Bovanenkovo
Yamal Major Field
-
BOVANENKOVO FIELD
BovanenkovoBovanenkovo field is a base field of the field is a base field of the YamalYamalpeninsula at present time. All the scientific and peninsula at present time. All the scientific and
technological tasks of technological tasks of YamalYamal fields development fields development were solved by VNIIGAZ. were solved by VNIIGAZ.
Explored gas reserves of Explored gas reserves of BovanenkovoBovanenkovo field exceed field exceed 3.5 3.5 TcmTcm . Most part of them refer to . Most part of them refer to
AptApt --CenomanianCenomanian deposits. deposits. They will start the fields developmentThey will start the fields development
-
Geological section
Ю Р
С К
А Я
НИЖНИЙ
СРЕДНИЙВЕРХ
М Е
Л О
В А
ЯН И
Ж Н
И Й
В Е
Р Х
Н И
ЙСЕНОМАН
МАРРЕСАЛПНИЙ
А Л Ь
БА
П Т
Б
А Р
Р Е
МБЕРРИАС
-ГОТЕРИВ
А Х
С К
А Я
ТАНОПЧИНСКАЯ
СИСТЕМА
ОТДЕЛ
ЯРУС
СВИТА
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
Ю
Ю
ЮЮ
ЮЮ
БЯБЯБЯТПТП
ТП
ТП
ТПТПТП
ТП
ТП
ХМХМ
ПК
ПК
ПК
64 121 98 78 83 131 71 100 74 55119 108 73
JUR
AS
SIC
CR
ET
AC
EO
US
BOVANENKOVO FIELD
-
Proven gas resources, Proven gas resources, BcmBcm
BOVANENKOVO FIELD
32.43450.7TOTAL
32.42579.9II
870.8PK1
I
С2С1of developmentof development
of Resourses, 1982 г.in objectObject
Approved in State CommitteeLayers
PK9, PK10, HM1-2, TP1-6, TP7-8, TP9,
TP10-11
-
BOVANENKOVO FIELD
Synchronous start of development of layers with diff erent reservoirpressure required to join in same cluster wells with different head pressures. In this case it should be constructed tw o gas gatheringsystems, i.e. low and high pressure.
Optimized strategy of field development based on co nstruction of one gathering system. In this case start of development and the production of each layer are determined by the level of well head pressure.
First layerFirst layer
Second layerSecond layer
Third layerThird layer
-
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
T, °C-3 -2 -1 0 +1
Tn
Tbf
SCHEME OF PERMAFROSTSCHEME OF PERMAFROST
permafrost rockspermafrost rocks
cooledcooled rocksrocks
meltedmelted rocksrocks
iceice
TnTn –– natural temperaturenatural temperature
ТТbf bf –– experimental of water experimental of water
freezing in rocksfreezing in rocks
-6 -4 -2 0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
T, °C
Tn
Tbf
BOVANENKOVO FIELD
-
Design of horizontal well
0
200
400
600
800
1000
1200
1400
0 200 400 600 800Horizontal deviation, м
Dep
th, м
ГВКApt
Senoman
130 м
200 м
450 м
850 м
250 м
1380 м
BOVANENKOVO FIELD
Insulated tubingSpecial
refrigerants
-
Choosing of well construction and well clusters loc ation
Ice content > 40% and thickness > 25 meters.a) Special refrigerants and well with insulated tub ing.b) Move the well clusters
Ice content > 20% and thickness < 25 meters.Well with insulated tubing.
Ice content < 20% or from 20 to 40% and thickness < 10-15 meters.
Well without insulated tubing.
BOVANENKOVO FIELD
-
Scheme of well clusterScheme of well cluster
BOVANENKOVO FIELD
Hole of well:deviated
subhorizontal
TP1-6Senoman
1-6
PK9-10TP7-11HM1-2
Observing
Well heads for :Well cluster
area
-
The introduction of new engineering solutions, developed i n VNIIGAZ
into the Bovanenkovo field development will make it possibl e to cut
considerably starting investments, to ensure operation safe ty of wells
and field equipment, to reduce metal content and to meet ecol ogical
requirements. The improvement of economic indices made the
project competitive in the current conditions and allowed con sidering
it as one of the priority targets of Gazprom.
BOVANENKOVO FIELD
-
The main problems of the The main problems of the YamalYamal resource commercial development resource commercial development
are related to environmental protection. To tackle this problem are related to environmental protection. To tackle this problem JSC JSC
GazpromGazprom has worked out an Advanced research program. The has worked out an Advanced research program. The
program is intended for developing environmentally soun d program is intended for developing environmentally soun d
technologies, minimizing environmental impacts and p reserving antechnologies, minimizing environmental impacts and p reserving an d d
developing unique culture, ethnos and traditional form s of activdeveloping unique culture, ethnos and traditional form s of activ ity of ity of
local nations.local nations.
The results obtained made it possible to conclude th at the The results obtained made it possible to conclude th at the
commercial development of commercial development of YamalYamal gas fields, including the gas fields, including the
construction of gas mains and railway, will not lead to irreversconstruction of gas mains and railway, will not lead to irrevers ible ible
ecological consequences on the peninsulaecological consequences on the peninsula ..
BOVANENKOVO FIELD
-
THANK YOU
FOR ATTENTION
-
Carried out in VNIIGAZ investigations showed that maximal technoCarried out in VNIIGAZ investigations showed that maximal technological logical and economic efficiency, minimal environmental impact will proviand economic efficiency, minimal environmental impact will provide:de:
••Construction of one gas gathering system;Construction of one gas gathering system;
••Well commissioning for various objects at equalizing the well heWell commissioning for various objects at equalizing the well head ad pressures;pressures;
••Drilling in the initial period of all the wells in the cluster wDrilling in the initial period of all the wells in the cluster with conservation ith conservation of the idle wells until commencement of production;of the idle wells until commencement of production;
••Opening of each operation object with separate system of wells.Opening of each operation object with separate system of wells.
••For maximal reduction of thermal loading on permafrost it is plaFor maximal reduction of thermal loading on permafrost it is planned to nned to use special thermaluse special thermal--insulation pipes. This allows to reduce the distance insulation pipes. This allows to reduce the distance between the well mouths in one cluster to between the well mouths in one cluster to 20m20m. Successful tests of the . Successful tests of the wells with such pipes have been already underway for several yeawells with such pipes have been already underway for several years at the rs at the field.field.
BOVANENKOVO FIELD