The existing bridge “Pont Adolphe” in the center of
the city of Luxemburg needs to be closed for traffic
because of major repair works. To ensure that traffic
encounters least possible disruption of the closure, a
temporary bridge is built, so there still remains a
traffic corridor over the valley.
On both sides an abutment was built with EnkaGrid
PRO to relieve the forces on the piles on which the
bridge deck rests.
The abutments of this bridge are positioned on the slopes
of the valley. The heavy steel beams of the deck will rest
on an abutment on each side of the valley. This abutment
consists of pillars, cantilever wall and reinforced earth. The
bridge deck will rest on the pillars. The horizontal forced of
the back soil are removed by resealing the soil by means
of reinforced earth such that the pillars stand on their own.
Design based on Eurocode 7
Bridge abutment Pont Adolphe City of Luxembourg, Luxembourg
Project owner
Council of Luxembourg
Product
EnkaGrid® Pro
EnkaMat®
Function
Soil Reinforcement
Contractor
TRALUX Construction
China +86 519 6858 5555
France +33 1 74 90 00 13
Germany +49 6022 812020
Hungary +36 23 610 870
Netherlands +31 85 744 1300
USA +1 800 365 7391
Disclaimer
The information set forth in this brochure reflects our best knowledge at the time of publication. We have a policy of continuous
development and therefore our products, information and specifications may be subject to change. We therefore advise you to
contact us to make sure the information you receive is accurate and actual. We do not accept any liability arising from the
application of these products, the results thereof or the information given in this document. © 2018 Low & Bonar
www.enkasolutions.com | [email protected]