(brief) Update on the target facility. M. Calviani , on behalf of the CENF SBWG team CENF PTM meeting – 5 th February 2014. Updates on integration work. Mass 35t. Upgrades on the support module design Detail about the air tightness - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/1.jpg)
(brief) Update on the target facility
M. Calviani, on behalf of the CENF SBWG teamCENF PTM meeting – 5th February 2014
![Page 2: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/2.jpg)
Updates on integration work
Mass 35t
Upgrades on the support module design
Detail about the air tightness
A new designer (V. Clerc) will start working in the overall integration
S. Girod
![Page 3: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/3.jpg)
Outstanding items Target cost very high
due to reduced horn inner conductor (IC) diameter (24 mm Ø) Future mechanical
studies will assume the possibility of a 30 mm IC Ø (MiniBooNE)
Preliminary neutrino studies have been performed for this config.
24 + 12 mm Ø
30 + 12 mm Ø
![Page 4: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/4.jpg)
Complete extraction system CV
M. Battistin, M. Archambault
![Page 5: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/5.jpg)
Cooling circuits in the cooling room
Horn & Reflector Cooling: 17-22 °C Shield + 2xHelium
cooling: 27-> °C
M. Battistin, M. Archambault
![Page 6: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/6.jpg)
CV further feedbacks Hydraulic circuits under completion AL capable of executing a conceptual design of a
purification system for the CENF helium vessel1. He purity in the order of 1% can be reached with a
single membrane circuit2. He purity in the order of 0.1% can be reached with a
double cascade membrane circuit (PRESENT REFERENCE)
3. He purity in the order of the ppm (or more) requires active carbons, silica gel and cryogenic trap technology.
M. Battistin
![Page 7: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/7.jpg)
V. Venturi
![Page 8: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/8.jpg)
V. Venturi
![Page 9: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/9.jpg)
V. Venturi
![Page 10: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/10.jpg)
Radioprotection aspects Input for dump design (waste zoning) Air contamination for the He vessel (1%, 0.1%
and ppm)
C. Strabel
![Page 11: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/11.jpg)
Dump (1st and 2nd) installation 2 solutions proposed
by EN/HE “open trench” solution Installation with blocks
on baskets After an ensuing
discussions a hybrid solution with the first dump installed via a vertical shaft will be further investigated
R. Rinaldesi, C. Bertone
![Page 12: (brief) Update on the target facility](https://reader035.vdocument.in/reader035/viewer/2022062410/56815f43550346895dce1fd6/html5/thumbnails/12.jpg)
Thanks