bridges in korea
TRANSCRIPT
![Page 1: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/1.jpg)
Bridges in Korea
- Long Span Bridges-
Heungbae “Harry” Gil
Korea Expressway Corporation
Email : [email protected]
![Page 2: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/2.jpg)
Contents
Road Networks in KOREA
Korea Expressway Corporation
Constructed Long Span Bridges
Under-construction Long Span Bridges
![Page 3: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/3.jpg)
Road Networks & KEC
![Page 4: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/4.jpg)
3
Korean Peninsula
Complicated Coastlines
![Page 5: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/5.jpg)
7
216
258
109
1979 463
62
25
62 3,174 No. of Islands
Lands of Islands
![Page 6: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/6.jpg)
104,702km
99,620km²
49 million
17 million
KOREA Overview
![Page 7: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/7.jpg)
※ MLTM : Ministry of Land, Transport & Maritime Affairs
Road Network in KOREA
Name of Route Authority Length (km)
Expressway KEC(3,632km) / Others(281km) 3,913
National Highway MLTM 13,905
Special • Metropolitan
City Road
Special Metropolitan
City Government 18,517
Provincial Road Provincial Government 18,193
City • County Road City / County Government 50,174
Total Length of Road Network 104,702
(as of 2011)
![Page 8: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/8.jpg)
7
Road Bridges
Routes Numbers Length (km)
Expressway 8,140 1,069
National Highway 6,610 662
Special • Metropolitan
City Road 1,045 287
Provincial Road 4,614 296
City • County Road 7,692 407
Total 2,721
(as of 2011)
28,152
![Page 9: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/9.jpg)
8
Road Bridges
Length All Roads Expressway
100M ~ 500M 6,138 2,428
500M ~ 1,000M 566 300
≥ 1,000M 160 68
Total 8,140
(as of 2011)
28,152
≤ 100M 21,288 5,344
![Page 10: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/10.jpg)
9
Research &
Development
Installation &
Management of
Subsidiary Facilities
Construction,
Maintenance & Operation of Expressway
Development of Areas
Adjacent to
Expressways
Established in 1969
Korea Expressway Corporation
![Page 11: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/11.jpg)
3,913 km Present
General Information – 7 x 9 Master Plan
6,160 km
7 corridors north and south
9 corridors east and west
Within 30-minutes access to
expressways nationwide
Increase alternative routes
2020
![Page 12: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/12.jpg)
Long Span Bridges before 2000s
![Page 13: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/13.jpg)
Historical Bridges
12
![Page 14: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/14.jpg)
13
Bridges in 1970 ~ 1980
![Page 15: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/15.jpg)
14
Namhae Bridge (1973)
Suspension Bridge
Total Length: 606M Main span: 404M
![Page 16: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/16.jpg)
15
Jindo Bridge (1984)
Cable Stayed Bridge
Total Length: 484M
Main Span: 344M
Steel Box Girder
![Page 17: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/17.jpg)
16
Dolsan Bridge (1984)
Cable Stayed Bridge
Total Span Length: 450M
Main Span: 279.5M
Steel Box Girder
![Page 18: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/18.jpg)
Bridges in 1990s
Large number of sea-crossing bridges for the development of islands
Securing of self-reliant technology for BCM and steel box bridges
Design focused essentially on functionality and economy
Narodo bridge (1994) Onnam Bridge (1996) Changseon bridge (1995)
Yaksan bridge (1999) Jodo Br. (1997) Tongyoung bridge (1998)
![Page 19: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/19.jpg)
Long Span Bridges after 2000s
![Page 20: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/20.jpg)
19
![Page 21: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/21.jpg)
Long Span Bridges after 2000s
Strong demands for road infrastructure
Early 2000s
Conservatism in designs & constructions
Corporation with foreign companies & engineers
Beginning of golden era for long span bridges in Korea
Initiation of National Highway 77 construction project
Late 2000s
EPC turnkey construction contracts
Partial cooperation & dependence with foreign companies
20
![Page 22: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/22.jpg)
Seohae Bridge (2000)
First composite cable-stayed bridge in Korea
Span length: 990M (60+200+470+200+60)
Girder : Stiffened steel girder with precast slab
![Page 23: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/23.jpg)
22
Foundation Concrete Pylons
Key Sag Stay Cable Works
Girder Erection
Seohae Bridge (2000)
![Page 24: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/24.jpg)
23
Self-anchored suspension bridge with three-
dimensional main cable profile
Total length: 550M(125+300+125)
Road-rail bridge, Double-deck
Yongjong Bridge (2000)
![Page 25: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/25.jpg)
24
Cable work on temp. bents
Yongjong Bridge (2000)
AS equipments
AS on the main span 3D cable arrangements
![Page 26: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/26.jpg)
25
Earth-anchored suspension bridge
Total length: 900M (200+500+200)
Girder type: Stiffened steel truss girders, double-deck
Gwangan Bridge (2002)
![Page 27: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/27.jpg)
26
Gwangan Bridge (2002)
Landmark of Busan City
![Page 28: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/28.jpg)
27
2nd Jindo Bridge (2005)
Needs for the new bridge
Increased traffic demands
Lack of load bearing capacity
![Page 29: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/29.jpg)
28
2nd Jindo Bridge (2005)
Twin cable-stayed bridges
Length:492.5M (74.25+344+74.25)
Steel Box Girder
Wind dynamic stability during
construction: TMD
![Page 30: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/30.jpg)
29
National Highway 77 Project
![Page 31: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/31.jpg)
30
Sorok Bridge (2008)
Mono cable self-anchored suspension bridge
Total length: 470M(110+250+110)
![Page 32: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/32.jpg)
31
Incheon Bridge (2009)
Total length: 18.25km
Length of CSB: 80+260+800+260+80 M
Fast-track method
PPP Projects
![Page 33: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/33.jpg)
32
Stiffening Girder Erection
Steel box girder
HSB600 steel plates
(Y.S.: 450MPa, T.S.: 600MPa)
Incheon Bridge (2009)
![Page 34: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/34.jpg)
33
PWS(Parallel Wire Strand) cable
• Ultimate strength: 1770MPa
• Diameter of wire : 7 mm
Incheon Bridge (2009)
![Page 35: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/35.jpg)
34
Incheon Bridge (2009)
Construction: JUN. 2005 – OCT. 2009 (52 Months)
Longest cable-stayed bridge in Korea
![Page 36: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/36.jpg)
35
Geogum Bridge (2011)
Cable-stayed bridge in a semi-harp arrangement
Total length: 1,116M(120+198+ 480+198+120)
Bundles of 7 cables
Double-deck Warren truss
![Page 37: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/37.jpg)
36
Geogum Bridge (2011)
Nickname: Golden Sunlight Bridge
![Page 38: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/38.jpg)
37
Mokpo Bridge (2012)
Red-crowned Crane
![Page 39: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/39.jpg)
38
Steel box girder cable-stayed bridge
Total length:900M (200+500+200)
3 way stay cable arrangement
Center span: double plane
Side spans: single plane
Mokpo Bridge (2012)
![Page 40: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/40.jpg)
Three-span suspension bridge
Total length: 2,260M(357.5+1545+357.5)
4th longest bridge in the world
Yi Sun-sin Bridge (2012)
Admiral Yi Sun-sin
(Born in 1545)
![Page 41: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/41.jpg)
40
Highest concrete tower in the world for suspension bridges (272m)
Slip form construction
Construction period of pylon: 11 Months ( Great Belt Bridge: 254m, 30 Months)
Yi Sun-sin Bridge (2012)
![Page 42: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/42.jpg)
41
High-strength steel cable: 1,860MPa (Kiswire)
Cable erection: newly-developed AS system
Yi Sun-sin Bridge (2012)
![Page 43: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/43.jpg)
42
Twin-Box Girder
Floating Girder System
Yi Sun-sin Bridge (2012)
![Page 44: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/44.jpg)
43
Yi Sun-sin Bridge (2012)
Temporary Opening Date:
May 10, 2012
![Page 45: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/45.jpg)
44
Typical choice:
- Balanced Cantilever PSC Box Girder Bridges
Bridges for 100~200M ??
![Page 46: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/46.jpg)
45
New Alternative:
Extradosed* Bridges
* a cross between a girder bridge & a cable-stayed bridge
![Page 47: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/47.jpg)
46
2nd Pyung-Yeo Bridge (2007)
First Extradosed Bridge in Korea
Length : 550M (3@50+65+120+65)
Pier Height : 10.5M
![Page 48: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/48.jpg)
47
Length: 796.6M (85.35+5@125+85.25)
Pier Height: 8.85M
Geumga Bridge (2008)
![Page 49: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/49.jpg)
48
Approach to Inchon Bridge (2009)
Length: 310M
![Page 50: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/50.jpg)
49
Hag-Na-Rae Bridge (2012)
Length: 740M(100+3@180+100)
Pier Height : 26m
Longest span ED bridge in Korea
![Page 51: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/51.jpg)
Under-construction Long Span Bridges
![Page 52: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/52.jpg)
51
![Page 53: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/53.jpg)
52
Total length : 400M
Main span length : 400M
Stiffening girder : Steel Edge Girder
World’s Longest Single Pylon Suspension Bridge
Dandeung Bridge (2013)
![Page 54: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/54.jpg)
53
Dandeung Bridge (2013)
Cable strength : 1,960MPa
AS (Air Spinning) erection method
![Page 55: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/55.jpg)
54
Sepoong Bridge (2014)
Bridge type : 6-span Cable-stayed Bridge
Total length : 725M (R=2000M)
Main span length : 220M
Stiffening girder : PSC Box Girder with Strut
![Page 56: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/56.jpg)
55
Ulsan Bridge (2015)
PPP projects
Single span(L=1,150M) suspension bridge
Cable strength: 1,960MPa
PPWS erection method
Tunnel type anchorage(AN2)
![Page 57: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/57.jpg)
56
Ulsan Bridge (2015)
![Page 58: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/58.jpg)
57
2nd Namhae Bridge (2016)
3 Dimensional Cable Suspension Bridge With Inclined Pylons
![Page 59: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/59.jpg)
58
Pylon at Land :
Prevention of Marine Pollution
Inclined Pylon : Minimization of
Tension on Main Cable
3D Arrangement of Main Cable : Securing Wind Resistance from Horizontal force of Hanger
Total length : 990.0M
Main span length : 890M
Pylon height : 148.5M
Inclined angle of pylon : 8.0°
Cable strength : 1,960MPa
Cable construction method
: Low Tension Air Spinning
2nd Namhae Bridge (2016)
![Page 60: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/60.jpg)
New Millennium Bridge 1 (2019)
59
Total length: 1,004M(67+120+120+510+120+67)
PSC Box Girder + Steel Box Girder
![Page 61: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/61.jpg)
60
New Millennium Bridge 2 (2019)
Bridge type : Four-span Suspension Bridge
Total length : 1,750M
Main span length : 650M
Cable erection: PPWS (1,960MPa)
![Page 62: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/62.jpg)
Conclusion
Stiff competitions
Uniqueness
Bold Designs
Technology Developments
Super Long Bridge R&DB Projects
61
![Page 63: Bridges in Korea](https://reader031.vdocument.in/reader031/viewer/2022012314/5540b7ed4a7959b41d8b4b75/html5/thumbnails/63.jpg)
Thanks to…..