bodyby means of a silicone gasket.The floodlight is closed atone end by a painted,die cast aluminium alloy cover,andat the other end,by a frame and door assembly also madeof painted,die cast aluminium alloy.The reflector made ofpolished and anodised aluminium and the control gearare removable. Suitable for 35W CDMT Lamp. Color Pure
White
Nos 6
Lamps: 1 x 35W CDMT
SECTION – J : UPS SYSTEM & CONNECTED WORKS
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
Supply, fixing, Testing and commissioning of the
following UPS System and connected works with all
necessary accessories complete as required at site and asper standards.
![Page 171: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/171.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 171/2939
484 Supply, Installation Testing and Commissioning of MicroProcessor Controlled 1 x 70 KVA UPS input supply of 415Volts + 15%, 3 Phase, 50 Hz ± 10% and an out put of 415Volts ±1%, 3 Phase 50 ± 0.1 Hz, Input Power Factor<=0.99, Input Total Harmonic Distortion (THDi) <2.5%,Unity Output Power Factor @ 35deg C consisting ofRectifier, Inverter, External Isolation Transformer, BatteryDC Circuit Breaker with necessary MS enclosure, InbuiltStatic BY PASS Panel (Input & output switches and AutoStatic & Manual Bypass Switches), necessary cable alleyshall be provided if cable entry/exit for UPS unit is frombottom/sides and necessary hardware & software forBMS Intergration with communication port RS 485 (Status Monitoring ), all interconnecting Copper cables(Battery bank to Battery DC Circuit breaker, Battery DCCircuit breaker to UPS, complete as required) withnecessary adequate size of copper lugs etc., withnecessary base channels/supports complete as requiredand all other necessary accessories required as perdetailed specification.
No. 2
485 Supply, Installation, Testing and Commissioning ofSealed Maintenance Free Batteries to support 70KVA for20 minutes complete with intercell connectors & coppercables, battery stand made out of Powder Coated MSAngles with adequate supports to carry the load of thebatteries.
No. 2
486 Supply, Installation Testing and Commissioning of MicroProcessor Controlled 1 x 60 KVA UPS input supply of 415Volts + 15%, 3 Phase, 50 Hz ± 10% and an out put of 415Volts ±1%, 3 Phase 50 ± 0.1 Hz, Input Power Factor<=0.99, Input Total Harmonic Distortion (THDi) <2.5%,Unity Output Power Factor @ 35deg C consisting of
Rectifier, Inverter, External Isolation Transformer, BatteryDC Circuit Breaker with necessary MS enclosure, InbuiltStatic BY PASS Panel (Input & output switches and AutoStatic & Manual Bypass Switches), necessary cable alleyshall be provided if cable entry/exit for UPS unit is frombottom/sides and necessary hardware & software forBMS Intergration with communication port RS 485 (Status Monitoring ), all interconnecting Copper cables(Battery bank to Battery DC Circuit breaker, Battery DCCircuit breaker to UPS, complete as required) withnecessary adequate size of copper lugs etc., withnecessary base channels/supports complete as requiredand all other necessary accessories required as perdetailed specification.
No. 1
487 Supply, Installation, Testing and Commissioning ofSealed Maintenance Free Batteries to support 60KVA for20 minutes complete with intercell connectors & coppercables, battery stand made out of Powder Coated MSAngles with adequate supports to carry the load of thebatteries.
No. 1
![Page 172: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/172.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 172/2939
488 Supply, Installation, Testing and commissioning of MicroProcessor Controlled 1 x 20KVA standalone UPS (Application: For Emergency Lighting, BMS, VAV &Security service loads) input supply of 415 Volts +/- 15%,3 Phase, 50 Hz ± 10%, an out put of 415 Volts ±1%, 3Phase 50 ± 0.1 Hz , Input Power Factor <=0.99, Input TotalHarmonic Distortion (THDi) <2.5%, Unity OutputPower Factor @ 35deg C consisting of Rectifier,Inverter, Battery DC Circuit Breaker with necessary MSenclosure, Inbuilt Static BYPASS( Input & output switchesand Auto Static & Manual Bypass Switches), necessarycable alley shall be provided if cable entry/exit for UPSunit is from bottom/sides and necessary hardware &software for BMS Intergration with communication portRS 485 ( Status Monitoring ), all interconnecting Coppercables (Battery bank to Battery DC Circuit breaker, BatteryDC Circuit breaker to UPS complete as required)with necessary adequate size of copper lugs etc., withnecessary base channels/supports complete as requiredand all other necessary accessories required as per
detailed specification.
No. 2
489 Supply, Installation, Testing and commissioning of MicroProcessor Controlled 1 x 10KVA standalone UPS (Application: For Emergency Lighting, BMS, VAV &Security service loads) input supply of 415 Volts +/- 15%,3 Phase, 50 Hz ± 10%, an out put of 415 Volts ±1%, 3Phase 50 ± 0.1 Hz , Input Power Factor <=0.99, Input TotalHarmonic Distortion (THDi) <2.5%, Unity Output PowerFactor @ 35deg C consisting of Rectifier, Inverter, BatteryDC Circuit Breaker with necessary MS enclosure, InbuiltStatic BYPASS( Input & output switches and Auto Static &
Manual Bypass Switches), necessary cable alley shall beprovided if cable entry/exit for UPS unit is frombottom/sides and necessary hardware & software forBMS Intergration with communication port RS 485 (Status Monitoring ), all interconnecting Copper cables(Battery bank to Battery DC Circuit breaker, Battery DCCircuit breaker to UPS complete as required) withnecessary adequate size of copper lugs etc., withnecessary base channels/supports complete as requiredand all other necessary accessories required as perdetailed specification.
No. 1
490 Supply, Installation, Testing and Commissioning of
Sealed Maintenance Free Batteries to support 10KVA for20 minutes complete with intercell connectors & coppercables, battery stand made out of Powder Coated MSAngles with adequate supports to carry the load of thebatteries.
No. 1
![Page 173: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/173.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 173/2939
491 Supply, Installation, Testing and commissioning of MicroProcessor Controlled 1 x 5KVA standalone UPS (Application: For Emergency Lighting, BMS, VAV &Security service loads) input supply of 415 Volts +/- 15%,3 Phase, 50 Hz ± 10%, an out put of 415 Volts ±1%, 3Phase 50 ± 0.1 Hz , Input Power Factor <=0.99, Input TotalHarmonic Distortion (THDi) <2.5%, Unity Output PowerFactor @ 35deg C consisting of Rectifier, Inverter, BatteryDC Circuit Breaker with necessary MS enclosure, InbuiltStatic BYPASS( Input & output switches and Auto Static &Manual Bypass Switches), necessary cable alley shall beprovided if cable entry/exit for UPS unit is frombottom/sides and necessary hardware & software forBMS Intergration with communication port RS 485 (Status Monitoring ), all interconnecting Copper cables(Battery bank to Battery DC Circuit breaker, Battery DCCircuit breaker to UPS complete as required) withnecessary adequate size of copper lugs etc., withnecessary base channels/supports complete as requiredand all other necessary accessories required as per
detailed specification.
No. 2
SECTION – K : LIGHTNING PROTECTION
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
ADVANCED LIGHTNING PROTECTION SYSTEM
492 Supply,Installation,Testing and commissioning of the
Advanced Lightning Protection CSE Air Terminal withall accessories required for its proper functioning. Theelevated pole should be fitted firmly attached to the wallor column with suitable guy wire system as permanufacturer recommendations to be provided.(Coverage 86m Radius)
Nos. 3
493 84 Supply,Installation,Testing and commissioning of theHVSC down conductor shall be consists of copperconducors, inner insulation, outer copper conductor,conductive sheaths, all cencentrically arrangements outerdiameterr of the down conductor shall be less than 37mm.The main conductor cross sectional area is 50 sq.mm Thedown conductor shall be placed minimum wall thicknessand minimum bending radius is 0.5m.The downconductor 50 sq.mm / 37mm / OD weight is 2.050 kg
ermetre.
RMT 450
![Page 174: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/174.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 174/2939
494 Supply,Installation,Testing and commissioning of theLightning Strike Recorder designed for easy mountingon the down conductor to effectively count the number ofliightning strikes captured by the air terminal. Therecorder sensitive range of 1500 amps to a maximum of220KA @ 8/20µs. The recorder is self powered and doesnot require the use of battery or any other external powersource etc.
Nos. 3
495 Supply,Installation,Testing and commissioning of efficientearthing system with copper bonded earth rod, Clamp,Copper Tape, Ground Resistance Improvement powderall as required including excavation of earth etc asrequired as per manufacture recommendation.(Tripodearthing with 3 Nos. of earth pit)
Nos. 6
496 Supply of 25x3mm copper Down Conductor RMT 100
497 Supply of tape clip for fastening the DownConductor.
Nos 300
Aviation Lamp Fittings:
498 Supply, fixing of 2x12W LED cluster integral type aviation
lamp at topmost height of the building with Auto ON /OFF photo cell controller, connecting wires upto aviationlamp including all connected accesories etc as per thespecification.
No. 3
SECTION – L : Solar system
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
The complete Solar PV system should have a warranty
and after sales service for 5 years
499 Supply, erection, testing and commisioning of15Kwp solar roof top grid tie system complete with allaccessories and as mentioned below and as per thedetailed technical specifications
No. 1
250 Wp Solar Array (high efficiency multicrystalline modules)Galvanized MS Module mounting structure
15KWp,3Phase,415V,50HZ, Power Conditioning Unitwith MPPT Solar Charge Controller and Data Logger
Data logging and monitoring system
Array & Main junction boxesAC Distribution panel
Earthing Kit as per IS 3043
Lightning arrestor
Installation Hardware Kit
1C x 4 sq.mm PVC Copper Cables
2C x 10 sq.mm PVC Copper Cables
3C x 25 sq.mm PVC Copper Cables
Statutory permissions and approvals
![Page 175: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/175.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 175/2939
Electrical Works ( Interior Works )
SECTION – M : SUPPLY AND FIXING OF LIGHTING
LUMINAIRES & FANS
All installation works should be as complete and as
directed by Engineer-Incharge.
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
Samples to be submitted and get approval fom Architect
Consultant before procurement
For LED light fittings, the complete luminaire should
have a warranty for 5 years which includes the housing
+ LED + Driver
500 Wipro WCP 37226 SGW or equivalent
2X26W CFL RECESS MOUNTED DOWNLIGHTLUMINAIRE WITH SATIN FINISH REFLECTOR
Nos 296
Lamps: 2X26W CFL
501 Wipro WCP 27218SGW or equivalent
2X18W CFL RECESS MOUNTEDDOWNLIGHTER WITH FROSTED GLASS
Nos 520
Lamps: 2X18W CFL
502 Wipro WIF 20128SGW or equivalent
1X28W T5 SAVIOUR-SLIM ENERGY SAVINGCHANNEL SUITABLE FOR FTL (T5) LAMP
Nos 152
Lamps: 1X28W T5
503 Wipro WIF 30228SGW or equivalent
2X28W SAVIOUR - SLIM ENERGY SAVINGCHANNEL SUITABLE FOR FTL (T5) LAMPS WITHBI-DIRECTIONAL REFLECTOR
Nos 108
Lamps: 2X28W T5
504 Wipro WVF 22414SGW or equivalent
4X14W T5 RECESS MOUNTED DIRECT LIGHTLUMINARIE
Nos 564
Lamps: 4X14W T5
505 Wipro GRP SGW 90226 or equivalent
2X26W CFL RHYTHM - PENDENT MOUNTEDLUMINAIRE WITH PRISMATIC DIFFUSER
Nos 26
Lamps: 2X26W CFL
506 Wipro GCH 35070 or equivalent
1X70W KOMPASS UNO-RECESS MOUNTEDMETAL HALIDE DOWNLIGHTERS
Nos 30
Lamps: 1X70W MH lamp
507 Wipro GCH 35035 or equivalent
1X35W RECESSED GIMBALL LUMINAIRE Nos 96Lamps: 1X35W MH lamp
508 Wipro WIP 53236 SGW or equivalent
2X36W CFL SURFACE MOUNTED IP 54BOTTOM OPENING TYPE CLEAN ROOMLUMINAIRE SUITABLE FOR CFL(TC-L)LAMP
Nos. 3
Lamps: 2X36W CFL
509 Wipro WRF 80128 SG or equivalent
![Page 176: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/176.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 176/2939
1X28W T5 INDOOR DECORATIVE LUMINAIRESUITABLE FOR T5 LAMP
Nos 10
Lamps: 1X28W T5
510 Wipro WVP 45218 or equivalent
2X18W CFL SURFACE MOUNTED MIRROR OPTICLUMINAIRE WITH PARALITE P5 LOUVRES
Nos. 8
Lamps: 2X18W CFL
511 Wipro WVF 48228 SGW or equivalent
2X28W T5 SURFACE MOUNTED LUMINARIE WITHUNIQUE DUAL FINISH LOUVRE SYSTEM SUITABLEFOR FTL(T5) LAMP
Nos 45
Lamps: 2X28W T5
512 Wipro WDF 9128 SG or equivalent
Wall light patti fitting Nos 601Lamps: 1X28W
513 Wipro WRP 21111 or equivalent
Mirror light fitting (2feet patti fitting) Nos 86Lamps: 1X11W CFL
514 Wipro WKP 14 or equivalentBulk head fitting Nos 145Lamps: 1X9W CFL
515 Wipro WFH51150 or equivalent or equivalent
Compact Sturdy general purpose floodlight with integralgear, housing made of non-corrosive, high pressure diecast aluminium with low copper content and blackpowder coated finish, heat resistant EPR gasket with IP-65suitable for use with High Pressure Metal Halide MHN-TD 150W lam
Nos 15
Lamps: 1X150W MHL
516 Bajaj BRBOL 118 or equivalent
Renaissance - Integral Bollard with cylindrical shapehousing, spun aluminium hat shape top cover fixed withclear acrylic cover
Nos 30
Lamps: 1X18W CFL
517 Bajaj BECBL 03 126 CFL B or equivalent
Renaissance - Integral Bollard with black epoxy powdercoated cylindrical bollard with antiglare louvers diffuserin clear acrylic cover.
30
Lamps: 1X26W CFL
518 Similar to Wipro LD70-400-XXX-27-XX (Spotz LED)
Efficacy > 100lumens / watt
Color temperature: 2700 deg Kelvin
High efficiency Prismatic collimator lens for better lightdistributionBlack anodized aluminium heat sink for effective heatdissipationAesthetically textured chrome plated bottom Finish Nos 25Lamps: 1 X 4W LED
![Page 177: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/177.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 177/2939
519 High performance PIR occupancy presence detectros forautomatic control of lighting. Shall have adjustable offdelay timing varying from 10 sec to 99 min. Advance PIRsensor for occupancy and vacancy sensing with built-inswitching photo cell detector for daylight detection.Sensor has 2 way programming feature using knobsprovided on the sensor or with hand held IR device. Thesensitivity of the sensor can be adjusted in 9 differentsteps. The sensor has in built IR receiver to be operatedusing hand held IR remote control. Similar to WIPRO:COP 11010
Nos 100
520 Sliding type dimming system with select light level withslider - slide up to brighten, down to dim. Suitable for0–10 V dimmable fluorescent ballasts.Rated for maximum20 ballasts/40 mA control current.Requires mains voltageoccupancy sensor by another manufacturer to powerballasts. Similar to WIPRO: LSTV-F20B-FAW-M
Nos 10
521 High performance PIR occupancy presence detectros forautomatic control of lighting. Shall have adjustable off
delay timing varying from 10 sec to 99 min. Advance PIRsensor for occupancy and vacancy sensing with built-inregulating photo cell detector for daylight detection.Sensor has 2 way programming feature using knobsprovided on the sensor or with hand held IR device. Thesensitivity of the sensor can be adjusted in 9 differentsteps. The sensor has in built IR receiver to be operatedusing hand held IR remote control. Suitable for analoguedimming. Similar to WIPRO: CDA 13010
Nos 50
522 Supply, fixing, testing and commissioning of 1200mmsweep single phase ceiling fan with standard down rod,similar to Bajaj Elctra 50 (White).
Nos 506
523 Supply, fixing, testing and commissioning of 600mmsweep single phase ceiling fan with standard down rod,similar to Bajaj Maxima 600mm (White).
Nos 66
524 Supply, fixing, testing and commissioning of 300mm dialight duty single phase exhaust fan for toilets, Similar toBajaj Maxima DX (White).
Nos 241
525 Supply, fixing, testing and commissioning of 1400 RPMheavy duty 380 mm dia single phase exhaust fan withlouvers.
Nos. 3
526 Supply, fixing, cutting, threading and fixing of 25 mm MSconduit for fixing of down rods, including check nut, balland socket etc. after the installation the pipe shall paintedwith required colour as required at site condition.
RMT 2000
527 Supply and fixing chain suspender with suitable anchorplatners for mirror optics light fititngs in office floors.
RMT 2000
SECTION – N : SUPPLY AND FIXING OF SPECIAL
LIGHTING LUMINAIRES
All installation works should be as complete and as
directed by Engineer-Incharge.
![Page 178: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/178.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 178/2939
The rate includes necessary connected minor civil works
if required and necessary supports as required at site.
No extra payment will be made for the same.
Samples to be submitted and get approval fom Architect
before procurement
Type-C, Bachelor and Transit accomodation (Option-1)
528 Entrance light above door
The Ledino flush wall bracket is a futuristic themed light.The half bowl fitting is finished in white and features ahollowed out space into which 2 down lights shine. Thefitting measures 13.1cm in diameter and protrudes fromthe wall 6.5cm. The light comes complete with 2 x 2.5wLED bulbs.
Nos 32
Similar to Philips Reference.No: 69085/31
529 Ceiling lights
Aluminum E27 Max 1 x 100W Material Glass withouthLamp
Nos 352
Similar to Philips Reference.No: QCG 301530 Wall lights
E27 Max 1x60W Material Glass withouth Lamp Nos 224Similar to Philips Reference.No: QWG 301
531 Balcony lights
Material Synthetic, Color White IP20, LampIncluded, 1x22W 230V
Nos 64
Similar to Philips Reference.No: 30161
532 Toilet mirror light
Mirror lamps chrome 1x8W 230V - Chrome finish Nos 128Similar to Philips Reference.No: FWZ 300
533 Store light
Aquafit QCZ801 G9, Max. 1x 25W - Chrome finish Nos 64Similar to Philips Reference.No: QCZ801
534 Toilet down lighter
Genie E27, 14W not included,With toughened glasscover, finish -nickle satin
Nos 64
Similar to Philips Reference.No: FBG302
Type-C, Bachelor and Transit accomodation (Option-2)
535 Entrance light above door
Wall light - Material Metal,Color white,On/off switch onarticle, IP code: IP20, protection against objects biggerthan 12.5 mm, no protection against water,Wattage
bulb included: 2.5 W, Light color 4000K cool white
Nos 32
Similar to Philips Reference.No: 33257
536 Ceiling lights
Ceiling Light - Material Glass, color gold E27, 1NormalLamp, Lamp Excluded, Non Dimable
Nos 352
Similar to Philips Reference.No: QCG 309
537 Wall lights
![Page 179: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/179.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 179/2939
Wall Light - Material Glass, color gold E27, lamp1x60W,Lamp Excluded, Non Dimable
Nos 224
Similar to Philips Reference.No: QWG 315
538 Balcony lights
Ceiling Light, Balcony Garden,Material - Steel, ColorWhite,Lamp Excluded, Non Dimable
Nos 64
Similar to Philips Reference.No: ECB 300
539 Toilet mirror lightMirror lamps chrome 1x8W 230V - Chrome finish Nos 128Similar to Philips Reference.No: FWZ 300
540 Store light
Aquafit QCZ801 G9, Max. 1x 25W - Chrome finish Nos 64Similar to Philips Reference.No: QCZ801
541 Toilet down lighter
Genie E27, 14W not included,With toughened glasscover, finish -nickle satin
Nos 64
Similar to Philips Reference.No: FBG302
Type-D & VIP rooms
542 Entrance light above door
Wall light - LED 2.5 W, Material: Glass, Color: Chrome,premium Quality,Energy saving: 80 %, Lamp Included
Nos. 4
Similar to Philips Reference.No: 37242
543 Ceiling lights living (double ht)
Pendant Light FPG701 Material Steel, Finish Aluminum -Suspension Light, Lamp included , base cap 2GX13
Nos. 8
Similar to Philips Reference.No: FPG701
544 Ceiling lights
Ceiling Light - 37246 ceiling lamp chrome 9x2.5WSELV,Material: Glass, Color: Chrome, premium
Quality,Energy saving: 80 %, Lamp Included
Nos 20
Similar to Philips Reference.No: 37246
545 Wall lights
Wall light - LED 2.5 W, Material: Glass, Color: Chrome,premium Quality,Energy saving: 80 %, Lamp Included
Nos 31
Similar to Philips Reference.No: 37242
546 Toilet Mirror Light
Mirror Light cap: GX53,Wattage bulb included: 9 W,Lightcolor: 2700K warm white,IP code: IP44, protection againstobjects bigger than 1 mm, protection from splashed water,Material Metal, color chrome
Nos. 6
Similar to Philips Reference.No: 34312/11
547 Balcony lights
Ceiling Light, Balcony Garden,Material - Steel, ColorWhite,Lamp Excluded, Non Dimable
Nos 14
Similar to Philips Reference.No: ECB 300
548 Store light
Aquafit QCZ801 G9, Max. 1x 25W - Chrome finish Nos. 8Similar to Philips Reference.No: QCZ801
549 Toilet down lighter
![Page 180: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/180.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 180/2939
Genie E27, 14W not included,With toughened glasscover, finish -nickle satin
Nos 10
Similar to Philips Reference.No: FBG302
OFFICE AREA
550 Mouette (Reference.No: L 860710)
Extruded aluminium structure; rotational mouldedpolypropylene diffuser; steel suspension wires Max
1900mm to use 4 x 24w T5 tubes with Dali DimmableBallst.
Nos. 4
Similar to Artemide (Light Art) or equivalent
551 Channel (Reference.No: 436LEV.128X.8)
Recessed Fixture with Aluminium profile,trim,Acrylic diffuser and Dali Dimmable ballast for 1 x 28w T5tube
Nos 52
Similar to Regent (Light Art) or equivalent
552 Umbrella (Reference.No: 00-2727-AP-05)
Pendant in Black lacquered body,Golden pleated interiorshade and frosted glass at bottom to hide the lamp to use3 x max 14w CFL.
Nos. 7
Similar to LEDSC-4 (Light Art) or equivalent
553 Castor (Reference.No: 8332)
Pendant with white base and opal glass for E27 max 27wSpiral CFL.
Nos. 4
Similar to Light Art or equivalent
554 Castor (Reference.No: 8333)
Pendant with white base and opal glass for E27 max 27wSpiral CFL.
Nos 4
Similar to Light Art or equivalent
555 Castor (Reference.No: 8334)
Pendant with white base and opal glass for E27 max 27wSpiral CFL.
Nos 4
Similar to Light Art or equivalent
556 Similar to Ligman Mustang 34 largw single tennis court
luminaire (Catalogue.No:93051-SC76)
Large size rectangular shape area light distribution formetal halide lamps or sodium vapour discharge lamps 70-400w. A high quality reflector design creates broad spreadlight distribution. Main application for lighting of public,private roadways, car parks, exhibition areas, servicestations, truck stop and sports grounds.
Aluminium housing with high corrosion resistance.Stainless steel screws. Durable silicone rubber gasket andclear toughened glass with hinge aluminium frame for in-
position lamp replacement. Anodized high purityaluminium reflector. Main housing is powder paint withhigh corrosion resistance with chemical chromatisedprotection.
Nos 1
Lamps: HIT 1000W
SCHEDULE - F - DG Works
DG SET WITH SCRUBBER, EXHAUST STACK AND
CONNECTED WORKS
![Page 181: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/181.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 181/2939
All installation works should be as complete and as
directed by Engineer-Incharge.
557 Supply, Installation, Testing and Commissioning offactory assembled and factory tested, water cooled,turbo charged after cooled diesel engine alternator setcapable of generating full load of 1250 KVA capacity at40° C, power factor not less than 0.8 lag, 415 Volts,
1500rpm, 3 phase, 50 Hz, AC supply and driven withdiesel engine complete with all accessories such asBase frame, residential silencer, radiator, alternatorcapable of delivering 415 Volts, 50Hz, 3 phase, PF 0.8,1250 KVA load, coupling arrangement of alternator withengine, coupling guard, water pump, oil pump, fuel filter,oil filter, air filter, exhaust flexible piping, fuel tank (990Litres capacity of day tank), fuel transfer hand pump withsuitable hose pipe, battery 24 Volts and 200 AHcapacity, battery charging
Nos. 2
alternator, engine control panel, anti-vibration spring typemounting (quantity as per the manufacturer‟s
recommendation),conducting of trial run and A/T as per special conditionsSuitable for acoustic enclosure installation but withoutacoustic enclosure and standard type of engine alternatorcontrol panel etc. complete as per specifications.(Excluding cost of foundation).
Note : The sucessful tenderer should confirm that theengine model shall be capable of delivering minimum1250KVA and suitable for delivering 1250 KVA whencoupled with alternator given below at site condition asrequired. The Acoustic Enclosure is included seperately.
558 Supply, Installation, Testing and Commissioning ofacoustic enclosure suitable for 1 No. 1250 KVA radiatorwater cooled diesel generator with all accessoriesfabricated with 16 SWG CRCA sheet steel, mineral woolinsulation of high density with perforated GI sheetcovering, ventilation system complete with fans andlouvers, doors, inside temperature controller, insideillumination with energy efficient T5 fluorescent fittings,wiring for light and plug points with suitable size andnumber of PVC insulated copper conductor cable onsurface MS conduit system, i/c. MCB type distributionboard, earthing complete as per the Specification and the
drawing enclosed.(The above enclosure should be as perCPCB norms. The current approval certificate shall besubmitted by the firm).The day tank of 990 Litres shall bemounted on a suitable pedestal with weather proofenclosure nearer to the DG set. (Excluding cost offoundation). The necessary details such asweight(dynamic & static weight), sizes shall be furnishedfor the execution.
Nos. 2
![Page 182: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/182.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 182/2939
559 Supply, Installation, Testing and Commissioning ofControl panel indoor, floor mounting type with2000Amps, 4pole 65KA ,EDO type ,air circuit breakerwith shunt release, shutter assembly, door interlock andother required accessories, complete set of instrumentpanel,protection release/relays, auto start/stoparrangement as per detailed specification.The panel shallbe installed inside the acoustic enclosure.
Nos. 2
560 Supply,Installation, Testing and Commissioning of AMFwith Auto Synchronising control panel with Auto Loadsharing arrangement of indoor, floor mounting type with2 Nos. 2000Amps, TP, 65KA ,EDO type ,air circuit breakerwith shunt release, shutter assembly, door interlock andother required accessories and 250Amps,4 pole, neutralisolating contactor as incoming with complete set ofinstrument panel with accessories, protectionrelease/relays etc. and 1No. 4000Amps, 4pole, 75KA,EDO ACB with shunt release, shutter assembly, doorinterlock and other required accessories as bus coupler &
2 Nos. 2000Amps, 4Pole, 65KA ,EDO type ,air circuitbreaker with shunt release, shutter assembly, doorinterlock and other required accessories as outgoingfeeders with complete set of instrument panel withaccessories, protection release/relays etc.
No. 1
and necessary electrical interlocking arrangementbetween incomer and bus coupler by hardware controlwiring along with PLC (Programmable Logic Control).The hardware control wiring for MPCC, AMF Panel,Capacitor Panel, Auto Synchronisation Panel and othernecessary control wiring and PLC operation shall be
feasible to extend for the panel as per the detaileds ecification and drawin s enclosed.
561 Supply, installation, Testing and Commissioning of wetscrubber with packing media and connected accessorieslike scrubbing tank 1No., scrubbing pumps 2Nos. (1 mainand 1standby) interconnecting pipe line works with allaccessories and control valves, suitable supports for thescrubber, required ducting for the scrubber assembly i/c.dampers for bypass arrangement, neutralisation system,suitable for 3Nos. 1250KVA DG set ( 2 Nos. at present + 1No Future), hot gas inlet and outlet arrangements, onlinePH monitoring and connected electrical works i/c. controlpanel, earthing, starter for pump sets, control and power
copper cabling, minor civil works, painting, sign writingcomplete as per specification and drawings enclosed etc.as required. (Excluding cost of foundation).
No. 1
![Page 183: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/183.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 183/2939
562 Supply and Laying of 50mm x 10mm copper flat fromearth electrode in 80mm dia B class GI, directly in groundincluding earth work excavation, refilling the trench, withall accessories, jointing the flats with lap joint with 2Nos.of bolt/nuts/spring washers/check nuts completed etc.as re uired.
RMT 50
563 Supply and fixing of earthing station with 2Nos X 600mmx 50mm x 12.5mm copper busbar on suitable No. ofsupporting insulators having machine made holes forincoming/outgoing earth flats, painting and sign writingetc as required.
No. 4
564 Supply and fixing of 10" dia MS exhaust pipe class Bsuitable for 1250 KVA engine exhaust line including withall accessories such as bends,.flanges, gaskets,condensation removal plug, fixing of flexible coupling,residential silencer supplied along with the engine.Providing necessary MS angle iron supports for the pipeline and the silencer, welding arrangements/ flanged joints with bolts/nuts as per the site conditions.Terminating the pipe line/ ducting in scrubber and
chimney including the complete pipe line/ duct ofinsulation with 50mm thick glass wool, polythenecovering,chicken mesh and aluminium cladding completeas per the specifications etc. as required.
RMT 16
565 Supply and fixing of 14" dia MS exhaust pipe class Bsuitable for 1250 KVA engine exhaust line including withall accessories such as bends,.flanges, gaskets,condensation removal plug, fixing of flexible coupling,residential silencer supplied along with the engine.Providing necessary MS angle iron supports for the pipeline and the silencer, welding arrangements/ flanged joints with bolts/nuts as per the site conditions.
Terminating the pipe line/ ducting in scrubber andchimney including the complete pipe line/ duct ofinsulation with 50mm thick glass wool, polythenecovering,chicken mesh and aluminium cladding completeas per the specifications etc. as required.
RMT 60
566 Supply & fixing of 50mm thick glass wool insulation forthe 1250KVA engine residential silencer including cutting,fixing of glass wool, polythene covering,chicken meshand aluminium cladding complete as per thespecifications etc. as required.
Nos. 2
567 Supplying and laying of 25mm dia , B class MS pipe, fuelline for the interconnection of the reserve tanks to day
tank and day tank to engine i/c. fuel transfer pumps withall accessories such as bend,elbow, coupling, union,plugs,flanges,bolts/nuts,gaskets, making threadedends/welding as per the site condition laying in thefollowing manner etc. as required.
a In the exposed surface the pipe line shall be painted withone coat of primer and two coats of synthetic enamelpaint i/c. with necessary supports complete as required.
RMT 40
![Page 184: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/184.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 184/2939
b In soil , below 0.5 Mtrs from the ground level , the pipeline shall be painted with one coat of hotbitumen,wrapping with 3 layers of hessian cloth dippedin hot bitumen i/c. with necessary supports complete etc.as required.
RMT 30
568 Supplying and fixing of outdoor weather proof reservefuel day tank made up of 3mm thick MS sheet, 990 ltrscapacity i/c. cutting, welding,grinding,providinginlet,outlet, overflow, drain, air vent, inlet fuel filter, fuellevel indicator with scale, painting,fixing with suitablesize MS angle iron frame work on the existing foundationetc. as required. (Excluding cost of foundation).
Nos. 2
569 Supply, Installation,Testing and commissioning of fueltransfer pumps 1 HP capacity, self priming, flame proofpumps 2Nos. (1No. Main and 1No. Standby) i/c.installation of pump sets on the existing foundation,connected fuel pipe line work with necessary controlvalves, to fill the reserve tank from barrels and to fill theday tanks from the reserve tanks i/c. all electrical works
such as control MCB, starter,changeover switch, controland power wiring with PVC insulated copper conductorcabling, end terminations, earthing thepumps,painting,sign writing and complete as required.(Excluding cost of foundation).
Nos. 2
570 Supply and laying of the following PVC insulated, PVCsheathed armoured Copper conductor cabling fromengine control panel to AMF control panel and batterycharger, day tank with suitable clamping arrangement,end terminations, earthing the glands, laying on theexisting cable tray /trench, painting complete etc. asrequired.
16 Core X 2.5Sq.mm Copper cable RMT 100571 Supply and fixing 200mm width cable tray suspended
from the ceiling or supported from the ground withsuitable angle iron supports. The tray shall be made up of38mmX38mmX5mm MS angle iron and interconnectedwith 2Nos.X25mmX3mm MS flat at every 150mm intervalwith necessary painting with one coat of red oxide paintand two coat of enamel paint etc. as required.
RMT 100
572 Supply and fixing of 1200mm X 600mm size 22 guage GIsheet board for display the name plate details of DG setwith suitable frame work i/c. fixing on the accousticenclosure, painting,sign writing etc. as required.
Nos. 2
573 Supply, Installation, Testing and Commissioning of thestructrual stack height of 30 mtr from ground level usingvarious size of GI channels and Supports of ResidentialSilencer, Fuel Pipe and busduct etc. Detailed design alongwith all calcuation details shallbe submitted by thesucessful vendor. The rate shall inclusive of foundationbolt, base plate for the stack etc.
MT 12
![Page 185: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/185.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 185/2939
Lift Works
LIFT AND ELEVATOR
574 PASSENGER LIFT
Supplying, installation, testing & commissioning ofPassenger lift for various buildings of standard designconforming to latest lift act and modern lift withmicroprocesor including AC- Gearless synchronous
V.V.V.F drive system in the existing lift well / shafthaving the following speed, travel and stops for variousbuildings. The lift car interiors such as carenclosure,ceiling, handrailing,door panelling,Jambs in allfloors,fan, car light and others shall be complete as perspecification and two hours fire rated for landing doors.
The lift shall be of excellent quality and shall haveluminous white square flush mounted Braille pushbuttons,intelligent group controls of four lifts, floorannouncement system, Gearless and other features as perdetailed specifications attached. The lift car shall have twoparallel car operating control panels in automatic mode
with or without attendant (duplex mode).
The lift equipment being machine room the machine willbe fixed on the guide rail and machine room less elevatorlift assemble within the hoist way at the last landing. Allthe lift equipments, i/c car, car doors self-levellingdevices, control devices, indicators, landing doors,indicators, terminal buffers,hoisting suspension ropesshall be of steel of suitable size for safety devices i/c allwiring connection, interconnection and all connectedequipments shall be as per specifications. The work alsoincludes all structural items in machine room and abovethe lift well like RCC block, & MS girders required for liftinsallations & providing miscellaneous items likesupports for guide rails, overhead gears, scaffoldings, sillprojections, facia inside the lift well, minor building workslike making sockets, holes etc. i/c making good thedamages.
The rate shall include approval / obtaining completioncertificate from the electrical / lift inspectorate of LocalCompetent Electrical Authority for installation andcommissioning of lifts before handing over the entireinstallation of the lift, as complete in all respectscomplying with all relevant standard specification and as
directed by the Engineer-Incharge.
a 13 passenger of 884kgs without Machine room ofminimum speed of 2.0m/sec (min) with a total travel of53.60 mtrs. Stilt plus 18 floors servicing 19 stops and 19landings on same side.
Nos. 2
b 13 passenger of 884kgs without Machine room ofminimum speed of 1.5m/sec (min) with a total travel of32.95 mtrs. Ground plus 11 floors servicing 12 stops and12 landings on same side.
Nos. 2
![Page 186: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/186.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 186/2939
c 6 passenger of 408kgs without Machine room ofminimum speed of 1.0m/sec (min) with a total travel of12.6 mtrs. Ground plus 3 floors servicing 4 stops and 4landings on same side.
Nos. 2
575 SERVICE LIFT
Supplying, installation, testing & commissioning ofService elevator for various buildings of designconforming to latest lift act and modern lift with includingAC Gearless synchronous digitalised microprocessorbased programmable VVVF controller in the existing liftwell / shaft having the following speed,travel and stopsfor various buildings. The lift shall be complete withfactory enamelled / MS paint finish for car enclosure,ceiling & car doors (all four sides) and landing doors shallbe opening telescopic stainless steel door (two hours firerated) and three sides guard rail,handle inside the car.(with all car interiors complete as per specification)
The lift shall be of excellent quality and shall haveluminous white square flush mounted braille push
buttons, intelligent group of simplex controls,collective,floor announcement system, Gearless machine and otherfeatures as per detailed specifications attached. The lift carshall have car operating control panel (1no) in automaticmode (with or without attendant) and from one panel inattendant mode.
The lift equipment will be installed in the machine roomdirectly above the lift well and machine room less elevatorlift assemble within the hoist way at the last landing. Allthe lift equipments, i/c car, car doors self-levellingdevices, control devices, indicators, landing doors,indicators,terminal buffers,hoisting suspension ropes
shall be of steel of suitable size for safety devices i/c allwiring connection, interconnection and all connectedequipments shall be as per specifications. The work alsoincludes all structural items in machine room and abovethe lift well like RCC block, & MS girders required for liftinsallations & providing miscellaneous items likesupports for guide rails, overhead gears, scaffoldings, sillprojections, facia inside the lift well, minor building workslike making sockets, holes etc. i/c making good thedamages.
The rate shall include approval / obtaining completioncertificate from the electrical / lift inspectorate of LocalCompetent Electrical Authority for installation andcommissioning of lifts before handing over the entireinstallation of the lift, as complete in all respectscomplying with all relevant standard specification and asdirected by the Engineer-incharge
a One Service Elevator of 1420 kgs without Machine roomof minimum speed of 1.0m/sec (min) with a total travel of12.60 mtrs. Ground plus 3 floors servicing 4 stops and 4landings on same side.
Nos. 1
![Page 187: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/187.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 187/2939
b One Service Elevator of 1360 kgs with Machine room ofminimum speed of 1.0m/sec (min) with a total travel of6.00 mtrs. Ground plus 1 floors servicing 2 stops and 2landings on same side.
Nos. 1
HVAC Works (Heat Ventilation & Air-Conditioning)
I AIR COOLED SCROLL CHILLERS
576 Design, supply, customs clearance , freight upto site,
Insurance, delivery, hoisting, installing, testing andcommissioning of the following items as shown on theequipment data and drawing for complete andsatisfactory operation and control and to local authoritiesapproval. The units shall be anti-corrosive suitable forcoastal area application.BMS interfacing type microprocessor controlled Roof topair-cooled liquid chiller package suitable for refrigerant R-
410A or R407c having multiple scroll type compressors(hermetic type) with hydronic pumps (1W+1Standby),unit mounted starters, controllers and complete as perspecification. The rate shall inclusive of vibration isolators(moulded elastomeric isolators) to arrest noise and
vibration.Chillers capacity of each chilling unit will be as follows:
Capacity : 40 TR (minimum) at 40ºC Ambient Nos. 1Water in : (+) 12 Deg C
Water Out : (+)7 Deg C
Fouling factor : 0.0001 FPS units
577 Flanges of resilent vibration isolating material (like rubberfor example) at the inlet and outlet of chillers and pumpsalong with necessary bushes-also of similar material tominimize transmission of vibration to connected piping.
65NB Nos. 9578 Necessary sockets and nipples with shut off valves for
mounting sensors/transmitters on pipe line to interfacethe BMS system.
Set 1
579 Supply,installation testing and commissioning of Chillerisolator panel outdoor type suitable for 40 TR Air cooledscroll cooled chiller with isolator
No. 1
580 Supply, fabrication and erection of grating from the curbof pedestal to provide easy and trouble free access,weather protective cowl for electrical panel and all specialtools and tackles for operation, assembling,commissioning and maintaining the chiller unit. It shallbe supplied / provided by the ACMV Contractor.
Kg 500
II AIR HANDLING UNITS AND ENERGY RECOVERY
UNIT
581 AIR HANDLING UNITS - FLOOR MOUNTED TYPE
![Page 188: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/188.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 188/2939
Supply, installtion, erection testing and commissioning ofDouble Skin floor mounted AHU with 6 Row cooling coils(copper tubes with Aluminium fins construction) flatfilters section with 48 mm thick Non-woven synthetic prefilter, medium pressure fan section with centrifugal fan/s,sq.cage induction motor belt drive, belt guard, vibrationisolators, double canvas connections and with unitmounted emergency off station internally factory wiredbetween motors and emergency off station as perspecifications.
Frame of anodised extruded aluminium thermal breaksections and bolted together with cast aluminium, fittingsprovided at joints and the entire unit is supported onpainted steel channel frame. All the section shall bethermal break as the AHU is outdoor type. Casing panelsshall be of insulated sandwich made of 0.6mm thickpowder coated or plasticised sheet outside shall besuitable for out door application and 0.6mm thickgalvanised sheet steel inside with 50mm thick Puf
insulation media in between. One section of panel toanother and panel to frame work are bolted together withleak proof soft neoprene rubber gasket to prevent any airleakage. Air tight access doors with adjustable tensionlocking device for inspection wherever required.Common channel base to mount fan and motor assemblywith vibration isolator for smooth vibration freeo eration.The double skin air handler shall include for the followingand its final painting to code.Low leaking volume control damper in 1.6mm galvanised/ aluminium aerofoil blade, 16mm dia plated steel stubslocked to the blades with mechanical fasteners, heavy
duty moulded nylon bearings, neoprene rubber seals attips, aluminium compression seals at jambs, brass rollers,double linkage on panels over 1000mm in width etc.
Flexible connections at fan outlet constructed of the fire-resistant flexible double canvass sleeve as per thespecification.The price shall also include the following.
a) All internal wiring between limit switch and marinelights, power cabling copper earthing of air handling unitmotors, from the local control panel and control wiring
b) Bimetallic lugs shall be used at copper to aluminium
joints.c) Accessories and associated wiring between fire damperpanel to fire damper and AHU motor to close firedampers and shut-off AHU motor in the case of fire.
AHU Specifications:
Location-Terrace Floor
Cooling Capacity : 40.0 TR (Outdoor type) No. 1Dehumidified air quantity :13600 CFM
![Page 189: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/189.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 189/2939
Chilled Water flow rate : 96.0 GPM
582 ENERGY RECOVERY UNIT
Supply,installation, testing and commissioning of Energyrecovery unit consists of exhaust air block and fresh airblock. Each block is made up of double skin constructiondesigned on modular concept basis and has provision forfan , motor, damper and filter. Each block module shall be
fitted with other block, housing heat recovery devices,washable metallic viscous filters (50mm thick) and inletand outlet dampers (extruded aluminium low leakageconstruction) with bird screen for supply and return air.Air flow parameters: Energy recovery unit complete withdesiccant coated aluminium media rotor seal GI structuralframe work to house rotor, drive system, rotor drivemotor, belt, pre-filter complete with starter panel. Theprice for energy recovery unit shall include the followinga) All internal wiring, power cabling copper earthing oftreated fresh air unit motors, from the panel and controlwiring b) Bimetallic lugs shall be used at copper toaluminium joints and as per specification.
The vendor shall select the suitable units with minimumleakage. The fresh air quantity required after leakage is asfollows.5220 cfm (Supply air fan and return air fan) -Outdoor type No. 1
ESP - 500 Pa for fresh air supply fan and 500 Pa for returnair fan
III VRV SYSTEM
583 Supply, Installation, testing and commissioning of VRVIndoor air conditioning units with direct driven fan, highefficient filter, inbuilt microprocessor thermostat,
electronic expansion valve, provision of fresh air ductconnection, wired PID remote controller, drain pump,necessary ceiling supports & vibration isolators,refrigerant charging, oil charging, control wiring anddrain connection, etc. The capacities and cfm are asmentioned below:-
a Multi Flow Cassette Units (Round/4-way) (VRV)
i Cooling Capacity: 39,600 Btu/hr Air Flow : 1130 cfm Nos. 11
ii Cooling Capacity: 31,700 Btu/hr Air Flow : 742 cfm Nos. 23
iii Cooling Capacity: 24,900 Btu/hr Air Flow : 671 cfm Nos. 8
iv Cooling Capacity: 19,800 Btu/hr Air Flow : 565 cfm Nos. 20
v Cooling Capacity: 16,000 Btu/hr Air Flow : 530 cfm Nos. 20
vi Cooling Capacity: 12,600 Btu/hr Air Flow : 459 cfm Nos. 33vii Cooling Capacity: 9,900 Btu/hr Air Flow : 459 cfm Nos. 67
b 2-Way cassette units (VRV)
i Cooling Capacity: 19,800 Btu/hr Air Flow : 424 cfm Nos. 2
ii Cooling Capacity: 16,000 Btu/hr Air Flow : 424 cfm Nos. 16
iii Cooling Capacity: 12,600 Btu/hr Air Flow : 318 cfm Nos. 5
iv Cooling Capacity: 9,900 Btu/hr Air Flow : 318 cfm Nos. 9
c Ceiling Suspended unit (VRV)
Cooling Capacity: 39,600 Btu/hr Air Flow: 883 cfm Nos. 4
![Page 190: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/190.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 190/2939
d Ceiling Mounted Ductable units (VRV)
i Cooling Capacity: 57,000 Btu/hr Air Flow: 1624 cfm Nos. 2
ii Cooling Capacity: 78,500 Btu/hr Air Flow: 2047 cfm Nos. 1
584 Supply, Installation and commissioning of energyrecovery unit combined with supply air fan, return airfan, suitable heat exchanger elements with necessarysupports, cabling, steel frame works etc.The capacity of
energy recovery unit as mentioned below
a Air Flow : 325 - 382 cfm Nos. 2
b Air Flow : 400 - 471 cfm Nos. 3
c Air Flow : 500 - 588 cfm Nos. 14
585 Supply, Installation, testing and commissioning ofOutdoor units consists of minimum one no of inverterscroll / rotary compressor, constant speed scrollcompressors, DC fan motor with aero-spiral fan blade, e-pass heat exchanger, safety valves, solenoid valves,receiver, capilary tube, check valve, electronic expansionvalve, high pressure switch, low pressure sensor, pressureregulating valve, refrigerant filter, stop valve,accumulator and outdoor refnet kits. Rate inclusive of R-410A / R-407C / equivalent refrigerant for entire circuits& oil pre charging, vibration isolators, supports, necessarycivil works for fountation/pedestal/steel frame works,etc.
a 18 HP Nos. 1
b 28 HP Nos. 2
c 34 HP Nos. 1
d 36 HP Nos. 1
e 38 HP Nos. 1
f 40 HP Nos. 1
g 48 HP Nos. 3
586 Supply and installation of central remote controller - I
touch screen controller suitable to connect upto multipleindoor and outdoor units (including integration with firealarm system, operate or monitor on / off, temperaturesetting etc.,) individually. The controller shall compatibleto connect with BMS.
Lot 1
587 Supply and installation of Refnet joints (Refrigerantbranch kit) for taking branches between two outdoorunits and various indoors as per VRV scheme drawings.The refnet joint set consists of both liquid and gas linebranch kits. The Refnet joint model name as follows.
a 22T Nos. 60b 33T Nos. 24
c 72T Nos. 55
d 73T + 73T Nos. 72
588 Supply and erection of 16 Gauge Hard drawn RefrigerantCopper pipes to integrate outdoor / indoor units. The rateshall inclusive of closed cell nitrile rubber insulation forcopper pipes. The pipe sizes and insulation thickness asfollows.
a 6.4mm dia with 9mm thick insulation RMT 699
![Page 191: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/191.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 191/2939
b 9.5mm dia with 9mm thick insulation RMT 342
c 12.7mm dia with 13mm thick insulation RMT 916
d 15.9mm dia with 13mm thick insulation RMT 358
e 19.1mm dia with 19mm thick insulation RMT 247
f 22.2mm dia with 19mm thick insulation RMT 335
g 25.4mm dia with 19mm thick insulation RMT 59
h 28.6mm dia with 19mm thick insulation RMT 8
i 31.7mm dia with 19mm thick insulation RMT 141 j 34.9mm dia with 19mm thick insulation RMT 16
k 38.4mm dia with 19mm thick insulation RMT 153
l 41.3mm dia with 19mm thick insulation RMT 128
589 Supply and laying of 2C x 1.5 Sqmm PVC CopperArmoured Cable - Communication and Control cablingbetween indoor and outdoor units. The rate shall beincluding suitable size MS conduit with conduitaccessories and necessary fixing arrangement.
RMT 1750
590 Supply and laying of 2C x 0.75 Sqmm PVC CopperArmoured Cable - Control cabling for wired remote
controller.(optional)
RMT 1070
591 Supply and fixing in position of Heavy duty PVC pipe cutto required length with 9mm thick nitrile rubberinsulation, installed with all joints, reducer, necessaryelbows and tees.
a 40 NB RMT 562
b 25 NB RMT 596VRV SYSTEM SUMMARY
IV DX SYSTEM
592 DUCTABLE SPLIT UNITS
Supply,Installation,testing and commissioing of Ceilingmounted ductable splitunits of specified capacities with R
410A / R-407c refrigerant gas filling. The indoor unitsshall be ceiling mounted duct type. The Indoor unit shallcomprise of Fan, Cooling coil, Filter and Expansiondevice. The Outdoor unit shall comprise of scroll / rotaryCompressors, Air cooled condenser & Condenser fan. Ifmultiple compressors are offered, they shall haveindependent refrigerant circuits. Also, compressors shallbe cut-off automatically under part load conditions. Theunits shall have microprocessor controls. The outdoor unitshall be installed in the terrace level. The rate shallinclusive of control wiring between indoor and outdoorunits, refrigerant charging, insulated drain pipes andsupports for the indoor and outdoor units. The units shall
be selected for chennai Ambient conditions. The unitsshall be factory assembled and only the refrigerant pipingcarried out at site.it is inclusive of cabling between indoorand outdoor units and earthing of indoor and outdoorunits.
a Cooling Capacity: 1,32,000 Btu/h Air flow: 4400 cfm Nos. 1
b Cooling Capacity: 1,02,000 Btu/h Air flow: 3400 cfm Nos. 1
c Cooling Capacity: 45,000 Btu/h Air flow: 1235 cfm Nos. 1
![Page 192: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/192.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 192/2939
593 HI WALL SPLIT UNITS
Supply and Installation of Hi-Wall Split air conditioningunits of specified capacities with R410A/R407Crefrigerant gas filling.The indoor units shall be wall fixingtype. The Indoor unit shall comprise of Blower, Coolingcoil, Filter and Expansion device. The Outdoor unit shallcomprise of inverter scroll / rotary Compressor, Aircooled condenser & Condenser fans. The outdoor unitshall be installed at terrace level.Scope shall include allsupports for the indoor and outdoor units. The units shallbe selected for Chennai Ambient conditions asspecified.Rate inclusive of suitable voltagestabilizer,cabling 20 Amps contactor with NO+NC (forremote operation through BMS) and control cable.
a Cooling Capacity: 36,000 Btu/hr Air flow: 811 cfm Nos. 2
b Cooling Capacity: 24,000 Btu/hr Air flow: 670 cfm Nos. 3
c Cooling Capacity: 18,000 Btu/hr Air flow: 572 cfm Nos 32
d Cooling Capacity: 12,000 Btu/hr Air flow: 350 cfm Nos. 2
594 CASSETTE UNITS
Supply, Installation and commissioning of DX Cassetteunits of specified capacities with R410A/R407Crefrigerant gas filling. The Indoor unit shall comprise of 4-way air flow Blowers, Cooling coil, Filter and Expansiondevice and drain pan. The Outdoor unit shall comprise ofinverter scroll Compressor, Air cooled condenser &Condenser fans. The outdoor unit shall be installed atterrace floor level. Scope shall be inclusive of suitablevoltage stablizer, all supports for the indoor and outdoorunits. The units shall be selected for chennai Ambientconditions as specified. Rate inclusive of 20 Amps
contactor with NO+NC (for remote operation throughBMS) and suitable earthing of indoor and outdoor units.
a Cooling Capacity - 36,000 Btu/hr Air Flow -988cfm Nos. 3
b Cooling Capacity - 24,000 Btu/hr Air Flow -670cfm Nos. 2
c Cooling Capacity - 18,000 Btu/hr Air Flow -529cfm Nos. 8
595 HI SENSIBLE FLOOR MOUNTED PACKAGED
UNITS
![Page 193: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/193.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 193/2939
Supply,Installation,testing and commissioing of Hisensible floor mounted ductable packaged units ofspecified capacities with R-410A / R-407c / Equivalentrefrigerant gas filling. The indoor units shall be floormounted packaged type. The Indoor unit shall compriseof Fan, Cooling coil, Filter and Expansion device. TheOutdoor unit shall comprise of Hermetic scrollCompressors, Air cooled condenser & Condenser fan. Ifmultiple compressors are offered, they shall haveindependent refrigerant circuits. Also, compressors shallbe cut-off automatically under part load conditions. Theunits shall have microprocessor controls. The outdoor unitshall be installed in the terrce level. The rate shallinclusive of control wiring between indoor and outdoorunits, refrigerant charging, insulated drain pipes andsupports for the indoor and outdoor units. The units shallbe selected for chennai Ambient conditions. The unitsshall be factory assembled and only the refrigerant pipingcarried out at site.it is inclusive of cabling between indoorand outdoor units and earthing of indoor and outdoor
units.
Cooling Capacity: 1,98,000 Btu/h Air flow: 8250 CFM(2w+1s)
Nos. 3
596 Supply,erection and testing of Refrigerant Copper pipesof the following diameters to integrate outdoor /indoor units. The liquid line and suction line shall beinsulated with closed cell nitrile rubber insulation asspecified below.
a 6.4mm dia liquid pipe with 9mm thick insulation RMT 213
b 9.5mm dia liquid pipe with 9mm thick insulation RMT 128
c 12.7mm dia liquid pipe with 9mm thick insulation RMT 301
d 15.9mm dia liquid pipe with 13mm thick insulation RMT 312
e 19.1mm dia gas pipe with 13mm thick insulation RMT 28f 25.4mm dia gas pipe with 13mm thick insulation RMT 292
g 28.6mm dia gas pipe with 13mm thick insulation RMT 8
597 Supply and fixing in position of Heavy duty PVC pipe cutto required length with 13mm thick nitrile rubberinsulation, installed with all joints, reducer, necessaryelbows and tees.
a 40 NB RMT 103
b 25 NB RMT 112
598 Supply and laying of 3C x 2.5 Sqmm PVC Copper CableControl cabling between indoor and outdoor units.The rate shall be including suitable size GI conduit with
conduit accessories and necessary fixing arrangement.
RMT 428
599 Supply and laying of 2C x 1.5 Sqmm PVC Copper Cable -Control cabling between indoor and outdoor units. Therate shall be including suitable size MS conduit withconduit accessories and necessary fixing arrangement.
RMT 239
![Page 194: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/194.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 194/2939
600 Supply and erection of following sizes Ladder type cabletray made out of 16G thick GI sheet folded to requiredshape with adequate number of supports for Insulatedrefrigerant pipe and cable conduits. The tray shall becovered 16G GI sheet at terrace and wherever exposed.
a 150mm wide RMT 48
b 300mm wide RMT 40
c 450mm wide RMT 2
V PRECISION AIR-CONDITIONING (PAC) SYSTEM
601 Supply, Installation, testing and commissioning ofMicroprocessor based floor mounted, bottom dischargeair cooled precision Packaged air conditioners with eco-friendly refrigerant.Acoustically insulated Indoor unit with DX cooling coil,filter, EC Fan, hermetically sealed scroll compressor,preheater, humidifier, automatic control thermostat andhumidistat, canvass connections, fixing/mountingaccessories, adjustable and lockable support brackets,
hardware rubber pads etc. The outdoor unit shall consistsof Air cooled condenser with condenser coil and propellerfansElectro-Mechanical Microprocessor panel, digital display,programmable control & recording unit complete withintelligent 16 digit 2 line alpha numeric display, functionkeys, cursor keys, free programmable keys, multi colorLEDS, inscription fields with integrated battery backupsupply at 24 V AC 50 Hz, starter, push buttons, SPP,thermal overload, safety cut-offs, MCBs provision receivezone fire alarm signal and tripping of PACs during thefire. The price shall be inclusive of he sequence controllerand necessary hardware for third party BMS integration.
Unit shall be fitted with high limit humidity sensor /humidistat mounted in the fan outlet and wired toprevent discharge of saturated air from the precision air-conditioner. The unit shall be provided with an underwater leakage sensor to be installed in the false flooringbelow the drain pan for floor discharge units.
The unit shall be selected to meet the required conditionat chennai ambient.Inside condition shall be maintained as 20 ± 1 °C DBT &
50 ± 5 % RHNominal Capacity: 23.0 TR, Air flow rate: 13780 CFM -
Downward Flow (4w+1s)Nos. 5
602 Supply and erection of 16 Gauge Refrigerant Copperpipes with closed cell nitrile rubber insulation to integrateoutdoor / indoor units as per specification.
a 15.9mm dia liquid line with 19mm thick insulation RMT 435
b 22.2mm dia hot gas line with 19mm thick insulation RMT 435
![Page 195: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/195.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 195/2939
603 Supply and laying of Power cabling 4Corex16sq.mm withCopper armoured cable with PVC insulated, PVCsheathed, cables from the isolator (located nearby theindoor units) to the indoor units. (Vender shall confirmthe cable size based on the selected model)
RMT 50
604 Supply and laying of Control cabling 4core x 2.5 Sq.mmbetween indoor and outdoor units. The rate shall beincluding suitable size heavy duty PVC conduit withconduit accessories and necessary fixing arrangement.
RMT 450
605 Supply & fixing of sheet metal plenum box fabricatedfrom 22G GI sheet and branch duct with 24G GI sheetconnecting unit bottom to server room below falseflooring. The size of the plenum and branch duct shall beas per the drawing.
Nos. 5
606 Supply and fabrication of suitable angle iron frame workfor supporting the indoor units complete with 2 coats ofred oxide and enamel paint.
Nos. 5
607 Supply and fabrication of suitable steel frame work for
supporting all the condensing units as per site conditionand provide clear space for air intake / maintenancecomplete with 2 coats of red oxide and enamel paint. Allthe steel structure works, necessary civil works & RCCworks are in PAC vendor scope.
Lot 1
608 Supply and fixing of Powder coated Heavy duty floormounted supply air discharge grilles with Volume controldamper. Size: 600 x 600mm.
Nos. 64
609 Supply and fixing of Extruded Aluminium, powderCoated 0 degree deflection return air ceiling grilles of size600 x 600mm without Volume control damper
Nos. 64
610 Supply and fixing in position of Class B GI pipe(humidifier water line) cut to required length installed
with all joints, reducer, necessary elbows and tees,supporting arrangements, etc.
a 40 NB RMT 55
b 25 NB RMT 12
611 Providing and fixing in position the following Ball valvescomplete with end flanges / matching flanges, additionalsupports, fixing accessories etc. The valve shall bethermally insulated with 13mm thick nitrile rubberinsulation.25 NB Nos. 5PRECISION AIR-CONDITIONING (PAC) SYSTEM
SUMMARY
VI PIPES AND VALVES612 Supply, erection, testing and commissioning of chilled
water pipes. Pipes will be of MS Class C‟ up to 150mm diaas per IS 1239, 6 mm thick for 200mm and 250mm diapipes and 8mm thick for above 300mm dia as per IS 3589.Necessary RCC pedestals of size 600 x300x150mm highshall be provided at every 2200mm interval to run thechilled fluid piping above the floor level by ACMVcontractor.
![Page 196: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/196.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 196/2939
All other pipe supports will have to be on regular pipehangers with spring and acceptable isolation in eachsupport. The quoted piping rate shall include forincorporating service flanges on all valves, strainers,service screen/basket strainer on the water line entry toall equipments like chilled water coils and chillers serviceflanges, descalling Tees, airvent valves, drain valves etc.,required to make the circuits fully operational. Thetemporary service strainers shall be removed anddiscarded after the first few hours of trial runs.
The unit rate for piping shall also include the chemicalcleaning and passivation as detailed in the specification.The insulation valves shall be considered as onemetre ofthe size.M.S angle /Channel also to be insulated.
Chilled Water piping with black steel pipes, bends,
Tees and fittings, factory made supports as follows
100 NB - MS Class C RMT 12
613 Supply and erection of FM approved Nitrile rubber as per
specification for pipe mentioned below:a 65 NB RMT 12
614 Providing and fixing in position the following bare, GIClass B pipe (make-up and drain) cut to required lengthand installed with all screw joints, reducer, necessaryelbows and tees.
a 40 NB RMT 26
b 25 NB RMT 45
615 Providing and fixing in position the following Butterflyvalves (PN16) complete with matching flanges,lockingdevices,extended flow control lever,thermal insulationwith aluminium clading and fixing accessories etc.. as per
specification65 NB - Lever operated Nos. 4
616 Providing and fixing in position the following Brass Ballvalves complete with end flanges/matching flanges,additional supports, fixing accessories etc. as perspecification25 NB - Lever operated Nos. 2
617 Supply and erection of balancing valves, non-risingspindle of stainless steel SS410 stem, stainless steel disc ofAISI SS410 with EPDM sealing on seat, double seal byEPDM back flow and graphic asbestos packing on spindleC1220 cast iron / aluminium / MS fabricated hand wheelwith pressure test cocks for measurements and regulation
of flow through pressure drop across the valves, 50mmthick EPS as thermal insulation with Aluminium claddingas specified, flanges boards, drain valves etc. suitable forcomputerized balancing instrumentation probes.
65 NB Nos. 1
![Page 197: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/197.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 197/2939
618 Supply and installation of electronic, Self-balancing,pressure independent type dynamic balancing valve withintegrated 2-way modulating control valves in a singlebody. The actuator shall be capable of accepting 2-10VCD,4-20mA electric signal and shall provide similartransduced feedback output signal to control system. Theminimum close of pressure of actuator must be 1.5 timesshut off head of pump as per specification of followingsizes.65 NB Nos. 1
619 Supply and installation of 2-way Motorised valves(ON/OFF) with actuator working on 230 V of. If requirednecessary transformer to be included in the scope
65 NB Nos. 1
620 Supply and installation of MS fabricated „Y‟ type strainerwith removable brass /stainless steel (SS-316) screen(24G) with 3mm perforation and permanent magnet,drain piping(SS-410) complete with matching flanges and80mm thick EPS thermal insulation with aluminium
cladding as specified65 NB Nos. 1
621 Supply, installation and commissioning of Water Pressuregauges (bourdan type)complete with ball valve, gaugevalve mounting, fittings and copper tubing extensionwhere required
Nos. 4
622 Supply and erection of Thermometers of the mercury inglass stem type and copper separable well complete withguard etc. Mounted on water lines, thermowells, drainvalves, vent cocks etc., in the inlet and outlet of coolingcoil connections.
Nos. 4
623 Supply and erection of Automatic Air Vents shall beinstalled at all high sections of piping. The discharge from
this air vents shall be piped via tubes of appropriate sizeto the nearest waste drain pipe.1/2'' size Nos. 1
VII AIR DISTRIBUTION SYSTEM
624 Supply, installation, testing and balancing of AirDistribution System consists of factory fabricated sheetmetal ducting complete with supports (anchor fastnersand tie-rods, cradles, angle iron supports, GI bolts andnuts, 4mm thick self-adhesive neoprene rubber gasket,stiffeners, zinc chromate painted angle iron flanges,chipping and plastering of openings made for ductsupports etc., complete as per specification. The rates
quoted shall include turning vanes, straightening vanes,splitters, inspection doors probe, inlets with test openingsenclosures complete with locking caps, chain, gaskets,insulating plugs, and extension for insulated ductworketc.
a 1.2mm thick GSS (18G) ducting – factory fabricated Sqm. 8
b 1.0mm thick GSS (20G) ducting – factory fabricated Sqm. 218
c 0.8mm thick GSS (22G) ducting – factory fabricated Sqm. 401
d 0.63mm thick GSS(24G) ducting – factory fabricated Sqm. 909
![Page 198: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/198.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 198/2939
e 0.55mm thick GSS (26G) ducting. – factory fabricated Sqm. 1771
625 Supply and installing of Acoustic insulation,Material shall be processed Nitrile Rubber foam. Thematerial should be fibre free. The density of the sameshall be within 140-180 Kg/m3.The material shouldhave a thermal conductivity not exceeding 0.050 W/mK.The maximum surface temperature the material shouldwithstand is 105º C and minimum temperature should be20ºC. The Thickness of the material shall be 15mm. Thematerial should conform to Class 1 rating for surfacespread of Flame as per BS 476 Part 7.
Sqm. 88
626 Supply and erection of Thermal Insulation ofSupply air duct with 9mm thick closed cell nitrile rubbertemperature range from -10ºC to +60ºC, Class O firecategory and as per specification.
Sqm. 653
627 Supply and installation of Thermal Insulation of Exposedsupply and return air duct with 25mm thick Pre factorylaminated with treated glass cloth of 205 gsm (blackcolour) nitrile rubber temperature range from -10ºC to
+60ºC, Class O fire category and as per specification.
Sqm. 75
628 Supply and installation of Flexible duct connectionsbetween main duct and diffuser plenums and main ductto cassette units shall be 25mm thick fiber glass pre-insulated, single ply/multiply Aluminium constructionand with multiple layers of polyester film glass fibercovered with mechanical lock sheets/ Aluminiumlaminated jackets-Fire resistant complete with Pre-fabricated and powder coated Aluminium angle framemounting brackets and supports
a 100mm dia Rmt 327
b 200mm dia Rmt 27
c 300mm dia RMT 10629 Supply and fixing of Spigot damper (Butterfly damper)
shall be installed from take off collar to diffuser plelumboxes and at plenum boxes (low leakage) made out of1.6mm galvanized sheet steel frame and blades of 1.0mmgalvanized steel with suitable links.
a 100mm dia Nos 218
b 200mm dia Nos 18
c 300mm dia Nos. 6
630 Supply and fixing of Extruded Aluminium, powdercoated Supply air diffusers with removable centre core
overall size 600 x 600mm without volume controldampers.
a 525 x 525mm neck size Nos 11
b 450 x 450mm neck size Nos. 6
c 375 x 375mm neck size Nos 20
d 300 x 300mm neck size Nos 28
![Page 199: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/199.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 199/2939
631 Supply and fixing of Extruded Aluminium, powderCoated Return air diffusers with removable centrecore overall size 600 x 600mm without volume controldampers.
a 600 x 600mm (outer size) Nos 32
b 375 x 375mm neck size Nos 21
632 Supply and installation of Acoustic insulated plenum
boxes for supply air diffusers with 12mm thick, 48kg/Cu.m density fibre glass rigid board fasten to theplenum box with nuts and bolts.
375 x 375 - 450mm height Nos 24
633 Supply and installation of Powder coated extrudedaluminium continuous linear grilles with 0 degreedeflection without volume control damper for fresh airGrille.
Sqm. 3
634 Supply and installation of Powder coated extrudedaluminium continuous linear grilles with 0 degreedeflection without volume control damper forexhaust air Grille.
Sqm. 8
635 Supply and installation of Polypropylene or
Aluminium return air round diffuser with white finish.The cone is screwed a number of turns clockwise oranticlockwise so as to achive the air gap.150mm dia Nos 197
636 Supply and installation of Polypropylene orAluminium exhasut air round diffuser (for toilets) withwhite finish. The cone is screwed a number of turnsclockwise or anticlockwise so as to achive the air gap. (Dia150 mm)
Nos 48
637 Supply, installation and commissioning of combinedSmoke and Fire damper with actuator complete withfactory made 1.6mm thick GSS sleeves suitable for 90
minutes fire rating located in supply air ducts.In case offire failure the damper shall assume " closed posittion"(suitable for BAS) The motorised actuator to operate theabove fire damper on receipt of signal from DDC system/fire detection system.
Sqm. 3
638 Supply,Installation,Testing and commissioning offollowing: Actuator,temperature sensor and provision forreceipt of external fire signal, wiring as specifications.
Nos. 6
639 Supply and installation of Control panel for the above fire
damper (to be located near Fire damper in respectiveAHU/fan rooms Power supply to the fire damper panelsshall be provided from AHU/fan electrical panel. These
shall be interlocked/integrated with zonal damper statusindicating panels.
Nos. 6
640 Powder coated extruded aluminium air transfer (non
vision) door grilles comprising of front section withinverted „V‟ horizontal blades, borders, countersunk forscrew fixing, and matching rear side frame flanges.
Sqm. 2
![Page 200: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/200.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 200/2939
641 Supply and installation of GI volume control damper lowleakage( wheel type ) made out of 1.6mm thick galvanisedsheet steel frame and opposed blades of 1.6mmgalvanised steel with suitable links, handles, levers andquadrants for manual control of volume of air flow andfor proper balancing of air distribution system.
Sqm. 10
642 Supply and installation of Non Return damper (lowleakage) made out of 1.6mm thick galvanised sheet. Sqm. 0.15
643 Supply, fixing, testing and balancing of Aluminiumpowder coated Fresh air and exhaust arrangement with
storm proof louvers, volume control damper, MS weldmesh bird screen / mounting frame - 100mm louverspacing and 45 deg angle suitable for protection againstsplashing rain water fixed within a right aluminiumframe.
Sqm. 49
644 Supply and erection of following sizes Ladder type cable
tray made out of 16G thick GI sheet folded to requiredshape with adequate number of supports forInsulated refrigerant pipe and cable conduits. The tray
shall be covered 16G GI sheet at terrace and whereverexposed.
a 150mm wide RMT 497
b 300mm wide RMT 717
c 450mm wide RMT 66
d 600mm wide RMT 63
e 900mm wide RMT 19
VIII VENTILATION SYSTEM
645 Supply, installation, testing and commissioning of cabinettype and Rectangular type ventilation fans consists of GSSrectangular cabinet, removable access door for easyaccessibility to motor and fan, flanged inlet and outlet for
easy duct work connection, thermally protected motorand necessary supports. Motors shall be suitable for 415+/- 10%v, 50Hz 3Phase & 230 +/- 10%V, 50Hz, 1 PhaseAC supply and the capacity are as follows. The fan shallbe located at terrace (Weather proof for outdoor type fansand no weather proof for indoor type fans)
a Air flow rate : 22800CFM (Outdoor type) Nos. 2External Static Pressure : 400 Pa
Fan type: Cabinet type fan
Indicative Fan motor : 11.0 kW
b Air flow rate : 14400CFM (Outdoor type) Nos. 2
External Static Pressure : 400 PaFan type: Cabinet type fan
Indicative Fan motor : 7.5 kW
c Air flow rate : 5550CFM Nos. 1External Static Pressure : 300 Pa
Fan type: Cabinet type fan
Indicative Fan motor : 2.2 kW
d Air flow rate : 5550CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
![Page 201: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/201.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 201/2939
Fan type: Cabinet type fan
Indicative Fan motor : 2.2 kW
e Air flow rate : 3450CFM Nos. 1External Static Pressure : 300 Pa
Fan type: Cabinet type fan
Indicative Fan motor : 1.5 kW
f Air flow rate : 2760CFM Nos. 2
External Static Pressure : 100 PaFan type: Rectangular ducted inline fan
Indicative Fan motor : 1.1 kW
g Air flow rate : 2550CFM Nos. 1External Static Pressure : 100 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 1.1 kW
h Air flow rate : 400CFM (Outdoor type) Nos. 1External Static Pressure : 100 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.37 kW
i Air flow rate : 510 CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.37 kW
j Air flow rate : 500 CFM Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.37 kW
k Air flow rate : 700 CFM (Outdoor type) Nos. 2External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.37 kW
l Air flow rate : 978 CFM (Outdoor type) Nos. 2External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.55 kW
m Air flow rate : 1100 CFM Nos. 2External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.55 kW
n Air flow rate : 1200 CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 0.55 kWo Air flow rate : 1400 CFM (Outdoor type) Nos. 3External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 1.1 kW
p Air flow rate : 1580 CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 1.1 kW
![Page 202: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/202.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 202/2939
q Air flow rate : 1800 CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 1.1 kW
r Air flow rate : 2150 CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor :1.1 kWs Air flow rate : 2400 CFM (Outdoor type) Nos. 1
External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor :1.1 kW
t Air flow rate : 3184 CFM (Outdoor type) Nos. 1External Static Pressure : 300 Pa
Fan type: Rectangular ducted inline fan
Indicative Fan motor : 2.2 kW
u Air flow rate : 4800 CFM Nos. 4External Static Pressure : 300 Pa
Fan type: Cabinet type DIDWIndicative Fan motor :2.2 kW
646 Supply, installation, testing and commissioning of circularinline direct drive fan, wall mounted type complete withgravity louvers, motors, starter panels, powder coatedAluminium angle, mounting brackets, 5amps plug top,3mtr. flexible power cables, from nearby power outlets,motors shall be included for life ball bearing with internalautomatic reset safety thermal overload protection device,mounting supports and other standard accessories as perspecifications and suitable for operation 230 +/- 10%V,50/60Hz, 1 Phase AC supply.
a Air flow rate : 350CFM Nos. 1External Static Pressure : 100 Pa
Fan type: Circular ducted inline fan
Indicative Fan motor : 0.1 kW
b Air flow rate : 250CFM Nos. 1External Static Pressure : 100 Pa
Fan type: Circular ducted inline fan
Indicative Fan motor : 0.1 kW
647 Supply, installation, testing and commissioning ofpropeller type direct drive fan, wall mounted typecomplete with gravity louvers, motors, starter panels,powder coated Aluminium angle, mounting brackets,
5amps plug top, 3mtr. flexible power cables, from nearbypower outlets, 600x600x20mm thick marine plywood withhole to suit impeller dia, mounting supports and otherstandard accessories as per specifications and suitable foroperation 230 +/- 10%V, 50Hz, 1 Phase AC supply.
a Air flow rate : 2150CFM Nos. 2External Static Pressure : 100 Pa
Fan type: Propeller
![Page 203: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/203.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 203/2939
Indicative Fan motor : 1.1 kW
b Air flow rate : 550CFM Nos. 3External Static Pressure : 100 Pa
Fan type: Propeller
Indicative Fan motor : 0.37kW
c Air flow rate : 250CFM Nos. 66External Static Pressure : 100 Pa
Fan type: PropellerIndicative Fan motor : 0.1 kW
d Air flow rate : 200CFM Nos. 28External Static Pressure : 100 Pa
Fan type: Propeller
Indicative Fan motor : 0.1 kW
e Air flow rate : 100CFM Nos. 189External Static Pressure : 100 Pa
Fan type: Propeller
Indicative Fan motor : 0.1 kW
648 Supply, installation, testing and commissioning of Roofextractor fan type complete with mild steel or galvanisedsteel mounted on a horizontal square base for cylindicalcasing, rain hood shall be made of fibre class as protectionagainst adverse weather conditions, impeller shall bemanually adjustable pitch blade made of powder coatedAluminium, gravity louvers, motors, starter panels, anglemounting brackets, 5amps plug top, 3mtr. flexible powercables, from nearby power outlets, mounting supportsand other standard accessories as per specifications andsuitable for operation 230 +/- 10%V, 50/60Hz, 1 PhaseAC supply.
a Air flow rate : 900CFM Nos. 2
External Static Pressure : 100 PaFan type: Roof extractor fan (Outdoor type)
Indicative Fan motor : 0.37 kW
b Air flow rate : 700CFM Nos. 2External Static Pressure : 100 Pa
Fan type: Roof extractor fan (Outdoor type)
Indicative Fan motor : 0.37 kW
649 MS additional supports for hanging all the indoor units kg 2450
IX ACMV RELATED ELECTRICAL ITEMS
650 Supply,erection,testing and commissioning of startercomprising of the following
1No. 16A TP&N MCB with adjustable variable settings 16KA with all connected accessories
![Page 204: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/204.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 204/2939
1 No. DOL (3 Phase) suitable for 2.20KW for exhaust fanwith Ammeter, selector switch, suitable ratio ofCTs,control fuses, Auto/Manual selector switch,on/off/trip indication lamp with necessary power andcontrol wiring interconnections etc.,with suitableprovision to link with IBMS for remote operation and allconnected necessary accessories ina suitable MS enclosurewith painting , earthling and suitable fixing arrangementas required
Nos. 7
651 Supply,erection,testing and commissioning of startercomprising of the following1No. 63A TP&N MCCB with adjustable variable settings16 KA with all connected accessories.1 No. Star Delta starter (3 Phase) suitable for 7.5 KW forcabinet type fan with Ammeter, selector switch, suitableratio of CTs,control fuses, Auto/Manual selector switch,on/off/trip indication lamp with necessary power andcontrol wiring interconnections etc.,with suitableprovision to link with IBMS and all connected necessaryaccessories in a suitable MS enclosure with painting ,
earthling and suitable fixing arrangement as required.
Nos. 2
652 Supply,erection,testing and commissioning of startercomprising of the following1No. 32A TP&N MCB with adjustable variable settings 16KA with all connected accessories1 No. Star Delta starter (3 Phase) suitable for 7.5 KW for
AHU with Ammeter, selector switch, suitable ratio ofCTs,control fuses, Auto/Manual selector switch,on/off/trip indication lamp with necessary power andcontrol wiring interconnections etc.,with suitableprovision to link with IBMS for remote operation and allconnected necessary accessories in a suitable MS
enclosure with painting , earthling and suitable fixingarrangement as required
Nos. 1
653 Supply,erection,testing and commissioning of startercomprising of the following1No. 32A TP&N MCB with adjustable variable settings 16KA with all connected accessories1 No. DOL starter (3 Phase) suitable for 3.7 KW for HRW
with Ammeter, selector switch, suitable ratio ofCTs,control fuses, Auto/Manual selector switch,on/off/trip indication lamp with necessary power andcontrol wiring interconnections etc.,with suitableprovision to link with IBMS for remote operation and all
connected necessary accessories in a suitable MSenclosure with painting , earthling and suitable fixingarrangement as required
Nos. 2
654 Supply,erection,testing and commissioning of startercomprising of the following1No. 63A TP&N MCB with adjustable variable settings 16KA with all connected accessories.
![Page 205: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/205.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 205/2939
1 No. Star Delta starter (3 Phase) suitable for 11.0 KW forexhaust air fan with Ammeter, selector switch, suitableratio of CTs,control fuses, Auto/Manual selector switch,on/off/trip indication lamp with necessary power andcontrol wiring interconnections etc.,with suitableprovision to link with IBMS and all connected necessaryaccessories in a suitable MS enclosure with painting ,earthling and suitable fixing arrangement as required.
Nos. 2
CABLE AND TERMINATION
655 Supply, laying of following cables
a 4 Core 6 Sqmm PVC Cu. Cable RMT 45
b 4 Core 4 Sqmm PVC Cu. Cable RMT 85
c 3.5 Core 50 Sqmm XLPE Arm.Cu. Cable RMT 20
656 Supply termination and commissioning of the followingsize cables with suitable double compression glands andcrimping socket with suitable earth clip & fixingaccessories.
a 4 Core 6 Sqmm PVC Cu. Cable Nos. 4
b 4 Core 4 Sqmm PVC Cu. Cable Nos 10
c 3.5 Core 50 Sqmm XLPE Arm.Cu. Cable Nos. 4
d 3 Core 2.5 Sqmm PVC Cu. Cable Nos 14
657 Supply and fixing of lockable type push button control forON / OFF
Nos 313
EARTHING
658 Supply, erection of following sizes GI Ladder type cablerack system made out of sheet steel folded to requiredshape with adequate number of supports.
The cable rack shall have runners rugs of suitable size,horizontal elbow, vertical elbow 90 Deg. Up verticalelbow 90 Deg. Down, re-deep, coupler plates, materials.
The cable racks shall be suspended from ceilingsupported from side walls in columns etc. with adequatesize supporting angles / channels with fastners, welding,anchor bolts, nuts etc. The rack shall have suitable cableclamping arrangements etc. The metal rack system shallbe treated with one coat of rubber based polyvinyl paintas primer and finished with two coats of green enamelpaint complete with all civil works for fabrication details
150 MM RMT 160Fire Protection System
659 DIESEL ENGINE DRIVEN PUMP
![Page 206: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/206.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 206/2939
Supply, installation, testing and commissioning of dieselengine driven pump set as per specification.The engineshould have RPM between 1800 to 2100.The Pump shallbe horizontal end suction, top discharge mounted oncommon baseframe. Pump shall be directly coupled todiesel engine of suitable as per system design condition.Engine shall be complete with flywheel, spider coupling,Air cleaners, Water cooled,Heat Exchanger,CorrosionResistor,Oil Sump with lube at pump. Governor, FuelFilter,starting motor battery charging alternator &instrument panel suitable for 24 volt DC includingstarting switches, Diesel tank, lube oil temperaturegauge,lube oil pressure & high water temperatureincluding flexible exhaust connection.The pump shall becapable to delivery 171m3/hr. at 120 m head. 129KWapprox.
Set 1
660 MAIN ElECTRICAL DRIVEN FIRE PUMPSET
Supply, installation, testing, commissioning of electricallydriven pump set as per specification. Motor TEFC type,
2900 rpm, 415V, 50 cycle frequency 3 phase class „F‟insulation, I.P. 54 protection, starting on DOL. The Pumpshall be horizontal, end suction, top discharge. The pumpshall have cast iron casing, bronze impeller, steel shaftwith common base frame capable of discharging 171 m3per hour at 120 m head. 110KW approx.
Set 2
661 JOCKEY PUMPSET
Supply, installation, testing and commissioning ofelectrically driven pump set as per specification. MotorTEFC type, 2900 RPM 415 V, 50 cycles, 3 phase, class „F‟
insulation, IP 54 protection, 20 HP(Indicative) starting onDOL. The Pump shall be Vertical Inline Pump. The pump
shall have cast iron casing, Cast iron impeller, steelshaft.with common base frame capable of discharging10.8 m3/hour at 120 m head.
Set 1
662 MOTOR CONTROL CENTRE (MCC PANEL)
Supply installation testing and commissioning ofsectionalised cubicle type floor mounted front operateddust and vermin proof power cum control panel made outof not less than 1.6mm MS sheet with enamelled finishi/c. one coat of primer of approved shade and colour i/c.providing suitable number of switchgears, busbars,auxilliary switches, audio alarm hooters, visual
indications, relays, contactors, timers of suitable capacityfor automatic operation of pumps i/c. connections alongwith provision to link with IBMS and all connectedaccessories.Panel should be powder coated, Indicatinglamps should be of LED type as per the Single linedia ram.Outgoing
![Page 207: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/207.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 207/2939
100/125A TP&N MCCB 25 KA with fully automatic DOLStarter suitable for jockey pump with ON/OFF/TRIPindicating lamps,ON/OFF push buttons and all otherrequired accessories -1No 100/125A TP&N MCCB 25 KAwith fully automatic star delta starter suitable for boosterpump with ON/OFF/TRIP indicating lamps ,ON/OFFpush buttons and all other required accessories -3Nos.400A TP&N MCCB 25 KA with 150 HP fully automaticDOL starter with ON/OFF/TRIP indicatinglamps,ON/OFF push buttons and all other requiredaccessories-2Nos. 32A TP&N MCCB 25 KA with all otherrequired accessories with one set of ON/OFF/TRIPindicating lamp with protective fuses-1No With necessaryAluminium busbars,interconnections,earthing etc.,withrequired accessories as per specifications.
No. 1
663 DIESEL ENGINE AUTO START PANEL
Supply and installation of Autostart panel for the dieselengine complete with auto/manual switch, LED
indication lamps, protective fuses with Electronichooter,Electronic timer,plug in relay,Push buttons,voltmeter,ammeter,Bridgerectifier,Choke,OFF/AUTO/MANUAL selectionswitch,TRICKLE/BOOST selection switch,ON/OFFselection switch, battery charger, suitable of working on230 V, AC, single phase, enclosure being vermin & dustproof. Also potential free contacts shall be provided forconnecting to the building automation system. Automaticstarting by means of a battery powered electric startermotor incorporating the axial displacement type ofpinion, having automatic repeat start facilities initiated bya fall in pressure in the water supply pipe to the sprinkler
and/or hydrant installation. The battery (lead acid orNickel-Cadmium) capacity shall be adequate for tenconsecutive starts without recharging with a cold engineunder full compression.Panel should be powder coated,Indicating lamps should be of LED type.Panelconstruction shall be 14SWG M.S sheetbolted/welded..Wiring shall be of 1.5 Sq.mm PVCinsulated stranded copper conductor.
Set 1
664 CABLES:
Supply, laying, testing and commissioning of thefollowing sizes of cables on surface of wall or cabletraearth clip & fixing Accessories
a 2 core X1.5Sq.mm PVC copper armoured cable RMT 30
b 3 core X1.5Sq.mm PVC copper armoured cable RMT 30
c 4 core X1.5Sq.mm PVC copper armoured cable RMT 30
665 CABLE TERMINATION :
Supply terminatin & commissioning of following cableswith double compression glands & crimping typeAluminium lugs with suitable earth clip & fixingAccessories
a 2 core X1.5Sq.mm PVC copper armoured cable Nos. 2
![Page 208: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/208.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 208/2939
b 3 core X1.5Sq.mm PVC copper armoured cable Nos. 2
c 4 core X1.5Sq.mm PVC copper armoured cable Nos. 6HYDRANT SYSTEM
666 Supply, installation, testing & commissioning ofelectrically driven pumpset as per specification. MotorTEFC type, 2900 RPM, 415 V 50 cycle, 3 phase Class 'F"insulation, IP - 55 protection, 10 HP starting on DOL. The
Pump shall be horizontal, end suction, top discharge. Thepump shall be cast iron casing, bronze impeller, steelshaft. with common base frame capable of discharging 27m3/hour at 45 m head. Pump to be installed at Terrace.
Nos. 4
667 Supply and instalation of Cast Iron Sluice Valve, as perIS:14846 with necessary flanges
a 300 NB, PN.16 Nos. 2
b 200 NB, PN.16 Nos. 5
c 150 NB, PN.16 Nos. 25
d 100NB PN.16 Nos. 2
e 80 NB, PN.16 No. 1
668 Supply and installation of Cast Iron Butterfly isolationvalve with necessary flanges, supports, bolts, nuts, etc
a 150 NB Nos. 16
b 100 NB Nos. 4
c 65 NB Nos. 14
d 50 NB Nos. 7
669 Supply, erection, testing and commissioning of gunmetalgate valve with necessary flanges, supports, bolts, nuts,etc & (Below 50NB) screwed ends
a 50 NB Nos. 11
b 40NB Nos. 49
c 20NB Nos. 7
670 Suplying & installation of Cast Iron Non-Return Valves(Normex make) including making flanged joints byproviding necessary nuts, bolts, gaskets etc. All completeas per specifications.
a 200 NB No. 1
b 150 NB Nos. 16
c 65 NB No. 3
d 50 NB No. 4
671 Under Ground piping - Supply, erection, testing andinstallation of MS pipes conforming to IS 3589 for 200NB& above and IS 1239 for 150NB & below with welded
joints including cutting the pipes to correct length,providing and welding flanges to pipe, fixing with clampsto MS brackets/ hangers, making flanged joints withnecessary nuts, bolts, gaskets,. blank flanges, etc. Ratesincluding 10% radiograph all complete as perspecifications of the following diameters.
a 200 NB - Class C RMT 580
b 150 NB - Class C RMT 1198
![Page 209: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/209.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 209/2939
c 80 NB - Class C RMT 37
672 Supply, erection, testing and installation of MS pipesconforming to IS 3589 for 200NB & above and IS 1239 for150NB & below with welded joints including cutting thepipes to correct length, providing and welding flanges topipe, fixing with clamps to MS brackets/ hangers, makingflanged joints with necessary nuts, bolts, gaskets,. blankflanges, etc. Rate shall be inclusive of Zinc chromateprimer over that 2 coats red enamel panit as per Fireauthorities requirement over all above ground pipes.
a 400 NB -8mm thick RMT 9
b 300 NB -8mm thick RMT 4
c 200 NB -6.35mm thick RMT 19
d 150 NB - Class C RMT 174
e 100 NB - Class C RMT 178
f 80 NB - Class C RMT 38
g 65 NB - Class C RMT 93
h 50 NB - Class C RMT 73
i 40 NB - Class C RMT 31673 Supply, installation, testing and commissioning ofcourtyard Gun metal Single headed hydrant as per IS:5290 consisting of 63NB single outlet flanged oblique typehydrants valve with instantaneous female plunger typecoupling, chained blank cap including making flanged joints by providing necessary nuts, bolts, gaskets allcomplete as per specifications suitable for 80 NB stand
ost.
Nos. 26
674 Supply & installation of RRL type-A hose reel of 63mmdia. x 15metres long with heavy quality gun metal malecoupling of IS: 903. combined with 2 Nos of Canvasshoses and 2 Nos of nozzles with ms painted hose tray to
accommodate hose reel
Nos. 26
675 Supply & installation of fabricated MS sheet of size750x600x250 with glass fronted door, painted in red outside and white in inside, hose boxes along with GIsupport angles for courtyard hydrants. Each box shall becapable to accommodate 2 hose each of 63 mm dia x 15 mlong hose pipe, nozzle, branch pipe etc.
Nos. 26
676 Supply, installation, testing and commissioning of 63mmdia. approved make GM double headed fire hydrantlanding valves (with instantaneous female plunger typecouplings, chained blank caps) including making flanged joints by providing necessary nuts, bolts, gaskets, etc.painting complete as per specifications.
Nos. 21
677 Supply, installation, testing and commissioning of 63mmdia. approved make GM single headed fire hydrantlanding valves (with instantaneous female plunger typecouplings, chained blank caps) including making flanged joints by providing necessary nuts, bolts, gaskets, etc.painting complete as per specifications.
Nos. 54
![Page 210: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/210.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 210/2939
678 Supply & installation of RRL type-A hose reel of 63mmdia. x 7.5metres long with heavy quality gun metal malecoupling of IS: 903. combined with 2 Nos of Canvasshoses and 2 Nos of nozzles with ms painted hose tray toaccommodate hose reel
Nos. 75
679 Supply & Installation of drum type wall mounting hosereels, swiveling 180o consisting of 25 mm dia. x 30metreslong armored rubber hose pipe with 15 mm dia. bronzeshut of type jet nozzle & cut-off valve on the inletincluding making connection to the wet riser, by drillingwelding, fixing the hose reel to the wall by providingnecessary anchor fasteners/ expansion bolts, grouting thesame with cement mortar, painting all complete as perdrawings, specifications.
Nos. 75
680 Supply and fixing of fire shutter fabricated out ofanodised aluminium sheet and frame,door shall be900mmx1500mm & fixed with 4mm thick class,suitablerubber beeding and locking arrangement.Rate shall beincludes all fateners etc, and complete shutter shall be
powder coated of approved colour both inside andoutside.
Nos. 55
681 Supply & installation of Siamese inlet (Fire Brigade inlet)connection with provision for Four male instantaneouscoupling fabricated out of 150 mm dia. approved makeheavy class MS pipe with nonreturn valve, for firefighting system including making connection byproviding necessary piping & fittings to the fire storagetank, fire fighting wet riser, sprinkler system painting thesame with 3 coats of enamel paint over a coat of ZincChromate primer all complete as per drawings,specifications.Connection to Fire Tanks / Yard Hydrants
Nos. 13
682 Supply and wrapping of Coating & Wrapping Materialsmanufactured as per IS 10221 (make:Pypkote) 4mm thickfor underground Pipes as per specification Steel pipelinesto be laid underground buried in the soil shall beprotected against corrosion by means of coating &wrapping as per IS:10221.The above coating andwrapping shall be carried out in systematic manner suchthat uniform thickness of coating is obtained as per ISspecification.Buried pipelines shall be laid in general withtop of pipe 1(one) metre below the ground level. Wheresoil conditions are not satisfactory, masonry or equivalentsupports shall be provided at regular intervals. The rateshall be inclusive of holiday test of undergorund pipes.
Sqm. 965
683 Orifice plate made out of stainless steel 5mm thick
80 NB dia Nos. 26
684 Electronic level indicator with pressure transducer sensorsED display high / low level / cabling to pumphouse withindicators etc.,
Set 1
![Page 211: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/211.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 211/2939
685 Supply & installation of 1 No Differential Pressure switchwith 1No 150dia dial pressure gauge in 150dia manifold,Bronze check valve with 2mm Orifice, Stainless Steelpresssure sensing piping 15mm dia required length asshown in drawing.
Nos. 7
SPRINKLER SYSTEM
686 Supply, erection, testing and installation of heavy (classC) black steel pipes conforming to IS 1239 with welded joints including cutting the pipes to correct lengths, fixingwith clamps to MS brackets / hangers, steel supports,hitec supports as per drawing. The hydro testing shall be
done at 18 kgs/cm2 pressure. Rate shall be inclusive ofZinc chromate primer over that 2 coats red enamel panitas per Fire authorities requirement over all above groundpies.Rates to inclusive of all complete as per specifications(including heavy class forged fittings of IS standards) ofthe following diameters.
a 150 NB - Heavy Class RMT 353
b 100 NB - Heavy Class RMT 123
c 80 NB - Heavy Class RMT 385d 65 NB - Heavy Class RMT 590
e 50 NB - Heavy Class RMT 1515
f 40 NB - Heavy Class RMT 349
g 32 - Heavy Class RMT 849
h 25 - Heavy Class RMT 3642
687 Supply and installation of Cast Iron Butterfly isolationvalve with necessary flanges, supports, bolts, nuts, etc
a 150 NB Nos. 20
b 100NB Nos. 4
c 80NB Nos. 19
d 65NB Nos. 6e 50NB Nos. 4
688 Supply, erection, testing and commissioning of gunmetalgate valve with necessary flanges, supports, bolts, nuts,etc. (Below 50NB) screwed ends
a 50NB Nos. 32
b 40 NB. Nos. 16
c 20 NB. Nos. 7
689 Supply & installation of 20 NB CI Automatic Air ReleaseValve to all Sprinkler risers all complete as perspecifications.
Nos. 9
690 Supply and installation of Pendant type Sprinkler head
with the following temperature rating & respond,universal deflector, chromium finish as per specifications.Size: 15-mm dia. The rate shall be inclusive of Stainlesssteel Rossette plate in office area and other false ceilingareas. Temperature Rating: 68°C Standard respond
Nos. 693
![Page 212: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/212.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 212/2939
691 Supply and installation of Upright Sprinkler head withthe following temperature rating & respond, universaldeflector, chromium finish as per specifications. Size: 15-mm dia. Temperature Rating: 68°C Standard respond
Nos. 930
692 Supply and installation of Side wall type Sprinkler headwith the following temperature rating & respond,universal deflector, chromium finish as per specifications.Size: 15-mm dia. Temperature Rating: 68°C Standardrespond.
Nos. 690
693 Supplying & installing of approved make flow switches
(flow sensors) suitable to be fixed directly on line of thefollowing diameters, with 1 NO & 1 NC potential freecontacts.
a 150 NB Nos. 7
b 100 NB Nos. 2
c 80 NB Nos. 16
d 65NB Nos. 3
694 Supply, erection, testing and commissioning of Metallic
stainless steel (SS 304) corrugated or braided Flexible
drop pipes of 25mm dia with cross bar assembly supportsuitable for grid ceiling, reducing fitting, special shoulderNipple, redcing nipple, T bar braket, braket clip assembly.(Make:TYCO / Flex Head / Viking)
1200 mm Nos. 683
695 Supply & installation of Instrument cables for flowswitches to annunciator panel The cable should be 2 corex 1.5 Sq.mm copper armoured cable. Complete as perspecification.
RMT 8833
696 Supply & installation of sprinkler annunciator panelconsisting of 40 windows, capable of working on 230 V
AC single phase supply and provided with battery back-up of 24 V complete as per specification. Each windowsshall be provided with potential free contact forconnecting to the BMS system
Lot 1
697 Supply, installation, testing and commissioning of waterflow will activate a hydraulic powered water motor alarmby way of integral valve alarm line trim piping. Watermotor gong shall be connected to a water pressureretarding chamber to limit the propensity of unnecessaryalarms. Water motor alarm shall be equipped with a rearclosure plate to limit the access of foreign materials ofaccumulation of debris.Size of alarm valve shall be200NB.
No. 1
698 PORTABLE FIRE EXTINGUISHERS:
Supply & installation of following Portable FireExtinguisher :
a Carbon Dioxide Fire Extinguisher Nos. 102Capacity - 4.5 Kg
Type - Upright
IS - 15683
b ABC Fire Extinguisher Nos. 124Capacity - 5 Kg
![Page 213: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/213.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 213/2939
Type - Upright
IS - 15683
c DCP Type Extinguisher Nos. 20Capacity - 9 Kg
Type - Upright
IS - 15683
699 Supply and installation of Fire buckets of 9 ltrs capacity.
Stand made of MS Channel and angle to accommodate 4Nos of buckets filled with cleaned soft sand. Rate shall beinclusive of red paint as per Fire Codes for buckets andMS Stand.
Nos. 5
IBMS works
FIRE ALARM SYSTEM.
700 Supply, installation, testing and commissioning of thefollowing system as per the technical specification.
Analogue addressable micro Process - controlled FireAlarm Control Panels, capable of being IP networked tothe central monitoring System, to monitor and integratedthe following quantity of accessories like detectors,MCP's/hooters/control modules, Fault IsolationModules, hooters, response indicators, fire/faultindicators, audiovisual signals, central processing units,complete with LCD display, zone indicating LEDs as perthe detailed specification: complete with Battery backupwith charger for each panel. Each loop should providedwith minimum 125 detectors /devices
a 8 LOOP PANEL No. 1
b 6 LOOP PANEL No. 1
c 1 LOOP PANEL Nos. 3Note: Providing Windows based graphical software,
(with necessary software addresses required as per BOQ)on MS windows 2000/XP or latest platform, includingAlarm Management for IBMS as per the above item
701 Rate of Rise Heat Detectors (Thermal Detectors):GRADE-IAddressable analogue type Heat Detectors with solidstate design with sensing element combination of fixedtype and rate of rise of temperature indicating LED,mounting base etc. as per detailed specifications.(wallmounted type)
Nos. 568
702 Addressable analogue MUTISENSOR type smokedetectors with dual chamber, solid state design, indicatingLED, mounting base etc. as per detailed specification. Therate shall inclusive of necessary base box, connecting gladfor above detectors(ceiling, false ceiling, direct ceiling &false flooring mounted type)
Nos. 767
703 Duct detector suitable for providing the return air pathwith suitable fixing accessories
Nos. 20
704 Hooter with relay module and strobe light with minimum85 db audible and control relay module, power supplyunits etc
Nos. 96
![Page 214: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/214.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 214/2939
705 Manual call points pull stations of approved make withNO/NC contacts slim type and projecting out from thesurface of enclosure with glass suitable for addressablefunction
Nos. 108
706 Fault isolation module to electrically isolate differentsections of detector loops.
Nos. 79
707 Addressable control module to trip the AHU,s, Accessdoor, triggering the DVR.lift landing etc
Nos. 24
708 Addressable monitor module along with door contact forFire doors & Beam detector
Nos. 25
709 Response indicator for mounting on false ceiling at theentries of the cabin for indicating the operation fordetectors in the above areas.
Nos. 342
710 2C 1.5 armoured copper FRLS cable in ceiling withsuitable clamps and screws (RED colour)
RMT 16000
711 Wall mounted type Beam detector with receiver coverageof minimum 25 mtr distance as per detailed specifications.
The adjustable angle shall be +/- 10o for both vertical andHorizontal. The detector should be capable of connectingto existing Addressable fire alarm panel.
set 4
712 Wiring to the detectors/devices using 2C x 0.75 sq mmPVC insulated flexible copper conductor (FRLS) insuitable size PVC pipe in concealed system in thefloor/ceiling with all accessories likebends,elbows,junction boxes, clamps, GI flexible hose etc.,
RMT 10000
713 Repeater panel as per the specification (Suitable for abovefire panel loop). The rate shall be inclusive of all powersupply units, LCD display etc.,
No. 1
II PUBLIC ADDRESS SYSTEM AND EVC SYSTEM
Supply, installation, testing and commissioning of the
following system as per the technical specification.
714 System Controller complete with 12 Zone Call Station,Stem Type Microphone, 2 mm thick CRCA Sheet PowderCoated Rack, Dual Tone Control for Speech & Music,integration facility with Fire Alarm System, tonegenerator & Speech Processor with relays for activatingtone & pre-recorded fire alarm messages, facility tointegrate with the base builder P.A System as specified inthe Tender Specifications . The rate inclusive of Prioritymodule, selector switch etc
No. 1
715 42U floor mounted rack frame made out of powder
coated materials with ventilation louvers in back sideprovided with glass door in front side. The rack shall beprovided with suitable power sockets/strips, ventilationtray fans, horizontal cable manager, bottom wheel etc
No. 1
716 20 W Wall/Column Mounted Speakers with linematching transformers and selected able tap setting asspecified in the Tender Specifications
Nos. 31
![Page 215: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/215.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 215/2939
717 6 W Wall Mounted Speakers with line matchingtransformers & selected able tap setting as specified in theTender Specifications for electrical rooms and AHU rooms
Nos. 19
718 6 W Ceiling Mounted Speakers with line matchingtransformers & selectable tap setting as specified in theTender Specifications for false ceiling areas.
Nos. 290
719 Rack Mounted minimum 480 W Power Amplifier asspecified in the Tender Specifications
Nos. 3
720 Rack Mounted minimum 240 W Power Amplifier asspecified in the Tender Specifications
Nos. 6
721 2 core twin twisted 48/0.2 ATC, Multi strand, over allarmoured speaker cable as specified in the TenderSpecifications
RMT 12500
722 Micro phone unit with back box, STAND LEGNTH OFCABLES
No. 1
723 1 No. each of AM/FM Tuner, DVD player withoverriding facility, Music Source Selector, with assignablepriority on each channel to accept Music, Telephone,Microphone, Recorded message from Voice recorder etc.,
with in-built compressor and limiter.
Nos. 1
724 Auto dialer for interfacing with Fire alarm system Nos. 1
725 12 Zone Auto speech processor (Digital Voice Recorder)for fire activation message
Nos. 1
III ACCESS CONTROL SYSTEM
Supply, installation, testing and commissioning of the
following system as per the technical specification.
726 Access control system complete with necessary hardware,Software etc., as specified for centralized securitymonitoring. Supply, installation, testing andCommissioning of the following system as per thetechnical specification.Access Controllers, each with capacity of 10000 eventsbuffer memory connecting the the item listed belowsuch as card readers, Magnetic locks, boom barriers etc
a 2 reader controller (1 set of single door) Nos. 14
b 2 reader controller (1 set of double door) Nos. 9
c 4 reader controller (1 set of single door+1set of doubledoor)
No. 1
d 4 reader controller (2 set of Tripod Turnstile) Nos. 4
e 6 reader controller (3 sets of single door) No. 1
f Smart Card readers with stainless steel base plate Nos. 72
g Biometric Card readers with stainless steel base plate Nos 1h Electromagnetic Locks - Single Door Nos 18
i Electromagnetic Locks - Double Door Nos 10
j Magnetic Contact Nos 38
k Emergency push button (glass type) Nos. 28FRLS shielded Cables:
727 Cable from electromagnetic lock/Sensor toController - 1Sqmm 4 C sqmm multi standarmoued shilelded cable
RMT 2650
![Page 216: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/216.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 216/2939
728 Cable from Reader to Controller - 1 Sqmm 6 C sqmmmultistand shielded armoured cable
RMT 6300
729 Network cable for controller to controller -Armoured cable
RMT 2000
730 Access management software with time and attendancemodule suitable for flexi time report regeneration as perclient requirement with SQL /Oracle data base.
No. 1
731 Smart Card with holder, Lanyard, Adhesive labels forprinting the ID card
Nos. 500
732 Visitors management software as per technicalspecification and system PC comprising Intel core T2 Duo2.8 Ghz Processor @ L2 Cache 3 MB Intel 31 PR motherboard, 2GB DDr2 RAM @ 667 Mhz , 250GB HDD SATALogitech Keyboard, Logitech Optical mouse, ATX P IVCabinet with SMPS Prime Source, DVD Writer, Creative2.1 Speaker with Window NT/2000 operating system.(Main server - HOT Stand by / Parallel reduendancymode) .The system should be supplied with 21" TFT ColorMonitor.- Also, the PC shall be supplied with Web
Camera for taking the visitor photos.
No. 1
Boom Barrier
733 4.5Mtr. Rising Boom Barrier of as per the specificationcomplete with control unit and accessories, for Four wheelvehicle entry. The rate shall includes supply andproviding of necessary safety loop coil, pedestal for fixingthe Card reader in suitable height with weather proofarrangements.
Nos. 4
734 4.0Mtr. Rising Boom Barrier of as per the specificationcomplete with control unit and accessories, for Four wheelvehicle entry. The rate shall includes supply andproviding of necessary safety loop coil, pedestal for fixing
the Card reader in suitable height with weather proofarrangements.
Nos. 2
735 3.5Mtr. Rising Boom Barrier of as per the specificationcomplete with control unit and accessories, for Twovehicle entry. The rate shall includes supply andproviding of necessary safety loop coil, pedestal for fixingthe Card reader in suitable height with weather proofarrangements.
Nos. 5
736 2.5Mtr. Rising Boom Barrier of as per the specificationcomplete with control unit and accessories, for Twovehicle entry. The rate shall includes supply andproviding of necessary safety loop coil, pedestal for fixingthe Card reader in suitable height with weather proofarran ements.
Nos. 4
Stainless steel Tripod barriers
737 Tripod Turnstile with stainless steel with electric operatedhorms (motorized) as per the detailed specificationattached
Nos. 7
738 Swing gate for Handicap line No. 1
739 Full height Turnstile with stainless steel with electricoperated horms (motorized) as per the detailedspecification attached
No. 1
![Page 217: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/217.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 217/2939
740 Booster antenna with pole to activate the RFID tag locatedat security gate
Nos. 36
741 50mm dia & 1.2 mtr height SS pole for Reader & Egressswitch fixing
Nos. 20
742 13.56 MHZ contact less smart Tag with Adhesive back. Nos. 200
IV CLOSED CIRCUIT TELEVISION SYSTEM
Supply, installation, testing and commissioning of the
following system as per the technical specification.
743 Colour 1/3" fixed dome indoor camera , 540 TV linesresolution and minimum lux level not more than 1.2 lux(F1.2) including all mounting supports / brackets andfixing accessories.
Nos 12
744 Colour 1/3" fixed dome outdoor camera , 540 TV linesresolution and minimum lux level not more than 1.2 lux(F1.2) including all mounting supports / brackets andfixing accessories.
Nos 8
745 Color high speed 1/4" Pan/Tilt/Zoom indoor camera, 540TVL (PAL)lines resolution and minimum lux level not
more than 0.05 lux at F1.2 with 23X optical or bettermotorized zoom lens, receiver, driver, Pan/Tilt andnecessary mounting support / bracket, accessories asrequired for indoor installation. and mounting support as
er s ecification.
No. 1
746 Color high speed 1/4" Pan/Tilt/Zoom outdoor camera,480 TVL (PAL)lines resolution and minimum lux level notmore than 0.05 lux at F1.2 with 23X optical or bettermotorized zoom lens, receiver, driver, Pan/Tilt andnecessary mounting support / bracket, accessories asrequired for outdoor installation along with standardoutdoor enclosure with suitable accessories and mountingsupport as per specification.
Nos 16
747 Power Supply Unit fixed cameras-12V Nos 20
748 DC/AC Power supply unit as required for the PTZcameras-24V
Nos 17
749 16 Channel Duplex Digital Video Recorder formultiplexing and digital recording , suitable for liveviewing and playback while recording , Motion detection,alarm event detection with TCP / IP connectivity - Harddisc ca acit 4TB
Nos 4
Cables:
750 RG 11Coaxial armoured Cable RMT 12600
751 2 Core 1.5 Sqm Twisted pair Shielded armmoured FRLS
cable for PTZ operation
RMT 5000
752 6 Mtr height GI post with necessary mounting bracket,weather proof box and Civil works for external cameras.
Nos 22
753 Mounting bracket with accessories for external cameramounted at terrace .
Nos 3
![Page 218: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/218.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 218/2939
754 Excavation of ground to a depth of 3' level and width of1.5' and refilling etc.for laying the RG 11Coaxial armouredCable with PTZ operation cable and power cable. Extraearth after re-filling to be leveled in low lying area asdirected by the Engineer-in-charge .
RMT 5000
IP CAMERA
755 Integrated IP Colour 1/3" fixed dome indoor camera , 540TV lines resolution and minimum lux level not more than1.2 lux (F1.2) including all mounting supports / bracketsand fixing accessories.(Inclusive of POE)
Nos 36
756 Integrated IP Color high speed 1/4" Pan/Tilt/Zoomindoor camera, 540 lines resolution and minimum luxlevel not more than 0.05 lux at F1.2 with 23X motorizedzoom lens, receiver, driver, Pan/Tilt and necessarymounting support / brackets and fixing accessories as perspecification. (Inclusive of POE)
No. 1
757 DVM Dual core Server suitable to connect max. 100cameras with 5 User License. The rate shall inclusive ofnecessary software etc (1+1 ) configuration. The rate shall
inclusive of necessary storage server, processor server etc.,
Nos 1
758 Supply, fixing, testing and commissioning of CAT -12 portswitch and patch panel, connected accessories
Nos 4
759 Supply and fixing of Single I/O face plate with RJ 45connectors with suitable base box
Nos 80
760 9 U wall mounted rack with socket provision, powerchard
nos 4
761 Video streamer card for connecting the cameras -singlecamera streamer card. The rate shall inclusive of enclosurebox, power supply, filter board, gland etc
nos 8
V NOVEC GAS BASED SUPRESSION SYSTEM
(SERVER ROOM)
Supply, installation, testing and commissioning of thefollowing system as per the technical specification.
762 120 Ltrs. Cylinder with Valve for Server Room Nos 6
763 Novec gas kgs 550
764 Primary Completer Kit complete with Solenoid & Gaugeassembly, Discharge Tube, Manual Pneumatic Actuator,Flex Hoses, Warning Sign, Nameplate and Connectors.
No. 1
765 Slave completer Kit complete with Discharge Tube, FlexHoses, Pressure Gauge, Elbows and Connectors.
Nos 6
766 Check Valve Nos 6
767 Nozzles Nos 14768 Manifold No. 1
769 Rack - Wall Mount Kit Nos 12
770 M.S. Seamless pipes as per ASTM A 106 Gr. B, schedule 40with necessary fittings.
No. 1
771 Gas Release Panel with Battery Backup as Detection &Control equipment as per detailed technical specificationsfor Gas Suppression system
No. 1
![Page 219: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/219.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 219/2939
![Page 220: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/220.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 220/2939
791 2c x 1.0 Sq.mm copper conductor PVC insulated cable in25 mm Dia MS Conduit
RMT 150
IX INTERGRATED BUILDING MANAGEMENT SYSTEM
AND BUILDING MANAGEMENT SYSTEM:
Supply, installation, testing and commissioning of the
following system as per the technical specification.
BAS SERVER
792 Microprocessor based Integrated Building ManagementSystem as per the detailed specifications for complete andsatisfactory operation and control and to local authorities‟
approval. Main stations and subsystems with LAN,complete with hardware and software to providegraphical users interface consisting of System PCcomprising Intel core i 7 Ghz Processor , 4GB DDr2 RAM@ 667 Mhz , 500 GB HDD , Keyboard, Optical mouse,ATX P IV Cabinet with SMPS Prime Source, DVD Writer,Speaker with Window Latest operating system. Thesystem should be supplied with 21" TFT Color Monitor..Service pack XP-2 (Main server - HOT Stand by / Parallelredundancy mode) (1 set = 2 nos)
No. 1
GRAPHICAL SOFTWARE
793 Providing Windows based graphical software, (withnecessary software addresses required as per I/O list) onMS windows 2000/XP or NT platform, including AlarmManagement for IBMS as per the above item
No. 1
SOFT POINTS
794 Providing necessary Software and Hardware for
Interfacing through a gate way for monitoring throughserial Modbus interface for the data points for Chillers ,VFDs , VAVs, etc as per the detailed IO summary inHVAC tender . Total soft points 2500 pts includingenergymetres, UPS etc
Set 1
MONITORING STATION AND PRINTERS:
795 Monitoring station as per technical specification andsystem PC comprising Intel core T2 Duo 2.8 GhzProcessor @ L2 Cache 3 MB intel 31 PR mother board,4GB DDr2 RAM @ 667 Mhz , 250GB HDD , Keyboard,Optical mouse, external speakers, sound card ATX P IVCabinet with SMPS Prime Source, DVD Writer, Servicepack XP-2 with Window NT/2000 operating system. Thesystem should be supplied with 21" TFT Color Monitor.-1.FIRE & BMS PC (2-nos) 2. CCTV &ACCESS PC (2-nos)
Nos 4
796 Supply and commissioning of 600 DPI Colour InkjetPrinter
Nos 1
797 Supply and commissioning of Single A4 size Laser Printer No. 1
798 DIRECT DIGITAL CONTROLLER:
![Page 221: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/221.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 221/2939
Autonomous networkable DDC Controller with 32 bitmicroprocessor based standalone and networkable typewith real time clock and historical database of min 1 Mbwith panels, peer to peer communicable DDC modules,input or output relays, terminal block, real time clock,networking and inbuilt data buffer for Followingrequirement as per Enclosed IO summary .
a DDC-TYPE A (Chiller) No. 1
b DDC-TYPE B (AHU) No. 1
c DDC-TYPE C (VRV unit) for OFFICE BLOCK No. 1
d DDC-TYPE D FOR REGIONAL STORE No. 1
e DDC-TYPE E FOR FIRE FIGHTING PANEL No. 1
f DDC-TYPE F FOR Bachelors & TransitAccommodation
No. 1
g DDC-TYPE G FOR TYPE C&D No. 1
h DDC-TYPE H (Electrical panel at substation) No. 1FIELD EQUIPMENT:
799 water level indicator for 3000 mm length Nos. 2
800 For Chiller
a Immersion type temperature sensor and thermowellacross the chiller pipe (Supply header, Return header,Supply header before bypass line and Return headerbefore bypass line) as per the system requirements forBAS system
Nos 4
b Differential-pressure transducer across the Chiller header(Supply & Return) as per the system requirements forBAS system
No. 1
c Flow sensor at chilled water flow as per the systemrequirements for BAS system
No. 1
d Ultrasonicmetre/BTUmetre as per the systemrequirements for BAS system
No. 1
e Pressure transducer across the Chiller header (Supply &
Return) as per the system requirements for BAS system
Nos 2
801 For AHU
a Immersion type temperature sensor in AHU CHW Inletpipe as per the system requirements for BAS system.
Nos 2
b Temperature (Supply & Return air) with necessaryaccessories to monitoring the conditioned areatemperature as per the system requirements for BASsystem
Nos 3
c RH Sensors (Supply & Return air) with necessaryaccessories to monitoring the conditioned area RH as perthe system requirements for BAS system
Nos 3
d Duct static pressure sensor to measure the static pressurein duct as per the AHU I/O listed for BAS system.
No. 1
e Differential pressure switch to monitor Filter & Fan statusas per AHU I/O listed for BAS system
Nos 3
f Flowmetre to measure the air flow of AHU at Plenum asper the AHU I/O listed for BAS system
No. 1
802 For TFA
![Page 222: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/222.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 222/2939
a Temperature (Exhaust & Fresh air) with necessaryaccessories to monitoring the conditioned areatemperature as per the system requirements for BASsystem
Nos 4
b Differential pressure switch to monitor Filter & Fan statusas per TFA I/O listed for BAS system
Nos 7
c outdoor Temperature sensor No. 1
d Flowmetre to measure the air flow of AHU at Plenum asper the TFA I/O listed for BAS system
Nos 1
e Immersion type temperature sensor in AHU CHW Inletpipe as per the system requirements for BAS system.
No. 1
803 Software for facility management system with nessaryhardware accessories
set 1
CABLES / WIRES FOR IBMS
804 2 Core 1.0 sq. mm, armoured Annealed Tinned Copperconductor multi stranded Unscreened cable. [For ON /OFF Command & various status, Supply for FieldDevices]
RMT 7000
805 2 Core 1.0 sq. mm, armoured Annealed Tinned Copper
conductor multi stranded, screened cable. [For Sensors]
RMT 2000
806 4 Core 1.0 sq. mm, armoured Annealed Tinned Copperconductor multi stranded, screened cable. [For Sensors]
RMT 500
807 bus cable to intergate all DDCs, BTUmetres, VAVs etc -Armoured
RMT 2800
X MISCELLANEOUS ITEMS
Supply, installation, testing and commissioning of the
following system as per the technical specification.
808 150 mm wide size slotted angle GI ready made cable trays
of 14 SWG GI sheet. The rates for installation shallincluding necessary anchor fasteners and 'L' anglesupports @ 600mm interval etc., to suit site conditions asrequired all complete as directed by Engineer-Incharge.
RMT 1750
809 300 mm wide size slotted angle GI ready made cable traysof 14 SWG GI sheet. The Quoted rates for installation shallincluding necessary anchor fasteners and 'L' anglesupports @ 600mm interval etc., to suit site conditions asrequired all complete as directed by Engineer-Incharge.
RMT 1000
810 6 A 3-Pin Socket mounted on PVC Box which has to befixed in wall as required. The Socket should be of modular
type etc all complete as directed by Engineer-Incharge.
Each 110
TOTAL AMOUNT
(Rs.
Rebate
Final amount
![Page 223: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/223.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 223/2939
![Page 224: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/224.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 224/2939
![Page 225: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/225.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 225/2939
![Page 226: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/226.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 226/2939
![Page 227: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/227.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 227/2939
![Page 228: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/228.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 228/2939
![Page 229: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/229.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 229/2939
![Page 230: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/230.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 230/2939
![Page 231: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/231.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 231/2939
![Page 232: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/232.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 232/2939
![Page 233: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/233.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 233/2939
![Page 234: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/234.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 234/2939
![Page 235: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/235.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 235/2939
![Page 236: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/236.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 236/2939
![Page 237: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/237.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 237/2939
![Page 238: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/238.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 238/2939
![Page 239: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/239.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 239/2939
![Page 240: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/240.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 240/2939
![Page 241: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/241.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 241/2939
![Page 242: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/242.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 242/2939
![Page 243: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/243.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 243/2939
![Page 244: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/244.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 244/2939
![Page 245: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/245.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 245/2939
![Page 246: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/246.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 246/2939
![Page 247: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/247.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 247/2939
![Page 248: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/248.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 248/2939
![Page 249: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/249.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 249/2939
![Page 250: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/250.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 250/2939
![Page 251: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/251.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 251/2939
![Page 252: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/252.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 252/2939
![Page 253: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/253.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 253/2939
![Page 254: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/254.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 254/2939
![Page 255: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/255.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 255/2939
![Page 256: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/256.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 256/2939
![Page 257: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/257.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 257/2939
![Page 258: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/258.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 258/2939
![Page 259: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/259.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 259/2939
![Page 260: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/260.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 260/2939
![Page 261: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/261.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 261/2939
![Page 262: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/262.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 262/2939
![Page 263: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/263.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 263/2939
![Page 264: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/264.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 264/2939
![Page 265: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/265.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 265/2939
![Page 266: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/266.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 266/2939
![Page 267: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/267.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 267/2939
![Page 268: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/268.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 268/2939
![Page 269: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/269.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 269/2939
![Page 270: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/270.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 270/2939
![Page 271: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/271.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 271/2939
![Page 272: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/272.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 272/2939
![Page 273: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/273.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 273/2939
![Page 274: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/274.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 274/2939
![Page 275: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/275.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 275/2939
![Page 276: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/276.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 276/2939
![Page 277: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/277.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 277/2939
![Page 278: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/278.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 278/2939
![Page 279: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/279.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 279/2939
![Page 280: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/280.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 280/2939
![Page 281: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/281.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 281/2939
![Page 282: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/282.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 282/2939
![Page 283: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/283.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 283/2939
![Page 284: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/284.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 284/2939
![Page 285: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/285.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 285/2939
![Page 286: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/286.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 286/2939
![Page 287: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/287.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 287/2939
![Page 288: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/288.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 288/2939
![Page 289: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/289.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 289/2939
![Page 290: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/290.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 290/2939
![Page 291: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/291.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 291/2939
![Page 292: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/292.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 292/2939
![Page 293: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/293.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 293/2939
![Page 294: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/294.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 294/2939
![Page 295: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/295.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 295/2939
![Page 296: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/296.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 296/2939
![Page 297: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/297.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 297/2939
![Page 298: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/298.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 298/2939
![Page 299: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/299.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 299/2939
![Page 300: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/300.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 300/2939
![Page 301: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/301.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 301/2939
![Page 302: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/302.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 302/2939
![Page 303: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/303.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 303/2939
![Page 304: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/304.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 304/2939
![Page 305: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/305.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 305/2939
![Page 306: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/306.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 306/2939
![Page 307: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/307.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 307/2939
![Page 308: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/308.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 308/2939
![Page 309: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/309.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 309/2939
![Page 310: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/310.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 310/2939
![Page 311: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/311.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 311/2939
![Page 312: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/312.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 312/2939
![Page 313: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/313.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 313/2939
![Page 314: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/314.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 314/2939
![Page 315: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/315.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 315/2939
![Page 316: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/316.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 316/2939
![Page 317: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/317.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 317/2939
![Page 318: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/318.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 318/2939
![Page 319: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/319.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 319/2939
![Page 320: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/320.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 320/2939
![Page 321: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/321.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 321/2939
![Page 322: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/322.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 322/2939
![Page 323: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/323.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 323/2939
![Page 324: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/324.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 324/2939
![Page 325: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/325.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 325/2939
![Page 326: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/326.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 326/2939
![Page 327: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/327.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 327/2939
![Page 328: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/328.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 328/2939
![Page 329: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/329.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 329/2939
![Page 330: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/330.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 330/2939
![Page 331: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/331.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 331/2939
![Page 332: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/332.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 332/2939
![Page 333: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/333.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 333/2939
![Page 334: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/334.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 334/2939
![Page 335: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/335.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 335/2939
![Page 336: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/336.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 336/2939
![Page 337: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/337.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 337/2939
![Page 338: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/338.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 338/2939
![Page 339: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/339.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 339/2939
![Page 340: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/340.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 340/2939
![Page 341: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/341.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 341/2939
![Page 342: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/342.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 342/2939
![Page 343: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/343.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 343/2939
![Page 344: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/344.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 344/2939
![Page 345: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/345.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 345/2939
![Page 346: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/346.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 346/2939
![Page 347: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/347.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 347/2939
![Page 348: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/348.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 348/2939
![Page 349: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/349.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 349/2939
![Page 350: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/350.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 350/2939
![Page 351: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/351.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 351/2939
![Page 352: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/352.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 352/2939
![Page 353: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/353.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 353/2939
![Page 354: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/354.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 354/2939
![Page 355: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/355.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 355/2939
![Page 356: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/356.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 356/2939
![Page 357: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/357.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 357/2939
![Page 358: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/358.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 358/2939
![Page 359: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/359.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 359/2939
![Page 360: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/360.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 360/2939
![Page 361: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/361.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 361/2939
![Page 362: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/362.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 362/2939
![Page 363: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/363.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 363/2939
![Page 364: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/364.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 364/2939
![Page 365: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/365.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 365/2939
![Page 366: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/366.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 366/2939
![Page 367: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/367.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 367/2939
![Page 368: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/368.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 368/2939
![Page 369: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/369.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 369/2939
![Page 370: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/370.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 370/2939
![Page 371: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/371.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 371/2939
![Page 372: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/372.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 372/2939
![Page 373: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/373.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 373/2939
![Page 374: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/374.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 374/2939
![Page 375: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/375.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 375/2939
![Page 376: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/376.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 376/2939
![Page 377: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/377.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 377/2939
![Page 378: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/378.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 378/2939
![Page 379: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/379.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 379/2939
![Page 380: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/380.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 380/2939
![Page 381: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/381.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 381/2939
![Page 382: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/382.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 382/2939
![Page 383: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/383.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 383/2939
![Page 384: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/384.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 384/2939
![Page 385: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/385.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 385/2939
![Page 386: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/386.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 386/2939
![Page 387: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/387.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 387/2939
![Page 388: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/388.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 388/2939
![Page 389: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/389.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 389/2939
![Page 390: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/390.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 390/2939
![Page 391: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/391.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 391/2939
![Page 392: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/392.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 392/2939
![Page 393: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/393.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 393/2939
![Page 394: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/394.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 394/2939
![Page 395: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/395.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 395/2939
![Page 396: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/396.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 396/2939
![Page 397: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/397.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 397/2939
![Page 398: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/398.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 398/2939
![Page 399: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/399.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 399/2939
![Page 400: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/400.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 400/2939
![Page 401: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/401.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 401/2939
![Page 402: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/402.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 402/2939
![Page 403: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/403.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 403/2939
![Page 404: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/404.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 404/2939
![Page 405: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/405.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 405/2939
![Page 406: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/406.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 406/2939
![Page 407: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/407.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 407/2939
![Page 408: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/408.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 408/2939
![Page 409: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/409.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 409/2939
![Page 410: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/410.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 410/2939
![Page 411: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/411.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 411/2939
![Page 412: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/412.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 412/2939
![Page 413: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/413.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 413/2939
![Page 414: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/414.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 414/2939
![Page 415: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/415.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 415/2939
![Page 416: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/416.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 416/2939
![Page 417: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/417.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 417/2939
![Page 418: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/418.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 418/2939
![Page 419: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/419.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 419/2939
![Page 420: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/420.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 420/2939
![Page 421: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/421.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 421/2939
![Page 422: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/422.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 422/2939
![Page 423: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/423.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 423/2939
![Page 424: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/424.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 424/2939
![Page 425: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/425.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 425/2939
![Page 426: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/426.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 426/2939
![Page 427: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/427.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 427/2939
![Page 428: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/428.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 428/2939
![Page 429: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/429.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 429/2939
![Page 430: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/430.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 430/2939
![Page 431: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/431.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 431/2939
![Page 432: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/432.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 432/2939
![Page 433: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/433.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 433/2939
![Page 434: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/434.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 434/2939
![Page 435: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/435.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 435/2939
![Page 436: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/436.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 436/2939
![Page 437: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/437.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 437/2939
![Page 438: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/438.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 438/2939
![Page 439: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/439.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 439/2939
![Page 440: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/440.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 440/2939
![Page 441: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/441.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 441/2939
![Page 442: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/442.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 442/2939
![Page 443: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/443.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 443/2939
![Page 444: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/444.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 444/2939
![Page 445: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/445.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 445/2939
![Page 446: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/446.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 446/2939
![Page 447: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/447.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 447/2939
![Page 448: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/448.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 448/2939
![Page 449: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/449.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 449/2939
![Page 450: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/450.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 450/2939
![Page 451: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/451.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 451/2939
![Page 452: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/452.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 452/2939
![Page 453: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/453.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 453/2939
![Page 454: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/454.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 454/2939
![Page 455: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/455.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 455/2939
![Page 456: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/456.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 456/2939
![Page 457: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/457.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 457/2939
![Page 458: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/458.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 458/2939
![Page 459: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/459.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 459/2939
![Page 460: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/460.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 460/2939
![Page 461: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/461.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 461/2939
![Page 462: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/462.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 462/2939
![Page 463: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/463.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 463/2939
![Page 464: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/464.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 464/2939
![Page 465: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/465.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 465/2939
![Page 466: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/466.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 466/2939
![Page 467: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/467.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 467/2939
![Page 468: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/468.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 468/2939
![Page 469: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/469.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 469/2939
![Page 470: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/470.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 470/2939
![Page 471: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/471.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 471/2939
![Page 472: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/472.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 472/2939
![Page 473: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/473.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 473/2939
![Page 474: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/474.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 474/2939
![Page 475: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/475.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 475/2939
![Page 476: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/476.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 476/2939
![Page 477: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/477.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 477/2939
![Page 478: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/478.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 478/2939
![Page 479: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/479.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 479/2939
![Page 480: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/480.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 480/2939
![Page 481: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/481.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 481/2939
![Page 482: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/482.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 482/2939
![Page 483: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/483.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 483/2939
![Page 484: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/484.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 484/2939
![Page 485: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/485.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 485/2939
![Page 486: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/486.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 486/2939
![Page 487: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/487.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 487/2939
![Page 488: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/488.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 488/2939
![Page 489: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/489.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 489/2939
![Page 490: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/490.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 490/2939
![Page 491: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/491.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 491/2939
![Page 492: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/492.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 492/2939
![Page 493: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/493.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 493/2939
![Page 494: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/494.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 494/2939
![Page 495: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/495.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 495/2939
![Page 496: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/496.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 496/2939
![Page 497: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/497.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 497/2939
![Page 498: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/498.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 498/2939
![Page 499: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/499.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 499/2939
![Page 500: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/500.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 500/2939
![Page 501: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/501.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 501/2939
![Page 502: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/502.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 502/2939
![Page 503: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/503.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 503/2939
![Page 504: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/504.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 504/2939
![Page 505: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/505.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 505/2939
![Page 506: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/506.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 506/2939
![Page 507: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/507.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 507/2939
![Page 508: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/508.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 508/2939
![Page 509: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/509.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 509/2939
![Page 510: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/510.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 510/2939
![Page 511: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/511.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 511/2939
![Page 512: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/512.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 512/2939
![Page 513: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/513.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 513/2939
![Page 514: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/514.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 514/2939
![Page 515: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/515.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 515/2939
![Page 516: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/516.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 516/2939
![Page 517: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/517.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 517/2939
![Page 518: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/518.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 518/2939
![Page 519: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/519.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 519/2939
![Page 520: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/520.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 520/2939
![Page 521: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/521.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 521/2939
![Page 522: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/522.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 522/2939
![Page 523: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/523.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 523/2939
![Page 524: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/524.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 524/2939
![Page 525: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/525.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 525/2939
![Page 526: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/526.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 526/2939
![Page 527: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/527.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 527/2939
![Page 528: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/528.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 528/2939
![Page 529: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/529.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 529/2939
![Page 530: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/530.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 530/2939
![Page 531: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/531.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 531/2939
![Page 532: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/532.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 532/2939
![Page 533: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/533.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 533/2939
![Page 534: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/534.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 534/2939
![Page 535: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/535.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 535/2939
![Page 536: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/536.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 536/2939
![Page 537: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/537.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 537/2939
![Page 538: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/538.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 538/2939
![Page 539: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/539.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 539/2939
![Page 540: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/540.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 540/2939
![Page 541: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/541.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 541/2939
![Page 542: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/542.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 542/2939
![Page 543: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/543.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 543/2939
![Page 544: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/544.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 544/2939
![Page 545: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/545.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 545/2939
![Page 546: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/546.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 546/2939
![Page 547: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/547.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 547/2939
![Page 548: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/548.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 548/2939
![Page 549: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/549.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 549/2939
![Page 550: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/550.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 550/2939
![Page 551: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/551.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 551/2939
![Page 552: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/552.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 552/2939
![Page 553: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/553.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 553/2939
![Page 554: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/554.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 554/2939
![Page 555: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/555.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 555/2939
![Page 556: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/556.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 556/2939
![Page 557: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/557.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 557/2939
![Page 558: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/558.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 558/2939
![Page 559: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/559.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 559/2939
![Page 560: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/560.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 560/2939
![Page 561: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/561.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 561/2939
![Page 562: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/562.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 562/2939
![Page 563: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/563.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 563/2939
![Page 564: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/564.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 564/2939
![Page 565: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/565.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 565/2939
![Page 566: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/566.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 566/2939
![Page 567: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/567.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 567/2939
![Page 568: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/568.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 568/2939
![Page 569: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/569.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 569/2939
![Page 570: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/570.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 570/2939
![Page 571: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/571.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 571/2939
![Page 572: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/572.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 572/2939
![Page 573: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/573.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 573/2939
![Page 574: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/574.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 574/2939
![Page 575: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/575.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 575/2939
![Page 576: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/576.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 576/2939
![Page 577: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/577.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 577/2939
![Page 578: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/578.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 578/2939
![Page 579: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/579.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 579/2939
![Page 580: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/580.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 580/2939
![Page 581: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/581.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 581/2939
![Page 582: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/582.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 582/2939
![Page 583: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/583.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 583/2939
![Page 584: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/584.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 584/2939
![Page 585: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/585.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 585/2939
![Page 586: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/586.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 586/2939
![Page 587: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/587.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 587/2939
![Page 588: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/588.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 588/2939
![Page 589: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/589.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 589/2939
![Page 590: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/590.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 590/2939
![Page 591: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/591.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 591/2939
![Page 592: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/592.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 592/2939
![Page 593: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/593.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 593/2939
![Page 594: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/594.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 594/2939
![Page 595: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/595.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 595/2939
![Page 596: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/596.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 596/2939
![Page 597: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/597.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 597/2939
![Page 598: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/598.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 598/2939
![Page 599: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/599.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 599/2939
![Page 600: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/600.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 600/2939
![Page 601: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/601.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 601/2939
![Page 602: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/602.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 602/2939
![Page 603: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/603.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 603/2939
![Page 604: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/604.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 604/2939
![Page 605: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/605.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 605/2939
![Page 606: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/606.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 606/2939
![Page 607: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/607.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 607/2939
![Page 608: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/608.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 608/2939
![Page 609: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/609.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 609/2939
![Page 610: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/610.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 610/2939
![Page 611: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/611.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 611/2939
![Page 612: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/612.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 612/2939
![Page 613: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/613.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 613/2939
![Page 614: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/614.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 614/2939
![Page 615: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/615.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 615/2939
![Page 616: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/616.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 616/2939
![Page 617: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/617.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 617/2939
![Page 618: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/618.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 618/2939
![Page 619: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/619.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 619/2939
![Page 620: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/620.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 620/2939
![Page 621: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/621.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 621/2939
![Page 622: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/622.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 622/2939
![Page 623: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/623.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 623/2939
![Page 624: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/624.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 624/2939
![Page 625: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/625.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 625/2939
![Page 626: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/626.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 626/2939
![Page 627: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/627.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 627/2939
![Page 628: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/628.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 628/2939
![Page 629: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/629.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 629/2939
![Page 630: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/630.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 630/2939
![Page 631: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/631.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 631/2939
![Page 632: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/632.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 632/2939
![Page 633: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/633.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 633/2939
![Page 634: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/634.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 634/2939
![Page 635: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/635.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 635/2939
![Page 636: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/636.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 636/2939
![Page 637: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/637.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 637/2939
![Page 638: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/638.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 638/2939
![Page 639: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/639.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 639/2939
![Page 640: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/640.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 640/2939
![Page 641: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/641.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 641/2939
![Page 642: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/642.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 642/2939
![Page 643: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/643.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 643/2939
![Page 644: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/644.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 644/2939
![Page 645: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/645.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 645/2939
![Page 646: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/646.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 646/2939
![Page 647: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/647.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 647/2939
![Page 648: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/648.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 648/2939
![Page 649: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/649.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 649/2939
![Page 650: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/650.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 650/2939
![Page 651: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/651.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 651/2939
![Page 652: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/652.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 652/2939
![Page 653: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/653.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 653/2939
![Page 654: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/654.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 654/2939
![Page 655: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/655.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 655/2939
![Page 656: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/656.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 656/2939
![Page 657: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/657.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 657/2939
![Page 658: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/658.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 658/2939
![Page 659: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/659.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 659/2939
![Page 660: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/660.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 660/2939
![Page 661: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/661.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 661/2939
![Page 662: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/662.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 662/2939
![Page 663: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/663.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 663/2939
![Page 664: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/664.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 664/2939
![Page 665: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/665.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 665/2939
![Page 666: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/666.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 666/2939
![Page 667: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/667.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 667/2939
![Page 668: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/668.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 668/2939
![Page 669: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/669.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 669/2939
![Page 670: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/670.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 670/2939
![Page 671: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/671.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 671/2939
![Page 672: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/672.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 672/2939
![Page 673: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/673.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 673/2939
![Page 674: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/674.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 674/2939
![Page 675: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/675.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 675/2939
![Page 676: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/676.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 676/2939
![Page 677: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/677.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 677/2939
![Page 678: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/678.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 678/2939
![Page 679: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/679.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 679/2939
![Page 680: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/680.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 680/2939
![Page 681: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/681.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 681/2939
![Page 682: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/682.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 682/2939
![Page 683: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/683.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 683/2939
![Page 684: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/684.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 684/2939
![Page 685: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/685.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 685/2939
![Page 686: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/686.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 686/2939
![Page 687: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/687.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 687/2939
![Page 688: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/688.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 688/2939
![Page 689: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/689.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 689/2939
![Page 690: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/690.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 690/2939
![Page 691: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/691.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 691/2939
![Page 692: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/692.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 692/2939
![Page 693: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/693.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 693/2939
![Page 694: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/694.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 694/2939
![Page 695: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/695.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 695/2939
![Page 696: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/696.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 696/2939
![Page 697: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/697.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 697/2939
![Page 698: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/698.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 698/2939
![Page 699: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/699.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 699/2939
![Page 700: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/700.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 700/2939
![Page 701: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/701.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 701/2939
![Page 702: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/702.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 702/2939
![Page 703: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/703.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 703/2939
![Page 704: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/704.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 704/2939
![Page 705: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/705.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 705/2939
![Page 706: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/706.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 706/2939
![Page 707: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/707.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 707/2939
![Page 708: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/708.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 708/2939
![Page 709: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/709.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 709/2939
![Page 710: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/710.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 710/2939
![Page 711: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/711.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 711/2939
![Page 712: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/712.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 712/2939
![Page 713: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/713.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 713/2939
![Page 714: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/714.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 714/2939
![Page 715: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/715.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 715/2939
![Page 716: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/716.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 716/2939
![Page 717: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/717.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 717/2939
![Page 718: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/718.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 718/2939
![Page 719: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/719.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 719/2939
![Page 720: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/720.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 720/2939
![Page 721: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/721.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 721/2939
![Page 722: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/722.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 722/2939
![Page 723: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/723.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 723/2939
![Page 724: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/724.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 724/2939
![Page 725: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/725.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 725/2939
![Page 726: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/726.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 726/2939
![Page 727: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/727.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 727/2939
![Page 728: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/728.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 728/2939
![Page 729: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/729.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 729/2939
![Page 730: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/730.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 730/2939
![Page 731: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/731.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 731/2939
![Page 732: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/732.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 732/2939
![Page 733: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/733.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 733/2939
![Page 734: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/734.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 734/2939
![Page 735: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/735.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 735/2939
![Page 736: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/736.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 736/2939
![Page 737: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/737.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 737/2939
![Page 738: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/738.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 738/2939
![Page 739: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/739.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 739/2939
![Page 740: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/740.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 740/2939
![Page 741: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/741.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 741/2939
![Page 742: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/742.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 742/2939
![Page 743: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/743.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 743/2939
![Page 744: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/744.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 744/2939
![Page 745: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/745.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 745/2939
![Page 746: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/746.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 746/2939
![Page 747: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/747.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 747/2939
![Page 748: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/748.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 748/2939
![Page 749: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/749.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 749/2939
![Page 750: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/750.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 750/2939
![Page 751: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/751.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 751/2939
![Page 752: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/752.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 752/2939
![Page 753: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/753.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 753/2939
![Page 754: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/754.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 754/2939
![Page 755: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/755.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 755/2939
![Page 756: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/756.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 756/2939
![Page 757: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/757.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 757/2939
![Page 758: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/758.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 758/2939
![Page 759: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/759.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 759/2939
![Page 760: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/760.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 760/2939
![Page 761: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/761.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 761/2939
![Page 762: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/762.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 762/2939
![Page 763: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/763.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 763/2939
![Page 764: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/764.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 764/2939
![Page 765: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/765.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 765/2939
![Page 766: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/766.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 766/2939
![Page 767: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/767.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 767/2939
![Page 768: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/768.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 768/2939
![Page 769: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/769.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 769/2939
![Page 770: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/770.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 770/2939
![Page 771: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/771.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 771/2939
![Page 772: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/772.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 772/2939
![Page 773: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/773.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 773/2939
![Page 774: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/774.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 774/2939
![Page 775: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/775.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 775/2939
![Page 776: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/776.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 776/2939
![Page 777: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/777.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 777/2939
![Page 778: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/778.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 778/2939
![Page 779: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/779.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 779/2939
![Page 780: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/780.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 780/2939
![Page 781: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/781.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 781/2939
![Page 782: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/782.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 782/2939
![Page 783: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/783.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 783/2939
![Page 784: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/784.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 784/2939
![Page 785: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/785.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 785/2939
![Page 786: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/786.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 786/2939
![Page 787: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/787.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 787/2939
![Page 788: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/788.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 788/2939
![Page 789: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/789.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 789/2939
![Page 790: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/790.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 790/2939
![Page 791: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/791.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 791/2939
![Page 792: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/792.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 792/2939
![Page 793: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/793.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 793/2939
![Page 794: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/794.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 794/2939
![Page 795: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/795.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 795/2939
![Page 796: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/796.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 796/2939
![Page 797: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/797.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 797/2939
![Page 798: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/798.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 798/2939
![Page 799: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/799.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 799/2939
![Page 800: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/800.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 800/2939
![Page 801: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/801.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 801/2939
![Page 802: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/802.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 802/2939
![Page 803: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/803.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 803/2939
![Page 804: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/804.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 804/2939
![Page 805: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/805.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 805/2939
![Page 806: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/806.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 806/2939
![Page 807: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/807.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 807/2939
![Page 808: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/808.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 808/2939
![Page 809: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/809.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 809/2939
![Page 810: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/810.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 810/2939
![Page 811: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/811.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 811/2939
![Page 812: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/812.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 812/2939
![Page 813: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/813.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 813/2939
![Page 814: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/814.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 814/2939
![Page 815: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/815.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 815/2939
![Page 816: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/816.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 816/2939
![Page 817: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/817.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 817/2939
![Page 818: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/818.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 818/2939
![Page 819: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/819.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 819/2939
![Page 820: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/820.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 820/2939
![Page 821: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/821.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 821/2939
![Page 822: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/822.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 822/2939
![Page 823: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/823.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 823/2939
![Page 824: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/824.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 824/2939
![Page 825: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/825.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 825/2939
![Page 826: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/826.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 826/2939
![Page 827: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/827.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 827/2939
![Page 828: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/828.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 828/2939
![Page 829: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/829.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 829/2939
![Page 830: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/830.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 830/2939
![Page 831: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/831.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 831/2939
![Page 832: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/832.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 832/2939
![Page 833: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/833.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 833/2939
![Page 834: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/834.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 834/2939
![Page 835: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/835.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 835/2939
![Page 836: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/836.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 836/2939
![Page 837: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/837.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 837/2939
![Page 838: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/838.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 838/2939
![Page 839: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/839.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 839/2939
![Page 840: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/840.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 840/2939
![Page 841: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/841.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 841/2939
![Page 842: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/842.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 842/2939
![Page 843: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/843.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 843/2939
![Page 844: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/844.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 844/2939
![Page 845: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/845.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 845/2939
![Page 846: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/846.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 846/2939
![Page 847: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/847.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 847/2939
![Page 848: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/848.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 848/2939
![Page 849: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/849.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 849/2939
![Page 850: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/850.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 850/2939
![Page 851: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/851.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 851/2939
![Page 852: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/852.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 852/2939
![Page 853: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/853.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 853/2939
![Page 854: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/854.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 854/2939
![Page 855: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/855.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 855/2939
![Page 856: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/856.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 856/2939
![Page 857: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/857.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 857/2939
![Page 858: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/858.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 858/2939
![Page 859: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/859.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 859/2939
![Page 860: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/860.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 860/2939
![Page 861: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/861.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 861/2939
![Page 862: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/862.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 862/2939
![Page 863: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/863.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 863/2939
![Page 864: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/864.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 864/2939
![Page 865: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/865.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 865/2939
![Page 866: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/866.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 866/2939
![Page 867: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/867.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 867/2939
![Page 868: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/868.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 868/2939
![Page 869: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/869.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 869/2939
![Page 870: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/870.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 870/2939
![Page 871: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/871.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 871/2939
![Page 872: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/872.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 872/2939
![Page 873: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/873.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 873/2939
![Page 874: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/874.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 874/2939
![Page 875: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/875.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 875/2939
![Page 876: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/876.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 876/2939
![Page 877: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/877.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 877/2939
![Page 878: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/878.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 878/2939
![Page 879: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/879.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 879/2939
![Page 880: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/880.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 880/2939
![Page 881: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/881.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 881/2939
![Page 882: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/882.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 882/2939
![Page 883: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/883.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 883/2939
![Page 884: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/884.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 884/2939
![Page 885: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/885.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 885/2939
![Page 886: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/886.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 886/2939
![Page 887: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/887.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 887/2939
![Page 888: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/888.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 888/2939
![Page 889: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/889.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 889/2939
![Page 890: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/890.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 890/2939
![Page 891: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/891.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 891/2939
![Page 892: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/892.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 892/2939
![Page 893: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/893.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 893/2939
![Page 894: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/894.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 894/2939
![Page 895: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/895.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 895/2939
![Page 896: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/896.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 896/2939
![Page 897: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/897.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 897/2939
![Page 898: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/898.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 898/2939
![Page 899: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/899.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 899/2939
![Page 900: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/900.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 900/2939
![Page 901: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/901.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 901/2939
![Page 902: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/902.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 902/2939
![Page 903: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/903.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 903/2939
![Page 904: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/904.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 904/2939
![Page 905: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/905.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 905/2939
![Page 906: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/906.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 906/2939
![Page 907: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/907.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 907/2939
![Page 908: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/908.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 908/2939
![Page 909: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/909.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 909/2939
![Page 910: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/910.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 910/2939
![Page 911: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/911.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 911/2939
![Page 912: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/912.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 912/2939
![Page 913: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/913.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 913/2939
![Page 914: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/914.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 914/2939
![Page 915: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/915.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 915/2939
![Page 916: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/916.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 916/2939
![Page 917: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/917.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 917/2939
![Page 918: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/918.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 918/2939
![Page 919: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/919.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 919/2939
![Page 920: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/920.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 920/2939
![Page 921: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/921.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 921/2939
![Page 922: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/922.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 922/2939
![Page 923: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/923.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 923/2939
![Page 924: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/924.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 924/2939
![Page 925: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/925.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 925/2939
![Page 926: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/926.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 926/2939
![Page 927: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/927.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 927/2939
![Page 928: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/928.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 928/2939
![Page 929: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/929.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 929/2939
![Page 930: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/930.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 930/2939
![Page 931: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/931.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 931/2939
![Page 932: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/932.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 932/2939
![Page 933: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/933.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 933/2939
![Page 934: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/934.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 934/2939
![Page 935: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/935.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 935/2939
![Page 936: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/936.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 936/2939
![Page 937: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/937.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 937/2939
![Page 938: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/938.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 938/2939
![Page 939: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/939.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 939/2939
![Page 940: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/940.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 940/2939
![Page 941: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/941.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 941/2939
![Page 942: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/942.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 942/2939
![Page 943: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/943.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 943/2939
![Page 944: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/944.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 944/2939
![Page 945: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/945.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 945/2939
![Page 946: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/946.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 946/2939
![Page 947: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/947.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 947/2939
![Page 948: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/948.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 948/2939
![Page 949: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/949.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 949/2939
![Page 950: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/950.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 950/2939
![Page 951: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/951.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 951/2939
![Page 952: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/952.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 952/2939
![Page 953: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/953.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 953/2939
![Page 954: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/954.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 954/2939
![Page 955: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/955.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 955/2939
![Page 956: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/956.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 956/2939
![Page 957: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/957.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 957/2939
![Page 958: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/958.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 958/2939
![Page 959: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/959.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 959/2939
![Page 960: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/960.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 960/2939
![Page 961: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/961.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 961/2939
![Page 962: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/962.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 962/2939
![Page 963: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/963.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 963/2939
![Page 964: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/964.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 964/2939
![Page 965: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/965.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 965/2939
![Page 966: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/966.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 966/2939
![Page 967: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/967.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 967/2939
![Page 968: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/968.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 968/2939
![Page 969: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/969.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 969/2939
![Page 970: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/970.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 970/2939
![Page 971: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/971.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 971/2939
![Page 972: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/972.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 972/2939
![Page 973: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/973.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 973/2939
![Page 974: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/974.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 974/2939
![Page 975: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/975.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 975/2939
![Page 976: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/976.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 976/2939
![Page 977: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/977.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 977/2939
![Page 978: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/978.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 978/2939
![Page 979: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/979.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 979/2939
![Page 980: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/980.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 980/2939
![Page 981: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/981.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 981/2939
![Page 982: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/982.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 982/2939
![Page 983: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/983.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 983/2939
![Page 984: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/984.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 984/2939
![Page 985: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/985.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 985/2939
![Page 986: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/986.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 986/2939
![Page 987: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/987.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 987/2939
![Page 988: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/988.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 988/2939
![Page 989: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/989.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 989/2939
![Page 990: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/990.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 990/2939
![Page 991: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/991.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 991/2939
![Page 992: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/992.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 992/2939
![Page 993: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/993.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 993/2939
![Page 994: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/994.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 994/2939
![Page 995: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/995.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 995/2939
![Page 996: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/996.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 996/2939
![Page 997: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/997.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 997/2939
![Page 998: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/998.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 998/2939
![Page 999: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/999.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 999/2939
![Page 1000: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1000.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1000/2939
![Page 1001: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1001.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1001/2939
![Page 1002: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1002.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1002/2939
![Page 1003: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1003.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1003/2939
![Page 1004: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1004.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1004/2939
![Page 1005: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1005.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1005/2939
![Page 1006: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1006.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1006/2939
![Page 1007: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1007.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1007/2939
![Page 1008: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1008.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1008/2939
![Page 1009: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1009.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1009/2939
![Page 1010: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1010.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1010/2939
![Page 1011: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1011.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1011/2939
![Page 1012: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1012.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1012/2939
![Page 1013: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1013.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1013/2939
![Page 1014: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1014.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1014/2939
![Page 1015: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1015.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1015/2939
![Page 1016: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1016.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1016/2939
![Page 1017: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1017.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1017/2939
![Page 1018: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1018.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1018/2939
![Page 1019: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1019.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1019/2939
![Page 1020: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1020.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1020/2939
![Page 1021: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1021.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1021/2939
![Page 1022: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1022.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1022/2939
![Page 1023: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1023.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1023/2939
![Page 1024: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1024.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1024/2939
![Page 1025: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1025.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1025/2939
![Page 1026: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1026.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1026/2939
![Page 1027: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1027.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1027/2939
![Page 1028: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1028.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1028/2939
![Page 1029: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1029.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1029/2939
![Page 1030: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1030.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1030/2939
![Page 1031: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1031.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1031/2939
![Page 1032: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1032.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1032/2939
![Page 1033: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1033.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1033/2939
![Page 1034: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1034.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1034/2939
![Page 1035: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1035.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1035/2939
![Page 1036: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1036.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1036/2939
![Page 1037: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1037.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1037/2939
![Page 1038: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1038.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1038/2939
![Page 1039: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1039.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1039/2939
![Page 1040: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1040.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1040/2939
![Page 1041: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1041.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1041/2939
![Page 1042: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1042.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1042/2939
![Page 1043: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1043.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1043/2939
![Page 1044: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1044.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1044/2939
![Page 1045: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1045.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1045/2939
![Page 1046: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1046.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1046/2939
![Page 1047: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1047.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1047/2939
![Page 1048: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1048.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1048/2939
![Page 1049: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1049.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1049/2939
![Page 1050: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1050.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1050/2939
![Page 1051: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1051.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1051/2939
![Page 1052: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1052.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1052/2939
![Page 1053: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1053.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1053/2939
![Page 1054: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1054.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1054/2939
![Page 1055: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1055.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1055/2939
![Page 1056: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1056.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1056/2939
![Page 1057: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1057.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1057/2939
![Page 1058: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1058.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1058/2939
![Page 1059: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1059.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1059/2939
![Page 1060: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1060.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1060/2939
![Page 1061: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1061.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1061/2939
![Page 1062: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1062.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1062/2939
![Page 1063: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1063.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1063/2939
![Page 1064: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1064.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1064/2939
![Page 1065: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1065.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1065/2939
![Page 1066: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1066.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1066/2939
![Page 1067: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1067.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1067/2939
![Page 1068: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1068.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1068/2939
![Page 1069: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1069.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1069/2939
![Page 1070: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1070.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1070/2939
![Page 1071: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1071.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1071/2939
![Page 1072: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1072.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1072/2939
![Page 1073: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1073.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1073/2939
![Page 1074: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1074.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1074/2939
![Page 1075: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1075.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1075/2939
![Page 1076: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1076.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1076/2939
![Page 1077: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1077.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1077/2939
![Page 1078: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1078.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1078/2939
![Page 1079: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1079.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1079/2939
![Page 1080: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1080.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1080/2939
![Page 1081: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1081.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1081/2939
![Page 1082: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1082.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1082/2939
![Page 1083: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1083.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1083/2939
![Page 1084: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1084.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1084/2939
![Page 1085: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1085.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1085/2939
![Page 1086: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1086.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1086/2939
![Page 1087: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1087.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1087/2939
![Page 1088: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1088.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1088/2939
![Page 1089: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1089.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1089/2939
![Page 1090: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1090.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1090/2939
![Page 1091: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1091.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1091/2939
![Page 1092: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1092.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1092/2939
![Page 1093: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1093.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1093/2939
![Page 1094: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1094.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1094/2939
![Page 1095: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1095.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1095/2939
![Page 1096: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1096.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1096/2939
![Page 1097: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1097.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1097/2939
![Page 1098: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1098.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1098/2939
![Page 1099: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1099.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1099/2939
![Page 1100: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1100.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1100/2939
![Page 1101: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1101.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1101/2939
![Page 1102: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1102.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1102/2939
![Page 1103: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1103.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1103/2939
![Page 1104: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1104.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1104/2939
![Page 1105: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1105.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1105/2939
![Page 1106: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1106.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1106/2939
![Page 1107: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1107.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1107/2939
![Page 1108: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1108.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1108/2939
![Page 1109: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1109.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1109/2939
![Page 1110: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1110.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1110/2939
![Page 1111: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1111.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1111/2939
![Page 1112: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1112.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1112/2939
![Page 1113: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1113.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1113/2939
![Page 1114: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1114.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1114/2939
![Page 1115: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1115.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1115/2939
![Page 1116: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1116.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1116/2939
![Page 1117: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1117.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1117/2939
![Page 1118: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1118.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1118/2939
![Page 1119: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1119.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1119/2939
![Page 1120: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1120.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1120/2939
![Page 1121: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1121.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1121/2939
![Page 1122: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1122.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1122/2939
![Page 1123: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1123.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1123/2939
![Page 1124: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1124.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1124/2939
![Page 1125: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1125.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1125/2939
![Page 1126: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1126.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1126/2939
![Page 1127: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1127.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1127/2939
![Page 1128: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1128.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1128/2939
![Page 1129: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1129.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1129/2939
![Page 1130: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1130.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1130/2939
![Page 1131: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1131.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1131/2939
![Page 1132: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1132.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1132/2939
![Page 1133: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1133.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1133/2939
![Page 1134: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1134.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1134/2939
![Page 1135: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1135.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1135/2939
![Page 1136: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1136.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1136/2939
![Page 1137: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1137.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1137/2939
![Page 1138: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1138.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1138/2939
![Page 1139: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1139.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1139/2939
![Page 1140: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1140.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1140/2939
![Page 1141: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1141.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1141/2939
![Page 1142: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1142.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1142/2939
![Page 1143: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1143.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1143/2939
![Page 1144: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1144.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1144/2939
![Page 1145: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1145.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1145/2939
![Page 1146: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1146.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1146/2939
![Page 1147: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1147.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1147/2939
![Page 1148: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1148.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1148/2939
![Page 1149: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1149.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1149/2939
![Page 1150: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1150.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1150/2939
![Page 1151: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1151.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1151/2939
![Page 1152: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1152.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1152/2939
![Page 1153: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1153.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1153/2939
![Page 1154: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1154.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1154/2939
![Page 1155: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1155.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1155/2939
![Page 1156: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1156.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1156/2939
![Page 1157: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1157.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1157/2939
![Page 1158: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1158.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1158/2939
![Page 1159: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1159.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1159/2939
![Page 1160: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1160.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1160/2939
![Page 1161: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1161.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1161/2939
![Page 1162: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1162.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1162/2939
![Page 1163: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1163.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1163/2939
![Page 1164: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1164.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1164/2939
![Page 1165: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1165.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1165/2939
![Page 1166: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1166.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1166/2939
![Page 1167: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1167.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1167/2939
![Page 1168: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1168.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1168/2939
![Page 1169: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1169.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1169/2939
![Page 1170: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1170.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1170/2939
![Page 1171: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1171.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1171/2939
![Page 1172: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1172.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1172/2939
![Page 1173: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1173.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1173/2939
![Page 1174: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1174.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1174/2939
![Page 1175: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1175.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1175/2939
![Page 1176: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1176.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1176/2939
![Page 1177: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1177.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1177/2939
![Page 1178: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1178.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1178/2939
![Page 1179: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1179.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1179/2939
![Page 1180: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1180.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1180/2939
![Page 1181: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1181.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1181/2939
![Page 1182: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1182.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1182/2939
![Page 1183: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1183.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1183/2939
![Page 1184: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1184.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1184/2939
![Page 1185: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1185.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1185/2939
![Page 1186: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1186.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1186/2939
![Page 1187: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1187.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1187/2939
![Page 1188: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1188.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1188/2939
![Page 1189: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1189.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1189/2939
![Page 1190: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1190.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1190/2939
![Page 1191: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1191.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1191/2939
![Page 1192: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1192.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1192/2939
![Page 1193: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1193.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1193/2939
![Page 1194: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1194.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1194/2939
![Page 1195: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1195.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1195/2939
![Page 1196: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1196.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1196/2939
![Page 1197: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1197.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1197/2939
![Page 1198: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1198.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1198/2939
![Page 1199: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1199.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1199/2939
![Page 1200: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1200.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1200/2939
![Page 1201: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1201.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1201/2939
![Page 1202: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1202.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1202/2939
![Page 1203: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1203.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1203/2939
![Page 1204: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1204.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1204/2939
![Page 1205: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1205.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1205/2939
![Page 1206: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1206.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1206/2939
![Page 1207: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1207.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1207/2939
![Page 1208: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1208.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1208/2939
![Page 1209: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1209.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1209/2939
![Page 1210: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1210.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1210/2939
![Page 1211: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1211.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1211/2939
![Page 1212: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1212.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1212/2939
![Page 1213: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1213.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1213/2939
![Page 1214: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1214.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1214/2939
![Page 1215: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1215.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1215/2939
![Page 1216: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1216.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1216/2939
![Page 1217: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1217.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1217/2939
![Page 1218: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1218.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1218/2939
![Page 1219: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1219.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1219/2939
![Page 1220: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1220.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1220/2939
![Page 1221: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1221.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1221/2939
![Page 1222: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1222.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1222/2939
![Page 1223: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1223.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1223/2939
![Page 1224: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1224.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1224/2939
![Page 1225: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1225.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1225/2939
![Page 1226: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1226.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1226/2939
![Page 1227: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1227.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1227/2939
![Page 1228: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1228.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1228/2939
![Page 1229: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1229.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1229/2939
![Page 1230: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1230.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1230/2939
![Page 1231: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1231.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1231/2939
![Page 1232: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1232.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1232/2939
![Page 1233: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1233.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1233/2939
![Page 1234: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1234.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1234/2939
![Page 1235: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1235.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1235/2939
![Page 1236: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1236.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1236/2939
![Page 1237: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1237.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1237/2939
![Page 1238: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1238.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1238/2939
![Page 1239: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1239.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1239/2939
![Page 1240: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1240.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1240/2939
![Page 1241: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1241.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1241/2939
![Page 1242: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1242.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1242/2939
![Page 1243: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1243.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1243/2939
![Page 1244: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1244.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1244/2939
![Page 1245: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1245.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1245/2939
![Page 1246: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1246.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1246/2939
![Page 1247: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1247.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1247/2939
![Page 1248: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1248.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1248/2939
![Page 1249: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1249.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1249/2939
![Page 1250: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1250.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1250/2939
![Page 1251: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1251.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1251/2939
![Page 1252: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1252.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1252/2939
![Page 1253: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1253.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1253/2939
![Page 1254: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1254.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1254/2939
![Page 1255: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1255.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1255/2939
![Page 1256: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1256.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1256/2939
![Page 1257: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1257.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1257/2939
![Page 1258: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1258.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1258/2939
![Page 1259: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1259.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1259/2939
![Page 1260: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1260.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1260/2939
![Page 1261: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1261.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1261/2939
![Page 1262: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1262.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1262/2939
![Page 1263: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1263.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1263/2939
![Page 1264: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1264.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1264/2939
![Page 1265: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1265.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1265/2939
![Page 1266: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1266.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1266/2939
![Page 1267: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1267.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1267/2939
![Page 1268: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1268.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1268/2939
![Page 1269: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1269.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1269/2939
![Page 1270: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1270.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1270/2939
![Page 1271: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1271.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1271/2939
![Page 1272: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1272.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1272/2939
![Page 1273: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1273.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1273/2939
![Page 1274: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1274.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1274/2939
![Page 1275: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1275.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1275/2939
![Page 1276: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1276.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1276/2939
![Page 1277: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1277.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1277/2939
![Page 1278: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1278.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1278/2939
![Page 1279: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1279.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1279/2939
![Page 1280: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1280.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1280/2939
![Page 1281: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1281.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1281/2939
![Page 1282: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1282.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1282/2939
![Page 1283: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1283.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1283/2939
![Page 1284: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1284.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1284/2939
![Page 1285: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1285.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1285/2939
![Page 1286: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1286.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1286/2939
![Page 1287: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1287.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1287/2939
![Page 1288: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1288.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1288/2939
![Page 1289: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1289.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1289/2939
![Page 1290: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1290.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1290/2939
![Page 1291: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1291.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1291/2939
![Page 1292: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1292.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1292/2939
![Page 1293: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1293.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1293/2939
![Page 1294: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1294.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1294/2939
![Page 1295: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1295.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1295/2939
![Page 1296: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1296.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1296/2939
![Page 1297: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1297.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1297/2939
![Page 1298: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1298.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1298/2939
![Page 1299: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1299.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1299/2939
![Page 1300: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1300.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1300/2939
![Page 1301: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1301.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1301/2939
![Page 1302: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1302.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1302/2939
![Page 1303: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1303.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1303/2939
![Page 1304: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1304.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1304/2939
![Page 1305: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1305.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1305/2939
![Page 1306: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1306.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1306/2939
![Page 1307: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1307.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1307/2939
![Page 1308: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1308.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1308/2939
![Page 1309: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1309.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1309/2939
![Page 1310: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1310.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1310/2939
![Page 1311: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1311.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1311/2939
![Page 1312: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1312.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1312/2939
![Page 1313: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1313.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1313/2939
![Page 1314: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1314.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1314/2939
![Page 1315: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1315.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1315/2939
![Page 1316: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1316.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1316/2939
![Page 1317: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1317.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1317/2939
![Page 1318: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1318.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1318/2939
![Page 1319: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1319.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1319/2939
![Page 1320: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1320.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1320/2939
![Page 1321: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1321.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1321/2939
![Page 1322: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1322.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1322/2939
![Page 1323: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1323.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1323/2939
![Page 1324: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1324.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1324/2939
![Page 1325: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1325.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1325/2939
![Page 1326: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1326.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1326/2939
![Page 1327: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1327.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1327/2939
![Page 1328: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1328.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1328/2939
![Page 1329: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1329.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1329/2939
![Page 1330: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1330.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1330/2939
![Page 1331: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1331.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1331/2939
![Page 1332: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1332.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1332/2939
![Page 1333: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1333.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1333/2939
![Page 1334: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1334.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1334/2939
![Page 1335: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1335.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1335/2939
![Page 1336: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1336.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1336/2939
![Page 1337: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1337.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1337/2939
![Page 1338: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1338.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1338/2939
![Page 1339: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1339.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1339/2939
![Page 1340: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1340.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1340/2939
![Page 1341: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1341.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1341/2939
![Page 1342: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1342.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1342/2939
![Page 1343: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1343.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1343/2939
![Page 1344: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1344.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1344/2939
![Page 1345: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1345.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1345/2939
![Page 1346: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1346.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1346/2939
![Page 1347: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1347.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1347/2939
![Page 1348: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1348.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1348/2939
![Page 1349: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1349.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1349/2939
![Page 1350: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1350.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1350/2939
![Page 1351: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1351.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1351/2939
![Page 1352: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1352.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1352/2939
![Page 1353: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1353.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1353/2939
![Page 1354: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1354.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1354/2939
![Page 1355: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1355.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1355/2939
![Page 1356: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1356.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1356/2939
![Page 1357: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1357.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1357/2939
![Page 1358: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1358.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1358/2939
![Page 1359: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1359.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1359/2939
![Page 1360: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1360.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1360/2939
![Page 1361: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1361.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1361/2939
![Page 1362: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1362.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1362/2939
![Page 1363: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1363.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1363/2939
![Page 1364: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1364.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1364/2939
![Page 1365: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1365.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1365/2939
![Page 1366: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1366.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1366/2939
![Page 1367: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1367.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1367/2939
![Page 1368: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1368.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1368/2939
![Page 1369: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1369.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1369/2939
![Page 1370: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1370.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1370/2939
![Page 1371: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1371.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1371/2939
![Page 1372: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1372.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1372/2939
![Page 1373: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1373.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1373/2939
![Page 1374: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1374.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1374/2939
![Page 1375: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1375.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1375/2939
![Page 1376: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1376.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1376/2939
![Page 1377: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1377.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1377/2939
![Page 1378: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1378.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1378/2939
![Page 1379: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1379.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1379/2939
![Page 1380: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1380.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1380/2939
![Page 1381: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1381.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1381/2939
![Page 1382: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1382.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1382/2939
![Page 1383: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1383.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1383/2939
![Page 1384: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1384.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1384/2939
![Page 1385: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1385.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1385/2939
![Page 1386: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1386.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1386/2939
![Page 1387: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1387.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1387/2939
![Page 1388: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1388.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1388/2939
![Page 1389: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1389.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1389/2939
![Page 1390: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1390.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1390/2939
![Page 1391: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1391.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1391/2939
![Page 1392: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1392.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1392/2939
![Page 1393: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1393.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1393/2939
![Page 1394: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1394.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1394/2939
![Page 1395: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1395.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1395/2939
![Page 1396: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1396.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1396/2939
![Page 1397: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1397.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1397/2939
![Page 1398: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1398.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1398/2939
![Page 1399: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1399.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1399/2939
![Page 1400: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1400.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1400/2939
![Page 1401: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1401.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1401/2939
![Page 1402: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1402.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1402/2939
![Page 1403: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1403.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1403/2939
![Page 1404: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1404.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1404/2939
![Page 1405: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1405.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1405/2939
![Page 1406: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1406.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1406/2939
![Page 1407: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1407.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1407/2939
![Page 1408: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1408.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1408/2939
![Page 1409: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1409.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1409/2939
![Page 1410: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1410.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1410/2939
![Page 1411: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1411.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1411/2939
![Page 1412: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1412.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1412/2939
![Page 1413: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1413.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1413/2939
![Page 1414: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1414.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1414/2939
![Page 1415: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1415.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1415/2939
![Page 1416: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1416.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1416/2939
![Page 1417: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1417.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1417/2939
![Page 1418: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1418.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1418/2939
![Page 1419: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1419.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1419/2939
![Page 1420: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1420.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1420/2939
![Page 1421: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1421.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1421/2939
![Page 1422: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1422.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1422/2939
![Page 1423: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1423.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1423/2939
![Page 1424: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1424.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1424/2939
![Page 1425: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1425.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1425/2939
![Page 1426: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1426.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1426/2939
![Page 1427: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1427.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1427/2939
![Page 1428: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1428.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1428/2939
![Page 1429: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1429.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1429/2939
![Page 1430: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1430.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1430/2939
![Page 1431: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1431.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1431/2939
![Page 1432: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1432.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1432/2939
![Page 1433: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1433.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1433/2939
![Page 1434: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1434.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1434/2939
![Page 1435: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1435.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1435/2939
![Page 1436: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1436.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1436/2939
![Page 1437: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1437.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1437/2939
![Page 1438: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1438.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1438/2939
![Page 1439: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1439.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1439/2939
![Page 1440: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1440.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1440/2939
![Page 1441: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1441.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1441/2939
![Page 1442: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1442.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1442/2939
![Page 1443: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1443.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1443/2939
![Page 1444: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1444.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1444/2939
![Page 1445: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1445.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1445/2939
![Page 1446: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1446.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1446/2939
![Page 1447: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1447.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1447/2939
![Page 1448: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1448.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1448/2939
![Page 1449: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1449.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1449/2939
![Page 1450: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1450.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1450/2939
![Page 1451: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1451.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1451/2939
![Page 1452: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1452.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1452/2939
![Page 1453: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1453.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1453/2939
![Page 1454: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1454.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1454/2939
![Page 1455: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1455.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1455/2939
![Page 1456: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1456.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1456/2939
![Page 1457: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1457.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1457/2939
![Page 1458: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1458.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1458/2939
![Page 1459: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1459.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1459/2939
![Page 1460: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1460.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1460/2939
![Page 1461: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1461.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1461/2939
![Page 1462: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1462.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1462/2939
![Page 1463: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1463.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1463/2939
![Page 1464: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1464.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1464/2939
![Page 1465: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1465.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1465/2939
![Page 1466: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1466.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1466/2939
![Page 1467: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1467.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1467/2939
![Page 1468: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1468.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1468/2939
![Page 1469: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1469.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1469/2939
![Page 1470: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1470.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1470/2939
![Page 1471: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1471.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1471/2939
![Page 1472: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1472.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1472/2939
![Page 1473: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1473.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1473/2939
![Page 1474: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1474.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1474/2939
![Page 1475: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1475.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1475/2939
Rate Amount
4758 49,573,602
5556 34,502,760
7432 10,256,160
x ens on, enna - ,
![Page 1476: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1476.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1476/2939
-
-
303517 1,517,585
531155 2,655,775
834671 834,671
168 1,476,048
168 34,104
131 144,100
131 72,050
155 85,250
155 85,250
181 80,907
181 199,100
![Page 1477: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1477.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1477/2939
1106 10,936,128
2151 1,600,344
1019 11,555,460
131 471,600 204 1,525,512
![Page 1478: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1478.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1478/2939
160 818,400
4847 2,040,587
5184 1,088,640
5683 4,245,201
![Page 1479: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1479.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1479/2939
8532 37,975,932
8532 3,378,672
8532 827,604 8590 13,116,930
8590 12,696,020
8590 10,806,220
8590 9,680,930
8590 3,676,520
8590 2,559,820
8615 2,567,270
8615 2,567,270
8615 2,567,270
8615 2,567,270
8615 2,567,270
8615 2,567,270 8615 2,584,500
8615 1,766,075
8615 1,679,925
8615 1,679,925
8657 1,688,115
8657 1,714,086
8657 1,056,154
8657 657,932
![Page 1480: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1480.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1480/2939
8657 588,676
3533 2,543,760
3290 1,246,910
1772 3,492,612
![Page 1481: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1481.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1481/2939
77790 227,535,750
532 5,277,440
566 12,852,728
584 24,970,088
584 2,130,432
138 1,539,114
![Page 1482: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1482.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1482/2939
4727 4,282,662
4710 273,180
4710 188,400
4710 155,430
4710 155,430
4710 155,430
4710 164,850
4748 166,180
4748 166,180
4748 166,180
4748 166,180
4748 166,180
4786 167,510
4786 124,436
4786 124,436
4786 124,436
4786 124,436
4823 144,690
4823 62,699
4823 72,345
1289 242,332
1380 2,565,420
1380 1,259,940
1380 1,346,880
![Page 1483: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1483.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1483/2939
1380 897,000
1380 527,160
832 20,800
832 10,816
832 37,440
832 29,120
7788 903,408
727 53,798
727 26,899
727 12,359
727 12,359
727 12,359
727 12,359
![Page 1484: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1484.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1484/2939
749 12,733
749 12,733
749 12,733
749 12,733
749 12,733
757 12,869
757 12,869
757 12,869 757 12,869
757 12,869
765 17,595
765 6,885
765 18,360
1618 3,135,684
![Page 1485: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1485.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1485/2939
1618 2,567,766
1618 1,475,616
1618 1,203,792
1618 1,203,792
1618 1,219,972
1663 1,253,902
1663 1,253,902
1663 1,253,902 1663 1,253,902
1663 1,253,902
1678 1,265,212
1678 1,137,684
1678 817,186
1678 682,946
1678 682,946
1693 858,351
1693 509,593
1693 433,408
1693 443,566 1693 546,839
1017 29,493
1017 291,879
1017 310,185
1017 310,185
1017 310,185
1017 285,777
1062 298,422
1062 298,422
1062 298,422 1062 298,422
1062 298,422
1077 302,637
1077 298,329
1077 298,329
1077 298,329
1077 298,329
1092 366,912
1092 125,580
1092 109,200
1092 3,276
![Page 1486: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1486.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1486/2939
258 4,601,946
193 951,297
122395 31,822,700
105779 4,442,718
![Page 1487: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1487.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1487/2939
108053 3,241,590
100252 6,015,120
4898 352,656
![Page 1488: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1488.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1488/2939
1190 506,940
2099 1,288,786
598 7,011,550
1622 1,523,058
![Page 1489: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1489.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1489/2939
104520 376,272
561 1,818,201
497 623,735
829 644,133
937 669,955
![Page 1490: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1490.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1490/2939
849 983,142
194 5,083,576
378 30,857,652
34 399,194
609 4,285,533
![Page 1491: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1491.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1491/2939
609 392,805
436 3,513,288
436 3,513,288
673 2,756,608
![Page 1492: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1492.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1492/2939
1206 280,998
![Page 1493: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1493.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1493/2939
1206 2,314,314
1206 1,439,964
![Page 1494: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1494.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1494/2939
1357 823,699
1055 2,527,780
![Page 1495: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1495.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1495/2939
![Page 1496: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1496.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1496/2939
3014 7,851,470
![Page 1497: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1497.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1497/2939
![Page 1498: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1498.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1498/2939
3014 7,227,572
7158 5,339,868
![Page 1499: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1499.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1499/2939
641 1,995,433
603 300,294
![Page 1500: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1500.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1500/2939
528 5,280
679 6,790
829 8,290
980 9,800
-
1131 11,310
1281 12,810
1357 13,570
1890 18,900
-
2035 20,350
2261 22,610
2562 25,620
2939 29,390
-
2788 27,880
2939 29,390
3165 31,650
3466 34,660 -
3014 30,140
3316 33,160
3768 37,680
4521 45,210
543 54,300
![Page 1501: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1501.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1501/2939
-
22603 678,090
-
7535 241,120
11 330,000
-
16 16
![Page 1502: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1502.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1502/2939
31 31
46 46
76 76
-
15069 15,069
1131 159,471
15069 587,691
![Page 1503: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1503.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1503/2939
189 9,450
-
12243 122,430
16952 830,648
957 834,504
-
905 371,050
![Page 1504: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1504.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1504/2939
1884 2,492,532
24110 1,591,260
14 165,312
![Page 1505: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1505.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1505/2939
1802 6,384,486
2266 5,352,292
5375 6,347,875
7059 12,501,489
![Page 1506: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1506.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1506/2939
955 3,132,400
1002 2,797,584
140 253,120
![Page 1507: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1507.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1507/2939
![Page 1508: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1508.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1508/2939
6996 4,715,304
3901 429,110
4198 155,326
![Page 1509: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1509.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1509/2939
2799 780,921
122885 122,885
22422 3,139,080
874494 874,494
![Page 1510: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1510.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1510/2939
11614 2,218,274
13992 111,936
16791 67,164
![Page 1511: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1511.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1511/2939
6996 13,992
4898 9,796
2799 5,598
13992 2,868,360
-
1540 303,380
2099 16,792
-
![Page 1512: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1512.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1512/2939
4478 1,020,984
5247 10,494
6297 138,534
3498 6,996
![Page 1513: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1513.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1513/2939
6297 100,752
10494 20,988
-
5422 1,453,096
8081 32,324
-
20988 146,916
![Page 1514: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1514.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1514/2939
11894 95,152
20988 314,820
20988 41,976
13992 27,984
-
21758 87,032
14762 2,568,588
![Page 1515: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1515.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1515/2939
13992 27,984
16791 33,582
20988 83,952
3498 34,980
-
1680 307,440
1260 120,960
1400 5,600
630 43,470
630 114,030
1400 33,600
![Page 1516: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1516.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1516/2939
-
10494 209,880
2239 434,366
1889 217,235
11894 118,940
350 136,150
1085 648,830
1120 24,640
231 131,208
![Page 1517: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1517.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1517/2939
48972 195,888
1141 11,410
1540 30,800
2344 23,440
-
-
231 911,295
259 1,036
![Page 1518: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1518.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1518/2939
-
196 784
224 612,640
343 945,308
441 563,598
714 121,380
1260 2,520
-
1120 2,240
1400 1,162,000
2729 185,572
3848 126,984
6017 150,425
-
3673 3,673
4128 8,256
-
5317 5,317
4828 9,656
-
8857 8,857
9935 19,870
![Page 1519: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1519.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1519/2939
-
840 4,200
1295 9,065
2099 20,990
-
15671 94,026
18190 1,346,060
21688 585,576
-
14692 14,692
16091 32,182
-
3498 76,956
-
13992 41,976
![Page 1520: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1520.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1520/2939
4198 847,996
20988 83,952
140 83,440
168 17,304
490 1,132,390
679 3,288,397
1225 2,156,000 -
280 183,680
455 91,000
644 748,328
1190 935,340
![Page 1521: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1521.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1521/2939
-
420 309,540
595 61,285
1120 1,086,400
910 577,850
-
1050 4,200
3498 97,944
![Page 1522: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1522.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1522/2939
224 56,448
343 137,543
441 156,555
714 299,880
1260 432,180
1610 552,230
2239 22,390
-
1330 803,320
1924 706,108 -
1924 1,165,944 -
![Page 1523: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1523.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1523/2939
-
2099 69,267
-
-
16791 638,058
27984 531,696
48972 195,888
-
13992 853,512
-
![Page 1524: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1524.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1524/2939
-
11894 404,396
13992 2,392,632
-
20289 4,159,245
770 47,740
1050 51,450
1400 67,200 1680 15,120
2099 4,198
20988 125,928
![Page 1525: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1525.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1525/2939
1051856 1,051,856
-
-
-
-
-
191899 959,495
-
![Page 1526: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1526.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1526/2939
-
-
-
-
-
-
-
-
-
-
104940 209,880
-
-
- -
-
![Page 1527: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1527.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1527/2939
![Page 1528: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1528.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1528/2939
349798 349,798
![Page 1529: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1529.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1529/2939
![Page 1530: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1530.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1530/2939
![Page 1531: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1531.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1531/2939
1972776 1,972,776
580916 580,916
-
![Page 1532: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1532.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1532/2939
![Page 1533: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1533.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1533/2939
![Page 1534: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1534.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1534/2939
![Page 1535: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1535.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1535/2939
![Page 1536: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1536.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1536/2939
-
![Page 1537: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1537.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1537/2939
![Page 1538: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1538.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1538/2939
![Page 1539: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1539.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1539/2939
10100446 10,100,446
![Page 1540: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1540.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1540/2939
![Page 1541: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1541.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1541/2939
![Page 1542: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1542.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1542/2939
![Page 1543: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1543.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1543/2939
![Page 1544: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1544.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1544/2939
3358056 3,358,056
![Page 1545: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1545.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1545/2939
1403 11,939,530
1259 1,535,980
![Page 1546: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1546.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1546/2939
1465 4,395,000
1244 597,120
![Page 1547: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1547.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1547/2939
2637 3,533,580
8322 2,871,090
3749 2,174,420
![Page 1548: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1548.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1548/2939
5254 966,736
3665 776,980
825 61,050
1991 284,713
![Page 1549: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1549.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1549/2939
2213 2,637,896
3017 241,360
2261 165,053
![Page 1550: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1550.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1550/2939
2433 498,765
![Page 1551: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1551.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1551/2939
![Page 1552: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1552.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1552/2939
5651 2,119,125
5576 11,152
3014 18,084
1281 23,058
![Page 1553: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1553.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1553/2939
1507 678,150
203 93,380
193 2,165,460
330 1,260,600
490 98,000
![Page 1554: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1554.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1554/2939
317 1,287,337
422 373,470
308 30,800
263 526,000
1928 3,092,512
![Page 1555: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1555.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1555/2939
1082 4,251,178
3413 1,433,460
![Page 1556: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1556.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1556/2939
1397 474,980
159 12,043,614
144 7,200
178 13,482,788
189 350,595
![Page 1557: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1557.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1557/2939
362 881,108
3222 7,842,348
![Page 1558: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1558.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1558/2939
283 471,195
1087 1,809,855
![Page 1559: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1559.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1559/2939
1262 2,419,254
![Page 1560: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1560.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1560/2939
4605 12,479,550
3837 1,438,875
654 1,412,640
1330 1,263,500
2907 2,354,670
![Page 1561: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1561.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1561/2939
1199 5,995
-
3633 18,165
3052 15,260
3488 52,320
4264 2,686,320
![Page 1562: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1562.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1562/2939
3488 3,313,600
8602 10,322,400
6009 60,090
-
-
8719 43,595
18890 188,900
![Page 1563: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1563.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1563/2939
1977 796,731
-
-
12351 17,908,950
![Page 1564: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1564.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1564/2939
-
-
10210 408,400
12924 245,556
-
![Page 1565: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1565.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1565/2939
8644 1,849,816
-
![Page 1566: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1566.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1566/2939
6441 1,494,312
155732 311,464
153877 1,077,139
10514 1,461,446
-
![Page 1567: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1567.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1567/2939
1685 1,090,195
1650 627,000
982 3,019,650
947 33,145
-
6600 1,709,400
9164 9,704,676
-
223 885,310
-
-
![Page 1568: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1568.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1568/2939
-
-
-
11492 2,930,460
9426 254,502
11822 2,435,332
11767 353,010
17229 482,412
-
![Page 1569: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1569.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1569/2939
357 857,871
357 429,114
1678 16,780
4376 1,115,880
2056 557,176
1408 5,632
8505 1,794,555
8763 105,156
10524 505,152
22622 2,171,712
7337 29,348
745 195,935
14035 2,666,650
968 968
974 723,682
239 10,994
490 292,530
31363 4,955,354
33686 1,246,382
8170 32,680
-
3744 14,976
2771 268,787
674 359,242
2246 327,916
250 25,500
![Page 1570: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1570.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1570/2939
869 88,638
31095 357,593
4214 695,310
-
1962 29,430
2616 1,216,440
![Page 1571: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1571.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1571/2939
1163 1,309,538
1233 573,345
2616 26,160
1956 39,120
-
16812 50,436
12976 12,976
11065 33,195
3306 310,764
![Page 1572: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1572.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1572/2939
-
-
1170 983,970
1452 2,904
-
-
-
![Page 1573: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1573.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1573/2939
-
-
-
-
7228 433,680
1956 332,520
2180 10,900
-
197 265,950
218 1,417,000
5783 23,132
9881 29,643
6539 228,865
![Page 1574: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1574.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1574/2939
1109 96,483
2398 990,374
9366 18,732
33143 5,634,310
![Page 1575: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1575.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1575/2939
37215 1,414,170
15986 1,598,600
9695 969,500
![Page 1576: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1576.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1576/2939
13327 79,962
41223 618,345
13513 337,825
74867 224,601
![Page 1577: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1577.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1577/2939
73536 73,536
5574 78,036
74867 224,601
111301 111,301
27451 54,902
1236 24,720
800 16,000
![Page 1578: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1578.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1578/2939
94273 565,638
100232 1,002,320
![Page 1579: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1579.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1579/2939
276228 1,657,368
69683 1,323,977
62010 3,286,530
54174 2,112,786
13350 106,800
![Page 1580: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1580.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1580/2939
49126 1,375,528
68974 137,948
![Page 1581: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1581.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1581/2939
23740 4,391,900
26617 266,170
30927 154,635
34675 69,350
![Page 1582: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1582.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1582/2939
45108 90,216
47686 95,372
77917 5,687,941
26675 106,700
![Page 1583: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1583.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1583/2939
49657 148,971
241120 482,240 241120 241,120
8962 44,810
1608 8,040
6813 34,065
![Page 1584: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1584.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1584/2939
24065 144,390
126560 8,099,840
41180 2,635,520
23950 1,532,800
59025 7,555,200
69158 1,936,424
![Page 1585: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1585.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1585/2939
41798 83,596
70981 851,772
17657 1,165,362
-
-
126560 506,240
41180 82,360
23950 47,900
59025 236,100
17657 35,314
54870 109,740
86194 172,388
![Page 1586: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1586.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1586/2939
113492 7,490,472
![Page 1587: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1587.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1587/2939
778589 49,829,696
![Page 1588: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1588.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1588/2939
330922 9,265,816
589555 589,555
![Page 1589: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1589.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1589/2939
![Page 1590: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1590.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1590/2939
935149 1,870,298
![Page 1591: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1591.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1591/2939
23901 2,007,684
![Page 1592: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1592.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1592/2939
16761 5,665,218
50849 2,593,299
10645 766,440
4496 107,904
-
40032 640,512
53882 1,077,640
![Page 1593: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1593.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1593/2939
-
9852 147,780
11537 80,759
12528 28,814,400
4078 20,390
![Page 1594: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1594.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1594/2939
8206 41,030
8335 941,855
3263 2,251,470
-
-
![Page 1595: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1595.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1595/2939
33717 14,329,725
31271 156,355
-
32086 3,529,460
![Page 1596: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1596.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1596/2939
29640 148,200
60683 788,879
-
-
23131 231,310
23131 462,620
![Page 1597: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1597.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1597/2939
-
23637 118,185
23637 283,644
-
8206 1,395,020
8206 12,596,210
-
![Page 1598: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1598.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1598/2939
13018 911,260
9723 2,479,365
8695 86,950
-
5058 7,587,000
![Page 1599: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1599.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1599/2939
-
5220 30,145,500
816 1,248,480
-
607 482,565
7748 813,540
![Page 1600: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1600.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1600/2939
8972 89,720
-
12234 19,574,400
12234 122,340
-
8483 254,490
9298 92,980
6613 66,130
![Page 1601: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1601.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1601/2939
3263 1,288,885
3263 326,300
1034 51,700
![Page 1602: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1602.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1602/2939
10815 216,300
6269 313,450
509736 2,038,944
![Page 1603: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1603.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1603/2939
1391441 1,391,441
7494493 7,494,493
1859847 3,719,694
1261000 1,261,000
![Page 1604: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1604.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1604/2939
1787500 1,787,500
2043682 4,087,364
970 97,000
-
16060 16,060
11149 66,894
46930 2,815,800
![Page 1605: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1605.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1605/2939
43703 2,884,398
41358 992,592
268195 268,195
32500 32,500
32500 32,500
26000 26,000
13000 13,000
13000 13,000
32500 32,500
13000 13,000
-
-
![Page 1606: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1606.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1606/2939
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
![Page 1607: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1607.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1607/2939
-
-
-
-
-
-
-
6015642 6,015,642
-
-
-
-
![Page 1608: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1608.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1608/2939
-
-
-
-
-
-
891745 1,783,490
-
-
-
-
-
- -
-
292750 292,750
-
-
-
-
![Page 1609: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1609.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1609/2939
-
-
-
-
-
-
759268 759,268
-
-
-
-
-
-
-
-
-
-
276819 276,819
-
-
-
-
-
-
![Page 1610: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1610.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1610/2939
-
-
225129 225,129
-
-
-
-
-
-
-
-
223829 223,829
-
-
-
- -
-
-
-
![Page 1611: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1611.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1611/2939
-
189368 189,368
-
-
-
-
-
- -
-
222529 222,529
-
-
-
-
-
-
-
-
![Page 1612: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1612.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1612/2939
223829 895,316
-
-
-
-
-
-
-
-
223829 2,909,777
-
-
-
-
-
-
-
241059 482,118
![Page 1613: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1613.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1613/2939
-
-
-
-
-
-
-
-
223829 223,829
-
-
-
-
-
-
-
223829 2,238,290
-
![Page 1614: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1614.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1614/2939
-
-
-
-
-
-
188068 188,068
-
-
-
-
-
-
-
-
126461 505,844
-
-
-
-
-
-
![Page 1615: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1615.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1615/2939
-
-
188068 188,068
-
-
-
- -
-
-
-
164823 164,823
-
-
-
-
- -
-
-
![Page 1616: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1616.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1616/2939
-
400032 400,032
-
-
-
-
-
-
-
-
281988 281,988
-
-
-
-
-
-
-
-
![Page 1617: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1617.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1617/2939
188068 188,068
-
-
-
-
-
-
-
300065 300,065
-
-
-
-
-
-
-
-
-
301365 301,365
![Page 1618: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1618.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1618/2939
-
-
-
-
-
-
-
215214 215,214
-
-
-
-
- -
-
-
-
197984 197,984
-
![Page 1619: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1619.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1619/2939
80786 161,572
-
-
21977 1,208,735
-
-
13036 104,288
![Page 1620: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1620.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1620/2939
-
-
-
-
-
-
-
-
-
-
-
21519 1,312,659
-
-
-
-
-
![Page 1621: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1621.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1621/2939
-
23872 143,232
-
-
-
-
-
-
27278 1,964,016
-
-
-
-
31017 62,034
-
-
-
-
-
-
![Page 1622: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1622.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1622/2939
25015 175,105
-
-
-
-
-
-
22660 45,320
-
-
-
-
-
-
37718 113,154
-
-
-
-
-
![Page 1623: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1623.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1623/2939
-
35460 141,840
-
-
-
-
-
31017 31,017
-
-
-
-
-
-
32588 97,764
-
-
-
-
-
-
![Page 1624: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1624.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1624/2939
27550 220,400
-
-
-
-
-
-
25015 25,015
-
-
-
-
-
-
22660 67,980
-
-
-
-
-
![Page 1625: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1625.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1625/2939
37526 37,526
-
-
-
-
-
25804 25,804
- -
-
-
-
5186 191,882
-
-
-
-
22429 89,716
-
-
![Page 1626: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1626.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1626/2939
-
-
23754 712,620
59684 119,368
2014 4,028
917 18,340
15513 15,513
15513 93,078
-
23754 498,834
59749 59,749
2079 2,079
982 13,748 15578 77,890
-
27028 973,008
67820 67,820
2547 2,547
1112 26,688
15708 219,912
-
![Page 1627: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1627.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1627/2939
31775 3,622,350
100274 401,096 3015 12,060
1495 113,620
63740 63,740
50504 50,504
28093 28,093
21405 449,505
15448 30,896
-
-
-
7452 819,720
5322 478,980
-
1468 954,200
785 667,250
![Page 1628: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1628.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1628/2939
2124 165,672
53 254,400
213 1,001,100
69 20,700
83 240,700
247 518,700
-
1590 795,000
![Page 1629: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1629.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1629/2939
-
884 2,824,380
463 570,416
133 1,263,500
69 324,300
166 1,826,000
677 119,152
384 176,640
634 174,350
1664 16,640
![Page 1630: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1630.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1630/2939
384 21,120
302 122,008
463 885,256
1433 117,506
348 87,000
450 79,650
2016 963,648
4919 108,218
4854 43,686
2748 54,960
7092 156,024
17727 159,543
26000 26,000
![Page 1631: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1631.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1631/2939
26000 78,000
20092 100,460
81 810
564 2,256
1299 5,196
81 810
294 119,364
1192 21,456
199 14,925
296 50,024
1104 8,832
191 1,910
302 170,328
1442 50,470
341 64,790
605 330,330
1416 36,816
![Page 1632: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1632.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1632/2939
311 32,655
1130 6,780
372 212,784
-
-
124 12,400
144 547,200
195 9,750
421 21,050 55 5,500
64 6,400
86 60,200
109 10,900
-
984 334,560
135 18,360
1370 164,400
170 8,160
2362 472,400
251 20,080
![Page 1633: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1633.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1633/2939
705 52,875
108 3,240
842 21,050
139 1,390
-
-
-
-
7042 7,042
-
-
![Page 1634: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1634.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1634/2939
-
-
1499 89,940
2105 52,625
3225 80,625
3566 142,640
4321 86,420
-
-
-
-
5221 26,105
6643 13,286
7563 37,815
9234 9,234
-
848 27,136
1152 36,864
9022 36,088
![Page 1635: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1635.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1635/2939
22 121,000
56 84,000
59 147,500
103 154,500
-
26 182,000
698 27,920
59 147,500
-
-
-
![Page 1636: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1636.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1636/2939
-
1401 3,964,830
1113 445,200
919 827,100
618 33,990
528 16,896
260 702,000
205 153,750 177 513,300
134 509,200
277 886,400
169 16,055
121 955,900
893 392,920
426 276,900
218 196,200
159 36,570
101 2,020
66 21,780
602 60,200
326 32,600
237 11,850
207 517,500 -
2945 106,020
2257 9,028
![Page 1637: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1637.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1637/2939
1932 50,232
1330 5,320
1195 4,780
980 56,840
767 42,952
475 105,450
465 113,460
430 28,380
283 566
273 36,036
780 62,400
650 13,000
390 17,160
260 4,160
195 780
130 4,160
403 1,612
311 1,244
294 1,176
282 22,560
256 6,912
-
-
-
![Page 1638: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1638.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1638/2939
7019 168,456
21230 764,280
277 102,490
144 50,400
545 185,300
99 255,420
3497 524,550
-
-
![Page 1639: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1639.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1639/2939
-
-
1026 410,400
1339 468,650
-
722 649,800
789 39,450
878 702,400
1310 78,600
3900 273,000
1175 11,750
-
-
-
2877 8,631
2175 54,375
234 46,800
368 3,680
4263 42,630
1221 2,442
1713 10,278
![Page 1640: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1640.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1640/2939
300 600
234 1,404
9126 91,260
611 6,110
-
-
-
382 64,940
88 30,800
2012 185,104
-
-
![Page 1641: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1641.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1641/2939
-
67339 6,195,188
-
-
13000 1,196,000
-
31884 956,520
-
![Page 1642: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1642.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1642/2939
-
27061 270,610
127595 5,358,990
31604 126,416
40433 161,732
-
-
![Page 1643: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1643.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1643/2939
-
32971 329,710
-
-
32418 1,037,376
32971 329,710
41846 83,692
-
-
![Page 1644: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1644.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1644/2939
55107 330,642
27061 162,366
![Page 1645: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1645.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1645/2939
1177522 2,355,044
263527 527,054
1056752 1,056,752
219822 219,822
![Page 1646: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1646.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1646/2939
545835 1,091,670
352236 352,236
117845 117,845
![Page 1647: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1647.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1647/2939
468781 937,562
-
-
-
-
166403 499,209
568 255,600
![Page 1648: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1648.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1648/2939
26173 78,519
28672 172,032
547 54,700
10 3,000
-
12440 37,320
-
-
-
-
7000000 7,000,000
-
-
-
-
- -
-
-
-
-
-
-
-
![Page 1649: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1649.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1649/2939
-
-
-
-
-
-
-
2227 659,192
-
-
1806 939,120
-
-
1403 213,256
-
-
1985 214,380
-
- 4930 2,780,520
-
-
4918 127,868
-
-
2872 86,160
-
- 2526 242,496
-
-
5543 16,629
-
-
![Page 1650: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1650.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1650/2939
919 9,190
-
-
2185 17,480
- -
2882 129,690
-
-
919 552,319
-
-
675 58,050
-
- 985 142,825
-
-
6605 99,075
-
-
8450 253,500
-
-
11700 351,000
-
-
-
-
-
-
3312 82,800
-
![Page 1651: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1651.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1651/2939
4363 436,300
17727 177,270
6157 307,850
2019 1,021,614
1629 107,514
4082 983,762
5616 16,848
187 374,000
133 266,000
![Page 1652: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1652.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1652/2939
6916 221,312
3549 1,249,248
2912 652,288
2548 163,072
5187 663,936
2730 174,720
5278 337,792
6552 209,664
3458 1,217,216
![Page 1653: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1653.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1653/2939
3185 713,440
4004 256,256
5187 663,936
2730 174,720
6500 416,000
8372 33,488
12194 97,552
26390 527,800
8736 270,816
6552 39,312
4004 56,056
2730 21,840
![Page 1654: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1654.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1654/2939
5200 52,000
10400 41,600
2860 148,720
15600 109,200
15600 62,400
18200 72,800
20150 80,600
10400 10,400
![Page 1655: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1655.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1655/2939
12651437 25,302,874
-
-
-
1089998 2,179,996
![Page 1656: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1656.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1656/2939
1109652 2,219,304
6773379 6,773,379
-
2074355 2,074,355
![Page 1657: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1657.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1657/2939
4375 218,750
33221 132,884
6459 103,344
9043 542,580
33919 67,838
-
1461 58,440
![Page 1658: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1658.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1658/2939
552 16,560
73051 146,102
21788 43,576
-
1261 126,100 1368 136,800
2755 5,510
127032 1,524,384
![Page 1659: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1659.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1659/2939
-
-
-
-
-
-
-
5182450 10,364,900
3889600 7,779,200
![Page 1660: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1660.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1660/2939
2342600 4,685,200
-
-
-
-
-
5006736 5,006,736
![Page 1661: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1661.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1661/2939
3808750 3,808,750
-
-
-
-
-
2277451 2,277,451
-
-
-
-
26070 234,630 403145 403,145
529458 529,458
219 109,500
-
-
![Page 1662: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1662.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1662/2939
-
-
-
-
-
-
-
-
-
-
-
1200687 1,200,687
-
![Page 1663: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1663.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1663/2939
-
-
-
-
1051002 1,051,002
-
-
-
-
74600 820,600
73181 1,683,163
66843 534,744
65424 1,308,480
63910 1,278,200
60316 1,990,428 59275 3,971,425
-
67316 134,632
60883 974,128
60031 300,155
58991 530,919
-
77721 310,884
![Page 1664: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1664.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1664/2939
-
97682 195,364
152954 152,954
-
134008 268,016
162414 487,242
170833 2,391,662
-
586836 586,836
893522 1,787,044
1121826 1,121,826
1164122 1,164,122
1208627 1,208,627
1363625 1,363,625
1501818 4,505,454
345947 345,947
-
3976 238,560 4638 111,312
6058 333,190
9463 681,336
-
444 310,356
![Page 1665: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1665.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1665/2939
596 203,832
826 756,616
1058 378,764
1138 281,086
1355 453,925
1561 92,099
1694 13,552
2109 297,369 2227 35,632
2323 355,419
2449 313,472
308 539,000
289 309,230
-
487 273,694
308 183,568
-
-
-
-
387572 387,572
294656 294,656
253367 253,367
![Page 1666: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1666.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1666/2939
-
-
131048 262,096
75755 227,265
66097 2,115,104
52992 105,984
- -
224053 672,159
182114 364,228
137967 1,103,736
-
-
![Page 1667: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1667.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1667/2939
-
639933 1,919,799
-
444 94,572
596 75,990
826 248,626
1058 330,096
1138 31,864 1561 455,812
1694 13,552
-
487 50,161
308 34,496
439 187,892
308 73,612
![Page 1668: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1668.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1668/2939
-
667 32,016
838 33,520
1049 2,098
-
-
-
-
-
-
-
2003871 10,019,355
-
1300 565,500
1501 652,935
![Page 1669: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1669.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1669/2939
1047 52,350
320 144,000
45233 226,165
15679 78,395
353746 353,746
5829 373,056
5120 327,680
-
853 46,915
647 7,764
-
3903 19,515
-
- -
![Page 1670: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1670.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1670/2939
-
-
-
2513 30,156
-
644 7,728
-
853 22,178
647 29,115
-
14322 57,288
-
3903 7,806
-
25323 25,323
![Page 1671: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1671.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1671/2939
-
109220 109,220
-
32979 32,979
-
20756 20,756
3552 14,208
2580 10,320
-
1421 1,421
-
-
1764 13,230
1501 327,218
1258 503,829
1127 1,024,443
![Page 1672: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1672.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1672/2939
960 1,699,680
1981 174,328
581 379,393
1060 79,500
-
358 117,066
435 11,745
487 4,627 -
465 101,370
624 11,232
776 4,656
-
2652 29,172
2652 15,912
2652 53,040
2652 74,256
![Page 1673: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1673.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1673/2939
-
2652 84,864
2652 55,692
-
500 12,000
8591 21,478
13624 108,720
-
1204 237,188
1204 57,792
12775 34,493
14064 84,384
8093 48,558
11223 23,568
![Page 1674: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1674.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1674/2939
10987 109,870
11855 1,778
14367 707,575
-
621 308,637
666 477,522
832 54,912
1216 76,608
1729 32,851
-
-
614334 1,228,668
-
-
-
448628 897,256
- -
-
175142 175,142
-
-
-
184717 184,717
-
![Page 1675: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1675.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1675/2939
-
-
132162 132,162
-
-
-
68202 136,404
- -
-
68202 68,202
-
-
-
35389 35,389
-
-
-
35389 35,389 -
-
-
35389 35,389
-
-
-
40499 80,998
-
-
-
40499 80,998 -
-
-
45549 91,098
-
-
-
45549 45,549
-
-
- 45549 136,647
-
-
-
47119 47,119
-
-
-
![Page 1676: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1676.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1676/2939
47119 47,119
-
-
-
56685 56,685
-
-
- 56685 56,685
-
-
-
117664 117,664
-
-
-
177902 711,608
-
- -
-
24766 24,766 -
-
-
21101 21,101
-
-
-
-
6482 12,964
-
-
![Page 1677: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1677.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1677/2939
-
18125 54,375
-
-
-
14183 936,078
-
- -
10715 300,020
-
-
-
8928 1,687,392
-
-
-
-
56830 113,660
- -
-
48993 97,986
-
-
-
219 536,550
-
-
-
![Page 1678: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1678.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1678/2939
48667 340,669
-
-
58814 117,628
-
-
58814 58,814
-
-
53784 107,568
-
-
![Page 1679: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1679.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1679/2939
66673 133,346
-
-
706 31,770
501 42,585
2088 41,760
-
632 2,528
592 5,920
2964 11,856
230 3,220
9342 2,924,046
-
-
-
1987 317,920
-
-
![Page 1680: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1680.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1680/2939
911625 911,625
-
663000 1,326,000
-
143650 143,650
-
-
-
![Page 1681: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1681.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1681/2939
193375 193,375
-
193375 193,375
-
-
155 4,650
188 5,640
243 7,290
-
-
66 132
![Page 1682: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1682.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1682/2939
99 198
133 798
-
0 -
-
99450 198,900
35360 176,800
21548 538,700
15470 30,940
14365 14,365
-
7293 116,688
6188 24,752
5525 77,350
4420 30,940
-
7735 85,085
6630 324,870
884 6,188
-
66300 66,300
39780 636,480
13260 39,780
11050 44,200
-
4641 2,691,780
2873 3,441,854
![Page 1683: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1683.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1683/2939
1492 55,204
-
13260 119,340
8840 35,360
4641 88,179
2873 499,902
1989 354,042
1492 56,696
1216 113,088
995 72,635
718 22,258 5967 155,142
4973 129,298
6630 172,380
15470 324,870
6078 328,212
![Page 1684: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1684.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1684/2939
19890 1,491,750
13260 994,500
13260 729,300
19890 258,570
398 384,070
-
1105 28,730
11050 11,050
![Page 1685: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1685.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1685/2939
60775 425,425
-
-
2763 975,339
1989 244,647
1547 595,595 1105 651,950
939 1,422,585
718 250,582
635 539,115
475 1,729,950
-
7293 145,860
6188 24,752
5746 109,174
5525 33,150 4420 17,680
-
7735 247,520
6630 106,080
884 6,188
1989 17,901
387 268,191
![Page 1686: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1686.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1686/2939
387 359,910
442 304,980
-
5525 38,675
5525 11,050
5525 88,400
4420 13,260
-
1768 1,207,544
122 1,077,626
66300 66,300
55250 55,250
- -
6630 676,260
-
-
-
2873 356,252
-
![Page 1687: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1687.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1687/2939
-
-
3315 66,300
-
-
-
1989 9,945
-
-
-
-
638394 638,394
566965 566,965
275655 826,965
-
3429 1,947,672
4016 3,080,272
12484 249,680
10452 1,003,392
![Page 1688: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1688.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1688/2939
4755 513,540
3478 274,762
4458 106,992
3182 79,550
162 55,404
135 2,160,000
73024 292,096
130 1,300,000
135722 135,722
-
-
296032 296,032
79180 79,180
2617 81,127
![Page 1689: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1689.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1689/2939
1565 29,735
1132 328,280
35423 106,269
19945 119,670
120 1,500,000
7330 7,330
9212 9,212
32680 32,680
50242 50,242
-
-
-
-
36134 505,876
36853 331,677
72270 72,270
72270 289,080
108405 108,405
6939 499,608
68960 68,960 3744 67,392
6649 66,490
489 18,582
1151 32,228
-
187 495,550
![Page 1690: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1690.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1690/2939
260 1,638,000
130 260,000
99361 99,361
466 233,000
547715 547,715
-
289801 1,159,204
278226 556,452
264751 1,323,755
264751 1,059,004
-
324641 2,272,487
486604 486,604
753514 753,514
![Page 1691: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1691.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1691/2939
59936 2,157,696
27350 547,000
1151 230,200
-
-
14525 174,300
23826 190,608
119780 119,780
96456 1,543,296
1151 23,020
5470 92,990
123570 494,280
-
114 1,436,400
128 640,000
22168 487,696
4895 14,685
![Page 1692: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1692.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1692/2939
360 1,800,000
-
43118 1,552,248
309669 309,669
3026252 3,026,252
79180 316,720
1151 92,080
17994 71,976
2488 19,904
-
-
118554 711,324
3715 2,043,250
85664 85,664
36249 217,494
30529 183,174
4970 69,580 67650 67,650
17994 215,928
146065 146,065
54702 54,702
![Page 1693: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1693.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1693/2939
2880 2,880
2880 2,880
-
-
685292 685,292
44627 44,627
132 33,000
2017 48,408
2017 48,408
132446 132,446
223137 223,137
3744 3,744
130 32,500
63341 63,341
-
-
23033 23,033
2017 24,204
130 19,500
-
-
59010 59,010
14109 84,654
979 5,874
3744 3,744
![Page 1694: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1694.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1694/2939
183 27,450
-
-
-
532656 532,656
-
339754 339,754
-
1362335 1,362,335
-
97893 391,572
27350 27,350
22168 22,168
-
![Page 1695: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1695.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1695/2939
-
94297 94,297
157161 157,161
157161 157,161
31433 31,433
31433 31,433
31433 31,433
31433 31,433
282893 282,893
-
18500 37,000
-
3377 13,508
25088 25,088
22315 22,315
520449 520,449
13261 26,522
-
3377 6,754
7181 21,543
2488 7,464
16740 16,740
3068 9,204
38582 38,582
-
![Page 1696: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1696.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1696/2939
1497 5,988
3068 21,476
16645 16,645
38582 38,582
3377 3,377
8460 8,460
-
109 763,000
114 228,000
171 85,500
130 364,000
1123 1,965,250
1522 1,522,000
1165 128,150
1,728,888,475
Grand Total 1,730,124,013
2% 34,602,480
fter rebate 1,695,521,533
![Page 1697: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1697.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1697/2939
![Page 1698: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1698.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1698/2939
![Page 1699: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1699.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1699/2939
![Page 1700: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1700.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1700/2939
![Page 1701: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1701.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1701/2939
![Page 1702: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1702.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1702/2939
![Page 1703: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1703.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1703/2939
![Page 1704: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1704.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1704/2939
![Page 1705: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1705.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1705/2939
![Page 1706: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1706.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1706/2939
![Page 1707: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1707.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1707/2939
![Page 1708: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1708.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1708/2939
![Page 1709: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1709.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1709/2939
![Page 1710: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1710.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1710/2939
![Page 1711: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1711.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1711/2939
![Page 1712: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1712.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1712/2939
![Page 1713: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1713.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1713/2939
![Page 1714: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1714.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1714/2939
![Page 1715: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1715.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1715/2939
![Page 1716: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1716.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1716/2939
![Page 1717: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1717.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1717/2939
![Page 1718: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1718.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1718/2939
![Page 1719: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1719.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1719/2939
![Page 1720: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1720.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1720/2939
![Page 1721: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1721.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1721/2939
![Page 1722: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1722.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1722/2939
![Page 1723: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1723.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1723/2939
![Page 1724: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1724.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1724/2939
![Page 1725: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1725.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1725/2939
![Page 1726: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1726.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1726/2939
![Page 1727: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1727.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1727/2939
![Page 1728: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1728.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1728/2939
![Page 1729: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1729.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1729/2939
![Page 1730: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1730.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1730/2939
![Page 1731: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1731.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1731/2939
![Page 1732: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1732.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1732/2939
![Page 1733: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1733.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1733/2939
![Page 1734: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1734.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1734/2939
![Page 1735: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1735.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1735/2939
![Page 1736: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1736.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1736/2939
![Page 1737: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1737.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1737/2939
![Page 1738: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1738.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1738/2939
![Page 1739: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1739.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1739/2939
![Page 1740: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1740.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1740/2939
![Page 1741: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1741.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1741/2939
![Page 1742: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1742.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1742/2939
![Page 1743: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1743.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1743/2939
![Page 1744: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1744.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1744/2939
![Page 1745: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1745.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1745/2939
![Page 1746: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1746.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1746/2939
![Page 1747: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1747.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1747/2939
![Page 1748: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1748.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1748/2939
![Page 1749: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1749.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1749/2939
![Page 1750: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1750.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1750/2939
![Page 1751: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1751.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1751/2939
![Page 1752: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1752.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1752/2939
![Page 1753: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1753.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1753/2939
![Page 1754: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1754.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1754/2939
![Page 1755: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1755.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1755/2939
![Page 1756: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1756.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1756/2939
![Page 1757: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1757.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1757/2939
![Page 1758: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1758.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1758/2939
![Page 1759: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1759.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1759/2939
![Page 1760: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1760.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1760/2939
![Page 1761: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1761.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1761/2939
![Page 1762: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1762.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1762/2939
![Page 1763: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1763.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1763/2939
![Page 1764: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1764.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1764/2939
![Page 1765: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1765.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1765/2939
![Page 1766: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1766.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1766/2939
![Page 1767: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1767.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1767/2939
![Page 1768: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1768.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1768/2939
![Page 1769: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1769.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1769/2939
![Page 1770: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1770.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1770/2939
![Page 1771: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1771.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1771/2939
![Page 1772: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1772.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1772/2939
![Page 1773: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1773.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1773/2939
![Page 1774: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1774.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1774/2939
![Page 1775: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1775.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1775/2939
![Page 1776: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1776.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1776/2939
![Page 1777: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1777.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1777/2939
![Page 1778: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1778.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1778/2939
![Page 1779: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1779.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1779/2939
![Page 1780: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1780.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1780/2939
![Page 1781: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1781.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1781/2939
![Page 1782: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1782.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1782/2939
![Page 1783: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1783.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1783/2939
![Page 1784: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1784.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1784/2939
![Page 1785: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1785.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1785/2939
![Page 1786: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1786.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1786/2939
![Page 1787: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1787.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1787/2939
![Page 1788: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1788.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1788/2939
![Page 1789: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1789.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1789/2939
![Page 1790: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1790.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1790/2939
![Page 1791: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1791.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1791/2939
![Page 1792: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1792.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1792/2939
![Page 1793: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1793.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1793/2939
![Page 1794: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1794.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1794/2939
![Page 1795: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1795.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1795/2939
![Page 1796: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1796.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1796/2939
![Page 1797: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1797.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1797/2939
![Page 1798: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1798.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1798/2939
![Page 1799: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1799.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1799/2939
![Page 1800: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1800.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1800/2939
![Page 1801: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1801.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1801/2939
![Page 1802: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1802.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1802/2939
![Page 1803: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1803.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1803/2939
![Page 1804: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1804.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1804/2939
![Page 1805: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1805.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1805/2939
![Page 1806: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1806.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1806/2939
![Page 1807: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1807.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1807/2939
![Page 1808: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1808.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1808/2939
![Page 1809: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1809.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1809/2939
![Page 1810: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1810.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1810/2939
![Page 1811: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1811.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1811/2939
![Page 1812: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1812.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1812/2939
![Page 1813: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1813.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1813/2939
![Page 1814: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1814.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1814/2939
![Page 1815: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1815.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1815/2939
![Page 1816: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1816.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1816/2939
![Page 1817: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1817.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1817/2939
![Page 1818: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1818.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1818/2939
![Page 1819: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1819.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1819/2939
![Page 1820: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1820.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1820/2939
![Page 1821: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1821.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1821/2939
![Page 1822: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1822.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1822/2939
![Page 1823: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1823.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1823/2939
![Page 1824: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1824.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1824/2939
![Page 1825: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1825.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1825/2939
![Page 1826: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1826.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1826/2939
![Page 1827: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1827.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1827/2939
![Page 1828: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1828.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1828/2939
![Page 1829: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1829.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1829/2939
![Page 1830: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1830.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1830/2939
![Page 1831: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1831.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1831/2939
![Page 1832: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1832.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1832/2939
![Page 1833: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1833.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1833/2939
![Page 1834: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1834.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1834/2939
![Page 1835: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1835.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1835/2939
![Page 1836: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1836.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1836/2939
![Page 1837: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1837.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1837/2939
![Page 1838: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1838.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1838/2939
![Page 1839: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1839.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1839/2939
![Page 1840: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1840.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1840/2939
![Page 1841: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1841.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1841/2939
![Page 1842: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1842.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1842/2939
![Page 1843: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1843.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1843/2939
![Page 1844: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1844.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1844/2939
![Page 1845: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1845.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1845/2939
![Page 1846: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1846.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1846/2939
![Page 1847: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1847.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1847/2939
![Page 1848: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1848.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1848/2939
![Page 1849: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1849.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1849/2939
![Page 1850: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1850.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1850/2939
![Page 1851: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1851.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1851/2939
![Page 1852: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1852.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1852/2939
![Page 1853: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1853.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1853/2939
![Page 1854: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1854.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1854/2939
![Page 1855: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1855.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1855/2939
![Page 1856: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1856.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1856/2939
![Page 1857: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1857.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1857/2939
![Page 1858: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1858.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1858/2939
![Page 1859: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1859.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1859/2939
![Page 1860: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1860.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1860/2939
![Page 1861: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1861.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1861/2939
![Page 1862: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1862.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1862/2939
![Page 1863: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1863.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1863/2939
![Page 1864: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1864.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1864/2939
![Page 1865: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1865.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1865/2939
![Page 1866: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1866.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1866/2939
![Page 1867: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1867.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1867/2939
![Page 1868: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1868.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1868/2939
![Page 1869: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1869.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1869/2939
![Page 1870: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1870.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1870/2939
![Page 1871: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1871.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1871/2939
![Page 1872: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1872.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1872/2939
![Page 1873: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1873.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1873/2939
![Page 1874: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1874.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1874/2939
![Page 1875: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1875.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1875/2939
![Page 1876: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1876.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1876/2939
![Page 1877: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1877.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1877/2939
![Page 1878: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1878.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1878/2939
![Page 1879: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1879.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1879/2939
![Page 1880: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1880.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1880/2939
![Page 1881: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1881.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1881/2939
![Page 1882: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1882.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1882/2939
![Page 1883: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1883.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1883/2939
![Page 1884: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1884.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1884/2939
![Page 1885: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1885.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1885/2939
![Page 1886: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1886.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1886/2939
![Page 1887: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1887.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1887/2939
![Page 1888: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1888.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1888/2939
![Page 1889: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1889.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1889/2939
![Page 1890: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1890.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1890/2939
![Page 1891: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1891.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1891/2939
![Page 1892: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1892.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1892/2939
![Page 1893: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1893.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1893/2939
![Page 1894: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1894.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1894/2939
![Page 1895: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1895.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1895/2939
![Page 1896: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1896.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1896/2939
![Page 1897: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1897.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1897/2939
![Page 1898: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1898.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1898/2939
![Page 1899: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1899.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1899/2939
![Page 1900: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1900.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1900/2939
![Page 1901: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1901.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1901/2939
![Page 1902: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1902.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1902/2939
![Page 1903: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1903.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1903/2939
![Page 1904: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1904.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1904/2939
![Page 1905: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1905.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1905/2939
![Page 1906: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1906.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1906/2939
![Page 1907: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1907.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1907/2939
![Page 1908: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1908.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1908/2939
![Page 1909: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1909.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1909/2939
![Page 1910: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1910.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1910/2939
![Page 1911: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1911.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1911/2939
![Page 1912: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1912.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1912/2939
![Page 1913: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1913.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1913/2939
![Page 1914: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1914.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1914/2939
![Page 1915: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1915.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1915/2939
![Page 1916: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1916.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1916/2939
![Page 1917: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1917.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1917/2939
![Page 1918: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1918.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1918/2939
![Page 1919: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1919.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1919/2939
![Page 1920: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1920.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1920/2939
![Page 1921: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1921.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1921/2939
![Page 1922: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1922.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1922/2939
![Page 1923: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1923.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1923/2939
![Page 1924: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1924.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1924/2939
![Page 1925: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1925.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1925/2939
![Page 1926: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1926.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1926/2939
![Page 1927: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1927.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1927/2939
![Page 1928: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1928.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1928/2939
![Page 1929: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1929.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1929/2939
![Page 1930: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1930.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1930/2939
![Page 1931: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1931.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1931/2939
![Page 1932: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1932.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1932/2939
![Page 1933: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1933.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1933/2939
![Page 1934: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1934.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1934/2939
![Page 1935: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1935.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1935/2939
![Page 1936: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1936.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1936/2939
![Page 1937: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1937.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1937/2939
![Page 1938: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1938.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1938/2939
![Page 1939: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1939.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1939/2939
![Page 1940: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1940.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1940/2939
![Page 1941: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1941.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1941/2939
![Page 1942: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1942.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1942/2939
![Page 1943: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1943.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1943/2939
![Page 1944: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1944.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1944/2939
![Page 1945: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1945.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1945/2939
![Page 1946: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1946.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1946/2939
![Page 1947: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1947.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1947/2939
![Page 1948: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1948.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1948/2939
![Page 1949: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1949.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1949/2939
![Page 1950: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1950.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1950/2939
![Page 1951: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1951.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1951/2939
![Page 1952: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1952.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1952/2939
![Page 1953: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1953.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1953/2939
![Page 1954: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1954.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1954/2939
![Page 1955: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1955.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1955/2939
![Page 1956: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1956.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1956/2939
![Page 1957: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1957.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1957/2939
![Page 1958: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1958.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1958/2939
![Page 1959: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1959.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1959/2939
![Page 1960: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1960.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1960/2939
![Page 1961: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1961.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1961/2939
![Page 1962: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1962.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1962/2939
![Page 1963: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1963.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1963/2939
![Page 1964: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1964.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1964/2939
![Page 1965: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1965.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1965/2939
![Page 1966: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1966.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1966/2939
![Page 1967: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1967.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1967/2939
![Page 1968: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1968.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1968/2939
![Page 1969: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1969.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1969/2939
![Page 1970: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1970.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1970/2939
![Page 1971: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1971.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1971/2939
![Page 1972: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1972.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1972/2939
![Page 1973: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1973.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1973/2939
![Page 1974: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1974.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1974/2939
![Page 1975: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1975.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1975/2939
![Page 1976: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1976.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1976/2939
![Page 1977: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1977.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1977/2939
![Page 1978: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1978.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1978/2939
![Page 1979: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1979.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1979/2939
![Page 1980: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1980.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1980/2939
![Page 1981: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1981.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1981/2939
![Page 1982: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1982.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1982/2939
![Page 1983: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1983.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1983/2939
![Page 1984: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1984.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1984/2939
![Page 1985: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1985.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1985/2939
![Page 1986: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1986.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1986/2939
![Page 1987: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1987.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1987/2939
![Page 1988: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1988.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1988/2939
![Page 1989: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1989.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1989/2939
![Page 1990: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1990.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1990/2939
![Page 1991: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1991.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1991/2939
![Page 1992: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1992.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1992/2939
![Page 1993: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1993.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1993/2939
![Page 1994: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1994.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1994/2939
![Page 1995: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1995.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1995/2939
![Page 1996: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1996.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1996/2939
![Page 1997: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1997.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1997/2939
![Page 1998: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1998.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1998/2939
![Page 1999: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/1999.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 1999/2939
![Page 2000: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2000.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2000/2939
![Page 2001: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2001.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2001/2939
![Page 2002: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2002.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2002/2939
![Page 2003: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2003.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2003/2939
![Page 2004: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2004.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2004/2939
![Page 2005: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2005.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2005/2939
![Page 2006: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2006.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2006/2939
![Page 2007: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2007.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2007/2939
![Page 2008: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2008.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2008/2939
![Page 2009: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2009.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2009/2939
![Page 2010: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2010.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2010/2939
![Page 2011: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2011.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2011/2939
![Page 2012: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2012.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2012/2939
![Page 2013: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2013.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2013/2939
![Page 2014: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2014.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2014/2939
![Page 2015: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2015.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2015/2939
![Page 2016: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2016.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2016/2939
![Page 2017: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2017.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2017/2939
![Page 2018: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2018.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2018/2939
![Page 2019: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2019.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2019/2939
![Page 2020: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2020.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2020/2939
![Page 2021: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2021.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2021/2939
![Page 2022: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2022.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2022/2939
![Page 2023: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2023.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2023/2939
![Page 2024: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2024.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2024/2939
![Page 2025: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2025.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2025/2939
![Page 2026: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2026.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2026/2939
![Page 2027: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2027.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2027/2939
![Page 2028: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2028.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2028/2939
![Page 2029: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2029.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2029/2939
![Page 2030: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2030.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2030/2939
![Page 2031: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2031.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2031/2939
![Page 2032: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2032.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2032/2939
![Page 2033: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2033.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2033/2939
![Page 2034: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2034.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2034/2939
![Page 2035: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2035.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2035/2939
![Page 2036: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2036.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2036/2939
![Page 2037: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2037.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2037/2939
![Page 2038: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2038.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2038/2939
![Page 2039: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2039.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2039/2939
![Page 2040: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2040.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2040/2939
![Page 2041: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2041.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2041/2939
![Page 2042: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2042.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2042/2939
![Page 2043: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2043.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2043/2939
![Page 2044: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2044.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2044/2939
![Page 2045: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2045.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2045/2939
![Page 2046: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2046.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2046/2939
![Page 2047: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2047.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2047/2939
![Page 2048: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2048.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2048/2939
![Page 2049: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2049.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2049/2939
![Page 2050: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2050.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2050/2939
![Page 2051: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2051.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2051/2939
![Page 2052: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2052.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2052/2939
![Page 2053: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2053.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2053/2939
![Page 2054: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2054.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2054/2939
![Page 2055: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2055.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2055/2939
![Page 2056: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2056.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2056/2939
![Page 2057: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2057.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2057/2939
![Page 2058: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2058.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2058/2939
![Page 2059: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2059.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2059/2939
![Page 2060: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2060.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2060/2939
![Page 2061: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2061.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2061/2939
![Page 2062: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2062.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2062/2939
![Page 2063: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2063.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2063/2939
![Page 2064: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2064.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2064/2939
![Page 2065: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2065.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2065/2939
![Page 2066: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2066.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2066/2939
![Page 2067: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2067.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2067/2939
![Page 2068: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2068.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2068/2939
![Page 2069: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2069.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2069/2939
![Page 2070: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2070.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2070/2939
![Page 2071: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2071.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2071/2939
![Page 2072: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2072.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2072/2939
![Page 2073: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2073.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2073/2939
![Page 2074: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2074.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2074/2939
![Page 2075: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2075.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2075/2939
![Page 2076: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2076.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2076/2939
![Page 2077: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2077.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2077/2939
![Page 2078: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2078.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2078/2939
![Page 2079: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2079.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2079/2939
![Page 2080: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2080.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2080/2939
![Page 2081: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2081.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2081/2939
![Page 2082: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2082.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2082/2939
![Page 2083: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2083.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2083/2939
![Page 2084: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2084.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2084/2939
![Page 2085: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2085.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2085/2939
![Page 2086: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2086.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2086/2939
![Page 2087: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2087.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2087/2939
![Page 2088: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2088.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2088/2939
![Page 2089: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2089.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2089/2939
![Page 2090: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2090.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2090/2939
![Page 2091: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2091.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2091/2939
![Page 2092: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2092.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2092/2939
![Page 2093: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2093.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2093/2939
![Page 2094: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2094.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2094/2939
![Page 2095: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2095.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2095/2939
![Page 2096: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2096.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2096/2939
![Page 2097: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2097.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2097/2939
![Page 2098: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2098.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2098/2939
![Page 2099: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2099.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2099/2939
![Page 2100: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2100.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2100/2939
![Page 2101: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2101.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2101/2939
![Page 2102: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2102.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2102/2939
![Page 2103: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2103.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2103/2939
![Page 2104: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2104.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2104/2939
![Page 2105: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2105.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2105/2939
![Page 2106: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2106.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2106/2939
![Page 2107: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2107.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2107/2939
![Page 2108: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2108.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2108/2939
![Page 2109: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2109.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2109/2939
![Page 2110: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2110.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2110/2939
![Page 2111: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2111.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2111/2939
![Page 2112: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2112.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2112/2939
![Page 2113: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2113.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2113/2939
![Page 2114: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2114.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2114/2939
![Page 2115: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2115.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2115/2939
![Page 2116: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2116.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2116/2939
![Page 2117: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2117.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2117/2939
![Page 2118: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2118.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2118/2939
![Page 2119: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2119.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2119/2939
![Page 2120: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2120.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2120/2939
![Page 2121: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2121.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2121/2939
![Page 2122: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2122.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2122/2939
![Page 2123: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2123.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2123/2939
![Page 2124: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2124.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2124/2939
![Page 2125: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2125.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2125/2939
![Page 2126: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2126.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2126/2939
![Page 2127: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2127.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2127/2939
![Page 2128: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2128.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2128/2939
![Page 2129: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2129.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2129/2939
![Page 2130: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2130.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2130/2939
![Page 2131: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2131.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2131/2939
![Page 2132: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2132.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2132/2939
![Page 2133: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2133.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2133/2939
![Page 2134: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2134.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2134/2939
![Page 2135: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2135.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2135/2939
![Page 2136: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2136.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2136/2939
![Page 2137: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2137.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2137/2939
![Page 2138: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2138.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2138/2939
![Page 2139: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2139.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2139/2939
![Page 2140: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2140.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2140/2939
![Page 2141: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2141.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2141/2939
![Page 2142: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2142.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2142/2939
![Page 2143: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2143.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2143/2939
![Page 2144: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2144.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2144/2939
![Page 2145: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2145.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2145/2939
![Page 2146: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2146.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2146/2939
![Page 2147: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2147.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2147/2939
![Page 2148: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2148.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2148/2939
![Page 2149: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2149.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2149/2939
![Page 2150: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2150.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2150/2939
![Page 2151: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2151.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2151/2939
![Page 2152: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2152.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2152/2939
![Page 2153: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2153.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2153/2939
![Page 2154: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2154.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2154/2939
![Page 2155: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2155.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2155/2939
![Page 2156: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2156.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2156/2939
![Page 2157: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2157.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2157/2939
![Page 2158: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2158.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2158/2939
![Page 2159: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2159.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2159/2939
![Page 2160: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2160.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2160/2939
![Page 2161: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2161.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2161/2939
![Page 2162: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2162.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2162/2939
![Page 2163: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2163.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2163/2939
![Page 2164: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2164.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2164/2939
![Page 2165: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2165.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2165/2939
![Page 2166: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2166.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2166/2939
![Page 2167: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2167.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2167/2939
![Page 2168: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2168.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2168/2939
![Page 2169: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2169.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2169/2939
![Page 2170: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2170.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2170/2939
![Page 2171: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2171.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2171/2939
![Page 2172: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2172.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2172/2939
![Page 2173: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2173.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2173/2939
![Page 2174: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2174.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2174/2939
![Page 2175: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2175.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2175/2939
![Page 2176: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2176.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2176/2939
![Page 2177: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2177.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2177/2939
![Page 2178: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2178.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2178/2939
![Page 2179: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2179.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2179/2939
![Page 2180: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2180.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2180/2939
![Page 2181: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2181.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2181/2939
![Page 2182: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2182.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2182/2939
![Page 2183: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2183.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2183/2939
![Page 2184: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2184.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2184/2939
![Page 2185: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2185.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2185/2939
![Page 2186: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2186.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2186/2939
![Page 2187: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2187.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2187/2939
![Page 2188: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2188.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2188/2939
![Page 2189: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2189.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2189/2939
![Page 2190: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2190.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2190/2939
![Page 2191: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2191.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2191/2939
![Page 2192: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2192.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2192/2939
![Page 2193: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2193.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2193/2939
![Page 2194: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2194.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2194/2939
![Page 2195: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2195.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2195/2939
![Page 2196: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2196.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2196/2939
![Page 2197: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2197.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2197/2939
![Page 2198: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2198.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2198/2939
![Page 2199: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2199.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2199/2939
![Page 2200: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2200.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2200/2939
![Page 2201: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2201.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2201/2939
![Page 2202: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2202.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2202/2939
![Page 2203: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2203.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2203/2939
![Page 2204: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2204.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2204/2939
![Page 2205: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2205.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2205/2939
![Page 2206: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2206.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2206/2939
![Page 2207: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2207.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2207/2939
![Page 2208: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2208.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2208/2939
![Page 2209: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2209.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2209/2939
![Page 2210: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2210.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2210/2939
![Page 2211: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2211.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2211/2939
![Page 2212: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2212.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2212/2939
![Page 2213: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2213.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2213/2939
![Page 2214: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2214.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2214/2939
![Page 2215: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2215.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2215/2939
![Page 2216: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2216.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2216/2939
![Page 2217: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2217.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2217/2939
![Page 2218: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2218.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2218/2939
![Page 2219: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2219.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2219/2939
![Page 2220: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2220.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2220/2939
![Page 2221: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2221.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2221/2939
![Page 2222: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2222.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2222/2939
![Page 2223: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2223.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2223/2939
![Page 2224: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2224.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2224/2939
![Page 2225: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2225.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2225/2939
![Page 2226: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2226.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2226/2939
![Page 2227: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2227.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2227/2939
![Page 2228: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2228.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2228/2939
![Page 2229: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2229.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2229/2939
![Page 2230: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2230.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2230/2939
![Page 2231: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2231.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2231/2939
![Page 2232: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2232.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2232/2939
![Page 2233: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2233.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2233/2939
![Page 2234: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2234.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2234/2939
![Page 2235: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2235.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2235/2939
![Page 2236: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2236.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2236/2939
![Page 2237: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2237.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2237/2939
![Page 2238: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2238.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2238/2939
![Page 2239: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2239.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2239/2939
![Page 2240: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2240.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2240/2939
![Page 2241: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2241.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2241/2939
![Page 2242: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2242.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2242/2939
![Page 2243: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2243.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2243/2939
![Page 2244: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2244.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2244/2939
![Page 2245: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2245.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2245/2939
![Page 2246: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2246.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2246/2939
![Page 2247: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2247.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2247/2939
![Page 2248: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2248.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2248/2939
![Page 2249: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2249.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2249/2939
![Page 2250: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2250.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2250/2939
![Page 2251: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2251.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2251/2939
![Page 2252: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2252.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2252/2939
![Page 2253: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2253.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2253/2939
![Page 2254: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2254.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2254/2939
![Page 2255: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2255.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2255/2939
![Page 2256: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2256.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2256/2939
![Page 2257: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2257.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2257/2939
![Page 2258: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2258.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2258/2939
![Page 2259: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2259.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2259/2939
![Page 2260: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2260.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2260/2939
![Page 2261: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2261.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2261/2939
![Page 2262: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2262.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2262/2939
![Page 2263: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2263.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2263/2939
![Page 2264: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2264.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2264/2939
![Page 2265: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2265.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2265/2939
![Page 2266: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2266.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2266/2939
![Page 2267: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2267.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2267/2939
![Page 2268: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2268.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2268/2939
![Page 2269: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2269.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2269/2939
![Page 2270: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2270.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2270/2939
![Page 2271: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2271.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2271/2939
![Page 2272: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2272.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2272/2939
![Page 2273: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2273.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2273/2939
![Page 2274: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2274.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2274/2939
![Page 2275: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2275.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2275/2939
![Page 2276: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2276.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2276/2939
![Page 2277: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2277.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2277/2939
![Page 2278: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2278.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2278/2939
![Page 2279: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2279.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2279/2939
![Page 2280: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2280.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2280/2939
![Page 2281: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2281.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2281/2939
![Page 2282: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2282.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2282/2939
![Page 2283: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2283.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2283/2939
![Page 2284: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2284.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2284/2939
![Page 2285: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2285.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2285/2939
![Page 2286: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2286.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2286/2939
![Page 2287: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2287.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2287/2939
![Page 2288: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2288.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2288/2939
![Page 2289: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2289.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2289/2939
![Page 2290: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2290.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2290/2939
![Page 2291: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2291.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2291/2939
![Page 2292: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2292.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2292/2939
![Page 2293: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2293.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2293/2939
![Page 2294: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2294.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2294/2939
![Page 2295: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2295.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2295/2939
![Page 2296: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2296.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2296/2939
![Page 2297: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2297.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2297/2939
![Page 2298: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2298.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2298/2939
![Page 2299: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2299.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2299/2939
![Page 2300: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2300.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2300/2939
![Page 2301: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2301.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2301/2939
![Page 2302: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2302.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2302/2939
![Page 2303: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2303.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2303/2939
![Page 2304: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2304.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2304/2939
![Page 2305: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2305.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2305/2939
![Page 2306: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2306.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2306/2939
![Page 2307: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2307.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2307/2939
![Page 2308: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2308.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2308/2939
![Page 2309: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2309.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2309/2939
![Page 2310: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2310.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2310/2939
![Page 2311: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2311.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2311/2939
![Page 2312: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2312.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2312/2939
![Page 2313: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2313.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2313/2939
![Page 2314: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2314.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2314/2939
![Page 2315: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2315.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2315/2939
![Page 2316: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2316.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2316/2939
![Page 2317: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2317.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2317/2939
![Page 2318: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2318.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2318/2939
![Page 2319: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2319.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2319/2939
![Page 2320: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2320.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2320/2939
![Page 2321: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2321.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2321/2939
![Page 2322: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2322.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2322/2939
![Page 2323: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2323.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2323/2939
![Page 2324: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2324.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2324/2939
![Page 2325: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2325.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2325/2939
![Page 2326: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2326.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2326/2939
![Page 2327: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2327.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2327/2939
![Page 2328: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2328.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2328/2939
![Page 2329: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2329.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2329/2939
![Page 2330: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2330.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2330/2939
![Page 2331: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2331.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2331/2939
![Page 2332: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2332.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2332/2939
![Page 2333: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2333.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2333/2939
![Page 2334: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2334.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2334/2939
![Page 2335: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2335.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2335/2939
![Page 2336: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2336.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2336/2939
![Page 2337: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2337.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2337/2939
![Page 2338: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2338.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2338/2939
![Page 2339: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2339.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2339/2939
![Page 2340: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2340.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2340/2939
![Page 2341: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2341.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2341/2939
![Page 2342: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2342.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2342/2939
![Page 2343: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2343.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2343/2939
![Page 2344: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2344.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2344/2939
![Page 2345: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2345.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2345/2939
![Page 2346: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2346.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2346/2939
![Page 2347: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2347.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2347/2939
![Page 2348: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2348.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2348/2939
![Page 2349: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2349.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2349/2939
![Page 2350: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2350.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2350/2939
![Page 2351: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2351.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2351/2939
![Page 2352: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2352.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2352/2939
![Page 2353: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2353.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2353/2939
![Page 2354: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2354.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2354/2939
![Page 2355: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2355.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2355/2939
![Page 2356: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2356.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2356/2939
![Page 2357: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2357.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2357/2939
![Page 2358: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2358.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2358/2939
![Page 2359: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2359.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2359/2939
![Page 2360: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2360.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2360/2939
![Page 2361: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2361.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2361/2939
![Page 2362: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2362.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2362/2939
![Page 2363: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2363.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2363/2939
![Page 2364: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2364.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2364/2939
![Page 2365: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2365.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2365/2939
![Page 2366: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2366.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2366/2939
![Page 2367: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2367.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2367/2939
![Page 2368: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2368.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2368/2939
![Page 2369: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2369.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2369/2939
![Page 2370: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2370.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2370/2939
![Page 2371: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2371.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2371/2939
![Page 2372: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2372.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2372/2939
![Page 2373: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2373.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2373/2939
![Page 2374: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2374.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2374/2939
![Page 2375: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2375.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2375/2939
![Page 2376: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2376.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2376/2939
![Page 2377: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2377.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2377/2939
![Page 2378: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2378.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2378/2939
![Page 2379: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2379.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2379/2939
![Page 2380: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2380.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2380/2939
![Page 2381: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2381.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2381/2939
![Page 2382: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2382.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2382/2939
![Page 2383: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2383.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2383/2939
![Page 2384: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2384.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2384/2939
![Page 2385: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2385.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2385/2939
![Page 2386: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2386.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2386/2939
![Page 2387: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2387.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2387/2939
![Page 2388: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2388.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2388/2939
![Page 2389: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2389.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2389/2939
![Page 2390: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2390.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2390/2939
![Page 2391: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2391.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2391/2939
![Page 2392: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2392.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2392/2939
![Page 2393: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2393.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2393/2939
![Page 2394: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2394.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2394/2939
![Page 2395: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2395.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2395/2939
![Page 2396: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2396.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2396/2939
![Page 2397: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2397.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2397/2939
![Page 2398: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2398.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2398/2939
![Page 2399: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2399.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2399/2939
![Page 2400: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2400.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2400/2939
![Page 2401: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2401.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2401/2939
![Page 2402: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2402.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2402/2939
![Page 2403: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2403.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2403/2939
![Page 2404: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2404.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2404/2939
![Page 2405: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2405.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2405/2939
![Page 2406: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2406.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2406/2939
![Page 2407: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2407.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2407/2939
![Page 2408: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2408.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2408/2939
![Page 2409: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2409.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2409/2939
![Page 2410: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2410.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2410/2939
![Page 2411: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2411.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2411/2939
![Page 2412: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2412.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2412/2939
![Page 2413: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2413.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2413/2939
![Page 2414: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2414.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2414/2939
![Page 2415: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2415.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2415/2939
![Page 2416: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2416.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2416/2939
![Page 2417: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2417.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2417/2939
![Page 2418: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2418.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2418/2939
![Page 2419: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2419.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2419/2939
![Page 2420: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2420.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2420/2939
![Page 2421: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2421.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2421/2939
![Page 2422: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2422.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2422/2939
![Page 2423: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2423.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2423/2939
![Page 2424: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2424.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2424/2939
![Page 2425: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2425.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2425/2939
![Page 2426: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2426.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2426/2939
![Page 2427: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2427.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2427/2939
![Page 2428: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2428.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2428/2939
![Page 2429: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2429.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2429/2939
![Page 2430: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2430.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2430/2939
![Page 2431: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2431.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2431/2939
![Page 2432: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2432.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2432/2939
![Page 2433: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2433.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2433/2939
![Page 2434: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2434.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2434/2939
![Page 2435: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2435.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2435/2939
![Page 2436: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2436.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2436/2939
![Page 2437: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2437.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2437/2939
![Page 2438: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2438.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2438/2939
![Page 2439: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2439.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2439/2939
![Page 2440: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2440.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2440/2939
![Page 2441: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2441.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2441/2939
![Page 2442: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2442.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2442/2939
![Page 2443: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2443.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2443/2939
![Page 2444: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2444.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2444/2939
![Page 2445: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2445.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2445/2939
![Page 2446: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2446.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2446/2939
![Page 2447: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2447.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2447/2939
![Page 2448: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2448.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2448/2939
![Page 2449: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2449.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2449/2939
![Page 2450: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2450.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2450/2939
![Page 2451: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2451.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2451/2939
![Page 2452: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2452.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2452/2939
![Page 2453: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2453.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2453/2939
![Page 2454: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2454.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2454/2939
![Page 2455: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2455.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2455/2939
![Page 2456: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2456.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2456/2939
![Page 2457: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2457.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2457/2939
![Page 2458: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2458.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2458/2939
![Page 2459: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2459.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2459/2939
![Page 2460: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2460.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2460/2939
![Page 2461: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2461.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2461/2939
![Page 2462: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2462.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2462/2939
![Page 2463: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2463.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2463/2939
![Page 2464: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2464.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2464/2939
![Page 2465: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2465.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2465/2939
![Page 2466: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2466.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2466/2939
![Page 2467: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2467.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2467/2939
![Page 2468: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2468.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2468/2939
![Page 2469: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2469.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2469/2939
![Page 2470: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2470.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2470/2939
![Page 2471: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2471.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2471/2939
![Page 2472: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2472.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2472/2939
![Page 2473: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2473.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2473/2939
![Page 2474: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2474.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2474/2939
![Page 2475: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2475.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2475/2939
![Page 2476: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2476.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2476/2939
![Page 2477: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2477.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2477/2939
![Page 2478: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2478.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2478/2939
![Page 2479: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2479.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2479/2939
![Page 2480: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2480.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2480/2939
![Page 2481: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2481.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2481/2939
![Page 2482: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2482.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2482/2939
![Page 2483: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2483.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2483/2939
![Page 2484: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2484.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2484/2939
![Page 2485: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2485.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2485/2939
![Page 2486: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2486.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2486/2939
![Page 2487: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2487.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2487/2939
![Page 2488: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2488.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2488/2939
![Page 2489: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2489.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2489/2939
![Page 2490: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2490.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2490/2939
![Page 2491: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2491.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2491/2939
![Page 2492: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2492.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2492/2939
![Page 2493: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2493.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2493/2939
![Page 2494: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2494.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2494/2939
![Page 2495: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2495.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2495/2939
![Page 2496: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2496.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2496/2939
![Page 2497: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2497.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2497/2939
![Page 2498: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2498.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2498/2939
![Page 2499: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2499.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2499/2939
![Page 2500: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2500.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2500/2939
![Page 2501: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2501.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2501/2939
![Page 2502: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2502.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2502/2939
![Page 2503: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2503.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2503/2939
![Page 2504: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2504.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2504/2939
![Page 2505: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2505.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2505/2939
![Page 2506: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2506.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2506/2939
![Page 2507: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2507.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2507/2939
![Page 2508: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2508.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2508/2939
![Page 2509: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2509.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2509/2939
![Page 2510: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2510.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2510/2939
![Page 2511: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2511.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2511/2939
![Page 2512: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2512.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2512/2939
![Page 2513: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2513.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2513/2939
![Page 2514: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2514.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2514/2939
![Page 2515: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2515.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2515/2939
![Page 2516: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2516.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2516/2939
![Page 2517: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2517.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2517/2939
![Page 2518: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2518.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2518/2939
![Page 2519: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2519.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2519/2939
![Page 2520: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2520.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2520/2939
![Page 2521: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2521.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2521/2939
![Page 2522: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2522.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2522/2939
![Page 2523: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2523.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2523/2939
![Page 2524: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2524.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2524/2939
![Page 2525: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2525.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2525/2939
![Page 2526: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2526.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2526/2939
![Page 2527: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2527.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2527/2939
![Page 2528: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2528.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2528/2939
![Page 2529: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2529.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2529/2939
![Page 2530: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2530.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2530/2939
![Page 2531: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2531.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2531/2939
![Page 2532: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2532.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2532/2939
![Page 2533: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2533.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2533/2939
![Page 2534: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2534.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2534/2939
![Page 2535: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2535.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2535/2939
![Page 2536: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2536.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2536/2939
![Page 2537: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2537.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2537/2939
![Page 2538: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2538.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2538/2939
![Page 2539: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2539.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2539/2939
![Page 2540: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2540.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2540/2939
![Page 2541: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2541.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2541/2939
![Page 2542: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2542.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2542/2939
![Page 2543: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2543.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2543/2939
![Page 2544: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2544.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2544/2939
![Page 2545: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2545.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2545/2939
![Page 2546: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2546.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2546/2939
![Page 2547: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2547.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2547/2939
![Page 2548: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2548.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2548/2939
![Page 2549: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2549.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2549/2939
![Page 2550: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2550.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2550/2939
![Page 2551: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2551.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2551/2939
![Page 2552: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2552.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2552/2939
![Page 2553: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2553.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2553/2939
![Page 2554: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2554.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2554/2939
![Page 2555: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2555.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2555/2939
![Page 2556: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2556.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2556/2939
![Page 2557: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2557.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2557/2939
![Page 2558: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2558.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2558/2939
![Page 2559: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2559.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2559/2939
![Page 2560: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2560.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2560/2939
![Page 2561: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2561.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2561/2939
![Page 2562: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2562.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2562/2939
![Page 2563: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2563.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2563/2939
![Page 2564: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2564.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2564/2939
![Page 2565: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2565.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2565/2939
![Page 2566: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2566.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2566/2939
![Page 2567: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2567.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2567/2939
![Page 2568: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2568.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2568/2939
![Page 2569: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2569.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2569/2939
![Page 2570: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2570.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2570/2939
![Page 2571: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2571.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2571/2939
![Page 2572: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2572.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2572/2939
![Page 2573: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2573.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2573/2939
![Page 2574: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2574.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2574/2939
![Page 2575: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2575.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2575/2939
![Page 2576: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2576.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2576/2939
![Page 2577: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2577.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2577/2939
![Page 2578: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2578.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2578/2939
![Page 2579: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2579.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2579/2939
![Page 2580: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2580.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2580/2939
![Page 2581: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2581.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2581/2939
![Page 2582: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2582.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2582/2939
![Page 2583: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2583.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2583/2939
![Page 2584: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2584.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2584/2939
![Page 2585: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2585.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2585/2939
![Page 2586: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2586.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2586/2939
![Page 2587: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2587.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2587/2939
![Page 2588: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2588.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2588/2939
![Page 2589: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2589.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2589/2939
![Page 2590: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2590.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2590/2939
![Page 2591: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2591.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2591/2939
![Page 2592: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2592.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2592/2939
![Page 2593: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2593.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2593/2939
![Page 2594: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2594.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2594/2939
![Page 2595: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2595.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2595/2939
![Page 2596: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2596.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2596/2939
![Page 2597: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2597.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2597/2939
![Page 2598: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2598.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2598/2939
![Page 2599: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2599.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2599/2939
![Page 2600: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2600.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2600/2939
![Page 2601: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2601.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2601/2939
![Page 2602: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2602.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2602/2939
![Page 2603: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2603.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2603/2939
![Page 2604: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2604.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2604/2939
![Page 2605: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2605.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2605/2939
![Page 2606: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2606.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2606/2939
![Page 2607: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2607.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2607/2939
![Page 2608: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2608.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2608/2939
![Page 2609: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2609.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2609/2939
![Page 2610: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2610.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2610/2939
![Page 2611: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2611.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2611/2939
![Page 2612: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2612.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2612/2939
![Page 2613: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2613.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2613/2939
![Page 2614: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2614.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2614/2939
![Page 2615: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2615.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2615/2939
![Page 2616: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2616.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2616/2939
![Page 2617: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2617.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2617/2939
![Page 2618: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2618.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2618/2939
![Page 2619: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2619.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2619/2939
![Page 2620: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2620.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2620/2939
![Page 2621: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2621.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2621/2939
![Page 2622: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2622.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2622/2939
![Page 2623: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2623.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2623/2939
![Page 2624: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2624.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2624/2939
![Page 2625: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2625.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2625/2939
![Page 2626: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2626.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2626/2939
![Page 2627: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2627.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2627/2939
![Page 2628: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2628.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2628/2939
![Page 2629: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2629.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2629/2939
![Page 2630: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2630.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2630/2939
![Page 2631: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2631.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2631/2939
![Page 2632: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2632.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2632/2939
![Page 2633: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2633.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2633/2939
![Page 2634: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2634.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2634/2939
![Page 2635: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2635.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2635/2939
![Page 2636: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2636.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2636/2939
![Page 2637: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2637.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2637/2939
![Page 2638: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2638.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2638/2939
![Page 2639: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2639.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2639/2939
![Page 2640: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2640.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2640/2939
![Page 2641: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2641.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2641/2939
![Page 2642: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2642.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2642/2939
![Page 2643: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2643.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2643/2939
![Page 2644: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2644.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2644/2939
![Page 2645: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2645.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2645/2939
![Page 2646: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2646.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2646/2939
![Page 2647: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2647.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2647/2939
![Page 2648: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2648.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2648/2939
![Page 2649: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2649.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2649/2939
![Page 2650: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2650.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2650/2939
![Page 2651: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2651.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2651/2939
![Page 2652: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2652.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2652/2939
![Page 2653: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2653.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2653/2939
![Page 2654: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2654.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2654/2939
![Page 2655: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2655.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2655/2939
![Page 2656: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2656.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2656/2939
![Page 2657: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2657.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2657/2939
![Page 2658: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2658.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2658/2939
![Page 2659: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2659.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2659/2939
![Page 2660: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2660.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2660/2939
![Page 2661: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2661.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2661/2939
![Page 2662: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2662.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2662/2939
![Page 2663: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2663.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2663/2939
![Page 2664: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2664.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2664/2939
![Page 2665: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2665.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2665/2939
![Page 2666: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2666.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2666/2939
![Page 2667: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2667.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2667/2939
![Page 2668: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2668.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2668/2939
![Page 2669: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2669.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2669/2939
![Page 2670: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2670.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2670/2939
![Page 2671: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2671.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2671/2939
![Page 2672: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2672.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2672/2939
![Page 2673: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2673.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2673/2939
![Page 2674: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2674.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2674/2939
![Page 2675: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2675.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2675/2939
![Page 2676: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2676.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2676/2939
![Page 2677: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2677.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2677/2939
![Page 2678: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2678.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2678/2939
![Page 2679: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2679.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2679/2939
![Page 2680: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2680.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2680/2939
![Page 2681: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2681.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2681/2939
![Page 2682: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2682.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2682/2939
![Page 2683: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2683.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2683/2939
![Page 2684: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2684.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2684/2939
![Page 2685: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2685.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2685/2939
![Page 2686: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2686.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2686/2939
![Page 2687: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2687.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2687/2939
![Page 2688: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2688.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2688/2939
![Page 2689: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2689.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2689/2939
![Page 2690: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2690.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2690/2939
![Page 2691: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2691.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2691/2939
![Page 2692: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2692.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2692/2939
![Page 2693: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2693.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2693/2939
![Page 2694: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2694.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2694/2939
![Page 2695: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2695.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2695/2939
![Page 2696: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2696.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2696/2939
![Page 2697: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2697.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2697/2939
![Page 2698: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2698.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2698/2939
![Page 2699: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2699.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2699/2939
![Page 2700: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2700.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2700/2939
![Page 2701: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2701.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2701/2939
![Page 2702: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2702.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2702/2939
![Page 2703: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2703.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2703/2939
![Page 2704: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2704.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2704/2939
![Page 2705: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2705.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2705/2939
![Page 2706: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2706.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2706/2939
![Page 2707: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2707.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2707/2939
![Page 2708: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2708.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2708/2939
![Page 2709: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2709.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2709/2939
![Page 2710: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2710.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2710/2939
![Page 2711: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2711.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2711/2939
![Page 2712: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2712.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2712/2939
![Page 2713: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2713.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2713/2939
![Page 2714: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2714.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2714/2939
![Page 2715: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2715.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2715/2939
![Page 2716: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2716.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2716/2939
![Page 2717: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2717.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2717/2939
![Page 2718: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2718.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2718/2939
![Page 2719: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2719.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2719/2939
![Page 2720: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2720.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2720/2939
![Page 2721: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2721.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2721/2939
![Page 2722: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2722.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2722/2939
![Page 2723: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2723.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2723/2939
![Page 2724: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2724.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2724/2939
![Page 2725: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2725.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2725/2939
![Page 2726: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2726.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2726/2939
![Page 2727: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2727.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2727/2939
![Page 2728: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2728.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2728/2939
![Page 2729: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2729.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2729/2939
![Page 2730: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2730.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2730/2939
![Page 2731: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2731.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2731/2939
![Page 2732: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2732.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2732/2939
![Page 2733: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2733.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2733/2939
![Page 2734: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2734.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2734/2939
![Page 2735: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2735.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2735/2939
![Page 2736: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2736.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2736/2939
![Page 2737: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2737.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2737/2939
![Page 2738: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2738.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2738/2939
![Page 2739: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2739.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2739/2939
![Page 2740: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2740.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2740/2939
![Page 2741: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2741.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2741/2939
![Page 2742: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2742.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2742/2939
![Page 2743: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2743.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2743/2939
![Page 2744: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2744.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2744/2939
![Page 2745: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2745.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2745/2939
![Page 2746: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2746.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2746/2939
![Page 2747: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2747.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2747/2939
![Page 2748: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2748.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2748/2939
![Page 2749: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2749.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2749/2939
![Page 2750: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2750.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2750/2939
![Page 2751: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2751.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2751/2939
![Page 2752: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2752.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2752/2939
![Page 2753: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2753.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2753/2939
![Page 2754: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2754.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2754/2939
![Page 2755: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2755.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2755/2939
![Page 2756: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2756.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2756/2939
![Page 2757: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2757.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2757/2939
![Page 2758: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2758.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2758/2939
![Page 2759: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2759.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2759/2939
![Page 2760: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2760.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2760/2939
![Page 2761: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2761.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2761/2939
![Page 2762: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2762.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2762/2939
![Page 2763: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2763.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2763/2939
![Page 2764: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2764.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2764/2939
![Page 2765: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2765.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2765/2939
![Page 2766: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2766.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2766/2939
![Page 2767: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2767.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2767/2939
![Page 2768: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2768.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2768/2939
![Page 2769: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2769.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2769/2939
![Page 2770: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2770.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2770/2939
![Page 2771: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2771.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2771/2939
![Page 2772: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2772.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2772/2939
![Page 2773: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2773.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2773/2939
![Page 2774: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2774.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2774/2939
![Page 2775: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2775.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2775/2939
![Page 2776: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2776.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2776/2939
![Page 2777: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2777.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2777/2939
![Page 2778: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2778.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2778/2939
![Page 2779: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2779.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2779/2939
![Page 2780: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2780.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2780/2939
![Page 2781: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2781.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2781/2939
![Page 2782: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2782.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2782/2939
![Page 2783: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2783.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2783/2939
![Page 2784: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2784.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2784/2939
![Page 2785: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2785.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2785/2939
![Page 2786: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2786.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2786/2939
![Page 2787: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2787.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2787/2939
![Page 2788: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2788.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2788/2939
![Page 2789: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2789.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2789/2939
![Page 2790: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2790.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2790/2939
![Page 2791: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2791.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2791/2939
![Page 2792: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2792.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2792/2939
![Page 2793: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2793.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2793/2939
![Page 2794: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2794.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2794/2939
![Page 2795: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2795.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2795/2939
![Page 2796: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2796.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2796/2939
![Page 2797: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2797.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2797/2939
![Page 2798: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2798.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2798/2939
![Page 2799: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2799.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2799/2939
![Page 2800: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2800.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2800/2939
![Page 2801: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2801.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2801/2939
![Page 2802: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2802.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2802/2939
![Page 2803: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2803.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2803/2939
![Page 2804: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2804.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2804/2939
![Page 2805: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2805.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2805/2939
![Page 2806: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2806.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2806/2939
![Page 2807: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2807.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2807/2939
![Page 2808: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2808.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2808/2939
![Page 2809: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2809.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2809/2939
![Page 2810: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2810.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2810/2939
![Page 2811: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2811.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2811/2939
![Page 2812: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2812.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2812/2939
![Page 2813: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2813.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2813/2939
![Page 2814: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2814.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2814/2939
![Page 2815: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2815.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2815/2939
![Page 2816: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2816.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2816/2939
![Page 2817: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2817.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2817/2939
![Page 2818: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2818.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2818/2939
![Page 2819: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2819.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2819/2939
![Page 2820: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2820.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2820/2939
![Page 2821: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2821.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2821/2939
![Page 2822: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2822.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2822/2939
![Page 2823: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2823.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2823/2939
![Page 2824: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2824.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2824/2939
![Page 2825: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2825.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2825/2939
![Page 2826: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2826.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2826/2939
![Page 2827: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2827.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2827/2939
![Page 2828: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2828.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2828/2939
![Page 2829: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2829.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2829/2939
![Page 2830: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2830.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2830/2939
![Page 2831: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2831.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2831/2939
![Page 2832: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2832.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2832/2939
![Page 2833: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2833.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2833/2939
![Page 2834: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2834.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2834/2939
![Page 2835: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2835.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2835/2939
![Page 2836: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2836.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2836/2939
![Page 2837: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2837.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2837/2939
![Page 2838: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2838.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2838/2939
![Page 2839: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2839.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2839/2939
![Page 2840: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2840.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2840/2939
![Page 2841: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2841.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2841/2939
![Page 2842: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2842.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2842/2939
![Page 2843: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2843.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2843/2939
![Page 2844: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2844.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2844/2939
![Page 2845: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2845.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2845/2939
![Page 2846: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2846.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2846/2939
![Page 2847: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2847.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2847/2939
![Page 2848: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2848.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2848/2939
![Page 2849: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2849.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2849/2939
![Page 2850: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2850.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2850/2939
![Page 2851: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2851.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2851/2939
![Page 2852: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2852.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2852/2939
![Page 2853: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2853.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2853/2939
![Page 2854: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2854.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2854/2939
![Page 2855: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2855.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2855/2939
![Page 2856: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2856.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2856/2939
![Page 2857: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2857.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2857/2939
![Page 2858: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2858.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2858/2939
![Page 2859: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2859.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2859/2939
![Page 2860: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2860.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2860/2939
![Page 2861: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2861.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2861/2939
![Page 2862: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2862.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2862/2939
![Page 2863: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2863.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2863/2939
![Page 2864: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2864.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2864/2939
![Page 2865: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2865.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2865/2939
![Page 2866: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2866.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2866/2939
![Page 2867: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2867.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2867/2939
![Page 2868: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2868.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2868/2939
![Page 2869: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2869.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2869/2939
![Page 2870: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2870.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2870/2939
![Page 2871: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2871.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2871/2939
![Page 2872: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2872.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2872/2939
![Page 2873: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2873.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2873/2939
![Page 2874: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2874.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2874/2939
![Page 2875: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2875.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2875/2939
![Page 2876: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2876.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2876/2939
![Page 2877: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2877.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2877/2939
![Page 2878: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2878.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2878/2939
![Page 2879: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2879.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2879/2939
![Page 2880: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2880.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2880/2939
![Page 2881: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2881.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2881/2939
![Page 2882: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2882.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2882/2939
![Page 2883: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2883.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2883/2939
![Page 2884: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2884.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2884/2939
![Page 2885: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2885.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2885/2939
![Page 2886: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2886.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2886/2939
![Page 2887: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2887.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2887/2939
![Page 2888: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2888.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2888/2939
![Page 2889: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2889.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2889/2939
![Page 2890: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2890.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2890/2939
![Page 2891: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2891.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2891/2939
![Page 2892: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2892.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2892/2939
![Page 2893: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2893.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2893/2939
![Page 2894: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2894.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2894/2939
![Page 2895: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2895.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2895/2939
![Page 2896: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2896.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2896/2939
![Page 2897: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2897.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2897/2939
![Page 2898: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2898.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2898/2939
![Page 2899: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2899.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2899/2939
![Page 2900: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2900.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2900/2939
![Page 2901: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2901.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2901/2939
![Page 2902: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2902.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2902/2939
![Page 2903: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2903.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2903/2939
![Page 2904: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2904.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2904/2939
![Page 2905: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2905.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2905/2939
![Page 2906: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2906.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2906/2939
![Page 2907: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2907.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2907/2939
![Page 2908: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2908.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2908/2939
![Page 2909: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2909.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2909/2939
![Page 2910: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2910.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2910/2939
![Page 2911: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2911.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2911/2939
![Page 2912: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2912.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2912/2939
![Page 2913: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2913.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2913/2939
![Page 2914: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2914.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2914/2939
![Page 2915: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2915.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2915/2939
![Page 2916: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2916.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2916/2939
![Page 2917: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2917.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2917/2939
![Page 2918: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2918.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2918/2939
![Page 2919: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2919.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2919/2939
![Page 2920: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2920.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2920/2939
![Page 2921: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2921.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2921/2939
![Page 2922: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2922.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2922/2939
![Page 2923: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2923.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2923/2939
![Page 2924: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2924.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2924/2939
![Page 2925: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2925.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2925/2939
![Page 2926: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2926.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2926/2939
![Page 2927: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2927.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2927/2939
![Page 2928: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2928.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2928/2939
![Page 2929: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2929.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2929/2939
![Page 2930: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2930.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2930/2939
![Page 2931: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2931.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2931/2939
![Page 2932: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2932.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2932/2939
![Page 2933: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2933.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2933/2939
![Page 2934: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2934.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2934/2939
![Page 2935: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2935.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2935/2939
![Page 2936: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2936.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2936/2939
![Page 2937: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2937.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2937/2939
![Page 2938: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2938.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2938/2939
![Page 2939: Boq Tnhb Ongc Chennai](https://reader030.vdocument.in/reader030/viewer/2022021220/577cddc61a28ab9e78adb58e/html5/thumbnails/2939.jpg)
7/30/2019 Boq Tnhb Ongc Chennai
http://slidepdf.com/reader/full/boq-tnhb-ongc-chennai 2939/2939