Page 1: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

1

Braddock Metro Neighborhood Plan Transportation Worksession #4

January 07, 2008

Page 2: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-2

Roadway NetworkRoadway Network

Route 1 is a “workhorse”

Grid pattern of local/collector streets

One-way and two-way street patterns

Page 3: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-3

Regional ConditionsRegional Conditions

Natural and physical barriers constrain travel optionsMajor destinations along Route 1Beltway heavily influences traffic conditions along Route 1

Page 4: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-4

20 Year Buildout20 Year Buildout

Assumptions (rounded):

Townhouse: 300 units

Multifamily: 2,100 units

Office: 260,000 sf

Retail: 80,000 sf

Page 5: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-5

Traffic Impact Assessment MethodologyTraffic Impact Assessment Methodology

Planning level assessment to estimate impact at the roadway link levelAssumes full buildout of future development– 20 year time frame

Four basic steps– How many trips will new development produce?– How many of those trips will occur as new auto trips?– Where will the new auto traffic travel to/from?– What is the impact of development traffic as a percentage of existing

volumes?

Page 6: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-6

Trip Generation SourcesTrip Generation Sources

Institute of Transportation Engineers (ITE) Trip Generation Manual– Nationally recognized database

Page 7: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-7

Baseline Trips (all trip types, all modes)Braddock Plan 20 Year BuildoutBaseline Trips (all trip types, all modes)Braddock Plan 20 Year Buildout

AM Peak Hour PM Peak Hour

Land Use

ITE Land Use

Code Size Rate Trips

0.44 trips/unit

0.51 trips/unit

1.55 trips/ksf

0.74 trips/ksf

300 units 130

2,100 units 1,070

405

60

1,665

260,000 sf

80,000 sf

230

220

710

814

Rate Trips

Townhouse 0.52 trips/unit

155

Multi family 0.62 trips/unit 1,305

Office 1.49 trips/ksf 385

Specialty Retail 2.71 trips/ksf 215

Total 2,060

Page 8: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-8

0

1,000

2,000

3,000

4,000

5,000

6,000

Buildout of Existing Zoning 20 Year Braddock Plan

PM P

eak

Hour

Tri

ps

How Does this Compare?How Does this Compare?

Cur

rent

Futu

re Futu

reC

urre

nt

20% increase in all trip making within Braddock– Includes both auto

and non-auto trips

Braddock Development

Net Increase

Page 9: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-9

Trip TypesTrip Types

Page 10: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-10

Mode ShareCommute Trips to OfficeMode ShareCommute Trips to Office

Outside Beltway

DC Metro Area

Inside Beltway

Braddock

Bus9%

Auto66%

Walk6% Metro

21%

Source: WMATA 2005 Ridership Survey

Central Business District

Bus12%

Auto21%

Walk5%

Metro63%

Bus3%

Walk0%

Metro8%

Auto89%

Non-Auto30%

Auto70%

Today (Existing Auto Mode Share)

Future (Reduced Auto Mode Share)

Non-Auto58%

Auto42%

Page 11: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-11

Mode ShareResidential TripsMode ShareResidential Trips

Outside Beltway

DC Metro Area

Inside Beltway

Braddock

Source: WMATA 2005 Ridership Survey

Central Business District

Today (Existing Auto Mode Share)

Future (Reduced Auto Mode Share)

Bus6%

Auto18%

Walk26%

Metro50%

Bus6%

Auto39%

Metro43%

Walk14%

Bus1%

Auto62%

Metro31%

Walk6%

Non-Auto50%

Auto50%

Non-Auto60%

Auto40%

Page 12: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-12

Auto Impacts from Future Braddock DevelopmentAuto Impacts from Future Braddock Development

Net reduction = 230 tripsReflective of successful TDM

Assumptions (rounded):

Townhouse: 300 units

Multifamily: 2,100 units

Office: 260,000 sf

Retail: 80,000 sf

0

200

400

600

800

1000

1200

Residential Office Retail Total

PM P

eak

Hou

r Trip

s

Existing Auto-mode Share Reduced Auto-mode share

Page 13: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-13

Trip Distribution Patterns for Traffic Generated by Future Development

Trip Distribution Patterns for Traffic Generated by Future Development

Relatively even distribution in all directions

One-half of all trips oriented toward US 1– 30% north– 20% south

Page 14: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-14

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

US 1 no

rth of

First S

tWash

ington

St (n

orth)

Montgo

mery S

t

Madiso

n St

Wythe S

tWash

ington

St (s

outh)

Patrick

St

Henry

St

Fayette

St

West Stre

et

Braddo

ck R

d

PM P

eak

Hour

Trip

s

9%

5%

4% 3%

4%

5%

4%11%

Braddock Plan Traffic ImpactsWith Existing Auto-mode ShareBraddock Plan Traffic ImpactsWith Existing Auto-mode Share

Added VolumeExisting Volume

4%

10% 12%

Page 15: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-15

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

US 1 no

rth of

First

St

Washin

gton S

t (nort

h)Mon

tgomery

StMad

ison S

t

Wythe S

t

Washin

gton S

t (sou

th)

Patrick

St

Henry

St

Faye

tte St

West S

treet

Braddo

ck R

d

PM P

eak

Hou

r Trip

s

7%

4%

3% 2%

3%

4%

3%9%

Braddock Plan Traffic ImpactsWith Reduced Auto-mode ShareBraddock Plan Traffic ImpactsWith Reduced Auto-mode Share

Added VolumeExisting Volume

4%

8% 10%

Page 16: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-16

What does this assessment tell us?What does this assessment tell us?

Congestion on US 1 will continue20 year buildout of Braddock expected to increase traffic volumes on Route 1 by 7-10%– Less than what is expected from background growth (.5 - 3% per year)

Local growth in a constrained network results in:– “squeezing out” of

regional trips– Peak hour spreading

(extended duration of congestion)

Page 17: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-17

How Can Transportation Demand Management Help?How Can Transportation Demand Management Help?Low-cost approach to maintaining mobilityPromotes more efficient use of the transportation system & delays widening streets by:

– Encouraging carpooling/carsharing– Enhancing alternate modes– Mixing land uses for shorter trips– Managing the parking system– Encouraging off-peak travel

TDM should address all trip types with:

– Infrastructure & services– Programs & promotions Based on 1995 NPTS Survey Data for Washington, D.C Region

Over time, TDM results in people changing travel behaviors– Portland, OR – Arlington, VA – Boulder, CO offer relevant examples of success

Type of Trip by Time-of-Day

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

AM Peak PM Peak Off-Peak

Time PeriodPe

rcen

t of V

ehic

le T

rips

Commute Trips Shopping Trips Other Trips from Home Trips from Other Places

Page 18: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-18

Common TDM Infrastructure & ProgramsCommon TDM Infrastructure & Programs

Infrastructure– High Occupancy Vehicle lanes– Transit (Metrorail, Metrobus, DASH)– Pedestrian facilities– Bicycle facilities– Shower, locker, storage facilities– Vans– “Flex Cars”

Programs– Carpool / Vanpool matching– Transit incentives– Guaranteed ride home for non-auto commuters– Parking Management (shared, unbundled, limited access)– Car sharing access

Initially focused on employee commutes, must be expanded

Page 19: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-19

Alexandria’s Current TDM Toolbox of ProgramsAlexandria’s Current TDM Toolbox of Programs

Transportation Management Plans (TMP)– Required for large-scale projects– Development-specific TDM program & funding

Program Assistance– “Carshare Alexandria!”

• 39% reduction in car ownership • Public Transportation Subsidy Program

– Commuter Connections– Old Town Transit Shop – Telework Assistance – Bicycle Commuter Assistance & Bike Parking

Improvements – Trip Planning Services– Local Motion web page & eNewsletter

Results– 58% drive alone to work (national avg. @ 80%) – Increasing walking & bicycling to Metrorail– Decreasing parking & drop-off rates since 2002

Meridian at Braddock

23%

72%

5% 0%

Drive Alone Metrorail Car/Vanpool Walk/Bike

Colecroft

35%

58%

0% 7%

Drive Alone Metrorail Car/Vanpool Walk/Bike

Page 20: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-20

Braddock Road Transportation ChallengesBraddock Road Transportation Challenges

Congestion on commuter routes

Neighborhood impacts from congestion & cut-through traffic

Mixed pattern of 1-way / 2-way streets

Bottlenecks and constraint points for access

Neighborhood parking constraints

Barriers to pedestrian mobility & transit access

Basic retail needs not met within the area

Local and regional growth may add to impacts

Page 21: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-21

Addressing the ChallengesAddressing the Challenges

Lloyd District in Portland, OregonConstraints:

– Limited points of access– Commuters using key corridors– Inability to widen roads– Mix of one-way / two-way streets– Limited transit– Limited parking– Anticipated local and regional growth

Conditions:– Transit commute mode split @ 10%– Accessory parking provided at 3.5

stalls/1,000 SF– No bike lanes or end-of-trip facilities– Only transit investments anticipated

Expected Growth in District:– Near doubling of employment– 200% increase in residential

19701970

20052005

Page 22: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-22

Lloyd District TDM SuccessesLloyd District TDM Successes

Resident/Employee commute modes since 1997:

1997 1998 1999 2000 20012002

20032004

Bikes

Transit

Drive Alone

67%

51% 53%50%

49%

46%

43%41%

21%

35% 38%36% 36%

43%

39% 41%

1% 1% 2% 2% 3% 4% 4% 5%

0%

10%

20%

30%

40%

50%

60%

Perc

enta

ge M

ode

Shar

e

Year

BikesTransitDrive Alone

Page 23: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-23

0

832

924

1249

1433

0 200 400 600 800 1000 1200 1400Vehicles Removed

2000

2001

2002

2003

2004

Year

Vehicles removed during commuter peak hour

Lloyd District TDM SuccessesLloyd District TDM Successes

Page 24: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-24

The Organizational StructureThe Organizational Structure

Established a Transportation Management Association (TMA)– All stakeholders included– Initially staffed and subsidized by City– Vision, Goals, & Leadership provided

by District representativesPartnership Goals for Transportation Providers:– Expand District access through transit– Provide aggressive TDM to make

transit work– Invest in ped/bike improvements to

complement transit access

Page 25: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-25

The Major TDM Tools UsedThe Major TDM Tools UsedTransit Investments & Incentives

– Lightrail, stations, bus circulators– Extension of “Fareless Square” from Downtown

to Lloyd District– Resident/Employee geo-coding for targeted

bus routing– Guaranteed ride home– Volume discounts for monthly/annual transit

passes

Pedestrian/Bicycle Improvements– Bike lanes/boulevards, bike parking,

shower/locker facilities, transit bike racks– Streetscaping, illumination, crosswalk

improvements, traffic calming

Parking– Metered on-street system for better

management– Promoted shared-parking agreements among

existing uses– Converted to parking maximums from parking

minimums– Flexible standards to accommodate unique

conditions

Page 26: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-26

Using a TMA to Strengthen TDM in BraddockUsing a TMA to Strengthen TDM in Braddock

Puts local residents and businesses in the leadEmphasizes the importance of partnerships– Public-Private– Resident-Business– Developer-Tenant

Provides strength in numbersProduces tailored programs & servicesMore responsive to changing needs

Page 27: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-27

Suggested Additions to Existing TDM ProgramsSuggested Additions to Existing TDM Programs

Expand Federal Public Transportation Subsidy (PTS) program to private sector

– Offers $115/month in commute benefitsRevise Alexandria Transportation Management Plan (TMP)

– Manage funds and programs through district-wide TMA– Enhance residential participation– Finance strategies to achieve Association goals:

• Discounted transit fare programs• Targeted shuttle bus service• Car sharing programs• Pedestrian facility improvements• Bicycle lockers and parking facilities• Administrative costs

Have TMP Consultant develop specific Braddock strategy

Page 28: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-28

Right-Sizing ParkingRight-Sizing Parking

On-street Spaces for residents & retail customers when neededAvoid over-supply Tailor supply to existing conditions

– Potomac Yards– Braddock Condos– Arlington

Results of Parking Studies– Parker Gray Neighborhood with supply

problems at some times of day - 85% full– Oversupply in on-site accessory parking – On-street restrictions are oriented to

Metro riders and vary widely from street to street

Accessory Residential Parking

Shared Parking

Accessory Commercial Parking

Page 29: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-29

Easy, Efficient, Reliable TransitEasy, Efficient, Reliable Transit

Metrorail service characteristics

Metrorail ridership up in Alexandria 11.74% since 2002, 2nd highest (behind DC at 17.14%) for all Metro WashingtonImprove efficiency and frequency of connections to rail system and area destinations

Page 30: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-30

Easy to Understand & Convenient Transit OptionsEasy to Understand & Convenient Transit OptionsTransit ridership is steadily increasing

– Metrobus up 30%– Dash reached 3,743,499 in FY2007

Frequent and convenient “loop”service for neighborhood tripsPredictable, direct & fast for longer tripsGood information and time/cost competitive with the auto

Page 31: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-31

Rosslyn-Ballston Corridor, Arlington, VA Pedestrian Route PlanRosslyn-Ballston Corridor, Arlington, VA Pedestrian Route Plan

Page 32: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-32

Rosslyn-Ballston Corridor, Arlington, VA ResultsRosslyn-Ballston Corridor, Arlington, VA Results

TDM Policy implemented in 1990– Requires developers to implement and fund TDM

Non-auto mode share 60%Flat daily traffic growth on major streets

Transit-Oriented Development in Arlington

http://en.wikipedia.org/wiki/Image:ArlingtonTODimage3.jpg

Peak

Hou

r Tra

ffic

Volu

mes

Page 33: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-33

Expanding Braddock’s Walkable Street NetworkExpanding Braddock’s Walkable Street Network

Page 34: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-34

Enhancing street safety and “walkability"Enhancing street safety and “walkability"

Pedestrian & Bicycle Mobility Plan

Page 35: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-35

Boulder, CO TDM Tools & ResultsBoulder, CO TDM Tools & Results

City-wide program began 1989– Welcoming public realm– Ubiquitous bike accommodation– Frequent, comfortable transit service– Branded & marketed bus routes– Student Transit Pass

32% of all trips are non-motorized60% of residents own bus passesSOV trips down 17%

Page 36: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-36

Bicycle Routing and Network BuildingBicycle Routing and Network Building

Provide a low-traffic alternative for cyclists

Page 37: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-37

Expanding Bicycling Accommodation in BraddockExpanding Bicycling Accommodation in Braddock

Page 38: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-38

Transportation Improvement OpportunitiesTransportation Improvement Opportunities

Page 39: Braddock Metro Neighborhood Plan Transportation …...TDM-4 20 Year Buildout20 Year Buildout Assumptions (rounded): Townhouse: 300 units Multifamily: 2,100 units Office: 260,000 sf

TDM-39

Transportation Improvement OptionsTransportation Improvement Options