Page 1: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Build something great™

> Community Liaison Group meeting

BORAL

BERRIMA CEMENT

5 December 2019

Berrima Cement Works

New Berrima

Page 2: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Agenda˃ Site inspection

˃ Welcome, administration and safety moment

˃ Operations

˃ Environment

˃ Planning

˃ Community

˃ General business

Page 3: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Welcome, administration and ‘safety moment’˃ Welcome and re-introductions

˃ Safety moment

˃ Previous meeting of the Community Liaison Group˃ 26 September 2019

˃ Note: Presentations and meeting notes from previous meetings are also available from the

Cement Works website – www.boral.com.au/berrimacement

˃ Action items˃ 1. Adjusted Teven Quarry ToRs for consideration and adoption - COMPLETE. DISCUSSION

THIS MEETING.

˃ 2. Solar panel cleaning advice - ONGOING.

˃ 3. Investigation into mid-morning ‘tailgate noise’ – ONGOING.

˃ Other matters arising?

˃ Apologies for this meeting

Page 4: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Build something great™

BORAL

BERRIMA CEMENT

> Operations

Page 5: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Operations, People, Safety

˃ Production: After a challenging year, November saw the site’s production get back

on track.˃ Exceeded budgeted volumes during the course of the month.

˃ We will be working through the Christmas-New Year period in order to ‘catch up’ on

lost time during 2019.˃ The kiln will shut down from 13 January for around 20 days for its annual maintenance program.

˃ Cement milling will continue as normal throughout the period.

˃ Safety: Recent incident involving a contracted coal truck tipping onto its side while

trying to unload on an uneven surface.˃ Occurred in early hours of morning when surface was not readily visible.

˃ Driver was uninjured in incident.

˃ Personnel: We welcome Rajat Mittal who will work in process control.

Page 6: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Dust mitigation and management progress˃ The ‘real time’ monitor has been ordered, with the aim to install it by the end of

the year. This will include direct telemetry to the control room.

˃ The Air Quality TARP has been prepared.

˃ The EPA issued Boral with a ‘Show Cause’ regarding the dust incident of late

June. Boral has provided a response and is awaiting the outcome from the EPA.

Page 7: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Operations: New water cart˃ Our new 30000L water cart is almost ready for deployment.

˃ Replaces former 7000L cart at a cost of around $250 000.

˃ Has cannon fitted for targeted spraying.

˃ New filling station built – former cart took 30-40 minutes to fill, new cart will take 5.

˃ Training for staff will begin next week and the cart is expected to be put to work from

Thursday/Friday.

˃ Until then, we’ll continue to use two contracted carts to manage site dusts.

Page 8: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Solid Waste Derived Fuels (SWDF) ˃ The SWDF shed extension is now complete but not yet operating.

˃ Crane programming issues are delaying finalisation of the project.

Page 9: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

BORAL

BERRIMA CEMENT

Build something great™

> Environment

Page 10: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Air Quality Management

˃ Recent stack monitoring.˃ Stack testing undertaken on 31 July was in compliance for all parameters.

Parameter – Kiln 6 (EPA ID. 2) Unit Limits31/07/2019

R007956

Mercury mg/m3 0.05 0.0088Type 1 and type 2 substances mg/m3 0.5 <0.079

Solid particles mg/m3 50 47

Nitrogen oxides mg/m3 1250 940

Cadmium and Thallium mg/m3 0.05 <0.0006

Chlorine mg/m3 50 <0.02

Dioxine and Furans (I-TEQ middle bound) ng/m3 0.1 0.0021

Hydrogen chloride (HCl)* mg/m3 10 0.057

Hydrogen fluoride mg/m3 1 <0.47

Sulfur dioxide mg/m3 50 0.6

Sulfuric acid mist and sulfur trioxide mg/m3 50 0.096

Volatiles organic compounds mg/m3 40 2.8

Page 11: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Air Quality Management

˃ Dust Deposition – graph of historical results and gauge location map.

Page 12: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Air Quality Management

˃ Ambient Air Monitoring Program – HVAS.

Page 13: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Environmental overview˃ Water quality monitoring.

˃ Due to the ongoing impact of the drought, no discharges have been recorded for the most recent

period.

˃ Three recent submissions to the NSW Department of Planning, Industry and

Environment (DPIE).˃ Solid Waste Derived Fuels (SWDF) first year assessment report.

˃ SWDF 12 monthly audit: nil non-compliances, two recommendations (update Operational

Environment Management Plan and model ground emissions).

˃ SWDF Quarterly Pollutant Tracking report.

Page 14: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Then and now – 2014 v 2019˃ The picture on the left was taken just after the trees were planted during April

2014. The one of the right was taken during October from the same point.˃ Trees originally planted as part of site Landscape Management Plan.

Page 15: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Build something great™

BORAL

CEMENT

BERRIMA

> Planning

Page 16: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Planning˃ MOD 11 – Use of HiCal 50.

˃ MOD 11 was approved on 25 October 2019.

˃ Approval now permits blending of HiCal 50 (carbon

anode) at 4% with coal and use during start-up

conditions.

˃ Licence variation submitted to the EPA.

˃ Anticipating commencing use in early 2020 once the

EPA variation is approved.

˃ MOD 12 - Isotainers˃ MOD 12 seeks to introduce handling of isotainers at the

site via rail rather then just on road.

˃ This could, over time, reduce our reliance on road

based deliveries from site.

˃ Application was submitted to DPIE for assessment in

July which continues.

˃ The EPA and Council have provided favourable

responses to the project.

˃ Noise impacts are considered to be minimal and can

be managed on the site.

Page 17: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Planning˃ MOD 13 - SWDF hours of delivery.

˃ Ultimately, we want to reduce the effects of traffic movements in the site area.

˃ We are aiming to achieve this by dispersing the amount of vehicle movements we add to local

roads.

˃ This will result in more consistent delivery of SWDF materials to the site, and won’t increase the

overall amount of vehicle movements.

˃ This will allow more efficient delivery of SWDF material to the site and use in the kiln.

Page 18: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Build something great™

BORAL

CEMENT

BERRIMA

> Community

Page 19: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Community˃ Habitat corridor proposal.

˃ Internal discussion held following meeting in North Sydney.

˃ Supportive of concept however more information required.

˃ Will require Cement line management endorsement, multi-year project if supported, resource

dependant.

Page 20: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Community˃ Previously reported support for the Southern Highlands Kennel and Obedience

Club (20 Oct) and annual Harper’s Mansion Garden and Plant Fair (27 Oct).˃ Both events conducted successfully on respective dates.

˃ A note that community contribution may be more limited during 2020 due to

resource availability.˃ Restructuring of Berrima’s community support program is planned to be undertaken to suit

available resources and site-determined local priorities.

Credits: Harper’s Mansion;

SHK&OC Facebook

Page 21: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Build something great™

BORAL

BERRIMA CEMENT

> General business

Page 22: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

General business and contacts˃ Items of general business

˃ Next meetings˃ Community Liaison Group – Mar 2020?.

˃ Next ‘Whole of Community’ meeting – Jul-Aug 2020 unless needed earlier.

˃ Boral Berrima Cement contacts:

˃ Berrima Cement Works Reception4860 2222 / [email protected]

˃ Paul Jackson Stakeholder Relations Manager

4677 2946 / 0401 894 097 /

[email protected]

˃ www.boral.com.au/berrimacement

˃ [email protected]

˃ Like us on Facebook: @Boral Australia

Page 23: BORAL BERRIMA CEMENT · Operations, People, Safety ˃ Production: After a challenging year, November saw the site’s production get back on track. ˃ Exceeded budgeted volumes during

Build something great™

BORAL

BERRIMA CEMENT

> Thank you for your attendance