Bridges and Structures COMMITMENT: $261.5 MILLION OVER FIVE YEARS Manitoba Infrastructure and Transportation has a five-year plan to invest $2 billion in Manitoba’s road system. Of this, $1.2 billion is for capital construction and renewal. One part of the five-year plan addresses the bridges and structures which link the road system across the province. Manitoba has 2400 bridges and structures on the provincial highway system, of which 1250 are bridges. The other structures include overpasses, large culverts and overhead sign structures throughout the province. Structures designed before 1994 generally have a design life of 40 to 50 years. The use of new timber, concrete or steel technologies has advanced the design life of modern bridges to 75 years. A large number of provincial bridges and structures were built in the 1960s and require or will require significant rehabilitation work. A lack of planning over previous decades has increased the need for more up-front investment to catch up on use and load carrying demand and to maintain safety. To ensure the continued safety and efficiency of the network, Manitoba has substantially increased investment in structures on the highway system. There is also more funding to monitor and inspect bridges, providing the current information needed to make reasonable decisions for strategic investments. PROJECT SCOPE Over the next five years, $261.5 million is scheduled to be spent on bridges and structures across the province. 2007 2008 2009 2010 2011 $47.7 million $46.1 million $47.2 million $62.9 million $57.6 million

Upload: truongnguyet

Post on 23-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

Bridges and StructuresCommitment: $261.5 million over five yearS

Manitoba Infrastructure and Transportation has a five-year plan to invest $2 billion in Manitoba’s road system. Of this, $1.2 billion is for capital construction and renewal. One part of the five-year plan addresses the bridges and structures which link the road system across the province.

Manitoba has 2400 bridges and structures on the provincial highway system, of which 1250 are bridges. The other structures include overpasses, large culverts and overhead sign structures throughout the province.

Structures designed before 1994 generally have a design life of 40 to 50 years. The use of new timber, concrete or steel technologies has advanced the design life of modern bridges to 75 years.

A large number of provincial bridges and structures were built in the 1960s and require or will require significant rehabilitation work. A lack of planning over previous decades has increased the need for more up-front investment to catch up on use and load carrying demand and to maintain safety.

To ensure the continued safety and efficiency of the network, Manitoba has substantially increased investment in structures on the highway system. There is also more funding to monitor and inspect bridges, providing the current information needed to make reasonable decisions for strategic investments.

P r o j e C t S C o P e

Over the next five years, $261.5 million is scheduled to be spent on bridges and structures across the province.

2007 2008 2009 2010 2011

$47.7 million $46.1 million $47.2 million $62.9 million $57.6 million

Page 2: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

2

EASTErn rEgIOn

PTH 1 Rehabilitation at Symington Yard Overpass (East of Winnipeg)

PTH 1 Rehabilitation at Birch River (East of Prawda)

PTH 9 Replacement at Parks Creek (South of Selkirk)

PTH 11 Rehabilitation at Powerview Creek (Near Pine Falls)

PTH 12 Replacement at Rat River Diversion (Southwest of Zhoda)

PTH 12 Rehabilitation at PR 207 (Ste. Anne Overpass)

PTH 59 Replacement at La Rochelle Drain/Coulee de Naults (North of La Rochelle)

PTH 59 Rehabilitation at PTH 100

PTH 59 Rehabilitation at PTH 44 (East of Lockport)

PTH 59 Replacement at Indian Reserve Drain (In Brokenhead Ojibway Nation)

PTH 75 Rehabilitation at Plum River (N/B) (Vicinity of St. Jean Baptiste)

PTH 100 Rehabilitation at Assiniboine River (South Perimeter)

PTH 100 Rehabilitation at East Interchange of PTH 1 (South Perimeter)

PTH 100 Rehabilitation at Red River (South Perimeter)

PTH 101 Rehabilitation at PTH 8 Overpass

PTH 101 Rehabilitation at PTH 9 Overpass

PTH 101 Rehabilitation at PTH 59 Overpass (Northeast Perimeter)

PTH 101 Interchange Construction at PTH 59 Overpass

PR 201 Replacement at Red River (Letellier)

PR 211 Rehabilitation at Winnipeg River (West of Pinawa)

PR 307 Replacement at Picket Creek (Whiteshell Area)

PR 315 Replacement at Peterson Creek (South of Bird Lake Turnoff)

WR 710 Rice River Road: New Bridge at Bloodvein River

P r o j e C t l i S t i n g

Page 3: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

Page 4: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

4

Niverville

BonnetLac du

Ste. Anne

Morris

Carberry

Gimli

Oakbank

Teulon

Minnedosa

Killarney

StonewallBeausejour

Altona

Carman

Neepawa

LA PRAIRIEPORTAGE

STEINBACH

SELKIRK

WINNIPEG

WINKLERMORDEN

ANDON

29

19

9A

7

59

34

23

12

50

50

68

68

68

5

9

17

17

7

8

8

6

626

101

9

101

2767

4

59

44

12

12

12

11

11

1515

44

11

52

89

23

59

59

23

3A

3

3

2

2

2

3

13

14

75

75

32 30

31

34

34

5

5

5

18

18

3

350352

352

468464

464466

465

245

231

512

419

229

418

419

417

278

361

360480

221

248

248

430

430

240

424 334

411

227

227

242

567

569

575

265265

261

462

462

261

260

260

357

262

265

471

245

242

449305

338

240

432

201

244 432

243

420

332

306

524

428

201

421

422

205 330

336

247

332

247

305

334

424332

248

331

240

305

350

352

242

530

453

351

344

340

457

423

201

528242

253

342

442

440

342

342

245

532

253

458

458

341

238

509

410

300

241

521

334

332

209

218

405

217

203

203

200 218

302

201201

310

216

246 303

403

404

503

505

200

200

216

210

207

207

206

501

311

305

205

205210

210

311

302

302

319

500

304

504

304

304

520

433

408

507

506

211

502

313

313315

307

215

406

435

212206

213

214

317

317

508

320

202

230

322

220

321

204

409236

232

225

236

415

323

322

518

416

415

519

324 222

231

229

222

329

326

233

1A

16

100

1

1

1

1

1Assiniboine River Diversion

Assiniboine River

McCormans Coulee

Codner Drain

Gillespie Drain

Squirrel Creek

3 Drains

OverPass, CNR

Prepared by:Construction Support ServicesNovember 2006

LEGEND

WINTER ROADS

HIGHWAY NETWORK

Bridges in Year 2007/2008

Bridges in Year 2008/2009

Bridges in Year 2009/2010

Bridges in Year 2010/2011

Bridges in Year 2011/2012

PROVINCE OF MANITOBABRIDGE INFRASTRUCTURE CAPITAL PROGRAMSOUTH CENTRAL REGION2007/2008 - 2011/2012

0 10 20 30 40 50

Kilometers

SOuTh CEnTrAl rEgIOn

PTH 1 Rehabilitation at Assiniboine River (East of Portage la Prairie)

PTH 1 3 Replacements at Bowes Trailer Park: East of Portage la Prairie (W/B)

PTH 1 Replacement at First Creek (West of Headingley)

PTH 1 Rehabilitation at Portage Diversion (E/B)

PTH 1 Replacement at Third Creek (West of Headingley)

PTH 1 Rehabilitation of CNR Overpass – Portage la Prairie Bypass

PTH 2 Replacement at Codner Drain (Vicinity of Starbuck)

PTH 34 Replacement at Gillespie Drain (South of Gladstone)

PTH 34 Replacement at Squirrel Creek (Vicinity of Austin)

PR 248 Rehabilitation at Assiniboine River (North of St. Eustache)

PR 352 Replacement at McCorman’s Coulee (East of Eden)

Page 5: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

5

SOuTh WEST rEgIOn

PTH 1 Rehabilitation at Assiniboine River (Vicinity of Brandon)

PTH 2 Rehabilitation at Souris River (Vicinity of Wawanesa)

PTH 2 Replacement at Cypress River (East of Cypress River)

PTH 10 In Brandon: New 18th Street Bridge over the Assiniboine River

PTH 16 Rehabilitation at Assiniboine River (West of Russell)

PR 250 Rehabilitation at Assiniboine River (North of Alexander)

PR 253 Replacement at Pembina River (West of Pilot Mound)

PR 264 2 Replacements at Arrow River (Vicinity of Decker)

Page 6: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

6

WEST CEnTrAl rEgIOn

PTH 5 Replacement at Bield Overpass (East of Roblin)

PTH 5 Replacement at Drain (21-19-15W) (Vicinity of Kelwood)

PTH 5 Replacement at Drain (33-19-15W) (Vicinity of Kelwood)

PTH 5 Rehabilitation at Lake of the Prairies (West of Roblin)

PTH 6 Replacement at Burnt Lake Drain (North of Lundar)

PTH 6 Rehabilitation at Homebrook Drain (at St. Martin Junction)

PTH 68 Replacement at Hansen Drain (East of Ste. Rose du Lac)

PR 489 Replacement at Tributary to Garland River (South of Duck River)

PR 513 Replacement at Partridge Drain (Northeast of St. Martin)

Page 7: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

7

du LacSte. Rose

Minnedosa

Roblin

Russell

RiverSwan

Stonewall

Neepawa

DAUPHIN

24

19

45

45

83

49

57

83

83

83

4242

41

50

50

68

68

68

20

20

5

5

520

5

5

10

10

20A

10A

10A

10

10

77

60

60

10

10

17

17

6

6

6

21

364

272

491

273

489

271

267

362

276

276

269

364

269

593

484

367

274

367

591

594

584

584 366

366

485

488

486

366

486

275

279

268

268

363

264

359

359

476

478

476

264

470

566

577

350352

352

464466

465

262

250

354

355

270

355

264

469

474

472

571

467

256

568

545

487

588

587

266

279

365

327

231

512

419

229

418

325

419

417

278

361

360480

582

248430

411

242

567

569

575

265265

261

462

462

261

260

260

357

262

265

471

262

250

270

354

547

482

549

584

592

583

366

274

579

478

233

483

475

322

236

415

323

322

518

416

415

233

32

325

233

224

513

237

237

513

239

328

481

481490

16A

16

16

16

Partridge Creek

Homebrook Drain

Tributary to Garland River

Drain

Drain

Burnt Lake Drain

Lake of the PrairiesBield OverPass

Hansen Drain

Prepared by:Construction Support ServicesNovember 2006

LEGEND

WINTER ROADS

HIGHWAY NETWORK

Bridges in Year 2007/2008

Bridges in Year 2008/2009

Bridges in Year 2009/2010

Bridges in Year 2010/2011

Bridges in Year 2011/2012

0.0 7.5 15.0 22.5 30.0 37.5

Kilometers

PROVINCE OF MANITOBABRIDGE INFRASTRUCTURE CAPITAL PROGRAMWEST CENTRAL REGION2007/2008 - 2011/2012

Page 8: Bridges and Structures - Province of Manitoba | Home Page€¦ ·  · 2007-02-21Bridges and Structures Commitment: $261.5 million over five yearS Manitoba Infrastructure and Transportation

nOrThErn rEgIOn

PTH 6 Rehabilitation at North Three Rivers (49.3km South of Grand Rapids)

PTH 6 Rehabilitation at Centre Three Rivers (49.6km South of Grand Rapids)

PTH 6 Rehabilitation at South Three Rivers (52.6km South of Grand Rapids)

PTH 6 Replacement at North Morrison Creek (11.7km South of Grand Rapids)

PTH 6 Replacement at South Morrison Creek (18.2km South of Grand Rapids)

PTH 6 Rehabilitation at Minago River (57.2km South of Ponton)

PTH 6 Rehabilitation at Two Rivers Diversion (76.9km South of Grand Rapids)

PTH 6 Rehabilitation at William River (85.0km North of Grand Rapids)

PTH 10 Replacement at Big Island Lake (South of Flin Flon)

PR 283 Rehabilitation at Pasquia River (West of The Pas)

WR 730 New Modular Structure at God’s Lake Narrows

PR 800 Replacement at Mistik Creek (East of Flin Flon)