breaking down the barriers between wells p&a and platform...

17
© 2016 Aker Solutions Breaking down the barriers between wells P&A and platform decommissioning St. Andrews | 16th November 2016 Ole Jakob Kverneland and Per Arild Boganes

Upload: vuongdat

Post on 15-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

© 2016 Aker Solutions

Breaking down the barriers between wells

P&A and platform decommissioning

St. Andrews | 16th November 2016

Ole Jakob Kverneland and Per Arild Boganes

© 2016 Aker Solutions

Challenges

Breaking down the barriers between wells P&A and platform decommissioning

The major activities are performed like a relay race Wells P&A

Shutdown and cleaning

Engineering down

Preparations for removal

Normally unattended installation (NUI)

Final preparations (heavy lift vessel)

Removal

Certain facilities require external accommodation solutions when platform systems are shut down

Sequential timeline

Slide 2

Year 2

10 11 12 9 8 7 6 5 4 3 2 1

Year 3

10 11 12 9 8 7 6 5 4 3 2 1

Year 4

10 11 12 9 8 7 6 5 4 3 2 1

Year 1

10 11 12 9 8 7 6 5 4

Offshore P&A Eng Down & Cold Phase Preps Normally Unattended Inst. (NUI) Final preps

Topsides Removal

Jacket Removal

© 2016 Aker Solutions

Challenges

One operation at a time

Breaking down the barriers between wells P&A and platform decommissioning Slide 3

© 2016 Aker Solutions

Objectives

Demonstrate that efficiency on total decommissioning scope can be improved by

integrating P&A work and platform decommissioning

Early completion of decommissioning work prior to cold phase ready for removal

Improve technology (P&A) and execution efficiency by using an integrated schedule,

eliminating interfaces and sharing resources

Reduce decommissioning costs significantly by SIMOPS (20 – 30%)

Breaking down the barriers between wells P&A and platform decommissioning Slide 4

© 2016 Aker Solutions

Aker Solutions decommissioning

Modifications for decommissioning

Deactivation

Prepare for removal Utilities

Hook down modules, MSF, bridges and flare

Install lifting points

Breaking down the barriers between wells P&A and platform decommissioning Slide 5

© 2016 Aker Solutions

Decommissioning project execution experience

Breaking down the barriers between wells P&A and platform decommissioning Slide 6

Phillips

Maureen A

EPRD

TOTAL

Frigg & MCP01

EPRD

1995-1997 1998-2002 2004-2010

CNRI

Murchison

DSC

BP

Old Valhall

DSC

2011-2016 2012-2016

TENAS/Repsol

Yme DSC

2013-2015 2015-2016

ExxonMobil

Jotun B

Rig Removal

Prep for P&A

Continuous business for 21 years

2008-2009

BP

DP Rig

Removal

2014-2016

Repsol

Varg; DSC

ConocoPhillips

Ekofisk tank

cleaning

Esso

Odin

EPRD

© 2016 Aker Solutions

Halliburton wells P&A

Traditional well service and surface decommissioning

provider Discrete services

Bundled services

Turnkey projects

Include drilling contractor Bundled services

Turnkey projects

Provide full decom services Extended co-operation with decom provider

Breaking down the barriers between wells P&A and platform decommissioning Slide 7

© 2016 Aker Solutions

Collaboration

Breaking down the barriers between wells P&A and platform decommissioning Slide 8

Statoil - Halliburton Veslefrikk FPA Project, Meeting 08.06.16

Engineering

Up Well P&A

Conductor

Removal

Decom &

Clean

Prep for

Removal

Platform

Removal

Onshore

Disposal Shutdown

1 2 3 4 5 6 7 8

Ma

in

C

on

tra

cto

r

Strate

gic

Pa

rtn

er

Aker Solutions Aker Solutions Aker Solutions Aker Solutions Aker Solutions Aker Solutions Aker Solutions Aker Solutions

Lifting

Contractor

© 2016 Aker Solutions

Success criteria

Focus on the total SOW Reduce total time for wells P&A, decommissioning and removal

Optimise the total decommissioning schedule rather than days per well

Alignment of goals All parties

Joint delivery model Accountability / ownership

Commercial alternatives Mutual benefit

Common environment Operations room

Performance drive Estimated time

Service quality

Service alignment

Breaking down the barriers between wells P&A and platform decommissioning Slide 9

© 2016 Aker Solutions

Organisation

Breaking down the barriers between wells P&A and platform decommissioning Slide 10

Operator

Operations dept.

drilling department

Operation services:

De-pressuring /

flush/purge

Isolations

Gen. deactivation

Logistics (cranes,

accommodation)

Drilling services:

Utility support

General P&A support

Aker Solutions

M&M

decom services

DSC / M&M services:

Engineering down

Modifications for cold

phase

Utility modifications

Temporary systems

Removal preps

P&A assistance:

Multiskilling EIT /

mech.

Halliburton

P&A

decom services

P&A services:

Fluids / cementing

Wireline / coiled

tubing

Cutting, pulling and

tools

Waste handling

MDR and surf. syst.

PPS services:

Flush, purge, clean

Pipeline / pigging

Removal Contractor

Removal

disposal

Removal services:

Final preparations

Grillage, seafastening

HLV lifting, transport

Marine oper. / barges

Disposal:

Onshore demolition

Disposal, recycling

Drilling Contractor

Rig

P&A services:

Drilling facilities

General services:

Rig crew

Accommodation

Utility supply

Crane handling

Step 1: Strategic alliance with P&A contractors, piloting

integration of well P&A (Halliburton) with topsides logistics Process

- Execution strategy

-Scope definition / split

-Interface management

-Overall planning and risks

-Resources

-Optimisation using LEAN

© 2016 Aker Solutions

Positive team interaction – is it a relay race?

Breaking down the barriers between wells P&A and platform decommissioning Slide 11

Typical timeline for P&A, EDC, mods and removal preps

Acti

vit

ies

on

DP

P&A – Bottom plugs P&A – Remaining plugs P&A – Conductor recovery

COP process Clean process ED process Remove process Well disconnect

Mods cold phase Mods/temp systems Final mods

ED well/ut Remove w/ut SD/clean we/ut ED/rem. key syst.

Prep. for MDR Remove MDR

Gen removal preps cold and hot work-after bottom plugs and declassification Gen remove preps-cold

Timeline on DP after cold phase (HLV in field)

Final rem. preps topside Lift and transport of topside Final rem. preps jacket Lift and transport of jacket

Onshore disposal topside Onshore disposal jacket

© 2016 Aker Solutions

Sequential timeline

Breaking down the barriers between wells P&A and platform decommissioning Slide 12

Year 2

10 11 12 9 8 7 6 5 4 3 2 1

Year 3

10 11 12 9 8 7 6 5 4 3 2 1

Year 4

10 9 8 7 6 5 4 3 2 1

Year 1

10 11 12 9 8 7 6

Offshore P&A Eng Down & Cold Phase Preps Normally Unattended Inst.

(NUI) Final preps

Topsides Removal

Jacket Removal

Offshore P&A

Removal Preparations

Eng Down & Cold Phase Preps

Normally Unattended Inst. (NUI)

Topsides Removal

Jacket Removal

Result from SIMOPS and collaboration

© 2016 Aker Solutions

Potential cost savings

Breaking down the barriers between wells P&A and platform decommissioning Slide 13

0

2,000,000,000

4,000,000,000

6,000,000,000

8,000,000,000

10,000,000,000

12,000,000,000

14,000,000,000

16,000,000,000

18,000,000,000

Current estimate Improved P&Atechnology and

reduced duration

Reduced vesseltime

Integrated planning Acceleratedschedule

New estimate

12. Monitoring

11. Site Remediation

9. Substructure Onshore Recycling

8. Topsides Onshore Recycling

7. Substructure Removal

6. Topsides Removal

5. Topsides Preparation

4. Facilities / Pipeline Making Safe

3. Wells Abandonment

2. Facility Running / Owner cost

1. Operator Project Management

- 22%

© 2016 Aker Solutions

Result from SIMOPS and collaboration

Breaking down the barriers between wells P&A and platform decommissioning Slide 14

© 2016 Aker Solutions

Conclusions

Aker Solutions to be the integrator - a new concept in

the market

Basis is to optimise the schedule Based on Halliburton P&A technology

SIMOPS

Common resources

Efficient utilisation of available accommodation

Potential reduction in duration / net costs of 20%

through efficient collaboration

Breaking down the barriers between wells P&A and platform decommissioning Slide 15

© 2016 Aker Solutions Breaking down the barriers between wells P&A and platform decommissioning Slide 16

© 2016 Aker Solutions

Copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors

as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior

permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction.

Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause

actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions,

the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and

affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”,

“believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among

others, economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions’ businesses, oil prices,

market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other

factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based

upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation.

Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and

neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use.

Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the common brand or trade

mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” when we refer to Aker Solutions companies in general

or where no useful purpose is served by identifying any particular Aker Solutions company.

Slide 17