Purpose of Issue
Project Title
Drawing Title
Drawn Checked
MidpointAlençon Link, BasingstokeHampshire, RG21 7PPTelephone (01256) 310200Fax (01256) 310201www.aecom.com
AECOM
DateApproved
RevDrawing Number
01
THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THETERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO LIABILITY
FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINAL CLIENT ORFOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, AND ONLY FOR THE
PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED.
AECOM Internal Project No. Scale @ A3
60612179 1:15,000
HB SL EC
Client
File Nam
e: \\eu.aecom
net.com
\EMIA\UKI\UKB
AS1\Jobs\PR-427777_Ipsw
ich_BC
_SFR
A\900_CAD
_GIS\911_G
IS
0 0.35 0.7 1.05 1.4km
LEGEND
IPSWICH LEVEL 1 SFRA 2019
DRAFT
IPSWICH BOROUGHCOUNCIL
THIS DRAWING IS TO BE USED ONLY FOR THE PURPOSE OFISSUE AND IS SUBJECT TO AMENDMENT
Copyright
Contains OS data © Crown copyright and databaseright (2019)
Contains Environment Agency information ©Environment Agency and/or database right
Notes
01/20
Borough Boundary
Main Rivers
Ordinary Watercourses
Breach Locations
Hazard rating
Caution
Danger to some
Danger to most
Danger to all
FLOOD HAZARD 0.1% ANDCLIMATE CHANGE TO 2118 FROM
PUMPING STATION FAILURE
FIGURE 19AF
1.This mapshows themodelledfloodhazardfromthe IP04Barrier : PSnot operating.2. IP04scenarioincludes: IpswichFDMSincludingbarrier, pumpingstationfor fluvial flow, repairs toNewCut u/s defences,WhersteadRdfloodgate, Tescodevelopment withenhanceddefences. Barrier closedandpumpingstationnot built.3. Thebreachmodellingwas updatedin2011as partof theoriginal SFRA(fromEAbreachmodellingcreatedin2009) andwas sensitivity testedby theEnvironment Agency in2019for inclusionwithinthis updatedSFRA.4. Modellingshownincludes theraisingof flooddefences (relativetoformer SHLAAsite47) to6mAOD. This defenceraisinghas not beencompleted,therefore, thelocal representationof floodhazardanddepthmay beslightly altered. Development proposals local tothis siteshouldfurther developbreachmodellinginconsultationwiththeEA, IBC&LLFAtoinformdevelopment layout
closed