Page 1: BP 2013 UFT  Presentation Stage3 - Team Stokes

Team Stokes

Proposal Presentation

Group Members

Kiran BholasinghRochard DukeGovinda Hosein

Trinidad Metrocable: A New Approach To Mass Transit

Page 2: BP 2013 UFT  Presentation Stage3 - Team Stokes

2Team Stokes - UFT Stage 3 Presentation

Introduction

The challenge: Develop a single technical innovation to significantly reduce the cost of Passenger Kilometres Travelled (PKT) per capita in Trinidad and Tobago by the year 2030.

Our solution: Metrocable Gondola Lifts!

Page 3: BP 2013 UFT  Presentation Stage3 - Team Stokes

Metrocable Gondola Lifts

Image showing the ‘ Keçiören Teleferik’ system in Ankara, Turkey (source link: http://gondolaproject.com/)

• Type of aerial lifts supported and propelled by cables.

• Capacity between two (2) to sixteen (16) passengers per cabin.

• Travels at constant speeds between two (2) stations.

3Team Stokes - UFT Stage 3 Presentation

Page 4: BP 2013 UFT  Presentation Stage3 - Team Stokes

Implementation of a Metrocable Gondola Lift System in Trinidad

• Monocable Detachable Gondolas (MDG)

• Can be partially solar powered

• Towers have low space requirements

• Can achieve speeds up to 40 km/h

Image showing a Monocable Detachable Gondola (Source Link: http://fatihbozkaya.com/)

4Team Stokes - UFT Stage 3 Presentation

Page 5: BP 2013 UFT  Presentation Stage3 - Team Stokes

Implementation of a Metrocable Gondola Lift System in Trinidad

5Team Stokes - UFT Stage 3 Presentation

Main stations at the following locations:

• Port-Of-Spain

• San Juan

• Curepe

• Arima

• Sangre Grande

• Chaguanas

• San Fernando Image showing planned routes for implementation

Page 6: BP 2013 UFT  Presentation Stage3 - Team Stokes

Benefits of implementing a Metrocable Gondola Lift System in Trinidad

1. Reduce travel time by approximately 45%

2. Produces low emissions approximately 50% less than buses

3. Approximately 66% cheaper to implement than other forms of mass transit

4. Low noise and high reliability

5. Can aid in the reducing the dependency of natural gas in Trinidad

6. Will provide job opportunities in both the Energy sector and Construction Sector

6Team Stokes - UFT Stage 3 Presentation

Page 7: BP 2013 UFT  Presentation Stage3 - Team Stokes

Benefits of implementing a Metrocable Gondola Lift System in Trinidad (cont’d)

7. Can cause a reduction in crime rates by

providing a much safer means of travel

8. Potential of implementing social facilities

at stations

7Team Stokes - UFT Stage 3 Presentation

Image showing example of a social facility that can be included at stations (Source link:

http://www.law.ugent.be/llm/images/stories/G04DB20011.jpg)

Page 8: BP 2013 UFT  Presentation Stage3 - Team Stokes

Team Stokes - UFT Stage 3 Presentation 8

Conclusion