Customer: British Gypsum Limited
BTC 12262F: Page 1 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Report Number BTC 12262F
A FIRE RESISTANCE TEST ON A 5m HIGH X 3m WIDEGYPROC SHAFTWALL SYSTEM INCORPORATING A 60mmMETAL STUD FRAMEWORK CLAD WITH A DOUBLE LAYEROF 12.5mm GYPROC FIRELINE, EXPOSED TO THE FIRE FROMTHE SHAFT SIDE. CONDUCTED IN ACCORDANCE WITHBS EN 1364-1:1999.
Test Date: 19th September 2002
www.btconline.co.uk
Customer: British Gypsum LimitedEast LeakeLoughboroughLeicestershireLE12 6HX
Customer: British Gypsum Limited
BTC 12262F: Page 2 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
A FIRE RESISTANCE TEST ON A 5m HIGH X 3m WIDE GYPROC SHAFTWALL SYSTEMINCORPORATING A 60mm METAL STUD FRAMEWORK CLAD WITH A DOUBLE LAYEROF 12.5mm GYPROC FIRELINE, EXPOSED TO THE FIRE FROM THE SHAFT SIDE.CONDUCTED IN ACCORDANCE WITH BS EN 1364-1:1999.
TABLE OF CONTENTS
FOREWORD___________________________________________________________________ 3
REPORT AUTHORISATION _____________________________________________________ 3
TEST CONSTRUCTION _________________________________________________________ 4
TEST MATERIALS _____________________________________________________________ 7Gyproc Boards ______________________________________________________________________ 7
Metal Components ___________________________________________________________________ 7
Fasteners ___________________________________________________________________________ 8
Jointing Material ____________________________________________________________________ 8
TEST PROCEDURE ____________________________________________________________ 9
TEST RESULTS ________________________________________________________________ 9
LIMITATIONS ________________________________________________________________ 10
TEST DATA __________________________________________________________________ 11Observations _______________________________________________________________________ 11
Furnace Temperature Graph _________________________________________________________ 15
Unexposed Face Temperature Graph___________________________________________________ 16
Pressure Graph_____________________________________________________________________ 17
Unexposed Face Thermocouple Layout _________________________________________________ 18
Exposed Face Board Layout __________________________________________________________ 19
Unexposed Face Standard Five Temperature Data _______________________________________ 20
Additional Unexposed Face Temperature Data___________________________________________ 23
Additional Internal Temperature Data _________________________________________________ 29
Specimen Lateral Deflection __________________________________________________________ 32
PHOTOGRAPHS ______________________________________________________________ 35
Customer: British Gypsum Limited
BTC 12262F: Page 3 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
FOREWORD
This test report details a fire resistance test conducted on a shaftwall partition system. The testsponsor was British Gypsum Limited.
The test specimen was installed by British Gypsum. The construction of the specimen took placeon the 13th September 2002. British Gypsum Limited designed and selected the materialscomprising the test specimen.
The test date was the 19th September 2002.
This report details the method of construction, the test conditions and the results obtainedwhen the specific element of construction described herein was tested following theprocedures outlined in EN 1363-1, and where appropriate EN 1363-2. Any significant deviationwith respect to size, constructional details, loads, stresses, edge or end conditions other thanthose allowed under the field of direct application in EN 1364-1 is not covered by this report.
Because of the nature of fire resistance testing and the consequent difficulty in quantifying theuncertainty of measurement of fire resistance, it is not possible to provide a stated degree ofaccuracy of the result.
REPORT AUTHORISATION
The Building Test Centre will not discuss the content of this report without written permissionfrom the test sponsor. The Building Test Centre retains ownership of the test report contentbut authorises the test sponsor to reproduce the report as necessary in its entirety only.
Report Author
Brian WillsonTest Report Writer
Authorised by
Eur Ing. Paul HowardBSc. (Hons.), CEng., MIOAHead of Laboratory
Customer: British Gypsum Limited
BTC 12262F: Page 4 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
TEST CONSTRUCTION
The specimen was constructed in a refractory concrete lined steel restraint frame having anopening of 5000mm high x 3000mm wide.
A continuous Glasroc FS FireStrip was applied to the centreline of a Gypframe 62mm Shaftwall Jchannel (62JC70). The channel was then fixed to the head of the restraint frame aperture using60mm Hilti Hus fixings at 300mm centres (long flange to exposed face).
Gypframe 62mm Shaftwall floor channel (62C50) was fixed to the base of the restraint frameaperture using 60mm Hilti-Hus fixings at 600mm centres.
Gypframe 60mm Shaftwall starter channel (60SC55) was fixed to the left hand side of therestraint frame aperture (viewed from the unexposed face) using Hilti-Hus fixings at 600mmcentres. The starter channel was cut short by 15mm to accommodate the designed deflection.
A 60mm Gypframe 60I70 stud (cut short by 15mm) was positioned between the head and basechannels adjacent to the right hand side of the restraint frame aperture (viewed from theunexposed face) but not fixed. A 50mm Rockwool Firebatt gasket was inserted between thechannel and the restraint frame. The stud was ‘tabbed’ to gain a height of 5m i.e. the flanges ofan ‘I’ stud were trimmed leaving a 200mm flat web extension which was then fixed to anadjoining ‘I’ stud with 4 Gypframe wafer head screws. The ‘Tab’ was positioned 3600mm fromthe base of the stud.
60mm Gypframe 60I70 studs (cut short by 15mm) were positioned between the head and basechannels at 600mm centres. The studs were ‘tabbed’ to gain height of 5m. ‘Tabs’ werepositioned 3600mm from the base of the studs.
One layer of 19mm Gyproc CoreBoard (also cut 15mm short at the head) was inserted intospaces between the studs. The Core board was secured in position with Gypframe G102retaining channel inserted into the spaces between the board and the stud flanges. HorizontalCoreBoard joints were 1500mm and 4500mm from the base.
Two 122mm Gyproc CoreBoard fire stops, comprising two layers of 19mm Gyproc CoreBoard600mm wide, were pushed fully up into the web of the head channel and fixed using two32mm Gyproc Drywall screws for each 600mm wide pair through the head channel flange.
122mm fire stops were fixed to Gypframe GA3 angle sections (inserted into the horizontal boardjoints) using three 32mm Gyproc Drywall screws per fire stop, plus beads of sealant top andbottom.
Customer: British Gypsum Limited
BTC 12262F: Page 5 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Gyproc Sealant was applied in the angle formed by the restraint frame and the head channel onthe unexposed face.
An inner layer of 12.5mm Gyproc Fireline was fixed to the unexposed face to all framingmembers (except the head channel) at 300mm centres using 25mm Gyproc Drywall screws(horizontal joint was positioned 2000mm from the base).
An outer layer of 12.5mm Gyproc Fireline was fixed to the unexposed face to all framingmembers (except the head channel) at 300mm centres using 36mm Gyproc Drywall screws(horizontal joint was positioned 3000mm from the base). Gypframe GFS1 Fixing strap was usedto back the outer layer horizontal joint.
The outer layer board joints were finished with Gyproc joint tape and Gyproc joint filler. Allscrew heads were spotted with Gyproc joint filler.
Customer: British Gypsum Limited
BTC 12262F: Page 6 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Figure 1. Cross-section through the partition.
The descriptions of individual components making up the test specimen were provided by thecustomer and were checked for accuracy wherever possible.
a) Single layer of 19mm Gyproc CoreBoard.
b) Gyproc Drywall screw.
c) Gypframe G102 retaining channel.
d) Gypframe 60I70 stud.
e) 19mm x 122mm Gyproc CoreBoard firestop.
f) Double layer of 12.5mm Gyproc Fireline.
Customer: British Gypsum Limited
BTC 12262F: Page 7 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
TEST MATERIALS
Gyproc Boards
(i) Nominally, 3000mm (long) x 598mm (wide) x 19mm (thick), Gyproc CoreBoardmanufactured and supplied by British Gypsum Limited ex Robertsbridge Works.
Measured surface density: 16.67 kg/m2.Measured thickness: 19.75 mm.Board identification numbers: 24 232 2 13:18Measured moisture content: 0.57%
(ii) Nominally, 3000mm (long) x 1200mm (wide) x 12.5mm (thick), Gyproc Fireline(T/E) manufactured and supplied by British Gypsum Limited ex East Leake Works.
Measured surface density: 9.8 kg/m2.Measured thickness: 12.74 mm.Board identification numbers: 16 156 2 02:33Measured moisture content: 0.68%
The surface density and board thickness were calculated using the actual weight and size of aselection of boards used in the test specimen. The moisture content of the board wasdetermined using samples dried to a constant weight in an oven at 40oC.
Metal Components
(i) Gypframe 62JC70 J Channel. Nominally 0.7mm thick, manufactured from galvanisedmild steel.
(ii) Gypframe 62C50 Channel. Nominally 0.5mm thick, manufactured from galvanised mildsteel using the “Ultrasteel” process.
(iii) Gypframe 60SC55 Starter Channel. Nominally 0.55mm thick, manufactured fromgalvanised mild steel.
(iv) Gypframe 60I70 Stud. Nominally 0.7mm thick, manufactured from galvanised mild steel.(v) Gypframe G102 Retaining Channel. Nominally 0.5mm thick, manufactured from
galvanised mild steel using the “Ultrasteel” process.(vi) Gypframe GA3 Steel Angle. Nominally 0.7mm thick, manufactured from galvanised mild
steel.(vii) Gypframe GFS1 Fixing Strap. Nominally 0.5mm thick, manufactured from galvanised
mild steel.
All metal components supplied by British Gypsum Limited.
Customer: British Gypsum Limited
BTC 12262F: Page 8 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Fasteners
(i) 25mm Gyproc Drywall screws supplied by British Gypsum Limited.(ii) 32mm Gyproc Drywall screws supplied by British Gypsum Limited.(iii) 36mm Gyproc Drywall screws supplied by British Gypsum Limited.(iv) 60mm Hilti Hus fixings supplied by Hilti Limited.(v) 13mm Gypframe wafer head screws supplied by British Gypsum Limited.
Jointing Material
(i) Gyproc Joint Filler supplied by British Gypsum Limited.(ii) Gyproc Paper Tape supplied by British Gypsum Limited.
Customer: British Gypsum Limited
BTC 12262F: Page 9 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
TEST PROCEDURE
The test was conducted fully in accordance with BS EN 1364-1:1999. The specimen wassubjected to fire from one side, as specified in BS EN 1364-1:1999. The test specimen was notsymmetrical and should therefore be tested in both orientations. No performance can beclaimed for the partition system if installed with the corridor side exposed to the furnace,without a separate test being undertaken to substantiate this orientation.
The test procedure used was EN 1364-1 Issue 1.
The ambient temperature at the commencement of the test was 17oC.
The furnace pressure head was located at a height of 3 metres and the pressure wasmaintained at 1 ± 2 Pa positive with respect to the atmosphere, except during the first 5minutes of the test and at 20 minutes.
The test conditions did not meet the full requirements of BS EN 1363-1:1999 as the furnacelinings and test frame stiffness did not fully comply. The test centre is of the opinion thatthese deviations from the documented method will not unduly effect the result of the test.
TEST RESULTS
The requirements of the standard were satisfied for the following periods:
Integrity:
Insulation:
107 minutes (cotton pad)
107 minutes (sustained flaming)
94 minutes (Thermocouple No. 32 exceeded 180 deg C.)
The test was terminated at 110 minutes.
Customer: British Gypsum Limited
BTC 12262F: Page 10 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
LIMITATIONS
The results only relate to the behaviour of the specimen of the element of construction underthe particular conditions of test; they are not intended to be the sole criteria for assessing thepotential fire performance of the element in use nor do they reflect the actual behaviour infires.
The specification and interpretation of fire test methods are the subject of ongoingdevelopment and refinement. Changes in associated legislation may also occur. For thesereasons it is recommended that the relevance of test reports over 5 years old should beconsidered by the user. The laboratory that issued the report will be able to offer, on behalf ofthe legal owner, a review of the procedures adopted for a particular test to ensure that theyare consistent with current practices, and if required may endorse the test report.
Customer: British Gypsum Limited
BTC 12262F: Page 11 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
TEST DATA
Observations
Observers: Unexposed face R EvansExposed face M Fountain
Timehrs mins
Observations
Observations to be read in conjunction with figure 6.All observations refer to the exposed face unless otherwise stated.
0 Test Started
5 Charring of face paper and jointing materials.Slight buckling of metal studs.
10 Further charring of face paper and jointing materials.Lower horizontal joint open to approximately 2 – 3mm.
15 Lower horizontal joint open to approximately 3 – 4mm.
20 Lower horizontal joint open to approximately 5mm.
25 Lower horizontal joint open to approximately 6 – 7mm, 10mm max.
27 Unexposed faceRight hand stud (free end) buckled outwards, approximately 3500mm height.
29 Unexposed faceHorizontal joint tape coming away from left hand and centre boards.Crack in horizontal joint material adjacent to left hand vertical joint.Right hand stud, approximately 3500mm height, buckling increased causingboard surface to crack.
32 Lower horizontal joint open to approximately 10mm and increases to a maxof 20mm max towards left hand side (free end).Small amount of flaming into furnace at left hand side.A few small vertical cracks at top of lower boards.
Customer: British Gypsum Limited
BTC 12262F: Page 12 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Timehrs mins
Observations
Observations to be read in conjunction with figure 6.All observations refer to the exposed face unless otherwise stated.
36 Unexposed faceCrack in horizontal joint material propagated along joint in both directions.
43 Unexposed faceCrack lengthened in horizontal joint material, open to approximately 4mm.
46 Lower horizontal joint open to a maximum of 30mm.
49 Unexposed faceHorizontal joint, smoke/steam emissions from crack in joint.Lower left hand board, screw heads pulled through field of board.
55 Unexposed faceLower centre board, screw heads pulled through field of board.
58 Unexposed faceHorizontal joint open to approximately 6mm.Lower left hand board, all screw heads pulled through field of board.
1 00 Lower boards, cracking in all the top corners, except the one at fixed end.
1 02 Horizontal joints 7/12, 8/13 and 9/14 have closed.
1 07 Unexposed faceScrew head discolouration at both vertical joints.
1 11 Unexposed faceHorizontal joint open approximately 10mm where jointing cracked.Lower centre board, from approximately 1500mm to 3000mm all screw headspulled through field of board.
1 24 Lower left hand board bowing into furnace.
1 30 Lower left hand board, crack from horizontal joint down centre of board.
1 31 All middle and lower boards, crazed.
Customer: British Gypsum Limited
BTC 12262F: Page 13 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Timehrs mins
Observations
Observations to be read in conjunction with figure 6.All observations refer to the exposed face unless otherwise stated.
1 32 Unexposed faceLower left hand board, discolouration in field of board at approximately2000mm height.
1 33 Board 7 bowing into furnace.
1 34 Unexposed faceINSULATION FAILURE. The temperature rise of thermocouple No. 32 exceeded180oC.
1 36 Unexposed faceLower centre board, discolouration in field of board approximately 2500mmheight.Lower left hand and lower centre boards, glow visible through screw holes infield of board.
1 37 Board fall, board 7 broke across width and fell into furnace.
1 39 Board fall, lower part of board 6 approximately 600mm x 500mm (high)fallen, remainder of board slid down to lower horizontal joint.
1 41 Unexposed faceLower left hand and lower centre boards, discolouration spreading downfield of boards.
1 42 Board fall, boards 8,9,12 and 14 fallen.
1 45 Board fall, unexposed inner layer approximately mid-height and mid-width ofspecimen has fallen.
1 46 Unexposed faceLower left hand board, gap in field of board approximately 1500mm height.
Customer: British Gypsum Limited
BTC 12262F: Page 14 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Timehrs mins
Observations
Observations to be read in conjunction with figure 6.All observations refer to the exposed face unless otherwise stated.
1 47 Unexposed faceINTEGRITY FAILURE. Lower left hand board, sustained flaming atapproximately 1750mm height.FURTHER INTEGRITY FAILURE. Cotton Pad applied at centre board horizontaljoint mid-span. The pad ignited.
1 48 Unexposed faceLeft and right hand vertical joints open approximately 3mm.
1 50 TEST TERMINATED.
Customer: British Gypsum Limited
BTC 12262F: Page 15 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Furnace Temperature Graph
Mean Furnace Temp Specified Furnace Temp
Tem
pera
ture
°C
Time minutes
0
200
400
600
800
1000
1200
0 30 60 90 120
Figure 2. Furnace temperature graph
Customer: British Gypsum Limited
BTC 12262F: Page 16 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Unexposed Face Temperature Graph
Mean St5 Temp Max Unexposed Temp
Tem
pera
ture
°C
Time minutes
0
100
200
300
400
500
0 30 60 90 120
Figure 3. Unexposed face temperature graph.
Customer: British Gypsum Limited
BTC 12262F: Page 17 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Pressure Graph
Pres
sure
Pa
Time minutes
-5
-10
-15
-20
0
5
10
15
30 60 90 120
Figure 4. Pressure graph.
Customer: British Gypsum Limited
BTC 12262F: Page 18 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Unexposed Face Thermocouple Layout
Figure 5. Unexposed face thermocouple layout.
32
Centre of stud at mid-height of specimen
15mm from horizontal 15mm from vertical joint
2928
15mm from horizontal joint at mid-width of specimen
Right StudLeft Stud
Internal Thermocouples at 3750mm height
3534
Exposed Face
Unexposed Face
Free end
3330 31
2423
22
2120
26 2725
Right Stud
37
Left Stud
36
Exposed Face
Unexposed Face
Internal Thermocouples at 2500mm height
100mm from free edge at mid-height of the specimen
Standard Five
15mm from vertical joint at mid-height of specimen
15mm down at mid-width of specimen15mm down and 15mm
in from vertical joint15mm down at centre of stud
15mm from fixed edge and at mid-height of the specimen
Standard FiveStandard Five
Standard FiveStandard Five
Customer: British Gypsum Limited
BTC 12262F: Page 19 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Exposed Face Board Layout
Figure 6. Exposed face board layout.
Customer: British Gypsum Limited
BTC 12262F: Page 20 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Unexposed Face Standard Five Temperature Data
Temperature Rise (oC)Time
(mins)Thermocouple
No. 20Thermocouple
No. 21Thermocouple
No. 22Thermocouple
No. 23Thermocouple
No. 240123456789
1011121314151617181920212223242526272829303132333435
-2000000012358
1013161922252830323436373940404142424243434343
0000000012358
1013172023262931333537383941414243434343434343
0000000012357
1013161922252830323436383940414242434344444545
0000000123468
1114172023262931343638404142434445454646474848
1000101122457
1012151821242729313435373840414243434344444545
Customer: British Gypsum Limited
BTC 12262F: Page 21 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Temperature Rise (oC)Time
(mins)Thermocouple
No. 20Thermocouple
No. 21Thermocouple
No. 22Thermocouple
No. 23Thermocouple
No. 24363738394041424344454647484950515253545556575859606162636465666768697071727374
434445474849495050505051515152535353535353535252525252525252525252535353535454
444546484949495050505151525353545454545455555555555555555555555555555555555656
464748494949494950505051525253535454545455555555555555555555555454555555555556
495152525353545454545555555656565656565656565554525151505050505050505051535456
464848494949495050515152535354545555555656565656565656565656565656565656565757
Customer: British Gypsum Limited
BTC 12262F: Page 22 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Temperature Rise (oC)Time
(mins)Thermocouple
No. 20Thermocouple
No. 21Thermocouple
No. 22Thermocouple
No. 23Thermocouple
No. 2475767778798081828384858687888990919293949596979899
100101102103104105106107108109110
555657585959595960616162626263636464656666686972757778808182848688919499
59616262626363646464656565666667686869707072757881848689919497
100103107114136
58596060606060616161616162636464656565666869717377808283858688919498
102108
586060616263636465666768697071727375798284868788909192949698
101104110123174259
59616261616262626364646566666768686970707171717376808487889091939698
104114
See figure 5 for thermocouple layout
Customer: British Gypsum Limited
BTC 12262F: Page 23 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Additional Unexposed Face Temperature Data
Temperature Rise (ºC)Time
(mins)Thermocouple
No. 25Thermocouple
No. 26Thermocouple
No. 27Thermocouple
No. 28Thermocouple
No. 29Thermocouple
No. 300123456789
101112131415161718192021222324252627282930313233343536
011111122469
12161922252729313335373840414243444546464747474748
0-10-1000011233456789
111213151617182021232425272830323435
11111112358
1114161921242729323436383940424344454546464646464747
-------------------------------------
0000111123468
101315182023252628293132333434353636373737383839
-10-10001234579
121417202225272931323435363738383940404041414141
Customer: British Gypsum Limited
BTC 12262F: Page 24 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Temperature Rise (ºC)Time
(mins)Thermocouple
No. 25Thermocouple
No. 26Thermocouple
No. 27Thermocouple
No. 28Thermocouple
No. 29Thermocouple
No. 30373839404142434445464748495051525354555657585960616263646566676869707172737475
494950515152535354545555555656565656565656565656565656565656565656565655555656
373940414345454645464646454645464647464647474849494950515050515252515253545353
484848494950505151515252525353535353545454545353535353535353525252525251515151
---------------------------------------
394041424243434344444444444545464647484849505051525353545555555555565656575860
414242424344454646464647474747474747484849494949494950505050504950505050505050
Customer: British Gypsum Limited
BTC 12262F: Page 25 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Temperature Rise (ºC)Time
(mins)Thermocouple
No. 25Thermocouple
No. 26Thermocouple
No. 27Thermocouple
No. 28Thermocouple
No. 29Thermocouple
No. 30767778798081828384858687888990919293949596979899
100101102103104105106107108109110
5656575859596060616162626363646565666768697071727476788082848586878890
5353535352525252525252525251515151515151505049494949484848495052535556
5151515151515151515252525253535354545455555656565758585961626568727884
-----------------------------------
616363646565666667686970727375777880818384858687899093959799
105115133170230
5151515151515354555657575859606162646566676869707070707071727577798082
See figure 5 for thermocouple layout.
Thermocouple No. 28 was located on a screw head.
Customer: British Gypsum Limited
BTC 12262F: Page 26 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Additional Unexposed Face Temperature Data (continued)
Time Temperature Rise (ºC)(mins) Thermocouple
No. 31Thermocouple
No. 32Thermocouple
No. 33
0123456789
101112131415161718192021222324252627282930313233343536
-3000111113469
121519222529323538414446485051535354555556575758
0-10000012479
13162024273135384144474950515253545556565555555555
0000000112468
111417202427293234363739404142424343444445454647
Customer: British Gypsum Limited
BTC 12262F: Page 27 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Time Temperature Rise (ºC)(mins) Thermocouple
No. 31Thermocouple
No. 32Thermocouple
No. 33
373839404142434445464748495051525354555657585960616263646566676869707172737475
595960616263646565656666666666666665656564636361595858575655545454555658596060
555656565756565656555554545454545454545555555556565657575858595960616263636465
484950515253535454555555565656565656565655565555555555555556565657586061626263
Customer: British Gypsum Limited
BTC 12262F: Page 28 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Time Temperature Rise (ºC)(mins) Thermocouple
No. 31Thermocouple
No. 32Thermocouple
No. 33
767778798081828384858687888990919293949596979899
100101102103104105106107108109110
6161626263636464656667697072757678798183848586878991939599
104110120137167213
66666768697173798589929497
100104109119139166189206219229238250270297326366425463475488486459
6363646465666666676869707274768184868889909293959799
102106111120136156174189206
See figure 5 for thermocouple layout.
Figures shown in red indicate insulation failure.
Customer: British Gypsum Limited
BTC 12262F: Page 29 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Additional Internal Temperature Data
Actual Temperature (ºC)Time
At 3750mm height At 2500mm height(mins) Left Stud. Cold Flange.
Thermocouple No. 34Right Stud. Cold Flange.
Thermocouple No. 35Left Stud. Cold FlangeThermocouple No 36
Right Stud. Cold FlangeThermocouple No. 37
0123456789
10111213141516171819202122232425262728293031323334353637
191924324971859196
100103112121129138147155163169176180184189192196201205209214220226234242250258266274282
19214154687581859197
103111120128136145155163170177182186191196201206211216221226232239247255264272280288
192028385063769399
105112117125132140147154160166169172175177180183186190194200203210216225235245254263272
1920243241536781879298
106113120127134140145150153157161165169173178181184188192197204210219226234250270
Customer: British Gypsum Limited
BTC 12262F: Page 30 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Actual Temperature (ºC)Time
At 3750mm height At 2500mm height(mins) Left Stud. Cold Flange.
Thermocouple No. 34Right Stud. Cold Flange.
Thermocouple No. 35Left Stud. Cold FlangeThermocouple No 36
Right Stud. Cold FlangeThermocouple No. 37
3839404142434445464748495051525354555657585960616263646566676869707172737475767778
290298306314322330338347356363370376381386392397403409415423432439446453458464469475481488495502508515521527533538543548553
295301309315322329337345352359365372379385391397403409415421428434441447452456460465470475480486493500507514522530538545552
280288296305315325335345355364373382390398405412418426434441448454459464468473479485491498505512520529537545554562570577585
282288297306311321337350368381389398406414423433442451459466473480487494500506513520526532540547558565577586596605613621628
Customer: British Gypsum Limited
BTC 12262F: Page 31 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Actual Temperature (ºC)Time
At 3750mm height At 2500mm height(mins) Left Stud. Cold Flange.
Thermocouple No. 34Right Stud. Cold Flange.
Thermocouple No. 35Left Stud. Cold FlangeThermocouple No 36
Right Stud. Cold FlangeThermocouple No. 37
798081828384858687888990919293949596979899100101102103104105106107108109110
557562567571576580584588593597601605608612615620624628632640714771799817859896902908911909
--
5595665725785845895956006066126186246296346396446496556616666736837007221024
-------
592598605611617624630636641646651656661666671676681687695708855882889901903
-------
635613621628635642650658666672681659671678683690703721735776862881885900
--------
See figure 5 for the location of the thermocouples.
Thermocouple No. 34 did not work after 108 minutes.Thermocouple No. 35 did not work after 103 minutes.Thermocouple No. 36 did not work after 103 minutes.Thermocouple No. 37 did not work after 102 minutes.
Customer: British Gypsum Limited
BTC 12262F: Page 32 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Specimen Lateral Deflection
Deflection (mm)Time(mins) Centrally On free end
012345678910111213141516171819202122232425262728293031323334353637383940
028.948.959.169.776.780.386.39195
98.3101.4104.4107.2110.1113.1116.2118.6121
123.3125.9128.1130.7133.6136.3139.1142.1145
147.9150.6153.3156.2159.3162.3165.3168.1170.1172.3174.4176.6178.7
09.7
23.935.246.252.654.961.467.372.577
80.584.387.891.695.799.2101.2103105
107.1108.9111
113.4115.8118.1120.5122.7124.9126.4127.8129
130.2130.9131.5132
132.4132.6132.7132.9133.3
Customer: British Gypsum Limited
BTC 12262F: Page 33 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Deflection (mm)Time(mins) Centrally On free end
41424344454647484950515253545556575859606162636465666768697071727374757677787980818283
180.2180.1180.2
----------------------------------------
133.6134
134.4134.7134.9135135
135.1134.9134.7134.4134.2134.1133.9133.6133.4133.2132.8132.7132.4132.2132
131.8131.7131.5131.4131.2131
130.8130.7130.5130.4130.2130
---------
Customer: British Gypsum Limited
BTC 12262F: Page 34 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Deflection (mm)Time(mins) Centrally On free end
84858687888990919293949596979899
100101102103104105106107108109110
---------------------------
---------------------------
The deflection was recorded at the approximate centre of the specimen and at mid-height onthe free edge.
Positive readings indicate deflection into the furnace.
Centre Deflection Transducer was not in contact with specimen after 43 minutes.
Free End Deflection Transducer was removed at 75 minutes.
Customer: British Gypsum Limited
BTC 12262F: Page 35 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
PHOTOGRAPHS
Photo 1. Exposed face prior to test.
Customer: British Gypsum Limited
BTC 12262F: Page 36 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Photo 2. Unexposed face prior to test.
Customer: British Gypsum Limited
BTC 12262F: Page 37 of 37
The Building Test CentreBritish Gypsum LimitedEast LeakeLoughboroughLeics. LE12 6NPTel (0115) 945 1564Fax (0115) 945 1562email [email protected]
0296
Photo 3. View of unexposed face at Integrity Failure on 107 minutes.