Bridgeton Landfill, LLC Weekly Data Submittal Week of December 13  December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SLCC01088 Effective May 13, 2013 Contents: Attachment A  Leachate Levels in Leachate Collection Sumps Attachment B  Temperature Monitoring Probe Analytical Charts Attachment C  Gas Interceptor Wellhead Temperature Graphs Attachment D  NeckArea Gas Extraction Wellhead Temperature Graphs Provided Separately:  – Leachate Level in Leachate Collection Sump Raw Data Excel Spreadsheet – Temperature Monitoring Probe Raw Data Excel Spreadsheet – Heat Extraction System TMP Raw Data Excel Spreadsheet – Gas Interceptor Well Reading Raw Data Excel Spreadsheet – NeckArea Gas Extraction Well Data Excel Spreadsheet December 28, 2015 

Upload: others

Post on 23-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Bridgeton Landfill, LLC 

Weekly Data Submittal Week of December 13 – December 19, 2015 

Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 

Contents: 

Attachment A – Leachate Levels in Leachate Collection Sumps Attachment B – Temperature Monitoring Probe Analytical Charts Attachment C – Gas Interceptor Wellhead Temperature Graphs Attachment D – Neck‐Area Gas Extraction Wellhead Temperature Graphs 

Provided Separately:  

– Leachate Level in Leachate Collection Sump Raw Data Excel Spreadsheet– Temperature Monitoring Probe Raw Data Excel Spreadsheet– Heat Extraction System TMP Raw Data Excel Spreadsheet– Gas Interceptor Well Reading Raw Data Excel Spreadsheet– Neck‐Area Gas Extraction Well Data Excel Spreadsheet

December 28, 2015 

Page 2: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Commentary on Data  December 28, 2015 

Attachment A – Leachate Levels in Leachate Collection Sumps   

Leachate  Collection  Sump  (LCS)‐1D,  ‐3D,  ‐4B,  and  ‐5A were  partially  or  fully  operational  during  the weekly reporting period.  

The level sensors in LCS‐1D, ‐3D, and ‐4B are currently not recording liquid levels but will be serviced in the near future.  

The pump in LCS‐2D and ‐6B were non‐operational during the weekly monitoring event.  

Attachment B ‐ Temperature Monitoring Probe Analytical Charts 

The following TMPs indicated generally consistent profiles to previous observations: TMP‐1, ‐2, ‐3, ‐3R,  ‐4, ‐4R, ‐6, ‐9, ‐10, ‐11, ‐14, ‐16, ‐17, ‐18, ‐21, ‐22, ‐23, ‐24, ‐25, ‐26, ‐27, ‐28, and ‐29.   

TMP readings for evaluation of the Heat Extraction System (HES) are provided as a separate attachment, but not evaluated in this commentary.   

Attachment C ‐ Gas Interceptor Wellhead Temperature Graphs 

As part of the HES, there are currently cooling water circulation loops installed in twelve Gas Interceptor Wells  (GIWs)  (GIW‐02  through GIW‐13).      The  remaining well without  a HES  installed  (GIW‐01),  gas temperatures are operating within historical limits.   

Attachment D – Neck Area Gas Extraction Well Data 

Weekly gas  temperature data  is being  collected  for  select gas extraction wells  (GEWs)  located  in  the neck area of the landfill.  These wells include GEW‐008, ‐009, ‐010, ‐038, ‐039, ‐040, 041R, ‐043R, ‐053,   ‐054 ‐055, ‐056R, ‐109, and ‐110.  All wells are showing temperatures within historic limits. 

During this reporting period, landfill gas well GEW‐109 gas flow temperatures have trended down due to limited gas  flow most  likely due  to obstructed well screens  from  liquid  levels within  the gas well. This well has a downhole pump which will be inspected and if necessary serviced in the near future.  

Page 3: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

ATTACHMENT A

LEACHATE LEVELS IN LEACHATE COLLECTION SUMPS

Page 4: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

Dep

th B

elow

Gra

de (f

eet)

LCS-1D Liquid Level Below Ground Surface

Measured Liquid Level Below Ground Surface(feet)

--Transducer at 92.4 ft depth -- --Liquid Level many be lower--

Page 5: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

Dep

th B

elow

Gra

de (f

eet)

LCS-3D Liquid Level Below Ground Surface

Measured Liquid Level Below Ground Surface(Ft.)

Page 6: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

Dep

th B

elow

Gra

de (f

eet)

LCS-4B Liquid Level Below Ground Surface

Measured Liquid Level Below Ground Surface(Ft.)

--Transducer at 74 ft depth -- --Liquid Level many be lower--

Page 7: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0

20

40

60

80

100

120

140

160

180

Hei

ght A

bove

Qua

rry

Floo

r (fe

et)

LCS-5A Liquid Level Above Quarry Floor

Height of Liquid (Ft. )

Page 8: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0

20

40

60

80

100

120

140

160

180

Hei

ght A

bove

Qua

rry

Floo

r (fe

et)

LCS-6B Liquid Level Above Quarry Floor

Height of Liquid (Ft. )

Page 9: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

ATTACHMENT B

TEMPERATURE MONITORING PROBE ANALYTICAL CHARTS

Page 10: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

BRIDGETON LANDFILL, LLC

13570 ST. CHARLES ROCK ROAD

BRIDGETON, MISSOURI 63044

BRIDGETON LANDFILL

DRAWING NO.:

APPROVED BY: ALK

FEBRUARY 2015

REVISION DATEPROJECT NUMBER: BT-041 FILE PATH:

FEEZORWEEKLY TMP MONITORING

001

DESIGNED BY: DMK

LEGEND

TEMPERATURE MONITORING PROBE (EXISTING)

Feet

0 60 120

Page 11: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATIO

N(F

T) LEGEND11/26/1211/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 12: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATIO

N(F

T) LEGEND11/26/1211/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 13: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATIO

N(F

T) LEGEND11/26/1211/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 14: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND02/11/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 15: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND11/26/201211/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 16: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND02/11/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 17: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATIO

N(F

T) LEGEND11/26/1211/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 18: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND11/26/201211/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 19: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND4/6/1311/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 20: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND4/6/1311/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 21: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND4/6/1311/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 22: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND8/31/1411/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 23: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND8/31/1411/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 24: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND8/31/1411/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 25: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 26: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 27: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 28: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 29: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 30: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 31: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 32: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 33: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

60 80 100 120 140 160 180 200 220 240 260 280 300

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGEND01/28/1511/17/1511/23/1512/01/1512/08/1512/14/15

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

Notes for TMPs are summarized at the end of the TMP figures.

Page 34: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

60 80 100 120 140 160 180 200 220 240 260 280 300 320

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

LATI

ON

(FT)

LEGENDTMP-1TMP-2TMP-3TMP-3RTMP-4TMP-4RTMP-6TMP-9TMP-10TMP-11TMP-14

Notes for TMPs are summarized at the end of the TMP figures.

Page 35: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

TEMPERATURE VS DEPTHBRIDGETON LANDFILL

60 80 100 120 140 160 180 200 220 240 260 280 300 320

TEMPERATURE (oF)

260

240

220

200

180

160

140

120

100

80

60

40

20

0

DE

PTH

AT

INS

TALL

ATI

ON

(FT)

LEGENDTMP-16TMP-17TMP-18TMP-21TMP-22TMP-23TMP-24TMP-25TMP-26TMP-27TMP-28TMP-29

Notes for TMPs are summarized at the end of the TMP figures.

Page 36: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

11/01/1201/01/13

03/01/1305/01/13

07/01/1309/01/13

11/01/1301/01/14

03/01/1405/01/14

07/01/1409/01/14

11/01/1401/01/15

03/01/1505/01/15

07/01/1509/01/15

11/01/1501/01/16

DATE

60708090100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

60708090

100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

LEGENDTMP-1TMP-2TMP-3TMP-3RTMP-4TMP-4RTMP-5TMP-6TMP-7TMP-8TMP-9TMP-10TMP-11TMP-12TMP-13TMP-14

TEMPERATURE VS TIMEBRIDGETON LANDFILL

Page 37: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

11/01/1201/01/13

03/01/1305/01/13

07/01/1309/01/13

11/01/1301/01/14

03/01/1405/01/14

07/01/1409/01/14

11/01/1401/01/15

03/01/1505/01/15

07/01/1509/01/15

11/01/1501/01/16

DATE

60708090

100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

60708090100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

LEGENDTMP-1TMP-2TMP-3TMP-3RTMP-4TMP-4RTMP-5TMP-6TMP-7TMP-8TMP-9TMP-10TMP-11TMP-12TMP-13TMP-14

TEMPERATURE VS TIMEBRIDGETON LANDFILL

Page 38: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

08/01/1409/01/14

10/01/1411/01/14

12/01/1401/01/15

02/01/1503/01/15

04/01/1505/01/15

06/01/1507/01/15

08/01/1509/01/15

10/01/1511/01/15

12/01/1501/01/16

DATE

60708090100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

60708090

100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

LEGENDTMP-16TMP-17TMP-18TMP-21TMP-22TMP-23TMP-24TMP-25TMP-26TMP-27TMP-28TMP-29

TEMPERATURE VS TIMEBRIDGETON LANDFILL

Page 39: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

08/01/1409/01/14

10/01/1411/01/14

12/01/1401/01/15

02/01/1503/01/15

04/01/1505/01/15

06/01/1507/01/15

08/01/1509/01/15

10/01/1511/01/15

12/01/1501/01/16

DATE

60708090

100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

60708090100110120130140150160170180190200210220230240250260270280290300310

TEM

PE

RA

TUR

E (o F

)

LEGENDTMP-16TMP-17TMP-18TMP-21TMP-22TMP-23TMP-24TMP-25TMP-26TMP-27TMP-28TMP-29

TEMPERATURE VS TIMEBRIDGETON LANDFILL

Page 40: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Reading Date 12/14/15  Bridgeton TMP Notes  Page 1 of 5 

TMP BRIDGETON LANDFILL NOTES 

TMP‐1: 

1. No reliable temperature readings at 138 ft depth from 8/1/2014 to 3/24/2015.2. No reliable temperature readings at 78 ft depth from 8/13/2014 to 3/24/2015.3. No reliable temperature readings at 38 ft depth from 8/2/2014 to 3/24/2015.

TMP‐2: 

1. Unit at 180 ft depth had resistance reading above allowable and is no longer working.  Noreliable reading has been obtained since 11/26/2012.

2. The resistance reading was high and no temperature readings were obtained at 160 ft depthsince 6/19/2014.

3. Unit at 120 ft depth had high resistance readings that were fluctuating on 10/22/14 & from11/5‐12/6/2014 and on 12/16/2014.

4. Unit at 60 ft depth had fluctuating high resistance readings from 11/12/14 – 12/6/14 and noresistance reading between 2/11/2015 and 2/25/15, therefore the temperatures are unreliableduring those dates.

5. The conductivity tests on 3/19/15 conducted by Feezor Engineering showed that units at 20’,40’, 80’, 100’, 140’ are no longer reliable.

TMP‐3: 

1. No reliable temperature readings have been obtained at  170' depth since 1/29/2014, except on3/13/2014.

2. The conductivity tests on 4/11/14 conducted by CEC showed that units at 10', 90', 130’, 210' and250' are no longer reliable.

3. No reliable temperature readings were obtained at 230' depth from 8/01/2014 – 12/6/14 and2/11/15 – 2/25/15.

4. No reliable temperature readings were obtained at 190' depth from 9/12 to 10/17/14, from11/5 to 11/26/14 and on 12/16/14.

5. The conductivity tests on 10/28/14 conducted by Feezor Engineering showed that units at 10',90', 110', 130', 210' and 250' are not reliable.

6. The unit at 150' no temperature or unreliable readings between 9/12/14 and 3/3/15.7. The unit at 230' had unreliable or no readings from 10/22/‐12/6/2014, between 2/11/15 –

2/25/15.8. The unit at 190' had unreliable or no readings from 12/16/14 – 2/17/15.

TMP‐3R:  NONE 

TMP‐4:  

1. The conductivity tests on 4/11/14 conducted by CEC showed that the unit at 48' depth is nolonger reliable.

Page 41: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Reading Date 12/14/15  Bridgeton TMP Notes  Page 2 of 5 

TMP‐4R:  NONE 

TMP‐5:  TMP NO LONGER IN SERVICE– Verified by Conductivity testing by Feezor Engineering in March 2015. 

TMP‐6:  

1. Unit at 195 ft depth had a resistance reading above acceptable on 11/20/2013. 2.  Unit at 155 and depth had resistance readings above acceptable since 3/19/2014. No 

temperature readings were obtained. 3. Units at 195 ft depths had resistance readings above acceptable and no temperature readings 

obtained from 3/19/2014 to 4/11/2014.  4. The conductivity tests on 4/11/14 conducted by CEC showed that units at 35', 55', 75', 155', 

175', and 195' depths are no longer reliable.   5. No reliable temperature readings were obtained at the unit at 95' on 5/13/14, 5/28‐7/2/14, 

10/1‐10/8/14, 10/22/14, 11/12‐12/6/14, 1/14/15 & 2/4/15–4/7/15.  The temperatures between 12/16/14‐1/8/15 are questionable due to high/fluctuating resistivity.  

6. No reliable temperature readings were obtained at the 15' unit on 5/28‐6/13/14, 6/25/14, 8/1‐9/2/14, 10/1‐10/8/14, 11/19‐12/6/14, 1/2/15, & between 1/28/15 – 3/18/15. The temperature obtained on 12/16/14 is questionable due to high resistivity.  

7. No reliable temperature readings were obtained at the unit at 215' since 6/13/14. 

TMP‐7R:  TMP NO LONGER IN SERVICE 

TMP‐8: 

1. Lines connecting data over distance of > 40' are to identify the data set and should not be used for temperature estimation. 

2. The presented TMP readings represent the thermocouples that were operational on those dates. 

3. No acceptable readings were obtained between 7/25/13 to 10/10/13. 4. Acceptable readings were obtained resuming on 10/16/13 from 20' to 80' depths. 5. Resistance of the unit at 80' indicates the reading is not reliable since 12/04/13. 6. The conductivity tests on 10/28/14 conducted by Feezor Engineering showed that units at 40' 

and 60' are not reliable. 7. A conductivity test conducted by Feezor Engineering showed that the unit at 20’ is not reliable 

on 9/9/15. 

TMP‐9: 

1. All units had resistivity readings higher than acceptable levels on 7/3, 7/18, 7/25, 8/14, 8/20, 8/27, and 9/3/2013.  Values shown on and between those dates are for informational purposes and should not be considered reliable.  Resistivity readings since 9/11/2013 were acceptable for all units except 100'. 

Page 42: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Reading Date 12/14/15  Bridgeton TMP Notes  Page 3 of 5 

2. Unit at 100' depth had an inaccurate temperature reading on 8/1/2013 and no reading since 8/6/2013. 

3. Unit at 80' depth had a high resistivity and no temperature readings on 4/1/2014. 4. The conductivity tests on 4/11/14 conducted by CEC showed that units at 20', 60', 80', and 100' 

depths are no longer reliable. 5. Unit at 40' depth had a resistance lower than credible on 11/12/14.  The unit requires 

assessment. 6. Unit at 40' depth had a resistance which is fluctuating from week to week between 11/19 & 

11/26/14. The readings are considered unreliable during that time. 

TMP‐10: 

1. Resistance readings for 7/18 and 7/25/2013 were acceptable; however the temperature readings appear inaccurate.  This issue appears to be resolved as of the 8/1/2013 readings. 

2. No reliable temperature reading was obtained at 113’ depth between 3/3/15 and 3/18/15. 

TMP‐11: 

1. None of the units had acceptable resistivity readings on 7/3/2013.  The units at TMP‐11 were subsequently re‐read on 7/8/2013.  Resistance readings for 7/8/2013 were acceptable. 

2. All units had resistivity readings higher than acceptable levels on 7/18/2013.  Values shown for that date are for informational purposes and should not be considered reliable. 

3. All units had acceptable resistance readings starting on 7/25/13, except a high resistance reading at 116' depth since 10/30/13. 

4. No temperature reading was obtained at 176' since 1/17/2014. 5. The unit at 156' depth had high or questionable resistance since 1/17/14.  No temperatures 

were obtained between 1/17/14 and 5/13/14, on 6/19/14, between 8/13/14 and 10/17/2014, and since 2/11/15.   Readings were either not obtained or deemed unreliable between 8/13/14 and 3/31/15, except for on 10/22/14 and 12/10/14.   

6. The unit at 56' depth had a high resistance reading since 3/19/14 & no temperatures were obtained.   

7. The conductivity tests on 4/11/14 conducted by CEC showed that units at 56', 116', and 176' depths are no longer reliable. 

8. No temperature was obtained on 6/25/14 at 216' depth. 9. The conductivity tests on 10/28/14 conducted by Feezor Engineering showed that units at 56', 

116' and 176' are not reliable. 10. The Unit at 76' depth had either no readings or unreasonable readings between 11/12 & 

12/6/14, 12/24/14, on 1/14/15, on 2/17/15 and from 3/10/15 – 3/31/15. 11. The Unit at 16' depth had either no readings or unreasonable readings between 11/19 & 

12/6/14 and 12/16/14 – 1/28/15. 

TMP‐12:   

1. No reliable readings between 2/4/15 and 3/31/15.   

Page 43: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Reading Date 12/14/15  Bridgeton TMP Notes  Page 4 of 5 

2. All units except at depth 15’ and 35’ verified by Conductivity testing by Feezor Engineering inMarch 2015 to be unreliable.

3. All units were verified by Conductivity testing by Feezor Engineering in October 2015 to beunreliable.

TMP‐13:  TMP NO LONGER IN SERVICE 

TMP‐14:   

1. The unit at 181 ft depth had resistance readings that were out of readable limit and notemperature readings obtained since 7/9/2014.

2. The unit at 101 ft depth had resistance readings that were out of readable limit and notemperature readings from 7/9/2014 to 7/17/2014.

3. The unit at 121 ft depth had resistance readings out of readable limit and no temperaturereadings since 7/25/2014.

4. The unit at 141 ft depth had a high resistance reading and no temperature reading obtainedsince 8/01/2014.

5. The unit at 21 ft depth had low resistance readings and unreliable temperature readings since7/25/2014.

6. The unit at 201 ft depth had no temperature or resistance reading obtained on 12/24/2014 andfrom  6/1/15 – 7/28/15. Also, the unit had no or high resistivity reading obtained and unreliabletemperatures since 10/20/15.

7. The unit at 161 ft depth had no resistivity reading obtained and an unreliable temperature since4/7/15.

TMP‐14R:  NOT PART OF THIS SUBMITTAL (HEAT EXTRACTION TMP) 

TMP‐15: TMP WAS NEVER IN SERVICE 

TMP‐16:   

1. A conductivity test conducted by Feezor Engineering showed that the units on TMP‐16 may notbe reliable since 9/9/15.  Further testing at the end of September 2015 showed possibleconnectivity on some of the units.  The resistivity and temperatures will continue to bemonitored.

TMP‐17:  NONE 

TMP‐18:  NONE 

TMP‐19:  NOT PART OF THIS SUBMITTAL (HEAT EXTRACTION TMP) 

TMP‐20:  NOT PART OF THIS SUBMITTAL (HEAT EXTRACTION TMP) 

TMP‐21:  NONE 

Page 44: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

Reading Date 12/14/15  Bridgeton TMP Notes  Page 5 of 5 

TMP‐22:  NONE 

TMP‐23:  NONE 

TMP‐24:  NONE 

TMP‐25:  NONE 

TMP‐26:  NONE 

TMP‐27:  NONE 

TMP‐28:   

1. The unit at 217 ft depth has had no resistance or temperature readings since installation. 

TMP‐29:  NONE 

TMP vs DEPTH and TMP vs ELEVATION (for 12/14/2015): 

1. There were no reliable temperature readings for TMP‐13 since 3/19/2014. 2. There were no reliable temperature readings for TMP‐7R, as determined by the conductivity 

test on 4/11/14. 3. There were no reliable temperature readings for TMP‐5 from 7/17‐9/2/2014 and since 

11/5/14. 4. There were no reliable temperature readings for TMP‐9 from 11/19 ‐ 12/26/2014. 5. There were no reliable temperature readings for TMP‐12 from 11/19/2014 – 3/31/15, except  

2/4/15.  There were no reliable temperature readings for TMP‐12 since 9/28/15. 6. There were no reliable temperature readings for TMP‐8 since 9/9/15. 

 

 

   

 

 

 

 

Page 45: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

ATTACHMENT C

GAS INTERCEPTOR WELLHEAD TEMPERATURE GRAPHS

Page 46: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0 35 70 105 140

1 inch = 70 meters

GEW-001

GEW-002GEW-003

GEW-004

GEW-005

GEW-006

GEW-007

GEW-008

GEW-009

GEW-010

GEW-011

GEW-013AGEW-014A

GEW-015GEW-016R

GEW-018B

GEW-018R

GEW-019A

GEW-020A

GEW-021A

GEW-022R

GEW-023A

GEW-024A

GEW-025A

GEW-026R

GEW-027A

GEW-028R

GEW-029

GEW-030R

GEW-033R

GEW-034GEW-034A

GEW-035

GEW-036

GEW-037

GEW-038

GEW-039

GEW-040

GEW-041R

GEW-042R

GEW-043R

GEW-044

GEW-045R

GEW-046R

GEW-047R

GEW-048

GEW-049GEW-050

GEW-051

GEW-052

GEW-053GEW-054

GEW-055

GEW-056R

GEW-057B

GEW-057R

GEW-058GEW-058A

GEW-059R

GEW-061B

GEW-064A

GEW-065AGEW-066

GEW-067A

GEW-068A

GEW-069RGEW-070R

GEW-071

GEW-071B

GEW-072RR

GEW-073R

GEW-075

GEW-076R

GEW-077

GEW-078R

GEW-080

GEW-081

GEW-082R

GEW-083

GEW-084

GEW-085

GEW-086

GEW-087GEW-088

GEW-089

GEW-090

GEW-091

GEW-100

GEW-101

GEW-102

GEW-103

GEW-104GEW-105

GEW-106

GEW-107

GEW-108

GEW-109GEW-110

GEW-112

GEW-113

GEW-116

GEW-117GEW-118

GEW-120

GEW-121

GEW-122

GEW-123

GEW-124

GEW-125GEW-126

GEW-127

GEW-128GEW-129

GEW-131

GEW-132

GEW-133

GEW-134

GEW-135

GEW-136

GEW-137

GEW-138

GEW-139

GEW-140

GEW-141

GEW-142

GEW-143

GEW-144

GEW-145

GEW-146

GEW-147

GEW-148GEW-149

GEW-150

GEW-151 GEW-152GEW-153GEW-154

GEW-155

GEW-156

GIW-01

GIW-02

GIW-03 GIW-04GIW-05GIW-06

GIW-07

GIW-08GIW-09

GIW-10GIW-11

GIW-12

GIW-13

LCS-1D

LCS-2D

LCS-3C

LCS-4B

LCS-5A

LCS-6B

PGW-60

SEW-012A

SEW-017R

SEW-031RSEW-032R

SEW-060R

SEW-061R

SEW-062R

SEW-063

SEW-064

SEW-067

SEW-072R

SEW-074SEW-079R

T-56

Gas Extraction Wells - Bridgeton Landfill

LEGEND

= Well Location

GEW-010

GEW-011

GEW-038

GEW-039

GEW-056R

GEW-091

GEW-108

GEW-109

GEW-110

GIW-01GIW-02

GIW-03GIW-04

GIW-05GIW-06

GIW-07

GIW-08GIW-09

GIW-10

GIW-11GIW-12

GIW-13

LCS-1D

SEW-063

Page 47: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-1 Wellhead Temperatures

Wellhead Temp. (°F)

Page 48: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-2 Wellhead Temperatures

Wellhead Temp. (F)

Page 49: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-3 Wellhead Temperatures

Wellhead Temp. (F)

Page 50: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-4 Wellhead Temperatures

Wellhead Temp. (F)

Page 51: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-5 Wellhead Temperatures

Wellhead Temp. (F)

Page 52: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-6 Wellhead Temperatures

Wellhead Temp. (F)

Page 53: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-7 Wellhead Temperatures

Wellhead Temp. (F)

Page 54: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-8 Wellhead Temperatures

Wellhead Temp. (F)

Page 55: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-9 Wellhead Temperatures

Wellhead Temp. (F)

Page 56: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-10 Wellhead Temperatures

Wellhead Temp. (F)

Page 57: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-11 Wellhead Temperatures

Wellhead Temp. (F)

Page 58: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-12 Wellhead Temperatures

Wellhead Temp. (F)

Page 59: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GIW-13 Wellhead Temperatures

Wellhead Temp. (F)

Page 60: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

ATTACHMENT D

NECK-AREA GAS EXTRACTION WELL DATA

Page 61: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-008 Wellhead Temperatures

Wellhead Temp. (°F)

Page 62: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-009 Wellhead Temperatures

Wellhead Temp. (°F)

Page 63: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-010 Wellhead Temperatures

Wellhead Temp. (°F)

Page 64: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-038 Wellhead Temperatures

Wellhead Temp. (°F)

Page 65: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-039 Wellhead Temperatures

Wellhead Temp. (°F)

Page 66: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-040 Wellhead Temperatures

Wellhead Temp. (°F)

Page 67: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-041R Wellhead Temperatures

Wellhead Temp. (°F)

Page 68: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-043R Wellhead Temperatures

Wellhead Temp. (°F)

Page 69: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-053 Wellhead Temperatures

Wellhead Temp. (°F)

Page 70: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-054 Wellhead Temperatures

Wellhead Temp. (°F)

Page 71: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-055 Wellhead Temperatures

Wellhead Temp. (°F)

Page 72: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-056R Wellhead Temperatures

Wellhead Temp. (°F)

Page 73: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-109 Wellhead Temperatures

Wellhead Temp. (°F)

Page 74: Bridgeton Landfill, LLC - DNR · Week of December 13 – December 19, 2015 Required by Section 52.F of Agreed Order, Case No. 13SL‐CC01088 Effective May 13, 2013 Contents: Attachment

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

Tem

pera

ture

°F

GEW-110 Wellhead Temperatures

Wellhead Temp. (°F)