british-czech nuclear forum panel 5: nuclear new build

13
British-Czech Nuclear Forum Panel 5: Nuclear New Build Doosan Babcock By Dr Glen Little 31 October 2013

Upload: others

Post on 12-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: British-Czech Nuclear Forum Panel 5: Nuclear New Build

British-Czech Nuclear Forum

Panel 5: Nuclear New Build

Doosan Babcock

By Dr Glen Little 31 October 2013

Page 2: British-Czech Nuclear Forum Panel 5: Nuclear New Build

2 2 2

Turnover 2012: £816m Employees: 6,527

Doosan Babcock

Doosan Lentjes Doosan Škoda

Power Doosan Babcock

Boiler & Air Pollution Control

Turbo-generators

Service

Doosan Power Systems CEO Mr J Mok

Doosan Heavy Industries

Turnover 2012: £812m Employees: 5,800

Products and Services

Page 3: British-Czech Nuclear Forum Panel 5: Nuclear New Build

3 3

Thermal Aftermarket and MRO

Boiler Outages

Shutdowns

Maintenance

CCGT / HRSG

Steam Turbine

Nuclear Projects

EDF Energy

Magnox Decomms

Sellafield Reprocessing

Petrochemicals and Pharmas

Projects

Shutdowns

De-bottlenecking

Minor EPC

Nuclear MRO

Nuclear Outages

Vessel Entry

Minor Projects

No. 1 Mechanical Construction

Contractor

in UK Power

Sector

Doosan Babcock Service Business Unit

Page 4: British-Czech Nuclear Forum Panel 5: Nuclear New Build

4 4

Caustic Scrubber for BP Process Piping for Ineos

Pulse Jet Mixers Sludge Storage Vessel

Renfrew Manufacturing

Page 5: British-Czech Nuclear Forum Panel 5: Nuclear New Build

6 6

Doosan Babcock Nuclear and Major

Project Activities in the UK

Page 6: British-Czech Nuclear Forum Panel 5: Nuclear New Build

7 7

Project Objectives:

4 x 500 MWe Sub Critical Units

(OEM Babcock)

To be the first 2000 MW Power

Station in the UK to successfully

retrofit SCR to all units with low

NOx emissions

Incorporated various additional

Life Extension Projects

Overview of SCR Project

Page 7: British-Czech Nuclear Forum Panel 5: Nuclear New Build

9 9

Built up in Layers from Ground up

Modular Structure and Construction showing ONE of SCR Units

Page 8: British-Czech Nuclear Forum Panel 5: Nuclear New Build

11 11

On Site Final Assembly Facility

Page 9: British-Czech Nuclear Forum Panel 5: Nuclear New Build

12 12

100 lifts of over 50 tonnes

Max -120 tonnes at 100m

Large Crane Construction Strategy

Page 10: British-Czech Nuclear Forum Panel 5: Nuclear New Build

13 13

Hot Structure Flues and Ducts

Page 11: British-Czech Nuclear Forum Panel 5: Nuclear New Build

14 14

Doosan Babcock Future Activities and Supply

Chain Support

Page 12: British-Czech Nuclear Forum Panel 5: Nuclear New Build

15 15

Doosan Babcock will continue to offer full range Nuclear capabilities from complete EPC to aftermarket service - supported by our Supply Chain

2013

EDF Energy: 7 year AGR fleet support Plant upgrades Maintenance packages Areva: Sizewell Refuelling

outages to 2015 Magnox: Ongoing support to Wylfa

and Decommissioning

Strong relationships with Utilities and Technology

providers.

Through Life Support – new UK fleets

2100

Supporting UK wide Nuclear New Build

Seeking to be Preferred Mechanical Contractor

Selective overseas involvement

Doosan Babcock Nuclear Business – The Future

Page 13: British-Czech Nuclear Forum Panel 5: Nuclear New Build

Thank you