bridge no - connecticut...underwater special frequency date type c two girder system, welded plate...

36
Inspection Type: Underwater BRIDGE NO. 04180 52980 - NEWTOWN INTERSTATE 84 WESTBOUND over HOUSATONIC RIVER Underwater Inspection 7/18/2018 Infrastructure Inspected by:

Upload: others

Post on 04-Feb-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • Inspection Type: Underwater

    BRIDGE NO.04180

    52980 - NEWTOWN

    INTERSTATE 84 WESTBOUND

    over

    HOUSATONIC RIVER

    Underwater Inspection

    7/18/2018

    InfrastructureInspected by:

  • Report Title Page 1

    Location Map 2

    Structure Inventory and Appraisal (BRI-19) 3

    Underwater Inspection (BRI-59) 7

    Underwater Inspection (BRI-58) 8

    UW Drawings 12

    Photos 22

    Back-Up Material 33

    TABLE OF CONTENTS

    Section Page Number

  • Form: Location

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Location Map # 1

    Bridge No. 04180Interstate 84 Westbound over Housatonic

    RiverNewtown, CT

  • Form: BRI-19, Rev. 2/15

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    STRUCTURE TYPE & MATERIALS

    STRUCTURE INVENTORY & APPRAISAL

    (90) Inspection Date

    Indepth Insp Proposed next Indepth Year

    Deck Survey Date Class

    (91) Frequency

    Bridge Name

    Sufficiency Rating

    Access Flagman

    INSPECTION

    Fracture

    Underwater

    Special

    TypeFrequency Date

    C Two GirderSystem, welded plategirders

    24

    B Underwater Only24 07/18/2018

    IDENTIFICATION

    No

    03

    24

    81.0

    15 - Over 40 ft.reach 0

    (43) Structure Type, Main

    A) Material

    B) Design Type

    (44) Structure Type, Approach

    4 - Steel continuous

    03 - Girder and Floorbeam System

    A) Material

    B) Design Type

    0 - Other

    00 - Other

    (45) Number of Spans, Main Unit

    (46) Number of Approach Spans

    (107) Deck Structure Type

    4

    0

    1 - Concrete Cast-in-Place

    (108) Wearing Surface/Protection Systems

    A) Type of Wearing Surface

    B) Type of Membrane

    C) Type of Deck Protection

    Substructure

    A) Material

    B) Design Type

    2 - CONCRETE

    1 - FULL HEIGHT STEM

    6 - Bituminous

    2 - Preformed Fabric

    0 - None

    Paint

    Type

    Year

    Comment

    GEOMETRIC DATA

    Town Code - Name

    (5) Inventory Route

    (B) Signing Prefix

    (A) Record Type

    (D) Route Number.

    (E) Dir Suffix

    1 - INTERSTATE HIGHWAY

    1: Route carried "on" the structure

    4 - WEST

    00084

    ROCHAMBEAU BRIDGE

    52980 - NEWTOWN

    (C) Level of Service 1 - MAINLINE

    (6A) Featured Intersected HOUSATONIC RIVER

    (6B) Critical Facility Indicator

    (7) Facility Carried

    (9) Location

    (16) Latitude

    INTERSTATE 84 WESTBOUND

    Miles

    1.5 MI EAST OF EXIT 11

    (11) Mile Post 18.42

    Deg. Min. Sec.212641

    (17) Longitude Deg. Min. Sec.5314-73

    (98) Border Bridge

    (A) State Code (B) Percent Responsibility

    (C) Border Town Name

    (99) Border Bridge Structure No.

    (48) Length of Maximum Span

    (49) Structure Length

    ft.

    ft.792

    224

    (50) Curb or Sidewalk Widths

    A) Left ft.0 B) Right ft.0

    (51) Bridge Roadway Width Curb to Curb ft.60

    (52) Deck Width, Out to Out ft.63

    (32) Approach Roadway Width ft.50

    in.9

    in.0 in.0

    Structurally Deficient N Functionally Obsolete N

    %

    in.0

  • Form: BRI-19, Rev. 2/15

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    AGE AND SERVICE(33) Bridge Median 0 - No median

    Deck Area sq. ft.50529

    (34) Skew Angle

    (35) Structure Flared

    0

    0 - No flare

    (10) Inv. Rte. Min. Vert. Clearance ft.99

    (47) Inv. Rte. Total Horiz. Clr. ft.60

    Log Inv. Rte. Total Horiz. Clr. ft.60

    RLog Inv. Rte. Total Horiz. Clr. ft.0

    (53) Min. Vert. Clearence Over Bridge ft.99

    (54) Log-Min. Vert. Underclearance ft.ref. 0N

    (55) Min. Lat Underclearance on Right ft.ref. 0N

    (56) Min. Lat Underclearance on Left ft.0

    APPRAISALS

    Year Built 1977 (106) Year Reconstructed

    (42) Type of Service

    A) On 1 - Highway

    B) Under 5 - Waterway

    (28) Number of Lanes

    A) On 02 B) Under 00

    (29) Average Daily Traffic

    Is Above Half ADT?

    (109) Precent Truck

    (30) Years of ADT

    (19) Bypass, Detour Length

    36650

    Yes

    9

    2015

    CONDITION

    (58) Deck

    (59) Superstructure

    (60) Substructure

    (61) Channel & Channel Protections

    (62) Culverts

    5

    5

    6

    5

    N

    (36) Traffic Safety Features

    A) Bridge Railings

    B) Transitions

    C) Approach Guardrail

    D) Approach Guardrail Ends

    0

    0

    1

    1

    (67) Structural Evaluation

    (68) Deck Geometry

    (69) Underclearances, Vert. & Horiz.

    (71) Waterway Adequacy

    (72) Approach Roadway Alignment

    (113) Scour Critical

    5

    9

    N

    9

    8

    8

    COMMENTS

    Special inspection: Horizontal cracking along floorbeams &main girders.

    CLASSIFICATIONWATERWAY

    (112) NBIS Bridge Length

    (104) Highway System

    (26) Functional Class

    (100) Defense Highway

    (101) Parallel Structure

    (102) Direction of Traffic

    Yes

    1 - Structure/Route is on NHS

    01 - Rural - Principal Arterial - Interstate

    1 - Is on an Interstate STRAHNET route

    L - Left structure (South or West)

    1 - 1-way traffic

    Drainage Basin Waterway

    (38) Navigation Control

    (39) Navigation Vertical Clearance

    (40) Navigation Horiz. Clr.

    (111) Pier/Abutment Navigation

    6000 - Housatonic River

    0 - No navigation controlon waterway (bridge permitnot required)

    0 ft.

    ft.0

    2 - In place and functioning

    Miles1

    %

    in.99

    in.0

    in.0

    in.0

    in.99

    in.0

    in.0

    in.0

    (116) Vert-Lift Brg Nav Min 0 ft. 0 In.

    deg.

  • Form: BRI-19, Rev. 2/15

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    (103) Temporary Structure

    (110) Designated NationalNetwork

    (20) Toll

    (21) Maintain

    (22) Owner

    Report Class

    (37) Historical Significance

    1 - Inventory route on National TruckNetwork

    3 - On Free Road

    01 - State Highway Agency

    01 - State Highway Agency

    S - STATE

    5 - Not eligible for National Register

    PROPOSED IMPROVEMENTS

    (75A) Type of Work Proposed

    (75B) Work Done By

    (76) Length of Structure Improvement

    (94) Bridge Improvement Cost $

    (95) Roadway Improvement Cost $

    (96) Total Project Cost $

    (97) Year of Improvement Estimate

    (114) Future ADT

    (115) Year of Future ADT

    DOT Bridge Program List No

    Project No

    Advertised Date

    35 - Rehabilitation -Deterioration1 - Work to be done bycontract

    30000

    2014

    54458

    2035

    27

    0096-0201

    09/18/2019

    ft.

    LOAD RATING & POSTING

    POSTED SIGNS

    Other Posted Sign 1

    Other Posted Sign 2

    Actual Recomended

    Posted Load Single Unit Truck

    Posted Load Semi-Trailer Truck

    Posted Load 4 Axle Truck

    Posted Load 3S2 Truck

    All Vehicles

    tons

    tons

    tons

    tons

    tons

    Posted Vert. Clearance on Bridge

    Posted Vert. Underclearance

    Posted Speed Limit on Bridge

    ft. in.

    ft. in.

    m.p.h.

    OTHER FEATURES

    Fence Required

    Fence Present

    Fence Height

    Fence Material

    Fence Top Type

    Barrel Ladders

    Stand Pipes

    Catwalks

    Moveable Inspection System

    Haunches Present over Roadway

    Utilities

    No

    No

    Blank

    Blank

    Yes

    No

    Yes

    No

    NO

    (31) Design Load

    (63) Operating Rating Type

    (64) Operating Rating

    (65) Inventory Rating Type

    (66) Inventory Rating

    Evaluation Code

    Year of Evaluation

    (70) Bridge Posting

    (41) Structure Status

    5 - HS 20

    1 - Load Factor (LF)

    60

    1 - Load Factor (LF)

    36

    L - Load Factor

    1995

    5 - Equal to or above legal loads

    A - OpenFence Type Blank

    N | No Utilities present

  • Form: BRI-19, Rev. 2/15

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    INSPECTOR'S SIGNATURES:

    3) Date:

    08/14/2018

    4) Date:

    08/17/2018

    1) Date:

    2) Date:

    P.E. SIGNATURE: Date: 08/17/2018

    P.E. #

    Date: 09/04/2018Reviewed By:

    27367

  • Type of water:

    Underwater Inspections performed in conjunction with Bridge No. 01218.

    Boat ramp located at the end of Scout Road in Southbury.

    Fresh

    Minor aquatic growth and zebra mussels up to 1" thick.Marine Growth:

    YesDive Station Used?

    Access to Bridge:

    Access/ Equipment Comments U/W:

    Boat

    8.0'

    Current Strength:

    U/W Visibility:

    Cobbles, silt, river rock, and sand with up to 5.0' penetration into the channel bottom.Bottom Composition:

    25.0'Max Water Depth:

    Max Water Depth at Pier Or Abutment:

    1.0 fps

    25.0'

    Carried:52980 - NEWTOWN Crossed:INTERSTATE 84 WESTBOUND04180

    UNDERWATER INSPECTION (BRI-59)

    Town:Bridge:

    Boat Used?

    3

    Yes

    26'Boat Size:

    HOUSATONIC RIVER

    Total Number of Piers:

    Piers in the Water:

    3

  • ITEM RATING REMARKS

    60. SUBSTRUCTURE

    ABUTMENT 1:

    STEM

    FOOTING

    EROSION

    SETTLEMENT

    SCOUR

    WINGWALLS

    General Remarks:

    N

    N

    N

    N

    N

    N

    N

    South Abutment. Located out of the channel.

    6 REINFORCED CONCRETE ABUTMENTS AND PIERS

    ABUTMENT 2:

    STEM

    FOOTING

    EROSION

    SETTLEMENT

    SCOUR

    WINGWALLS

    General Remarks:

    N

    N

    N

    N

    N

    N

    N

    North Abutment. Located out of the channel.

    UNDERWATER INSPECTION

    PIER NO.

    PILES

    STEM

    FOOTING

    6

    N

    6

    6

    • There is no exposure of the steel H-piles.

    The reinforced concrete pier has the following deficiencies:

    • 5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.• Horizontal cracks up to 17' long x up to 1/2” wide along the cold joints above and below water.• Near the midpoint of the footing on both faces there is a vertical hairline crack x 5' long withefflorescence.• The north face has isolated vertical hairline cracks x up to 2' long throughout.• Random areas of Zebra mussels up to 50% coverage x 1" thick.

    (See UW Drawings 5 & 6 and Photos 3 - 5)

    The step footing has the following deficiencies:

    • Step footing exposed over its full-length x up to full-height (5.4’ high) along both faces of the pier.• Footing exposed up to 5.1’ vertically over a length of 37’ along the pier on both faces with noundermining.• Isolated vertical hairline cracks up to 5' long with efflorescence.

    (See UW Drawings 5 & 6 and Photos 6 & 7)

    • Channel elevations have varied around the pier with an increase by up to 1.9', this is possibly due tothe timber surrounding the pier.• Along the north face of the pier, there is a 20' length of sheet pile exposure up to 6' high located 5'off the pier face.• The Step Footing is exposed over its full-length x up to full-height (5.4’ high) along both faces of thepier,• Footing has been exposed up to 5.1’ vertically (previously 5.0' high) over a length of 37’ on bothfaces of the pier.

    (See UW Drawings 5 & 6)

    1

    Form: BRI-58.

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    09/04/2018 Page 1 of 4

  • Form: BRI-58.

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    SCOUR

    SETTLEMENT

    6

    8

    • Channel elevations have varied around the pier with an increase by up to 1.9', this is possibly due tothe timber surrounding the pier.• Along the north face of the pier, there is a 20' length of sheet pile exposure up to 6' high located 5'off the pier face.• The Step Footing is exposed over its full-length x up to full-height (5.4’ high) along both faces of thepier,• Footing has been exposed up to 5.1’ vertically (previously 5.0' high) over a length of 37’ on bothfaces of the pier.

    (See UW Drawings 5 & 6)

    • No apparent settlement observed.

    General Remarks:

    PIER NO.

    PILES

    STEM

    FOOTING

    SCOUR

    SETTLEMENT

    6

    N

    7

    6

    5

    8

    • There is no exposure of the steel H-piles.

    The reinforced concrete pier has the following deficiencies:

    • 5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.• There are steel H-piles intermittently exposed along the stem located above the step footing(formwork left in place from construction).• Random areas of Zebra mussels up to 50% coverage x 1" thick.

    (See UW Drawings 7 & 8 and Photos 8 - 10)

    The step footing and footing have the following deficiencies:

    • The step footing is exposed over its full-length x up to full-height (5.0’ high) on both faces of the pier.• The footing has been exposed full length x up to full-height (5.5’ high) on the south face and fulllength x up to 1.7’ high (previously 0.2' high) on the north face of the pier with no undermining.• The tremie seal has been exposed up to 1.0’ long across the full-width of the Upstream (West) Noseand over 2’ long x 0.5' high at the southwest corner of the pier.• Random vertical hairline cracks up to 3’ long with efflorescence on the footing.• Isolated edge spalls on the footing up to 2’ long x 4” wide x up to 4” deep.• At the center of the Downstream (South) face of the step footing there is a spall 18" long x 1' wide x4" deep.• At the southwest corner of the footing/tremie interface there is a spall 2' long x 4" high x 3" deep.

    (See UW Drawings 7 & 8 and Photos 10 & 11)

    • Channel elevations surrounding Pier 2 has had aggradation of up to 3.1' with isolated areas ofdegradation up to 3.0'.• The step footing is exposed full length x up to full-height (5.0’ high) on both faces of the pier.• The footing has been exposed over its full-length x up to full-height (5.5’ high) on the south face andfull length x up to 1.7’ high on the north face of the pier.• The Tremie Seal has been exposed up to 1.0’ high (previously 0.9' high) across the full-width of theUpstream (West) Nose and over 2’ long x 0.5' high at the southwest corner of the pier.

    (See UW Drawings 7 & 8)

    • No apparent settlement observed.

    General Remarks:

    2

    PIER NO.

    PILES

    STEM

    6

    N

    7

    • There is no exposure of the steel H-piles.

    The reinforced concrete pier has the following deficiencies:

    • Band of abrasion up to 1/4" deep extending from 1' above the water surface down to the channelbottom.• The north face towards the Upstream (West) Nose of the pier there is a 1.7' long vertical hairlinecrack below the construction joint.

    (See UW Drawings 9 & 10 and Photos 12 & 13)

    3

    09/04/2018 Page 2 of 4

  • Form: BRI-58.

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    61. CHANNEL & CHANNEL PROTECTION:

    CHANNEL SCOUR

    EMBANKMENT EROSION

    DEBRIS

    VEGETATION

    CHANNEL CHANGE

    FENDER SYSTEM

    SPUR DIKES & JETTIES

    5

    5

    7

    5

    7

    7

    N

    N

    The Housatonic River is a fresh body of water that flows from West to East beneath the structure.

    • Channel bottom elevations along the upstream and downstream fascias have random areas of mostlyaggradation up to 4.0' since the 2016 Underwater Inspection.• Channel bottom elevations at Pier 1 have varied around the pier with an increase by up to 1.9', this ispossibly due to the timber surrounding the pier since the 2016 Underwater Inspection.• Channel bottom elevations at Pier 2 show evidence of aggradation of up to 3.1' with isolated areas ofdegradation up to 3.0' since the 2016 Underwater Inspection.• Channel bottom elevations at Pier 3 south face have remained relatively unchanged (less than 0.6’variations) as compared to the 2016 Underwater Inspections.• Channel bottom elevations at Pier 3 show evidence of degradation of up to 3.0' along the north face of thepier most likely due to the sandbar that was noted in the previous 2016 Underwater Inspection.• At Piers 1 and 2, the step footing and footing have been exposed due to scour.• At Pier 1, the step footing is exposed over its full-length x up to full-height (5.4’ high) along both faces ofthe pier, and the footing has been exposed up to 5.1’ vertically (previously 5.0' high) over a length of 37’ onboth faces of the pier.• At Pier 2, the step footing is exposed over its full-length x up to full-height (5.0’ high) on both faces of thepier and the footing has been exposed over its full-length x up to full-height (5.5’ high) on the south face andfull length x up to 1.7’ high (previously 0.2' high) on the north face of the pier.• At Pier 2 the Tremie Seal has been exposed up to 1.0’ high (previously 0.9') across the full-width of theupstream (west) nose and over 2’ long x up to 0.5' high at the southwest corner of the pier.• There is no exposure of the footings at Pier 3.

    (See UW Drawings 1 - 10)

    • There is no significant erosion along the channel embankments.

    (See Photos 19 & 20)

    • There is timber debris up to 1' diameter at the upstream (west) and downstream (east) noses of Pier 1.• There is moderate timber debris up to 2' diameter along the north face of Pier 1.• There is timber debris up to 1' diameter at the upstream (west) nose of Pier 2.

    • The channel embankments are well vegetated.

    • There is no apparent change to the channel orientation.• Bridge No. 01218 is located approximately 40' downstream (East) of the bridge.• There is approximately a 150’ long x 20’ wide x 3’ high sandbar/area of aggradation located north of Pier 3.

    (See UW Drawings 1 - 3 and Photos 16 - 18)

    RIP RAP N

    FOOTING

    SCOUR

    SETTLEMENT

    N

    7

    8

    The reinforced concrete pier has the following deficiencies:

    • Band of abrasion up to 1/4" deep extending from 1' above the water surface down to the channelbottom.• The north face towards the Upstream (West) Nose of the pier there is a 1.7' long vertical hairlinecrack below the construction joint.

    (See UW Drawings 9 & 10 and Photos 12 & 13)

    • There is no exposure of the step footing or footing at the pier.• There is a section of sheet pile exposed up to 6" high along the south face of the pier approximately12.5' off the pier face.

    (See UW Drawing 3)

    • Channel bottom elevations have remained relatively unchanged (less than 0.6’ variations) except forscour up to 3.0' along the north face of the pier since 2016 Inspection.

    (See UW Drawings 9 & 10)

    • No apparent settlement observed.

    General Remarks:

    09/04/2018 Page 3 of 4

  • Form: BRI-58.

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    General Remarks: The navigation lights on Pier 1, Span 2 Fascia and Pier 2 and the west bridge fascia appear to be on timers and were not on at thetime of the inspection.

    (Photos 20 -22)

    09/04/2018 Page 4 of 4

  • N.T.S.

    C L

    MATCH LINE A-A

    50'+/- 25'+/- 15'+/- 10'+/- 15'+/- 25'+/- 50'+/-10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/-

    25'+/-

    15'+/-

    10'+/-

    10'+/-

    15'+/-

    25'+/-

    BRIDGE 04180- PIER 1 BRIDGE 01218- PIER 1

    FLOWAND FOOTING

    EXPOSED STEP-FOOTING

    AND FOOTING

    EXPOSED STEP-FOOTING

    -17.7'

    -17.0'

    -18.2'

    -18.0'

    -18.7'

    -19.6'

    -20.6'

    -27.1'

    -19.6'

    -17.8'

    -19.1'

    -18.6'

    -20.0'

    -21.0'

    -22.4'

    -26.8'

    -21.6'

    -19.2'

    -19.6'

    -19.7'

    -20.6'

    -22.3'

    -23.3'

    -26.7'

    -22.8'

    -21.1'

    -24.6'

    -20.3'

    -21.8'

    -23.1'

    -24.2'

    -26.7'

    -24.0'

    -24.6'

    -24.8'

    -29.2'

    -24.9'

    -25.8'

    -27.7'

    -25.7'

    -26.5'

    -25.3'

    -27.1'

    -27.0'

    -24.4'

    -27.5'

    -27.3'

    -26.6'

    -27.6'

    -27.9'

    -25.6'

    -24.8'

    -25.0'

    -26.9'

    -25.6'

    -25.8'

    -25.5'

    -26.8'

    -26.0'

    -25.6'

    -25.3'

    -27.0'

    -25.8'

    -26.1'

    -26.2'

    -26.7'

    -25.8'

    -26.1'

    -26.5'

    -26.8'

    -25.6'

    -26.1'

    -26.3'

    -26.9'

    -25.8'

    -27.0'

    -26.9'

    -26.8'

    -26.0'

    -27.2'

    -27.1'

    -27.1'

    -24.3'

    -27.6'

    -27.6'

    -26.8'

    -20.6'

    -24.1'

    -24.0'

    -26.2'

    -21.3'

    -25.4'

    -24.2'

    -25.6'

    -27.6'

    -24.5'

    -25.6'

    -24.4'

    -30.7'

    -30.4'

    -27.0'

    -29.2'

    -29.9'

    -27.1'

    -28.0'

    -28.6'

    -26.5'

    -25.9'

    -27.0'

    -26.6'

    -27.4'

    -27.1'

    -25.1'

    -30.1'

    -28.8'

    -24.9'

    -26.6' -25.1' -31.5' -22.9' -26.5' -31.2'

    UW

    DR

    AWIN

    G

    1

    -28.4'

    -26.6'

    -24.7'

    -24.4'

    -31.1'

    -29.5'

    -24.6'

    -31.9'

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    BRIDGE NO. 04180

    REVISED BY: FHDRAWING NO.

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    SOUNDING PLAN

    LEGEND FOR BOTTOM ELEVATIONS

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    -23.9'

    -24.1'

    -26.5'

    -26.2'

    -23.9'

    -25.7'

    -26.8'

    -26.3'

    -26.6'

    -26.9'

    -25.0'

    -25.3'

    -25.3'

    -26.1'

    -24.3'-27.3'

    -27.2'

    1.0'

    -26.3'-29.0'

    1.0'

    -28.3'-28.9'

    0.8'

    -29.3'-28.5'

    0.1'

    -27.3'-29.8'-28.3'

    0.3'

    -30.2'

    -28.3'

    0.1'

    -29.2'

    -29.3'

    0.1'

    -30.4'

    -29.3'

    0.2'

    -29.2'

    -27.8'

    1.6'

    -28.1'

    -27.3'

    1.0'

    -27.2'

    -25.3'

    2.0'

    -26.3'-24.3'

    3.0'

    -26.5'-25.1'

    -26.1'-25.8'

    -27.1'-26.7'

    -23.5'-25.3'

    -22.4'-23.3'

    -29.9'-29.3'

    SOUNDING PLAN

    04180 AINSPECTED BY: JK, MB, JW

    07 / 18 / 18

    LEGEND FOR SYMBOLS

    W.S. ELEV. -7.3'

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    -7.3'

    -32.1' -30.4' -28.8' -24.1' -23.4'

    -36.3' -31.3' -27.3' -24.3' -23.3'

    0.2' 0.2' 0.2' 0.2' 0.2'

    -32.6'-26.1'

    -27.1'

    -28.5'

    -26.9'

    -25.3'

    -23.9'

    -25.8'

    -25.4'

    -27.2'

    -23.3'

    -22.3'

    -23.6'

    -24.8'

    0.2'

    -22.3'

    -21.6'

    0.2'

    -24.6'

    -26.3'

    0.2'

    -25.0'-27.9'-32.5'

    -34.3' -31.3' -27.3'

    0.2'0.2'0.2'

    -36.3'-34.1'

    0.0'

    -23.8'-24.1'

    -23.3'-20.3'

    -24.9'

    -26.2'

    -26.6'

    -23.5'

    -26.9'

    -26.1'-26.6'

    -26.8'

    -26.8'-25.5'

    -26.3'

    -26.5'

    OFF PIER FACE)

    EXPOSURE OF SHEET PILING (5'

    20'L x 9'H (INSIDE) 5'H (OUTSIDE)

    TIMBER DEBRIS

    OF UP TO 2' DIAMETER

    MODERATE BUILD-UP

    TIMBER DEBRIS

    15'L x 1' DIAMETER

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

  • N.T.S.

    C L

    MATCH LINE A-A

    BRIDGE 01218- PIER 2BRIDGE 04180- PIER 2

    50'+/- 25'+/- 15'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 15'+/- 25'+/- 50'+/-25'+/-

    15'+/-

    10'+/-

    50'+/-

    10'+/-

    15'+/-

    25'+/-

    MATCH LINE B-B

    FLOW

    AND FOOTING

    EXPOSED STEP-FOOTING

    AND FOOTING

    EXPOSED STEP-FOOTING

    -28.6'

    -27.2'

    -29.0'

    -24.9'

    -23.7'

    -24.4'

    -14.9'

    -22.1'

    -22.4'

    -17.9'

    -13.6'

    -28.1'

    -26.1'

    -26.9'

    -24.6'

    -21.4'

    -20.6'

    -17.9'

    -12.9'

    -27.2'

    -25.5'

    -26.1'

    -23.9'

    -21.6'

    -19.9'

    -15.5'

    -12.9'

    -27.0'

    -26.0'

    -26.0'

    -23.6'

    -11.3'

    -15.7'

    -19.1'

    -26.8'

    -11.1'

    -15.3'

    -19.8'

    -25.8'

    -11.0'

    -15.0'

    -20.0'

    -25.1'

    -11.4'

    -14.2'

    -16.4'

    -21.1'

    -11.4'

    -12.9'

    -14.4'

    -16.2'

    -11.5'

    -12.6'

    -12.8'

    -16.5'

    -26.9'

    -27.6'

    -30.4'

    -27.1'

    -27.8'

    -30.9'

    -26.8'

    -27.8'

    -29.6'

    -26.5'

    -26.6'

    -27.7'

    -26.6'

    -23.8'

    -24.6'

    -26.8'

    -23.3'

    -22.5'

    -26.3'

    -23.3'

    -22.4'

    -26.5'

    -22.7'

    -21.1'

    -26.3'

    -23.0'

    -20.6'

    -26.0'

    -22.3'

    -21.4'

    -25.0'

    -23.6'

    -21.4'

    -25.1'

    -22.7'

    -22.5'

    -22.8' -20.1' -19.1'

    -24.6'

    -21.9'

    -23.0'

    -12.2' -12.6' -12.3' -13.2' -14.7' -15.6' -16.5'

    -12.9' -13.1' -13.5' -13.8' -14.2' -14.4' -14.4'

    -11.6' -11.6' -11.6' -11.8' -11.9' -11.2' -12.3'

    -16.3' -13.6' -14.1' -13.1' -16.2' -16.2' -16.5'

    -20.2' -21.0' -19.8' -18.0'

    UW

    DR

    AWIN

    G

    2

    -20.1'

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    BRIDGE NO. 04180

    REVISED BY: FHDRAWING NO.

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    SOUNDING PLAN

    04180 B

    SOUNDING PLAN

    -12.3'

    -13.3'

    -10.3'

    -14.2'-13.2'

    -12.5'

    -13.8'

    -11.5'

    1.0'

    -15.8' -17.2' -16.2' -14.2' -14.4'-21.3' -21.3' -19.8' -19.8' -16.3'

    0.1'0.1'0.2'0.3'0.3'

    -14.7'-13.5'

    -12.1'

    -12.6'

    -11.5'-11.3'

    -12.3'

    -12.0'

    1.0'

    -21.6'-22.3'

    0.3'

    -22.3' -21.8' -21.3' -20.5' -18.8'

    0.6'

    -21.7' -22.3' -20.7' -19.6' -18.3'

    0.3' 0.4' 0.2' 0.3'

    -16.3'-17.2'

    0.1'

    -26.1'

    -23.6'

    -21.2'

    -25.0'

    -24.4'

    -20.9'

    -26.7'

    -23.7'

    -22.2'-21.2'

    -26.0'

    -26.1'

    -11.4'

    -16.2'

    -19.1'

    -11.0'

    -14.3'

    -17.6'

    1.0'

    3.0'

    1.0'

    -25.3'

    -21.7'

    3.0'

    -11.3'

    -14.5'

    -19.3'

    -24.1'

    -19.6'

    -23.5'

    -14.9'

    -11.0'

    -27.6' -27.5' -27.7' -25.5'-30.6' -25.3' -25.8' -25.3'

    2.0'2.0'0.2'3.0'

    -23.8'-23.3'

    2.0'

    -21.3'-24.4'

    5.0'

    -27.8'

    3.0'

    -26.3'

    -33.6' -30.3' -29.9' -29.5'

    0.0' 0.0' 0.0'

    -31.3' -31.3' -28.3' -27.3'

    0.3'

    0.2'

    -32.3'-33.9'

    -26.6'

    -26.8'

    -32.2'-32.3'

    -25.3'

    -26.3' -25.5'

    -23.4'

    -25.3'

    -26.5'

    -27.4'

    -28.6'

    LEGEND FOR SYMBOLS

    LEGEND FOR BOTTOM ELEVATIONS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    W.S. ELEV. -7.3'

    -7.3'

    UP TO 1' DIAMETER

    HEAVY TIMBER DEBRIS

    INSPECTED BY: JK, MB, JW

    07 / 18 / 18

    0.0'

    0.0'

    0.0'

    0.0'

    0.0'

    0.0' 0.0'

    0.0'

    0.0'

    NOSE AND SOUTHWEST CORNER

    TREMIE SEAL EXPOSED AT THE

  • N.T.S.

    C L

    BRIDGE 01218- PIER 3

    50'+/- 25'+/- 15'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 15'+/- 25'+/- 50'+/-25'+/-

    15'+/-

    10'+/-

    50'+/-

    10'+/-

    15'+/-

    25'+/-

    MATCH LINE B-B

    (TYPICAL)

    SHORELINE

    BRIDGE 04180- PIER 3

    12.5'

    FLOWELEV. -8.2'EXPOSED SHEET PILE

    -10.3'

    -9.2'

    -7.6'

    -7.8'

    -5.5' -5.3'

    -6.3'

    -7.7'

    -8.8'

    -10.3'

    -5.3'

    -6.3'

    -7.7'

    -8.7'

    -10.1'

    -5.8'

    -7.3'

    -7.7'

    -8.4'

    -10.3' -11.0' -11.1' -10.4' -10.8' -9.1' -9.3' -10.0' -10.3' -10.3' -9.9' -9.3' -10.5' -10.4'

    -8.6' -8.5' -8.5' -8.4' -8.5' -8.6' -8.8' -8.7' -8.4' -8.3' -8.1' -7.8' -8.2'

    -7.7' -7.8' -7.6' -7.7' -7.7' -7.6' -7.9' -8.0' -8.1' -7.6' -7.6' -7.8' -8.2'

    -7.1' -7.2'

    -4.3' -5.3' -5.3' -6.3' -6.3' -6.8' -7.6' -7.7' -7.8' -7.7' -7.9' -8.2' -8.5'

    -7.6' -7.4' -8.0' -8.3'

    UW

    DR

    AWIN

    G

    3

    -7.4' -7.7' -7.8' -8.0' -8.3' -8.5' -8.7'-7.8'

    x 3'H SANDBAR150'L x UP TO 20'W

    -7.4'

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    BRIDGE NO. 04180

    REVISED BY: FHDRAWING NO.

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    -10.4'

    -8.3'

    -7.6'

    -9.5'

    -8.3'

    -8.3'

    -9.7'

    -8.9'

    -7.9'

    -9.6'

    -8.8'

    -8.0'

    0.4'

    0.5'

    0.7'

    -8.7'

    1.0'

    -8.9'-9.9'

    -9.3'

    1.0'

    -8.3'

    -9.3'

    0.5'

    -8.4'

    1.1'

    -8.8'-8.4'

    0.7'

    -8.8'-8.6'

    1.0'

    -8.7'

    0.4'

    -9.9'-8.8'

    -9.1' -8.4' -7.8' -7.6'

    1.0' 1.0' 1.0' 2.5'

    -8.8' -8.3' -8.0' -7.8'-8.1'

    2.0'

    -8.3'

    30'

    -7.7'

    -7.4'-7.8'

    -7.8'

    1.0'

    1.0' -7.7'

    -7.9'-8.1'

    -8.0'

    -10.4'

    -10.4'

    0.1'

    -10.2'

    -8.6'-9.0'

    -10.5'

    -8.6'

    -8.5'

    0.1'

    -7.7'

    -7.5'

    0.1'

    -8.0'

    -8.2'

    -6.9'

    0.1'

    -7.5'

    -5.3' -5.3' -4.3'-6.3' -6.3' -7.3'

    -3.3'-6.3'

    -8.0'

    0.1'

    -8.2'

    0.1'

    -7.8'

    -8.2'

    -7.6'

    -8.1'

    0.1'

    -7.7'

    -7.7'

    -3.3'

    0.1'

    0.1'

    -6.3'

    -8.2'

    -7.8'

    -7.7'

    -8.2'

    0.1'

    -3.3'

    -6.3'

    -6.3'

    -5.8'

    -6.3'

    -6.3'

    SOUNDING PLAN

    04180 C

    SOUNDING PLAN

    LEGEND FOR SYMBOLS

    LEGEND FOR BOTTOM ELEVATIONS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    W.S. ELEV. -7.3'

    -7.3'

    INSPECTED BY: JK, MB, JW

    07 / 18 / 18

    0.0'

    0.0'

  • N.T.S.

    PIER 2

    (PER PLANS)TOP OF TREMIE ELEV. -36.3'

    (PER PLANS)BOTTOM OF TREMIE ELEV. -42.3'

    (PER PLANS)TOP OF TREMIE ELEV. -33.0'

    (PER PLANS)BOTTOM OF TREMIE ELEV. -39.0'

    (PER PLANS)TOP OF TREMIE ELEV. -24.3'

    (PER PLANS)BOTTOM OF TREMIE ELEV. -29.3'

    (PER PLANS)TOP OF FOOTING ELEV. -16.3'

    (MEASURED)TOP OF STEP-FOOTING ELEV. -22.5'

    (MEASURED)TOP OF FOOTING ELEV. -27.5'

    PIER 3

    PIER 1

    W.S. ELEV.

    ELEV. -19.4' (MEASURED)TOP OF STEP-FOOTING

    -3.3' -3.3'

    -7.7'

    -7.7'

    -7.7'

    -8.6'

    -10.4'-11.4'

    -16.2'

    -19.1'

    -25.3'

    -27.6' -32.2'

    -26.8'

    -33.6'

    -33.9'

    -26.6' -26.5'

    -24.1'-23.9'

    -24.3'

    -30.2'

    -22.4'-29.9'

    -23.5'

    -29.2'

    -29.8'

    -7.3'

    0.0'

    UW

    DR

    AWIN

    G

    4

    0.1'

    0.1'

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    BRIDGE NO. 04180

    REVISED BY: FHDRAWING NO.

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    LEGEND FOR SYMBOLS

    LEGEND FOR BOTTOM ELEVATIONS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    W.S. ELEV. -7.3'

    -7.3'

    LEGEND FOR MUDLINE ELEVATIONS

    JULY 2016

    JULY 2018

    UPSTREAM (WEST) ELEVATION

    04180 D

    UPSTREAM (WEST) ELEVATION

    07 / 18 / 18

    INSPECTED BY: JK, MB, JW

    -6.3' -6.3'

    -8.2'

    -7.8'

    -8.2'

    -10.4'

    -8.5'

    -11.0'

    -14.3'

    -17.6'

    -21.7'

    -30.6'

    -31.3'

    -32.3'

    -26.3'

    -25.3'

    -32.3'

    -26.2'

    -25.7'-23.9'

    -27.3'

    -28.3'

    -28.3'

    -29.3'

    -29.3' -23.3'

    -25.3'

    -6.3'

    0.1'

    0.1'

    0.1'1.0'

    3.0'

    1.0'

    3.0'

    3.0'

    0.2'

    0.3'

    0.1'

    0.1'

    ABUTMENT 2ABUTMENT 1

    ELEV. -10.3' (PER PLANS)TOP OF STEP-FOOTING 0.0' 0.0'

    0.0'

    0.0'

    0.0' 0.0'

    0.0'

    0.0'

    0.0'

    0.0'0.0'

    0.0'

    ELEV. -24.8' (MEASURED)TOP OF FOOTING

  • N.T.S.

    ~ CONCRETE ~

    NOTE:

    CONSTRUCTION JOINT

    (TYP.)

    STEEL "H" PILES

    FLOW

    (PER PLANS)

    BOTTOM OF TREMIE ELEV. -42.3'

    (PER PLANS)

    TOP OF TREMIE ELEV. -36.3'

    PIER 1 (SOUTH) ELEVATION

    04180 E

    PIER 1 (SOUTH) ELEVATION

    W.S. ELEV.

    (MEASURED) (PREVIOUSLY NOTED AS 21.5')

    TOP OF STEP FOOTING ELEV. -19.4'

    (MEASURED) (PREVIOUSLY NOTED AS 26.5')

    TOP OF FOOTING ELEV. -24.8'

    HAIRLINE CRACK

    7'L VERTICAL

    CRACK

    HORIZONTAL

    3'L x 1/16"W IN COLD JOINT

    HORIZONTAL CRACK

    6'L x UP TO 1/2"W

    WITH EFFLORESCENCE

    HAIRLINE CRACK

    5'L VERTICAL

    COLD JOINT

    HORIZONTAL CRACK IN

    13.0'L x UP TO 1/8"W

    3'

    -30.2'

    -30.4'

    -29.2' -28.1'

    -26.3'

    -7.3'

    UW

    DR

    AWIN

    G

    5

    -29.2'

    -27.2'

    0.1'

    FULL LENGTH x UP TO FULL HEIGHTSTEP FOOTING EXPOSED

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    DRAWING NO.

    BRIDGE NO. 04180

    REVISED BY: FH

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    -24.3'

    -25.3'-27.3'-27.8'

    -29.3'

    -28.3'

    -29.3'

    LEGEND FOR BOTTOM ELEVATIONS

    LEGEND FOR MUDLINE ELEVATIONS

    JULY. 2018

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    JULY. 2016

    LEGEND FOR SYMBOLS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    W.S. ELEV. -7.3'

    -7.3'

    07 / 18 / 18

    INSPECTED BY: JK, MB, JW

    0.1'

    0.2'

    1.6' 1.0'

    2.0'

    3.0'

    37'L x UP TO 4.8'H

    FOOTING EXPOSED

    X 1" THICK ON UNDERWATER SUBSTRUCTURE.

    RANDOM AREAS OF ZEBRA MUSSELS UP TO 50% COVERAGE3.

    TO 1' ABOVE.

    ABRASION UP TO 1/4"D FROM 4' BELOW WATER SURFACE2.

    BOTTOM.

    AND DOWNSTREAM NOSE ALONG THE CHANNEL

    TIMBER DEBRIS UP TO 1' DIA. AT THE UPSTREAM 1.

  • N.T.S.

    ~ CONCRETE ~

    NOTE:

    (PER PLANS)

    TOP OF TREMIE ELEV. -36.3'

    FLOW

    (PER PLANS)

    BOTTOM OF TREMIE ELEV. -42.3'

    COLD JOINT

    HORIZONTAL CRACK IN

    17.0'L x UP TO 1/4"W

    CONSTRUCTION JOINT

    04180 F

    PIER 1 (NORTH) ELEVATION

    W.S. ELEV.

    (MEASURED) (PREVIOUSLY NOTED AS -18.4')

    TOP OF STEP FOOTING ELEV. -19.4'

    (MEASURED) (PREVIOUSLY NOTED AS -24.4')

    TOP OF FOOTING ELEV. -24.8'

    IN COLD JOINT

    HORIZONTAL CRACK

    4'L x UP TO 1/4"W

    WITH EFFLORESCENCE

    5'H VERTICAL HAIRLINE CRACK

    3'

    (TYP.)

    STEEL "H" PILES

    -26.3'

    -29.0' -28.9'

    -28.5'

    -30.2'

    -7.3'

    UW

    DR

    AWIN

    G

    6

    -27.2'

    -29.8'

    0.1'

    1.0'

    1.0' 0.8'

    FULL LENGTH x UP TO FULL HEIGHT

    STEP FOOTING EXPOSED

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    DRAWING NO.

    BRIDGE NO. 04180

    REVISED BY: FH

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    LEGEND FOR BOTTOM ELEVATIONS

    LEGEND FOR MUDLINE ELEVATIONS

    JULY. 2018

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    JULY. 2016

    LEGEND FOR SYMBOLS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    W.S. ELEV. -7.3'

    -7.3'

    INSPECTED BY: JK, MB, JW

    07 / 18 / 18

    PIER 1 (NORTH) ELEVATION

    -28.3'

    -28.3'

    -27.3'

    -29.3'

    -24.3'-26.3'

    -28.3'3.0'

    0.3'

    0.1'

    40'L x UP TO 3.7'H

    FOOTING EXPOSED

    3.5' WIDE

    EXPOSURE 5.1'H

    MAXIMUM VERTICAL

    X 1" THICK ON UNDERWATER SUBSTRUCTURE.

    RANDOM AREAS OF ZEBRA MUSSEL UP TO 50% COVERAGE5.

    9' HIGH (INSIDE), 5'H (OUTSIDE).

    20' LONG SHEET PILING 5' OFF OF THE FOOTING UP TO4.

    UP TO 2' LONG.

    PIER STEM DISPLAYS ISOLATED VERTICAL HAIRLINE CRACKS3.

    TO 1' ABOVE.

    ABRASION UP TO 1/4" DEEP FROM 4' BELOW WATER SURFACE2.

    UP TO 2' DIA. ALONG THE SOUTH FACE.

    DOWNSTREAM NOSE ALONG THE CHANNEL BOTTOM, AND

    TIMBER DEBRIS UP TO 1' DIA. AT THE UPSTREAM AND 1.

  • N.T.S.

    ~ CONCRETE ~

    H H

    NOTE:

    CONSTRUCTION JOINT

    (TYP.)

    STEEL "H" PILES

    FLOWH PILE (TYPICAL)

    (PER PLANS)

    BOTTOM OF TREMIE ELEV. -39.0'

    PIER 2 (SOUTH) ELEVATION

    04180 G

    PIER 2 (SOUTH) ELEVATION

    (MEASURED) (PREVIOUSLY NOTED AS -19.4')

    TOP OF STEP FOOTING ELEV. -22.5'

    (MEASURED) (PREVIOUSLY NOTED AS -25.4')

    TOP OF FOOTING ELEV. -27.5'

    (PER PLANS)

    TOP OF TREMIE ELEV. -33.0'

    UP TO 1.0'L x 4"W x 4"D

    A FEW EDGE SPALLS

    FOOTING INTERFACE

    SPALL AT TREMIE/

    2'L x 4"H x 3"D

    EFFLORESCENCE

    CRACK WITH

    1.5'L HAIRLINE

    WITH EFFLORESCENCE

    2'L HAIRLINE CRACK

    WITH EFLORESCENCE

    3'L HAIRLINE CRACK

    W.S. ELEV.

    UW

    DR

    AWIN

    G

    7

    -33.9' -30.3'-29.9' -29.5'

    -24.4'

    -7.3'

    0.0'

    0.0'

    -33.6'

    0.0'-27.8'

    FULL LENGTH x UP TO FULL HEIGHT

    STEP FOOTING EXPOSED

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    DRAWING NO.

    BRIDGE NO. 04180

    REVISED BY: FH

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    TREMIE HAS IRREGULAR SURFACE

    -32.3'

    -31.3'

    -31.3'

    -28.3' -27.3'

    -26.3'

    -21.3'

    6' WIDE

    ON CENTER OF SOUTH FACE

    18"L x 1'W x 4"D SPALL

    0.2'

    0.3'

    3.0'

    5.0'

    LEGEND FOR BOTTOM ELEVATIONS

    LEGEND FOR MUDLINE ELEVATIONS

    JULY. 2018

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    JULY. 2016

    07 / 18 / 18

    INSPECTED BY: JK, MB, JW

    LEGEND FOR SYMBOLS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    W.S. ELEV. -7.3'

    -7.3'

    FULL LENGTH x UP TO FULL HEIGHT

    FOOTING EXPOSED

    1'H x FULL WIDTH OF WEST NOSE

    ON SOUTH FACE AND

    UP TO 0.5'H x 2'L

    TREMIE SEAL EXPOSED

    SUBSTRUCTURE.

    50% COVERAGE x 1" THICK ON UNDERWATER

    RANDOM AREAS OF ZEBRA MUSSELS UP TO3.

    TO 1.0' ABOVE THE WATER SURFACE.

    ABRASION UP TO 1/8" DEEP FROM 4' BELOW 2.

    UPSTREAM NOSE ALONG CHANNEL BOTTOM.

    HEAVY TIMBER DEBRIS UP TO 1' DIA. AT THE 1.

  • N.T.S.

    ~ CONCRETE ~

    FLOW

    H H

    H PILE (TYPICAL)

    NOTE:

    CONSTRUCTION JOINT

    (TYP.)

    STEEL "H" PILES

    (PER PLANS)

    BOTTOM OF TREMIE ELEV. -39.0'

    (PER PLANS)

    TOP OF TREMIE ELEV. -33.0'

    W.S. ELEV.

    PIER 2 (NORTH) ELEVATION

    04180 H

    (MEASURED) (PREVIOUSLY NOTED AS -25.4')

    TOP OF FOOTING ELEV. -27.5'

    (MEASURED) (PREVIOUSLY NOTED AS -19.4')

    TOP OF STEP FOOTING ELEV. -22.5'

    PIER 2 (NORTH) ELEVATION

    -24.4'

    -25.5'

    -27.7'

    -27.5'

    -33.9'

    -7.3'

    UW

    DR

    AWIN

    G

    8

    -23.8'

    -27.6'

    FULL LENGTH x UP TO FULL HEIGHT

    STEP FOOTING EXPOSED

    0.9'H x FULL WIDTH OF NOSE

    TREMIE SEAL EXPOSED UP TO

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    DRAWING NO.

    BRIDGE NO. 04180

    REVISED BY: FH

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    INSPECTED BY: JK, MB, JW

    07 / 18 / 18

    LEGEND FOR SYMBOLS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    W.S. ELEV. -7.3'

    -7.3'

    LEGEND FOR BOTTOM ELEVATIONS

    LEGEND FOR MUDLINE ELEVATIONS

    JULY. 2018

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    JULY. 2016

    -21.3'

    -23.3'-25.3'

    -25.8'

    -25.3'

    -30.6'

    -32.3'

    5.0'

    2.0'

    2.0'

    2.0'

    0.2'

    3.0'

    0.2'

    FULL LENGTH x UP TO 1.7'

    FOOTING EXPOSED

    SUBSTRUCTURE.

    50% COVERAGE x 1" THICK ON UNDERWATER

    RANDOM AREAS OF ZEBRA MUSSELS UP TO3.

    WATER SURFACE TO 1' ABOVE.

    ABRASION UP TO 1/4" DEEP FROM 4' BELOW THE 2.

    UPSTREAM NOSE ALONG CHANNEL BOTTOM.

    HEAVY TIMBER DEBRIS UP TO 1' DIA. AT THE1.

  • ~ CONCRETE ~

    (PER PLANS)

    TOP OF TREMIE ELEV. -24.3'

    (PER PLANS)

    BOTTOM OF TREMIE ELEV. -29.3'

    CONSTRUCTION JOINT

    (TYP.)

    STEEL "H" PILES

    NOTES:

    (PER PLANS)

    TOP OF STEP FOOTING ELEV. -10.3'

    (PER PLANS)

    TOP OF FOOTING ELEV. -16.3'

    FLOW

    W.S. ELEV.

    UW

    DR

    AWIN

    G

    9

    -7.7'

    -8.0' -7.8' -7.6'-7.5'

    -7.3'

    0.1'

    0.1' 0.1'

    0.1'

    -7.7'

    0.1'

    -6.9'

    0.1'

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    DRAWING NO.

    BRIDGE NO. 04180

    REVISED BY: FH

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    -7.8'

    -8.2'

    -8.2' -8.2' -8.1'-8.0' -7.5'

    N.T.S.

    PIER 3 (SOUTH) ELEVATION

    PIER 3 (SOUTH) ELEVATION

    LEGEND FOR BOTTOM ELEVATIONS

    LEGEND FOR MUDLINE ELEVATIONS

    JULY. 2018

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    JULY. 2016

    LEGEND FOR SYMBOLS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    W.S. ELEV. -7.3'

    -7.3'

    07 / 18 / 18

    INSPECTED BY: JK, MB, JW

    0.1'

    04180 I

    ABOVE THE WATER SURFACE.

    ABRASION UP TO 1/4" DEEP FROM MUDLINE TO 1.0'1.

  • ~ CONCRETE ~

    N.T.S.

    CONSTRUCTION JOINT

    NOTES:

    (PER PLANS)

    TOP OF TREMIE ELEV. -24.3'

    (TYP.)

    STEEL "H" PILES

    (PER PLANS)

    TOP OF STEP FOOTING ELEV. -10.3'

    (PER PLANS)

    TOP OF FOOTING ELEV. -16.3'

    04180 J

    CRACK

    1.7'L HAIRLINE

    UW

    DR

    AWIN

    G

    10

    -3.3' -4.3' -5.3' -5.3'-3.3'

    -7.7'

    0.1'

    -6.9'

    0.1'

    (PER PLANS)

    BOTTOM OF TREMIE ELEV. -29.3'

    FLOW

    CONNECTICUT DEPARTMENT OF TRANSPORTATION

    CONNECTICUT

    AS SHOWN

    SCALE: DATE OF INSPECTION

    DRAWING NO.

    BRIDGE NO. 04180

    REVISED BY: FH

    INC.

    INFRASTRUCTURE

    ENGINEERS,

    1-888-451-6822

    ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER

    NEWTOWN

    -6.3'

    -7.5'

    -7.3' -6.3'-6.3' -6.3'

    -7.8'

    LEGEND FOR BOTTOM ELEVATIONS

    LEGEND FOR MUDLINE ELEVATIONS

    JULY. 2018

    -0.0'JULY. 2016:

    JULY. 2018: -0.0'

    JULY. 2016

    LEGEND FOR SYMBOLS

    DEPTH OF PENETRATION 0.0'

    OF THE NORTH FACE OF PIER 1

    TOP OF THE PIER AT THE CENTERLINE

    CONSTRUCTION JOINT DOWN FROM THE

    EASTBOUND BRIDGE 01218 AT THE SECOND

    DATUM ELEV. 0.0' TAKEN FROM THE

    W.S. ELEV. -7.3'

    -7.3'

    INSPECTED BY: JK, MB, JW

    07 / 18 / 18

    PIER 3 (NORTH) ELEVATION

    PIER 3 (NORTH) ELEVATION

    W.S. ELEV. -7.3'

    ABOVE THE WATER SURFACE.

    ABRASION UP TO 1/4" DEEP FROM MUDLINE TO 1.0'1.

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Upstream (North) Bridge ElevationPhoto Number: 1 Photo Taken: 07/18/2018

    Downstream (South) Bridge ElevationPhoto Number: 2 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Pier 1 South ElevationPhoto Number: 3 Photo Taken: 07/18/2018

    Pier 1 North ElevationPhoto Number: 4 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Pier 1 South Elevation Stem

    Note: Zebra mussels on pier.

    Photo Number: 5 Photo Taken: 07/18/2018

    Pier 1 at Upstream Sothwest Corner

    Note: Exposed step and footing.

    Photo Number: 6 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Pier 1 at North Side Near Centerline

    Note: Sheet piling.

    Photo Number: 7 Photo Taken: 07/18/2018

    Pier 2 South ElevationPhoto Number: 8 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Pier 2 North ElevationPhoto Number: 9 Photo Taken: 07/18/2018

    Pier 2 Upstream South Elevation

    Note: Exposed footing and step.

    Photo Number: 10 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Pier 2 Upstream Nose

    Note: Exposed tremie.

    Photo Number: 11 Photo Taken: 07/18/2018

    Pier 3 South ElevationPhoto Number: 12 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Pier 3 North ElevationPhoto Number: 13 Photo Taken: 07/18/2018

    Channel Looking (West) UpstreamPhoto Number: 14 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Channel Looking (East) DownstreamPhoto Number: 15 Photo Taken: 07/18/2018

    Northwest Channel EmbankmentPhoto Number: 16 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Northeast Channel EmbankmentPhoto Number: 17 Photo Taken: 07/18/2018

    Southwest Channel EmbankmentPhoto Number: 18 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Southeast Channel EmbankmentPhoto Number: 19 Photo Taken: 07/18/2018

    Navigational Light Pier 1 (Upstream)Photo Number: 20 Photo Taken: 07/18/2018

  • Form: Asset Photos

    Inspection type:

    Inspection Date:

    Inspected by:

    7/18/2018

    Bridge No: 04180

    NEWTOWN

    INTERSTATE 84 WESTBOUND

    HOUSATONIC RIVER

    NHS

    Underwater

    Infrastructure Engineers

    Town:

    Carried:

    Crossed:Inventory Route:

    Navigational Light Span 2 (Upstream)Photo Number: 21 Photo Taken: 07/18/2018

    Navigational Light Pier 2 (Upstream)Photo Number: 22 Photo Taken: 07/18/2018

  •  

     

     

     

    BACK‐UP MATERIAL 

     

     

  • By: Infrastructure Engineers

    CS1 CS2 CS3 CS4

    210 Mod. Reinforced Concrete Pier Wall 42 LF 0 21 21 0

    1130 Cracking 21 LF 21

    1190 Abrasion / Wear (PSC/RC) 21 LF 21

    220 Mod. Reinforced Concrete Pile Cap/Footing 42 LF 0 0 42 0

    6000 Scour 42 LF 42

    210 Mod. Reinforced Concrete Pier Wall 42 EA 0 42 0 0

    1190 Abrasion / Wear (PSC/RC) 42 LF 42

    220 Mod. Reinforced Concrete Pile Cap/Footing 42 LF 0 0 42 0

    6000 Scour 42 LF 42

    210 Mod. Reinforced Concrete Pier Wall 42 LF 0 42 0 0

    1190 Abrasion / Wear (PSC/RC) 42 LF 42

    SUBSTRUCTURE

    Pier 1

    • 5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.

    • Horizontal cracks up to 17' long x up to 1/2” wide along the cold joints above and below water.

    • Near the midpoint of the footing on both faces there is a vertical hairline crack x 5' long with efflorescence.

    • The North face has isolated vertical hairline cracks x up to 2' long throughout.

    • Zebra mussels up to full height x 1" thick.

    • Step Footing exposed over its full-length x up to full-height (5.4’ high) along both faces of the pier.

    • Footing exposed up to 5.1’ vertically over a length of 37’ on the pier.

    • Isolated vertical hairline cracks up to 5' long with efflorescence.

    NATIONAL BRIDGE ELEMENTS RECORDING SHEET *

    Element

    /Str. Unit No.Env Element/Structure Unit Description

    Structure No. 04180 Date: 7/18/2018

    Condition State QuantityTotal

    Qty.Units

    • 5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.

    • There are steel H-piles intermittently exposed along the stem located above the step footing (formwork left in place from construction).

    • Random areas of Zebra mussels up to 50% coverage x 1" thick.

    • The step footing is exposed over its full-length x up to full-height (5.0’ high) on both faces of the pier.

    • The footing has been exposed full length x up to full-height (5.5’ high) on the South face and full length x up to 1.7’ high on the North face of the pier,

    • The Tremie Seal has been exposed up to 1.0’ long across the full-width of the Upstream (West) nose and over 2’ long x 0.5' high at the Southwest

    corner of the pier.

    • Random vertical hairline cracks up to 3’ long with efflorescence on the footing.

    • Isolated edge spalls on the footing up to 2’ long x 4” wide x up to 4” deep.

    • At the center of the Downstream (South) face of the Step Footing there is a spall 18" long x 1' wide x 4" deep.

    • At the Southwest corner of the Footing/Tremie interface there is a spall 2' long x 4" high x 3" deep.

    Pier 3

    • Band of abrasion up to 1/4" deep extending from 1' above the water surface down to the channel bottom.

    • Random areas of Zebra mussels up to 50% coverage x 1" thick.

    • The North face towards the Upstream (West) nose of the pier there is a 1.7' long vertical hairline crack below the construction joint.

    • There is no exposure of the Step Footing or Footing at the pier.

    • There is a section of sheet pile exposed up to 6" high along the South face of the pier approximately 12.5' off the pier face

    * Includes only defects on Piers 1 through 3 from the high water mark to the channel bottom.

    Pier 2

    Report CoverTable of ContentsReport Title PageLocation MapStructure Inventory and Appraisal (BRI-19)Underwater Inspection (BRI-59)Underwater Inspection (BRI-58)UW DrawingsPhotosBack-Up Material