Brazilian Industry and Maritime Demands for Equipment
and Services in the Horizon 2018-2030:
Paulo Sergio Rodrigues Alonso
Petrobras Local Content Advisor to the CEO
Executive Coordinator of PROMINP
RIO OIL & GAS: Rio de Janeiro, 15-18th September 2014
April 2014: Undocking of P-66’s hull in Rio Grande Shipyard, the first hull for Pre-Salt fully built in Brazil
Agenda
Brazilian Local Content Regulation and Requirements for Libra
PETROBRAS’ Local Content Policy
Offshore and Maritime Equipment Demand
Conclusions
Brazilian Local Content Regulation and Requirements for Libra
PETROBRAS’ Local Content Policy
Offshore and Maritime Equipment Demand
Agenda
Conclusions
O&G Operators
Union
(represented by the ANP)
Local Content Offered
Signing Bonus
Minimum Exploratory Program (PEM)
Goods and Services
Suppliers
Contract goods and services
with local content requirement,
without jeopardizing price, time
and quality
Local Content Certifiers
Accredited by ANP
Local Content Booklet (official methodology)
Measure the local content that is effectively
manufactured in Brazil
Manufacture equipment and
provide services and hire
certification entity to
measure local content
Concession of Exploratory Blocks
12 Bidding Rounds (1999-2013)
Transfer of Rights (2010)
Production Sharin Contract – Libra (2013)
Assessment methodology:
Winner Bid = Max (0.4 x Minimum Exploratory Programme) +
(0.4 x Signing Bonus ) + (0.2 x Local Content offered)
Brazilian Local Content Regulation Concession Model - Agreement with the ANP
ANP: National Agency of Petroleum
Obs 1 – Logistic Support
Obs 2 – Drilling + Completion
Obs 3 – Auxiliary System
Exploratory Phase
Subsystem Item Minimum Local
Content item (%)
Minimum LC–
Exploratory Phase (%)
Operational Support Logistic Support (Sea/Air/Base) (obs. 1) 50
37
Geology and Geophysics Seismic Acquisition 5
Interpretation and Processing 85
Drilling, Evaluation and Completion
Drilling Rig 29
Drilling + Completion (obs. 2) 45
Auxiliary System (obs. 3) 54
Extended Well Test (EWT) 15
Sub-items Exploration Phase (%)
Flight Support 50
Offshore/Maritime Support 50
Onshore/ Land Support 80
Sub-items Exploration Phase (%)
Drilling Bit 5
Wellhead 60
Production Column 24
Well Equipment 50
Casing 73
Sub-items Exploration Phase (%)
Field Instrumentation 40
Automation System 60
Flow Measurement System 60
Telecommunications System 40
Electrical System 70
Local Content Requirements for Libra Exploraty Phase
Local Content Requirements for Libra Exploraty Phase
Development Phase (DP) - modules with first oil up to 2021
Subsystem Item Minimum Item Local
Content (MLC) (%)
MLC -Development
Phase modules (%)
Drilling,
Assessment
and
Completion
Drilling Rig 50
55
Logistic Support (Maritime/air/Base (obs 1) 50
Christmas Tree 70
Drilling + Completion (obs 2) 37
Auxiliary Systems (obs 3) 58
Production
Collection
System
Flowlines Flexibles 40
Rigids 80
Basic Engineering 90
Detailed Engineering 90
Management, Construction and Assembly 34
Flexible Production/Injection Lines (Flowlines, Risers) 56
Rigid Production/Injection Lines 50
Manifolds 70
Underwater Control System 20
Umbilicals 55
SPU
Hull
Basic Engineering 90
Detailed Engineering 90
Management 90
Construction and Assembly 75
Comissioning 90
Equipment and Materials 40
Naval Systems 50
Materials 80
Plants (obs 5)
Basic Engineering 90
Detailed Engineering 90
Management 90
Construction and Assembly 75
Comissioning 90
Equipment and Materials (obs 5.1) 57
Materials 80
Modules Integration
and Instalation
Basic Engineering 90
Detailed Engineering 90
Management 80
Construction and Assembly 75
Naval Systems 10
Comissioning 75
Materials 75
Anchoring
Pre-Installation and Hook-up of Anchoring
Lines 40
Multiple Anchoring Systems 85
Obs 1 - Logistic Support
Subsystem DP up to 2021
Maritime Support 50
Air Support 50
Base Support 80
Obs 2 - Drilling + Completion
Subsystem DP up to 2021
Drill 5
Wellhead 60
Production Tube 32
Well equipment 50
Casing 73 Obs 3 - Auxiliary Systems
Subsystem DP up to 2021
Field Instrumentation 40
Automation System 75
Fiscal Measurement
System 60
Telecommunication
System 40
Electric System 70
Obs 5.1 - Equipaments and Materials
Equipaments MLC (%)
Boiler
Forges 80
Tanks 83
Pressure Vessels 70
Field Instrumentation 40
Estatic
Equipamets
Filters 80
Cathodic Protection 90
Flare System 14
Valves (Up to 24") 58
Rotary
Equipament
Pumps 70
Rotary Equipament - Alternative Compressors 70
Rotary Equipament - Rotary Screw Air Compressors 70
Rotary Equipament - Diesel Engines (up to 6 HP) 65
Rotary Equipament - Gas Turbines 35
Rotary Equipament - Steam Turbines 80
Automation System 75
Fiscal Measurement System 60
Telecommunication System 40
Electric System 70
Process Towers 75
Cooling Towers 85
Heat Exchangers 50
Brazilian Local Content Regulation and Requirements for Libra
PETROBRAS’ Local Content Policy
Offshore and Maritime Equipment Demand
Agenda
Conclusions
PETROBRAS' Local Content Policy
The projects and acquisitions for Petrobras must support the
challenges of Company’s Strategic Plan and therefore maximize local
content based on competitive and sustainable basis, accelerating the
development of markets where it operates, guided by ethics and
generating continued innovation.
December 22nd, 2011
PETROBRAS’ Local Content Policy
PETROBRAS’ Local Content Policy Drivers
Ensure adherence to capital discipline, assuring the competitiveness of
procurement and reducing financial and logistical risks in implementation and
operation of projects.
Capital
Discipline
Execute procurement in a coordinated manner for the items of common use. Integration of
Supply
Uniform criteria for measuring and requiring local content in Petrobras
acquisitions.
Local Content
Standardization in
Petrobras
Encourage the development of local markets in a sustainable manner. Local Suppliers
Prioritize supplies with local engineering development. National
Engineering
Encourage the development of the local market to overcome technology gaps. Technology
Gaps
DR
IVE
RS
PETROBRAS’ Local Content Policy Local Content Requirements
Minimum Local Content requirement for financing concession (BNDES)
Local content requirements
established in oil field concession contracts
There is no Local Content requirement
Oil Company declares target and proves rate achieved
Petrobras Local Content Policy determines that all business areas must achieve
minimum local content on its activities (capital and operational expenditure)
Upstream Refining Gas & Power
Local content requirements set by Petrobras according to the list of goods and services demanded by capital projects and local industry capacity to provide them
ANP with O&G Operators Petrobras with Suppliers
Co
ntr
atu
al O
blig
atio
n
Brazilian Local Content Regulation and Requirements for Libra
PETROBRAS’ Local Content Policy
Offshore and Maritime Equipment Demand
Agenda
Conclusions
4.2
2013 2014 2015 2016 2017 2018 2019 2020
2014-2018 BMP:
Petrobras Oil and NGL Production Curve in Brazil
9
3
2
7 7
1
11
6 6
4
12
9
8
13
2
6
13
5
3
13
1
10
12 units
delivered + 9 + 13 + 23 + 22 + 30 + 21 + 21
149 new units to be delivered by 2020: 89 Tanker Vessels ( ), 32 Production Units ( ) and 28 Drilling Rigs ( ) 89 32 28
(1) Future Demand includes hired demand, demands in hiring phase and yet to be hired demand.
Petrobras Vessels Current and projected fleet
Source: Transpetro; BMP 2014-18; Petrobras (E&P-SERV/US-CONT and AB-LO/TM)
+ 154 Large
Supply Boats
Business and Management Plan 2014-2018
Significant equipment demand mapping:
Historically imported equipment with potential to attract foreign suppliers
Equipment produced nationally but with potential bottlenecks in production capacity
+ 32 Production
Units by 2020 and
+41 from 2021 to
2030 + 28 Drilling Rigs
* AHTS, ORSV, PSV
+ 89 Tanker
Vessels
Future Demand (2014-2020)
Critical
Resources Dec/2013
Situation
Future Situation:
Incremental values considering
acquisitions(1) and disposals
2020
Situation
2014-15 2016-17 2018-20
Tanker Vessels 55 13 23 38 127
Supply Vessels 414 44 44 66 568
Production Units
(SS and FPSO) 54 3 13 16 86
Drilling Rigs
(SWD > 2.000 m) 40 -1 8 7 54
Example of equipment with potential for national development
PROMEF I and II EBN I and II
49 Vessels by 2020 40 Vessels by 2020
7 delivered Vessels and 20 Vessels in advanced stage of
construction
22 Vessels in hiring phase or initial
construction phase
12 Products
8 LPG
3 Bunkers
14 Suezmax
8 Aframax
4 Panamax
6 Bunker
7 LPG
1 delivered Vessel and 2 Vessels in advanced stage of
construction
37 Vessels in hiring phase or initial
construction phase
Equipment demand not yet addressed for 59 Vessels (by 2020)
Petrobras Fleet Growth Program with
Brazilian Vessels
Tanker Vessels Fleet increase by 2020
Source: Transpetro; Petrobras (AB-LO/TM)
59 Sewage Treatment Units
59 Inert Gas Generation System
122 Life Boats
1.770 Accomodation Cabines
6 Panamax
21 Products
Demand for the 59 Vessels to be delivered between 2014 and 2020
Tanker Vessels Main demands for equipment
Source: Transpetro; Petrobras (AB-LO/TM)
EQUIPMENT DEMAND
AUXILIARY BOILER 118
AUXILIARY ENGINES (un) 177
CARGO & BALLAST PUMPS 295
COMBINED WINDLASS & MOORING WINCHES 118
ENGINE ROOM PUMPS 2.950
EXHAUSTED GAS ECONOMIZER/COMPOSED BOILERS 59
FRESH WATER GENERATOR 59
FUEL OIL CONDITIONER UNIT 59
FUEL OIL PURIFIERS 177
GENERAL SERVICE AIR COMPRESSORS 118
LUBE OIL PURIFIERS 295
MAIN & EMERC'Y SWITCH BOARDS 59
MAIN ENGINE (un) 59
OIL-WATER SEPARATOR 59
OTHERS MOORING WINCHES 354
PLATE HEAT EXCHANGER 354
SHAFT LINE 59
STARTING AIR COMPRESSOR 177
SUBMERGED CARGO & BALLAST PUMPS 720
THERMAL OIL HEATER 59
EQUIPMENT DEMAND
ACCOMODATION PAKAGE 59
ANCHORS 118
BOLLARD 0
CABLE (Electrical/Instrumentation/Telecom) (km) 14.750
CARGO VALVES - From 80 mm up to 650mm 17.700
CHAINS 118
ENGINE ROOM VALVES 47.200
FITTING (ton) 94.400
HOSE CRANE 118
INERT GAS SYSTEM 59
INFLATABLE BOATS 354
INSTRUMENTATION (Transmitter/Gauge/Indicator) (un) 7.500
INTEGRATED BRIDGE 59
LIFE BOATS 118
MANUAL VALVES (un) Produtos 662 valves outside E/R 23.600
PIPING (ton) 118.000
PROVISION CRANE 118
SEWAGE TRETMENT UNIT 59
Example of equipment with potential for national
development
+ 154 Large Supply Vessels
by 2020
Source: E&P-SERV/US-CONT
OSRV Oil Recovery
PSV General Cargo + Oil + Bulk + Cement
TS Tugs + Oil Recovery
LH SOS Standby + Handling Spy (messenger)
AHTS Maintenence TO´s + DMA´s + New Production Units
Instalation + FPSO`s and NT´s Operation
UT / P Emergency Cargo / Passenger
65
45
171
21
58
49
Current Petrobras Fleet Quantity Future Demand
154 Offshore and Provision Cranes
154 Vacuum Sewage Systems
1,232,000 meters of Metal Pipes
173,250 Manual Operated Valves
35,933 ton of Classified Profiles
3,730 ton of Fitting
Large Supply Vessels Fleet increase by 2020
Demand for 154 vessels to be delivered by 2020 EQUIPMENT DEMAND
Classified profiles (ton) 35,933
Chock fast (UN 300L) 958
Directional propulsion system (UN) 240
Transverse thrusters (UN) 240
Generator set (UN) 479
Emergency generator - port (UN) 120
Compressors (UN) 359
Oil Purifier (UN) 240
Oil water separator (UN) 120
Heat exchanger (UN) 479
Fans and blowers (UN) 4,432
Vacuum sewage system (system) 120
Air-conditioning system (system) 120
Fresh water heater (UN) 120
Provision Room (system) 120
Laundry equipment (set) 240
Trailer/mooring winch (UN) 240
EQUIPMENT DEMAND
Provisions crane (UN) 154
Compressors for bulk (UN) 154
Cargo pump (UN) 924
Control systems and supervising machines
(system) 154
Metal pipes (meters) 1,232,000
Valves (estimated) (pieces) 231,000
Manual Operated Valves (estimated) (pieces) 173,250
Fittings (estimated) (ton) 3,733
Cable Seals (UN) 15,400
Main switchboard (set) 154
Distribution Panels (UN) 3,080
Starters (UN) 1,540
Spotlights and reflectors (UN) 3,080
Navigation lights (set) 154
Aldis lamp (UN) 154
Battery charger (UN) 154
Static Inverter/Frequency Converter (UN) 616
Window Wiper (UN) 3,850
Source: E&P-SERV/US-CONT
Large Supply Vessels Main demands for equipment (1/2)
Equipment Demand
Sound-Powered Telephone (UN) 616
Public Address System (system) 154
Transformers and Rectifiers (UN) 308
Radar (UN) 308
Navigation, communication and signaling
equipments (set) 154
Ecosounder (UN) 154
VHF Radio (UN) 616
SSB Radio (UN) 308
Speed log (UN) 154
Automatic Pilot (UN) 154
Satellite navigator+ Ploter (UN) 308
Automation System/Micro Full (system) 154
Dynamic Positioning System(system) (system) 154
Steel doors (UN) 4,620
Ducts of natural and forced ventilation (UN) 462
Windows (UN) 5,852
Guards and wide eyes (UN) 4,620
Equipment Demand
Fixed firefighting system (system) 154
Smoke and heat detectors (set) 154
General alarm (system) 154
Whistle (UN) 154
Magnetic Compass (UN) 154
General bulkheads (m 2) 308,000
Ceiling and bulkhead liners (m 2) 308,000
Flooring (m2) 138,600
Doors class B (UN) 7,700
Anchors (UN) 308
Mooring lines (UN) 308
Mooring cables and trailer (UN) 1,386
Rubber Fenders (UN) 3,080
Motorized service boats (UN) 154
Liferafts (UN) 924
Lifebuoys and life jackets (UN) 1,232
Boats transceivers (UN) 924
Demand for 154 vessels to be delivered by 2020
Large Supply Vessels Main demands for equipment (2/2)
Source: E&P-SERV/US-CONT
Production Units Fleet increase by 2030
Operation Startup Timeline for Petrobras Production Units
Source: BMP 2014-18; Petrobras ND: Not defined * Charted Production Unit ** Integrated in Brazil with imported Hull or Modules
Made Abroad/Brazil ** Made in Brazil To be contracted Exceeding of Onerous Transfer of Rights Concession or Production Sharing
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
171 Chemical Injection Units
171 Offshore Cranes
57 Vacuum Sewage System
114 Offloading System
228 Life Boats + Davit
399,000 Manual Operated Valves
54,000 ton of Piping
91,200 ton of Fittings
Equipment demand not yet addressed for 57
Production Units to be delivered by 2030
Production Units considered for the equipment demand analysis
Production Units Concept for the Libra standard FPSO
The concept for the Libra standard FPSO is still under
evaluation, but most likely it will not deviate significantly
from a typical Pre-salt FPSO shown below.
Demand for the 57 Production Units to be delivered between 2018 and 2030
Production Units Main demands for equipment – Topside
Source: BMP 2014-18; Sinaval
Package/Skid Demand (Units)
Vapor Recovery Unit 114
Gas Dehydration Unit 57
Vacuum Deaerator Unit 57
Chemical Injection Unit 171
H2S Removal Unit 15
Nitrogen Generator Unit 57
Sulphate Removal Unit 57
Electrostatic Treaters Package 57
Produced Water Treatment 57
Flare Gas Recovery Compression Unit 57
Flare 57
Fresh Water Maker 57
Shell&Tubes Heat Exchange Package 57
Plate Heat Exchangers Package 57
Pressure Vessels / Separators Packages 57
Centrifugal Pumps Package 57
Sea Water Lift Pumps Package 57
Package/Skid Demand (Units)
Water Injection Pumps Package 57
Well Service Pump Package 57
Reciprocating Pumps Package 57
Positive Displacement Pumps Package 57
Filters Package 57
Pig Launchers & Receivers Package 57
Mechanical Handling Equipment Package 57
Icss – Integrated Control & Safety System 57
Hydraulic Power Unit - Hpu 57
Fiscal Metering Skid 57
Electrical And Automation Module 57
Hvac System 57
Exportation Gas Compression Unit 57
CO2 Compression Unit 15
Main Gas Compressor 57
Injection Gas Compression Unit 57
Main Turbogenerator Unit 57
Production Units Main demands for equipment – Loose Equipment
Source: BMP 2014-18; Sinaval
Demand for the 57 Production Units to be delivered between 2018 and 2030
1120 of 1190 compressors are activated by turbine (Libra)
Equipment Demand (Units)
Compressor 11901
Pressure Vessel (Scrubber/Separator/K.O.Drum) 3.534
Tank 1539
Control Panel (Distribution Panel) 4.731
Pumps 5.928
Hydrocyclones / Gas Flotation 399
Filter 1254
Shell&Tubes Heat Exchanger 2.679
Plate Heat Exchanger 1026
Mechanical Handling Equipment 6.042
Oil Dehydrator / Pre-Oil Dehydrator 114
Oil Dehydrator Degasser / Pre-Oil Dehydrator Degasser 114
Pig Launchers & Receivers 1368
Control, Shutdown, Choke, Pressure Safety, Deluge Valves 45.600
Manual Valves (Un) 399.000
Piping (Ton) 114.000
Fitting (Ton) 91.200
Cable (Electrical/Instrumentation/Telecom) (Km) 28.500
Instrumentation (Transmitter/Gauge/Indicator) (Un) 114.000
Production Units Main equipment demand – Hull
Source: BMP 2014-18; Sinaval
Demand for the 57 Production Units to be delivered between 2018 and 2030
Equipment Demand (Units)
Offshore Crane Api-2C (50T) 171
Aluminium Helideck 57
Lifeboat & Davit 228
Rescue Boat & Davit 228
Foam Firefighting System 57
CO2 Firefighting System 57
Inert Gas System 57
Sewage Treatment & Vacuum Unit 57
Auxiliary & Emergency Diesel Generator 114
Diesel Fire Water Pump 114
Ballast Pumps 228
Cooling Water Pumps 114
Fresh Water Generator 114
Portable Water Generator 114
Equipment Demand (Units)
Fire Detection System 57
Environmental & Positioning System 57
Navigation Aid System 57
Offloading System 57
Mooring System 228
Pull-In / Pull-Out System 57
Submerged Cargo Pumps 798
Submerged Deballast Pumps 342
Control Valves System (Un) 11.400
Helicopter Refueling System 57
Diesel Purifier 57
Vac System 57
Accomodation Package 57
Automation & Electric Package 57
Example of equipment with potential
for national development
21 Derrick Structure
21 Traveling equipment
21 Choke and Kill Manifold
21 sets of Risers
21 BOP (parcial)
21 sets Eletrical System
126 Main Diesel Generators (parcial)
21 Emergency generators
63 Deck Cranes
126 Azimut Thrusters
2,037 Pumps
630 HVAC System
21 Accomodation
Drilling Rigs Fleet increase by 2020
Equipment demand not yet
addressed for the 21 drilling
rigs to be delivered by 2020
Source: Petrobras; Sinaval
Drilling rigs considered for the equipment demand analysis
Petrobras Drilling Rigs Startup Timeline
+6
+4
+6
+3
+8
+1
2014 2015 2016 2017 2018 2019 2020
Abroad/Brazil **
Construction Site
Drilling Rigs Main demands for equipment – Drilling Package
Demand for the 21 Drilling Rigs to be delivered between 2017 and 2020
Source: Petrobras; Sinaval
Equipment Demand
Electrical & Instruments Automation System (Esd,Fire/Gas Detection, Ship Sever ,Electrical Power
(Transfomers/Swith Borders) (System,Ups System) 21
Heave Compensation Set 21
Topdrives & Associated Equipment(907 Mtx 2X857 Kw) 21
Vertical Pipehandling – Stanbuilding 21
Traveling Equipment – General 21
Drawworks And Machinery(8508 Kn /10056 Kn) 21
Rotary Table & Associated Equipment(47,5 Kn, 40 Rpm) 21
Hydraulic Roughnecks For Well Centre & Stadbuilding 21
Riser & Pipe Rack Handling System 21
Hydraulic Power Unit(4X 150 Kw + 1X 9 Kw) 105
Mud System (Pums, Accessories, Mixer)7500 Psi X 4 Un. 21
Choke & Kill Manifold 21
Drillers Control Cabin & Control System 21
Bop / Xmas Tree Transportatio / Handling System 21
Riser Tensioning System 21
Bulk Mud & Cement System 21
Subsea Package 21
Drilling Rigs Main demands for equipment – Ship Package
Source: Petrobras; Sinaval
Demand for the 21 Drilling Rigs to be delivered between 2017 and 2020
Equipment Demand
Electrical & Instruments Automation System (Esd,Fire/Gas Detection, Ship Sever ,Electrical Power
(Transfomers/Swith Borders) (System,Ups System) 21
Main Diesel Generators Sets(7680 Kw X720 Rpmx11000V) 126
Emergency Generator Set (1180 Kw X1800 Rpmx600V) 21
Deck Crane-Lattice Boom 25Tx42M 63
Deck Cranes-Knuckle Boom -25Tx45M + 1X85T X19M 42
Azimuth Thrusters(4500 Kwx4,50M Dia) 126
Anchoring & Moring Equipments(Electrichal Hyd. Driven) 21
Pumps (Centrifugal,Pneumatics,Positive Displac.) 2.037
Hvac System (Main Machines) (Un) 63
Hvac System (Self-Container) (Un) 630
Accomodation Module (Persons) 21
Piping ( Ton) 21.000
Fittings (Ton) 12.727
Cable (Electrical / Instrumentation / Telecom) (Km) 8.273
Valves (Ton) 16.800
2
3
1
Aerial view Rio Grande shipyard ERG1 – RS (Sep/14).
(1) Portico with 600 tons capacity; (2) Portico with 2.000 tons capacity ; (3) Patio slabs of Ecovix;
(4) FPSO Replicante P-66 hull construction; (5) FPSO Replicante P-67 hull construction;
4
Rio Grande Shipyard (ERG 1) - RS • 8 Hull Constructions (“Replicantes” )
Local Content: 70%
5
2
Rio Grande Shipyard ERG1 – RS (april/14)
(1) P-66 final hull construction activities at quay – the first hull for Pre-Salt fully built in Brazil – 70% Local content;
(2) P-67 hull construction on dry dock: integration of mega blocks built in China;
(3) P-67 and P-69 mega blocks built in Rio Grande Shipyard.
Rio Grande Shipyard (ERG 1) - RS • 8 Hull Constructions (“Replicantes” )
Local Content: 70% 1
3
3
Rio Grande Shipyard (ERG 2) - RS
Works' Aerial View of Rio Grande 2 Shipyard (ERG2) – RS (Sep/14).
Construction work of the ERG 2 Shipyard where it will be built 3 DRILLSHIPS (NS Cassino, NS Curumim and NSSalinas).
(1) Workshops
1
• 3 Drilling Vessels
Local Content: 55%, 60% and 60%
1
Inhaúma Shipyard - RJ
Overview of Inhaúma Shipyard, in Rio de Janeiro - RJ (05/07/13).
(1) P-74: Conversion of the ship VLCC's hull (hull structural reinforcement, expansion, renovation and adaptation of accommodation, equipment installation and anchoring system's adjustment
and utilities), (2) Dry dock recovered by Petrobras.
• 4 Hull Conversions (P-74,P-75,
P-76,P-77) Local content: 70%
1
2
Atlântico Sul Shipyard - PE
1
4
3
2
Aerial View of Atântico Sul Shipyard, Ipojuca-PE (Sep/14):
(1) Henrique Dias 4th ship of suezmax type;
(2) 5th Ship of suezmax;
(3) Future area for construction of 6 Setebrasil's rigs ;
(4) Future area of Promar Shipyard , responsible for building the batch of 8 Promef Phase 2's gas tankers.
• 6 Drilling Vessels
Local Content (LC): 55% - 65%
• 7 Suezmax: 72% LC
• 5 Aframax: 68% LC
• 4 Suezmax DP: 73% LC
• 3 Aframax DP: 73% LC
/ IHI
Enseada do Paraguaçu Shipyard- BA
Overview of future Enseada do Paraguaçu Shipyard Area in Maragogipe - BA (april/2014).
The Enseada do Paraguaçu Shipyard has contract with Setebrasil to build the 6 DRILLSHIPS (Ondine, Pituba, Boipeba, Interlagos, Itapema, Comandatuba)
(1) Integration pier; (2) Cutting and sheet metal processing; (3) Drydock
• 6 Drilling Vessels
Local content: 55% - 65%
1
2
3
BrasFels Shipyard - RJ
1
6
Overview of BrasFels Shipyard in Angra dos Reis - RJ (Sep/14).
(1) Urca Drilling (CL:55%): Construction; (2) Construction and assembly of blocks; (3) P-66 and P-69 modules building on dry dock;
(4) Portico with 2.000 tons capacity; (5) Portico with 600 tons capacity; (6) SS-53 Drilling
• 5 Building Modules and Integration
(Itaguaí, P-66, P-69 and
Caraguatatuba)
• 6 Drilling SS. Local content 55% -
65%
3
4 5
2
1
2
3
4 5
6
BrasFels Shipyard - RJ
• 5 Building Modules and Integration (Itaguaí,
P-66, P-69 and Caraguatatuba)
• 6 Drilling Vessels. Local content 55% -
65%
Overview of BrasFels Shipyard in Angra dos Reis - RJ (Sep/14).
(1) Urca Drilling (CL:55%): Construction; (2) Construction and assembly of blocks; (3) P-66 and P-69 modules building on dry dock;
(4) Portico with 2.000 tons capacity; (5) Portico with 600 tons capacity; (6) SS-53 Drilling
Brasa Shipyard - RJ
Overview of Brasa and Maua Shpyards in Rio de Janeiro - RJ (Sep/2014).
FPSO Cidade de Maricá modules construction activities;
• Brasa: 3 Building Modules, Topside and
Integration (Cidade de Ilha Bela, Cidade de
Maricá and Cidade de Saquarema
1
2
3
Mauá Shipyard - RJ
Overview of Brasa and Maua Shpyards in Rio de Janeiro - RJ (Sep/2014).
(1) Anita Garibaldi ship of Panamax type. Construction activities;
(2) Irmã Dulce ship of Panamax type. Construction ctivities ;
(3) FPSO Cidade de Ilha Bela being integrated on Mauá Shipyard – 65% Local content
• Mauá: 12 tanker vessels (4
Panamax and 8 Products)
Brazilian Local Content Regulation and Requirements for Libra
PETROBRAS’ Local Content Policy
Offshore and Maritime Equipment Demand
Agenda
Conclusions
Local Content Policy is a law requirement and is a consolidated practice for projects
in Exploration and Production;
The challenges to put the Pre Salt fields into operation are known but the Maritime
Industry plays a key role considering the demands;
The average Local Content today for E&P Projects range between 55% and 65%.
There are plenty of opportunities for foreign companies wishing to establish in
Brazil;
The association between brazilian and foreign manufacturers is the best approach
as to provide the solutions for technology bottlenecks.
Conclusions