Bridge Maintenance Strategies Peter Weykamp, P.E.
Bridge Maintenance Program EngineerNew York State Department of Transportation
![Page 2: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/2.jpg)
•Definitions•Conditions•Needs•Support•Bridge Elements
BACKGROUND
![Page 3: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/3.jpg)
DEFINITIONS• Maintenance: a network
level, long-term strategy that enhances bridge performance by using an integrated, cost-effective set of practices that extend bridge service life, improve safety, and meet motorist expectations.
– Or anything done to a bridge short of a deck replacement.
PREVENTIVEPREVENTIVEMAINTENANCEMAINTENANCE
CORRECTIVE CORRECTIVE REPAIRSREPAIRS
CYCLICAL CYCLICAL MAINTENANCEMAINTENANCE
![Page 4: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/4.jpg)
DEFICIENTFHWA - A bridge is “structurally deficient”if either the superstructure, substructure, or deck is rated less than 5 on a 9 point scale.
![Page 5: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/5.jpg)
NYSDOT CONDITION RATING
• “Deficient”– Weighed average
condition < 5.0
• Rating Scale– 1 – Failed condition– 3 – Serious deterioration– 5 – Functioning as
designed– 7 – New condition
• Weights– Primary member 10– Abutments 8– Piers 8– Structural Deck 8– Bridge Seats 6– Bearings 6– Wing & Backwalls 5 – Secondary member 5– Joints 4– Wearing surface 4– Sidewalks 2– Curbs 1
![Page 6: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/6.jpg)
Number and Status of Bridges in the US(12% SD, 13% FO)
0
20,000
40,000
60,000
80,000
100,000
120,000
Pre1910
1910s 1920s 1930s 1940s 1950s 1960s 1970s 1980s 1990s 2000s
Decade Built
Num
ber o
f Brid
ges
0%
10%
20%
30%
40%
50%
60%
70%
80%
% o
f Def
icie
nt B
ridge
s
Number of Bridges % of Deficient Bridges
Source: 2007 NBI
![Page 7: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/7.jpg)
State and Local Highway Bridge Condition Trends
40
45
50
55
60
65
70
75
80
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
% Goo
d an
d Excellent by N
umbe
r
Year
Local Bridges State Bridges
![Page 8: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/8.jpg)
Deficient Bridge Wave
0
100
200
300
400
500
600
700
800
900
<3 3.1 3.3 3.5 3.7 3.9 4.1 4.3 4.5 4.7 4.9 5.1 5.3 5.5 5.7 5.9 6.1 6.3 6.5 6.7 6.9
New York State Rating
Num
ber o
f Brid
ges
Local Bridges State Bridges
1450 bridges become deficient in next 5 years
1500 additional bridges become deficient in next 6-10 years
![Page 9: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/9.jpg)
ASSESSING NEEDS• Inspection data
– Focus on safety
• Models focus on rehab/replace
• Maintenance candidates – Real vs. ideal needs
• Decision support systems– Domestic scan of lead States
![Page 10: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/10.jpg)
MAINTENANCE NEEDS
0%
100%
Time
BR
IDG
E C
ON
DIT
ION
• Bad– Rehab/Replace
• Good– Preventive/Cyclical
• Fair– What has to get done?– What are the
consequences of deferred action?
FAIRFAIR
BAD
GOOD
![Page 11: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/11.jpg)
FUNDING• Federal formula
– Based on deficiency – Rewards poor stewardship– Some flexibility
• Organized to build the interstate system• Few advocates for bridge maintenance • “Follow the Money”
![Page 12: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/12.jpg)
BRIDGE PARTS
![Page 13: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/13.jpg)
CEU QUESTIONS
![Page 14: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/14.jpg)
Current Practices in Bridge Maintenance
PART 1
![Page 15: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/15.jpg)
EXPANSION JOINTS• All Joints Leak• Armored Joints
– Constructability– Repair-ability– Safety hazard– Deterioration
![Page 16: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/16.jpg)
![Page 17: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/17.jpg)
ARMOR-LESS JOINTS• Elastomeric Concrete
– Polymer based– “Maintenance friendly”– Rapid setting– EXPENSIVE
• Seals– Repairable
• Liquid
• Pre-formed
![Page 18: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/18.jpg)
![Page 19: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/19.jpg)
![Page 20: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/20.jpg)
INTEGRAL ABUTMENTS
![Page 21: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/21.jpg)
INTEGRAL ABUTMENTS• Simple joint• Minimal substructure• Low Maintenance• Design Hierarchy
– Integral– Joint-less– Joint expansion end– Joints on both ends
• Large skews• Unbalanced spans, etc
![Page 22: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/22.jpg)
![Page 23: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/23.jpg)
PROTECTIVE COATINGS
• Lead-Based Primers– Safety concerns
• Moisture-cured Urethane– Over-coating– Total Removal– Moisture tolerant
![Page 24: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/24.jpg)
CONCERNS
• Surface Preparation • Health & Safety
– Containment• Cost
– Service Life– Performance
• New Primer– Zinc
![Page 25: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/25.jpg)
ALTERNATIVES• Weathering Steel• Concrete• Timber• New Coating Systems
![Page 26: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/26.jpg)
WEATHERING STEEL
• Self-protecting– Patina
• Aesthetics• Environment
– Health & Safety• Needs Wet/Dry
Cycles
![Page 27: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/27.jpg)
P/S ADJACENT BOX BEAMS
• Plant Q/C• No Painting• Rapid Construction• Low Initial Cost• Freeboard
– Pressure flow• Debris
![Page 28: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/28.jpg)
CONCERNS• Longitudinal
Cracking of Decks– Working Cracks
• Limited treatments
• Deck Deteriorates• Unknown Beam
Condition
![Page 29: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/29.jpg)
OPEN GRATED BRIDGE DECKS
• Super and substructure deterioration
• Eliminated
![Page 30: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/30.jpg)
REINFORCING STEEL
• Bare Bars – Premature full-depth
cracking
– SIP forms• Corrosion evident
• Epoxy Bars– Proven success– Min. increase in $
• Stainless– Justifiable
![Page 31: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/31.jpg)
UNCOATED REBAR
![Page 32: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/32.jpg)
HP CONCRETE
• Pozzolans – Fly Ash & Silica Fume
• High Strengths• Low Permeability• Shrinkage Cracking
– Increased permeability
![Page 33: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/33.jpg)
BRIDGE BEARINGS• Steel Bearings
– Lubrication Required– Can’t meet 4 year cycle
• Jack & Clean• Often “Freeze”
– Thermal Stresses• Replacement Program
– Elastomeric Bearings– “Maintenance Friendly”
![Page 34: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/34.jpg)
![Page 35: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/35.jpg)
CONTEXT SENSITIVE DESIGN
![Page 36: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/36.jpg)
PREVENTIVE MAINTENANCE
![Page 37: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/37.jpg)
TASK CODE DESCRIPTION CYCLEH11 Clean Substructure 2 yrs H13 Seal Substructure 6 yrs
H29 Lubricate Bearings 4 yrs
H38 Clean Superstructure & Deck 2 yrs
H58 Remove Wearing Surface 12 yrs H59 Place Wearing Surface 12 yrs H60 Place Waterproof Membrane 12 yrs H69 Seal Deck 4 yrs H73 Fill Cracks & Joints 4 yrs
H75 Clean Drainage Systems 2 yrs
H89 Bridge Painting 12 yrs
![Page 38: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/38.jpg)
SPOT PAINTING
• Resume Program• Materials
– Calcium Sulfonate
• Needle Scalers• Vacuum Tools • Minimal
Containment Necessary
![Page 39: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/39.jpg)
DECK TREATMENTS
• All Concrete Cracks– Transverse– Longitudinal– Map
• New & Old Concrete• Treatments
– Fill cracks or– Bridge cracks
![Page 40: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/40.jpg)
RADAR Statistical Analysis• Inspector rating supported• GPR sees things the
inspector doesn’t• Rating alone cannot be
used for selecting deck treatment
• Deterioration is age related• Age and % delamination
are not correlated
![Page 41: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/41.jpg)
FILLING CRACKS
![Page 42: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/42.jpg)
BRIDGING CRACKS
![Page 43: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/43.jpg)
PM & MINOR REPAIRS
![Page 44: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/44.jpg)
4.4
5.8
$250K
$5K
2370 Good Bridges
4740 Fair Bridges
790 Poor
$3.7M
Treatment Costs / Bridge
Maintenance Candidates
Major Rehab or Replacement Candidates
![Page 45: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/45.jpg)
![Page 46: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/46.jpg)
MAINTENANCE DESIGN• Weathering Steel• Composite Design• Simple Span
– No pier in water• Integral Abutment
– No joints– No bearings
• Epoxy Bars • Bridge Railing
– No sidewalk
![Page 47: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/47.jpg)
Best Practices in Bridge Management Decision Making
PART 2
![Page 48: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/48.jpg)
Bridge Management Decision MakingDomestic Scan Tour
Discover and collect information on how DOTs manage maintenance of highway bridges and how maintenance impacts the overall bridge program
Focus on decision processes for maintenance programs;How Do Decisions Rely On:
• Bridge Conditions• Maintenance Needs• Effectiveness of Maintenance• Funding Availability
![Page 49: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/49.jpg)
AASHTO
FHWA Consultant
Academia
Bruce JohnsonOregon DOT
Scot BeckerWisconsin DOT
Tod KimballFHWA Vermont
Narendra KhambhatiArora and Assoc., NJArt D’Andrea
Louisiana DOTKeith RamseyTexas DOT
George HearnUniv. of Colorado
Pete WeykampNew York DOT
![Page 50: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/50.jpg)
WA
CA
MI
OH
FL
DE
VA
Washington DOT
California DOT & El Dorado/Placer County DOTs
Michigan DOT
Ohio DOT
Florida DOT & Turnpike
Delaware DOT
Virginia DOT
![Page 51: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/51.jpg)
Inputs
.
Site Visit
Scan Team
Document Review
![Page 52: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/52.jpg)
Bridge Management Process
Preventive Maintenance
Agency Support
KEY FINDINGS
![Page 53: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/53.jpg)
•Maintenance Needs•Prioritization•Performance Measures•Verification
Bridge Management
![Page 54: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/54.jpg)
Statewide -- State Owned
0
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
45000000
50000000
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Calendar Year Data
Squa
re A
rea
of B
ridge
s
Non Deficient Total deficient
New York
![Page 55: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/55.jpg)
0
200
400
600
800
1000
1200
1400
Num
ber o
f Brid
ges
1 2 3 4 5 6 7 8 9
NBI Rating55
GoodFairPoorSerious or Critical
Michigan
![Page 56: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/56.jpg)
Identified at the element level Uniform, specific, and repeatable Stated as standard work actionsAccessible throughout the agency
Maintenance Needs
![Page 57: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/57.jpg)
NBI CONDITION ASSESSMENT Ohio
![Page 58: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/58.jpg)
TYPESModified NBI Commonly Recognized (CoRe) Bridge ElementsOwn system
SUPPORTSDetailed reportsMaintenance decisionsTreatment options Early interventionMinimize repair costs
Element Level Inspection
![Page 59: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/59.jpg)
INSPECTION FORM OHIO
![Page 60: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/60.jpg)
Uniform, Specific, & Repeatable
METHODSInspectors recommend actionDrop-down menuActions prioritizedCosts per actionStored in database Draft work order
![Page 61: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/61.jpg)
Needs Database New York
![Page 62: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/62.jpg)
Needs Database Oregon
![Page 63: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/63.jpg)
Inspector Recommendations Washington
![Page 64: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/64.jpg)
Integrate objectives for deficiencies, preventive maintenance, network performance, and risk.
Engage both central and regional DOT.
Advance from network‐level rankings to selection of specific projects.
Prioritization
![Page 65: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/65.jpg)
Prioritization Formulas• Sufficiency Rating (NBI) Structural Adequacy and Safety (55% maximum);
Serviceability and Functional Obsolescence (30% maximum);
Essentiality for Public Use (15% maximum); Special Reductions
• Health Index (Pontis)Health Index (HI) = (∑ CEV ÷ ∑ TEV) × 100
TEV = Total element quantity × Failure cost of element (FC)
CEV = (∑ [Quantity in condition state i × WF(i)]) × FC
Health 80-89 Health 70-79 Health below 70
![Page 66: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/66.jpg)
Deficiency Form
ula
Del
awar
e
![Page 67: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/67.jpg)
Maintenance Accountability Program Washington
![Page 68: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/68.jpg)
Match objectives in bridge maintenance
Identify work to advance maintenance objectives
Provide simple indications of status of bridge networks
Virginia
Performance Measures
![Page 69: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/69.jpg)
4A2 Structural Bridge Repair
2007-09 M Program Budget: $9.2 million
Bridge inspections result in the “to‐do list” of smaller‐scale structural repairs for the Maintenance Program to complete. Examples of these repairs include: Bridge Cap Repair
Bridge Column RepairDebris RemovalScour RepairExpansion Joint Repair
Washington
![Page 70: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/70.jpg)
4A2 Performance Measurement
A: 90 -100% completedB: 80 - 89% completedC: 65 - 79% completedD: 50 – 64% completedF: Less than 50% completed
The performance measurement for this activity focuses on Priority 1 repairs. The of repairs for is compiled annually.
The Level of Service is based on the percentage of Priority 1 repairs completed.
Level of Service target is a C
2008 Level of Service delivered is a D
The 2009-11 proposed budget includes an additional $1.5 million to catch up with this maintenance backlog and achieve the target.
Washington
![Page 71: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/71.jpg)
Bridge Maintenance Contract Funding and Backlog
$94
$63
$63
$94
$94
$94
$13
$9$6$6$6
$94
$94
1645
2883
2922
2961
3000
3039
3078
3117
2844
1870 20
95 2320 25
44
$-
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14Fiscal Year
Fun
ding
Lev
el (M
illio
n $)
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
# of
Bri
dges
Funding $ Backlog Bridges
Actual Projected
71
Bridge Maintenance Program 2001 - 2005
CalTrans
![Page 72: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/72.jpg)
Bridge Maintenance Contract Funding and Backlog
$94
$63
$63
$94
$94
$94
$13
$9$6$6$6
$94
$94
1645
2647 28
35
2874
2913
2952
2991
3030
2507
1870 20
95 2320 25
44
$-
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14Fiscal Year
Fun
ding
Lev
el (M
illio
n $)
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
# of
Brid
ges
Funding $ Backlog Bridges Reduce Backlog
2007 & 2009 Five Year Plan
Actual
72
CalTrans
![Page 73: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/73.jpg)
Strategy is effectiveInvestment pays off
Needs are metLevel of Service indicatorsNeeds – Accomplishment = Gap
Work completed Report into BMS, MMS, Capital Program, …
Verification
![Page 74: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/74.jpg)
74
1,333 BridgesCurrent - 11%
Goal – 5%
8,623 BridgesCurrent - 69%
Goal – 85%
2,544 BridgesCurrent - 20%
Goal 10%300 Bridges/Yr
Rehab. Program (SHOPP)
Maintenance Program Preservation Program(Major Maintenance)
40 Bridges/Yr
870 BridgesCurrent - 7%
Goal – 5%
9,122 BridgesCurrent - 71%
Goal – 85%
2,835 BridgesCurrent - 22%
Goal 10%560 Bridges/Yr
Rehab. Program (SHOPP)
Maintenance Program Preservation Program(Major Maintenance)
20 Bridges/Yr
CALTRANS
![Page 75: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/75.jpg)
Preventive Maintenance
Significant part of programApplied before bridges become deficientImplements clear plans of actionFlexible allocation of resources
Washington
![Page 76: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/76.jpg)
Tracking Trends Michigan
Deterioration RateStatewide Trunkline Bridges
0
50
100
150
200
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Year
Num
ber B
ridge
s G
oing
fro
m G
ood/
Fair
to P
oor Linear Fit
76
![Page 77: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/77.jpg)
Bridge Deck Preservation Matrix Michigan
77
![Page 78: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/78.jpg)
Cyclical Maintenance Virginia
78
Bridge Deck Washing (Concrete) – 1 YearBridge Deck Sweeping – 1 YearSeats & Beam Ends Washing – 2 YearsCutting & Removing Vegetation - 2 YearsRoutine Maintenance of Timber Structures - 2 YearsReplacement of Compression Seal Joints – 10 yearsScheduled Replacement of Pourable Joints – 6 yearsCleaning and Lubricating Bearing Devices – 4 yearsScheduled Beam Ends Painting – 10 YearsInstallation of Thin Epoxy Concrete Overlay – 15 YearsRemoving Debris from Culverts – 5 Years
![Page 79: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/79.jpg)
Bearing Replacement Program New York
79
![Page 80: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/80.jpg)
LEGISLATURE: gas tax, dedicated fund, MPOpercentage
DOT Executives: Maintenance is not a episodic.ODOT – “Fix it First”
DOT Central: Use quantitative performance measures, Recognize districts’ first‐hand knowledge
District Engineers: Evaluate needs and trends funds and projects
Inspectors: Identify needs, recommend actions
Crews: Execute work, take initiative
Agency Support
![Page 81: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/81.jpg)
Funding Levels
Michigan– Fixed: 22% PM, 30% Rehab, 48% Replace
Ohio, Washington– 15% to MPOs (Fed. legislation @ 15% min.)
Virginia– Majority of $ maintenance - legislated
California– PM from $6M to $94M
State Gas Tax– NY 42.5; Ca 39.9; Wa 37.5; Fl 34.5; Mi 30.9
![Page 82: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/82.jpg)
DIRECTION“Service-life Extension”
MobilityAdvances in Materials
Concrete repairs, CoatingsInnovative Designs for In-
service BridgesDeck replacement optionsRapid replacement
Culverts
Comparative MeasuresPartnerships
Industry, ConsultantsRegional GroupsCommunicationOwners, LegislaturesTriagePosted & Closed AssessmentTreatmentsHolistic
Management
![Page 83: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/83.jpg)
CEU QUESTIONS
![Page 84: Bridge Maintenance Strategies - Buffalomceer.buffalo.edu/education/Bridge_Speaker_Series/2009-2010... · Bridge Maintenance Strategies Peter Weykamp, P.E. Bridge Maintenance Program](https://reader030.vdocument.in/reader030/viewer/2022021423/5aa913a17f8b9a86188c5169/html5/thumbnails/84.jpg)
We, the bridge maintenance engineers of New York, hold these truths to be
self-evident: all joints leak, all concrete cracks, and rust never sleeps. We will
strive to capitalize our way out of maintenance and maintain our way out of capital. It is our endeavor to educate others that a bridge is as important to a
highway as a diamond is to a ring.