Inspection Type: Underwater
BRIDGE NO.04180
52980 - NEWTOWN
INTERSTATE 84 WESTBOUND
over
HOUSATONIC RIVER
Underwater Inspection
7/18/2018
InfrastructureInspected by:
-
Report Title Page 1
Location Map 2
Structure Inventory and Appraisal (BRI-19) 3
Underwater Inspection (BRI-59) 7
Underwater Inspection (BRI-58) 8
UW Drawings 12
Photos 22
Back-Up Material 33
TABLE OF CONTENTS
Section Page Number
-
Form: Location
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Location Map # 1
Bridge No. 04180Interstate 84 Westbound over Housatonic
RiverNewtown, CT
-
Form: BRI-19, Rev. 2/15
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
STRUCTURE TYPE & MATERIALS
STRUCTURE INVENTORY & APPRAISAL
(90) Inspection Date
Indepth Insp Proposed next Indepth Year
Deck Survey Date Class
(91) Frequency
Bridge Name
Sufficiency Rating
Access Flagman
INSPECTION
Fracture
Underwater
Special
TypeFrequency Date
C Two GirderSystem, welded plategirders
24
B Underwater Only24 07/18/2018
IDENTIFICATION
No
03
24
81.0
15 - Over 40 ft.reach 0
(43) Structure Type, Main
A) Material
B) Design Type
(44) Structure Type, Approach
4 - Steel continuous
03 - Girder and Floorbeam System
A) Material
B) Design Type
0 - Other
00 - Other
(45) Number of Spans, Main Unit
(46) Number of Approach Spans
(107) Deck Structure Type
4
0
1 - Concrete Cast-in-Place
(108) Wearing Surface/Protection Systems
A) Type of Wearing Surface
B) Type of Membrane
C) Type of Deck Protection
Substructure
A) Material
B) Design Type
2 - CONCRETE
1 - FULL HEIGHT STEM
6 - Bituminous
2 - Preformed Fabric
0 - None
Paint
Type
Year
Comment
GEOMETRIC DATA
Town Code - Name
(5) Inventory Route
(B) Signing Prefix
(A) Record Type
(D) Route Number.
(E) Dir Suffix
1 - INTERSTATE HIGHWAY
1: Route carried "on" the structure
4 - WEST
00084
ROCHAMBEAU BRIDGE
52980 - NEWTOWN
(C) Level of Service 1 - MAINLINE
(6A) Featured Intersected HOUSATONIC RIVER
(6B) Critical Facility Indicator
(7) Facility Carried
(9) Location
(16) Latitude
INTERSTATE 84 WESTBOUND
Miles
1.5 MI EAST OF EXIT 11
(11) Mile Post 18.42
Deg. Min. Sec.212641
(17) Longitude Deg. Min. Sec.5314-73
(98) Border Bridge
(A) State Code (B) Percent Responsibility
(C) Border Town Name
(99) Border Bridge Structure No.
(48) Length of Maximum Span
(49) Structure Length
ft.
ft.792
224
(50) Curb or Sidewalk Widths
A) Left ft.0 B) Right ft.0
(51) Bridge Roadway Width Curb to Curb ft.60
(52) Deck Width, Out to Out ft.63
(32) Approach Roadway Width ft.50
in.9
in.0 in.0
Structurally Deficient N Functionally Obsolete N
%
in.0
-
Form: BRI-19, Rev. 2/15
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
AGE AND SERVICE(33) Bridge Median 0 - No median
Deck Area sq. ft.50529
(34) Skew Angle
(35) Structure Flared
0
0 - No flare
(10) Inv. Rte. Min. Vert. Clearance ft.99
(47) Inv. Rte. Total Horiz. Clr. ft.60
Log Inv. Rte. Total Horiz. Clr. ft.60
RLog Inv. Rte. Total Horiz. Clr. ft.0
(53) Min. Vert. Clearence Over Bridge ft.99
(54) Log-Min. Vert. Underclearance ft.ref. 0N
(55) Min. Lat Underclearance on Right ft.ref. 0N
(56) Min. Lat Underclearance on Left ft.0
APPRAISALS
Year Built 1977 (106) Year Reconstructed
(42) Type of Service
A) On 1 - Highway
B) Under 5 - Waterway
(28) Number of Lanes
A) On 02 B) Under 00
(29) Average Daily Traffic
Is Above Half ADT?
(109) Precent Truck
(30) Years of ADT
(19) Bypass, Detour Length
36650
Yes
9
2015
CONDITION
(58) Deck
(59) Superstructure
(60) Substructure
(61) Channel & Channel Protections
(62) Culverts
5
5
6
5
N
(36) Traffic Safety Features
A) Bridge Railings
B) Transitions
C) Approach Guardrail
D) Approach Guardrail Ends
0
0
1
1
(67) Structural Evaluation
(68) Deck Geometry
(69) Underclearances, Vert. & Horiz.
(71) Waterway Adequacy
(72) Approach Roadway Alignment
(113) Scour Critical
5
9
N
9
8
8
COMMENTS
Special inspection: Horizontal cracking along floorbeams &main girders.
CLASSIFICATIONWATERWAY
(112) NBIS Bridge Length
(104) Highway System
(26) Functional Class
(100) Defense Highway
(101) Parallel Structure
(102) Direction of Traffic
Yes
1 - Structure/Route is on NHS
01 - Rural - Principal Arterial - Interstate
1 - Is on an Interstate STRAHNET route
L - Left structure (South or West)
1 - 1-way traffic
Drainage Basin Waterway
(38) Navigation Control
(39) Navigation Vertical Clearance
(40) Navigation Horiz. Clr.
(111) Pier/Abutment Navigation
6000 - Housatonic River
0 - No navigation controlon waterway (bridge permitnot required)
0 ft.
ft.0
2 - In place and functioning
Miles1
%
in.99
in.0
in.0
in.0
in.99
in.0
in.0
in.0
(116) Vert-Lift Brg Nav Min 0 ft. 0 In.
deg.
-
Form: BRI-19, Rev. 2/15
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
(103) Temporary Structure
(110) Designated NationalNetwork
(20) Toll
(21) Maintain
(22) Owner
Report Class
(37) Historical Significance
1 - Inventory route on National TruckNetwork
3 - On Free Road
01 - State Highway Agency
01 - State Highway Agency
S - STATE
5 - Not eligible for National Register
PROPOSED IMPROVEMENTS
(75A) Type of Work Proposed
(75B) Work Done By
(76) Length of Structure Improvement
(94) Bridge Improvement Cost $
(95) Roadway Improvement Cost $
(96) Total Project Cost $
(97) Year of Improvement Estimate
(114) Future ADT
(115) Year of Future ADT
DOT Bridge Program List No
Project No
Advertised Date
35 - Rehabilitation -Deterioration1 - Work to be done bycontract
30000
2014
54458
2035
27
0096-0201
09/18/2019
ft.
LOAD RATING & POSTING
POSTED SIGNS
Other Posted Sign 1
Other Posted Sign 2
Actual Recomended
Posted Load Single Unit Truck
Posted Load Semi-Trailer Truck
Posted Load 4 Axle Truck
Posted Load 3S2 Truck
All Vehicles
tons
tons
tons
tons
tons
Posted Vert. Clearance on Bridge
Posted Vert. Underclearance
Posted Speed Limit on Bridge
ft. in.
ft. in.
m.p.h.
OTHER FEATURES
Fence Required
Fence Present
Fence Height
Fence Material
Fence Top Type
Barrel Ladders
Stand Pipes
Catwalks
Moveable Inspection System
Haunches Present over Roadway
Utilities
No
No
Blank
Blank
Yes
No
Yes
No
NO
(31) Design Load
(63) Operating Rating Type
(64) Operating Rating
(65) Inventory Rating Type
(66) Inventory Rating
Evaluation Code
Year of Evaluation
(70) Bridge Posting
(41) Structure Status
5 - HS 20
1 - Load Factor (LF)
60
1 - Load Factor (LF)
36
L - Load Factor
1995
5 - Equal to or above legal loads
A - OpenFence Type Blank
N | No Utilities present
-
Form: BRI-19, Rev. 2/15
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
INSPECTOR'S SIGNATURES:
3) Date:
08/14/2018
4) Date:
08/17/2018
1) Date:
2) Date:
P.E. SIGNATURE: Date: 08/17/2018
P.E. #
Date: 09/04/2018Reviewed By:
27367
-
Type of water:
Underwater Inspections performed in conjunction with Bridge No. 01218.
Boat ramp located at the end of Scout Road in Southbury.
Fresh
Minor aquatic growth and zebra mussels up to 1" thick.Marine Growth:
YesDive Station Used?
Access to Bridge:
Access/ Equipment Comments U/W:
Boat
8.0'
Current Strength:
U/W Visibility:
Cobbles, silt, river rock, and sand with up to 5.0' penetration into the channel bottom.Bottom Composition:
25.0'Max Water Depth:
Max Water Depth at Pier Or Abutment:
1.0 fps
25.0'
Carried:52980 - NEWTOWN Crossed:INTERSTATE 84 WESTBOUND04180
UNDERWATER INSPECTION (BRI-59)
Town:Bridge:
Boat Used?
3
Yes
26'Boat Size:
HOUSATONIC RIVER
Total Number of Piers:
Piers in the Water:
3
-
ITEM RATING REMARKS
60. SUBSTRUCTURE
ABUTMENT 1:
STEM
FOOTING
EROSION
SETTLEMENT
SCOUR
WINGWALLS
General Remarks:
N
N
N
N
N
N
N
South Abutment. Located out of the channel.
6 REINFORCED CONCRETE ABUTMENTS AND PIERS
ABUTMENT 2:
STEM
FOOTING
EROSION
SETTLEMENT
SCOUR
WINGWALLS
General Remarks:
N
N
N
N
N
N
N
North Abutment. Located out of the channel.
UNDERWATER INSPECTION
PIER NO.
PILES
STEM
FOOTING
6
N
6
6
⢠There is no exposure of the steel H-piles.
The reinforced concrete pier has the following deficiencies:
⢠5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.⢠Horizontal cracks up to 17' long x up to 1/2â wide along the cold joints above and below water.⢠Near the midpoint of the footing on both faces there is a vertical hairline crack x 5' long withefflorescence.⢠The north face has isolated vertical hairline cracks x up to 2' long throughout.⢠Random areas of Zebra mussels up to 50% coverage x 1" thick.
(See UW Drawings 5 & 6 and Photos 3 - 5)
The step footing has the following deficiencies:
⢠Step footing exposed over its full-length x up to full-height (5.4â high) along both faces of the pier.⢠Footing exposed up to 5.1â vertically over a length of 37â along the pier on both faces with noundermining.⢠Isolated vertical hairline cracks up to 5' long with efflorescence.
(See UW Drawings 5 & 6 and Photos 6 & 7)
⢠Channel elevations have varied around the pier with an increase by up to 1.9', this is possibly due tothe timber surrounding the pier.⢠Along the north face of the pier, there is a 20' length of sheet pile exposure up to 6' high located 5'off the pier face.⢠The Step Footing is exposed over its full-length x up to full-height (5.4â high) along both faces of thepier,⢠Footing has been exposed up to 5.1â vertically (previously 5.0' high) over a length of 37â on bothfaces of the pier.
(See UW Drawings 5 & 6)
1
Form: BRI-58.
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
09/04/2018 Page 1 of 4
-
Form: BRI-58.
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
SCOUR
SETTLEMENT
6
8
⢠Channel elevations have varied around the pier with an increase by up to 1.9', this is possibly due tothe timber surrounding the pier.⢠Along the north face of the pier, there is a 20' length of sheet pile exposure up to 6' high located 5'off the pier face.⢠The Step Footing is exposed over its full-length x up to full-height (5.4â high) along both faces of thepier,⢠Footing has been exposed up to 5.1â vertically (previously 5.0' high) over a length of 37â on bothfaces of the pier.
(See UW Drawings 5 & 6)
⢠No apparent settlement observed.
General Remarks:
PIER NO.
PILES
STEM
FOOTING
SCOUR
SETTLEMENT
6
N
7
6
5
8
⢠There is no exposure of the steel H-piles.
The reinforced concrete pier has the following deficiencies:
⢠5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.⢠There are steel H-piles intermittently exposed along the stem located above the step footing(formwork left in place from construction).⢠Random areas of Zebra mussels up to 50% coverage x 1" thick.
(See UW Drawings 7 & 8 and Photos 8 - 10)
The step footing and footing have the following deficiencies:
⢠The step footing is exposed over its full-length x up to full-height (5.0â high) on both faces of the pier.⢠The footing has been exposed full length x up to full-height (5.5â high) on the south face and fulllength x up to 1.7â high (previously 0.2' high) on the north face of the pier with no undermining.⢠The tremie seal has been exposed up to 1.0â long across the full-width of the Upstream (West) Noseand over 2â long x 0.5' high at the southwest corner of the pier.⢠Random vertical hairline cracks up to 3â long with efflorescence on the footing.⢠Isolated edge spalls on the footing up to 2â long x 4â wide x up to 4â deep.⢠At the center of the Downstream (South) face of the step footing there is a spall 18" long x 1' wide x4" deep.⢠At the southwest corner of the footing/tremie interface there is a spall 2' long x 4" high x 3" deep.
(See UW Drawings 7 & 8 and Photos 10 & 11)
⢠Channel elevations surrounding Pier 2 has had aggradation of up to 3.1' with isolated areas ofdegradation up to 3.0'.⢠The step footing is exposed full length x up to full-height (5.0â high) on both faces of the pier.⢠The footing has been exposed over its full-length x up to full-height (5.5â high) on the south face andfull length x up to 1.7â high on the north face of the pier.⢠The Tremie Seal has been exposed up to 1.0â high (previously 0.9' high) across the full-width of theUpstream (West) Nose and over 2â long x 0.5' high at the southwest corner of the pier.
(See UW Drawings 7 & 8)
⢠No apparent settlement observed.
General Remarks:
2
PIER NO.
PILES
STEM
6
N
7
⢠There is no exposure of the steel H-piles.
The reinforced concrete pier has the following deficiencies:
⢠Band of abrasion up to 1/4" deep extending from 1' above the water surface down to the channelbottom.⢠The north face towards the Upstream (West) Nose of the pier there is a 1.7' long vertical hairlinecrack below the construction joint.
(See UW Drawings 9 & 10 and Photos 12 & 13)
3
09/04/2018 Page 2 of 4
-
Form: BRI-58.
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
61. CHANNEL & CHANNEL PROTECTION:
CHANNEL SCOUR
EMBANKMENT EROSION
DEBRIS
VEGETATION
CHANNEL CHANGE
FENDER SYSTEM
SPUR DIKES & JETTIES
5
5
7
5
7
7
N
N
The Housatonic River is a fresh body of water that flows from West to East beneath the structure.
⢠Channel bottom elevations along the upstream and downstream fascias have random areas of mostlyaggradation up to 4.0' since the 2016 Underwater Inspection.⢠Channel bottom elevations at Pier 1 have varied around the pier with an increase by up to 1.9', this ispossibly due to the timber surrounding the pier since the 2016 Underwater Inspection.⢠Channel bottom elevations at Pier 2 show evidence of aggradation of up to 3.1' with isolated areas ofdegradation up to 3.0' since the 2016 Underwater Inspection.⢠Channel bottom elevations at Pier 3 south face have remained relatively unchanged (less than 0.6âvariations) as compared to the 2016 Underwater Inspections.⢠Channel bottom elevations at Pier 3 show evidence of degradation of up to 3.0' along the north face of thepier most likely due to the sandbar that was noted in the previous 2016 Underwater Inspection.⢠At Piers 1 and 2, the step footing and footing have been exposed due to scour.⢠At Pier 1, the step footing is exposed over its full-length x up to full-height (5.4â high) along both faces ofthe pier, and the footing has been exposed up to 5.1â vertically (previously 5.0' high) over a length of 37â onboth faces of the pier.⢠At Pier 2, the step footing is exposed over its full-length x up to full-height (5.0â high) on both faces of thepier and the footing has been exposed over its full-length x up to full-height (5.5â high) on the south face andfull length x up to 1.7â high (previously 0.2' high) on the north face of the pier.⢠At Pier 2 the Tremie Seal has been exposed up to 1.0â high (previously 0.9') across the full-width of theupstream (west) nose and over 2â long x up to 0.5' high at the southwest corner of the pier.⢠There is no exposure of the footings at Pier 3.
(See UW Drawings 1 - 10)
⢠There is no significant erosion along the channel embankments.
(See Photos 19 & 20)
⢠There is timber debris up to 1' diameter at the upstream (west) and downstream (east) noses of Pier 1.⢠There is moderate timber debris up to 2' diameter along the north face of Pier 1.⢠There is timber debris up to 1' diameter at the upstream (west) nose of Pier 2.
⢠The channel embankments are well vegetated.
⢠There is no apparent change to the channel orientation.⢠Bridge No. 01218 is located approximately 40' downstream (East) of the bridge.⢠There is approximately a 150â long x 20â wide x 3â high sandbar/area of aggradation located north of Pier 3.
(See UW Drawings 1 - 3 and Photos 16 - 18)
RIP RAP N
FOOTING
SCOUR
SETTLEMENT
N
7
8
The reinforced concrete pier has the following deficiencies:
⢠Band of abrasion up to 1/4" deep extending from 1' above the water surface down to the channelbottom.⢠The north face towards the Upstream (West) Nose of the pier there is a 1.7' long vertical hairlinecrack below the construction joint.
(See UW Drawings 9 & 10 and Photos 12 & 13)
⢠There is no exposure of the step footing or footing at the pier.⢠There is a section of sheet pile exposed up to 6" high along the south face of the pier approximately12.5' off the pier face.
(See UW Drawing 3)
⢠Channel bottom elevations have remained relatively unchanged (less than 0.6â variations) except forscour up to 3.0' along the north face of the pier since 2016 Inspection.
(See UW Drawings 9 & 10)
⢠No apparent settlement observed.
General Remarks:
09/04/2018 Page 3 of 4
-
Form: BRI-58.
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
General Remarks: The navigation lights on Pier 1, Span 2 Fascia and Pier 2 and the west bridge fascia appear to be on timers and were not on at thetime of the inspection.
(Photos 20 -22)
09/04/2018 Page 4 of 4
-
N.T.S.
C L
MATCH LINE A-A
50'+/- 25'+/- 15'+/- 10'+/- 15'+/- 25'+/- 50'+/-10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/-
25'+/-
15'+/-
10'+/-
10'+/-
15'+/-
25'+/-
BRIDGE 04180- PIER 1 BRIDGE 01218- PIER 1
FLOWAND FOOTING
EXPOSED STEP-FOOTING
AND FOOTING
EXPOSED STEP-FOOTING
-17.7'
-17.0'
-18.2'
-18.0'
-18.7'
-19.6'
-20.6'
-27.1'
-19.6'
-17.8'
-19.1'
-18.6'
-20.0'
-21.0'
-22.4'
-26.8'
-21.6'
-19.2'
-19.6'
-19.7'
-20.6'
-22.3'
-23.3'
-26.7'
-22.8'
-21.1'
-24.6'
-20.3'
-21.8'
-23.1'
-24.2'
-26.7'
-24.0'
-24.6'
-24.8'
-29.2'
-24.9'
-25.8'
-27.7'
-25.7'
-26.5'
-25.3'
-27.1'
-27.0'
-24.4'
-27.5'
-27.3'
-26.6'
-27.6'
-27.9'
-25.6'
-24.8'
-25.0'
-26.9'
-25.6'
-25.8'
-25.5'
-26.8'
-26.0'
-25.6'
-25.3'
-27.0'
-25.8'
-26.1'
-26.2'
-26.7'
-25.8'
-26.1'
-26.5'
-26.8'
-25.6'
-26.1'
-26.3'
-26.9'
-25.8'
-27.0'
-26.9'
-26.8'
-26.0'
-27.2'
-27.1'
-27.1'
-24.3'
-27.6'
-27.6'
-26.8'
-20.6'
-24.1'
-24.0'
-26.2'
-21.3'
-25.4'
-24.2'
-25.6'
-27.6'
-24.5'
-25.6'
-24.4'
-30.7'
-30.4'
-27.0'
-29.2'
-29.9'
-27.1'
-28.0'
-28.6'
-26.5'
-25.9'
-27.0'
-26.6'
-27.4'
-27.1'
-25.1'
-30.1'
-28.8'
-24.9'
-26.6' -25.1' -31.5' -22.9' -26.5' -31.2'
UW
DR
AWIN
G
1
-28.4'
-26.6'
-24.7'
-24.4'
-31.1'
-29.5'
-24.6'
-31.9'
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
BRIDGE NO. 04180
REVISED BY: FHDRAWING NO.
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
SOUNDING PLAN
LEGEND FOR BOTTOM ELEVATIONS
-0.0'JULY. 2016:
JULY. 2018: -0.0'
-23.9'
-24.1'
-26.5'
-26.2'
-23.9'
-25.7'
-26.8'
-26.3'
-26.6'
-26.9'
-25.0'
-25.3'
-25.3'
-26.1'
-24.3'-27.3'
-27.2'
1.0'
-26.3'-29.0'
1.0'
-28.3'-28.9'
0.8'
-29.3'-28.5'
0.1'
-27.3'-29.8'-28.3'
0.3'
-30.2'
-28.3'
0.1'
-29.2'
-29.3'
0.1'
-30.4'
-29.3'
0.2'
-29.2'
-27.8'
1.6'
-28.1'
-27.3'
1.0'
-27.2'
-25.3'
2.0'
-26.3'-24.3'
3.0'
-26.5'-25.1'
-26.1'-25.8'
-27.1'-26.7'
-23.5'-25.3'
-22.4'-23.3'
-29.9'-29.3'
SOUNDING PLAN
04180 AINSPECTED BY: JK, MB, JW
07 / 18 / 18
LEGEND FOR SYMBOLS
W.S. ELEV. -7.3'
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
-7.3'
-32.1' -30.4' -28.8' -24.1' -23.4'
-36.3' -31.3' -27.3' -24.3' -23.3'
0.2' 0.2' 0.2' 0.2' 0.2'
-32.6'-26.1'
-27.1'
-28.5'
-26.9'
-25.3'
-23.9'
-25.8'
-25.4'
-27.2'
-23.3'
-22.3'
-23.6'
-24.8'
0.2'
-22.3'
-21.6'
0.2'
-24.6'
-26.3'
0.2'
-25.0'-27.9'-32.5'
-34.3' -31.3' -27.3'
0.2'0.2'0.2'
-36.3'-34.1'
0.0'
-23.8'-24.1'
-23.3'-20.3'
-24.9'
-26.2'
-26.6'
-23.5'
-26.9'
-26.1'-26.6'
-26.8'
-26.8'-25.5'
-26.3'
-26.5'
OFF PIER FACE)
EXPOSURE OF SHEET PILING (5'
20'L x 9'H (INSIDE) 5'H (OUTSIDE)
TIMBER DEBRIS
OF UP TO 2' DIAMETER
MODERATE BUILD-UP
TIMBER DEBRIS
15'L x 1' DIAMETER
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
0.0'
-
N.T.S.
C L
MATCH LINE A-A
BRIDGE 01218- PIER 2BRIDGE 04180- PIER 2
50'+/- 25'+/- 15'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 15'+/- 25'+/- 50'+/-25'+/-
15'+/-
10'+/-
50'+/-
10'+/-
15'+/-
25'+/-
MATCH LINE B-B
FLOW
AND FOOTING
EXPOSED STEP-FOOTING
AND FOOTING
EXPOSED STEP-FOOTING
-28.6'
-27.2'
-29.0'
-24.9'
-23.7'
-24.4'
-14.9'
-22.1'
-22.4'
-17.9'
-13.6'
-28.1'
-26.1'
-26.9'
-24.6'
-21.4'
-20.6'
-17.9'
-12.9'
-27.2'
-25.5'
-26.1'
-23.9'
-21.6'
-19.9'
-15.5'
-12.9'
-27.0'
-26.0'
-26.0'
-23.6'
-11.3'
-15.7'
-19.1'
-26.8'
-11.1'
-15.3'
-19.8'
-25.8'
-11.0'
-15.0'
-20.0'
-25.1'
-11.4'
-14.2'
-16.4'
-21.1'
-11.4'
-12.9'
-14.4'
-16.2'
-11.5'
-12.6'
-12.8'
-16.5'
-26.9'
-27.6'
-30.4'
-27.1'
-27.8'
-30.9'
-26.8'
-27.8'
-29.6'
-26.5'
-26.6'
-27.7'
-26.6'
-23.8'
-24.6'
-26.8'
-23.3'
-22.5'
-26.3'
-23.3'
-22.4'
-26.5'
-22.7'
-21.1'
-26.3'
-23.0'
-20.6'
-26.0'
-22.3'
-21.4'
-25.0'
-23.6'
-21.4'
-25.1'
-22.7'
-22.5'
-22.8' -20.1' -19.1'
-24.6'
-21.9'
-23.0'
-12.2' -12.6' -12.3' -13.2' -14.7' -15.6' -16.5'
-12.9' -13.1' -13.5' -13.8' -14.2' -14.4' -14.4'
-11.6' -11.6' -11.6' -11.8' -11.9' -11.2' -12.3'
-16.3' -13.6' -14.1' -13.1' -16.2' -16.2' -16.5'
-20.2' -21.0' -19.8' -18.0'
UW
DR
AWIN
G
2
-20.1'
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
BRIDGE NO. 04180
REVISED BY: FHDRAWING NO.
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
SOUNDING PLAN
04180 B
SOUNDING PLAN
-12.3'
-13.3'
-10.3'
-14.2'-13.2'
-12.5'
-13.8'
-11.5'
1.0'
-15.8' -17.2' -16.2' -14.2' -14.4'-21.3' -21.3' -19.8' -19.8' -16.3'
0.1'0.1'0.2'0.3'0.3'
-14.7'-13.5'
-12.1'
-12.6'
-11.5'-11.3'
-12.3'
-12.0'
1.0'
-21.6'-22.3'
0.3'
-22.3' -21.8' -21.3' -20.5' -18.8'
0.6'
-21.7' -22.3' -20.7' -19.6' -18.3'
0.3' 0.4' 0.2' 0.3'
-16.3'-17.2'
0.1'
-26.1'
-23.6'
-21.2'
-25.0'
-24.4'
-20.9'
-26.7'
-23.7'
-22.2'-21.2'
-26.0'
-26.1'
-11.4'
-16.2'
-19.1'
-11.0'
-14.3'
-17.6'
1.0'
3.0'
1.0'
-25.3'
-21.7'
3.0'
-11.3'
-14.5'
-19.3'
-24.1'
-19.6'
-23.5'
-14.9'
-11.0'
-27.6' -27.5' -27.7' -25.5'-30.6' -25.3' -25.8' -25.3'
2.0'2.0'0.2'3.0'
-23.8'-23.3'
2.0'
-21.3'-24.4'
5.0'
-27.8'
3.0'
-26.3'
-33.6' -30.3' -29.9' -29.5'
0.0' 0.0' 0.0'
-31.3' -31.3' -28.3' -27.3'
0.3'
0.2'
-32.3'-33.9'
-26.6'
-26.8'
-32.2'-32.3'
-25.3'
-26.3' -25.5'
-23.4'
-25.3'
-26.5'
-27.4'
-28.6'
LEGEND FOR SYMBOLS
LEGEND FOR BOTTOM ELEVATIONS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
-0.0'JULY. 2016:
JULY. 2018: -0.0'
W.S. ELEV. -7.3'
-7.3'
UP TO 1' DIAMETER
HEAVY TIMBER DEBRIS
INSPECTED BY: JK, MB, JW
07 / 18 / 18
0.0'
0.0'
0.0'
0.0'
0.0'
0.0' 0.0'
0.0'
0.0'
NOSE AND SOUTHWEST CORNER
TREMIE SEAL EXPOSED AT THE
-
N.T.S.
C L
BRIDGE 01218- PIER 3
50'+/- 25'+/- 15'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 10'+/- 15'+/- 25'+/- 50'+/-25'+/-
15'+/-
10'+/-
50'+/-
10'+/-
15'+/-
25'+/-
MATCH LINE B-B
(TYPICAL)
SHORELINE
BRIDGE 04180- PIER 3
12.5'
FLOWELEV. -8.2'EXPOSED SHEET PILE
-10.3'
-9.2'
-7.6'
-7.8'
-5.5' -5.3'
-6.3'
-7.7'
-8.8'
-10.3'
-5.3'
-6.3'
-7.7'
-8.7'
-10.1'
-5.8'
-7.3'
-7.7'
-8.4'
-10.3' -11.0' -11.1' -10.4' -10.8' -9.1' -9.3' -10.0' -10.3' -10.3' -9.9' -9.3' -10.5' -10.4'
-8.6' -8.5' -8.5' -8.4' -8.5' -8.6' -8.8' -8.7' -8.4' -8.3' -8.1' -7.8' -8.2'
-7.7' -7.8' -7.6' -7.7' -7.7' -7.6' -7.9' -8.0' -8.1' -7.6' -7.6' -7.8' -8.2'
-7.1' -7.2'
-4.3' -5.3' -5.3' -6.3' -6.3' -6.8' -7.6' -7.7' -7.8' -7.7' -7.9' -8.2' -8.5'
-7.6' -7.4' -8.0' -8.3'
UW
DR
AWIN
G
3
-7.4' -7.7' -7.8' -8.0' -8.3' -8.5' -8.7'-7.8'
x 3'H SANDBAR150'L x UP TO 20'W
-7.4'
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
BRIDGE NO. 04180
REVISED BY: FHDRAWING NO.
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
-10.4'
-8.3'
-7.6'
-9.5'
-8.3'
-8.3'
-9.7'
-8.9'
-7.9'
-9.6'
-8.8'
-8.0'
0.4'
0.5'
0.7'
-8.7'
1.0'
-8.9'-9.9'
-9.3'
1.0'
-8.3'
-9.3'
0.5'
-8.4'
1.1'
-8.8'-8.4'
0.7'
-8.8'-8.6'
1.0'
-8.7'
0.4'
-9.9'-8.8'
-9.1' -8.4' -7.8' -7.6'
1.0' 1.0' 1.0' 2.5'
-8.8' -8.3' -8.0' -7.8'-8.1'
2.0'
-8.3'
30'
-7.7'
-7.4'-7.8'
-7.8'
1.0'
1.0' -7.7'
-7.9'-8.1'
-8.0'
-10.4'
-10.4'
0.1'
-10.2'
-8.6'-9.0'
-10.5'
-8.6'
-8.5'
0.1'
-7.7'
-7.5'
0.1'
-8.0'
-8.2'
-6.9'
0.1'
-7.5'
-5.3' -5.3' -4.3'-6.3' -6.3' -7.3'
-3.3'-6.3'
-8.0'
0.1'
-8.2'
0.1'
-7.8'
-8.2'
-7.6'
-8.1'
0.1'
-7.7'
-7.7'
-3.3'
0.1'
0.1'
-6.3'
-8.2'
-7.8'
-7.7'
-8.2'
0.1'
-3.3'
-6.3'
-6.3'
-5.8'
-6.3'
-6.3'
SOUNDING PLAN
04180 C
SOUNDING PLAN
LEGEND FOR SYMBOLS
LEGEND FOR BOTTOM ELEVATIONS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
-0.0'JULY. 2016:
JULY. 2018: -0.0'
W.S. ELEV. -7.3'
-7.3'
INSPECTED BY: JK, MB, JW
07 / 18 / 18
0.0'
0.0'
-
N.T.S.
PIER 2
(PER PLANS)TOP OF TREMIE ELEV. -36.3'
(PER PLANS)BOTTOM OF TREMIE ELEV. -42.3'
(PER PLANS)TOP OF TREMIE ELEV. -33.0'
(PER PLANS)BOTTOM OF TREMIE ELEV. -39.0'
(PER PLANS)TOP OF TREMIE ELEV. -24.3'
(PER PLANS)BOTTOM OF TREMIE ELEV. -29.3'
(PER PLANS)TOP OF FOOTING ELEV. -16.3'
(MEASURED)TOP OF STEP-FOOTING ELEV. -22.5'
(MEASURED)TOP OF FOOTING ELEV. -27.5'
PIER 3
PIER 1
W.S. ELEV.
ELEV. -19.4' (MEASURED)TOP OF STEP-FOOTING
-3.3' -3.3'
-7.7'
-7.7'
-7.7'
-8.6'
-10.4'-11.4'
-16.2'
-19.1'
-25.3'
-27.6' -32.2'
-26.8'
-33.6'
-33.9'
-26.6' -26.5'
-24.1'-23.9'
-24.3'
-30.2'
-22.4'-29.9'
-23.5'
-29.2'
-29.8'
-7.3'
0.0'
UW
DR
AWIN
G
4
0.1'
0.1'
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
BRIDGE NO. 04180
REVISED BY: FHDRAWING NO.
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
LEGEND FOR SYMBOLS
LEGEND FOR BOTTOM ELEVATIONS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
-0.0'JULY. 2016:
JULY. 2018: -0.0'
W.S. ELEV. -7.3'
-7.3'
LEGEND FOR MUDLINE ELEVATIONS
JULY 2016
JULY 2018
UPSTREAM (WEST) ELEVATION
04180 D
UPSTREAM (WEST) ELEVATION
07 / 18 / 18
INSPECTED BY: JK, MB, JW
-6.3' -6.3'
-8.2'
-7.8'
-8.2'
-10.4'
-8.5'
-11.0'
-14.3'
-17.6'
-21.7'
-30.6'
-31.3'
-32.3'
-26.3'
-25.3'
-32.3'
-26.2'
-25.7'-23.9'
-27.3'
-28.3'
-28.3'
-29.3'
-29.3' -23.3'
-25.3'
-6.3'
0.1'
0.1'
0.1'1.0'
3.0'
1.0'
3.0'
3.0'
0.2'
0.3'
0.1'
0.1'
ABUTMENT 2ABUTMENT 1
ELEV. -10.3' (PER PLANS)TOP OF STEP-FOOTING 0.0' 0.0'
0.0'
0.0'
0.0' 0.0'
0.0'
0.0'
0.0'
0.0'0.0'
0.0'
ELEV. -24.8' (MEASURED)TOP OF FOOTING
-
N.T.S.
~ CONCRETE ~
NOTE:
CONSTRUCTION JOINT
(TYP.)
STEEL "H" PILES
FLOW
(PER PLANS)
BOTTOM OF TREMIE ELEV. -42.3'
(PER PLANS)
TOP OF TREMIE ELEV. -36.3'
PIER 1 (SOUTH) ELEVATION
04180 E
PIER 1 (SOUTH) ELEVATION
W.S. ELEV.
(MEASURED) (PREVIOUSLY NOTED AS 21.5')
TOP OF STEP FOOTING ELEV. -19.4'
(MEASURED) (PREVIOUSLY NOTED AS 26.5')
TOP OF FOOTING ELEV. -24.8'
HAIRLINE CRACK
7'L VERTICAL
CRACK
HORIZONTAL
3'L x 1/16"W IN COLD JOINT
HORIZONTAL CRACK
6'L x UP TO 1/2"W
WITH EFFLORESCENCE
HAIRLINE CRACK
5'L VERTICAL
COLD JOINT
HORIZONTAL CRACK IN
13.0'L x UP TO 1/8"W
3'
-30.2'
-30.4'
-29.2' -28.1'
-26.3'
-7.3'
UW
DR
AWIN
G
5
-29.2'
-27.2'
0.1'
FULL LENGTH x UP TO FULL HEIGHTSTEP FOOTING EXPOSED
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
DRAWING NO.
BRIDGE NO. 04180
REVISED BY: FH
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
-24.3'
-25.3'-27.3'-27.8'
-29.3'
-28.3'
-29.3'
LEGEND FOR BOTTOM ELEVATIONS
LEGEND FOR MUDLINE ELEVATIONS
JULY. 2018
-0.0'JULY. 2016:
JULY. 2018: -0.0'
JULY. 2016
LEGEND FOR SYMBOLS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
W.S. ELEV. -7.3'
-7.3'
07 / 18 / 18
INSPECTED BY: JK, MB, JW
0.1'
0.2'
1.6' 1.0'
2.0'
3.0'
37'L x UP TO 4.8'H
FOOTING EXPOSED
X 1" THICK ON UNDERWATER SUBSTRUCTURE.
RANDOM AREAS OF ZEBRA MUSSELS UP TO 50% COVERAGE3.
TO 1' ABOVE.
ABRASION UP TO 1/4"D FROM 4' BELOW WATER SURFACE2.
BOTTOM.
AND DOWNSTREAM NOSE ALONG THE CHANNEL
TIMBER DEBRIS UP TO 1' DIA. AT THE UPSTREAM 1.
-
N.T.S.
~ CONCRETE ~
NOTE:
(PER PLANS)
TOP OF TREMIE ELEV. -36.3'
FLOW
(PER PLANS)
BOTTOM OF TREMIE ELEV. -42.3'
COLD JOINT
HORIZONTAL CRACK IN
17.0'L x UP TO 1/4"W
CONSTRUCTION JOINT
04180 F
PIER 1 (NORTH) ELEVATION
W.S. ELEV.
(MEASURED) (PREVIOUSLY NOTED AS -18.4')
TOP OF STEP FOOTING ELEV. -19.4'
(MEASURED) (PREVIOUSLY NOTED AS -24.4')
TOP OF FOOTING ELEV. -24.8'
IN COLD JOINT
HORIZONTAL CRACK
4'L x UP TO 1/4"W
WITH EFFLORESCENCE
5'H VERTICAL HAIRLINE CRACK
3'
(TYP.)
STEEL "H" PILES
-26.3'
-29.0' -28.9'
-28.5'
-30.2'
-7.3'
UW
DR
AWIN
G
6
-27.2'
-29.8'
0.1'
1.0'
1.0' 0.8'
FULL LENGTH x UP TO FULL HEIGHT
STEP FOOTING EXPOSED
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
DRAWING NO.
BRIDGE NO. 04180
REVISED BY: FH
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
LEGEND FOR BOTTOM ELEVATIONS
LEGEND FOR MUDLINE ELEVATIONS
JULY. 2018
-0.0'JULY. 2016:
JULY. 2018: -0.0'
JULY. 2016
LEGEND FOR SYMBOLS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
W.S. ELEV. -7.3'
-7.3'
INSPECTED BY: JK, MB, JW
07 / 18 / 18
PIER 1 (NORTH) ELEVATION
-28.3'
-28.3'
-27.3'
-29.3'
-24.3'-26.3'
-28.3'3.0'
0.3'
0.1'
40'L x UP TO 3.7'H
FOOTING EXPOSED
3.5' WIDE
EXPOSURE 5.1'H
MAXIMUM VERTICAL
X 1" THICK ON UNDERWATER SUBSTRUCTURE.
RANDOM AREAS OF ZEBRA MUSSEL UP TO 50% COVERAGE5.
9' HIGH (INSIDE), 5'H (OUTSIDE).
20' LONG SHEET PILING 5' OFF OF THE FOOTING UP TO4.
UP TO 2' LONG.
PIER STEM DISPLAYS ISOLATED VERTICAL HAIRLINE CRACKS3.
TO 1' ABOVE.
ABRASION UP TO 1/4" DEEP FROM 4' BELOW WATER SURFACE2.
UP TO 2' DIA. ALONG THE SOUTH FACE.
DOWNSTREAM NOSE ALONG THE CHANNEL BOTTOM, AND
TIMBER DEBRIS UP TO 1' DIA. AT THE UPSTREAM AND 1.
-
N.T.S.
~ CONCRETE ~
H H
NOTE:
CONSTRUCTION JOINT
(TYP.)
STEEL "H" PILES
FLOWH PILE (TYPICAL)
(PER PLANS)
BOTTOM OF TREMIE ELEV. -39.0'
PIER 2 (SOUTH) ELEVATION
04180 G
PIER 2 (SOUTH) ELEVATION
(MEASURED) (PREVIOUSLY NOTED AS -19.4')
TOP OF STEP FOOTING ELEV. -22.5'
(MEASURED) (PREVIOUSLY NOTED AS -25.4')
TOP OF FOOTING ELEV. -27.5'
(PER PLANS)
TOP OF TREMIE ELEV. -33.0'
UP TO 1.0'L x 4"W x 4"D
A FEW EDGE SPALLS
FOOTING INTERFACE
SPALL AT TREMIE/
2'L x 4"H x 3"D
EFFLORESCENCE
CRACK WITH
1.5'L HAIRLINE
WITH EFFLORESCENCE
2'L HAIRLINE CRACK
WITH EFLORESCENCE
3'L HAIRLINE CRACK
W.S. ELEV.
UW
DR
AWIN
G
7
-33.9' -30.3'-29.9' -29.5'
-24.4'
-7.3'
0.0'
0.0'
-33.6'
0.0'-27.8'
FULL LENGTH x UP TO FULL HEIGHT
STEP FOOTING EXPOSED
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
DRAWING NO.
BRIDGE NO. 04180
REVISED BY: FH
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
TREMIE HAS IRREGULAR SURFACE
-32.3'
-31.3'
-31.3'
-28.3' -27.3'
-26.3'
-21.3'
6' WIDE
ON CENTER OF SOUTH FACE
18"L x 1'W x 4"D SPALL
0.2'
0.3'
3.0'
5.0'
LEGEND FOR BOTTOM ELEVATIONS
LEGEND FOR MUDLINE ELEVATIONS
JULY. 2018
-0.0'JULY. 2016:
JULY. 2018: -0.0'
JULY. 2016
07 / 18 / 18
INSPECTED BY: JK, MB, JW
LEGEND FOR SYMBOLS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
W.S. ELEV. -7.3'
-7.3'
FULL LENGTH x UP TO FULL HEIGHT
FOOTING EXPOSED
1'H x FULL WIDTH OF WEST NOSE
ON SOUTH FACE AND
UP TO 0.5'H x 2'L
TREMIE SEAL EXPOSED
SUBSTRUCTURE.
50% COVERAGE x 1" THICK ON UNDERWATER
RANDOM AREAS OF ZEBRA MUSSELS UP TO3.
TO 1.0' ABOVE THE WATER SURFACE.
ABRASION UP TO 1/8" DEEP FROM 4' BELOW 2.
UPSTREAM NOSE ALONG CHANNEL BOTTOM.
HEAVY TIMBER DEBRIS UP TO 1' DIA. AT THE 1.
-
N.T.S.
~ CONCRETE ~
FLOW
H H
H PILE (TYPICAL)
NOTE:
CONSTRUCTION JOINT
(TYP.)
STEEL "H" PILES
(PER PLANS)
BOTTOM OF TREMIE ELEV. -39.0'
(PER PLANS)
TOP OF TREMIE ELEV. -33.0'
W.S. ELEV.
PIER 2 (NORTH) ELEVATION
04180 H
(MEASURED) (PREVIOUSLY NOTED AS -25.4')
TOP OF FOOTING ELEV. -27.5'
(MEASURED) (PREVIOUSLY NOTED AS -19.4')
TOP OF STEP FOOTING ELEV. -22.5'
PIER 2 (NORTH) ELEVATION
-24.4'
-25.5'
-27.7'
-27.5'
-33.9'
-7.3'
UW
DR
AWIN
G
8
-23.8'
-27.6'
FULL LENGTH x UP TO FULL HEIGHT
STEP FOOTING EXPOSED
0.9'H x FULL WIDTH OF NOSE
TREMIE SEAL EXPOSED UP TO
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
DRAWING NO.
BRIDGE NO. 04180
REVISED BY: FH
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
INSPECTED BY: JK, MB, JW
07 / 18 / 18
LEGEND FOR SYMBOLS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
W.S. ELEV. -7.3'
-7.3'
LEGEND FOR BOTTOM ELEVATIONS
LEGEND FOR MUDLINE ELEVATIONS
JULY. 2018
-0.0'JULY. 2016:
JULY. 2018: -0.0'
JULY. 2016
-21.3'
-23.3'-25.3'
-25.8'
-25.3'
-30.6'
-32.3'
5.0'
2.0'
2.0'
2.0'
0.2'
3.0'
0.2'
FULL LENGTH x UP TO 1.7'
FOOTING EXPOSED
SUBSTRUCTURE.
50% COVERAGE x 1" THICK ON UNDERWATER
RANDOM AREAS OF ZEBRA MUSSELS UP TO3.
WATER SURFACE TO 1' ABOVE.
ABRASION UP TO 1/4" DEEP FROM 4' BELOW THE 2.
UPSTREAM NOSE ALONG CHANNEL BOTTOM.
HEAVY TIMBER DEBRIS UP TO 1' DIA. AT THE1.
-
~ CONCRETE ~
(PER PLANS)
TOP OF TREMIE ELEV. -24.3'
(PER PLANS)
BOTTOM OF TREMIE ELEV. -29.3'
CONSTRUCTION JOINT
(TYP.)
STEEL "H" PILES
NOTES:
(PER PLANS)
TOP OF STEP FOOTING ELEV. -10.3'
(PER PLANS)
TOP OF FOOTING ELEV. -16.3'
FLOW
W.S. ELEV.
UW
DR
AWIN
G
9
-7.7'
-8.0' -7.8' -7.6'-7.5'
-7.3'
0.1'
0.1' 0.1'
0.1'
-7.7'
0.1'
-6.9'
0.1'
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
DRAWING NO.
BRIDGE NO. 04180
REVISED BY: FH
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
-7.8'
-8.2'
-8.2' -8.2' -8.1'-8.0' -7.5'
N.T.S.
PIER 3 (SOUTH) ELEVATION
PIER 3 (SOUTH) ELEVATION
LEGEND FOR BOTTOM ELEVATIONS
LEGEND FOR MUDLINE ELEVATIONS
JULY. 2018
-0.0'JULY. 2016:
JULY. 2018: -0.0'
JULY. 2016
LEGEND FOR SYMBOLS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
W.S. ELEV. -7.3'
-7.3'
07 / 18 / 18
INSPECTED BY: JK, MB, JW
0.1'
04180 I
ABOVE THE WATER SURFACE.
ABRASION UP TO 1/4" DEEP FROM MUDLINE TO 1.0'1.
-
~ CONCRETE ~
N.T.S.
CONSTRUCTION JOINT
NOTES:
(PER PLANS)
TOP OF TREMIE ELEV. -24.3'
(TYP.)
STEEL "H" PILES
(PER PLANS)
TOP OF STEP FOOTING ELEV. -10.3'
(PER PLANS)
TOP OF FOOTING ELEV. -16.3'
04180 J
CRACK
1.7'L HAIRLINE
UW
DR
AWIN
G
10
-3.3' -4.3' -5.3' -5.3'-3.3'
-7.7'
0.1'
-6.9'
0.1'
(PER PLANS)
BOTTOM OF TREMIE ELEV. -29.3'
FLOW
CONNECTICUT DEPARTMENT OF TRANSPORTATION
CONNECTICUT
AS SHOWN
SCALE: DATE OF INSPECTION
DRAWING NO.
BRIDGE NO. 04180
REVISED BY: FH
INC.
INFRASTRUCTURE
ENGINEERS,
1-888-451-6822
ROUTE 84 WESTBOUND OVER HOUSATONIC RIVER
NEWTOWN
-6.3'
-7.5'
-7.3' -6.3'-6.3' -6.3'
-7.8'
LEGEND FOR BOTTOM ELEVATIONS
LEGEND FOR MUDLINE ELEVATIONS
JULY. 2018
-0.0'JULY. 2016:
JULY. 2018: -0.0'
JULY. 2016
LEGEND FOR SYMBOLS
DEPTH OF PENETRATION 0.0'
OF THE NORTH FACE OF PIER 1
TOP OF THE PIER AT THE CENTERLINE
CONSTRUCTION JOINT DOWN FROM THE
EASTBOUND BRIDGE 01218 AT THE SECOND
DATUM ELEV. 0.0' TAKEN FROM THE
W.S. ELEV. -7.3'
-7.3'
INSPECTED BY: JK, MB, JW
07 / 18 / 18
PIER 3 (NORTH) ELEVATION
PIER 3 (NORTH) ELEVATION
W.S. ELEV. -7.3'
ABOVE THE WATER SURFACE.
ABRASION UP TO 1/4" DEEP FROM MUDLINE TO 1.0'1.
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Upstream (North) Bridge ElevationPhoto Number: 1 Photo Taken: 07/18/2018
Downstream (South) Bridge ElevationPhoto Number: 2 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Pier 1 South ElevationPhoto Number: 3 Photo Taken: 07/18/2018
Pier 1 North ElevationPhoto Number: 4 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Pier 1 South Elevation Stem
Note: Zebra mussels on pier.
Photo Number: 5 Photo Taken: 07/18/2018
Pier 1 at Upstream Sothwest Corner
Note: Exposed step and footing.
Photo Number: 6 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Pier 1 at North Side Near Centerline
Note: Sheet piling.
Photo Number: 7 Photo Taken: 07/18/2018
Pier 2 South ElevationPhoto Number: 8 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Pier 2 North ElevationPhoto Number: 9 Photo Taken: 07/18/2018
Pier 2 Upstream South Elevation
Note: Exposed footing and step.
Photo Number: 10 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Pier 2 Upstream Nose
Note: Exposed tremie.
Photo Number: 11 Photo Taken: 07/18/2018
Pier 3 South ElevationPhoto Number: 12 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Pier 3 North ElevationPhoto Number: 13 Photo Taken: 07/18/2018
Channel Looking (West) UpstreamPhoto Number: 14 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Channel Looking (East) DownstreamPhoto Number: 15 Photo Taken: 07/18/2018
Northwest Channel EmbankmentPhoto Number: 16 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Northeast Channel EmbankmentPhoto Number: 17 Photo Taken: 07/18/2018
Southwest Channel EmbankmentPhoto Number: 18 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Southeast Channel EmbankmentPhoto Number: 19 Photo Taken: 07/18/2018
Navigational Light Pier 1 (Upstream)Photo Number: 20 Photo Taken: 07/18/2018
-
Form: Asset Photos
Inspection type:
Inspection Date:
Inspected by:
7/18/2018
Bridge No: 04180
NEWTOWN
INTERSTATE 84 WESTBOUND
HOUSATONIC RIVER
NHS
Underwater
Infrastructure Engineers
Town:
Carried:
Crossed:Inventory Route:
Navigational Light Span 2 (Upstream)Photo Number: 21 Photo Taken: 07/18/2018
Navigational Light Pier 2 (Upstream)Photo Number: 22 Photo Taken: 07/18/2018
-
BACKâUP MATERIAL
-
By: Infrastructure Engineers
CS1 CS2 CS3 CS4
210 Mod. Reinforced Concrete Pier Wall 42 LF 0 21 21 0
1130 Cracking 21 LF 21
1190 Abrasion / Wear (PSC/RC) 21 LF 21
220 Mod. Reinforced Concrete Pile Cap/Footing 42 LF 0 0 42 0
6000 Scour 42 LF 42
210 Mod. Reinforced Concrete Pier Wall 42 EA 0 42 0 0
1190 Abrasion / Wear (PSC/RC) 42 LF 42
220 Mod. Reinforced Concrete Pile Cap/Footing 42 LF 0 0 42 0
6000 Scour 42 LF 42
210 Mod. Reinforced Concrete Pier Wall 42 LF 0 42 0 0
1190 Abrasion / Wear (PSC/RC) 42 LF 42
SUBSTRUCTURE
Pier 1
⢠5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.
⢠Horizontal cracks up to 17' long x up to 1/2â wide along the cold joints above and below water.
⢠Near the midpoint of the footing on both faces there is a vertical hairline crack x 5' long with efflorescence.
⢠The North face has isolated vertical hairline cracks x up to 2' long throughout.
⢠Zebra mussels up to full height x 1" thick.
⢠Step Footing exposed over its full-length x up to full-height (5.4â high) along both faces of the pier.
⢠Footing exposed up to 5.1â vertically over a length of 37â on the pier.
⢠Isolated vertical hairline cracks up to 5' long with efflorescence.
NATIONAL BRIDGE ELEMENTS RECORDING SHEET *
Element
/Str. Unit No.Env Element/Structure Unit Description
Structure No. 04180 Date: 7/18/2018
Condition State QuantityTotal
Qty.Units
⢠5' high band of abrasion up to 1/4" deep extending from 1' above to 4' below the water surface.
⢠There are steel H-piles intermittently exposed along the stem located above the step footing (formwork left in place from construction).
⢠Random areas of Zebra mussels up to 50% coverage x 1" thick.
⢠The step footing is exposed over its full-length x up to full-height (5.0â high) on both faces of the pier.
⢠The footing has been exposed full length x up to full-height (5.5â high) on the South face and full length x up to 1.7â high on the North face of the pier,
⢠The Tremie Seal has been exposed up to 1.0â long across the full-width of the Upstream (West) nose and over 2â long x 0.5' high at the Southwest
corner of the pier.
⢠Random vertical hairline cracks up to 3â long with efflorescence on the footing.
⢠Isolated edge spalls on the footing up to 2â long x 4â wide x up to 4â deep.
⢠At the center of the Downstream (South) face of the Step Footing there is a spall 18" long x 1' wide x 4" deep.
⢠At the Southwest corner of the Footing/Tremie interface there is a spall 2' long x 4" high x 3" deep.
Pier 3
⢠Band of abrasion up to 1/4" deep extending from 1' above the water surface down to the channel bottom.
⢠Random areas of Zebra mussels up to 50% coverage x 1" thick.
⢠The North face towards the Upstream (West) nose of the pier there is a 1.7' long vertical hairline crack below the construction joint.
⢠There is no exposure of the Step Footing or Footing at the pier.
⢠There is a section of sheet pile exposed up to 6" high along the South face of the pier approximately 12.5' off the pier face
* Includes only defects on Piers 1 through 3 from the high water mark to the channel bottom.
Pier 2
Report CoverTable of ContentsReport Title PageLocation MapStructure Inventory and Appraisal (BRI-19)Underwater Inspection (BRI-59)Underwater Inspection (BRI-58)UW DrawingsPhotosBack-Up Material