Page 1: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore Building More Efficient, Sustainable Systems and Processes Which Create Higher Reliability and More Visible Cost Control Unconventional Production Facilities Design, Onshore 2015 Scott Abel, Facilities Manager, Marathon Oil Corporation

September 16, 2015

Page 2: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

•  Background

•  Setting the scene

•  Changing a culture

•  Building more efficient, sustainable systems and processes

•  SAP-PM Integration

•  Marathon Oil Corporation results

•  Question & answer session

Marathon Oil Corporation

Agenda

2

Page 3: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

Marathon Oil Corporation

Background

3

Page 4: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore Setting the scene

4

Northern OK

Western

Central

Southern

Southern OK

•  20 Total leadership roles •  Functional

•  17 Total leadership roles •  Geographical

Marathon Oil Corporation

Page 5: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

•  Impact

–  Provide clear lines of accountability

–  Improved utilization of processes

–  Scalable to align with future development plans

•  Requirements

–  Focused delivery

–  Value aligned

–  Continual improvement

Marathon Oil Corporation

Changing a culture

5

Page 6: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

Marathon Oil Corporation

Building more efficient, sustainable systems and processes Accountability Continual Improvement

Effective Planning

Weekly Monthly

Quarterly

Roles & Responsibilities

6

Page 7: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

Marathon Oil Corporation

SAP PM Integration

7

2014 2015 2016 2017 2018 2019 2020

Proposed  Maintenance  &  Reliability  Workforce

Marathon  EmployeeContractor  (Direct  Field  Support)Total  HeadcountStaff  Augment

Page 8: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

•  Notifications are the electronic notebook for field operations •  Work Orders manage field operations

Marathon Oil Corporation

SAP PM Integration

8

WBS  Element Lease Budget  Year CO  Date Initiator Description Overall  Cost  Differential Node NotesDX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 2-­‐Mar-­‐15 Scott  King PCB:  Multi-­‐well  Discount  -­‐  Shared  Tankage -­‐$30,000 EQP.01 Common  tanks  vs.  Well  specific  for  2-­‐well  pad

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 2-­‐Mar-­‐15 Scott  King PCB:  Multi-­‐well  Discount  -­‐  Labor  Reduction -­‐$10,000 EQP.01 Labor  reduction  due  to  optimized  work  and  job  scope

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 2-­‐Mar-­‐15 Scott  King PCB:  Multi-­‐well  Discount  -­‐  Material  Reduction -­‐$9,000 EQP.01 Reduction  in  Containments  and  VPF

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 23-­‐Mar-­‐15 Scott  King New  Tank  Vendor  -­‐  Dragon -­‐$20,000 EQP.01 Engineering  found  a  new  vendor  with  better  costs

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 24-­‐Mar-­‐15 Scott  King New  Orifice  Flow  metere  Needed $3,000 EQP.01 Change  in  mid-­‐stream  /  lower  pressure  sales  line  =  larger  meter

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 24-­‐Mar-­‐15 Scott  King Add  6"  Senior  CHK  Meter  to  Pad $17,000 EQP.01 Added  6"  check  meter;  recieve  $180/day  benefit

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 6-­‐Apr-­‐15 Brian  Lipscomb Communication  upgrade  for  infi l l  wells $10,000 EQP.01 Needed  communication  towers  for  SCADA.    Increase  bandwidth  for  infill  growth

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 6-­‐May-­‐15 Scott  King Needed  to  order  new  tank  walkways $1,200 EQP.01 MRO  provided  wrong  specs  for  initial  walkways

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 28-­‐May-­‐15 Scott  King Time  Writing:  Adding  timewriting  to  Budget  AFE. $4,000 EQP.01 Timewriting  was  not  added  to  initial  budget  AFE.

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 28-­‐May-­‐15 Scott  King ECR  Facil ities  Upgrade $34,500 EQP.0140  BOPD  @  $55/BBL  stripped  from  gas  and  stabilized.    250  MSCFD  @  $3/MSCFD  gas  converted.    $1,450  net  increase  in  revenue.    1  

HPS,  1  BPV,  &  associated  Valves,  Pipes,  and  Fittings

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 14-­‐Aug-­‐15 Scott  King EQ  Reutil ization  HPS -­‐$7,000 EQP.01 Used  HPS  from  BL  Swinehart  1-­‐22H  instead  of  buying  new

DX.14.34600 OK  WS  SMITH  5-­‐18H  D&C 2015 14-­‐Aug-­‐15 Scott  King EQ  Reutil ization  Back  Pressure  Valve -­‐$5,000 EQP.01 Re-­‐used  BPV  from  Ely  1-­‐12H  instead  of  buying  new

Page 9: Bringing Offshore Onshore - LBCG

Bringing Offshore Onshore

•  The results we have achieved so far…

•  Being proactive not reactive

•  Using lessons learned to improve performance and forecasting

•  Not being dependent on heroes

•  Being engaged and proud of what we do

•  Seeing people grow within their roles

•  Highlight our ‘one team’ successes

•  Realizing that there is a long way yet to go

Marathon Oil Corporation

What does success look like?

9

Page 10: Bringing Offshore Onshore - LBCG

Roadmap to be Premier Independent E&P Marathon Oil’s Seven Strategic Imperatives (SI7)

10

Living Our

Values

Investing in our

People

Operating and Capital Efficiency

Driving Profitable

and Sustainable

Growth

Long-term Shareholder

Value

Quality and Material

Resource Capture

Rigorous Portfolio

Management